JUMLAH HARGA
NO. JENIS PEKERJAAN
(Rp.)
(1) (2) (3)
I. PEKERJAAN PENDAHULUAN #REF!
II. PEKERJAAN DINDING MULTIPLEKS LAPIS HPL #REF!
III. PEKERJAAN PLAFOND DAN INST. LISTRIK #REF!
IV. PEKERJAAN FINISHING #REF!
Terbilang : ###
I. PEKERJAAN PENDAHULUAN
1 Survey dan pengukuran - 1.00 ls 1,500,000.00 1,500,000.00
2 Bongkaran Panggung dan Plafond - 1.00 ls 5,000,000.00 5,000,000.00
3 Pembersihan Kembali Bekas Bongkaran - 1.00 ls 5,000,000.00 5,000,000.00
4 Alat Bantu Scaffolding - 1.00 ls 7,500,000.00 7,500,000.00
5 Peninggian Lantai
- Pek Urugan Tanah G.1 9.24 m3 146,768.75 1,356,143.25
- Pek Urugan Pasir Bawah Lantai G.2 3.23 m3 165,600.00 534,060.00
- Lantai Parquet C.4 #REF! m2 593,807.68 #REF!
2.13 13.47
BACK UP DATA QUANTITY
PEKERJAAN : REHABILITASI RUJAB WAKIL KETUA II DPRD
PENYEDIA JASA :
ITEM PEKERJAAN : Pekerjaan Teras
DIMENSI
LUAS VOLUME
No. SKETSA GAMBAR P L T Jumlah KETERANGAN
(m) (m) (m) ( Bh ) ( m2 ) 2
(m )
15.75
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN : REHABILITASI SEDANG/BERAT RUMAH JABATAN
PEKERJAAN : REHABILITASI RUJAB WAKIL KETUA II DPRD
TAHUN ANGGARAN : 2018
JUMLAH HARGA
NO. JENIS PEKERJAAN
(Rp.)
(1) (2) (3)
I. PEKERJAAN PENDAHULUAN 1,027,000.00
II. PEKERJAAN DAPUR 30,271,672.37
III. PEKERJAAN DRAINASE 1,900,953.77
IV. PEKERJAAN TERAS 16,412,977.79
V. PEK. PEMBONGKARAN DAN PEMASANGAN KEMBALI ATAP LAMA 51,880,427.67
VI. PEKERJAAN INSTALASI LISTRIK 11,251,176.25
VII. PEKERJAAN KAMAR MANDI 19,946,299.10
VIII. PEKERJAAN PLAFOND DAN INST. LISTRIK 19,714,651.26
IX. PEKERJAAN KAMAR 6,527,436.59
Terbilang : Empat Ratus Enam Belas Juta Dua Ratus Lima Puluh Ribu Rupiah
Parepare, 2018
A.1 Pemasangan 1 M2 Rangka Baja Ringan 36x76 mm, Modul 60 x 120 cm, Dinding Partisi
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.250 104,000.00 26,000.00
Tukang Besi L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 141,000.00 2,820.00
Mandor L.04 OH 0.020 165,000.00 3,300.00
A.4 Pemasangan 1 M2 Dinding Double Multipleks Lapis HPL 122 x 244 x 9 mm (DUA SISI)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.500 104,000.00 156,000.00
Tukang Kayu L.02 OH 4.000 124,000.00 496,000.00
Kepala Tukang L.03 OH 0.400 141,000.00 56,400.00
Mandor L.04 OH 0.400 165,000.00 66,000.00
D.1 1 M2 Pengecatan Tembok Baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.020 104,000.00 2,080.00
Tukang Cat L.02 OH 0.063 124,000.00 7,812.00
Kepala Tukang L.03 OH 0.0063 141,000.00 888.30
Mandor L.04 OH 0.003 165,000.00 495.00
F.1 Pemasangan 1 M2 Dinding Bata Merah (5 x 11 x 22) cm, tebal 1/2 batu Campuran 1 SP : 3 PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 104,000.00 31,200.00
Tukang Batu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 141,000.00 1,410.00
Mandor L.04 OH 0.015 165,000.00 2,475.00
H.1 Membuat 1 M3 Beton Mutu f'c = 16,9 Mpa (K.175), Slump (12 ± 2) cm, w/c = 0,61
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 104,000.00 171,600.00
Tukang Batu L.02 OH 0.275 124,000.00 34,100.00
Kepala Tukang L.03 OH 0.028 141,000.00 3,948.00
Mandor L.04 OH 0.083 165,000.00 13,695.00
Jumlah Harga Tenaga .............................................................. 223,343.00
B. BAHAN
Semen Portland Kg 352.000 1,175.00 413,600.00
Pasir beton Kg 731.000 82.14 60,046.43
Kerikil (maks 30 mm) Kg 1,031.000 138.89 143,194.44
Air Liter 215.000 150.00 32,250.00
H.1 Membuat 1 M3 Beton Mutu f'c = 16,9 Mpa (K.225), Slump (12 ± 2) cm, w/c = 0,61
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 104,000.00 171,600.00
Tukang Batu L.02 OH 0.275 124,000.00 34,100.00
Kepala Tukang L.03 OH 0.028 141,000.00 3,948.00
Mandor L.04 OH 0.083 165,000.00 13,695.00
Jumlah Harga Tenaga .............................................................. 223,343.00
B. BAHAN
Semen Portland Kg 371.000 1,175.00 435,925.00
Pasir beton Kg 698.000 82.14 57,335.71
Kerikil (maks 30 mm) Kg 1,047.000 138.89 145,416.67
Air Liter 215.000 150.00 32,250.00
G. BAHAN LISTRIK
### Kabel Listrik NYM 3x 2,5 mm m' 14,000.00 Eterna
### Kabel Listrik NYM 3x 1,5 mm m' 11,750.00
### Lampu RM 2 x 36 Watt (V-Shape) bh 540,000.00
### Down Light 1 X18 Watt, lengkap dengan kap bh 264,000.00
### PVC Konduit Ø20 mm m' 3,600.00
### Saklar Tunggal bh 17,000.00
7 Saklar Ganda bh 26,000.00
8 Lampu 25 Watt bh 25,000.00
9 Fitting bh 13,000.00
H. BAHAN PIPA DAN SANITER
### Pipa PVC Ø 3/4 " - 4 m m' 6,250.00 Type AW
### Pipa PVC Ø 3 " - 4 m m' 35,625.00 Type AW
### Clost Duduk bh 4,290,000.00 Otomatis
### Clost Jongkok bh 1,400,000.00
5 Urinoir bh 1,750,000.00
6 Westafel bh 2,235,000.00
7 Kran Air (Angsa) bh 225,000.00
8 Kran Air Panas bh 1,800,000.00
9 Shower + Accesories Set 1,900,000.00
10 Seal Tape bh 6,000.00
Parepare, 2018
Dibuat Oleh :
KONSULTAN PERENCANA
CV. HM BROTHER KONSULTAN
AMRAN, ST
DIREKTUR
2. DAFTAR UPAH TENAGA KERJA
HARGA SATUAN
NO. URAIAN TENAGA KERJA SATUAN (Rp.) KETERANGAN
1 Pekerja oh 104,000.00
2 Tukang Batu oh 124,000.00
3 Tukang Kayu oh 124,000.00
4 Tukang Besi oh 124,000.00
5 Tukang Cat oh 124,000.00
6 Tukang Listrik oh 124,000.00
7 Tukang Baja Ringan oh 124,000.00
8 Kepala Tukang Batu oh 141,000.00
9 Kepala Tukang Kayu oh 141,000.00
10 Kepala Tukang Besi oh 141,000.00
11 Kepala Tukang Cat oh 141,000.00
12 Kepala Tukang Listrik oh 141,000.00
13 Kepala Tukang Baja Ringan oh 141,000.00
14 Mandor oh 165,000.00
Parepare, 2018
Dibuat Oleh :
KONSULTAN PERENCANA
CV. HM BROTHER KONSULTAN
AMRAN, ST
DIREKTUR
MEMO DESAIN
KOMISI II
11.50 6.50 1.00 74.75 Luas Ruangan
1.50 1.50 1.00 2.25 Pengurangan W.C
72.50 Pek. Lantai Parquet
KOMISI III
11.00 6.50 1.00 71.50 Luas Ruangan
1.50 1.50 1.00 2.25 Pengurangan W.C
69.25 Pek. Lantai Parquet
11.00 3.20 2.00 70.40 Dinding Kiri/Kanan
6.50 3.20 2.00 41.60 Dinding Depan/Blkg
112.00
1.35 2.00 3.00 8.10 Pengurangan J.1
0.30 0.30 1.00 0.09 Pengurangan J.2
0.90 2.00 1.00 1.80 Pengurangan P.1
1.50 2.40 1.00 3.60 Pengurangan P.2
13.59
98.41 Pek. Dinding PVC
KOMISI II
10.95 6.40 1.00 70.08 Pek. Rangka Plafond
KOMISI III
10.95 6.40 1.00 70.08 Pek. Rangka Plafond
Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 201536
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUANMAKASSAR GOWA TAKALAR JENEPONTO
Berlian M² 51,000 52,000 53,000 54,000
15 Paving Blok Mutu (K 225) ###
Tebal 6 Cm M² 59,000 60,000 61,000 62,000
Tabal 8 Cm M² 62,000 63,000 64,000 65,000
16 Paving Blok Mutu ( K 300) ###
Tebal 6 Cm M² 60,000 61,000 62,000 63,000
Tebal 8 cm M² 65,000 66,000 67,000 68,000
17 Paving Blok Mutu (K 400) M² 75,000 76,000 77,000 78,000
18 Topiuskup (K 225) biji 4,200 4,700 5,200 5,700
19 Kanstin 20x25x50 biji 37,000 38,000 39,000 40,000
20 Buis Beton ###
d=20 cm Biji 215,000 225,000 235,000 245,000
d=30 cm Biji 256,000 266,000 276,000 286,000
d=40 cm Biji 326,500 336,500 346,500 356,500
d=50 cm Biji 386,000 396,000 406,000 416,000
d=60 cm Biji 442,000 452,000 462,000 472,000
###
BAHAN KAYU ###
1 Kayu Kelas I ###
Balok Gergaji Sawmil M³ 9,550,000 10,050,000 10,300,000 10,550,000
Papan Gergaji Sawmil M³ 10,050,000 10,550,000 10,550,000 11,171,000
Balok Gergaji Sansaw M³ 8,550,000 8,650,000 8,750,000 8,850,000
Papan Gergaji Sansaw M³ 8,650,000 8,850,000 8,800,000 8,850,000
2 Kayu Kelas II ###
Balok M³ 4,550,000 4,800,000 4,850,000 5,733,000
Papan M³ 4,850,000 4,650,000 4,700,000 5,733,000
3 Kayu Kelas III ###
Balok M³ 2,800,000 2,850,000 2,900,000 3,200,000
Papan M³ 3,275,000 3,425,000 3,475,000 3,625,000
###
BAHAN LANTAI ###
Tegel Keramik ###
Putih 10 X 20 cm Dos 45,000 45,500 46,000 46,500
Warna 10 X 20 cm Dos 47,000 47,500 48,000 48,500
Putih 20 X 20 cm Dos 60,000 60,500 61,000 61,500
Warna 20 X 20 cm Dos 65,000 65,500 66,000 66,500
Putih 20 X 25 cm Dos 60,000 60,500 61,000 61,500
Warna 20 X 25 cm Dos 65,000 65,500 66,000 66,500
Putih 30 X 30 cm Dos 50,000 50,500 51,000 51,500
Warna 30 X 30 cm Dos 60,000 60,500 61,000 61,500
Putih 40 X 40 cm Dos 55,000 55,500 56,000 56,500
Warna 40 X 40 cm Dos 65,000 65,500 66,000 66,500
Warna 50 x 50 cm Dos 135,000 135,500 136,000 136,500
Warna 60 x 60 cm Dos 175,000 175,500 176,000 176,500
###
BAHAN KACA ###
Kaca Bening 3 mm Mtr 100,000 100,500 105,000 105,500
Kaca Bening 5 mm Mtr 125,000 125,500 157,500 158,000
Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 201537
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUANMAKASSAR GOWA TAKALAR JENEPONTO
Kaca Buram 3 mm Mtr 100,000 100,500 157,500 158,000
Kaca Buram 5 mm Mtr 110,000 110,500 168,000 168,500
Kaca Ryben 3 mm Mtr 150,000 150,500 157,500 158,000
Kaca Ryben 5 mm Mtr 175,000 175,500 176,000 176,500
Rangka Nako Lengkap Terali 7 mata Set/daun 350,000 350,500 351,000 351,500
###
BAHAN BESI ###
1 Besi Beton ###
Ø 4 mm Btg 24,000 24,500 25,000 25,500
Ø 6 mm Btg 35,000 35,500 36,000 36,500
Ø 8 mm Btg 50,000 50,500 51,000 51,500
Ø 10 mm Btg 75,000 75,500 76,000 76,500
Ø 12 mm Btg 106,000 106,500 107,000 107,500
Ø 14 mm Btg 131,000 131,500 132,000 132,500
Ø 16 mm Btg 165,000 165,500 166,000 166,500
Ø 19 mm Btg 210,000 222,500 235,000 235,500
Ø 22 mm Btg 325,000 325,500 326,000 326,500
2 Besi Ulir ###
d = 13 mm Btg 110,000 110,500 111,000 111,500
d = 16 mm Btg 165,000 165,500 166,000 166,500
d = 19 mm Btg 227,000 227,500 228,000 228,500
3 Paku ###
Paku Biasa Kg 17,500 18,000 19,500 20,000
Paku Asbes Kg 45,000 45,500 46,000 46,500
Paku Seng (payung) RRT Dos 21,000 23,500 26,000 28,500
Paku skrup 3 ½ inci Dos 15,000 15,100 15,200 15,300
Paku Skrup 4 Inci Dos 15,000 15,100 15,600 15,700
Paku Payung Berulir 75 mm Kg 35,500 36,000 36,500 37,000
Paku Sirap Kg 20,000 20,500 21,000 21,500
Paku Beton Hitam Dos 43,500 44,000 44,500 45,000
Paku Beton Putih Dos 27,500 28,000 28,500 29,000
4 Kawat ###
Beton Kg 21,000 21,500 22,000 22,500
Nyamuk Mtr 30,000 30,500 31,000 31,500
Ayakan Kecil mtr 26,000 26,500 27,000 27,500
Duri roll 153,000 154,000 155,000 156,000
5 Besi Plat ###
2mm=120x240 mm Lbr 410,000 420,000 430,000 435,000
3 mm = 120 X 240 mm Lbr 520,000 530,000 540,000 545,000
Besi H 15 cm Panjang 12 m Btg 4,750,000 4,775,000 4,805,000 4,855,000
6 Besi Strep ###
30.3 mm Btg 34,000 34,500 35,000 35,500
35.4 mm Btg 55,000 55,500 56,000 56,500
46.4 mm Btg 105,000 105,500 106,000 106,500
40.6 mm Btg 75,000 75,500 76,000 76,500
50.6 mm Btg 130,000 130,500 131,000 131,500
7 Besi Siku ###
30.30.3 Btg 66,400 66,900 67,400 67,900
Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 201538
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUANMAKASSAR GOWA TAKALAR JENEPONTO
40.40.4 Btg 78,000 78,500 79,000 79,500
40.40.3 Btg 75,500 76,000 76,500 77,000
50.50.4 Btg 101,000 101,500 102,000 102,500
50.50.5 Btg 230,000 230,500 231,000 231,500
60.60.6 Btg 301,000 311,000 321,000 331,000
70.70.7 Btg 351,000 356,000 361,000 366,000
8 Besi 6 mm Mtr 20,000 20,500 21,000 21,500
9 Besi Tipe C (Rangka Baja Ringan) 6 m ###
Lebar 10, tebal, 1,8 -2,00 mm Btg 138,000 139,000 140,000 141,000
Lebar 12,5, tebal 1,8 -2,00 mm Btg 165,000 166,000 167,000 168,000
Lebar 15,Tebal 1,8 – 2,00 mm Btg 220,000 221,000 222,000 223,000
###
BAHAN PIPA ###
1 Pipa Besi GIP ###
ؽ Inci – 6 m Btg 128,500 129,500 130,500 184,000
Ø ¾ Inci – 6 m Btg 120,000 121,000 122,000 239,000
Ø 1Inci – 6 m Btg 252,500 253,500 254,500 329,000
Ø 2 Inci – 6 m Btg 550,000 555,000 565,000 653,874
Ø 2 ½ Inci – 6 m Btg 900,000 905,000 910,000 920,000
Ø 3 Inci – 6 m Btg 1,150,000 1,175,000 1,200,000 1,225,000
2 Pipa PVC Air Bersih ###
Ø ½ Inci – 6 m Btg 22,500 23,000 23,500 24,000
Ø ¾ Inci – 6 m Btg 32,000 32,500 33,000 33,500
Ø 1 Inci – 6 m Btg 44,000 44,500 45,000 45,500
Ø 1½ Inci – 6 m Btg 102,690 103,190 103,690 104,190
Ø 2 Inci – 6 m Btg 130,500 131,500 132,500 133,500
Ø 2 ½ Inci – 6 m Btg 186,800 187,800 188,800 189,800
Ø 3 Inci – 6 m Btg 135,400 136,400 137,400 138,400
Ø 4 Inci – 6 m Btg 400,000 405,000 410,000 420,000
Ø 6 Inci – 6 m Btg 855,700 864,700 884,700 904,700
Ø 8 Inci – 6 m Btg 1,405,000 1,445,000 1,495,000 1,545,000
Ø 10 Inci – 6 m Btg 2,232,250 2,248,250 2,298,250 2,348,250
3 Pipa untuk Saluran Pembuangan Air ###
Ø ½ Inci – 4 m Btg 22,500 23,000 23,500 24,000
Ø ¾ Inci – 4 m Btg 27,500 28,000 28,500 29,000
Ø 1 Inci – 4 m Btg 33,500 34,000 34,500 35,000
Ø 1 ½ Inci – 4 m Btg 96,500 97,000 97,500 98,000
Ø 2 Inci – 4 m Btg 152,500 153,000 153,500 154,000
Ø 2 ½ Inci – 4 m Btg 220,000 220,500 221,000 221,500
Ø 3 Inci – 4 m Btg 315,000 316,000 317,000 318,000
Ø 4 Inci – 4 m Btg 473,000 476,000 481,000 491,000
Ø 5 Inci – 4 m Btg 764,500 767,500 777,500 782,500
Ø 6 Inci – 4 m Btg 1,011,000 1,105,000 1,205,000 1,305,000
Ø 10 Inci – 4 m Btg 2,461,000 2,505,000 2,555,000 2,605,000
4 Pipa Untuk Instalasi Listrik ###
Ø 5/8 Inci – 4 m Btg 15,500 16,000 16,500 17,000
Ø ¾ Inci – 4 m Btg 25,500 26,000 26,500 27,000
Ø 1 Inci – 4 m Btg 32,500 33,000 33,500 34,000
Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 201539
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUANMAKASSAR GOWA TAKALAR JENEPONTO
Ø 1 ½ Inci – 4 m Btg 96,500 97,000 97,500 98,000
###
BAHAN LANGIT-LANGIT ###
1 Eternit 100 X 100 Set 18,500 19,000 19,500 20,000
2 Tripleks ###
122 X 244 x 0.2 cm Lbr 52,500 53,000 53,500 54,000
122 X 244 x 0.3 cm Lbr 70,000 70,500 71,000 71,500
122 X 244 x 0.6 cm Lbr 98,000 100,000 100,500 101,000
122 X 244 x 0.9 cm Lbr 130,000 130,500 131,000 131,500
3 Tripleks Melamin ###
122 X 244 x 0.3 cm Lbr 85,500 86,000 86,500 87,000
4 Accoustic 40 X 60 Lbr 55,500 56,000 56,500 57,000
5 Teakwood ###
80 X 244 x 0.3 cm Lbr 92,000 92,500 93,000 93,500
122 X 244 x 0.3 cm Lbr 96,500 97,000 97,500 98,000
Karsiboard Lbr 70,000 70,500 71,000 71,500
Gypsum Lbr 63,500 64,000 64,500 65,000
Les gipsum Lbr 29,500 30,000 30,500 31,000
6 Hard Board 122 X 244 cm Lbr 77,000 77,500 78,000 78,500
7 Asbes Plat Harfeks ###
200 X 100 X 0.3 cm Lbr 48,500 49,000 49,500 50,000
8 List Profil ###
2 x 3 cm / 4 m Btg 11,500 12,000 12,500 13,000
3 x 3 cm / 4 m Btg 15,500 16,000 16,500 17,000
4 x 4 cm / 4 m Btg 19,500 20,000 20,500 21,000
4 x 5 cm / 4 m Btg 25,500 26,000 26,500 27,000
###
BAHAN ATAP ###
1 Genteng ###
Beton Biji 33,500 34,000 34,500 35,000
Keramik Bh 16,000 16,500 17,000 17,500
Asbes gelombang 7 kaki Lbr 60,000 60,500 61,000 61,500
Harfles (115X85x0.5 cm) Lbr 63,000 63,500 64,000 64,500
2 Atap Metal lbr 87,000 87,500 88,000 88,500
3 Asbes Genteng Lbr 72,500 73,000 73,500 74,000
4 Sirap Ikat 305,000 310,000 315,000 320,000
5 Seng gelombang kecil ###
BJLS 0.20 mm Kaki 7,000 7,500 8,000 8,500
BJLS 0.22 mm Kaki 7,500 8,000 8,500 9,000
BJLS 0.30 mm Lbr 54,000 54,500 55,000 55,500
BJLS 0.35 mm Lbr 70,500 71,000 71,500 72,000
6 Atap Bitumen ###
Bitumen Gel.Acrylic Base(200x95x0,23 Lbr 173,800 174,300 174,800 175,300
cm)
Lisplank Acrylic Bace (104x34x023cm) Lbr 101,200 101,700 102,200 102,700
Nok Acrylic Base (50x104x0.23 Cm) Lbr 101,200 101,700 102,200 102,700
Sekrup Atap 6,5 cm Bh 1,200 1,200 1,300 1,400
Sekrup Nok 6,5 cm Bh 1,200 1,200 1,300 1,400
Talang Air Acrylic Bace Lbr 101,200 101,700 102,200 102,700
(104x50x0.23cm)
Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 201540
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUANMAKASSAR GOWA TAKALAR JENEPONTO
Sekrup Durafit (Ø 0.355cm - 6,5 cm) Bh 1,350 1,450 1,550 1,650
Bitumen Genteng (106x40x0,3 Cm) Lbr 70,000 70,500 71,000 71,500
Fiber Glass Gel. (transparan) Lbr 343,000 343,500 344,000 344,500
7 200x95x0.23cm
Seng Plat ###
BJLS 0.30 mm 40x180 Lbr 65,000 65,500 66,000 66,500
BJLS 0.35 mm Lbr 75,000 75,500 76,000 76,500
8 Seng Super Deck ###
180 X 70 cm – 10 kaki Kaki 13,000 13,500 14,000 14,500
9 Seng Aluminium Gelombang ###
SWG 32” 0.27 mm Kaki 9,500 10,000 10,500 11,000
SWG 30” 0.31 mm Kaki 12,000 12,500 13,000 13,500
SWG 28” 0.38 mm Kaki 13,000 13,500 14,000 14,500
10 Seng Plastik (Fiber) Kaki 13,500 14,000 14,500 15,000
11 Fiber Semen (Harflex) ###
Super 240 X 108 X 0.6 cm Lbr 79,000 79,500 80,000 80,500
Super 180 X 108 X 0.6 cm Lbr 65,000 65,500 66,000 66,500
Ekonomi 240 X 92 X 0.5 cm Lbr 69,500 70,000 70,500 71,000
Ekonomi 180 X 92 X 0.4 cm Lbr 63,000 63,500 64,000 64,500
Mini 240 X 105 X 0.4 cm Lbr 62,500 63,000 63,500 64,000
Mini 180 X 92 X 0.5 cm Lbr 71,000 71,500 72,000 72,500
Super 240 X 105 X 0.4 cm Lbr 66,500 67,000 67,500 68,000
Super 180 X 105 X 0.4 cm Lbr 69,000 69,500 70,000 70,500
12 Nok/Bubungan ###
Genteng Beton Bh 35,500 36,000 36,500 37,000
Genteng Asbes Bh 55,500 56,000 56,500 57,000
Genteng Keramik Bh 20,500 21,000 21,500 22,000
Alm. SWG 28” -180 cm Lbr 45,000 45,500 46,000 46,500
Alm. SWG 28” –105 cm Lbr 40,000 40,500 41,000 41,500
13 Nok Steel Gelombang ###
Super – 180 cm Bh 52,500 53,000 53,500 54,000
Mini – 105 cm Bh 41,500 42,000 42,500 43,000
Ekonomi – 95 cm Bh 19,000 19,500 20,000 20,500
14 Nok Steel Rata ###
Super – 108 cm Bh 30,000 30,500 31,000 31,500
Mini – 105 cm Bh 25,500 26,000 26,500 27,000
Ekonomi – 95 cm Bh 21,000 21,500 22,000 22,500
15 Nok ½ Lingkaran Bh 40,500 41,000 41,500 42,000
16 Karet Pelapis Genteng ###
Ukuran 55 mtr 9,500 10,000 10,500 11,000
Ukuran 90 Mtr 19,000 19,500 20,000 20,500
###
BAHAN PENGGANTUNG ###
1 Kunci Tanam ###
1 Slag Bh 173,000 173,500 174,000 174,500
Double Slag Bh 307,000 311,000 316,000 321,000
2 Penggantung ###
Hak Angin Kecil Bh 10,500 11,000 11,500 12,000
Hak Angin Besar Bh 15,500 16,000 16,500 17,000
Grendel Kecil Bh 13,500 14,000 14,500 15,000
Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 201541
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUANMAKASSAR GOWA TAKALAR JENEPONTO
Grendel Besar Bh 17,500 18,000 18,500 19,000
Engsel Pintu Bh 35,500 36,000 36,500 37,000
Engsel Jendela Bh 26,000 26,500 27,000 27,500
Expanyolet Bh 125,000 125,500 126,000 126,500
###
BAHAN SANITER ###
Kloset Jongkok Bh 230,000 235,000 258,000 245,000
Kloset Duduk Bh 2,000,000 2,005,000 2,080,260 2,015,000
Wasthafel warna Bh 475,000 480,000 485,000 490,000
Wasthafel cuci piring logam Bh 451,000 456,000 461,000 466,000
Pompa Mesin Bh 1,800,000 1,825,000 1,850,000 1,875,000
Urinoir lengkap Bh 1,500,000 1,525,000 1,550,000 1,555,000
Bak Mandi fiber Bh 755,000 760,000 765,000 770,000
Reservoir fiber = 1 m3 Bh 1,255,000 1,265,000 1,270,000 1,275,000
Reservoir Stainless stell = 1 m3 Bh 3,400,000 3,450,000 3,500,000 3,550,000
Stop Kran Bh 25,000 26,000 27,000 28,000
Kran Air Bh 20,000 20,500 21,000 21,500
###
BAHAN FINISHING/CAT ###
1 Cat Tembok ###
Cat Dasar 5 Kg 60,000 61,000 62,000 63,000
Cat Kilap 5 Kg 90,000 91,000 92,000 158,000
2 Cat Kayu ###
Cat Dasar Kg 20,000 20,500 21,000 21,500
Cat Kilap Ltr 61,000 61,500 62,000 62,500
Palatone Ltr 50,500 51,000 51,500 52,000
ICI Kg 75,500 76,000 76,500 77,000
Politur Kg 51,000 51,500 52,000 52,500
Meni 4 Kg 65,500 66,000 66,500 67,000
Minyak Cat Ltr 10,000 10,500 11,000 11,500
3 Cat Atap ###
Cat Dasar Kg 30,000 30,500 31,000 31,500
Cat Kilap Ltr 90,000 90,500 91,000 91,500
Lem Seng Ltr 13,000 13,500 14,000 14,500
Amplas/Kertas Gosok M 12,000 12,500 13,000 13,500
Dempul Kg 31,000 31,500 32,000 32,500
Residu 10 ltr 64,000 64,500 65,000 65,500
###
BAHAN INSTALASI LISTRIK ###
Kabel Listrik ###
1 Type NYA (Full) ###
1 ½ mm Roll 301,000 301,500 302,000 302,500
2 ½ mm Roll 386,000 391,000 396,000 401,000
2 Type NYY ###
2 X 1 ½ mm Roll 612,000 627,000 632,000 637,000
2 X 2 ½ mm Roll 762,000 772,000 777,000 782,000
2 X 4 mm Roll 652,000 657,000 662,000 667,000
3 Lampu TL ###
Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 201542
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUANMAKASSAR GOWA TAKALAR JENEPONTO
1 X 20 W Bh 94,000 94,500 95,000 95,500
2 X 20 W Bh 123,000 123,500 124,000 124,500
1 X 40 W Bh 117,000 117,500 118,000 118,500
2 X 40 W Bh 150,000 150,500 151,000 151,500
4 Lampu Pijar ###
25 W Bh 32,000 32,500 33,000 33,500
40 W Bh 56,000 56,500 57,000 57,500
60 W Bh 106,000 106,500 107,000 107,500
100 W Bh 188,000 188,500 189,000 189,500
Lampu Taman Mercury Bh 354,000 359,000 364,000 369,000
5 Saklar Phase ###
Tunggal Putih Bh 23,000 23,500 24,000 24,500
Tunggal Hitam Bh 18,000 18,500 19,000 19,500
Double Putih Bh 26,000 26,500 27,000 27,500
Double Hitam Bh 21,000 21,500 22,000 22,500
6 Stop Kontak ###
Hitam Bh 26,000 26,500 27,000 27,500
Putih Bh 28,000 28,500 29,000 29,500
7 Zekering Kast Lokal Biasa ###
Lokal 2 Group Automat Bh 83,000 83,500 84,000 84,500
Lokal 3 Group Biasa Bh 95,500 96,000 96,500 97,000
Fitting Bh 15,500 16,000 16,500 17,000
###
BAHAN JALAN ###
Aspal Kg 15,000 15,500 16,000 16,500
Minyak Tanah Ltr 10,000 10,500 11,000 11,500
Minyak Solar Ltr 4,500 5,000 5,500 6,000
Minyak Pelumas Ltr 28,000 28,500 29,000 29,500
###
UPAH KERJA ###
Pekerja Tidak Terampil Org/hr 65,000 65,000 65,000 65,000
Pekerja Terampil Org/hr 75,000 75,000 75,000 75,000
Pembantu Masinis Org/hr 80,000 80,000 80,000 80,000
Penjaga Gudang Org/hr 100,000 100,000 100,000 100,000
Penjaga Malam Org/hr 100,000 100,000 100,000 100,000
Tukang : ###
Tukang Kayu Org/hr 100,000 100,000 100,000 100,000
Tukang Batu Org/hr 100,000 100,000 100,000 100,000
Tukang Cat Org/hr 100,000 100,000 100,000 100,000
Tukang Listrik Org/hr 100,000 100,000 100,000 100,000
Tukang Pipa Org/hr 100,000 100,000 100,000 100,000
Tukang Besi Org/hr 100,000 100,000 100,000 100,000
Kepala Tukang ###
Kepala Tukang Kayu Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Batu Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Listrik Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Cat Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Pipa Org/hr 125,000 125,000 125,000 125,000
Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 201543
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUANMAKASSAR GOWA TAKALAR JENEPONTO
Kepala Tukang Besi Org/hr 125,000 125,000 125,000 125,000
Mandor Org/hr 150,000 150,000 150,000 150,000
Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 201544