NAMA KEGIATAN : PEMEIHARAAN RUTIN DAN BERKALA GEDUNG DINAS KESEHATAN PROV. JA
NAMA PEKERJAAN : PERENCANAAN PERBAIKAN PEMELIHARAAN RUANG LAKTASI DAN TPA
LOKASI PEKERJAAN: JL. A. YANI NO. 118 SURABAYA
TAHUN ANGGARAN: 2019
NO JENIS PEKERJAAN
TOTAL HARGA
Rp 48,028,640.39
Rp 5,028,216.98
Rp 2,124,548.14
Rp 600,306.03
Rp 2,606,384.00
Rp 4,465,624.10
Rp 157,852.80
Rp 624,791.20
Rp 63,636,363.64
Rp 6,363,636.36
Rp 70,000,000.00
RENCANA ANGGARAN BIAYA
NAMA KEGIATAN : PEMEIHARAAN RUTIN DAN BERKALA GEDUNG DINAS KESEHATAN PROV. JATIM
NAMA PEKERJAAN : PERENCANAAN PERBAIKAN PEMELIHARAAN RUANG LAKTASI DAN TPA
LOKASI PEKERJAAN: JL. A. YANI NO. 118 SURABAYA
TAHUN ANGGARAN: 2019
Rp 401,228.40 Rp 48,028,640.39
Rp 576,299.94 Rp 5,028,216.98
Rp 153,530.00 Rp 2,124,548.14
Rp 241,110.00 Rp 600,306.03
Rp 1,628,990.00 Rp 2,606,384.00
Rp 70,999.00 Rp 4,465,624.10
Rp 49,329.00 Rp 157,852.80
Rp 70,999.00 Rp 624,791.20
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pengecatan Kusen Kayu ( 1 plamir, 1 lapis cat dasar, 3 lapis ca
Nomer Analisa Pekerjaa : 24.04.02.05
Analisa : HSPK Perubahan 1 Tahun 2019 Surabaya
Satuan : M2
No. Uraian Kode Koef Satuan
A BAHAN
1 Cat kayu kg 0.17 Rp 50,100.00
2 Cat Meni Kayu kg 0.2 Rp 31,300.00
3 Clear Gloss kg 0.35 Rp 51,800.00
4 Plamir Tembok 5 kg kaleng 0.15 Rp 59,000.00
5 kus 4 Inci buah 0.01 Rp 34,700.00
I Jumlah ( bahan )
B TENAGA
1 Mandor O.H 0.00400 Rp 180,000.00
2 Tukang O.H 0.10500 Rp 165,000.00
3 Pembantu Tukang O.H 0.07000 Rp 155,000.00
II Jumlah ( tenaga )
Harga satuan pekerjaan ( I + II )
Jumlah
Rp 339,600.00
Rp 24,840.00
Rp 364,440.00
Rp 363.60
Rp 33,295.35
Rp 3,129.45
Rp 36,788.40
Rp 401,228.40
Jumlah
Rp 155,000.00
Rp 75,399.94
Rp 226,800.00
Rp 457,199.94
Rp 8,100.00
Rp 13,500.00
Rp 74,250.00
Rp 23,250.00
Rp 119,100.00
Rp 576,299.94
Jumlah
Rp 118,800.00
Rp 3,618.00
Rp 16,200.00
Rp 138,618.00
Rp 774.00
Rp 378.00
Rp 7,095.00
Rp 6,665.00
Rp 14,912.00
Rp 153,530.00
Jumlah
Rp 211,200.00
Rp 211,200.00
Rp 135.00
Rp 2,700.00
Rp 24,750.00
Rp 2,325.00
Rp 29,910.00
Rp 241,110.00
Jumlah
Rp 615,600.00
Rp 784,000.00
Rp 1,399,600.00
Rp 1,890.00
Rp 173,250.00
Rp 54,250.00
Rp 229,390.00
Rp 1,628,990.00
Pengecatan Kusen Kayu ( 1 plamir, 1 lapis cat dasar, 3 lapis cat penutup )
Jumlah
Rp 8,517.00
Rp 6,260.00
Rp 18,130.00
Rp 8,850.00
Rp 347.00
Rp 42,104.00
Rp 720.00
Rp 17,325.00
Rp 10,850.00
Rp 28,895.00
Rp 70,999.00
Rp 9,282.00
Rp 347.00
Rp 9,629.00
Rp 3,600.00
Rp 33,000.00
Rp 3,100.00
Rp 39,700.00
Rp 49,329.00
UPAH DAN BAHAN
NAMA KEGIATAN : PEMEIHARAAN RUTIN DAN BERKALA GEDUNG DINAS KESEHATA
NAMA PEKERJAAN : PERENCANAAN PERBAIKAN PEMELIHARAAN RUANG LAKTASI D
LOKASI PEKERJAAN : JL. A. YANI NO. 118 SURABAYA
TAHUN ANGGARAN : 2019
ITEM SATUAN
A Upah
1 Kepala Tukang / Mandor org/hr =
2 Tukang org/hr =
3 Pembantu Tukang org/hr =
B Bahan
1 Wall paper m2 =
2 Lem Wall Paper kg =
3 Gypsum Board 12 mm lembar =
4 Rangka Metal Stud kg =
5 Paku asbes sekrup 4 Inchi bh =
6 Alununium Putih uk. 4 x10 profil 4" m' =
7 Sealent tube =
8 Kaca Mati Rayban tebal 5 mm m2 =
9 Karpet Evamat m2 =
10 Lem Kayu kg =
11 Plat galvanis tebal 1.2 mm m2 =
12 Cat kayu kg =
13 Cat Meni Kayu kg =
14 Clear Gloss kg =
15 Plamir Tembok 5 kg kaleng =
16 kus 4 Inci buah =
17 Cat Besi buah =
UPAH DAN BAHAN
PEMEIHARAAN RUTIN DAN BERKALA GEDUNG DINAS KESEHATAN PROV. JATIM
PERENCANAAN PERBAIKAN PEMELIHARAAN RUANG LAKTASI DAN TPA
HARGA
Rp 180,000.00
Rp 165,000.00
Rp 155,000.00
Rp 283,000.00
Rp 124,200.00
Rp 155,000.00
Rp 4,896,100.00
Rp 8,100.00
Rp 108,000.00
Rp 60,300.00
Rp 192,000.00
Rp 105,000.00
Rp 12,000.00
Rp 980,000.00
Rp 50,100.00
Rp 31,300.00
Rp 51,800.00
Rp 59,000.00
Rp 34,700.00
Rp 54,600.00
PEKERJAAN PENDAHULUAN
Pemasangan Wall Paper
Dinding (Wall paper di batu bata)
Panjang = 4.43 m Panjang = 4.50 m
Tinggi = 1.95 m Tinggi = 1.95 m
Jumlah = 2.00 bh Jumlah = 1.00 bh
Luas 1 = 17.28 m2 Luas 2 = 8.78 m2
Kolom Dinding
Panjang = 0.75 m
Tinggi = 3.00 m
Jumlah = 4.00 bh
Luas 1 = 9.00 m2
Pintu
Mendatar Vertikal
Panjang = 1.00 m Panjang = 2.00 m
Jumlah = 1.00 bh Jumlah = 2.00 bh
Total jumlah = 1.00 m' Total jumlah = 4.00 m'
Panjang = 0.80 m
Tinggi = 2.00 m
Jumlah = 1.00 bh
Luas 1 = 1.60 m2
Luas Pemasangan Kaca Mati Rayban tebal 5 mm = 1.60 m2
Kusen Jendela
Panjang = 96.45 m Panjang = 18.00 m
Lebar = 0.26 m Lebar = 0.06 m
Jumlah = 1.00 bh Jumlah = 1.00 bh
Luas 1 = 25.08 m2 Luas 1 = 1.08 m2
Luas Kusen Jendela = 62.90 m2
Panjang = 0.80 m
Tinggi = 2.00 m
Jumlah = 2.00 bh
Luas 1 = 3.20 m2
Luas Pemasangan Kaca Mati Rayban tebal 5 mm = 3.20 m2
Pengecatan Daun Pintu Kayu
Panjang = 2.20 m
Tinggi = 1.00 m
Jumlah = 2.00 bh
Julah sisi = 2.00 sisi
Luas 1 = 8.80 m2
Luas Pemasangan Kaca Mati Rayban tebal 5 mm = 8.80 m2