TAH
NO URAIAN PEKERJAAN
A B
B C
Rp 6,200,754,293.5
Rp 2,945,550,844.9
N PLESTERAN Rp 2,945,550,844.9
Rp 639,497,441.87
Rp 746,400,392.65
Rp 746,400,392.65
Rp 752,165,110.69
OOF TANK Rp 61,087,507.06
Rp 467,126,519.8
Rp 95,986,907.20
Rp 123,713,204.20
Rp 123,713,204.20
Rp 123,713,204.20
Rp 190,778,370.0
Rp 986,354,391.5
Rp 242,450,881.05
Rp 241,360,494.33
Rp 241,360,494.33
Rp 242,200,914.33
Rp 18,981,607.50
Rp 352,101,331.5
Rp 87,495,596.66
Rp 87,779,051.36
Rp 87,779,051.36
Rp 86,922,316.64
OOF TANK Rp 2,125,315.50
Rp 306,568,400.0
Rp 44,485,400.00
Rp 87,361,000.00
Rp 87,361,000.00
Rp 87,361,000.00
Rp 51,563,935.7
JUMLAH PE
JUMLAH P
PAJAK PERTAMB
STANDARD
-
018
INDEKS KOEFISIEN
PERLANTAI
JUMLAH HASIL
AH HARGA
PENGALIAN
( PERMEN PU NO.45
TAHUN 2007 )
C D E
Rp 6,200,754,293.52 ###
Rp 2,945,550,844.92
Rp 2,945,550,844.92
Rp 467,126,519.80
Rp 190,778,370.00
Rp 986,354,391.53
Rp 900,710,500.00
Rp 352,101,331.52
Rp 306,568,400.00
Rp 51,563,935.76
NO URAIAN PEKERJAAN
a b
II. PEKERJAAN ARSITEKTUR
I LANTAI DASAR
4 Pasangan dinding bata ringan dengan Mortar siap pakai termasuk tangga & dind shaft
5 Pasangan dinding partisi Kalsiboard t = 8 mm rangka besi hollow
6 Plester + aci dinding bata ringan exterior/dind. Terluar
7 Plester + aci dinding bata ringan interior/dind. Bag dalam
8 Plester dinding trasram area kamar mandi unit dan umum
9 Kolom praktis & balok praktis 11/11 termasuk opening kusen aluminium
10 Perapihan kolom beton
11 Perapihan pelat beton bawah tangga + bordes + balustrade termasuk janggutan
12 Perapihan balok beton + balok tangga
13 Perapihan canopy jendela
Pas. besi Black Steel railling yang nempel di dinding pada tga tengah dan tga samping dia.2 1/2" finish
14
cat (terpasang) utk tangga service 2 unit
Pas. besi Black Steel railling yang nempel di dinding pada tga tengah dan tga samping dia.2 1/2" finish
15
cat (terpasang)utk tangga utama
16 Pas. Keramik 20x25 dinding toilet umum T=1.50 m, km/wc unit diffable dan janitor T=2.10 m
17 Pas. Plint Keramik 10x60 dinding corridor/selasar dan unit hunian
18 Pas. Border dinding Keramik 10x20 dinding km/wc unit diffable dan janitor
19 Area Selasar per 2 unit Hunian :
- Pasang Glass blok @ 1 unit = 16 buah
- Pasang Traliss Hollow 40.40.2 + cat (terpasang)
- Perapihan tempat duduk beton + cat
20 Pasang Stainless stell pada area toilet diffable
21 Railing bata t.90cm utk tangga service 2 unit
22 Railing bata t.90cm utk tangga utama
II LANTAI DUA
1 Pasangan dinding bata ringan t = 10 cm dgn Mortar siap pakai termasuk tangga & dind shaft
2 Pasangan dinding Partisi Kalsiboard t = 8 mm rangka besi hollow
3 Plester + aci dinding bata exterior/dind. Terluar
4 Plester + aci dinding bata interior/dind. Bag dalam
5 Plester dinding trasram
6 Kolom praktis & balok praktis 11/11 termasuk opening kusen aluminium
7 Perapihan kolom beton
8 Perapihan pelat beton bawah tangga + bordes + balustrade termasuk janggutan
9 Perapihan balok beton + balok tangga
10 Perapihan canopy jendela
Pas. besi Black Steel railling yang nempel di dinding pada tga tengah dan tga samping dia.2 1/2" finish
11
cat (terpasang) utk tangga service 2 unit
Pas. besi Black Steel railling yang nempel di dinding pada tga tengah dan tga samping dia.2 1/2" finish
12
cat (terpasang)utk tangga utama
13 Pas. Keramik 20x25 dinding km/wc dan janitor T=2.10 m
14 Pas. Plint Keramik 10x40 dinding corridor/selasar dan unit hunian
15 Pas. Border dinding Keramik 10x20 dinding km/wc dan janitor
16 Area Selasar per 2 unit Hunian :
- Pasang Glass blok @ 1 unit = 16 buah (GB5)
- Pasang Traliss Hollow 40.40.2 + cat (terpasang)
- Perapihan tempat duduk beton + cat
17 Railing bata t.90cm utk tangga service 2 unit
18 Railing bata t.90cm utk tangga utama
1 Pasangan dinding bata ringan t = 10 cm dgn Mortar siap pakai termasuk tangga & dind shaft
2 Pasangan dinding Partisi Kalsiboard t = 8 mm rangka besi hollow
3 Plester + aci dinding bata exterior/dind. Terluar
4 Plester + aci dinding bata interior/dind. Bag dalam
5 Plester dinding trasram
6 Kolom praktis & balok praktis 11/11 termasuk opening kusen aluminium
7 Perapihan kolom beton
8 Perapihan pelat beton bawah tangga + bordes + balustrade termasuk janggutan
9 Perapihan balok beton + balok tangga
10 Perapihan canopy jendela
Pas. besi Black Steel railling yang nempel di dinding pada tga tengah dan tga samping dia.2 1/2" finish
11
cat (terpasang)
Pas. besi Black Steel railling dengan kaki pada tga tengah dan tga samping dia. 2 1/2" finish cat
12
(terpasang)
13 Pas. Keramik 20x25 dinding km/wc dan janitor T=2.10 m
14 Pas. Plint Keramik 10x60 dinding corridor/selasar dan unit hunian
15 Pas. Border dinding Keramik 10x20 dinding km/wc dan janitor
16 Area Selasar per 2 unit Hunian :
- Pasang Glass blok @ 1 unit = 16 buah
- Pasang Traliss Hollow 40.40.2 + cat (terpasang)
- Perapihan tempat duduk beton + cat
17 Railing bata t.90cm utk tangga service 2 unit
18 Railing bata t.90cm utk tangga utama
IV LANTAI EMPAT
1 Pasangan dinding bata ringan t = 10 cm dgn Mortar siap pakai termasuk tangga & dind shaft
2 Pasangan dinding Partisi Kalsiboard t = 8 mm rangka besi hoollow
3 Plester + aci dinding bata exterior/dind. Terluar
4 Plester + aci dinding bata interior/dind. Bag dalam
5 Plester dinding trasram
6 Kolom praktis & balok praktis 11/11 termasuk opening kusen aluminium
7 Perapihan kolom beton
8 Perapihan pelat beton bawah tangga + bordes + balustrade termasuk janggutan
9 Perapihan balok beton + balok tangga
10 Perapihan canopy jendela
Pas. besi Black Steel railling yang nempel di dinding pada tga tengah dan tga samping dia.2 1/2" finish
11
cat (terpasang)
Pas. besi Black Steel railling dengan kaki pada tga tengah dan tga samping dia. 2 1/2" finish cat
12
(terpasang)
13 Pas. Keramik 20x25 dinding km/wc dan janitor T=2.10 m
14 Pas. Plint Keramik 10x60 dinding corridor/selasar dan unit hunian
15 Pas. Border dinding Keramik 10x20 dinding km/wc dan janitor
16 Area Selasar per 2 unit Hunian :
- Pasang Glass blok @ 1 unit = 16 buah
- Pasang Traliss Hollow 40.40.2 + cat (terpasang)
- Perapihan tempat duduk beton + cat
17 Railing bata t.90cm utk tangga service 2 unit
18 Railing bata t.90cm utk tangga utama
1 Pasangan dinding bata 1:5 termasuk sofi sofi dan dinding samping
2 Plester + aci dinding bata exterior/dind. Terluar
3 Plester dinding bata interior/dind. Dalam
4 Kolom praktis & balok praktis 11/11 atap
5 Perapihan canopy cantilever as A/0-0A, as D/0-0A, as 0/B-C dan as 0A/B-C
6 Pasang angin angin roster
7 Pas tangga "M" dari lt.5 menuju ke catwalk (lengkap terpasang + cat)
8 Pas tangga "M" dari cat walk menuju ke roof tank (lengkap terpasang + cat)
9 Pekerjaan cat walk (lihat detail drawing)
10 Kusen + Pintu Aluminium 60x60 cm
11 GRC t.9mm sisi kiri dan kanan atap paling atas
I LANTAI DASAR
1 Penutup plafond Flat Pull system gypsum T=9 mm + rangka metal furring uk 60x120 cm
Penutup plafond Flat Pull system Kalsiboard T=6 mm + rangka metal furring uk 60x120 cm : Kamar
2
mandi, janitor, entrance depan, balkon luar
3 List plafond gypsum 5/5
II LANTAI DUA
1 Penutup plafond Flat Pull system gypsum T=9 mm + rangka metal furring uk 60x120 cm
Penutup plafond Flat Pull system Kalsiboard T=6 mm + rangka metal furring uk 60x120 cm : Kamar
2
mandi, janitor, balkon luar
3 List plafond gypsum 5/5
IV LANTAI EMPAT
1 Penutup plafond Flat Pull system gypsum T=9 mm + rangka metal furring uk 60x120 cm
2 Penutup plafond Flat Pull system Kalsiboard T=6 mm + rangka metal furring uk 60x120 cm
3 List plafond gypsum 5/5
I LANTAI ATAP
I LANTAI DASAR
II LANTAI DUA
1 Pasang lantai keramik 20x20 ad. 5 cm (kasar) : kamar mandi unit, cuci, janitor, tempat sampah
2 Pasang keramik lantai termasuk selasar Homogenius Tile 60 x 60 Polished ex Granito
3 Pasang keramik tangga utama Homogenius Tile 60 x 60 Polished ex Granito
4 Pasang Step nozing tangga utama10 x 40 cm
5 Pasang keramik tangga service Homogenius Tile 60 x 60 Polished ex Granito
6 Pasang Step nozing tangga service10 x 40 cm
7 Waterproofing (bitumen) tahap 1 di atas lantai beton
Beton pengisi (K225) pada area dinding sekeliling km/wc T=22 cm, peninggian lantai km/wc T = 17 cm
8
dan lantai janitor T=17 cm
9 Waterproofing (liquid/cement base) tahap 2 di atas beton pengisi km/wc
10 Waterproofing (liquid/cement base) di daerah km/wc pada dinding T = 25 cm
11 Waterproofing (liquid/cement base) + screed di daerah canopy jendela
1 Pasang lantai keramik 20x20 ad. 5 cm (kasar) : kamar mandi unit, cuci, janitor, tempat sampah
2 Pasang keramik lantai termasuk selasar Homogenius Tile 60 x 60 Polished ex Granito
3 Pasang keramik tangga utama Homogenius Tile 60 x 60 Polished ex Granito
4 Pasang Step nozing tangga utama10 x 40 cm
5 Pasang keramik tangga service Homogenius Tile 60 x 60 Polished ex Granito
6 Pasang Step nozing tangga service10 x 40 cm
7 Waterproofing (bitumen) tahap 1 di atas lantai beton
Beton pengisi (K225) pada area dinding sekeliling km/wc T=22 cm, peninggian lantai km/wc T = 17 cm
8
dan lantai janitor T=17 cm
9 Waterproofing (liquid/cement base) tahap 2 di atas beton pengisi km/wc
10 Waterproofing (liquid/cement base) di daerah km/wc pada dinding T = 25 cm
11 Waterproofing (liquid/cement base) + screed di daerah canopy jendela
IV LANTAI EMPAT
1 Pasang lantai keramik 20x20 ad. 5 cm (kasar) : kamar mandi unit, cuci, janitor, tempat sampah
2 Pasang keramik lantai termasuk selasar Homogenius Tile 60 x 60 Polished ex Granito
3 Pasang keramik tangga utama Homogenius Tile 60 x 60 Polished ex Granito
4 Pasang Step nozing tangga utama10 x 40 cm
5 Pasang keramik tangga service Homogenius Tile 60 x 60 Polished ex Granito
6 Pasang Step nozing tangga service10 x 40 cm
5 Waterproofing (bitumen) tahap 1 di atas lantai beton
Beton pengisi (K225) pada area dinding sekeliling km/wc T=22 cm, peninggian lantai km/wc T = 17 cm
6
dan lantai janitor T=17 cm
7 Waterproofing (liquid/cement base) tahap 2 di atas beton pengisi km/wc
8 Waterproofing (liquid/cement base) di daerah km/wc pada dinding T = 25 cm
9 Waterproofing (liquid/cement base) + screed di daerah canopy jendela
Waterproofing (liquid/cement base) + screed di daerah canopy atap as A/0-15 dan as D/0-15 dan
3
canopy jendela samping kiri kanan
I LANTAI DASAR
II LANTAI DUA
1 Kusen Aluminium + Daun Pintu Plat Aluminium (lengkap terpasang) type PS
2 Kusen Alum. + Daun Pintu kaca + Jendela (lengkap terpasang) type PJ1
3 Kusen Aluminium + Daun Pintu Engineering wood t=4 mm (lengkap terpasang) type P1
4 Kusen Aluminium + Daun Pintu Double Teakwood (lengkap terpasang) type P2
5 Kusen Aluminium + Daun Pintu Double Teakwood Kaca (lengkap terpasang) type P3
6 Kusen PVC + Daun Pintu PVC klas 1/super (lengkap terpasang) type P4
7 Kusen PVC + Daun Pintu PVC klas 1/super (lengkap terpasang) type P5
8 Kusen Alum. + Daun jendela (lengkap terpasang) type J1A dan J1B
9 Kusen Alum. + Daun jendela (lengkap terpasang) type J3
10 Kusen Aluminium + Daun jendela bouvenligh (lengkap terpasang) type BV
11 Pasang Glass Block @ 1 unit = 16 buah glass block type GB2 (area bordes tangga service)
12 Pasang Glass Block @ 1 unit = 24 buah glass block type GB4 (area bordes tangga utama)
13 Pasang Tralis Balkon Utama + railling pipa BS dia. 2.5" + frame balok beton 11/11 + cat
14 Pintu lipat pvc type FD (lengkap terpasang)
15 Pas. Tralis hollow 40.20.2 Tempat Jemur + frame balok beton 11x11 + cat
IV LANTAI EMPAT
I LANTAI DASAR
II LANTAI DUA
IV LANTAI EMPAT
4 Cat canopy
5 Cat plafond
6 Cat list plafond
I LANTAI DASAR
II LANTAI DUA
IV LANTAI EMPAT
Pasangan dinding bata tangga entrance depan termasuk penambahan dinding pembungkus kolom
2
40x45
3 Plester + aci dinding bata exterior/dind. Terluar
4 Kolom praktis & balok praktis 11/11
5 Perapihan kolom + balok beton
6 Pasang lantai keramik 60x60 pada daerah entrance
7 Pas. Plint Keramik 10x60 cm
8 Pasang keramik tangga 60x60 cm
9 Pasang Step nozing 10 x 60 cm
10 Cat dinding bag. Luar (exterior)
11 Cat kolom + balok
RAMP
12 Pasangan rollag bata ramp
13 Pasang lantai keramik 60x60 unpolish
14 Pas. besi BS railling ramp penyandang cacat dia. 2", 3/4" dan 1" finish cat.
HARGA
VOLUME SAT KODE
SATUAN (Rp)
c d e f
SUB TOTAL
97.83 M2 335,500.00
166.38 M' 84,500.00
216.11 M2 310,400.00
664.75 M1 45,900.00
102.26 M1 39,400.00
216.11 M2 310,400.00
664.75 M1 45,900.00
102.26 M1 39,400.00
216.11 M2 310,400.00
664.75 M1 45,900.00
102.26 M1 39,400.00
60.24 M2 151,900.00
164.88 M2 93,700.00
164.88 M2 89,000.00
1.07 M3 75,900.00
85.56 M2 56,900.00
207.36 pcs 22,400.00
1.00 Unit 2,000,000.00
1.00 Unit 1,500,000.00
12.75 M' 35,000.00
2.00 Buah 1,500,000.00
28.52 M2 184,800.00
SUB TOTAL
60x120 cm : Kamar
28.33 M2 205,500.00
60x120 cm : Kamar
35.00 M2 205,500.00
SUB TOTAL
1,200.00 M2 127,900.00
63.50 M' 108,700.00
194.00 M' 156,680.00
SUB TOTAL
693.00 M2 311,500.00
11.65 M2 311,500.00
3.15 M2 69,100.00
18.95 M2 311,500.00
5.14 M2 69,100.00
i unit, cuci, janitor, toilet
35.00 M2 186,900.00
antai km/wc T = 17 cm
2.65 M3 1,320,700.00
5.58 M2 193,200.00
69.06 M2 77,500.00
115.62 M2
439.11 M2
empat sampah 31.30 M2 186,900.00
Granito 658.00 M2 311,500.00
10.99 M2 311,500.00
2.99 M2 69,100.00
17.88 M2 311,500.00
4.86 M2 69,100.00
42.95 M2 74,800.00
antai km/wc T = 17 cm
3.68 M3 1,320,700.00
31.30 M2 77,500.00
42.95 M2 193,200.00
28.48 M2 77,500.00
31.30 M2 77,500.00
42.95 M2 193,200.00
28.48 M2 77,500.00
20.48 M2 77,500.00
1.81 M2 107,000.00
an as D/0-15 dan
221.95 M2 77,500.00
SUB TOTAL
SUB TOTAL
303.32 M2 30,800.00
2,118.72 M2 25,600.00
65.70 M2 25,600.00
69.06 M2 30,800.00
490.55 M2 40,300.00
131.20 M1 2,560.00
238.00 M2 30,800.00
2,025.70 M2 25,600.00
17.87 M2 25,600.00
56.96 M2 30,800.00
644.65 M2 40,300.00
155.97 M1 2,560.00
238.00 M2 30,800.00
2,025.70 M2 25,600.00
17.87 M2 25,600.00
56.96 M2 30,800.00
644.65 M2 40,300.00
155.97 M1 2,560.00
238.00 M2 30,800.00
2,025.70 M2 25,600.00
56.96 M2 30,800.00
644.65 M2 40,300.00
155.97 M1 -
60.24 M2 30,800.00
8.76 M2 30,800.00
SUB TOTAL
SUB TOTAL
68.21 M2 335,500.00
embungkus kolom
8.24 M2 153,400.00
8.24 M2 93,700.00
0.28 M3 75,900.00
14.24 M2 78,900.00
23.40 M2 160,800.00
12.00 M1 58,600.00
24.96 M2 160,800.00
41.60 M' 58,600.00
4.16 M2 30,800.00
4.08 M2 -
3.96 M2 335,500.00
3.63 M2 282,500.00
6.80 M' 500,000.00
67.17 M2 77,500.00
67.17 M2 52,000.00
g = (c x f)
6,200,754,293.52
2,945,550,844.92
2,945,550,844.92
639,497,441.87
32,821,461.75
14,058,687.50
177,423,200.00
9,699,600.00
39,431,990.00
204,358,473.24
9,662,800.00
1,320,191.98
11,835,000.00
1,675,836.00
177,525.00
15,127,497.00
15,600,000.00
8,209,500.00
39,993,022.40
25,647,084.00
1,687,108.00
-
1,372,800.00
4,500,000.00
130,185.00
21,600,000.00
2,110,320.00
1,055,160.00
746,400,392.65
253,433,800.00
25,975,200.00
30,940,000.00
254,428,196.32
6,664,000.00
1,777,197.35
17,724,096.00
1,263,899.10
1,409,879.88
13,389,961.20
15,600,000.00
8,619,000.00
67,081,785.60
30,511,841.40
4,029,044.00
-
3,660,800.00
6,000,000.00
615,420.00
2,110,320.00
1,165,951.80
746,400,392.65
253,433,800.00
25,975,200.00
30,940,000.00
254,428,196.32
6,664,000.00
1,777,197.35
17,724,096.00
1,263,899.10
1,409,879.88
13,389,961.20
15,600,000.00
8,619,000.00
67,081,785.60
30,511,841.40
4,029,044.00
-
3,660,800.00
6,000,000.00
615,420.00
2,110,320.00
1,165,951.80
752,165,110.69
253,433,800.00
25,975,200.00
30,940,000.00
254,428,196.32
6,664,000.00
1,777,197.35
17,724,096.00
5,340,961.92
1,263,899.10
15,223,597.20
15,600,000.00
8,619,000.00
67,081,785.60
30,511,841.40
4,029,044.00
-
3,660,800.00
6,000,000.00
615,420.00
2,110,320.00
1,165,951.80
61,087,507.06
9,151,025.63
15,449,607.38
14,674,653.75
81,507.11
4,868,364.00
4,644,864.00
2,000,000.00
1,500,000.00
446,250.00
3,000,000.00
5,271,235.20
467,126,519.80
95,986,907.20
85,741,810.00
5,821,897.20
4,423,200.00
123,713,204.20
111,485,500.00
7,193,404.20
5,034,300.00
123,713,204.20
111,485,500.00
7,193,404.20
5,034,300.00
123,713,204.20
111,485,500.00
7,193,404.20
5,034,300.00
190,778,370.00
190,778,370.00
153,480,000.00
6,902,450.00
30,395,920.00
986,354,391.53
242,450,881.05
215,868,207.28
3,629,971.80
217,665.00
5,904,171.00
355,174.00
6,541,500.00
3,503,605.79
1,078,056.00
5,352,530.19
241,360,494.33
5,849,783.10
204,967,000.00
3,424,169.98
206,470.80
5,569,433.10
335,826.00
3,212,660.00
4,864,338.85
2,425,672.50
8,297,940.00
2,207,200.00
241,360,494.33
5,849,783.10
204,967,000.00
3,424,169.98
206,470.80
5,569,433.10
335,826.00
3,212,660.00
4,864,338.85
2,425,672.50
8,297,940.00
2,207,200.00
242,200,914.33
5,849,783.10
204,967,000.00
3,424,169.98
206,470.80
5,569,433.10
335,826.00
3,212,660.00
4,864,338.85
2,425,672.50
9,138,360.00
2,207,200.00
18,981,607.50
1,586,812.50
193,670.00
17,201,125.00
900,710,500.00
237,265,600.00
11,472,600.00
14,438,400.00
14,304,400.00
29,489,000.00
12,344,600.00
22,912,800.00
10,689,600.00
8,246,400.00
2,842,000.00
3,773,400.00
3,486,200.00
1,705,200.00
50,688,400.00
43,275,600.00
1,197,000.00
545,800.00
1,073,700.00
730,500.00
4,050,000.00
221,148,300.00
14,438,400.00
6,189,600.00
60,654,400.00
27,748,800.00
21,990,400.00
10,231,200.00
1,136,800.00
57,929,600.00
2,999,800.00
3,192,000.00
2,006,800.00
730,500.00
1,100,000.00
-
10,800,000.00
221,148,300.00
14,438,400.00
6,189,600.00
60,654,400.00
27,748,800.00
21,990,400.00
10,231,200.00
1,136,800.00
57,929,600.00
2,999,800.00
3,192,000.00
2,006,800.00
730,500.00
1,100,000.00
-
10,800,000.00
221,148,300.00
14,438,400.00
6,189,600.00
60,654,400.00
27,748,800.00
21,990,400.00
10,231,200.00
1,136,800.00
57,929,600.00
2,999,800.00
3,192,000.00
2,006,800.00
730,500.00
1,100,000.00
-
10,800,000.00
352,101,331.52
352,101,331.52
87,495,596.66
9,342,348.40
54,239,178.44
1,681,817.60
2,127,199.09
19,769,181.12
335,872.00
87,779,051.36
7,330,400.00
51,857,976.32
457,451.52
1,754,368.00
25,979,572.32
399,283.20
87,779,051.36
7,330,400.00
51,857,976.32
457,451.52
1,754,368.00
25,979,572.32
399,283.20
86,922,316.64
7,330,400.00
51,857,976.32
1,754,368.00
25,979,572.32
-
2,125,315.50
1,855,507.50
269,808.00
306,568,400.00
44,485,400.00
13,044,000.00
1,628,400.00
5,203,000.00
2,460,000.00
1,260,000.00
4,026,400.00
2,463,600.00
14,400,000.00
87,361,000.00
34,784,000.00
4,257,000.00
6,560,000.00
3,360,000.00
38,400,000.00
87,361,000.00
34,784,000.00
4,257,000.00
6,560,000.00
3,360,000.00
38,400,000.00
87,361,000.00
34,784,000.00
4,257,000.00
6,560,000.00
3,360,000.00
38,400,000.00
51,563,935.76
37,111,365.76
22,885,713.13
1,264,016.00
772,088.00
21,031.13
1,123,141.50
3,762,720.00
703,200.00
4,013,568.00
2,437,760.00
128,128.00
-
5,754,055.00
1,328,580.00
1,025,475.00
3,400,000.00
8,698,515.00
5,205,675.00
3,492,840.00
6,200,754,293.52
PEKERJAAN ARSITEK
No URAIAN PEKERJAAN AS pjg lbr Tinggi Jumlah LUBANG PINTU LUBANG JENDELA
TYPE UKURAN JML TYPE UKURAN
0.12 0.00
LANTAI 1
1 Tempat Sampah A-B'/0-1 3.00 5.50 3.28 1.52 2.05 2.00
3.00 5.50 3.28 P5 0.89 2.50 1.00
2 Unit Difable A-B'/1-2' 6.00 5.00 3.28 P1' 1.00 2.50 1.00 J1B 1.35
6.00 5.00 3.28 J4 1.00
0.95 3.28 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.28 P2' 1.00 2.50 1.00 J1A 1.35
3.00 3.00 3.28 1.00
1.13 3.28
km/wc 1.48 1.58 3.28 P4' 0.98 2.05 1.00
1.48 1.58 3.28 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.28
FD 2.10 2.20 1.00
3 Unit Difable A-B'/2'-4 6.00 5.00 3.28 P1' 1.00 2.50 1.00 J1B 1.35
6.00 5.00 3.28 J4 1.00
0.95 3.28 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.28 P2' 1.00 2.50 1.00 J1A 1.35
3.00 3.00 3.28 1.00
1.13 3.28
km/wc 1.48 1.58 3.28 P4' 0.98 2.05 1.00
1.48 1.58 3.28 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.28
FD 2.10 2.20 1.00
4 R. Serbaguna A-B'/4-7 12.00 5.00 3.28 J2 1.72
12.00 5.00 3.28 PD 3.49 1.64 1.00 J2 1.72
0.72 0.40 3.28 2.00 PS 0.59 1.25 2.00
5 Selasar A-B'/7-8 4.00 5.00 3.28
B'/2-3 1.35 3.28 GB5 1.18
B"/2-3 1.35 3.28 GB5 1.18
B'/12-13 1.35 3.28 GB5 1.18
B"/2-3 1.35 3.28 GB5 1.18
B'/0-7 28.50 1.60 3.28
B'/8-0A 28.50 1.60 3.28
C/0-7 28.50 3.28
C/8-0A 28.50 3.28
6 Mini Market A-B'/8-11 12.75 5.00 3.28 J2 1.72
12.75 5.00 3.28 PD 3.49 1.64 1.00 J2 1.72
0.72 0.40 3.28 2.00 PS 0.59 1.25 2.00
7 Unit Difable A-B'/11-12' 6.00 5.00 3.28 P1' 1.00 2.50 1.00 J1B 1.35
6.00 5.00 3.28 J4 1.00
0.95 3.28 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.28 P2' 1.00 2.50 1.00 J1A 1.35
3.00 3.00 3.28 1.00
1.13 3.28
km/wc 1.48 1.58 3.28 P4' 0.98 2.05 1.00
1.48 1.58 3.28 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.28
FD 2.10 2.20 1.00
8 Unit Difable A-B'/11-12' 6.00 5.00 3.28 P1' 1.00 2.50 1.00 J1B 1.35
6.00 5.00 3.28 J4 1.00
0.95 3.28 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.28 P2' 1.00 2.50 1.00 J1A 1.35
3.00 3.00 3.28 1.00
1.13 3.28
km/wc 1.48 1.58 3.28 P4' 0.98 2.05 1.00
1.48 1.58 3.28 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.28
FD 2.10 2.20 1.00
9 Tempat Sampah A-A'/14-0A 3.00 3.10 3.28 PB 1.52 2.05 2.00
3.00 3.10 3.28 P5 0.89 2.50 1.00
2.60 3.28
10 R.Panel A-A'/14-0A 2.10 2.50 3.28 P5 0.89 2.50 1.00
2.10 2.50 3.28
11 Tangga service B'-C'/0-1 3.00 6.20 3.28 PD1 1.80 2.09 1.00
3.00 3.88 3.28
12 Janitor B'-D/0-1 3.00 1.45 3.28 P4 0.70 2.05 1.00 GB1 0.86
B'-D/0-1 3.00 1.45 3.28
13 Unit Difable B'-D/1-2' 6.00 5.00 3.28 P1' 1.00 2.50 1.00 J1B 1.35
6.00 5.00 3.28 J4 1.00
0.95 3.28 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.28 P2' 1.00 2.50 1.00 J1A 1.35
3.00 3.00 3.28 1.00
1.13 3.28
km/wc 1.48 1.58 3.28 P4' 0.98 2.05 1.00
1.48 1.58 3.28 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.28
FD 2.10 2.20 1.00
14 Unit Difable B'-D/2'-4 6.00 5.00 3.28 P1' 1.00 2.50 1.00 J1B 1.35
6.00 5.00 3.28 J4 1.00
0.95 3.28 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.28 P2' 1.00 2.50 1.00 J1A 1.35
3.00 3.00 3.28 1.00
1.13 3.28
km/wc 1.48 1.58 3.28 P4' 0.98 2.05 1.00
1.48 1.58 3.28 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.28
FD 2.10 2.20 1.00
15 Kantor RT/RW B'-D/4-5 4.00 5.00 3.28 PD 3.49 1.64 1.00 J1B 1.35
4.00 5.00 3.28 J1A 1.35
0.72 0.40 3.28 1.00 PS 0.59 1.25 1.00
16 R. Duka B'-D/5-7 8.50 5.70 3.28 PD 3.49 1.64 1.00 J1B 1.35
8.50 5.70 3.28 J1A 1.35
8.50 5.70 3.28 J2 1.72
0.72 0.40 3.28 1.00 PS 0.59 1.25 1.00
17 Gudang B'-D/7-8 4.00 2.13 3.28 P6 0.80 2.05 1.00
4.00 2.13 3.28 GB4 2.58
18 Tangga utama B'-D/7-8 4.00 3.70 3.28
19 R. Pengelola B'-D/8-9 4.00 5.00 3.28 PJ2 0.80 2.50 1.00 J1B 1.35
4.00 5.00 3.28 PJ2 2.01 1.70 J1A 1.35
0.72 0.40 3.28 1.00 PS 0.59 1.25 1.00
20 Kios B'-D/9-10 4.00 5.00 3.28 PJ2 0.80 2.50 1.00 J1B 1.35
4.00 5.00 3.28 PJ2 2.01 1.70 J1A 1.35
21 Kios B'-D/10-11 4.00 5.00 3.28 PJ2 0.80 2.50 1.00 J1B 1.35
4.00 5.00 3.28 PJ2 2.01 1.70 J1A 1.35
0.72 0.40 3.28 1.00 PS 0.59 1.25 1.00
22 Mushola B'-D/11-13 8.50 5.70 3.28 PJ2 0.80 2.50 2.00 J1B 1.35
8.50 5.70 3.28 PJ2 2.01 1.70 J1A 1.35
0.72 0.40 3.28 1.00 PS 0.59 1.25 1.00
23 Toilet Umum B'-D/13-14 4.00 5.00 3.28 P6 0.80 2.05 2.00
4.00 5.00 3.28 GB3 2.56
Toilet wanita 2.50 2.85 3.28 P4 0.70 2.05 2.00
1.07 1.50 3.28
1.07 1.50 3.28
Toilet pria 1.80 2.85 3.28 P4 0.70 2.05 1.00
1.07 1.50 3.28
1.07 1.50 3.28
0.72 0.40 3.28 1.00 PS 0.59 1.25 1.00
24 Tangga service B'-C'/14-0A 3.00 6.00 3.28 PD1 1.80 2.09 1.00
3.00 3.88 3.28
25 Janitor B'-D/14-0A 3.00 1.45 3.28 P4 0.70 2.05 1.00 GB1 0.86
3.00 1.45 3.28
26 Entrance A0-A/7-8 4.00 2.31 3.28 2.00
Kolom K1
Kolom K2
Pelat bwh tangga
Bordes
Balustrade
TOTAL
PEKERJAAN ARSITEK
No URAIAN PEKERJAAN AS pjg lbr Tinggi Jumlah LUBANG PINTU LUBANG JENDELA
TYPE UKURAN JML TYPE UKURAN
0.12 0.00
LANTAI 2
1 Sampah A-A'/0-1 3.00 2.00 3.08 P4 1.52 2.05 1.00
3.00 2.00 3.08 PS1 0.50 0.50 1.00
2 Janitor A'-B/0-1 1.70 1.75 3.08 P4 1.52 2.05 1.00
1.70 1.45 3.08 PS1 0.50 0.50 1.00
3 UNIT - 4 A-B'/1-2' 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
4 UNIT - 3 A-B'/2'-4 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
5 UNIT - 2 A-B'/2'-4 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
6 UNIT - 1 A-B'/2'-4 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
7 Balkon A-A'/7-8 4.00 1.80 3.08 PJ1 1.50 2.55 1.00
PJ1 0.98 1.75
8 UNIT - 12 A-B'/8-9' 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
9 UNIT - 11 A-B'/9'-11 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
10 UNIT - 10 A-B'/11-12' 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
11 UNIT - 9 A-B'/12'-14 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
12 Sampah A-A'/14-0A 3.00 2.00 3.08 P4 1.52 2.05 1.00
3.00 2.00 3.08 PS1 0.50 0.50 1.00
12 Janitor A'-B/14-0A 1.70 1.75 3.08 P4 1.52 2.05 1.00
1.70 1.75 3.08 PS1 0.50 0.50 1.00
12 R.Panel A'-B/14-0A 2.10 1.76 3.08 P4 1.52 2.05 1.00
2.10 1.76 3.08 PS1 0.50 0.50 1.00
13 Tangga service B'-C'/0-1 3.00 6.20 3.08 GB2 1.72
3.00 3.88 3.08
14 UNIT - 8 B'-D/1-2' 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
15 UNIT - 7 B'-D/2'-4 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
16 UNIT - 6 B'-D/4-5' 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
17 UNIT - 5 B'-D/5'-7 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
18 Tangga utama B'-D/7-8 4.00 3.70 3.08 GB4 2.40
3.08
19 UNIT - 16 B'-D/8-9' 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
20 UNIT - 15 B'-D/9'-11 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
21 UNIT - 14 B'-D/11-12' 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
22 UNIT - 13 B'-D/12'-14 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
23 Tangga service B'-C'/14-0A 3.00 6.00 3.08 GB2 1.72
3.00 3.88 3.08
24 Selasar B-C/0 3.00 4.65 3.08 J3 1.80
B'/2-3 1.35 3.08 GB5 1.18
B'/5-6 1.35 3.08 GB5 1.18
B'/9-10 1.35 3.08 GB5 1.18
B'/12-13 1.35 3.08 GB5 1.18
B"/2-3 1.35 3.08 GB5 1.18
B"/5-6 1.35 3.08 GB5 1.18
B"/9-10 1.35 3.08 GB5 1.18
B"/12-13 1.35 3.08 GB5 1.18
B'/0-7 28.50 2.30 3.08
B'/7-8 4.25 3.62 3.08
B'/8-0A 28.50 2.30 3.08
C/0-7 28.50 2.85 3.08
C/7-8 1.10 1.10 3.08
C/8-0A 28.50 2.85 3.08
B-C/0A 4.65 3.08 J3 1.80
Kolom K3
Pelat bwh tangga
Bordes
Balustrade
Balok
TOTAL
PEKERJAAN ARSITEK
No URAIAN PEKERJAAN AS pjg lbr Tinggi Jumlah LUBANG PINTU LUBANG JENDELA
TYPE UKURAN JML TYPE UKURAN
pjg tinggi pjg
0.12 0.00
LANTAI 3
1 Sampah A-A'/0-1 3.00 2.00 3.08 P4 1.52 2.05 1.00
3.00 2.00 3.08 PS1 0.50 0.50 1.00
2 Janitor A'-B/0-1 1.70 1.75 3.08 P4 1.52 2.05 1.00
1.70 1.45 3.08 PS1 0.50 0.50 1.00
3 UNIT - 4 A-B'/1-2' 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
4 UNIT - 3 A-B'/2'-4 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
5 UNIT - 2 A-B'/2'-4 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
6 UNIT - 1 A-B'/2'-4 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
7 Balkon A-A'/7-8 4.25 1.90 3.08 PJ1 1.50 2.55 1.00
PJ1 0.98 1.75
8 UNIT - 12 A-B'/8-9' 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
9 UNIT - 11 A-B'/9'-11 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
10 UNIT - 10 A-B'/11-12' 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
11 UNIT - 9 A-B'/12'-14 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
12 Sampah A-A'/14-0A 3.00 2.00 3.08 P4 1.52 2.05 1.00
3.00 2.00 3.08 PS1 0.50 0.50 1.00
12 Janitor A'-B/14-0A 1.70 1.75 3.08 P4 1.52 2.05 1.00
1.70 1.75 3.08 PS1 0.50 0.50 1.00
12 R.Panel A'-B/14-0A 2.10 1.76 3.08 P4 1.52 2.05 1.00
2.10 1.76 3.08 PS1 0.50 0.50 1.00
13 Tangga B'-C'/0-1 3.00 4.75 3.08 GB2 1.72
3.00 3.88 3.08
14 UNIT - 8 B'-D/1-2' 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
15 UNIT - 7 B'-D/2'-4 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
16 UNIT - 6 B'-D/4-5' 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
17 UNIT - 5 B'-D/5'-7 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
18 Tangga B'-D/7-8 4.25 5.70 3.08 GB4 2.40
4.25 3.70 3.08
19 UNIT - 16 B'-D/8-9' 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
20 UNIT - 15 B'-D/9'-11 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
21 UNIT - 14 B'-D/11-12' 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
22 UNIT - 13 B'-D/12'-14 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
23 Tangga B'-C'/14-0A 3.00 4.75 3.08 GB2 1.72
3.00 4.75 3.08
24 Selasar B-C/0 3.00 4.65 3.08 J3 1.80
B'/2-3 1.35 3.08 GB5 1.18
B'/5-6 1.35 3.08 GB5 1.18
B'/9-10 1.35 3.08 GB5 1.18
B'/12-13 1.35 3.08 GB5 1.18
B"/2-3 1.35 3.08 GB5 1.18
B"/5-6 1.35 3.08 GB5 1.18
B"/9-10 1.35 3.08 GB5 1.18
B"/12-13 1.35 3.08 GB5 1.18
B'/0-7 28.50 2.30 3.08
B'/7-8 4.25 3.62 3.08
B'/8-0A 28.50 2.30 3.08
C/0-7 28.50 2.85 3.08
C/7-8 1.10 1.10 3.08
C/8-0A 28.50 2.85 3.08
B-C/0A 4.65 3.08 J3 1.80
Kolom K3
Pelat bwh tangga
Bordes
Balustrade
Balok
TOTAL
PEKERJAAN ARSITEK
No URAIAN PEKERJAAN AS pjg lbr Tinggi Jumlah LUBANG PINTU LUBANG JENDELA
TYPE UKURAN JML TYPE UKURAN
0.12 0.00
LANTAI 4
1 Sampah A-A'/0-1 3.00 2.00 3.08 P4 1.52 2.05 1.00
3.00 2.00 3.08 PS1 0.50 0.50 1.00
2 Janitor A'-B/0-1 1.70 1.75 3.08 P4 1.52 2.05 1.00
1.70 1.45 3.08 PS1 0.50 0.50 1.00
3 UNIT - 4 A-B'/1-2' 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
4 UNIT - 3 A-B'/2'-4 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
5 UNIT - 2 A-B'/2'-4 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
6 UNIT - 1 A-B'/2'-4 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
7 Balkon A-A'/7-8 4.25 1.90 3.08 PJ1 1.50 2.55 1.00
PJ1 0.98 1.75
8 UNIT - 12 A-B'/8-9' 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
9 UNIT - 11 A-B'/9'-11 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
10 UNIT - 10 A-B'/11-12' 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
11 UNIT - 9 A-B'/12'-14 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
12 Sampah A-A'/14-0A 3.00 2.00 3.08 P4 1.52 2.05 1.00
3.00 2.00 3.08 PS1 0.50 0.50 1.00
12 Janitor A'-B/14-0A 1.70 1.75 3.08 P4 1.52 2.05 1.00
1.70 1.75 3.08 PS1 0.50 0.50 1.00
12 R.Panel A'-B/14-0A 2.10 1.76 3.08 P4 1.52 2.05 1.00
2.10 1.76 3.08 PS1 0.50 0.50 1.00
13 Tangga B'-C'/0-1 3.00 4.75 3.08 GB2 1.72
3.00 3.88 3.08
14 UNIT - 8 B'-D/1-2' 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
15 UNIT - 7 B'-D/2'-4 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
16 UNIT - 6 B'-D/4-5' 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
17 UNIT - 5 B'-D/5'-7 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
18 Tangga B'-D/7-8 4.25 5.70 3.08 GB4 2.40
4.25 3.70 3.08
19 UNIT - 16 B'-D/8-9' 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
20 UNIT - 15 B'-D/9'-11 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
21 UNIT - 14 B'-D/11-12' 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
22 UNIT - 13 B'-D/12'-14 6.38 5.70 3.08 P1 0.80 2.50 1.00 J1B 1.35
6.38 5.70 3.08 J4 1.00
0.95 3.08 P3 0.80 2.05 1.00
kamar 3.00 3.00 3.08 P2 0.80 2.50 1.00 J1A 1.35
3.00 3.00 3.08 1.00
1.13 3.08
km/wc 1.48 1.58 3.08 P4 1.52 2.05 1.00
1.48 1.58 3.08 PS 0.59 1.25 1.00 BV 0.51
0.80 0.75 3.08
3.08 FD 2.10 2.20 1.00
23 Tangga B'-C'/14-0A 3.00 4.75 3.08 GB2 1.72
3.00 4.75 3.08
24 Selasar B-C/0 3.00 4.65 3.08 J3 1.80
B'/2-3 1.35 3.08 GB5 1.18
B'/5-6 1.35 3.08 GB5 1.18
B'/9-10 1.35 3.08 GB5 1.18
B'/12-13 1.35 3.08 GB5 1.18
B"/2-3 1.35 3.08 GB5 1.18
B"/5-6 1.35 3.08 GB5 1.18
B"/9-10 1.35 3.08 GB5 1.18
B"/12-13 1.35 3.08 GB5 1.18
B'/0-7 28.50 2.30 3.08
B'/7-8 4.25 3.62 3.08
B'/8-0A 28.50 2.30 3.08
C/0-7 28.50 2.85 3.08
C/7-8 1.10 1.10 3.08
C/8-0A 28.50 2.85 3.08
B-C/0A 4.65 3.08 J3 1.80
Kolom K3
Pelat bwh tangga
Bordes
Balustrade
Balok
TOTAL
PEKERJAAN ARSITEK
LANTAI ATAP
1 A-D/0-0A 60.00 12.75 3.20 0.04 5.00 0.19 0.88 523.80 0.00
A/0'-0 1.05 5.60
A/0A 1.05 76.80
D/0'-0 1.05 8.76
D/0A 1.05
15.00 8.00
60.00 8.00
12.10
4.55 4.50
76.00
PEKERJAAN ARSITEK
No URAIAN PEKERJAAN AS pjg lbr Tinggi Jumlah LUBANG PINTU LUBANG JENDELA
TYPE UKURAN JML TYPE UKURAN
0.12 0.00
LANTAI 1
1 Entrance 7.80 4.30
7.80 3.00
TOTAL
LUBANG JENDELA CLOSET KRAN SHOWER JET FLOOR URINOIR WASTAF MEJA PRAKTIS
UKURAN JML DUDUK JONGKOK WASHER DRAIN EL PANTRY KOLOM
tinggi vol
m' bh bh bh bh bh bh bh bh bh bh m3
0.04
1.70 1.00
1.70 1.00
2.53 1.00
2.53 1.00
2.53 1.00
2.53 1.00
1.70 1.00
0.04
0.04
0.04
1.70 1.00
1.70 1.00
0.04
1.86 1.00
0.04
1.70 1.00 0.04
1.70 1.00
1.00 0.04
3.36 1.00
2.00 5.00 3.00 1.00
0.04
1.00
LUBANG JENDELA CLOSET KRAN SHOWER JET FLOOR URINOIR WASTAF MEJA PRAKTIS
UKURAN JML DUDUK JONGKOK WASHER DRAIN EL PANTRY KOLOM
tinggi vol
m' bh bh bh bh bh bh bh bh bh bh m3
1.70 1.00
1.70 1.00
1.70 1.00
1.70 1.00
0.04
1.70 1.00
1.70 1.00
1.70 1.00
1.70 1.00
0.04
0.04
1.70 1.00
1.70 1.00
1.70 1.00
1.70 1.00
1.70 1.00
1.70 1.00
1.70 1.00
1.64 1.00
2.53 1.00
2.53 1.00
2.53 1.00
2.53 1.00
2.53 1.00
2.53 1.00
2.53 1.00
2.53 1.00
1.64 1.00
LUBANG JENDELA CLOSET KRAN SHOWER JET FLOOR URINOIR WASTAF MEJA PRAKTIS
UKURAN JML DUDUK JONGKOK WASHER DRAIN EL PANTRY KOLOM
KRAN SHOWER JET FLOOR URINOIR WASTAF MEJA
WASHER DRAIN EL PANTRY
tinggi vol
m' bh bh bh bh bh bh bh bh bh bh m3
0.04
1.70 1.00
1.70 1.00
1.70 1.00
1.70 1.00
0.04
1.70 1.00
1.70 1.00
1.70 1.00
1.70 1.00
0.04
0.04
1.70 1.00
1.70 1.00
1.70 1.00
1.70 1.00
1.70 1.00
1.70 1.00
1.70 1.00
1.00 1.00 1.00 1.00 1.00
0.45 1.00
1.70 1.00
1.64 1.00
2.53 1.00
2.53 1.00
2.53 1.00
2.53 1.00
2.53 1.00
2.53 1.00
2.53 1.00
2.53 1.00
1.64 1.00
LUBANG JENDELA CLOSET KRAN SHOWER JET FLOOR URINOIR WASTAF MEJA PRAKTIS
UKURAN JML DUDUK JONGKOK WASHER DRAIN EL PANTRY KOLOM
tinggi vol
m' bh bh bh bh bh bh bh bh bh bh m3
0.04
1.70 1.00
1.70 1.00
1.70 1.00
1.70 1.00
0.04
1.70 1.00
1.70 1.00
1.70 1.00
0.04
0.04
1.70 1.00
1.70 1.00
1.70 1.00
1.70 1.00
1.70 1.00
1.70 1.00
1.70 1.00
1.64 1.00
2.53 1.00
2.53 1.00
2.53 1.00
2.53 1.00
2.53 1.00
2.53 1.00
2.53 1.00
2.53 1.00
1.64 1.00
m2 pcs m2 m2 m2 m2
0.20 3.20 2.00 2.00 0.25 0.10
60.24 207.36 164.88 164.88 1,200.00 63.50 194.00 12.10 97.80 28.52 20.48 1.81
120.00
m' bh m3 bh m3 m3 m2 m2 m2 m2 m2 m2
2.93 2.93
6.00 0.24 18.47 18.47
6.26 8.32 15.31
5.00 0.20 12.14 36.74
14.00 0.56 3.68 21.81 21.81
3.68 10.83 27.23
2.93 2.93
12.00 0.48 3.68 21.81 21.81
3.68 10.83 27.23
12.00 0.48 3.68 21.81 21.81
3.68 10.83 27.23
2.93 2.93
22.00 0.87 7.35 31.15 31.15
7.35 23.29 41.99
4.24 2.93
25.00 0.99 0.94 26.24 26.24
6.22 4.52 20.92
14.68 14.68
8.41 5.54
4.92 8.41
4.47 13.82
3.49 6.98
4.92 6.98
2.93 2.93
3.00 0.12 25.77 25.77
12.73 12.73
4.00 0.16 2.65 0.23 12.65 12.65
4.76 14.60
307.20
245.76
28.97
31.19 8.24
19.66
2.65
808.00
314.00
49.00
41.00
(0.00)
307.20
43.20
24.49
17.87
1,290.00
162.00
396.00
Panjang
5.70
307.20
43.20
24.49
17.87
307.20
43.20
24.49
17.87
WATERPROOFING PENGECATAN
Canopy Dinding Canopy
atap dan Bata Jendela
jendela Ringan
bag. luar
m2 m2
1.50
222.00
0.05
27.88
15.95
2.80 23.40
8.60
2.30
2.95
0.50
25.00 67.08
16.05
64.35 4.08 4.08 0.09
1.60 1.60
1.36 1.36
1.20 1.20 12.00
166.38 0.00 0.00 8.24 0.00 8.24 12.00 23.40 67.17 0.00
VOLUME DINDING LANTAI
Plester aci Partisi Kalsiboard t = 8 mm Plint Keramik uk 20 x 25 Keramik 10 x 20 Keramik uk.
rangka besi hollow Keramik 40 x 40 cm
uk. 10 x
60 cm
luar Tinggi Volume T = 210 cm T = 150 cm Border Lantai
m2 m' m2 m' m2 m2 m1 m2
22.67
10.00 20.00
1.35
1.35
1.35
1.35 2.31
28.50 45.60
28.50 45.60
28.50
28.50
14.45 17.75 63.75
17.75
14.51
8.50 5.25
17.33 18.60
8.80 8.52
7.70 14.80
9.01 9.00 20.00
9.00
5.00 12.30
13.50
3.85
3.85
5.93
3.85
3.85
0.79
16.65 18.00
6.88
8.25 7.91 3.75
4.45
693.00
(0.00)
keramik unpolish
m2 m' m2 m' m2 m2 m1 m2
3.08 9.24
3.08 5.76 3.00
1.13
1.74 3.31 1.54
1.55 6.43 3.06
3.26 1.55
3.08 9.24
3.08 5.76 3.00
1.13
1.74 3.31 1.54
1.55 6.43 3.06
3.26 1.55
3.08 9.24
3.08 5.76 3.00
1.13
1.74 3.31 1.54
1.55 6.43 3.06
3.26 1.55
3.08 9.24
3.08 5.76 3.00
1.13
1.74 3.31 1.54
1.55 6.43 3.06
3.26 1.55
8.98 5.80
3.08 9.24
3.08 5.76 3.00
1.13
1.74 3.31 1.54
1.55 6.43 3.06
3.26 1.55
3.08 9.24
3.08 5.76 3.00
1.13
1.74 3.31 1.54
1.55 6.43 3.06
3.26 1.55
3.08 9.24
3.08 5.76 3.00
1.13
1.74 3.31 1.54
1.55 6.43 3.06
3.26 1.55
3.08 9.24
3.08 5.76 3.00
1.13
1.74 3.31 1.54
1.55 6.43 3.06
3.26 1.55
16.00
5.63
25.31
3.08 9.24
3.08 5.76 3.00
1.13
1.74 3.31 1.54
1.55 6.43 3.06
3.26 1.55
3.08 9.24
3.08 5.76 3.00
1.13
1.74 3.31 1.54
1.55 6.43 3.06
3.26 1.55
3.08 9.24
3.08 5.76 3.00
1.13
1.74 3.31 1.54
1.55 6.43 3.06
3.26 1.55
3.08 9.24
3.08 5.76 3.00
1.13
1.74 3.31 1.54
1.55 6.43 3.06
3.26 1.55
11.31 7.70
3.08 9.24
3.08 5.76 3.00
1.13
1.74 3.31 1.54
1.55 6.43 3.06
3.26 1.55
3.08 9.24
3.08 5.76 3.00
1.13
1.74 3.31 1.54
1.55 6.43 3.06
3.26 1.55
3.08 9.24
3.08 5.76 3.00
1.13
1.74 3.31 1.54
1.55 6.43 3.06
3.26 1.55
24.67
6.88
21.53 9.30 197.00
1.35
1.35
1.35
1.35
1.35
1.35
1.35
1.35
28.50
4.25
28.50
28.50
1.10
28.50
9.30
238.00
ci dinding interior
1,059.00 1,956.00
m2 m' m2 m' m2 m2 m1 m2
16.00
9.78 6.15
16.00
5.63
20.67
12.11 9.95
20.67
7.75
21.53 9.30 197.00
1.35
1.35
1.35
1.35
1.35
1.35
1.35
1.35
28.50
4.25
28.50
28.50
1.10
28.50
9.30
16.00
9.78 6.15
16.00
5.63
20.67
12.11 9.95
20.67
7.75
21.53 9.30 197.00
1.35
1.35
1.35
1.35
1.35
1.35
1.35
1.35
28.50
4.25
28.50
28.50
1.10
28.50
9.30
60 x 60 cm Menempel di
dinding
m' m2 m2 m2 m2 m1 m'
16.40
67.08
4.08 0.09
1.60
1.36
1.20
22.67
3.68
3.68
20.00 14.00
20.80
45.60 30.10
45.60 30.10
28.50
28.50
23.00 63.75 14.45
3.68
14.51
8.50
17.33
3.68
3.68
7.35 19.72
7.35
8.80
6.26
3.68 20.00 9.01
3.68
19.20 5.00
6.22
5.20
5.20
16.65
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
1.80 1.43 1.80 1.43 2.34
1.00 1.00 (0.39)
13.95 12.30
17.03
59.97 (2.41) 30.80
15.39 7.87
65.55 30.80
81.23 31.35
2.20
31.35
9.30
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
1.80 1.43 1.80 1.43 2.34
1.00 1.00 (0.39)
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
1.80 1.43 1.80 1.43 2.34
1.00 1.00 (0.39)
3.56 22.81
13.95 12.30
17.03
59.97 (2.41) 30.80
15.39 7.87
65.55 30.80
81.23 31.35
2.20
31.35
9.30
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
1.80 1.43 1.80 1.43 2.34
1.00 1.00 (0.39)
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
1.80 1.43 1.80 1.43 2.34
1.00 1.00 (0.39)
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
3.56 22.81
13.95 12.30
4.35
17.03
59.97 (2.41) 30.80
15.39 7.87
65.55 30.80
81.23 31.35
2.20
31.35
9.30
Dengan kaki 60 x 60 cm 10 x 60 cm
m' m2 m1
9.60 16.00
8.16 13.60
7.20 12.00
m2 m2 m2 m1 m' m' m2
21.65
25.66
31.29 16.47 3.68
34.38 2.94
2.95
14.05 3.68
25.29
7.41
5.71 2.34
8.43 (0.39)
10.17
13.78
17.78
17.06
12.86
15.09
26.42 6.00 6.00 2.70
12.73 13.97 6.00 2.70
12.65 3.12
14.60
31.29 16.47 3.68
34.38 2.94
2.95
14.05 9.00 3.68
25.29 5.61
7.41
5.71 2.34
8.43 (0.39)
10.17
2.93
18.47 0.00
15.31 6.26
36.74 0.00 17.76 12.00
8.00 0.63
21.81 20.00 3.68
27.23 3.68
2.93
21.81 20.00 3.68
27.23 3.68
21.81 20.00 3.68
27.23 3.68
2.93
31.15 48.45 7.35
41.99 7.35
2.93
26.24 0.00
20.92 6.22
14.68 5.20
5.54
8.41
13.82 5.20
6.98
6.98
2.93
25.77 0.00 6.00 6.00 2.70
12.73 13.97 6.00 2.70
12.65 3.12 2.65
14.60
PENGECATAN
Dinding Bata Dinding Partisi Plafond List plafond Canopy Balok beton + Pas. besi Black Steel railling
Ringan bag. Bata Jendela pelat bwh
luar Ringan tangga
bag. dlm
tangga service tangga utama
m2 m2 m2 m2 m1 m' m'
238.00 2,025.70
PENGECATAN
Dinding Bata Dinding Partisi Plafond List plafond Canopy Balok beton + Pas. besi Black Steel railling
Ringan bag. Bata Jendela pelat bwh
luar Ringan tangga
bag. dlm
Dinding Bata Dinding Partisi Plafond List plafond Canopy Balok beton +
Ringan bag. Bata Jendela pelat bwh
luar Ringan tangga
bag. dlm
tangga service tangga utama
m2 m2 m2 m2 m1 m' m'
PENGECATAN
Dinding Bata Dinding Partisi Plafond List plafond Canopy Balok beton + Pas. besi Black Steel railling
Ringan bag. Bata Jendela pelat bwh
luar Ringan tangga
bag. dlm
tangga service tangga utama
m2 m2 m2 m2 m1 m' m'
tangga utama tangga service tangga utama tangga service tangga utama
m2 m2 m2 m2 m2
TANGGA
Pasang bata railling Keramik 40 x 40 cm Step nossing 10 x 40
tangga service tangga utama tangga service tangga utama tangga service tangga utama
m2 m2 m2 m2 m1 m1
0.90 0.90
5.40 8.94 2.43 0.00
5.40 5.38 0.00 2.99
0.57 5.61
5.40 0.00 8.94 2.43
TANGGA
Pasang bata railling Keramik 40 x 40 cm Step nossing 10 x 40
tangga service tangga utama tangga service tangga utama tangga service tangga utama
m2 m2 m2 m2 m1 m1
0.90 0.90
5.40 8.94 2.43 0.00
5.40 5.38 0.00 2.99
0.57 5.61
5.40 0.00 8.94 2.43
TANGGA
Pasang bata railling Keramik 40 x 40 cm Step nossing 10 x 40
tangga service tangga utama tangga service tangga utama tangga service tangga utama
m2 m2 m2 m2 m1 m1
0.90 0.90
5.40 8.94 2.43 0.00
5.40 5.38 0.00 2.99
0.57 5.61
5.40 0.00 8.94 2.43
JUMLAH HARGA
Rp 2,507,477,955.98
Rp 1,698,197,917.50
Rp 592,426,228.48
Rp 178,853,810.00
Rp 38,000,000.00
RINCIAN ANGGARAN BIAYA PEKERJAAN NON STA
TAHUN ANGGARAN 2018
II BAK KONTROL
BAK KONTROL BK 1 - BK 4
1 Pasangan 1/2 bata Bak Kontrol ( 4 unit BK 1 - 4 ) 4.64
2 Plester + aci 4.00
3 Pasir urug t = 5 cm 0.07
4 Lantai kerja ad. 1:3:5 t = 5 cm 0.07
5 Galian tanah 0.86
6 Urugan tanah kembali 0.29
TOTAL Rp 2,507,477,955.98
Rp 559,402,997.50
M3 Rp 204,900.00 Rp 36,825,652.50
M2 Rp 279,300.00 Rp 501,971,925.00
M1 Rp 81,800.00 Rp 20,605,420.00
Rp 1,138,794,920.00
M3 Rp 204,900.00 Rp 52,618,320.00
M2 Rp 279,300.00 Rp 719,476,800.00
M1 Rp 81,800.00 Rp 60,204,800.00
Buah Rp 1,500,000.00 Rp 306,495,000.00
Rp 84,162,568.08
M2 Rp 153,400.00 Rp 31,344,222.00
M2 Rp 125,600.00 Rp 25,663,848.00
M3 Rp 1,024,000.00 Rp 4,483,584.00
M3 Rp 204,900.00 Rp 897,154.65
M3 Rp 99,800.00 Rp 5,243,691.60
M3 Rp 72,800.00 Rp 1,275,019.20
M1 Rp 135,700.00 Rp 162,840.00
M1 Rp 271,400.00 Rp 13,570,000.00
M1 Rp 110,425.00 Rp 1,522,208.63
Rp 1,409,850.40
M2 Rp 153,400.00 Rp 711,776.00
M2 Rp 125,600.00 Rp 502,400.00
M3 Rp 204,900.00 Rp 14,752.80
M3 Rp 1,024,000.00 Rp 73,728.00
M3 Rp 99,800.00 Rp 86,227.20
M3 Rp 72,800.00 Rp 20,966.40
Rp 178,853,810.00
M2 Rp 335,500.00 Rp 2,737,680.00
M2 Rp 125,600.00 Rp 7,110,216.00
M2 Rp 125,600.00 Rp 7,110,216.00
M2 Rp 125,600.00 Rp 7,110,216.00
M3 Rp 86,500.00 Rp 93,420.00
M2 Rp 78,900.00 Rp 2,499,552.00
M2 Rp 78,900.00 Rp 1,755,525.00
M2 Rp 78,900.00 Rp 7,561,776.00
M2 Rp 78,900.00 Rp 12,844,920.00
M2 Rp 86,000.00 Rp 2,026,160.00
M2 Rp 30,800.00 Rp 4,405,632.00
M2 Rp 25,600.00 Rp 3,056,640.00
M2 Rp 40,300.00 Rp 2,520,362.00
M2 Rp 30,800.00 Rp 3,180,408.00
M2 Rp 74,800.00 Rp 9,640,224.00
Unit Rp 802,900.00 Rp 6,423,200.00
Unit Rp 3,824,200.00 Rp 3,824,200.00
M2 Rp 186,900.00 Rp 12,041,967.00
M2 Rp 310,400.00 Rp 53,283,264.00
M2 Rp 74,800.00 Rp 17,659,532.00
Unit Rp 3,000,000.00 Rp 9,000,000.00
Buah Rp 900,000.00 Rp 2,700,000.00
Buah Rp 268,700.00 Rp 268,700.00
Rp 38,000,000.00
Rp 290,000,000.00
I. PERKERASAN DI BANGUNAN
1. Pasir Urug t = 7 cm
No. TYPE DIMENSI ( M ) BANYAK VOLUME
P L L' Tbl Tbl' ( BH ) M3
Depan 53.50 15.00 0.1 80.25
Belakang 63.25 15.00 0.1 94.88
Samping 4.60 5.00 0.1 2 4.60
Jumlah 179.73
2. Paving blok t = 8 cm
No. TYPE DIMENSI ( M ) BANYAK VOLUME
P L L' Tbl Tbl' ( BH ) M3
Depan 53.50 15.00
Belakang 63.25 15.00
Samping 4.60 5.00 2
Jumlah
3. Kanstin 8.20.40
No. TYPE DIMENSI ( M ) BANYAK VOLUME
P L L' Tbl Tbl' ( BH ) M3
Depan 53.50
Belakang 63.25
Samping 4.60 2
Jumlah
JALAN KELILING
1. Pasir Urug t = 7 cm
No. TYPE DIMENSI ( M ) BANYAK VOLUME
P L L' Tbl Tbl' ( BH ) M3
Depan/belakang 72.25 7.00 0.1 4 202.30
Samping 18.75 7.00 0.1 4 52.50
2 5.00 0.1 2 2.00
Jumlah 256.80
2. Paving blok t = 8 cm
No. TYPE DIMENSI ( M ) BANYAK VOLUME
P L L' Tbl Tbl' ( BH ) M3
Depan/belakang 72.25 7.00 4
Samping 18.75 7.00 4
2.00 7.00 2
Jumlah
3. Kanstin 8.20.40
No. TYPE DIMENSI ( M ) BANYAK VOLUME
P L L' Tbl Tbl' ( BH ) M3
Depan/belakang 72.25 4
Samping 18.75 4
2.00 2
Jumlah
SALURAN KELILING 40 X 40 CM
1. Pasangan Bata 1 : 5 ( Sal. keliling )
No. TYPE DIMENSI ( M ) BANYAK VOLUME
P L L' T Tbl' ( BH ) M3
Depan 7.25 0.40 0.40
54.00
4.70
Samping 15.75
Belakang 64.25
Jumlah
2. Plesteran + acian
No. TYPE DIMENSI ( M ) BANYAK VOLUME
P L L' T Tbl' ( BH ) M3
Depan 7.25 0.40 0.05
54.00
4.70
Samping 15.75
Belakang 64.25
Jumlah
3. Lantai kerja 1 : 3 : 5 t = 5 cm
No. TYPE DIMENSI ( M ) BANYAK VOLUME
P L L' T Tbl' ( BH ) M3
Depan 7.25 0.60 0.10 0.44
54.00 3.24
4.70 0.28
Samping 15.75 0.95
Belakang 64.25 3.86
Jumlah 8.76
4. Pasir urug t = 5 cm
No. TYPE DIMENSI ( M ) BANYAK VOLUME
P L L' T Tbl' ( BH ) M3
Depan 7.25 0.60 0.10 0.44
54.00 3.24
4.70 0.28
Samping 15.75 0.95
Belakang 64.25 3.86
Jumlah 8.76
5. Galian tanah
No. TYPE DIMENSI ( M ) BANYAK VOLUME
P L L' T Tbl' ( BH ) M3
Depan 7.25 0.60 0.60 2.61
54.00 19.44
4.70 1.69
Samping 15.75 5.67
Belakang 64.25 23.13
Jumlah 52.54
BAK KONTROL 40 X 40 X 40 CM
1. Galian tanah
No. TYPE DIMENSI ( M ) BANYAK VOLUME
P L L' T Tbl' ( BH ) M3
0.60 0.60 0.60 4 0.86
Jumlah 0.86
2. Pasir urug t = 5 cm
No. TYPE DIMENSI ( M ) BANYAK VOLUME
P L L' T Tbl' ( BH ) M3
0.60 0.60 0.10 4 0.14
Jumlah 0.14
3. Lantai kerja 1 : 3 : 5 t = 5 cm
No. TYPE DIMENSI ( M ) BANYAK VOLUME
P L L' T Tbl' ( BH ) M3
0.60 0.60 0.10 4 0.14
Jumlah 0.14
4. Pasangan Bata 1 : 4
No. TYPE DIMENSI ( M ) BANYAK VOLUME
P L L' T Tbl' ( BH ) M3
0.40 0.40 8
0.60 0.40 8
0.60 0.60 4
Jumlah
5. Plesteran + acian
No. TYPE DIMENSI ( M ) BANYAK VOLUME
P L L' T Tbl' ( BH ) M3
0.40 0.40 16
0.40 0.40 4
2.00 0.10 4
Jumlah
VOLUME
M2 M'
802.50 Teras
948.75
46.00
1,797.25
VOLUME
M2 M'
107.00 Teras
126.50
18.40
251.90
VOLUME
M2 M'
Jalan
VOLUME
M2 M'
2,023.00 Jalan
525.00
28.00
2,576.00
VOLUME
M2 M'
578.00 Jalan
150.00
8.00
736.00
VOLUME
M2 M'
10.15
75.60
6.58
22.05
89.95
204.33
VOLUME
M2 M'
9.43
70.20
6.11
20.48
83.53
189.74
VOLUME
M2 M'
VOLUME
M2 M'
VOLUME
M2 M'
VOLUME
M2 M'
VOLUME
M2 M'
VOLUME
M2 M'
VOLUME
M2 M'
1.28
1.92
1.44
4.64
VOLUME
M2 M'
2.56
0.64
0.80
4.00
DAFTAR HARGA SATUAN UPAH & BA
B BAHAN BATU
1 Batu pecah 15-20 cm
2 Batu pecah 10-15 cm
3 Batu pecah 5-7 cm
4 Batu pecah 3-5 cm
5 Batu pecah 2-3 cm kg 195.56
6 Batu pecah 1-2 cm
7 Batu pecah 1-1 cm
8 Batu belah
9 Agregat kasar
10 Agregat halus
11 Abu batu
12 Batu tempel/candi 20 x 20 cm
C BAHAN PASIR DAN TANAH
1 Pasir urug
2 Pasir pasang
3 Pasir beton kg
4 Sirtu
5 Kerikil Beton
6 Tanah merah
D BAHAN SEMEN
1 Semen PC, 50 kg
2 Semen PC
3 Semen warna
4 Mortar Utama ( MU- 300 )
5 Compound
E BAHAN LANTAI
1 Keramik Homogenius Tile 60 x 60 Polished ex Granito
2 Keramik Homogenius Tile 60 x 60 UnPolished ex Granito
3 Keramik 30 x 60 ex. Roman
4 Keramik Homogenius Tile 30 x 30 Polished
5 Keramik 30 x 30 Std
6 Keramik Homogenius Tile 40 x 80 UnPolished
7 Keramik Homogenius Tile 40 x 80 UnPolished
8 Keramik Homogenius Tile 10 x 40 Polished
9 Keramik 20 x 20 Std ( KW 1 )
10 Keramik 30 x 30 Std ( KW 1 )
11 Keramik 40 x 40 Std ( KW 1 )
12 Keramik 20 x 25 Std ( KW 1 )
13 Keramik 10 x 20 Std ( KW 1 )
14 Stepnoizing 10 x 20 cm
15 Stepnoizing 10 x 30 cm
16 Step Noshing 10 x 40 cm
17 Step Noshing 10 x 60 cm
18 Sika Floor hardener @ 6 Kg ( anti Slip )
19 Paving block t = 6 cm, fullpave, uk. 20x10x6 cm, abu2
20 Paving block t = 8 cm, fullpave, uk. 2x10x8 cm, abu2
21 Kansten 40x20x8 cm
22 Buis beton D 30 cm
23 Buis beton D 60 cm
F BAHAN DINDING
1 Glass Block 20 x 20 cm
2 Grass Blok Tebal uk. 30x45 cm( 6 Lubang ) = 6 cm
3 Batu bata 5x11x22 cm
4 Bata ringan uk. 60 x 20 x 10 cm
5 Bata ringan uk. 60 x 20 x 7,5 cm
6 Batako 20x40x9 cm (press)
7 Kerawang (roster) 20x20 cm, beton
8 Kerawang press (roster) 18x18 cm
9 Water proofing
10 Water proofing Membrane
11 Wallpaper
G BAHAN BETON
1 Beton ready mix K125, Tanpa Pompa
2 Beton ready mix K175, Tanpa Pompa
3 Beton ready mix K200, Tanpa Pompa
4 Beton ready mix K225, Tanpa Pompa
5 Beton ready mix K250, Tanpa Pompa
6 Beton ready mix K275, Tanpa Pompa
7 Beton ready mix K300, Tanpa Pompa
8 Beton ready mix K350, Tanpa Pompa
9 Beton ready mix K400, Tanpa Pompa
10 Beton ready mix K450, Tanpa Pompa
11 Tiang Pancang Beton Uk. 25 x 25 cm L = 12 M K.450
12 Tiang Pancang Beton Uk. 30 x 30 cm L = 12 M K.450
13 Air
14 Tali Ijuk
H BAHAN KAYU
1 Kayu Kelas II ex Borneo Super
2 Kayu Kelas III
3 Dolken dia. 6 s/d 8 cm
4 Dolken dia. 8 s/d 10 cm
5 Bambu dia. 5 - 7 cm
6 Bambu dia. 7 - 10 cm
7 Triplek 3 mm, uk. 1,2 x 2,4
8 Triplek 4 mm, uk. 1,2 x 2,4
9 Triplek 9 mm, uk. 1,2 x 2,4
10 Multiplek 6 mm, uk. 1,2 x 2,4
11 Multiplek 9 mm, uk. 1,2 x 2,5
12 Multiplek 12 mm, uk. 1,2 x 2,4
13 Multiplek 15 mm, uk. 1,2 x 2,4
14 Plywood 4 mm
15 Plywood 9 mm
16 Teakwood 3 mm, uk. 1,2 x 2,4
I BAHAN LANGIT - LANGIT
1 GRC board 120 x 240, tebal 4 mm
2 GRC board 120 x 240, tebal 6 mm
3 Gypsum Board uk. 1,2 x 2,4 t : 9 mm
4 Kalsiboard t = 6 mm
5 Kalsiboard t = 8 mm
6 List gypsum 5 cm
7 List kayu profil 5 cm
8 HPL
J BAHAN CAT
1 Amplas
2 Minyak Cat
3 Cat kilat
4 Plamur Tembok Set. MATEX
5 Cat tembok type weather shield Mowilex
6 Cat tembok std Mowilex
7 Cat tembok Interior, warna Stand. Ex Catylac
8 Cat tembok Exterior, warna Std. Ex Catylac
9 Cat alkali (undercoat)
10 Cat seng (zinc chromate)
11 Cat besi/kayu setara Glotex
12 Dempul kayu
13 Plitur
14 Thiner ex. Cobra
15 Thiner ND
16 Cat Melamic
17 Vernis
18 Meni
19 Oker
20 Lem kayu
21 Sealent
22 Rol Cat
23 Sabun/cream pembersih kotoran
24 Cat Duko
25 Ter/residu
26 Kuas 3" Std
27 Kape
28 White Sreen Microvision
K BAHAN PIPA
1 Pipa PVC O 1/2" AW Wavin 4 M
2 Pipa PVC O 3/4" AW Wafin
3 Pipa PVC O 3" AW Wafin
4 Pipa PVC O 4" AW Wafin
5 Pipa PVC O 6" AW Wafin
6 Lem PVC
7 Pintu UPVC
E BAHAN BESI DAN ALUMINIUM
1 Besi tulangan U-24 polos
2 Besi tulangan U-39 ulir
3 Besi wire mesh Std M 4 SNI
4 Besi wire mesh Std M 5 SNI
5 Besi wire mesh Std M 6 SNI
6 Kawat baja/bendarat
7 Baut dia. 4/8" Pj. 20 cm
8 Jendela Nako ( rangka + kaca )
9 Plat 1,2x2,4x12
10 Baja Profil IWF / CNP
11 Besi konstruksi (C)
12 Besi UNP 100.50.6
13 Besi UNP 100.50.20.7,5
14 Besi konstruksi (siku) 50.50.5
15 Besi konstruksi (siku) 40.40.4
16 Besi konstruksi ( siku ) 30.30.3
17 Besi strip 38.4
18 Besi strip 30.3
19 Besi hollow 40 X 40 X 400 mm t = 0,35 mm
20 Besi hollow 40 X 20 X 400 mm t = 0,35 mm
21 Besi profil
22 Kawat las
23 Kawat harmonika
24 Kawat kasa
25 Kawat BC
26 Aluminium Kusen 3" ( coklat/hitam ) Alexindo
27 Alumunium Kusen 4" ( coklat/hitam ) Alexindo
28 Plat Alluminium t = 2mm
29 Aluminium Frame Jendela 2" ( coklat/hitam )
30 Aluminium Frame Pintu 3" ( coklat/hitam )
31 Aluminium lapis pintu KM
32 Formika
33 Karet Pelapis
34 List karet jendela
35 Rangka baja ringan zincalume (truss/color) (tanpa jurai dalam - bentang 1 m
36 Dinabolt
37 Skrup fixer
38 Baut truss
39 Baut reng
40 Baut atap 5 cm
41 Baut angkur
42 Kawat duri
43 Teralis besi
44 Paku Skrup
45 Kawat penggantung hollow
46 Sunscreen alluminium
47 Tangga Besi/ Monyet Pipa 1" & 1.5" tebal = 1.2mm Jarak Antar tangga 40 cm
48 Alumunium Foil
49 Top Cross Rail
50 Furing Chanel 2x4 - 4 m
51 Furing Chanel 4x4 - 4 m
52 Conected Furing
53 Wall Angle 19 x 19 mm
F BAHAN KUNCI, PENGGANTUNG
1 Pintu plastik untuk wc uk. 70 x 195 cm
2 Kait angin
3 Engsel jendela 4'
4 Engsel pintu 4" Stainless ex Kodai
5 Engsel jendela 3"
6 Slot pintu
7 Slot jendela
8 Kunci tanam 2 slag Model 1203
9 Door closer ex. Yale
10 Door Stoper Griff 1824
11 Paku seng
12 Paku campuran 1" - 5"
13 Paku beton
14 Paku triplek
15 Paku GRC
16 Paku zincalum
17 Sekrup gypsum
18 Sekrup 1 - 2,5 cm
19 Sekrup fixer
20 Sekrup steel sheet
21 Sekrup zincalume
22 Kunci tanam antik
G BAHAN ATAP
1 Spandek berwarna uk. 1,2 m x 4 m, Tebal 0.4
2 Nok Metal roof ( L = 120 cm )
3 Seng Gelombang BJLS 0,25 mm x 80 cm x 180 cm
4 Talang Air
5 Seng BJLS 28 lebar 90 cm
6 List plank GRC 2,4 x 0,2 m, t = 9 mm
7 Skrup
H BAHAN KACA
1 Kaca polos, t = 3 mm
2 Kaca polos, t = 5 mm
3 Kaca polos, t = 6 mm
4 Kaca rayben, t = 5 mm
5 Kaca rayben, t = 6 mm
6 Kaca cermin, t = 5 mm
7 Kaca tempered, t = 8 mm
8 Glass block
K BAHAN ELEKTRIKAL
1 Pasang Listrik / Wirring
2 Lampu TL 10 Watt
3 Lampu PL 13 Watt
4 Lampu Exit 8 Watt
5 Lampu Downlight LED 7 Watt
6 Lampu Downlight LED 7 Watt + batt
7 Lampu TL Balk 36 Watt
8 Lampu TL Balk 18 Watt
9 Lampu TL Balk 18 Watt + battery
10 Lampu TL Balk 32 Watt + battery
11 Lampu Barret 32 Watt
12 Lampu Taman SL-26 Watt
13 Isolator
14 Las doof
15 Fitting
16 T dus PVC
17 Stop Kontak
18 Stop Kontak TV
19 Stop Kontak Telepon
20 Saklar Tunggal
21 Saklar Ganda
22 Kabel NYA 1000 Volt 1,5 mm2
23 Kabel NYA 1000 Volt 2x1,5 mm2
24 Kabel NYA 1000 Volt 3x1,5 mm2
25 Kabel NYA 1000 Volt 2,5 mm2
26 Kabel NYA 1000 Volt 4 mm2
27 Kabel NYA 1000 Volt 6 mm2
28 Kabel NYA 1000 Volt 10 mm2
29 Kabel NYA 1000 Volt 16 mm2
30 Kabel NYA 1000 Volt 50 mm2
31 Kabel NYM 300/750 Volt 3x2,5 mm2
32 Kabel NYM 300/750 Volt 3x4 mm2
33 Kabel NYY 0,6/1 KV 4x2,5 mm2
34 Kabel NYY 0,6/1 KV 4x4 mm2
35 Kabel NYY 0,6/1 KV 4x6 mm2
36 Kabel NYY 0,6/1 KV 4x185 mm2
37 Kabel NYFGBY 0,6/1 KV 3x2,5 mm2
38 Kabel NYY 0,6/1 KV 4x16 mm2
39 Kabel NYFGBY 0,6/1 KV 4x240 mm2
40 Kabel NYY 0,6/1 KV 70 mm2
41 Kabel FRC 0,6/1 KV 3x2,5 mm2
42 Kabel FRC 0,6/1 KV 4Cx4 mm2
43 Kabel FRC 0,6/1 KV 4Cx6 mm2
44 Kabel Coaxial 7C-2V2
45 Kabel Coaxial 5C-2V
46 Kabel ITC 4X0,6 mm2
47 Pipa Conduit HI dia, 20 mm
48 Tray W = 200 mm
49 TEE W = 200 mm
50 Elbow W = 200 mm
51 Heat detector
52 Smoke detector
53 Manual push button
54 Bel alarm
55 Lampu indikator
56 MCFA - 5 zone
57 Terminal Fire alarm
58 Terminal TV
59 Antena UHF 10 element
60 Antena VHF 10 element
61 Master Amplifier
62 Penangkal petir Spitzen
63 Sekering tunggal "LN" biasa
64 Sekering ganda "LN" biasa
65 Sekering 1 group + MCB
66 Sekering 2 group + MCB
65 Sekering 3 group + MCB
66 KWH/ 1 phase Digital
67 KWH/ 3 phase Digital
68 MCB 1 ph/6/10/16/25 Amper
69 Box Panel Hanger
70 Grounding box 40 x 40 x 40 cm
71 Grounding Rod 1"
72 BC 50 mm2
73 Genset 25 KVA Silent type
74 Box Telepon
75 Jelly armoured 10 x 2 x 0,6 mm
76 Splitter 6 port
77 MDF - FA ( 5 zone )
78 Kabel NYA 1000 Volt 6x1,5 mm
79 Kabel NYA 1000 Volt 20x1,5 mm
80 Pipa Konduit HI dia. 32 mm
81 Pipa Konduit HI 2 x dia. 32 mm
82 Saklar hotel
83 MCCB 3P 300A
84 Box Panel
85 Cup bar ex Japan
86 Tray W = 400 mm
87 TEE W = 400 mm
88 Elbow W = 400 mm
89 Reducer W = 400 mm
90 Tray W = 900 mm
91 Tray W = 600 mm
92 Lampu HPI-T 250 W NR 921
93 Kabel NYY 0,6/1 KV 3 x 2,5 mm2
94 Pipa GIP dia. 100 mm
95 Ladder W = 200 mm
96 Ladder TEE = 200 mm
97 Panel MDP
98 Panel Pengelola
99 Panel Lt. Dasar
100 Panel Lt. 2 s/d 5
101 Panel Kebakaran
102 Panel Pompa air
103 Panel Unit
104 Panel Selasar
105 Panel Pompa air bersih
106 PJU Solar 40 w 7 M Single
L BAHAN MINYAK
1 Minyak solar
2 Minyak solar industri
3 Bensin premium
4 Minyak pelumas
5 Oil diesel
6 Minyak tanah
7 Gas elpiji refill 12 kg
8 Meni besi
9 Nat
10 Minyak bekisting
ANGGARAN 2018
HARGA SATUAN
SATUAN
(Rp.)
HARGA SATUAN
SATUAN
(Rp.)
pc 60,000.00 323,000.00
pc 60,000.00 319,500.00
m2 230,000.00 243,000.00
pc 31,262.42 90,000.00
m2 87,624.00 90,000.00
pc 108,333.33
pc 108,333.33
pc 28,300.00
bh 2,813.00
bh 6,847.00
bh 12,218.00
bh 3,200.00
bh 1,406.50
bh 5,900.00
bh 9,393.94
pc 14,100.00
pc 25,800.00
kg 8,000.00
m2 132,500.00
m2 192,500.00
bh 25,000.00
m' 118,000.00
m' 236,000.00
bh 26,000.00
bh 31,500.00
bh 850.00
bh 8,072.29
bh 6,036.04
bh 2,400.00
bh 17,200.00
bh 11,900.00
kg 65,500.00
kg 25,000.00
m2 76,000.00
m3 5,500,000.00
m3 1,400,000.00
btg 22,000.00
btg 29,000.00
btg 25,000.00
btg 30,000.00
lbr 54,000.00
lbr 63,000.00
lbr 116,000.00
lbr 74,000.00
lbr 108,000.00
lbr 155,000.00
lbr 198,000.00
lbr 65,000.00
lbr 99,000.00
lbr 115,000.00
lbr 56,000.00
lbr 63,000.00
lbr 65,000.00
lbr 115,000.00
lbr 140,000.00
m 12,000.00
m 6,000.00
lbr
lbr 2,800.00
kg 12,000.00
kg 37,000.00
kg 20,000.00
kg 75,000.00
kg 48,600.00
kg 52,000.00
liter 34,000.00
kg 30,500.00
kg 71,300.00
kg 60,000.00
kg 18,000.00
kg 56,000.00
ltr 20,000.00
ltr 15,200.00
kg 55,000.00
ltr 37,000.00
kg 28,500.00
kg 21,000.00
kg 19,800.00
tube 43,250.00
bh 25,000.00
kg 22,000.00
kg 43,500.00
ltr 27,300.00
bh 10,000.00
bh 15,000.00
bh
m' 3,400.00
m' 4,600.00
m' 26,000.00
m' 41,000.00
m' 99,500.00
tube 13,500.00
unit 320,000.00
kg 7,900.00
kg 8,000.00
kg 11,800.00
kg 10,150.00
kg 8,500.00
kg 20,000.00
btg 3,200.00
m2 170,000.00
kg 9,300.00
kg 9,200.00
kg 9,200.00
kg 9,200.00
kg 9,200.00
kg 9,300.00
kg 9,650.00
kg 9,750.00
kg 29,329.61
kg 33,018.87
m' 19,875.00
m' 19,625.00
kg 21,000.00
kg 94,500.00
m2 24,500.00
m2 20,300.00
m 1,600.00
m 60,000.00
m 68,000.00
m2 151,000.00
m 110,200.00
m 115,700.00 230,000
lbr 47,700.00
lbr 213,500.00 360,000
m 5,300.00 420,000
m' 5,600.00
m2 115,000.00
bh 3,200.00
bh 300.00
bh 300.00
bh 300.00
bh 85.00
kg 11,000.00
m 1,700.00
m2
box 35,000.00
bh 26,000.00
m2 61,000.00
m2 830,000.00
m2 21,000.00
btg 84,000.00
m' 3,750.00
m' 5,000.00
Bh 7,000.00
Btg 20,000.00
bh 320,000.00
bh 20,500.00
bh 12,000.00
bh 17,100.00
bh 9,000.00
bh 45,500.00
bh 32,500.00
bh 172,500.00
bh 330,000.00
bh 90,000.00
kg 28,000.00
kg 17,500.00
kg 34,000.00
kg 23,500.00
kg 18,200.00
kg 25,200.00
kg 33,000.00
bh 200.00
bh 200.00
bh 200.00
bh 500.00
BH 225,000.00
m' 67,000.00
bh 58,000.00
bh 58,800.00
m 155,000.00
m' 52,300.00
m' 45,000.00
bh 300.00
m2 64,000.00
m2 76,000.00
m2 125,000.00
m2 104,500.00
m2 128,300.00
m2 184,000.00
m2 313,500.00
bh 25,000.00
psg 50,300.00
psg 61,000.00
psg 89,300.00
psg 25,000.00
bh 39,000.00
bh 175,000.00
bh 180,000.00
set 105,000.00
set 192,500.00
psg 92,000.00
bh 535,000.00
bh 225,000.00
bh 180,000.00
psg 115,000.00
set 92,500.00
set 105,000.00
bh 115,000.00
bh 120,000.00
bh 90,000.00
psg 60,000.00
set 225,000.00
bh 42,000.00
m' 155,000.00
bh 560,000.00
bh 1,450,000.00
bh 170,000.00
bh 155,000.00
bh 325,000.00
bh 369,000.00
bh 175,000.00
unit 1,397,000.00
unit
bh 385,000.00
bh 274,500.00
bh 240,000.00
bh 215,000.00
bh 230,500.00
bh 95,000.00
bh 35,000.00
bh 259,000.00
bh 450,000.00
unit 395,000.00
m2 230,000.00
m' 11,365.00
m' 16,930.00
m' 27,650.00
m' 42,200.00
m' 65,000.00
m' 103,050.00
m' 208,500.00
m' 321,100.00
m' 59,500.00
m' 79,500.00
m' 101,100.00
m' 126,200.00
m' 200,950.00
m' 256,250.00
m' 282,300.00
m' 621,675.00
m' 577,180.00
m' 328,230.00
m' 230,600.00
m' 110,900.00
m' 3,400.00
m' 4,600.00
m' 6,400.00
m' 8,800.00
m' 10,000.00
m' 12,700.00
m' 19,800.00
m' 26,000.00
m' 41,000.00
m' 78,200.00
m' 99,500.00
m' 190,000.00
m' 6,150.00
m' 6,700.00
m' 9,500.00
m' 12,200.00
m' 14,500.00
m' 23,200.00
m' 99,300.00
bh 9,150.00
unit 818,300.00
unit 19,860,000.00
unit 90,300,000.00
bh 145,000.00
m' 74,450.00
m' 58,900.00
m' 46,500.00
m' 40,750.00
m' 32,150.00
m' 25,125.00
m' 19,500.00
unit 1,885,000.00
unit 2,950,000.00
bh
bh 232,500,000.00
bh 43,750,000.00
bh 38,425,000.00
bh 9,125,000.00
bh 205,800.00
bh 265,500.00
bh 387,700.00
bh 485,100.00
bh 878,000.00
bh 1,855,000.00
bh 2,575,000.00
bh 3,305,000.00
bh 4,308,600.00
bh 5,755,300.00
bh 2,282,500.00
bh 4,975,000.00
bh 8,720,300.00
bh 4,672,200.00
bh 1,190,800.00
bh 3,144,200.00
bh 5,230,600.00
bh 1,450,200.00
bh 1,578,000.00
bh 4,864,250.00
bh 450,900.00
bh 2,632,800.00
bh 1,520,500.00
bh 5,061,800.00
bh 310,400.00
bh 380,500.00
bh 249,200.00
bh 123,500.00
bh 266,800.00
bh 267,250.00
bh 410,500.00
bh 515,000.00
bh 4,730,200.00
bh 4,332,500.00
bh 4,225,000.00
bh 4,136,300.00
bh 810,500.00
bh 425,600.00
titik 65,000.00
bh 45,500.00
bh 30,000.00
bh 1,725,000.00
bh 320,000.00
bh 750,500.00
bh 108,000.00
bh 75,200.00
bh 610,500.00
bh 782,000.00
bh 243,200.00
bh 350,400.00
bh 6,800.00
bh 2,725.00
bh 18,500.00
bh 5,000.00
bh 30,200.00
bh 57,000.00
bh 34,200.00
bh 33,000.00
bh 53,000.00
m' 3,000.00
m' 6,050.00
m' 18,250.00
m' 4,700.00
m' 7,600.00
m' 11,500.00
m' 19,200.00
m' 28,800.00
m' 166,100.00
m' 15,200.00
m' 20,600.00
m' 24,500.00
m' 37,100.00
m' 51,700.00
m' 748,800.00
m' 26,500.00
m' 90,700.00
m' 1,376,900.00
m' 107,200.00
m' 91,250.00
m' 161,250.00
m' 215,100.00
m' 16,900.00
m' 11,250.00
m' 4,000.00
m' 3,900.00
m' 142,000.00
m' 137,100.00
bh 212,300.00
bh 72,200.00
bh 370,500.00
bh 166,400.00
bh 125,200.00
bh 75,200.00
bh 6,080,200.00
bh 255,700.00
bh 269,000.00
bh 728,300.00
bh 840,000.00
bh 503,200.00
bh 61,500.00
bh 61,400.00
bh 67,200.00
unit 90,800.00
unit 129,500.00
unit 184,200.00
unit 509,500.00
unit 830,700.00
unit 54,100.00
unit 97,300.00
unit 482,800.00
unit 360,000.00
m' 111,350.00
unit 115,500,000.00
unit 450,400.00
m' 21,050.00
bh 132,900.00
bh 398,200.00
m' 10,200.00
m' 78,500.00
m' 13,000.00
m' 18,100.00
bh 93,500.00
bh 4,247,300.00
bh 1,093,700.00
unit 556,200.00
m' 201,980.00
bh 280,550.00
bh 259,100.00
bh 182,000.00
m' 436,250.00
m' 265,800.00
bh 3,850,400.00
m' 12,800.00
m' 243,100.00
m' 131,900.00
m' 170,700.00
bh 54,900,000.00
bh 9,375,500.00
bh 12,950,000.00
bh 46,500,000.00
bh 5,414,200.00
bh 9,746,800.00
bh 250,500.00
bh 161,200.00
bh 5,750,000.00
Unit 29,000,000.00
ltr 8,600.00
ltr
ltr
ltr
ltr
ltr
kg
kg 56,000.00
kg
ltr 13,500.00
jam 256,000.00
jam 50,000.00
jam 804,375.00
jam 100,000.00
jam 110,000.00
jam 1,100,000.00
jam 180,000.00
jam 331,300.00
jam 24,500.00
jam 28,000.00
jam 255,000.00
jam 1,150,000.00
jam 1,010,000.00
jam 55,000.00
jam 105,000.00
jam 283,500.00
jam 186,000.00
jam 179,400.00
jam 125,000.00
sewa - hari 3,700,000.00
jam 175,000.00
jam 81,000.00
jam 155,000.00
jam 150,000.00
set 40,000.00
ANALISA HARGA SATUAN PEKERJAAN
SESUAI DENGAN PERATURAN MENTERI PEKERJAAN UMUM DAN
NO. 28/PRT/M/2016
a b c
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
A.2.3.1.10 ( K3 ) 1 M3 PEKERJAAN PEMADATAN TANAH ( PER 20 CM )
A. TENAGA KERJA
Pekerja L.01
Mandor L.04
JU
B. BAHAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.17 1 KG PEKERJAAN PEMBESIAN DENGAN BESI POLOS
A. TENAGA KERJA
Pekerja L.01
Tukang Besi L.02
Kepala tukang L.03
Mandor L.04
JU
B. BAHAN
Besi Beton Polos
Kawat Beton
C. PERALATAN
C. PERALATAN
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.19 1 KG PEKERJAAN PEMASANGAN JARING KAWAT BAJA ( WIREMESH M-4 )
A. TENAGA KERJA
Pekerja L.01
Tukang Besi L.02
Kepala tukang L.03
Mandor L.04
JU
B. BAHAN
Jaring Kawat Beton
Kawat Beton
C. PERALATAN
C. PERALATAN
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.21 ( K3 ) 1 M2 PEMASANGAN BEKISTING UNTUK SLOOF
A. TENAGA KERJA
Pekerja L.01
Tukang Kayu L.02
Kepala tukang L.03
Mandor L.04
JU
B. BAHAN
Kayu Kelas III ( 2 Kali Pakai )
Paku 5 - 10 cm
Minyak Bekisting
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.4 PEMBUATAN 1 m2 PINTU BESI PLAT BAJA T = 2 mm Rangkap. Rangka Baja Siku
A TENAGA KERJA
Pekerja L.01
Tukang Las Biasa L.03
Kepala tukang L.03
Mandor L.04
B BAHAN
Besi siku L 30.30.3
Besi plat baja
Kawat las
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.5 PENGERJAAN 10 cm PENGELASAN DENGAN LAS LISTRIK
A TENAGA KERJA
Pekerja L.01
Tukang Besi Konstruksi L.03
Kepala tukang L.03
Mandor L.04
JU
B BAHAN
Kawat las listrik
Solar
Minyak pelumas
C PERALATAN
Sewa alat
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.7 PEMASANGAN 1 m2 PINTU ROLLING DOOR BESI
A TENAGA KERJA
Pekerja L.01
Tukang Las Biasa L.03
Kepala tukang L.03
Mandor L.04
JU
B BAHAN
Pintu gulung besi
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.8 PEMASANGAN 1 m2 PINTU LIPAT ( FOLDING DOOR ) Bahan Plastik/PVC
A TENAGA
Pekerja L.01
Tukang L.03
Kepala tukang L.03
Mandor L.04
B BAHAN
Pintu lipat
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.9 PEMASANGAN 1 m2 SUNSCREEN ALLUMINIUM
A TENAGA KERJA
Pekerja L.01
Tukang L.03
Kepala tukang L.03
Mandor L.04
JU
B BAHAN
Sunscreen alluminium
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.10 PEMASANGAN 1 m2 ROLLING DOOR ALLUMINIUM
A TENAGA
Pekerja L.01
Tukang Khusus Alumunium L.03
Kepala tukang L.03
Mandor L.04
JU
B BAHAN
Rolling dor alluminium
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.11 1 M' PEKERJAAN PEMASANGAN KUSEN PINTU ALLUMINUM
A. TENAGA KERJA
Pekerja L.01
Tukang L.03
Kepala tukang L.03
Mandor L.04
JU
B. BAHAN
Profil Allumunium 3"
Skrup Fixer
Sealant
C. PERALATAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.13 PEMASANGAN 1 m2 PINTU KACA RANGKA ALLUMINIUM
A TENAGA KERJA
Pekerja L.01
Tukang Allumunium/Kaca L.03
Kepala tukang L.03
Mandor L.04
B BAHAN
Pintu alluminium 3"
Kaca t = 6 cm
Sealant
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.14 1 M2 PEKERJAAN VENETIONS BLINDS DAN VERTICAL BLINDS
A. TENAGA KERJA
Pekerja L.01
Tukang L.03
Kepala tukang L.03
Mandor L.04
JU
B. BAHAN
Venetions Blinds dan Vertical Blinds ( Tirai )
C. PERALATAN
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.15 PEMASANGAN 1 m2 TERALI BESI STRIP (2 x 3) mm
A TENAGA KERJA
Pekerja L.01
Tukang Las L.03
Kepala tukang L.03
Mandor L.04
JU
B BAHAN
Besi strip
Pengelasan
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.17 PEMASANGAN 1 m2 JENDELA NAKO & TRALIS
A TENAGA KERJA
Pekerja L.01
Tukang L.03
Kepala tukang L.03
Mandor L.04
JU
B BAHAN
Jendela nako
(rangka + kaca 5 mm)
Paku skrup 1 cm – 2.5 cm
Besi strip
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.18 1 M' PEKERJAAN PEMASANGAN TALANG JURAI SENG BJLS 28 LEBAR 90 CM
A. TENAGA KERJA
Pekerja L.01
Tukang Besi L.03
Kepala tukang L.03
Mandor L.04
JU
B. BAHAN
Seng plat Bjls
Paku 2 - 3 cm
Papan kayu kelas III
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
Peralatan 10.0000
C. PERALATAN
Peralatan 10.0000
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.35 1 M2 PEKERJAAN PEMASANGAN LANTAI KERAMIK UK. 30 X 30 CM
A. TENAGA KERJA
Pekerja L.01
Tukang Batu L.02
Kepala tukang L.03
Mandor L.04
JU
B. BAHAN
Keramik uk. 40 x 40 cm
Semen Portland
Pasir pasang
Semen Warna
C. PERALATAN
C. PERALATAN
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.45 1 M2 PEKERJAAN UNDERLAYER ( PELAPIS BAWAH KARPET )
A. TENAGA KERJA
Pekerja L.01
Tukang Kayu L.02
Kepala tukang L.03
Mandor L.04
JU
B. BAHAN
Underlayer
Lem
C. PERALATAN
C. PERALATAN
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.53 1 M' PEKERJAAN PEMASANGAN KERAMIK DINDING UK. 10 X 20 CM
A. TENAGA KERJA
Pekerja L.01
Tukang Batu L.02
Kepala tukang L.03
Mandor L.04
JU
B. BAHAN
Keramik uk. 10 x 20 cm
Semen Portland
Pasir pasang
Semen Warna
C. PERALATAN
C. PERALATAN
C. PERALATAN
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.64 1 M2 PEKERJAAN PAVING BLOCK NATURAL TEBAL 6 CM
A. TENAGA KERJA
Pekerja L.01
Tukang Batu L.02
Kepala tukang L.03
Mandor L.04
JU
B. BAHAN
Paving Block tebal 6 cm
C. PERALATAN
C. PERALATAN
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3... 1 M' PEKERJAAN KANSTIN UK. 8.40.20 CM
A. TENAGA KERJA
Pekerja L.01
Tukang Batu L.02
Kepala tukang L.03
Mandor L.04
JU
B. BAHAN
Kanstin uk. 8.40.20
Adukan 1 : 4
C. PERALATAN
C. PERALATAN
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
A.4.5.1.7 1 M2 PEKERJAAN LANGIT-LANGIT KALSIBOARD UKURAN ( 120 X 240 ) CM, TEBAL
A. TENAGA KERJA
Pekerja L.01
Tukang Kayu L.02
Kepala tukang L.03
Mandor L.04
JU
B. BAHAN
Kalsiboard 6 mm
Paku Skrup
C. PERALATAN
C. PERALATAN
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
A.4.5.1.9 1 M' PEKERJAAN PEMASANGAN LIST GYPSUM
A. TENAGA KERJA
Pekerja L.01
Tukang Kayu L.02
Kepala tukang L.03
Mandor L.04
JU
B. BAHAN
List gypsum t = 5 cm
Compound
C. PERALATAN
C. PERALATAN
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
A.4.5.2.41 1 m2 PEKERJAAN PEMASANGAN ATAP ALLUMINIUM
A. TENAGA KERJA
Pekerja L.01
Tukang Kayu L.02
Kepala tukang L.03
Mandor L.04
JU
B. BAHAN
Spandek T = 0,4 mm
Paku
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.5 1 BUAH PEKERJAAN ENGSEL PINTU
A. TENAGA KERJA
Pekerja L.01
Tukang Kayu L.02
Kepala tukang L.03
Mandor L.04
JU
B. BAHAN
Engsel Pintu
C. PERALATAN
C. PERALATAN
C. PERALATAN
B. BAHAN
Spring Knip
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.16 1 M2 PEKERJAAN KACA TEBAL 3 MM
A. TENAGA KERJA
Pekerja L.01
Tukang Kayu L.02
Kepala tukang L.03
Mandor L.04
JU
B. BAHAN
Kaca Tebal 3 mm
Sealent
C. PERALATAN
C. PERALATAN
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.18 1 M2 PEKERJAAN KACA TEBAL 6 MM
A. TENAGA KERJA
Pekerja L.01
Tukang Kayu L.02
Kepala tukang L.03
Mandor L.04
JU
B. BAHAN
Kaca Tebal 6 mm
Sealent
C. PERALATAN
A TENAGA KERJA
Pekerja L.01
Tukang kayu L.02
Kepala tukang L.03
Mandor L.04
JU
B BAHAN
Kaca cermin 5 mm
C PERALATAN
D Jumlah (A+B+C)
E Overhead + Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.1 Pemasangan 1 m2 kaca cermin tebal 8 mm
A TENAGA KERJA
Pekerja L.01
Tukang kayu L.02
Kepala tukang L.03
Mandor L.04
B BAHAN
Kaca cermin 8 mm
C PERALATAN
D Jumlah (A+B+C)
E Overhead + Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.22. Pemasangan 1 m2 kaca wireglassed tebal 5 mm
A TENAGA KERJA
Pekerja L.01
Tukang kayu L.02
Kepala tukang L.03
Mandor L.04
J
B BAHAN
Kaca wireglassed 5 mm
C PERALATAN
D Jumlah (A+B+C)
E Overhead + Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm
A TENAGA KERJA
Pekerja L.01
Tukang kayu L.02
Kepala tukang L.03
Mandor L.04
JU
B BAHAN
Kaca patri 5mm
Sealant
C PERALATAN
D Jumlah (A+B+C)
E Overhead + Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
ANALISA BIAYA KONSTRUKSI PEKERJAAN PENGE
KODE A.4.7.1
A.4.7.1.4 1 M2 PEKERJAAN PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMUUR, 1 LAPIS
A. TENAGA KERJA
Pekerja L.01
Tukang Cat L.02
Kepala Tukang L.03
Mandor L.04
JU
B. BAHAN
Cat Menie
Plamur
Cat Dasar
Cat Penutup
Kuas
Pengencer
Ampelas
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
JU
B. BAHAN
1 Tiang Pacang Beton Uk. 25 x 25 cm
C. PERALATAN
JU
B. BAHAN
C. PERALATAN
1 Crane + Hydrolic Hammer
2 Welding Set
C. PERALATAN
NGGARAN 2017
-
JUMLAH HARGA BAHAN -
-
JUMLAH HARGA BAHAN -
-
JUMLAH HARGA BAHAN -
-
JUMLAH HARGA BAHAN -
-
JUMLAH HARGA BAHAN -
-
JUMLAH HARGA BAHAN -
-
JUMLAH HARGA BAHAN -
-
JUMLAH HARGA BAHAN -
-
JUMLAH HARGA BAHAN -
-
JUMLAH HARGA BAHAN -
MPURAN 1 SP : 3 PP
-
JUMLAH HARGA ALAT -
38,384.40
10% x D 10% 3,838.44
42,300.00
ap. Rangka Baja Siku
705,031.80
10% x D 10% 70,503.18
775,600.00
58,269.20
10% x D 10% 5,826.92
64,096.12
625,486.40
10% x D 10% 62,548.64
688,100.00
n Plastik/PVC
-
JUMLAH HARGA ALAT -
374,385.60
10% x D 10% 37,438.56
411,900.00
m2 1.0000 -
JUMLAH HARGA BAHAN -
-
JUMLAH HARGA PERALATAN -
100,713.60
10% x D 10% 10,071.36
110,800.00
-
JUMLAH HARGA PERALATAN -
887,240.00
10% x D 10% 88,724.00
976,000.00
OH 0.0430 115,200.00 4,953.60
OH 0.0430 98,400.00 4,231.20
OH 0.0043 151,200.00 650.16
OH 0.0021 170,400.00 357.84
JUMLAH HARGA TENAGA KERJA 10,192.80
792,036.88
10% x D 10% 79,203.69
871,300.00
-
JUMLAH HARGA PERALATAN -
598,861.30
10% x D 10% 59,886.13
658,800.00
m2 1.0000 -
JUMLAH HARGA BAHAN -
JUMLAH HARGA PERALATAN -
83,119.20
10% x D 8,311.92
91,500.00
-
JUMLAH HARGA PERALATAN -
625,789.15
10% x D 10% 62,578.91
688,400.00
223,914.40
10% x D 10% 22,391.44
246,400.00
LS 28 LEBAR 90 CM
dus 1.0500 - -
kg 10.0000 1,900.00 19,000.00
m3 0.0450 287,500.00 12,937.50
Kg 0.5000 15,000.00 7,500.00
JUMLAH HARGA BAHAN 39,437.50
m2 1.0500 -
Kg 0.3500 -
JUMLAH HARGA BAHAN -
JUMLAH HARGA PERALATAN -
40,620.00
10% x D 4,062.00
44,700.00
m2 1.0500 -
Kg 0.3500 -
JUMLAH HARGA BAHAN -
m2 1.0500 -
Kg 0.6000 -
JUMLAH HARGA BAHAN -
% 10.0000 12,700.00
JUMLAH HARGA PERALATAN 12,700.00
192,754.52
10% x D 19,275.45
212,100.00
% 10.0000 13,200.00
JUMLAH HARGA PERALATAN 13,200.00
253,854.52
10% x D 25,385.45
279,300.00
% 10.0000 7,100.00
JUMLAH HARGA PERALATAN 7,100.00
74,277.60
10% x D 7,427.76
81,800.00
AAN PENUTUP LANGIT - LANGIT ( PLAFOND )
222,699.20
10% x D 10% 22,269.92
245,000.00
367,844.40
10% x D 10% 36,784.44
404,628.84
141,299.20
10% x D 10% 14,129.92
155,500.00
m
2 1.1000 205,000.00 225,500.00
Kg 0.0500 43,250.00 2,162.50
JUMLAH HARGA BAHAN 227,662.50
254,192.10
10% x D 10% 25,419.21
279,611.31
UKSI PEKERJAAN PENGECATAN
-
JUMLAH HARGA PERALATAN -
47,240.40
10% x D 4,724.04
52,000.00
APIS PLAMUUR, 1 LAPIS CAT DASAR, 3 LAPIS CAT PENUTUP )
-
JUMLAH HARGA PERALATAN -
62,130.00
10% x D 6,213.00
68,400.00
PLAMUUR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP )
-
JUMLAH HARGA PERALATAN -
29,689.76
10% x D 2,968.98
32,700.00
CAT DASAR, 2 LAPIS CAT PENUTUP ) INTERIOR
-
JUMLAH HARGA PERALATAN -
23,235.84
10% x D 2,323.58
25,600.00
CAT DASAR, 2 LAPIS CAT PENUTUP ) EKSTERIOR
-
JUMLAH HARGA PERALATAN -
27,987.84
10% x D 2,798.78
30,800.00
-
JUMLAH HARGA PERALATAN -
36,600.00
10% x D 3,660.00
40,300.00
-
JUMLAH HARGA PERALATAN -
120,054.00
10% x D 12,005.40
132,100.00
GAN MENIE BESI
-
JUMLAH HARGA PERALATAN -
29,104.00
10% x D 2,910.40
32,100.00
K. 25 X 25 CM
JENIS PEKERJAAN
c
1
PEKERJAAN PERSIAPAN
( K3 ) 1 m2 PEMBUATAN PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER
PENGUKURAN DAN PEMASANGAN 1 M' BOUWPLANK
( K3 ) 1 m2 PEMBERSIHAN LAPANGAN DAN PERALATAN
( K3 ) 1 m2 PEMBUATAN STEGER/PERENCAH DARI BAMBU
1 m2 PEMBUATAN JALAN SEMENTARA
1 m3 PEMBONGKARAN BETON BERTULANG
1 m3 PEMBONGKARAN DINDING TEMBOK BATA
1 m2 PEMASANGAN PAGAR KAWAT JARING GALVANIS PANJANG 240 CM
1
PEKERJAAN TANAH
1 M3 PENGGALIAN TANAH BIASA SEDALAM 1 M
1 M3 PENGGALIAN TANAH BIASA SEDALAM 2 M
1 M3 PENGGALIAN TANAH BIASA SEDALAM 3 M
1 M3 PENGGALIAN TANAH KERAS SEDALAM 1 M
1 M3 PENGGALIAN TANAH CADAS SEDALAM 1 M
1 M3 PENGGALIAN TANAH LUMPUR SEDALAM 1 M
1 M3 PEKERJAAN PENGURUGAN KEMBALI GALIAN TANAH
( K3 ) 1 M3 PEKERJAAN PEMADATAN TANAH ( PER 20 CM )
1 M3 PEKERJAAN PENGURUGAN DENGAN PASIR URUG
1 M2 PEKERJAAN PEMASANGAN LAPISAN IJUK TEBAL 10 CM UNTUK BIDANG RESAPAN
1 M3 PEKERJAAN PENGURUGAN SIRTU PADAT
.1
PEKERJAAN PONDASI
1 M3 PEKERJAAN PEMBUATAN PONDASI BATU BELAH CAMPURAN 1 SP : 3 PP
1 M3 PEKERJAAN PEMBUATAN PONDASI BATU BELAH CAMPURAN 1 SP : 5 PP
1 M3 PEKERJAAN PEMBUATAN PONDASI BATU BELAH CAMPURAN 1 SP : 8 PP
1 M3 PEKERJAAN PEMASANGAN BATU KOSONG ( ANSTAMPING )
.1
PEKERJAAN BETON
1 M3 MEMBUAT BETON LANTAI KERJA MUTU f'c = 7,4 Mpa SLUMP ( 3-6 ) CM, W/C = 0,87
1 M3 MEMBUAT BETON MUTU f'c = 14,5 Mpa, SLUMP ( 120±20) MM - K 175
1 M3 MEMBUAT BETON MUTU f'c = 21,7 Mpa - K 250
1 M3 MEMBUAT BETON MUTU f'c = 24,0 Mpa - K 275
1 M3 MEMBUAT BETON MUTU f'c = 26,4 Mpa - K 300
1 M3 MEMBUAT BETON MUTU f'c = 31,2 Mpa - K 350
1 KG PEKERJAAN PEMBESIAN DENGAN BESI POLOS
1 KG PEKERJAAN PEMBESIAN DENGAN BESI ULIR
1 KG PEKERJAAN PEMASANGAN JARING KAWAT BAJA ( WIREMESH M-4 )
( K3 ) 1 M2 PEMASANGAN BEKISTING UNTUK PONDASI
( K3 ) 1 M2 PEMASANGAN BEKISTING UNTUK SLOOF
( K3 ) 1 M2 PEMASANGAN BEKISTING UNTUK KOLOM
( K3 ) 1 M2 PEMASANGAN BEKISTING UNTUK BALOK
( K3 ) 1 M2 PEMASANGAN BEKISTING UNTUK PLAT LANTAI
( K3 ) 1 M2 PEMASANGAN BEKISTING UNTUK DINDING
( K3 ) 1 M2 PEMASANGAN BEKISTING UNTUK TANGGA
( K3 ) 1 M2 PEMASANGAN JEMBATAN UNTUK PENGECORAN BETON
( K3 ) 1 M' PEMBUATAN KOLOM PRAKTIS BETON BERTULANG ( 11 X 11 CM )
.1
PEKERJAAN BESI DAN ALLUMUNIUM
1 Kg PEMASANGAN BESI PROFIL
PEMBUATAN 1 m2 PINTU BESI PLAT BAJA T = 2 mm Rangkap. Rangka Baja Siku
PENGERJAAN 10 cm PENGELASAN DENGAN LAS LISTRIK
PEMASANGAN 1 m2 PINTU ROLLING DOOR BESI
PEMASANGAN 1 m2 PINTU LIPAT ( FOLDING DOOR ) Bahan Plastik/PVC
PEMASANGAN 1 m2 SUNSCREEN ALLUMINIUM
PEMASANGAN 1 m2 ROLLING DOOR ALLUMINIUM
1 M' PEKERJAAN PEMASANGAN KUSEN PINTU ALLUMINUM
PEMASANGAN 1 m2 PINTU ALLUMINIUM STRIP Lebar = 8 cm
PEMASANGAN 1 m2 PINTU KACA RANGKA ALLUMINIUM
1 M2 PEKERJAAN VENETIONS BLINDS DAN VERTICAL BLINDS
PEMASANGAN 1 m2 TERALI BESI STRIP (2 x 3) mm
PEMASANGAN 1 m2 JENDELA NAKO & TRALIS
1 M' PEKERJAAN PEMASANGAN TALANG JURAI SENG BJLS 28 LEBAR 90 CM
1 M2 PEKERJAAN RANGKA BESI HOLLOW 40.40.2 MM, MODUL 60 X 120 CM, UNTUK PARTISI
1 M' PEKERJAAN RANGKA BESI HOLLOW 40.40.2 MM, MODUL 60 X 60 CM, UNTUK PLAFON
.1
PEKERJAAN PASANGAN DINDING
1 M2 PEKERJAAN DINDING BATA MERAH ( 5 X 11 X 22 ) CM TEBAL 1/2 BATA, CAMPURAN 1 SP : 3 PP
1 M2 PEKERJAAN DINDING BATA MERAH ( 5 X 11 X 22 ) CM TEBAL 1/2 BATA, CAMPURAN 1 SP : 5 PP
1 M2 PEKERJAAN DINDING BATA MERAH ( 5 X 11 X 22 ) CM TEBAL 1 BATA, CAMPURAN 1 SP : 3 PP
1 M2 PEKERJAAN DINDING TERAWANG ( ROOSTER ) 20 X 20, CAMPURAN 1 SP : 3 PP
1 M2 PEKERJAAN DINDING BATA RINGAN ( 60 X 20 X 7,5 ) CM DENGAN MORTAR SIAP PAKAI
1 M2 PEKERJAAN DINDING BATA RINGAN ( 60 X 20 X 10 ) CM, MORTAR SIAP PAKAI
.2
PEKERJAAN PLESTERAN DAN ACIAN
1 M2 PEKERJAAN PLESTERAN 1 SP : 3 PP TEBAL 15 MM
1 M2 PEKERJAAN PLESTERAN 1 SP : 5 PP TEBAL 15 MM
1 M2 PEKERJAAN ACIAN
PEKERJAAN PENGECATAN
1 M2 PEKERJAAN PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMUUR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUT
1 M2 PEKERJAAN PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMUUR, 1 LAPIS CAT DASAR, 3 LAPIS CAT PENUT
1 M2 PEKERJAAN PENGECATAN TEMBOK BARU ( 1 LAPIS PLAMUUR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP )
1 M2 PEKERJAAN PENGECATAN TEMBOK BARU ( 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP ) INTERIOR
1 M2 PEKERJAAN PENGECATAN TEMBOK BARU ( 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP ) EKSTERIOR
1 M2 PEKERJAAN PENGECATAN PLAFOND
1 M2 PEKERJAAN WALLPAPER
1 M2 PEKERJAAN PENGECATAN PERMUKAAN BAJA DENGAN MENIE BESI
JUMLAH HARGA
Rp
d
345,200.00
87,600.00
22,100.00
451,900.00
200,500.00
1,814,600.00
907,300.00
23,500.00
99,800.00
122,500.00
145,700.00
132,800.00
201,400.00
160,500.00
72,800.00
72,800.00
204,900.00
33,400.00
608,000.00
1,327,200.00
1,207,900.00
1,126,500.00
744,800.00
912,200.00
1,185,800.00
1,309,200.00
1,352,400.00
1,365,900.00
1,505,100.00
11,300.00
11,500.00
14,400.00
138,400.00
124,900.00
199,900.00
201,000.00
328,200.00
287,800.00
212,600.00
95,100.00
86,500.00
42,300.00
775,600.00
64,096.12
688,100.00
411,900.00
110,800.00
976,000.00
87,200.00
871,300.00
658,800.00
91,500.00
688,400.00
246,400.00
93,500.00
218,400.00
135,500.00
161,600.00
153,400.00
335,500.00
560,600.00
180,200.00
195,400.00
83,300.00
78,900.00
46,700.00
39,400.00
35,500.00
45,900.00
186,900.00
182,900.00
44,700.00
31,500.00
139,500.00
33,200.00
310,400.00
250,700.00
75,500.00
212,100.00
279,300.00
81,800.00
50,000.00
70,000.00
20,600.00
29,100.00
108,700.00
127,900.00
331,400.00
191,900.00
134,700.00
166,100.00
39,800.00
27,200.00
36,500.00
36,100.00
44,900.00
433,000.00
78,100.00
116,200.00
113,900.00
254,400.00
120,800.00
100,800.00
115,400.00
178,400.00
52,000.00
68,400.00
32,700.00
25,600.00
30,800.00
40,300.00
132,100.00
32,100.00
2,174,000.00
542,800.00
2,013,200.00
991,800.00
490,800.00
268,700.00
209,000.00
100,900.00
66,600.00
HARGA SATUAN PEKERJAAN
JENIS PEKERJAAN
c
Dirjen Binamarga-Panduan Analisis Satuan No 008BM2008
PEKERJAAN TANAH
1 M3 Galian Tanah Dengan Alat Berat ( Cut )
1 M3 Timbunan Tanah Berikut Pemadatan Tanah Tiap 20 cm ( Fill ) Tanah Setempat Bekas Galian Sumber Bahan
1 M3 Timbunan Tanah Berikut Pemadatan Tanah Tiap 20 cm ( Fill ) Tanah Dari Luar
1 M3 Timbunan Sirtu Berikut Pemadatan Tanah Tiap 20 cm ( Fill )
1 M3 Buangan Tanah Keluar Site Dengan Jarak Max.10 Km
1 M' Pengeboran Tanah Ø 30 cm Untuk Pondasi Bor Pile
PEKERJAAN PARTISI
1 M2 PEKERJAAN ALUMUNIUM + KACA TEMPERED 8 MM LAIS SANBLAST
1 M2 PEKERJAAN ALLUMUNIUM COMPOSITE PANEL + RANGKA HOLLOW
1 M2 PEKERJAAN BATU TEMPEL
1 M2 PEKERJAAN BATU ALAM ANDESIT
1 M2 PEKERJAAN MULTIPLEK T = 9 MM
1 M2 PEKERJAAN LAPISAN HPL
1 M2 PEKERJAAN PARTISI KALSIBOARD, TEBAL 8 MM ( DUA SISI ) + RANGKA HOLLOW
1 M2 PEKERJAAN PARTISI KACA TEMPERED, TEBAL 6 MM + SUN BLAST + KUSEN ALLUMUNIUM
1 M2 PEKERJAAN CURTAIN WALL TEMPERED 8 MM WARNA
PEKERJAAN ATAP
1 M2 PEKERJAAN ATAP ALUMUNIUM ( SPANDEK )
1 M2 PEKERJAAN ALUMUNIUM FOIL
1 M2 PEKERJAAN ROOF MESH
1 M2 PEKERJAAN GLASSWOOL
1 M2 PEKERJAAN RANGKA ATAP BAJA RINGAN GALVALUM
1 M2 PEKERJAAN BUBUNGAN ATAP SPANDEK
1 M' PEKERJAAN PEMASANGAN LISTPLANK GRC UK. ( 0,9 X 30 ) CM
BETON BERTULANG )
PEKERJAAN BETON BERTULANG
1 M3 PEKERJAAN BETON READY MIX ( K-175 ) DENGAN POMPA
1 M3 PEKERJAAN BETON READY MIX ( K-225 ) DENGAN POMPA
1 M3 PEKERJAAN BETON READY MIX ( K-250 ) DENGAN POMPA
1 M3 PEKERJAAN BETON READY MIX ( K-275) DENGAN POMPA
1 M3 PEKERJAAN BETON READY MIX ( K-300) DENGAN POMPA
1 M3 PEKERJAAN LANTAI KERJA 1 : 3 : 5
PENUTUP LANTAI )
PEKERJAAN PENUTUP LANTAI
1 M2 PASANG LANTAI KERAMIK POLISHED UK. 60 x 60 cm
1 M2 PASANG LANTAI KERAMIK UNPOLISHED UK. 60 x 60 cm
1 M2 PASANG LANTAI KERAMIK UNPOLISHED UK. 30 x 30 cm
1 M2 PASANG LANTAI KERAMIK UNPOLISHED UK. 30 x 60 cm
1 M1 PASANG STEPNOISING 10 X 40 CM
1 M1 PASANG STEPNOISING 10 X 60 CM
1 M1 PEKERJAAN COATING WATERPROOFING
1 M2 PEKERJAAN WATERPROOFING T = 25 CM
1 M2 PEKERJAAN WATERPROOFING T = 3 CM
1 M2 PEKERJAAN WATERPROOFING T = 10 CM
1 M2 SCREED LANTAI AD. 1 : 3 T = 5 CM
1 M1 PEKERJAAN PEMASANGAN LANTAI KERAMIK UK. 40 X 40 CM
KUSEN )
PEKERJAAN PENUTUP KUSEN DAN KACA
1 M' PASANG KUSEN PINTU DAN JENDELA ALLUMINIUM WARNA 4"
1 M2 PASANG DAUN JENDELA KACA TEMPERED 6 mm, RANGKA ALUMUNIUM
1 M2 PASANG DAUN PINTU PANEL MULTIPLEX 12 mm, RANGKA ALUMUNIUM
1 M2 PASANG KACA TEMPERED TEBAL 6 mm
1 M2 CURTAIN WALL KACA TEMPERED 8 MM WARNA BIRU MUDA
JUMLAH HARGA
Rp
d
40,300.00
50,900.00
202,200.00
621,400.00
55,700.00
737,600.00
42,800.00
22,500.00
19,700.00
72,100.00
280,200.00
27,700.00
164,400.00
Err:509
36,000.00
118,800.00
79,700.00
55,400.00
55,400.00
172,100.00
53,300.00
138,200.00
1,365,700.00
1,402,500.00
1,409,100.00
1,426,100.00
1,442,900.00
1,024,000.00
311,500.00
282,500.00
192,100.00
364,400.00
69,100.00
76,500.00
74,800.00
193,200.00
77,500.00
107,000.00
86,000.00
172,000.00
15,800.00
Err:509
502,600.00
Err:509
ANALISA HARGA SATUAN PEKERJAAN
a b c
C. PERALATAN
Buldozer
Excavator
Dump Truck 8 Ton
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
B.16.2.3 1 M3 Timbunan Tanah Berikut Pemadatan Tanah Tiap 20 cm ( Fill ) Tanah Setempat
A. TENAGA KERJA
Pekerja L.01
Mandor L.02
Operator Alat Berat L.04
JUM
B. BAHAN
C. PERALATAN
Wheel Loader 1-1,63 m3
Motor Grader
Vibrator Roller 6-8 Ton
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
B.16.2.4 1 M3 Timbunan Tanah Berikut Pemadatan Tanah Tiap 20 cm ( Fill ) Tanah Dari Luar
A. TENAGA KERJA
Pekerja L.01
Mandor L.02
Operator Alat Berat L.04
JUM
B. BAHAN
Tanah Merah
C. PERALATAN
Wheel Loader 1-1,63 m3
Motor Grader
Vibrator Roller 6-8 Ton
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
B.16.2.5 1 M3 Timbunan Sirtu Berikut Pemadatan Tanah Tiap 20 cm ( Fill )
A. TENAGA KERJA
Pekerja L.01
Mandor L.02
Operator Alat Berat L.04
JUM
B. BAHAN
Sirtu
C. PERALATAN
Wheel Loader 1-1,63 m3
Motor Grader
Vibrator Roller 6-8 Ton
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
B.16.2.7 1 M3 Buangan Tanah Keluar Site Dengan Jarak Max.10 Km
A. TENAGA KERJA
Pekerja L.01
Mandor L.02
Operator Alat Berat L.04
JUM
B. BAHAN
C. PERALATAN
Excavator 80-140 HP
Dump Truck 8 Ton
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
B.16.2.8 1 M' Pengeboran Tanah Ø 30 cm Untuk Pondasi Bor Pile
A. TENAGA KERJA
Pekerja L.01
Mandor L.02
JUM
B. BAHAN
C. PERALATAN
Mesin Pengeboran
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
a b c
KODE P ( PARTISI )
P.1 1 M2 PEKERJAAN ALUMUNIUM + KACA TEMPERED 8 MM LAIS SANBLAST
A. TENAGA KERJA
Pekerja
Tukang
Kepala Tukang
Mandor
JUM
B. BAHAN
Rangka Allumunium
Skrup
Sealent
Kaca Tempered 8 mm
Lapisan Sanblast
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
P.2 1 M2 PEKERJAAN ALLUMUNIUM COMPOSITE PANEL + RANGKA HOLLOW
A. TENAGA KERJA
Pekerja
Tukang
Kepala Tukang
Mandor
JUM
B. BAHAN
Allumunium Composite Panel + Rangka Besi
Stifener
Sealent GE/Down Coming Non Asan
Bracket Steel Galvanized
Alat Bantu
C. PERALATAN
JUM
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
P.3 1 M2 PEKERJAAN BATU TEMPEL
A. TENAGA KERJA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
JUM
B. BAHAN
Batu Tempel
Semen Portland
Pasir Pasang
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
P.4 1 M2 PEKERJAAN BATU ALAM ANDESIT
A. TENAGA KERJA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
JUM
B. BAHAN
Batu Alam ( Batu Andesit )
Semen Portland
Pasir Pasang
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
P.5 1 M2 PEKERJAAN MULTIPLEK T = 9 MM
A. TENAGA KERJA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
JUM
B. BAHAN
Multiplek Tebal 9 mm
Baut/Skrup
Lem Kayu
Alat Bantu
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
P.6 1 M2 PEKERJAAN LAPISAN HPL
A. TENAGA KERJA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
JUM
B. BAHAN
HPL
Lem Kayu
Alat Bantu
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
P.7 1 M2 PEKERJAAN PARTISI KALSIBOARD, TEBAL 8 MM ( DUA SISI ) + RANGKA HOLLOW
A. TENAGA KERJA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
JUM
B. BAHAN
Kalsiboard 8 mm
Paku Skrup
Coating
Besi Hollow 40/40 mm
Skrup Gypsum
Alat Bantu
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
P.8 1 M2 PEKERJAAN PARTISI KACA TEMPERED, TEBAL 6 MM + SUN BLAST + KUSEN ALL
A. TENAGA KERJA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
B. BAHAN
Profil Allumunium
Kaca Tempered 6 mm + Sun blast
Kalsiboard 8 mm
Paku Skrup
Coating
Besi Hollow 40/40 mm
Skrup Gypsum
Alat Bantu
C. PERALATAN
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
a b c
KODE ATP
ATP.1 1 M2 PEKERJAAN ATAP ALUMUNIUM ( SPANDEK )
A. TENAGA KERJA
Pekerja
Tukang
Kepala Tukang
Mandor
JUM
B. BAHAN
Atap Spandek t = 0,4 mm
Aksesoris
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
ATP.2 1 M2 PEKERJAAN ALUMUNIUM FOIL
A. TENAGA KERJA
Pekerja
Tukang
Kepala Tukang
Mandor
JUM
B. BAHAN
Alumunium Foil/Sisalation
C. PERALATAN
C. PERALATAN
C. PERALATAN
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
ATP.6 1 M2 PEKERJAAN BUBUNGAN ATAP SPANDEK
A. TENAGA KERJA
Pekerja
Tukang
Kepala Tukang
Mandor
JUM
B. BAHAN
Bubungan Spandek
Aksesories
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
ATP.7 1 M' PEKERJAAN PEMASANGAN LISTPLANK GRC UK. ( 0,9 X 30 ) CM
A. TENAGA KERJA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
JUM
B. BAHAN
GRC T = 9 mm
Paku Skrup
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON
a b c
KODE BB ( BETON BERTULANG )
BB.1 1 M3 PEKERJAAN BETON READY MIX ( K-175 ) DENGAN POMPA
A. TENAGA KERJA
Pekerja
Tukang
Kepala Tukang
Mandor
JUM
B. BAHAN
Beton ready mix K-175
C. PERALATAN
Pompa beton
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
BB.2 1 M3 PEKERJAAN BETON READY MIX ( K-225 ) DENGAN POMPA
A. TENAGA KERJA
Pekerja
Tukang
Kepala Tukang
Mandor
JUM
B. BAHAN
Beton ready mix K-225
C. PERALATAN
Pompa beton
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
BB.3 1 M3 PEKERJAAN BETON READY MIX ( K-250 ) DENGAN POMPA
A. TENAGA KERJA
Pekerja
Tukang
Kepala Tukang
Mandor
JUM
B. BAHAN
Beton ready mix K-250
C. PERALATAN
Pompa beton
C. PERALATAN
Pompa beton
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
BB.5 1 M3 PEKERJAAN BETON READY MIX ( K-300) DENGAN POMPA
A. TENAGA KERJA
Pekerja
Tukang
Kepala Tukang
Mandor
JUM
B. BAHAN
Beton ready mix K-300
C. PERALATAN
Pompa beton
C. PERALATAN
Pompa beton
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
a b c
KODE PL ( PENUTUP LANTAI )
PL.1 1 M2 PASANG LANTAI KERAMIK POLISHED UK. 60 x 60 cm
A. TENAGA KERJA
Pekerja
Tukang
Kepala Tukang
Mandor
JUM
B. BAHAN
Keramik HT uk. 60 x 60 cm
Semen portland
Pasir pasang
Semen warna
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
PL.2 1 M2 PASANG LANTAI KERAMIK UNPOLISHED UK. 60 x 60 cm
A. TENAGA KERJA
Pekerja
Tukang
Kepala Tukang
Mandor
JUM
B. BAHAN
Keramik HT uk. 60 x 60 cm
Semen portland
Pasir pasang
Semen warna
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
PL.3 1 M2 PASANG LANTAI KERAMIK UNPOLISHED UK. 30 x 30 cm
A. TENAGA KERJA
Pekerja
Tukang
Kepala Tukang
Mandor
JUM
B. BAHAN
Lantai Keramik 30 x 30 cm
Semen portland
Pasir pasang
Semen warna
C. PERALATAN
JU
D Jumlah Tenaga, Biaya dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
PL.4 1 M2 PASANG LANTAI KERAMIK UNPOLISHED UK. 30 x 60 cm
A. TENAGA KERJA
Pekerja
Tukang
Kepala Tukang
Mandor
JUM
B. BAHAN
Lantai Keramik 30 x 60 cm
Semen portland
Pasir pasang
Semen warna
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
PL.5 1 M1 PASANG STEPNOISING 10 X 40 CM
A. TENAGA KERJA
Pekerja
Tukang
Kepala Tukang
Mandor
JUM
B. BAHAN
Step Noising 10 x 40
Semen portland
Pasir pasang
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
PL.6 1 M1 PASANG STEPNOISING 10 X 60 CM
A. TENAGA KERJA
Pekerja
Tukang
Kepala Tukang
Mandor
JUM
B. BAHAN
Step Noising 10 x 60
Semen portland
Pasir pasang
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
PL.7 1 M1 PEKERJAAN COATING WATERPROOFING
A. TENAGA KERJA
Pekerja
Tukang
Kepala Tukang
Mandor
JUM
B. BAHAN
Waterproofing
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
PL.8 1 M2 PEKERJAAN WATERPROOFING T = 25 CM
A. TENAGA KERJA
Pekerja
Tukang
Kepala Tukang
Mandor
JUM
B. BAHAN
Waterproofing
Pasir
Semen Portland
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
PL.9 1 M2 PEKERJAAN WATERPROOFING T = 3 CM
A. TENAGA KERJA
Pekerja
Tukang
Kepala Tukang
Mandor
JUM
B. BAHAN
Waterproofing
Pasir
Semen Portland
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
PL.10 1 M2 PEKERJAAN WATERPROOFING T = 10 CM
A. TENAGA KERJA
Pekerja
Tukang
Kepala Tukang
Mandor
JUM
B. BAHAN
Waterproofing
Pasir
Semen Portland
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
PL.11 1 M2 SCREED LANTAI AD. 1 : 3 T = 5 CM
A. TENAGA KERJA
Pekerja
Tukang
Kepala Tukang
Mandor
JUM
B. BAHAN
Waterproofing
Pasir
Semen Portland
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
PL.12 1 M1 PEKERJAAN PEMASANGAN LANTAI KERAMIK UK. 40 X 40 CM
A. TENAGA KERJA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
JUM
B. BAHAN
Keramik uk. 40 x 40
Semen Portland
Pasir pasang
Semen Warna
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
ANALISA BIAYA KONSTRUKSI PEKERJAAN KUSE
a b c
KODE KS ( KUSEN )
KS.1 1 M' PASANG KUSEN PINTU DAN JENDELA ALLUMINIUM WARNA 4"
A. TENAGA KERJA
Pekerja
Tukang
Kepala Tukang
Mandor
JUM
B. BAHAN
Kusen Allumunium Warna 4"
Sekrup fixer
Sealent
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
KS.2 1 M2 PASANG DAUN JENDELA KACA TEMPERED 6 mm, RANGKA ALUMUNIUM
A. TENAGA KERJA
Pekerja
Tukang
Kepala Tukang
Mandor
JUM
B. BAHAN
Rangka Aluminium
Kaca Tempered 6 mm
Profil Kaca
Sealent
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
KS.3 1 M2 PASANG DAUN PINTU PANEL MULTIPLEX 12 mm, RANGKA ALUMUNIUM
A. TENAGA KERJA
Pekerja
Tukang
Kepala Tukang
Mandor
JUM
B. BAHAN
Rangka Aluminium
Multiplek 12 mm
Lem kuning/fox
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
KS.4 1 M2 PASANG KACA TEMPERED TEBAL 6 mm
A. TENAGA KERJA
Pekerja
Tukang
Kepala Tukang
Mandor
JUM
B. BAHAN
Kaca Tempered 6 mm
Sealent
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
KS.5 1 M2 CURTAIN WALL KACA TEMPERED 8 MM WARNA BIRU MUDA
A. TENAGA KERJA
Pekerja
Tukang
Kepala Tukang
Mandor
JUM
B. BAHAN
Kaca tempered 8 mm Warna Biru Muda
Saelent
Material/Alat bantu
Pek. Rangka Allumunium
Brecket
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
ANALISA BIAYA KONSTRUKSI PEKERJAAN KUSE
C. PERALATAN
JU
D Jumlah Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
ARGA SATUAN PEKERJAAN
N ANGGARAN 2017
ONSTRUKSI PEKERJAAN TANAH
PEKERJAAN TANAH
-
JUMLAH HARGA BAHAN -
MM LAIS SANBLAST
m' 4.4000 -
bh 4.0000 -
Tube 0.2700 -
m2 1.1000 -
m2 1.1000 -
JUMLAH HARGA BAHAN -
m2 1.0000 -
m2 0.5000 -
Kg 0.1250 -
m2 1.0000 -
Ls 0.0200 -
JUMLAH HARGA BAHAN -
m2 1.0000 -
Kg 10.8000 -
m3 0.0260 -
JUMLAH HARGA BAHAN -
m2 1.0000 -
Kg 15.7500 - -
m3 0.0300 - -
JUMLAH HARGA BAHAN -
m2 1.0000 - -
Kg 0.1000 19,800.00 1,980.00
Ls 1.0000 1,980.00 1,980.00
JUMLAH HARGA BAHAN 3,960.00
m2 1.1000 -
tube 0.2700 -
ls 1.0000 -
m' 4.4000 -
Bh 4.0000 -
JUMLAH HARGA BAHAN -
m2 1.0500 -
JUMLAH HARGA BAHAN -
m2 1.2000 -
JUMLAH HARGA BAHAN -
m' 1.2000 -
Ls 1.0000 -
JUMLAH HARGA BAHAN -
POMPA
-
JUMLAH HARGA PERALATAN -
930,908.00
10% x D 93,090.80
1,024,000.00
dus 1.0500 - -
kg 7.8500 1,900.00 14,915.00
m3 0.0450 287,500.00 12,937.50
kg 0.5000 15,000.00 7,500.00
JUMLAH HARGA BAHAN 35,352.50
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A BAHAN
Kusen aluminium 3" m' 24.67 87,200.00
Daun Pintu Kaca Alum. 3" m2 2.87 658,800.00
Daun Jendela Alum. 2" m2 2.08 620,458.63
Kaca t= 6 mm (jendela+bouvenlight) m2 1.61 115,400.00
Level handle pintu double set 1.00 224,021.60
Lockcase set 1.00 276,041.92
D-cylinder set 1.00 166,100.00
Engsel/Hinges psg 3.00 39,800.00
Grendel kunci tanam bwah bh 1.00 197,300.40
Grendel kunci tanam atas bh 1.00 191,900.00
Casement 8" psg 2.00 69,310.12
Casement 12" psg 2.00 81,080.12
Spring knip bh 4.00 36,100.00
JUMLAH HARGA BAHAN
B PERALATAN
Alat bantu ls 1.00 12,500.00
JUMLAH HARGA ALAT
D Jumlah ( A + B )
E Overhead + Profit ( 10% )
F Harga Satuan Pekerjaan (A+B)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A BAHAN
Kusen aluminium 3" m' 20.51 87,200.00
Daun Pintu Kaca Alum. 3" m2 3.00 658,800.00
Daun Jendela Alum. 2" m2 1.22 620,458.63
Kaca t= 6 mm (jendela + pintu) m2 2.12 115,400.00
Level handle pintu double set 1.00 224,021.60
Lockcase set 1.00 276,041.92
D-cylinder set 1.00 166,100.00
Engsel/Hinges psg 3.00 39,800.00
Grendel kunci tanam bwah bh 1.00 197,300.40
Grendel kunci tanam atas bh 1.00 191,900.00
Casement 12" psg 2.00 81,080.12
Spring knip bh 2.00 36,100.00
JUMLAH HARGA BAHAN
B PERALATAN
Alat bantu ls 1.00 12,500.00
JUMLAH HARGA ALAT
D Jumlah ( A + B )
Overhead + Profit ( 10% )
C Harga Satuan Pekerjaan (A+B)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A BAHAN
Kusen aluminium 3' m' 20.04 87,200.00
Daun Pintu Kaca Alum. 3" m2 3.28 658,800.00
Daun Jendela Alum. 2" m2 1.27 620,458.63
Kaca t= 6 mm (jendela+bouvenlight) m2 1.97 115,400.00
Level handle pintu single set 1.00 226,147.68
Lockcase set 1.00 276,041.92
D-cylinder set 1.00 166,100.00
Engsel/Hinges psg 1.50 39,800.00
Casement 12" psg 2.00 81,080.12
Spring knip bh 2.00 36,100.00
JUMLAH HARGA BAHAN
B PERALATAN
Alat bantu ls 1.00 12,500.00
JUMLAH HARGA ALAT
D Jumlah ( A + B)
Overhead + Profit ( 10% )
C Harga Satuan Pekerjaan (A+B)
Pemasangan Kusen Pintu Jendela type PJ3/unit
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A BAHAN
Kusen aluminium 3" m' 24.46 87,200.00
Daun Pintu Kaca 3" m2 1.76 658,800.00
Daun Jendela Alum. 2" m2 2.36 620,458.63
Kaca t= 6 mm (bouvenlight+jendela) m2 2.70 115,400.00
Level handle pintu single set 1.00 226,147.68
Lockcase set 1.00 179,791.92
D-cylinder set 1.00 166,100.00
Engsel/Hinges psg 1.50 39,800.00
Casement 12" psg 3.00 81,080.12
Spring knip bh 3.00 36,100.00
JUMLAH HARGA BAHAN
B PERALATAN
Alat bantu ls 1.00 12,500.00
JUMLAH HARGA ALAT
D Jumlah ( A + B )
E Overhead + Profit
F Harga Satuan Pekerjaan (A+B)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A BAHAN
Kusen aluminium 3" m' 6.78 87,200.00
Daun Pintu Engineering wood unit 1.00 2,246,475.00
Daun Bouvenlight Alum. 2" m2 0.33 620,458.63
Level handle pintu set 1.00 226,147.68
Lockcase set 1.00 179,791.92
D-cylinder set 1.00 166,100.00
Engsel/Hinges psg 1.50 39,800.00
Casement 8" psg 1.00 69,310.12
Spring knip bh 1.00 36,100.00
JUMLAH HARGA BAHAN
B PERALATAN
Alat bantu ls 1.00 12,500.00
JUMLAH HARGA ALAT
D Jumlah ( A+ B )
E Overhead + Profit ( 10% )
F Harga Satuan Pekerjaan (A+B)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A BAHAN
Kusen aluminium 3" m' 2.23 87,200.00
Daun Pintu Double Teakwood unit 1.00 587,100.00
Bouvenlight Alum. 2" m2 0.33 620,458.63
Level handle pintu set 1.00 226,147.68
Lockcase set 1.00 179,791.92
D-cylinder bh 1.00 166,100.00
Engsel/Hinges psg 1.50 39,800.00
Casement 8" psg 1.00 69,310.12
Spring knip bh 1.00 36,100.00
JUMLAH HARGA BAHAN
B PERALATAN
Alat bantu ls 1.00 12,500.00
JUMLAH HARGA ALAT
D Jumlah ( A + B )
E Overhead + Profit ( 10% )
F Harga Satuan Pekerjaan (A+B)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A BAHAN
Kusen aluminium 3" m' 1.64 87,200.00
Daun Pintu Double Teakwood + kaca unit 1.00 587,100.00
D Jumlah ( A + B )
E Overhead + Profit ( 10% )
F Harga Satuan Pekerjaan (A+B)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA KERJA
Pekerja OH 0.8000 115,200.00
Tukang OH 0.8000 99,600.00
Kepala Tukang OH 0.0800 151,200.00
Mandor OH 0.0012 170,400.00
B BAHAN
Kusen + Daun Pintu UPVC unit 1.00 320,000.00
JUMLAH HARGA BAHAN
B PERALATAN
Alat bantu ls 1.00 12,500.00
JUMLAH HARGA ALAT
D Jumlah ( A + B + C )
E Overhead + Profit ( 10% )
F Harga Satuan Pekerjaan (A+B)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A BAHAN
Kusen aluminium 3" m' 2.23 87,200.00
Daun Pintu Double Teakwood unit 1.00 587,100.00
Kaca t = 5 mm m2 0.08 115,400.00
Bouvenlight Alum. 2" m2 0.33 620,458.63
Level handle pintu set 1.00 226,147.68
Lockcase set 1.00 179,791.92
D-cylinder set 1.00 166,100.00
Engsel/Hinges psg 1.50 39,800.00
Casement 8" psg 1.00 69,310.12
Spring knip bh 1.00 36,100.00
JUMLAH HARGA BAHAN
B PERALATAN
Alat bantu ls 1.00 12,500.00
JUMLAH HARGA ALAT
D Jumlah ( A + B )
E Overhead + Profit ( 10% )
F Harga Satuan Pekerjaan (A+B)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A BAHAN
Kusen rangka hollow 40 x 20 m' 7.44 19,625.00
Daun Plat Alluminium t = 2 mm m2 0.54 151,000.00
Handle shaft set 1.00 225,000.00
Lockcase + d-cylider set 1.00 170,010.50
Engsel/Hinges bh 2.00 39,800.00
JUMLAH HARGA BAHAN
B PERALATAN
Alat bantu ls 1.00 12,500.00
JUMLAH HARGA ALAT
D Jumlah ( A + B + C )
E Overhead + Profit ( 10% )
C Harga Satuan Pekerjaan (A+B)
Pemasangan Kusen Jendela type J1A/unit dan J1B/unit
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A BAHAN
Kusen aluminium 3" m' 9.27 87,200.00
Daun Jendela Alum. 2" m2 1.06 620,458.63
Kaca t= 5 mm (jendela) m2 0.96 115,400.00
Casement 12" psg 1.00 81,080.12
Spring knip bh 2.00 36,100.00
Casement 8" psg 1.00 69,310.12
JUMLAH HARGA BAHAN
B PERALATAN
Alat bantu ls 1.00 12,500.00
JUMLAH HARGA ALAT
D Jumlah ( A + B )
E Overhead + Profit ( 10% )
F Harga Satuan Pekerjaan (A+B)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A BAHAN
Kusen aluminium 3" m' 14.38 87,200.00
Daun Jendela Alum. 2" m2 0.83 620,458.63
Kaca t= 5 mm (jendela) m2 3.56 115,400.00
Casement 8" psg 2.00 69,310.12
Spring knip bh 2.00 36,100.00
JUMLAH HARGA BAHAN
B PERALATAN
Alat bantu ls 1.00 12,500.00
JUMLAH HARGA ALAT
D Jumlah ( A + B + C )
E Overhead + Profit ( 10% )
F Harga Satuan Pekerjaan (A+B)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A BAHAN
Kusen aluminium 3" m' 10.16 87,200.00
Jalusi Alluminium m' 21.30 21,300.00
Kaca t= 5 mm (jendela) m2 1.28 115,400.00
D Jumlah ( A + B + C )
E Overhead + Profit ( 10% )
F Harga Satuan Pekerjaan (A+B)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A BAHAN
Kusen aluminium 3" m' 1.8200 87,200.00
Sealant tube 0.1250 43,250.00
Kaca t= 5 mm (jendela) m2 0.1978 115,400.00
D Jumlah ( A + B )
E Overhead + Profit ( 10% )
C Harga Satuan Pekerjaan (A+B)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0250 115,200.00
Tukang batu L.02 OH 0.2500 99,600.00
Kepala tukang L.03 OH 0.0250 151,200.00
Mandor L.04 OH 0.0500 170,400.00
JUMLAH TENAGA KERJA
B BAHAN
Glass block bh 8.0000 26,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead + Profit (Contoh 15%) 10% x D 10%
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0250 115,200.00
Tukang batu L.02 OH 0.2500 99,600.00
Kepala tukang L.03 OH 0.0250 151,200.00
Mandor L.04 OH 0.0500 170,400.00
JUMLAH TENAGA KERJA
B BAHAN
Glass block bh 16.0000 26,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead + Profit (Contoh 15%) 10% x D 10%
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0250 115,200.00
Tukang batu L.02 OH 0.2500 99,600.00
Kepala tukang L.03 OH 0.0250 151,200.00
Mandor L.04 OH 0.0500 170,400.00
JUMLAH TENAGA KERJA
B BAHAN
Glass block bh 36.000 26,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead + Profit (Contoh 15%) 10% x D 10%
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0250 115,200.00
Tukang batu L.02 OH 0.2500 99,600.00
Kepala tukang L.03 OH 0.0250 151,200.00
Mandor L.04 OH 0.0500 170,400.00
JUMLAH TENAGA KERJA
B BAHAN
Glass block bh 24.0000 26,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead + Profit (Contoh 15%) 10% x D 10%
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.025 115,200.00
Tukang batu L.02 OH 0.250 99,600.00
Kepala tukang L.03 OH 0.025 151,200.00
Mandor L.04 OH 0.050 170,400.00
JUMLAH TENAGA KERJA
B BAHAN
Glass block bh 24.000 26,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead + Profit (Contoh 15%) 10% x D 10%
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0250 115,200.00
Tukang batu L.02 OH 0.2500 99,600.00
Kepala tukang L.03 OH 0.0250 151,200.00
Mandor L.04 OH 0.0500 170,400.00
JUMLAH TENAGA KERJA
B BAHAN
Glass block bh 18.0000 26,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead + Profit (Contoh 15%) 10% x D 10%
F Harga Satuan Pekerjaan (D+E)
Pemasangan Kusen Jendela type LV1 80x60 cm/unit
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.0500 115,200.00
Tukang besi L.02 OH 0.3780 99,600.00
Kepala tukang L.03 OH 0.0378 151,200.00
Mandor L.04 OH 0.0019 170,400.00
JUMLAH TENAGA KERJA
B BAHAN
Kusen rangka UNP 100x50x5x7.5 kg 26.2080 9,200.00
Kusen rangka UNP 100x50x5x7.5 kg 10.9800 9,200.00
Cat besi kg 3.7188 60,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead + Profit (Contoh 15%) 10% x D 10%
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.2600 115,200.00
Tukang besi L.02 OH 0.3780 99,600.00
Kepala tukang L.03 OH 0.0378 151,200.00
Mandor L.04 OH 0.0019 170,400.00
JUMLAH TENAGA KERJA
B PERALATAN
Kusen rangka UNP 100x50x5x7.5 kg 33.6960 9,350.00
Kusen rangka UNP 100x50x5x7.5 kg 17.5680 9,350.00
Cat besi kg 51.2640 500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead + Profit (Contoh 15%) 10% x D 10%
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.0500 115,200.00
Tukang besi L.02 OH 0.3780 99,600.00
Kepala tukang L.03 OH 0.0378 151,200.00
Mandor L.04 OH 0.0019 170,400.00
JUMLAH TENAGA KERJA
B PERALATAN
Kusen rangka UNP 100x50x5x7.5 kg 18.7200 9,350.00
Kusen rangka UNP 100x50x5x7.5 kg 10.9800 9,350.00
Cat besi kg 29.7000 500.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead + Profit (Contoh 15%) 10% x D 10%
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.0500 115,200.00
Tukang besi L.02 OH 0.3780 98,400.00
Kepala tukang L.03 OH 0.0378 151,200.00
Mandor L.04 OH 0.0019 170,400.00
JUMLAH TENAGA KERJA
B BAHAN
Kusen rangka UNP 100x50x5x7.5 kg 31.4496 9,200.00
Daun Pintu Baja T=1,5 mm kg 79.1667 9,200.00
Rangka pintu besi siku 40x40x2 kg 42.4600 9,200.00
Level handle double pintu baja psg 1.0000 180,000.00
HD non panic swing bh 1.0000 535,000.00
D. cylinder bh 1.0000 92,500.00
Engsel/hinges psg 3.0000 92,000.00
Grendel tanam atas bh 1.0000 120,000.00
Grendel tanah bawah bh 1.0000 115,000.00
Cat besi kg 7.1298 60,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Alat 2 % 5.000
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead + Profit (Contoh 15%) 10% x D 10%
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A BAHAN
Kusen Plat Sheet t = 1,2 mm m' 1.1000 113,832.40
Daun Jendela Plat Sheet t = 1,2 mm m2 0.2500 623,262.82
Lockcase bh 1.0000 159,049.00
Handle + kunci bh 1.0000 194,000.00
Engsel psg 1.0000 73,516.30
Spring knip bh 1.0000 50,385.50
JUMLAH HARGA BAHAN
B PERALATAN
Alat bantu ls 1.0000 8,500.00
JUMLAH HARGA ALAT
A BAHAN
2,151,224.00 Kusen aluminium 3" m' 16.68
1,890,756.00 Daun Pintu Engineering wood m2 1.64
1,292,291.23 Daun Jendela Alum. 2" m2 0.13
185,470.88 Kaca t= 6 mm (jendela) m2 1.75
224,021.60 Level handle pintu single set 1.00
276,041.92 Lockcase set 1.00
166,100.00 D-cylinder set 1.00
119,400.00 Engsel/Hinges psg 1.50
197,300.40
191,900.00
138,620.24 Casement 8" psg 1.00
162,160.24
144,400.00 Spring knip bh 1.00
7,139,686.51 JUMLAH HARGA BAHAN
B PERALATAN
12,500.00 Alat bantu ls 1.00
12,500.00 JUMLAH HARGA ALAT
7,152,186.51 D Jumlah ( A + B )
E Overhead + Profit ( 10% )
7,152,200.00 F Harga Satuan Pekerjaan (A+B)
1,788,036.00
1,976,400.00
759,441.36
244,071.00
224,021.60
276,041.92
166,100.00
119,400.00
197,300.40
191,900.00
162,160.24
72,200.00
6,177,072.52
12,500.00
12,500.00
6,189,572.52
6,189,600.00
1,747,488.00
2,160,864.00
787,362.00
227,141.82
226,147.68
276,041.92
166,100.00
59,700.00
162,160.24
72,200.00
5,885,205.66
12,500.00
12,500.00
5,897,705.66
5,897,800.00
Jumlah Harga (Rp)
2,132,737.60
1,159,488.00
1,463,190.36
312,004.67
226,147.68
179,791.92
166,100.00
59,700.00
243,240.36
108,300.00
6,050,700.59
12,500.00
12,500.00
6,063,200.59
6,063,300.00
A BAHAN
591,216.00 Kusen aluminium m' 7.10
2,246,475.00 Daun Pintu Engineering wood unit 1.00
203,510.43 Dau Bouvenlight Alum. m2 0.33
226,147.68 Level handle pintu set 1.00
179,791.92 Lockcase set 1.00
166,100.00 D-cylinder set 1.00
59,700.00 Engsel/Hinges psg 1.50
69,310.12 Casement 8" psg 1.00
36,100.00 Spring knip bh 1.00
3,778,351.15 JUMLAH HARGA BAHAN
B PERALATAN
12,500.00 Alat bantu ls 1.00
12,500.00 JUMLAH HARGA ALAT
3,790,851.15 D
E
3,790,900.00 C Harga Satuan Pekerjaan (A+B)
A BAHAN
194,020.00 Kusen aluminium 3" m' 2.48
587,100.00 Daun Pintu Double Teakwood unit 1.00
203,510.43 Bouvenlight Alum. 2" m2 0.37
226,147.68 Level handle pintu set 1.00
179,791.92 Lockcase set 1.00
166,100.00 D-cylinder bh 1.00
59,700.00 Engsel/Hinges psg 1.50
69,310.12 Casement 8" psg 1.00
36,100.00 Spring knip bh 1.00
1,721,780.15 JUMLAH HARGA BAHAN
B PERALATAN
12,500.00 Alat bantu ls 1.00
12,500.00 JUMLAH HARGA ALAT
1,734,280.15 D Jumlah ( A + B + C )
E Overhead + Profit ( 10% )
1,734,300.00 F Harga Satuan Pekerjaan (A+B)
143,008.00
587,100.00
226,147.68
179,791.92
166,100.00
59,700.00
1,361,847.60
12,500.00
12,500.00
1,374,347.60
1,374,400.00
A TENAGA KERJA
92,160.00 Pekerja OH 0.8000
79,680.00 Tukang OH 0.8000
12,096.00 Kepala Tukang OH 0.0800
204.48 Mandor OH 0.0012
184,140.48
B BAHAN
320,000.00 Kusen + Daun Pintu UPVC unit 1.0000
320,000.00 JUMLAH HARGA BAHAN
B PERALATAN
12,500.00 Alat bantu ls 1.00
12,500.00 JUMLAH HARGA ALAT
516,640.48 D Jumlah ( A + B + C )
51,664.05 E Overhead + Profit ( 10% )
568,400.00 F Harga Satuan Pekerjaan (A+B)
1,743,069.01 D Jumlah ( A + B + C )
E Overhead + Profit ( 10% )
1,743,100.00 F Harga Satuan Pekerjaan (A+B)
A BAHAN
146,010.00 Kusen Plat Sheet t = 1,2 mm m' 1.1000
81,791.67 Daun Jendela Plat Sheet t = 1,2 mm m2 0.2400
225,000.00 Handle shaft set 1.0000
170,010.50 Lockcase + d-cylider set 1.0000
79,600.00 Engsel/Hinges bh 2.0000
702,412.17 JUMLAH HARGA BAHAN
B PERALATAN
12,500.00 Alat bantu ls 1.00
12,500.00 JUMLAH HARGA ALAT
820,273.99 D Jumlah ( A + B + C )
82,027.40 E Overhead + Profit ( 10% )
902,400.00 F Harga Satuan Pekerjaan (A+B)
Jumlah Harga (Rp)
807,908.00
656,321.14
110,934.02
81,080.12
72,200.00
69,310.12
1,797,753.40
12,500.00
12,500.00
1,810,253.40
1,810,300.00
1,253,936.00
516,221.58
410,685.52
138,620.24
72,200.00
2,391,663.34
12,500.00
12,500.00
2,404,163.34
2,404,200.00
885,952.00
453,690.00
147,712.00
1,487,354.00
12,500.00
12,500.00
1,499,854.00
1,499,900.00
158,704.00
5,406.25
22,826.12
186,936.37
12,500.00
12,500.00
199,436.37
199,500.00
2,880.00
24,900.00
3,780.00
8,520.00
40,080.00
208,000.00
208,000.00
248,080.00
24,808.00
272,900.00
2,880.00
24,900.00
3,780.00
8,520.00
40,080.00
416,000.00
416,000.00
456,080.00
45,608.00
501,700.00
2,880.00
24,900.00
3,780.00
8,520.00
40,080.00
936,000.00
936,000.00
976,080.00
97,608.00
1,073,700.00
2,880.00
24,900.00
3,780.00
8,520.00
40,080.00
624,000.00
624,000.00
664,080.00
66,408.00
730,500.00
2,880.00
24,900.00
3,780.00
8,520.00
40,080.00
624,000.00
624,000.00
664,080.00
66,408.00
730,488.00
2,880.00
24,900.00
3,780.00
8,520.00
40,080.00
468,000.00
468,000.00
508,080.00
50,808.00
558,888.00
Jumlah Harga (Rp)
120,960.00
37,648.80
5,715.36
318.99
164,643.15
241,113.60
101,016.00
223,128.00
565,257.60
729,900.75
72,990.07
802,900.00
145,152.00
37,648.80
5,715.36
318.99
188,835.15
315,057.60
164,260.80
25,632.00
504,950.40
693,785.55
69,378.55
763,164.10
120,960.00
37,648.80
5,715.36
318.99
164,643.15
175,032.00
102,663.00
14,850.00
292,545.00
457,188.15
45,718.81
502,906.96
120,960.00
37,195.20
5,715.36
318.99
164,189.55
289,336.32 9.36
728,333.33 26.04
390,632.00 1.833
180,000.00
535,000.00
92,500.00
276,000.00
120,000.00
115,000.00
427,790.40 kusen daun pintu rangka pintu
3,154,592.05 1.218 3.04 2.87184
157,729.60
3,476,511.20
347,651.12
3,824,200.00
125,215.64
155,815.70
159,049.00
194,000.00
73,516.30
50,385.50
757,982.14
8,500.00
8,500.00
766,482.14
Harga Satuan Jumlah Harga
(Rp) (Rp)
87,200.00 1,454,496.00
2,246,475.00 3,684,219.00
620,458.63 81,900.54
115,400.00 201,950.00
226,147.68 226,147.68
179,791.92 179,791.92
166,100.00 166,100.00
39,800.00 59,700.00
69,310.12 69,310.12
36,100.00 36,100.00
JUMLAH HARGA BAHAN 6,159,715.26
12,500.00 12,500.00
JUMLAH HARGA ALAT 12,500.00
6,172,215.26
6,172,300.00
Harga Satuan Jumlah Harga
(Rp) (Rp)
87,200.00 619,120.00
2,246,475.00 2,246,475.00
620,458.63 203,510.43
226,147.68 226,147.68
179,791.92 179,791.92
166,100.00 166,100.00
39,800.00 59,700.00
69,310.12 69,310.12
36,100.00 36,100.00
JUMLAH HARGA BAHAN 3,806,255.15
12,500.00 12,500.00
JUMLAH HARGA ALAT 12,500.00
3,818,755.15
3,818,800.00
87,200.00 215,820.00
587,100.00 587,100.00
620,458.63 228,949.23
226,147.68 226,147.68
179,791.92 179,791.92
166,100.00 166,100.00
39,800.00 59,700.00
69,310.12 69,310.12
36,100.00 36,100.00
JUMLAH HARGA BAHAN 1,769,018.95
12,500.00 12,500.00
JUMLAH HARGA ALAT 12,500.00
1,781,518.95
1,781,600.00
Harga Satuan Jumlah Harga
(Rp) (Rp)
115,200.00 92,160.00
99,600.00 79,680.00
151,200.00 12,096.00
170,400.00 204.48
184,140.48
375,000.00 375,000.00
JUMLAH HARGA BAHAN 375,000.00
12,500.00 12,500.00
JUMLAH HARGA ALAT 12,500.00
571,640.48
57,164.05
628,900.00
320,000.00 320,000.00
12,500.00 12,500.00
JUMLAH HARGA ALAT 12,500.00
516,640.48
51,664.05
568,400.00
18,350.00 20,185.00
- -
225,000.00 225,000.00
170,010.50 170,010.50
39,800.00 79,600.00
JUMLAH HARGA BAHAN 494,795.50
12,500.00 12,500.00
JUMLAH HARGA ALAT 12,500.00
74,219.33
581,514.83
58,151.48
639,700.00
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA
A TENAGA KERJA
Pekerja L.01 OH 0.025 115,200.00 2,880.00
Tukang kayu L.02 OH 0.250 99,600.00 24,900.00
Kepala tukang L.03 OH 0.025 151,200.00 3,780.00
Mandor L.04 OH 0.001 170,400.00 221.52
JUMLAH HARGA TENAGA KERJA 31,781.52
B BAHAN
Kaca buram 5 mm m2 1.1000 66,000.00 72,600.00
Sealant m' 1.1000 12,500.00 13,750.00
JUMLAH HARGA BAHAN 86,350.00
C PERALATAN
A TENAGA KERJA
Pekerja L.01 OH 0.0100 115,200.00 1,152.00
Tukang kayu L.02 OH 0.1000 99,600.00 9,960.00
Kepala tukang L.03 OH 0.0100 151,200.00 1,512.00
Mandor L.04 OH 0.0005 170,400.00 85.20
JUMLAH HARGA TENAGA KERJA 12,709.20
B BAHAN
Casement 8" psg 1.0000 50,300.00 50,300.00
JUMLAH HARGA BAHAN 50,300.00
C PERALATAN
A TENAGA KERJA
Pekerja L.01 OH 0.0100 115,200.00 1,152.00
Tukang kayu L.02 OH 0.1000 99,600.00 9,960.00
Kepala tukang L.03 OH 0.0100 151,200.00 1,512.00
Mandor L.04 OH 0.0005 170,400.00 85.20
JUMLAH HARGA TENAGA KERJA 12,709.20
B BAHAN
Casement 12" psg 1.000 61,000.00 61,000.00
JUMLAH HARGA BAHAN 61,000.00
C PERALATAN
A TENAGA KERJA
Pekerja L.01 OH 0.0100 115,200.00 1,152.00
Tukang kayu L.02 OH 0.1000 99,600.00 9,960.00
Kepala tukang L.03 OH 0.0100 151,200.00 1,512.00
Mandor L.04 OH 0.0005 170,400.00 85.20
JUMLAH HARGA TENAGA KERJA 12,709.20
B BAHAN
Casement 16" psg 1.0000 89,300.00 89,300.00
JUMLAH HARGA BAHAN 89,300.00
C PERALATAN
A TENAGA KERJA
Pekerja L.01 OH 0.0050 115,200.00 576.00
Tukang kayu L.02 OH 0.5000 99,600.00 49,800.00
Kepala tukang L.03 OH 0.0500 151,200.00 7,560.00
Mandor L.04 OH 0.0030 170,400.00 511.20
JUMLAH HARGA TENAGA KERJA 58,447.20
B BAHAN
Kunci pintu single set 1.000 105,000.00 105,000.00
JUMLAH HARGA BAHAN 105,000.00
C PERALATAN
A TENAGA KERJA
Pekerja L.01 OH 0.0200 115,200.00 2,304.00
Tukang kayu L.02 OH 0.2000 99,600.00 19,920.00
Kepala tukang L.03 OH 0.0200 151,200.00 3,024.00
Mandor L.04 OH 0.0020 170,400.00 340.80
JUMLAH HARGA TENAGA KERJA 25,588.80
B BAHAN
Handle pintu Bh 1.0000 180,000.00 180,000.00
JUMLAH HARGA BAHAN 180,000.00
C PERALATAN
A TENAGA KERJA
Pekerja L.01 OH 0.0050 115,200.00 576.00
Tukang kayu L.02 OH 0.5000 99,600.00 49,800.00
Kepala tukang L.03 OH 0.0500 151,200.00 7,560.00
Mandor L.04 OH 0.0030 170,400.00 511.20
JUMLAH HARGA TENAGA KERJA 58,447.20
B BAHAN
kunci pintu double set 1.0000 192,500.00 192,500.00
JUMLAH HARGA BAHAN 192,500.00
C PERALATAN
A TENAGA KERJA
Pekerja L.01 OH 0.0200 115,200.00 2,304.00
Tukang kayu L.02 OH 0.2000 99,600.00 19,920.00
Kepala tukang L.03 OH 0.0200 151,200.00 3,024.00
Mandor L.04 OH 0.0200 170,400.00 3,408.00
JUMLAH HARGA TENAGA KERJA 28,656.00
B BAHAN
Handle pintu Bh 1.0000 175,000.00 175,000.00
JUMLAH HARGA BAHAN 175,000.00
C PERALATAN
A TENAGA KERJA
Pekerja L.01 OH 0.0100 115,200.00 1,152.00
Tukang kayu L.02 OH 0.5000 99,600.00 49,800.00
Kepala tukang L.03 OH 0.0500 151,200.00 7,560.00
Mandor L.04 OH 0.0050 170,400.00 852.00
JUMLAH HARGA TENAGA KERJA 59,364.00
B BAHAN
Kunci tanam biasa/atas bh 1.0000 120,000.00 120,000.00
JUMLAH HARGA BAHAN 120,000.00
C PERALATAN
A TENAGA KERJA
Pekerja L.01 OH 0.005 115,200.00 576.00
Tukang kayu L.02 OH 0.500 99,600.00 49,800.00
Kepala tukang L.03 OH 0.050 151,200.00 7,560.00
Mandor L.04 OH 0.003 170,400.00 511.20
JUMLAH HARGA TENAGA KERJA 58,447.20
B BAHAN
Kunci pintu shaft set 1.000 90,000.00 90,000.00
JUMLAH HARGA BAHAN 90,000.00
C PERALATAN
A TENAGA KERJA
Pekerja L.01 OH 0.015 115,200.00 1,728.00
Tukang kayu L.02 OH 0.150 99,600.00 14,940.00
Kepala tukang L.03 OH 0.015 151,200.00 2,268.00
Mandor L.04 OH 0.001 170,400.00 136.32
JUMLAH HARGA TENAGA KERJA 19,072.32
B BAHAN
Engsel shaft Bh 1.000 30,000.00 30,000.00
JUMLAH HARGA BAHAN 30,000.00
C PERALATAN