TIME SCHEDULE

PAKET PEKERJAA: Pembangunan Rumah Kemasan


TAHUN ANGGARA: 2021

JADWAL PELAKSANAAN PEKERJAAN 210 (DUA RATUS SEPULUH) HARI KALENDER


BOBOT
NO. URAIAN PEKERJAAN BULAN 1 BULAN 2 BULAN 3 BULAN 4 BULAN 5 BULAN 6 BULAN 7 BULAN 8 KET
(%) M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 M28 M29 M30

I PEKERJAAN PEMBANGUNAN GEDUNG KANTOR KEC. PANYIPATAN

I PEKERJAAN PERSIAPAN 2.29 1.145 1.145

II PEKERJAAN PANCANGAN 18.75 15.750 1.500 1.500

III PEKERJAAN TANAH & PONDASI 78.96 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

#NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

#NAME? #NAME? #NAME? #NAME? #NAME?

#NAME? #NAME? #NAME? #NAME? #NAME?

#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? PHO

#NAME? #NAME? #NAME? #NAME? #NAME?

#NAME? #NAME? #NAME? 1.000 #NAME?

#NAME? #NAME? #NAME? 1.000 #NAME?

#NAME? #NAME? #NAME? 1.000 #NAME?

#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

#NAME? #NAME? #NAME? #NAME? 0.500

#NAME? SISTEM MANAGEMENT K3 (SMK3) KONSTRUKSI 0.00 -

Jumlah #NAME? JADWAL PELAKSANAAN PEKERJAAN 210 (DUA RATUS SEPULUH) HARI KALENDER

PROGRES RENCANA 1.145 15.750 1.500 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? 1.645

KOMULATIF PROGRES RENCANA 0.00 1.145 16.895 18.395 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

Dibuat Oleh :

PT. INSAN KHARISMA ABADI

M. RIDHO HENDARTO

Direktur
REKAPITULASI RENCANA ANGGARAN BIAYA (EE)
PAKET PEKERJAAN : Pembangunan Rumah Kemasan
LOKASI : Kecamatan Pelaihari
TAHUN ANGGARAN : 2021

NO. URAIAN PEKERJAAN JUMLAH HARGA SATUAN (Rp.)

PEMBANGUNAN RUANG KELAS

I PEKERJAAN PERSIAPAN Rp 27,350,000.00

II PEKERJAAN PANCANGAN Rp 224,000,000.00

III PEKERJAAN TANAH & PONDASI Rp 943,308,541.30

JUMLAH Rp 1,194,658,541.30
DIBULATKAN Rp 1,194,658,000.00

Dibuat Oleh :

Faisal, ST
Konsultan Perencana
RENCANA ANGGARAN BIAYA
PAKET PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

NO. URAIAN PEKERJAAN Analis Volume Satuan Harga Satuan (Rp.) Jumlah Harga (Rp.)

PEMBANGUNAN RUANG KELAS


I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Sebelum & Sesudah Pekerjaan 1.00 Ls Rp 5,000,000.00 Rp 5,000,000.00
2 Pengukuran & pemasangan bouwplank 1.00 Ls Rp 5,000,000.00 Rp 5,000,000.00
3 Pemasangan papan nama proyek 1.00 Bh Rp 350,000.00 Rp 350,000.00
4 Mobilisasi & Demobilisasi Excavator 1.00 Ls Rp 12,000,000.00 Rp 12,000,000.00
5 SMK Kontruksi 1.00 Ls Rp 5,000,000.00 Rp 5,000,000.00
TOTAL Rp 27,350,000.00
II PEKERJAAN PANCANGAN
1 Pengadaan Tiang pancang beton 25 cm x 25 cm P. 6 m K 500 (Drop hammer 1.5 T) 56.00 bh Rp 2,100,000.00 Rp 117,600,000.00
2 Pemancangan Tiang pancang beton 25 cm x 25 cm P. 6 m K 500 (Drop hammer 1.5 T) 336.00 m Rp 300,000.00 Rp 100,800,000.00
3 Pekerjaan pemecah kepala tiang pancang 56.00 bh Rp 100,000.00 Rp 5,600,000.00
TOTAL Rp 224,000,000.00
III PEKERJAAN TANAH & PONDASI
1 Galian tanah pondasi 622.89 m3 Rp 97,500.00 Rp 60,731,775.00
2 Urugan tanah kembali 207.63 m3 Rp 70,000.00 Rp 14,534,100.00
3 Urugan tanah laterit 658.50 m3 Rp 190,000.00 Rp 125,115,380.00
4 Urugan Pasir ; tb = 10 cm (Bawah Pondasi) 38.70 m3 Rp 255,000.00 Rp 9,868,500.00
5 Lantai kerja; tb = 5 cm (bawah pondasi) (K-100) 19.35 m3 Rp 852,500.00 Rp 16,495,875.00
6 Pekerjaan anstamping 193.50 m3 Rp 539,610.00 Rp 104,414,535.00
7 Pondasi pas. batu gunung menerus; camp. 1:4 505.46 m3 Rp 900,450.00 Rp 455,143,708.13
8 Plesteran Pondasi 147.52 m2 Rp 74,058.00 Rp 10,925,036.16
9 Acian Pondasi 147.52 m2 Rp 17,400.00 Rp 2,566,848.00
10 Poer Setempat (180 cm x 180 cm x 50 cm) :
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix 22.68 m3 Rp 1,322,500.00 Rp 29,994,300.00
- Bekesting 50.40 m2 Rp 196,400.00 Rp 9,898,560.00
- Pembesian 3,678.95 kg Rp 17,060.00 Rp 62,762,852.88
11 Kolom Nuet (KN) (60x60) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix 7.83 m3 Rp 1,322,500.00 Rp 10,350,414.00
- Bekesting 52.18 m2 Rp 325,700.00 Rp 16,993,723.20
- Pembesian 792.08 kg Rp 17,060.00 Rp 13,512,933.93
TOTAL Rp 943,308,541.30
RENCANA ANGGARAN BIAYA
BANGUNAN PENDOPO KUDA KUDA BAJA RINGAN + TIANG TIANG
NO. URAIAN PEKERJAAN Volume Sat Harga SatuanJumlah
(Rp.) Harga (Rp.)
A PEKERJAAN BETON BERTULANG
1 Kolom Struktur (K1) beton bertulang (60x60) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready M 10.66 m3 Rp 1,322,500.00 ###
- Bekesting 71.04 m2 Rp 325,700.00 ###
- Pembesian 125.56 kg Rp 17,060.00 ###

2 Ring Balok (RB1); beton bertulang (30x40) cm


- Beton mutu f' c = 21,7 Mpa (K-250) Ready M 3.84 m3 Rp 1,322,500.00 ###
- Bekesting 35.20 m2 Rp 332,300.00 ###
- Pembesian 401.08 kg Rp 17,060.00 ###
###

B PEKERJAAN RANGKA & PENUTUP ATAP


1 Pemasangan rangka baja ringan / truss 836.00 m2 Rp 286,210.47 ###
2 Pasangan atap spandek zincalume tb = 0,35 836.00 m2 Rp 147,700.00 ###
3 Nok Atap 92.00 m Rp 109,700.00 ###
4 List Plank 116.00 m Rp 100,000.00 ###
###
TOTAL ###
RENCANA ANGGARAN BIAYA
BANGUNAN PENDOPO KUDA KUDA WF TANPA TIANG TIANG
NO. URAIAN PEKERJAAN Volume Sat Harga SatuanJumlah
(Rp.) Harga (Rp.)
PEKERJAAN RANGKA & PENUTUP ATAP (Untuk Tidak ada Tiang Tengah)
1 Kuda-kuda baja WF (350x175x7x11)mm, 12,683.42 kg Rp 36,557.50 ###
2 Balok baja WF (350x175x7x11)mm, 1,586.67 kg Rp 36,557.50 ###
3 Plat landas/baseplate 300.300.10 mm 395.64 kg Rp 36,557.50 ###
4 Angkur Ø19 mm - pj.60 cm 240.00 bh Rp 100,000.00 ###
5 Gording/Purlin baja CNP (100x50x20x2,3) mm 3,704.61 kg Rp 36,557.50 ###
6 Dudukan purlin baja siku L (70x70x6) mm leba 298.58 kg Rp 36,557.50 ###
7 Ikatan angin RB Ø16 mm 523.74 kg Rp 17,060.00 ###
8 Pasangan atap spandek zincalume tb = 0,35 836.00 m2 Rp 147,700.00 ###
9 Nok Atap 92.00 m2 Rp 109,700.00 ###
10 List Plank 116.00 m Rp 100,000.00 ###
###
BACK UP VOLUME

NO. URAIAN PEKERJAAN KET P L T L N SISI VOL SAT

PEMBANGUNAN RUANG KELAS


I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Sebelum & Sesudah Pekerjaan
2 Pengukuran & pemasangan bouwplank
3 Pemasangan papan nama proyek
4 Mobilisasi & Demobilisasi Alat Pancang
5 Pagar seng lokasi proyek
6 IMB
7 SMK Kontruksi

II PEKERJAAN PANCANGAN
Pancangan tiang pancang beton 25cm x 25 cm P. 6 m K 500 (Drop hammer 1.5 T)
1 6.00 14.00 4.00 336.00 m

2 Pekerjaan pemecah kepala tiang pancang 56.00 bh

III PEKERJAAN TANAH & PONDASI


1 Galian tanah pondasi Pondasi Poer 1.80 1.80 0.50 3.24 6.00 1.00 9.72
1.80 1.80 0.50 3.24 8.00 1.00 12.96
Pondasi B.Gunung V1 12.00 1.50 1.53 18.00 1.00 1.00 27.54
vwc 1.50 1.50 1.53 2.25 1.00 1.00 3.44
va 12.00 1.50 1.53 18.00 1.00 1.00 27.54
V2 12.00 1.50 1.53 18.00 1.00 1.00 27.54
V3 12.00 1.50 1.53 18.00 1.00 1.00 27.54
V4 12.00 1.50 1.57 18.00 1.00 1.00 28.26
V5 12.00 1.50 1.57 18.00 1.00 1.00 28.26
V6 12.00 1.50 1.57 18.00 1.00 1.00 28.26
vb 12.00 1.50 1.57 18.00 1.00 1.00 28.26
vwc 1.50 1.50 1.57 2.25 1.00 1.00 3.53
V7 12.00 1.50 1.57 18.00 1.00 1.00 28.26
HA 36.00 1.50 1.55 54.00 1.00 1.00 83.70
H 36.00 1.50 1.55 54.00 1.00 1.00 83.70
HB 36.00 1.50 1.55 54.00 1.00 1.00 83.70
Hwc 3.00 1.50 1.55 4.50 1.00 1.00 6.98
HC 36.00 1.50 1.55 54.00 1.00 1.00 83.70
258.00 622.89 m3
2 Urugan tanah kembali 207.63 m3
3 Urugan tanah laterit 1.55 424.84 658.50 m3

4 Urugan Pasir ; tb = 10 cm (Bawah Pondasi) Pondasi Batu Gunung & Poer 258.00 1.50 0.10 387.00 1.00 1.00 38.70 m3

5 Lantai kerja; tb = 5 cm (bawah pondasi) (K-100) Pondasi Batu Gunung & Poer 258.00 1.50 0.05 387.00 1.00 1.00 19.35 m3

6 Pekerjaan anstamping 258.00 1.50 0.50 387.00 1.00 1.00 193.50 m4

7 Pondasi pas. batu gunung menerus; camp. 1:4 Ukuran 1 V1 12.00 0.75 2.00 9.00 1.00 1.00 18.00
vwc 1.50 0.75 2.00 1.13 1.00 1.00 2.25
va 12.00 0.75 2.00 9.00 1.00 1.00 18.00
V2 12.00 0.75 2.00 9.00 1.00 1.00 18.00
V3 12.00 0.75 2.00 9.00 1.00 1.00 18.00
HA 18.00 0.75 2.00 13.50 1.00 1.00 27.00
H 18.00 0.75 2.00 13.50 1.00 1.00 27.00
HB 18.00 0.75 2.00 13.50 1.00 1.00 27.00
Hwc 1.50 0.75 2.00 1.13 1.00 1.00 2.25
HC 18.00 0.75 2.00 13.50 1.00 1.00 27.00
Ukuran 2 V4 12.00 0.75 3.17 9.00 1.00 1.00 28.53
V5 12.00 0.75 3.17 9.00 1.00 1.00 28.53
V6 12.00 0.75 3.17 9.00 1.00 1.00 28.53
vb 12.00 0.75 3.17 9.00 1.00 1.00 28.53
vwc 1.50 0.75 3.17 1.13 1.00 1.00 3.57
V7 12.00 0.75 3.17 9.00 1.00 1.00 28.53
HA 18.00 0.75 3.17 13.50 1.00 1.00 42.80
H 18.00 0.75 3.17 13.50 1.00 1.00 42.80
HB 18.00 0.75 3.17 13.50 1.00 1.00 42.80
Hwc 1.50 0.75 3.17 1.13 1.00 1.00 3.57
HC 18.00 0.75 3.17 13.50 1.00 1.00 42.80
505.46 m3
Plesteran 96.00 1.54 147.52

8 Poer Setempat (180 cm x 180 cm x 50 cm) :


- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix 1.80 1.80 0.50 3.24 14.00 1.00 22.68 m3
- Bekesting 1.80 0.50 0.90 14.00 4.00 50.40 m2
- Pembesian 3,678.95 kg
9 Kolom Nuet (KN) (60x60) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix Ukuran 1 0.60 0.60 1.53 0.36 6.00 1.00 3.30
Ukuran 2 0.60 0.60 1.57 0.36 8.00 1.00 4.52
7.83 m3
- Bekesting Ukuran 1 0.60 1.53 0.92 6.00 4.00 22.03
Ukuran 2 0.60 1.57 0.94 8.00 4.00 30.14
52.18 m2
- Pembesian 792.08 kg

IV BANGUNAN Lt. DASAR


A. PEKERJAAN BETON BERTULANG
1 Sloof (SL1); beton bertulang (35x50) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix V1 10.80 0.35 0.50 0.18 1.00 1.00 1.89
vwc 1.50 0.35 0.50 0.18 1.00 1.00 0.26
va 4.00 0.35 0.50 0.18 1.00 1.00 0.70
V2 10.80 0.35 0.50 0.18 1.00 1.00 1.89
V4 10.80 0.35 0.50 0.18 1.00 1.00 1.89
V6 10.80 0.35 0.50 0.18 1.00 1.00 1.89
vb 4.00 0.35 0.50 0.18 1.00 1.00 0.70
vwc 1.50 0.35 0.50 0.18 1.00 1.00 0.26
V7 10.80 0.35 0.50 0.18 1.00 1.00 1.89
HA 33.60 0.35 0.50 0.18 1.00 1.00 5.88
H 36.00 0.35 0.50 0.18 1.00 1.00 6.30
HB 33.60 0.35 0.50 0.18 1.00 1.00 5.88
HC 33.60 0.35 0.50 0.18 1.00 1.00 5.88
201.80 35.32 m3
- Bekesting V1 10.80 0.35 0.50 5.40 1.00 2.00 10.80
vwc 1.50 0.35 0.50 0.75 1.00 2.00 1.50
va 4.00 0.35 0.50 2.00 1.00 2.00 4.00
V2 10.80 0.35 0.50 5.40 1.00 2.00 10.80
V4 10.80 0.35 0.50 5.40 1.00 2.00 10.80
V6 10.80 0.35 0.50 5.40 1.00 2.00 10.80
vb 4.00 0.35 0.50 2.00 1.00 2.00 4.00
vwc 1.50 0.35 0.50 0.75 1.00 2.00 1.50
V7 10.80 0.35 0.50 5.40 1.00 2.00 10.80
HA 33.60 0.35 0.50 16.80 1.00 2.00 33.60
H 36.00 0.35 0.50 18.00 1.00 2.00 36.00
HB 33.60 0.35 0.50 16.80 1.00 2.00 33.60
HC 33.60 0.35 0.50 16.80 1.00 2.00 33.60
201.80 m2
- Pembesian 125.56 kg
2 Sloof (SL2); beton bertulang (20x30) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix va 8.00 0.20 0.30 0.06 1.00 1.00 0.48
V3 11.70 0.20 0.30 0.06 1.00 1.00 0.70
V5 11.70 0.20 0.30 0.06 1.00 1.00 0.70
vb 8.00 0.20 0.30 0.06 1.00 1.00 0.48
Hwc 1.50 0.20 0.30 0.06 2.00 1.00 0.18
42.40 2.54 m3
- Bekesting va 8.00 0.20 0.30 2.40 1.00 2.00 4.80
V3 11.70 0.20 0.30 3.51 1.00 2.00 7.02
V5 11.70 0.20 0.30 3.51 1.00 2.00 7.02
vb 8.00 0.20 0.30 2.40 1.00 2.00 4.80
Hwc 1.50 0.20 0.30 0.45 2.00 2.00 1.80
25.44 m2
- Pembesian 15.59 kg
Kolom
3 Kolom Struktur (K1) beton bertulang (60x60) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix 0.60 0.60 3.00 0.36 16.00 1.00 17.28 m3
- Bekesting 0.60 0.60 3.00 1.80 16.00 4.00 115.20 m2
- Pembesian 2,320.67 kg
4 Kolom Struktur (K2); beton bertulang (30x30) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix 0.30 0.30 3.00 0.09 24.00 1.00 6.48 m3
- Bekesting 0.30 0.30 3.00 0.90 24.00 4.00 86.40 m2
- Pembesian 640.08 kg
5 Kolom Struktur (K3); beton bertulang (20x20) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix 0.20 0.20 3.00 0.04 8.00 1.00 0.96 m3
- Bekesting 0.20 0.20 3.00 0.60 8.00 4.00 19.20 m2
- Pembesian 1,143.54 kg
6 Balok Latei; beton bertulang (15x30) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix H 33.60 0.15 0.30 0.05 2.00 1.00 3.02
V 7.40 0.15 0.30 0.05 2.00 1.00 0.67
3.69 m3
- Bekesting H 33.60 0.15 0.30 25.20 2.00 1.00 50.40
V 7.40 0.15 0.30 5.55 2.00 1.00 11.10
61.50 m2
- Pembesian 460.73 kg
7 Ring Balok (RB1); beton bertulang (30x50) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix V1 10.80 0.30 0.50 0.15 1.00 1.00 1.62
va 4.00 0.30 0.50 0.15 1.00 1.00 0.60
V2 10.80 0.30 0.50 0.15 1.00 1.00 1.62
V4 10.80 0.30 0.50 0.15 1.00 1.00 1.62
V6 10.80 0.30 0.50 0.15 1.00 1.00 1.62
vb 4.00 0.30 0.50 0.15 1.00 1.00 0.60
V7 10.80 0.30 0.50 0.15 1.00 1.00 1.62
HA 33.60 0.30 0.50 0.15 1.00 1.00 5.04
H 36.00 0.30 0.50 0.15 1.00 1.00 5.40
HB 33.60 0.30 0.50 0.15 1.00 1.00 5.04
HC 33.60 0.30 0.50 0.15 1.00 1.00 5.04
198.80 29.82 m3
- Bekesting V1 10.80 0.30 0.50 14.04 1.00 1.00 14.04
va 4.00 0.30 0.50 5.20 1.00 1.00 5.20
V2 10.80 0.30 0.50 14.04 1.00 1.00 14.04
V4 10.80 0.30 0.50 14.04 1.00 1.00 14.04
V6 10.80 0.30 0.50 14.04 1.00 1.00 14.04
vb 4.00 0.30 0.50 5.20 1.00 1.00 5.20
V7 10.80 0.30 0.50 14.04 1.00 1.00 14.04
HA 33.60 0.30 0.50 43.68 1.00 1.00 43.68
H 36.00 0.30 0.50 46.80 1.00 1.00 46.80
HB 33.60 0.30 0.50 43.68 1.00 1.00 43.68
HC 33.60 0.30 0.50 43.68 1.00 1.00 43.68
258.44 m2
- Pembesian 1,339.41 kg
8 Ring Balok (RB2); beton bertulang (15x30) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix va 8.00 0.15 0.30 0.05 1.00 1.00 0.36
V3 11.70 0.15 0.30 0.05 1.00 1.00 0.53
V5 11.70 0.15 0.30 0.05 1.00 1.00 0.53
vb 8.00 0.15 0.30 0.05 1.00 1.00 0.36
39.40 1.77 m3
- Bekesting va 8.00 0.15 0.30 6.00 1.00 1.00 6.00
V3 11.70 0.15 0.30 8.78 1.00 1.00 8.78
V5 11.70 0.15 0.30 8.78 1.00 1.00 8.78
vb 8.00 0.15 0.30 6.00 1.00 1.00 6.00
29.55 m2
- Pembesian 1,168.02 kg
9 Ring Balok (RB3); beton bertulang (20x30) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix V 2.85 0.20 0.30 0.06 1.00 2.00 0.34
H 4.10 0.20 0.30 0.06 1.00 2.00 0.49
0.83 m3
- Bekesting V 2.85 0.20 0.30 2.28 1.00 2.00 4.56
H 4.10 0.20 0.30 3.28 1.00 2.00 6.56
11.12 m2
- Pembesian #NAME? kg
Kanopi
10 Plat kanopi; beton bertulang; tb = 7 cm;
- Beton mutu f'̹ = 19,3 Mpa (K-225) 4.04 0.80 0.07 3.23 8.00 1.00 1.81 m3
- Bekesting 4.04 0.80 0.07 3.63 8.00 1.00 29.01 m2
- Pembesian 162.70 kg
11 Plat Lantai Dasar ; beton bertulang; tb = 10 cm;
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix 8.70 7.70 0.10 66.99 1.00 4.00 26.80
4.20 3.70 0.10 15.54 1.00 4.00 6.22
8.70 3.70 0.10 32.19 1.00 2.00 6.44
39.45 m3
- Pembesian 2,467.14 kg

12 Tangga
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix Anak Tangga

B. PEKERJAAN DINDING & LANTAI


1 Pas. dinding bata ringan (hebel) camp. 1 : 4 V1 10.30 2.20 22.66 1.00 1.00 22.66
V2 7.00 2.20 15.40 1.00 1.00 15.40
V6 7.00 2.20 15.40 1.00 1.00 15.40
V7 7.00 2.20 15.40 1.00 1.00 15.40
VWc 2.40 2.70 6.48 2.00 1.00 12.96
HA 7.20 2.20 15.84 1.00 2.00 31.68
HB 32.40 2.20 71.28 1.00 3.00 213.84
HC 32.40 2.20 71.28 1.00 4.00 285.12
Hwc 1.25 2.70 3.38 2.00 5.00 33.75
Pengurang Kusen
646.21 m2
2 Plesteran dinding bata ringan (hebel) camp. 1 : 4 tbl. 1 cm 1,292.42 m2
3 Acian Dinding 1,292.42
K1 2.20 2.20 4.84 12.00 1.00 58.08
K1 2.30 2.20 5.06 2.00 1.00 10.12
K1 2.40 2.20 5.28 2.00 1.00 10.56
K2 1.00 2.20 2.20 16.00 1.00 35.20
K2 1.20 2.20 2.64 4.00 1.00 10.56
K3 1.10 2.20 2.42 2.00 1.00 4.84
Balok Latei 82.00 0.30 24.60 1.00 2.00 49.20
RB1 198.80 0.50 99.40 1.00 2.00 198.80
S1 201.80 0.50 100.90 1.00 2.00 201.80
S2 42.40 0.30 12.72 1.00 2.00 25.44
1,897.02 m2
4 Pas. Dinding partisi kalsiboard 3.5mm + rangka metal stud V3 3.70 2.70 9.99 1.00 1.00 9.99
V4 3.55 2.70 9.59 1.00 1.00 9.59
19.58 m2
5 Urugan Pasir Bawah Lantai Dalam 8.65 7.65 0.05 66.17 4.00 1.00 13.23
Teras 13.23 3.65 0.05 48.29 2.00 1.00 4.83
8.80 3.65 0.05 32.12 1.00 1.00 1.61
19.67 m3
6 Lantai granit polish 60 x 60 cm motif / warna 8.90 7.90 70.31 4.00 1.00 281.24 m2
7 Lantai granit polish 60 x 60 cm motif / warna (gelap) 35.90 4.00 143.60 1.00 1.00 139.10 m2
8 Pas. keramik lantai wc uk. 25x25 cm 1.50 1.50 2.25 2.00 1.00 4.50 m2
9 Keramik dinding polish 30 x 30 cm motif / warna 1.50 1.50 1.20 6.00 2.00 1.00 14.40 m2
10 Lantai granit tangga unpolish 30 x 60 cm motif / warna ( LT.Dasar ke LT.1 )
11 Lantai granit tangga unpolish 30 x 60 cm motif / warna ( Area Masuk)

C. PEKERJAAN KUSEN, PINTU, JENDELA , VENTILASI, PENGUNCIAN & PENGGANTUNGAN


1 Kusen Pintu Aluminium (Terpasang)
2 Kusen Jendela Aluminium (Terpasang)
3 P1
4 P2
5 P3
6 J1
7 J2
8 V1
9 Pas. Kaca Mati tbl. 5 cm
10 Pas. Engsel Pintu 4" (3bh/pintu)
11 Pas. Engsel Jendela 3" (2bh/jendela) (Terpasang)
12 Pas. Kait / Hak Angin (2bh/jendela) (Terpasang)
13 Pas. Grendel Jendela (Terpasang)
14 Pas. Grendel Pintu (Terpasang)
15 Pas. Kunci Pintu 2 X Putar ( lever handle ) (Terpasang)
16 Pas. Kunci Pintu (Full Handle ) (Terpasang)
17 Pas. Handel tarik jendela (Terpasang)
18 Pas. Handel Pintu (Terpasang)

D. PEKERJAAN PLAFOND
1 Pemasangan rangka langit- langit ( 60 x 60 ) cm 8.90 7.90 70.31 4.00 1.00 281.24
35.90 4.00 143.60 1.00 1.00 143.60
Pengurang Tangga
424.84 m2
2 Pemasangan plafond gypsum tbl. 9 mm 424.84 m2
3 List plafond gypsum 8.90 7.90 16.80 4.00 2.00 134.40
35.90 4.00 39.90 1.00 2.00 79.80
Pengurang Tangga
214.20 m
J. PEKERJAAN MEKANIKAL - ELEKTRIKAL
1 Instalasi Titik Lampu
2 Instalasi Titik AC
3 Instalasi Stop Kontak
4 ###
5 ###
6 ###
7 Saklar Tunggal
8 Saklar Ganda
9 Stop kontak dinding
10 Pas. MCB
11 Pas. Box MCB
12 Pemasangan KWH 2200 Watt
13 SLO

E. PEKERJAAN PLUMBING & SANITAIR


1 Instalasi air bersih
2 Instalasi air kotor
3 Kloset duduk + jet washer; lengkap aksesoris terpasang
4 Wastafel set + kran stainless; aksesoris lengkap terpasang
5 Kran air stainless 1/2 inch; terpasang
6 Floor drain stainless; terpasang
7 Biofil septick tank kap.1000 ltr
8 Resapan + Penutup
9 Tandon 2200 liter
10 Menara Tandon (Ulin)
11 Pas. Pompa Transfer (Automatic)
12 Pemasangan PDAM
F. PEKERJAAN PENGECATAN
1 Cat eksterior (dinding, kolom, balok & kanopi ) Dinding 646.21
K1 29.04
K1 5.06
K1 5.28
K2 17.60
K2 5.28
K3 2.42
Balok Latei 24.60
RB1 99.40
S1 100.90
S2 12.72
Plat kanopi; beton bertulang; tb = 7 cm; 58.03
1,006.54
2 Cat Interior (dinding, kolom) 834.89
3 Cat plafond

V BANGUNAN Lt.1
A. PEKERJAAN BETON BERTULANG
Kolom
8 Kolom Struktur (K1) beton bertulang (60x60) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix 0.60 0.60 3.00 0.36 16.00 1.00 17.28 m3
- Bekesting 0.60 0.60 3.00 1.80 16.00 4.00 115.20 m2
- Pembesian 2,320.67 kg
9 Kolom Struktur (K2); beton bertulang (30x30) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix 0.30 0.30 3.00 0.09 24.00 1.00 6.48 m3
- Bekesting 0.30 0.30 3.00 0.90 24.00 4.00 86.40 m2
- Pembesian 640.08 kg
10 Kolom Struktur (K3); beton bertulang (20x20) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix 0.20 0.20 3.00 0.04 8.00 1.00 0.96 m3
- Bekesting 0.20 0.20 3.00 0.60 8.00 4.00 19.20 m2
- Pembesian 1,143.54 kg
11 Balok Latei; beton bertulang (15x30) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix H 33.60 0.15 0.30 0.05 2.00 1.00 3.02
V 7.40 0.15 0.30 0.05 2.00 1.00 0.67
3.69 m3
- Bekesting H 33.60 0.15 0.30 25.20 2.00 1.00 50.40
V 7.40 0.15 0.30 5.55 2.00 1.00 11.10
61.50 m2
- Pembesian 460.73 kg
12 Ring Balok (RB1); beton bertulang (30x50) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix V1 10.8 0.30 0.50 0.15 1.00 1.00 1.62
va 4 0.30 0.50 0.15 1.00 1.00 0.60
V2 10.8 0.30 0.50 0.15 1.00 1.00 1.62
V4 10.8 0.30 0.50 0.15 1.00 1.00 1.62
V6 10.8 0.30 0.50 0.15 1.00 1.00 1.62
vb 4 0.30 0.50 0.15 1.00 1.00 0.60
V7 10.8 0.30 0.50 0.15 1.00 1.00 1.62
HA 33.6 0.30 0.50 0.15 1.00 1.00 5.04
H 36 0.30 0.50 0.15 1.00 1.00 5.40
HB 33.6 0.30 0.50 0.15 1.00 1.00 5.04
HC 33.6 0.30 0.50 0.15 1.00 1.00 5.04
198.80 29.82 m3
- Bekesting V1 10.80 0.30 0.50 14.04 1.00 1.00 14.04
va 4.00 0.30 0.50 5.20 1.00 1.00 5.20
V2 10.80 0.30 0.50 14.04 1.00 1.00 14.04
V4 10.80 0.30 0.50 14.04 1.00 1.00 14.04
V6 10.80 0.30 0.50 14.04 1.00 1.00 14.04
vb 4.00 0.30 0.50 5.20 1.00 1.00 5.20
V7 10.80 0.30 0.50 14.04 1.00 1.00 14.04
HA 33.60 0.30 0.50 43.68 1.00 1.00 43.68
H 36.00 0.30 0.50 46.80 1.00 1.00 46.80
HB 33.60 0.30 0.50 43.68 1.00 1.00 43.68
HC 33.60 0.30 0.50 43.68 1.00 1.00 43.68
258.44 m2
- Pembesian 1,339.41 kg
13 Ring Balok (RB2); beton bertulang (15x30) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix va 8 0.15 0.30 0.05 1.00 1.00 0.36
V3 11.7 0.15 0.30 0.05 1.00 1.00 0.53
V5 11.7 0.15 0.30 0.05 1.00 1.00 0.53
vb 8 0.15 0.30 0.05 1.00 1.00 0.36
39.40 1.77 m3
- Bekesting va 8.00 0.15 0.30 6.00 1.00 1.00 6.00
V3 11.70 0.15 0.30 8.78 1.00 1.00 8.78
V5 11.70 0.15 0.30 8.78 1.00 1.00 8.78
vb 8.00 0.15 0.30 6.00 1.00 1.00 6.00
29.55 m2
- Pembesian 1,168.02 kg
14 Ring Balok (RB3); beton bertulang (20x30) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix V 2.85 0.20 0.30 0.06 1.00 2.00 0.34
H 4.10 0.20 0.30 0.06 1.00 2.00 0.49
0.83 m3
- Bekesting V 2.85 0.20 0.30 2.28 1.00 2.00 4.56
H 4.10 0.20 0.30 3.28 1.00 2.00 6.56
11.12 m2
- Pembesian #NAME? kg
Kanopi
15 Plat kanopi; beton bertulang; tb = 7 cm;
- Beton mutu f'̹ = 19,3 Mpa (K-225) 4.04 0.80 0.07 3.23 8.00 1.00 1.81 m3
- Bekesting 4.04 0.80 0.07 3.63 8.00 1.00 29.01 m2
- Pembesian 162.70 kg
16 Plat Lantai 1; beton bertulang; tb = 15 cm;
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix 8.70 7.70 0.15 66.99 1.00 4.00 40.19
4.20 3.70 0.15 15.54 1.00 4.00 9.32
8.70 3.70 0.15 32.19 1.00 2.00 9.66
59.18 m3
Bekisting 8.70 7.70 0.15 66.99 1.00 4.00 267.96
4.20 3.70 0.15 15.54 1.00 4.00 62.16
8.70 3.70 0.15 32.19 1.00 2.00 64.38
394.50 m2
- Pembesian 4,934.27 kg

12 Tangga
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix Anak Tangga

B. PEKERJAAN DINDING & LANTAI


1 Pas. dinding bata ringan (hebel) camp. 1 : 4 Pengurang Tangga 10.30 2.20 22.66 1.00 1.00 22.66
V2 7.00 2.20 15.40 1.00 1.00 15.40
V6 7.00 2.20 15.40 1.00 1.00 15.40
V7 7.00 2.20 15.40 1.00 1.00 15.40
VWc 2.40 2.70 6.48 2.00 1.00 12.96
HA 7.20 2.20 15.84 1.00 2.00 31.68
HB 32.40 2.20 71.28 1.00 3.00 213.84
HC 32.40 2.20 71.28 1.00 4.00 285.12
Hwc 1.25 2.70 3.38 2.00 5.00 33.75
Pengurang Kusen
646.21 m2
2 Plesteran dinding bata ringan (hebel) camp. 1 : 4 tbl. 1 cm 1,292.42 m2
3 Acian Dinding 1,292.42
K1 2.20 2.20 4.84 12.00 1.00 58.08
K1 2.30 2.20 5.06 2.00 1.00 10.12
K1 2.40 2.20 5.28 2.00 1.00 10.56
K2 1.00 2.20 2.20 16.00 1.00 35.20
K2 1.20 2.20 2.64 4.00 1.00 10.56
K3 1.10 2.20 2.42 2.00 1.00 4.84
Balok Latei 82.00 0.30 24.60 1.00 2.00 49.20
RB1 198.80 0.50 99.40 1.00 2.00 198.80

1,669.78 m2
4 Pas. Dinding partisi kalsiboard 3.5mm + rangka metal stud V3 3.70 2.70 9.99 1.00 1.00 9.99
V4 3.55 2.70 9.59 1.00 1.00 9.59
19.58 m2
5 Urugan Pasir Bawah Lantai Dalam 8.65 7.65 0.05 66.17 4.00 1.00 13.23
Teras 13.23 3.65 0.05 48.29 2.00 1.00 4.83
8.80 3.65 0.05 32.12 1.00 1.00 1.61
19.67 m3
6 Lantai granit polish 60 x 60 cm motif / warna 8.90 7.90 70.31 4.00 1.00 281.24 m2
7 Lantai granit polish 60 x 60 cm motif / warna (gelap) 35.90 4.00 143.60 1.00 1.00 139.10 m2
8 Pas. keramik lantai wc uk. 25x25 cm 1.50 1.50 2.25 2.00 1.00 4.50 m2
9 Keramik dinding polish 30 x 30 cm motif / warna 1.50 1.50 1.20 6.00 2.00 1.00 14.40 m2
10 Lantai granit tangga unpolish 30 x 60 cm motif / warna ( LT.Dasar ke LT.1 )
11 Lantai granit tangga unpolish 30 x 60 cm motif / warna ( Area Masuk)

C. PEKERJAAN KUSEN, PINTU, JENDELA , VENTILASI, PENGUNCIAN & PENGGANTUNGAN


1 Kusen Pintu Aluminium (Terpasang)
2 Kusen Jendela Aluminium (Terpasang)
3 P1
4 P2
5 P3
6 J1
7 J2
8 V1
9 Pas. Kaca Mati tbl. 5 cm
10 Pas. Engsel Pintu 4" (3bh/pintu)
11 Pas. Engsel Jendela 3" (2bh/jendela) (Terpasang)
12 Pas. Kait / Hak Angin (2bh/jendela) (Terpasang)
13 Pas. Grendel Jendela (Terpasang)
14 Pas. Grendel Pintu (Terpasang)
15 Pas. Kunci Pintu 2 X Putar ( lever handle ) (Terpasang)
16 Pas. Kunci Pintu (Full Handle ) (Terpasang)
17 Pas. Handel tarik jendela (Terpasang)
18 Pas. Handel Pintu (Terpasang)

D. PEKERJAAN PLAFOND
1 Pemasangan rangka langit- langit ( 60 x 60 ) cm 8.90 7.90 70.31 4.00 1.00 281.24
35.90 4.00 143.60 1.00 1.00 143.60
Pengurang Tangga
424.84 m2
2 Pemasangan plafond gypsum tbl. 9 mm 424.84 m2
3 List plafond gypsum 8.90 7.90 16.80 4.00 2.00 134.40
35.90 4.00 39.90 1.00 2.00 79.80
Pengurang Tangga
214.20 m
J. PEKERJAAN MEKANIKAL - ELEKTRIKAL
1 Instalasi Titik Lampu
2 Instalasi Titik AC
3 Instalasi Stop Kontak
4 0
5 0
6 0
7 Saklar Tunggal
8 Saklar Ganda
9 Stop kontak dinding
10 Pas. MCB
11 Pas. Box MCB
12 Pemasangan KWH 2200 Watt
13 SLO
E. PEKERJAAN PLUMBING & SANITAIR
1 Instalasi air bersih
2 Instalasi air kotor
3 Kloset duduk + jet washer; lengkap aksesoris terpasang
4 Wastafel set + kran stainless; aksesoris lengkap terpasang
5 Kran air stainless 1/2 inch; terpasang
6 Floor drain stainless; terpasang
7 Biofil septick tank kap.1000 ltr
8 Resapan + Penutup
9 Tandon 2200 liter
10 Menara Tandon (Ulin)
11 Pas. Pompa Transfer (Automatic)
12 Pemasangan PDAM

F. PEKERJAAN PENGECATAN
1 Cat eksterior (dinding, kolom, balok & kanopi ) Dinding 646.21
K1 29.04
K1 5.06
K1 5.28
K2 17.60
K2 5.28
K3 2.42
Balok Latei 24.60
RB1 99.40
0 -
0 -
Plat Lantai 1; beton bertulang; tb = 15 cm; 58.03
892.92
2 Cat Interior (dinding, kolom) 834.89
3 Cat plafond

Kolom
1 Kolom Struktur (K1) beton bertulang (60x60) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting
- Pembesian
2 Kolom Struktur (K2); beton bertulang (30x30) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting
- Pembesian
3 Kolom Struktur (K3); beton bertulang (20x20) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting
- Pembesian
4 Balok Latei; beton bertulang (15x30) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting
- Pembesian
5 Ring Balok (RB1); beton bertulang (30x50) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting
- Pembesian
6 Ring Balok (RB2); beton bertulang (15x30) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting
- Pembesian
7 Ring Balok (RB3); beton bertulang (20x30) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting
- Pembesian
Kanopi
8 Plat kanopi; beton bertulang; tb = 7 cm;
- Beton mutu f'̹ = 19,3 Mpa (K-225)
- Bekesting
- Pembesian
9 Plat Lantai Dasar ; beton bertulang; tb = 10 cm;
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting
- Pembesian

B. PEKERJAAN DINDING & LANTAI


1 Pas. dinding bata ringan (hebel) camp. 1 : 4
2 Plesteran dinding bata ringan (hebel) camp. 1 : 4 tbl. 1 cm
3 Acian dinding bata ringan (hebel)
4 Lantai granit polish 60 x 60 cm motif / warna
5 Lantai granit polish 60 x 60 cm motif / warna (gelap)
6 Pas. keramik lantai wc uk. 25x25 cm
7 Keramik dinding polish 30 x 30 cm motif / warna
8 Lantai granit tangga unpolish 30 x 60 cm motif / warna ( LT.1 ke LT.2 )
9 Waterfrooping membran (garansi 3 thn) pada lantai

C. PEKERJAAN KUSEN, PINTU, JENDELA , VENTILASI, PENGUNCIAN & PENGGANTUNGAN


1 Kusen Pintu Aluminium (Terpasang)
2 Kusen Jendela Aluminium (Terpasang)
3 P1
4 P3
5 J1
6 J2
7 V1
8 Pas. Kaca Mati tbl. 5 cm
9 Pas. Engsel Pintu 4" (3bh/pintu)
10 Pas. Engsel Jendela 3" (2bh/jendela) (Terpasang)
11 Pas. Kait / Hak Angin (2bh/jendela) (Terpasang)
12 Pas. Grendel Jendela (Terpasang)
13 Pas. Grendel Pintu (Terpasang)
14 Pas. Kunci Pintu 2 X Putar ( lever handle ) (Terpasang)
15 Pas. Kunci Pintu (Full Handle ) (Terpasang)
16 Pas. Handel tarik jendela (Terpasang)
17 Pas. Handel Pintu (Terpasang)

D. PEKERJAAN PLAFOND
1 Pemasangan rangka langit- langit ( 60 x 60 ) cm
2 Pemasangan plafond gypsum tbl. 9 mm
3 List plafond gypsum

J. PEKERJAAN MEKANIKAL - ELEKTRIKAL


1 Instalasi Titik Lampu
2 Instalasi Titik AC
3 Instalasi Stop Kontak
4 Lampu Downlight Panel LED 18 watt
5 Lampu TL 2 x 18 Watt / Armatur
6 Lampu SL 10 Watt
7 Saklar Tunggal
8 Saklar Ganda
9 Stop kontak dinding
10 Pas. MCB
11 Pas. Box MCB

E. PEKERJAAN PLUMBING & SANITAIR


1 Instalasi air bersih
2 Instalasi air kotor
3 Kloset duduk + jet washer; lengkap aksesoris terpasang
4 Wastafel set + kran stainless; aksesoris lengkap terpasang
5 Kran air stainless 1/2 inch; terpasang
6 Floor drain stainless; terpasang

F. PEKERJAAN PENGECATAN
1 Cat eksterior (dinding, kolom, balok & kanopi )
2 Cat Interior (dinding, kolom)
3 Cat plafond

V BANGUNAN Lt.2
A. PEKERJAAN BETON BERTULANG
Kolom
1 Kolom Struktur (K1) beton bertulang (60x60) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting
- Pembesian
2 Kolom Struktur (K2); beton bertulang (30x30) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting
- Pembesian
3 Kolom Struktur (K3); beton bertulang (20x20) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting
- Pembesian
4 Balok Latei; beton bertulang (15x30) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting
- Pembesian
5 Ring Balok (RB1); beton bertulang (30x50) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting
- Pembesian
REKAPITULASI PERKIRAAN BIAYA ATAP PENDOPO

No Item Kolom Tengah Atap + Rangka Total


Kolom Tengah + Baja Ringan
1 Rp 62,990,064.98 Rp 384,441,551.88 Rp 447,431,616.86
(C75.75)
2 kolom Tengah + WF 250 Rp 62,990,064.98 Rp 615,561,057.80 Rp 678,551,122.78
3 Kuda2 WF 350 Rp 860,593,794.47 Rp 860,593,794.47
RENCANA ANGGARAN BIAYA
PAKET PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

NO. URAIAN PEKERJAAN

A PEKERJAAN PERSIAPAN
Pembersihan Lokasi Sebelum & Sesudah Pekerjaan
Pengukuran & pemasangan bouwplank
Pemasangan papan nama proyek
Mobilisasi & Demobilisasi Excavator
Mobilisasi & Demobilisasi Alat Pancang
IMB
SMK Kontruksi

B PEKERJAAN BANGUNAN
PEKERJAAN BETON BERTULANG
1 Kolom Struktur (K1) beton bertulang (50x50) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting
- Pembesian
2 Kolom Struktur (K2) beton bertulang (30x30) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting
- Pembesian
3 Kolom Struktur (K3) beton bertulang (25x25) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting
- Pembesian
4 Ring Balok (RB1); beton bertulang (30x40) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting
- Pembesian
5 Ring Balok (RB2); beton bertulang (20x30) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting
- Pembesian
6 Balok (B1); beton bertulang (15x15) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting
- Pembesian
7 Perbesar Kolom (PK); beton bertulang (25x25) cm Jadi (30x30) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting

PEKERJAAN DINDING & LANTAI


Urugan Pasir Bawah Lantai
Cor Lantai K-100
Lantai granit polish 60 x 60 cm motif / warna (gelap)

PEKERJAAN KUSEN, PINTU, JENDELA , VENTILASI, PENGUNCIAN & PEN


PEKERJAAN PLAFOND
Pemasangan rangka langit- langit ( 60 x 60 ) cm
Pemasangan plafond gypsum tbl. 9 mm
List plafond gypsum

PEKERJAAN RANGKA & PENUTUP ATAP


Pemasangan rangka baja ringan / truss
Pemasangan penutup atap setara Onduvilla
Nok Atap
List Plank

PEKERJAAN MEKANIKAL - ELEKTRIKAL


PEKERJAAN PENGECATAN
Cat eksterior (dinding, kolom, balok & kanopi )
Cat Interior (dinding, kolom)
Cat plafond

C PEKERJAAN SELASAR
PEKERJAAN TANAH & PONDASI
1 Galian Tanah
2 Cerucuk Galam
3 Urugan Tanah Kembali
4 Lantai kerja; tb = 5 cm (bawah pondasi) (K-100)
5 Pondasi pas. batu gunung menerus; camp. 1:4
6 Pekerjaan anstamping
7 Plesteran Pondasi
8 Acian Pondasi
9 Poer Setempat (180 cm x 180 cm x 50 cm) :
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting
- Pembesian
10 Kolom Nuet (KN) (25x25) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting
- Pembesian

PEKERJAAN BETON BERTULANG


1 Sloof (SL1); beton bertulang (15x20) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting
- Pembesian
2 Sloof (SL2); beton bertulang (15x15) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting
- Pembesian
3 Kolom Struktur (K1) beton bertulang (25x25) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting
- Pembesian
4 Ring Balok (RB1); beton bertulang (15x20) cm
- Beton mutu f' c = 21,7 Mpa (K-250) Ready Mix
- Bekesting
- Pembesian

PEKERJAAN DINDING & LANTAI


Urugan Tanah Laterit
Urugan Pasir Bawah Lantai
Cor Lantai K-100
Lantai granit polish 60 x 60 cm motif / warna (gelap)

PEKERJAAN KUSEN, PINTU, JENDELA , VENTILASI, PENGUNCIAN & PEN


PEKERJAAN PLAFOND
Pemasangan rangka langit- langit ( 60 x 60 ) cm
Pemasangan plafond gypsum tbl. 9 mm
List plafond gypsum

PEKERJAAN RANGKA & PENUTUP ATAP


Pemasangan rangka baja ringan / truss
Pemasangan penutup atap setara Onduvilla
Nok Atap
List Plank

PEKERJAAN MEKANIKAL - ELEKTRIKAL

PEKERJAAN PENGECATAN
Cat eksterior (dinding, kolom, balok & kanopi )
Cat Interior (dinding, kolom)
Cat plafond

D PEKERJAAN LAIN - LAIN


TALUT
1 Galian Tanah
2 Urugan Tanah Kembali
3 Cerucuk Galam
4 Pas. Batu Gunung
5 Plesteran
6 Acian
7 Pemasangan Pipa Suling 2''
NAIKAN TANGGA
1 Galian Tanah
2 Urugan Tanah Kembali
3 Urugan Tanah Laterit
4 Urugan Pasir
5 Pemasangan 1 m² dinding bata merah tebal 1/2 batu campuran 1 SP : 4PP
6 Plesteran
7 Acian
8 Cor Lantai
9 Lantai granit polish 60 x 60 cm motif / warna
POT BUNGA
1 Galian Tanah
2 Urugan Tanah Kembali
3 Urugan Pasir
4 Pas. Bata Merah
5 Plesteran
6 Acian
7 Pengecatan

Kuda-kuda baja WF (350x175x7x11)mm,

Balok baja WF (350x175x7x11)mm,


Plat landas/baseplate 300.300.10 mm

Angkur Ø19 mm - pj.60 cm


Gording/Purlin baja CNP (100x50x20x2,3) mm

Dudukan purlin baja siku L (70x70x6) mm lebar 10 cm


Ikatan angin RB Ø16 mm

Pasangan atap spandek zincalume tb = 0,35 mm


Nok Atap
List Plank

Kuda-kuda baja WF (250x175x7x11)mm,

Plat landas/baseplate 300.300.10 mm

Angkur Ø19 mm - pj.60 cm


Gording/Purlin baja CNP (100x50x20x2,3) mm

Dudukan purlin baja siku L (70x70x6) mm lebar 10 cm


Ikatan angin RB Ø16 mm

Pasangan atap spandek zincalume tb = 0,35 mm


Nok Atap
List Plank
ENCANA ANGGARAN BIAYA

URAIAN PEKERJAAN P

RSIAPAN
si Sebelum & Sesudah Pekerjaan
masangan bouwplank
n nama proyek
bilisasi Excavator
bilisasi Alat Pancang

NGUNAN
ON BERTULANG
1) beton bertulang (50x50) cm
= 21,7 Mpa (K-250) Ready Mix 0.60
0.60

2) beton bertulang (30x30) cm


= 21,7 Mpa (K-250) Ready Mix 0.30
0.30

3) beton bertulang (25x25) cm


= 21,7 Mpa (K-250) Ready Mix 0.25
0.25

beton bertulang (30x40) cm


= 21,7 Mpa (K-250) Ready Mix 8.00
8.00

beton bertulang (20x30) cm


= 21,7 Mpa (K-250) Ready Mix 27.00
27.00

bertulang (15x15) cm
= 21,7 Mpa (K-250) Ready Mix 27.00
27.00
K); beton bertulang (25x25) cm Jadi (30x30) cm
= 21,7 Mpa (K-250) Ready Mix 0.05
0.30

NDING & LANTAI


27.00
27.00
h 60 x 60 cm motif / warna (gelap) 27.00

SEN, PINTU, JENDELA , VENTILASI, PENGUNCIAN & PENGGANTUNGAN

ka langit- langit ( 60 x 60 ) cm
nd gypsum tbl. 9 mm

NGKA & PENUTUP ATAP


ka baja ringan / truss
tup atap setara Onduvilla
15.00
29.00

KANIKAL - ELEKTRIKAL
NGECATAN
ding, kolom, balok & kanopi )
ng, kolom)

ASAR
NAH & PONDASI
37.00

5 cm (bawah pondasi) (K-100) 37.00


gunung menerus; camp. 1:4 37.00
37.00
37.00

80 cm x 180 cm x 50 cm) :
= 21,7 Mpa (K-250) Ready Mix 0.80
0.80

(25x25) cm
= 21,7 Mpa (K-250) Ready Mix 0.25
0.25

ON BERTULANG
bertulang (15x20) cm
= 21,7 Mpa (K-250) Ready Mix 37.00
37.00

bertulang (15x15) cm
= 21,7 Mpa (K-250) Ready Mix 5.00
5.00

1) beton bertulang (25x25) cm


= 21,7 Mpa (K-250) Ready Mix 0.25
0.25

beton bertulang (15x20) cm


= 21,7 Mpa (K-250) Ready Mix 37.00
37.00

NDING & LANTAI


37.00
37.00
37.00
h 60 x 60 cm motif / warna (gelap) 37.00

SEN, PINTU, JENDELA , VENTILASI, PENGUNCIAN & PENGGANTUNGAN

ka langit- langit ( 60 x 60 ) cm
nd gypsum tbl. 9 mm

NGKA & PENUTUP ATAP


ka baja ringan / truss
tup atap setara Onduvilla
8.11
39.00

KANIKAL - ELEKTRIKAL

NGECATAN
ding, kolom, balok & kanopi )
ng, kolom)

N - LAIN
A

dinding bata merah tebal 1/2 batu campuran 1 SP : 4PP

h 60 x 60 cm motif / warna

P
F (350x175x7x11)mm, 13.60
10.30
10.03
9.70

0x175x7x11)mm, 8.00
ate 300.300.10 mm 0.30
0.30

a CNP (100x50x20x2,3) mm 25.64


24.28
22.93
21.57
20.21
18.86
17.50
16.40
14.79
13.43
12.07
10.71
9.36

ja siku L (70x70x6) mm lebar 10 cm 0.15


11.16
9.72
10.70
9.91

andek zincalume tb = 0,35 mm

P
F (250x175x7x11)mm, 13.60
10.30
10.03
9.70

ate 300.300.10 mm 0.30


0.30

a CNP (100x50x20x2,3) mm 25.64


24.28
22.93
21.57
20.21
18.86
17.50
16.40
14.79
13.43
12.07
10.71
9.36

ja siku L (70x70x6) mm lebar 10 cm 0.15


11.16
9.72
10.70
9.91

andek zincalume tb = 0,35 mm


L T LUAS N SISI VOL Sat

0.60 7.40 0.36 4.00 1.00 10.66 m3


0.60 7.40 4.44 4.00 4.00 71.04 m2
125.56 kg

0.30 1.50 0.09 8.00 1.00 1.08 m3


0.30 1.50 0.45 8.00 4.00 14.40 m2
15.59 kg

0.25 1.50 0.06 28.00 1.00 2.63 m3


0.25 1.50 0.38 28.00 4.00 42.00 m2
391.01 kg

0.30 0.40 2.40 4.00 1.00 3.84 m3


0.30 0.40 8.80 4.00 1.00 35.20 m2
401.08 kg

0.20 0.30 5.40 4.00 2.00 12.96 m3


0.20 0.30 21.60 4.00 2.00 172.80 m2
2,320.67 kg

0.15 0.15 4.05 4.00 1.00 2.43 m3


0.15 0.15 12.15 4.00 1.00 48.60 m2
396.95 kg

0.05 4.00 0.00 8.00 1.00 0.08 m3


0.30 4.00 1.20 8.00 4.00 38.40 m2

27.00 0.05 729.00 1.00 1.00 36.45 m3


27.00 0.07 729.00 1.00 1.00 51.03 m3
27.00 729.00 1.00 1.00 729.00 m2

772.00 m2
772.00 m2
140.00 m

836.00 m2
193.00 1.00 4.00 836.00 m2
8.00 23.00 1.00 4.00 92.00 m
29.00 1.00 4.00 116.00 m

2.00 2.60 74.00 1.00 4.00 769.60 m3

256.53 m3
2.00 0.05 74.00 1.00 4.00 14.80 m3
1.25 2.90 46.25 1.00 4.00 536.50 m3
2.00 0.50 74.00 1.00 4.00 148.00 m3
0.80 29.60 1.00 1.00 29.60 m2
29.60 m2

0.80 0.25 0.64 20.00 1.00 3.20 m3


0.80 0.25 0.20 20.00 4.00 16.00 m2
kg

0.25 2.90 0.06 20.00 1.00 3.63 m3


0.25 2.90 0.73 20.00 4.00 58.00 m2
640.08 kg
0.15 0.20 5.55 4.00 1.00 4.44 m3
0.15 0.20 14.80 4.00 1.00 59.20 m2
1,143.54 kg

0.15 0.15 0.75 24.00 1.00 2.70 m3


0.15 0.15 1.50 24.00 1.00 36.00 m2
460.73 kg

0.25 3.00 0.06 48.00 1.00 9.00 m3


0.25 3.00 0.75 48.00 4.00 144.00 m2
1,339.41 kg

0.15 0.20 5.55 4.00 1.00 4.44 m3


0.15 0.20 14.80 4.00 1.00 59.20 m2
1,168.02 kg

5.00 2.90 185.00 1.00 4.00 2,146.00 m3


5.00 0.05 185.00 1.00 4.00 37.00 m3
5.00 0.05 185.00 1.00 4.00 37.00 m3
5.00 185.00 1.00 4.00 740.00 m2

752.00 m2
752.00 m2
264.00 m

752.00 m2
188.00 1.00 4.00 752.00 m2
4.00 32.44 m
4.00 156.00 m
BJ N SISI VOL SAT
49.58 1.00 4.00 2,697.33
49.58 2.00 4.00 4,085.67
49.58 2.00 4.00 3,976.58
49.58 1.00 4.00 1,923.83
12,683.42 kg
49.58 1.00 4.00 1,586.67 kg
0.30 0.01 7,850.00 24.00 1.00 169.56
0.30 0.01 7,850.00 16.00 2.00 226.08
395.64 kg
40.00 6.00 240.00 bh
4.07 1.00 4.00 417.08
4.07 1.00 4.00 394.95
4.07 1.00 4.00 372.99
4.07 1.00 4.00 350.87
4.07 1.00 4.00 328.75
4.07 1.00 4.00 306.79
4.07 1.00 4.00 284.67
4.07 1.00 4.00 266.77
4.07 1.00 4.00 240.51
4.07 1.00 4.00 218.46
4.07 1.00 4.00 196.34
4.07 1.00 4.00 174.22
4.07 1.00 4.00 152.21
52.00 3,704.61 kg
6.38 6.00 52.00 298.58 kg
1.58 2.00 4.00 140.86
1.58 2.00 4.00 122.71
1.58 2.00 4.00 135.08
1.58 2.00 4.00 125.10
523.74 kg

BJ N SISI VOL SAT


29.58 1.00 4.00 1,609.33
29.58 2.00 4.00 2,437.67
29.58 2.00 4.00 2,372.58
29.58 1.00 4.00 1,147.83
7,567.42 kg

0.30 0.01 7,850.00 24.00 1.00 169.56


0.30 0.01 7,850.00 16.00 2.00 226.08
395.64 kg
40.00 6.00 240.00 bh
4.07 1.00 4.00 417.08
4.07 1.00 4.00 394.95
4.07 1.00 4.00 372.99
4.07 1.00 4.00 350.87
4.07 1.00 4.00 328.75
4.07 1.00 4.00 306.79
4.07 1.00 4.00 284.67
4.07 1.00 4.00 266.77
4.07 1.00 4.00 240.51
4.07 1.00 4.00 218.46
4.07 1.00 4.00 196.34
4.07 1.00 4.00 174.22
4.07 1.00 4.00 152.21
52.00 3,704.61 kg
6.38 6.00 52.00 298.58 kg
1.58 2.00 4.00 140.86
1.58 2.00 4.00 122.71
1.58 2.00 4.00 135.08
1.58 2.00 4.00 125.10
523.74 kg
1.5

1.5

1.5
atas bawah diagonal
Kuda Kuda 1 9.6 19 1.245 1.245
1.16 0.15 1.31
1.1 0.3 1.4
1.05 0.4 1.45
1.01 0.51 1.52
0.99 0.62 1.61
0.97 0.73 1.7
0.95 0.82 1.77
0.93 0.93 1.86
0.92 1.03 1.95
15.815
panjang N Volume total luasan kebutuhan m2
C.75.75 44.415 32 1421.28 307.2 4.63
8 12 96 307.2 0.31
14.10 32 451.2 307.2 1.47
Reng 8 40 320 307.2 1.04
lurus
8.8 0.80
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
5.30

6.41
Perhitungan Pembesian untuk 1m3 beton Poer

Dimensi Arah Horizontal Arah Vertikal


Diameter Jumlah Diameter Jumlah Berat Besi
No Item Pekerjaan Jarak antar Jml Lapis Berat Tul. Panjang Berat Jarak antar Jml Lapis Berat Tul. Panjang
p (m) l (m) t (m) Tulangan Tulangan Tulangan Tulangan Berat Besi Total (Kg/m)
Tulangan (m) Tulangan (Kg/m) tulangan Besi Tulangan (m) Tulangan (Kg/m) tulangan
(mm) (bh) (mm) (bh)
a c d f f g h i=c/f j k l=i*j*k m o p q=d/m r s t=q*r*s u

1 Poer P1 1.8 1.8 0.5 0.150 2 20 12 2.466 2.22 131.394 0.15 2 20 12 2.466 2.22 131.388 262.7820
TOTAL 3678.948

2 Lantai dasar 8.7 7.7 0.10 0.200 1 10 44 0.617 7.700 209.040 0.200 1 10 39 0.617 8.700 209.348 1673.552
4.2 3.7 0.1 0.200 1 10 21 0.617 3.700 47.941 0.200 1 10 19 0.617 4.200 49.237 388.712
8.7 3.7 0.1 0.200 1 10 44 0.617 3.700 100.448 0.200 1 10 19 0.617 8.700 101.990 404.876
TOTAL 2467.140

Plat kanopi; beton


3 4.04 0.8 0.07 0.200 1 10 21 0.617 0.800 10.366 0.200 1 10 4 0.617 4.040 9.971 162.696
bertulang; tb = 7 cm;

TOTAL 162.696
Plat Lantai 1; beton
4 8.7 7.7 0.15 0.200 2 10 44 0.617 7.700 418.079 0.200 2 10 39 0.617 8.700 418.696 3347.100
bertulang; tb = 15 cm;
4.2 3.7 0.15 0.200 2 10 21 0.617 3.700 95.882 0.200 2 10 19 0.617 4.200 98.473 777.420
8.7 3.7 0.15 0.200 2 10 44 0.617 3.700 200.895 0.200 2 10 19 0.617 8.700 203.980 809.750
TOTAL 4934.270

Tergantung Dimensi Pekerjaan Beton

W = Vb*Bjb UKURAN BERAT


= (1/4 * л * D^2 * L)*7850 (mm) (Kg)
= (1/4 * 3,1415 * D^2 * 1)*7850 6 0.222
= (1/4 * 3,1415 * ((10^-6)*D^2) * 1)*7850 8 0.395
= ((1/4 * 3,1415 * 1)*7850) * ((10^-6)*D^2) 9 0.500
W = 0.00616519375000 *D^2 10 0.617
12 0.888
Keterangan : 13 1.040
Vb = Volume Besi m3 19 2.226
Bjb = Berat Jenis Besi 7850 kg/m3 22 2.984
W = Berat Besi kg/m 25 3.850
29 5.185
dikarenakan D menggunakan Dimensi mm maka dikonversi dulu ke dimensi m
1mm^2 = 0.000001 m^2
PERHITUNGAN PEMBESIAN

Dimensi Tulangan Utama

No Item Pekerjaan Panjang Sloof / Kolom /


b (m) h (m) Jml Tul.
Ring Balk (m)

a c d e f
Kolom Struktur (K1) beton bertulang
1 0.6 0.6 7.40 8
(50x50) cm

Kolom Struktur (K2) beton bertulang


2 0.3 0.3 1.50 6
(30x30) cm

Kolom Struktur (K3) beton bertulang


3 0.25 0.25 1.50 6
(25x25) cm

Ring Balok (RB1); beton bertulang


4 0.3 0.4 8.00 8
(30x40) cm

Ring Balok (RB2); beton bertulang


5 0.2 0.3 27.00 8
(20x30) cm

Balok (B1); beton bertulang (15x15)


6 0.15 0.15 27.00 4
cm

6 Kolom Nuet (KN) (25x25) cm 0.25 0.25 2.90 8

Sloof (SL1); beton bertulang (15x20)


7 0.15 0.2 37.00 6
cm

Sloof (SL2); beton bertulang (15x15)


8 0.15 0.15 5.00 4
cm

Kolom Struktur (K1) beton bertulang


9 0.25 0.25 3.00 6
(25x25) cm

Ring Balok (RB1); beton bertulang


10 0.15 0.2 37.00 6
(15x20) cm
Perhitungan Berat Besi W = Vb*Bjb
= (1/4 * л * D^2 * L)*7850
= (1/4 * 3,1415 * D^2 * 1)*7850
=(1/4 * 3,1415 * ((10^-6)*D^2) * 1)*7850
=((1/4 * 3,1415 * 1)*7850) * ((10^-6)*D^2)
W = 0.01 *D^2

Keterangan :
Vb = Volume Besi m3
Bjb = Berat Jenis Besi 7850 kg/m3
W = Berat Besi kg/m

dikarenakan D menggunakan Dimensi mm maka dikonversi dulu ke dimensi m


1mm^2 = 0.00 m^2

UKURAN
(mm)
6
8
9
10
12
13
19
22
25
29
Tulangan Utama Tulangan Beugel

Berat Tul. Berat Panjang Jarak Jml Berat Tul. Berat


D (mm) D (mm)
(Kg/m) Besi Beugel sengkang Beugel (Kg/m) Besi

g h i= e*f*h k l m n o p = l*n*o
12 0.888 52.56 10 2.32 0.15 51.00 0.617 73.00

12 0.888 7.99 10 1.12 0.15 11.00 0.617 7.60

12 0.888 7.99 10 0.88 0.15 11.00 0.617 5.97

12 0.888 56.83 10 1.28 0.15 55.00 0.617 43.44

12 0.888 191.81 10 0.88 0.15 181.00 0.617 98.28

10 0.617 66.64 8 0.456 0.15 181.00 0.395 32.60

12 0.888 20.60 10 0.88 0.15 21.00 0.617 11.40

12 0.888 197.14 10 0.58 0.15 248.00 0.617 88.75

10 0.617 12.34 8 0.496 0.15 35.00 0.395 6.86

12 0.888 15.98 10 0.92 0.15 21.00 0.617 11.92

12 0.888 197.14 10 0.62 0.15 248.00 0.617 94.87


16 1.578

konversi dulu ke dimensi m

BERAT
(Kg)
0.222
0.395
0.500
0.617
0.888
1.040
2.226
2.984
3.850
5.185
Jumlah Sloof / Berat Besi Total
Kolom / Ring (Kg/panjang yang
Balk dibutuhkan)

q=i+p
4.00 125.561

8.00 15.592

28.00 391.008

4.00 401.075

8.00 2320.670

4.00 396.951

20.00 640.075

4.00 1143.541

24.00 460.733

48.00 1339.413

4.00 1168.024
ANALISA HARGA SATUAN

1
Penggalian 1 m³ tanah biasa sedalam 1 m
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.75 Rp 119,000.00 Rp 89,250.00
Mandor L.04 OH 0.03 Rp 128,000.00 Rp 3,200.00
Jumlah tenaga kerja Rp 92,450.00
B BAHAN
Jumlah harga bahan Rp -
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 92,450.00
E Overhead & profit 15% x D Rp 13,867.50
F Harga Satuan Pekerjaan (D+E) Rp 106,317.50

2
PekerjaanPembuatan 1 m2 Pagar Sementara dari SengGelombang Tinggi 2 Meter
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.20 Rp 119,000.00 Rp 23,800.00
Tukang Kayu L.04 OH 0.40 Rp 125,000.00 Rp 50,000.00
Kepala Tukang OH 0.02 Rp 128,000.00 Rp 2,560.00
Mandor OH 0.02 Rp 128,000.00 Rp 2,560.00
Jumlah tenaga kerja Rp 78,920.00
B BAHAN
Dolken kayu 8-10/400 cm M.17 Batang 1.25 Rp 8,000.00 Rp 10,000.00
Seng gelombang Lbr 1.20 Rp 75,000.00 Rp 90,000.00
Kayu 5/7 m3 0.07 Rp 1,900,000.00 Rp 136,800.00
Paku biasa Kg 0.06 Rp 20,000.00 Rp 1,200.00
Jumlah harga bahan Rp 238,000.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 326,920.00
E Overhead & profit 15% x D Rp 49,038.00
F Harga Satuan Pekerjaan (D+E) Rp 375,958.00

3
Pengurugan kembali 1 m³ galian tanah
Pengurugan kembali 1 m³ galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.50 Rp 119,000.00 Rp 59,500.00
Mandor L.04 OH 0.05 Rp 128,000.00 Rp 6,400.00
Jumlah tenaga kerja Rp 65,900.00
B BAHAN
Jumlah harga bahan Rp -
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 65,900.00
E Overhead & profit 15% x D Rp 9,885.00
F Harga Satuan Pekerjaan (D+E) Rp 75,785.00
4
Pengurugan 1 m³ dengan tanah dipadatkan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.50 Rp 119,000.00 Rp 59,500.00
Mandor L.04 OH 0.05 Rp 128,000.00 Rp 6,400.00
Jumlah tenaga kerja Rp 65,900.00
B BAHAN
Tanah Urug m³ 1.20 Rp 90,000.00 Rp 108,000.00
Jumlah harga bahan Rp 108,000.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 173,900.00
E Overhead & profit 15% x D Rp 26,085.00
F Harga Satuan Pekerjaan (D+E) Rp 199,985.00

5
Pengurugan 1 m³ dengan pasir urug
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.30 Rp 119,000.00 Rp 35,700.00
Mandor L.04 OH 0.01 Rp 128,000.00 Rp 1,280.00
Jumlah tenaga kerja Rp 36,980.00
B BAHAN
Pasir urug m³ 1.20 Rp 110,000.00 Rp 132,000.00
Jumlah harga bahan Rp 132,000.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 168,980.00
E Overhead & profit 15% x D Rp 25,347.00
F Harga Satuan Pekerjaan (D+E) Rp 194,327.00
6
Pemasangan 1 m³ pondasi batu belah campuran 1SP : 4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.50 Rp 119,000.00 Rp 178,500.00
Tukang Batu L.02 OH 0.75 Rp 125,000.00 Rp 93,750.00
Kepala Tukang L.03 OH 0.08 Rp 128,000.00 Rp 9,600.00
Mandor L.04 OH 0.08 Rp 128,000.00 Rp 9,600.00
Jumlah tenaga kerja Rp 291,450.00
B BAHAN
Batu belah m³ 1.20 Rp 250,000.00 Rp 300,000.00
Semen Portland kg 163.00 Rp 1,100.00 Rp 179,300.00
Pasir Pasang m³ 0.52 Rp 120,000.00 Rp 62,400.00
Jumlah harga bahan Rp 541,700.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 833,150.00
E Overhead & profit 15% x D Rp 124,972.50
F Harga Satuan Pekerjaan (D+E) Rp 958,122.50
Catatan : Bobot isi pasir = 1.400 kg/m³, Bobot isi kerikil = 1.350 kg/m³, Buckling factor pasir = 20%

Pekerjaan anstamping
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.78 Rp 119,000.00 Rp 92,820.00
Tukang Batu L.02 OH 0.39 Rp 125,000.00 Rp 48,750.00
Kepala Tukang L.03 OH 0.04 Rp 128,000.00 Rp 4,992.00
Mandor L.04 OH 0.04 Rp 128,000.00 Rp 4,992.00
Jumlah tenaga kerja Rp 151,554.00
B BAHAN
Batu belah m³ 1.20 Rp 250,000.00 Rp 300,000.00
Pasir Urug m³ 0.43 Rp 120,000.00 Rp 51,840.00

Jumlah harga bahan Rp 351,840.00


C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 503,394.00
E Overhead & profit 15% x D Rp 75,509.10
F Harga Satuan Pekerjaan (D+E) Rp 578,903.10
Catatan : Bobot isi pasir = 1.400 kg/m³, Bobot isi kerikil = 1.350 kg/m³, Buckling factor pasir = 20%

7
Membuat 1 m³ lantai kerja beton mutu f'̜ = 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0,87
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.20 Rp 119,000.00 Rp 142,800.00
Tukang Batu L.02 OH 0.20 Rp 125,000.00 Rp 25,000.00
Kepala Tukang L.03 OH 0.02 Rp 128,000.00 Rp 2,560.00
Mandor L.04 OH 0.06 Rp 128,000.00 Rp 7,680.00
Jumlah tenaga kerja Rp 178,040.00
B BAHAN
Semen Portland kg 230.00 Rp 1,100.00 Rp 253,000.00
Pasir Beton kg 893.00 Rp 85.71 Rp 76,542.86
Split (Maks 30mm) kg 1,027.00 Rp 148.15 Rp 152,148.15
Air liter 200.00 Rp 20.00 Rp 4,000.00
Jumlah harga bahan Rp 485,691.01
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 663,731.01
E Overhead & profit 15% x D Rp 99,559.65
F Harga Satuan Pekerjaan (D+E) Rp 763,290.66
Catatan : Bobot isi pasir = 1.400 kg/m³, Bobot isi kerikil = 1.350 kg/m³, Buckling factor pasir = 20%
8
Membuat 1 m³ beton mutu f'̹ = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.65 Rp 119,000.00 Rp 196,350.00
Tukang Batu L.02 OH 0.28 Rp 125,000.00 Rp 34,375.00
Kepala Tukang L.03 OH 0.03 Rp 128,000.00 Rp 3,584.00
Mandor L.04 OH 0.08 Rp 128,000.00 Rp 10,624.00
Jumlah tenaga kerja Rp 244,933.00
B BAHAN
Semen Portland kg 326.00 Rp 1,100.00 Rp 358,600.00
Pasir Beton kg 760.00 Rp 85.71 Rp 65,142.86
Split (Maks 30mm) kg 1,029.00 Rp 148.15 Rp 152,444.44
Air liter 215.00 Rp 20.00 Rp 4,300.00
Jumlah harga bahan Rp 580,487.30
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 825,420.30
E Overhead & profit 15% x D Rp 123,813.05
F Harga Satuan Pekerjaan (D+E) Rp 949,233.35
Catatan : Bobot isi pasir = 1.400 kg/m³, Bobot isi kerikil = 1.350 kg/m³, Buckling factor pasir = 20%

9
Membuat 1 m³ beton mutu f'̹ = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.65 Rp 119,000.00 Rp 196,350.00
Tukang Batu L.02 OH 0.28 Rp 125,000.00 Rp 34,375.00
Kepala Tukang L.03 OH 0.03 Rp 128,000.00 Rp 3,584.00
Mandor L.04 OH 0.08 Rp 128,000.00 Rp 10,624.00
Jumlah tenaga kerja Rp 244,933.00
B BAHAN
Semen Portland kg 371.00 Rp 1,100.00 Rp 408,100.00
Pasir Beton kg 698.00 Rp 85.71 Rp 59,828.57
Split (Maks 30mm) kg 1,047.00 Rp 148.15 Rp 155,111.11
Air liter 215.00 Rp 20.00 Rp 4,300.00
Jumlah harga bahan Rp 627,339.68
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 872,272.68
E Overhead & profit 15% x D Rp 130,840.90
F Harga Satuan Pekerjaan (D+E) Rp 1,003,113.58
Catatan : Bobot isi pasir = 1.400 kg/m³, Bobot isi kerikil = 1.350 kg/m³, Buckling factor pasir = 20%
10
Pembesian 10 kg dengan besi polos
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.07 Rp 119,000.00 Rp 8,330.00
Tukang Besi L.02 OH 0.07 Rp 125,000.00 Rp 8,750.00
Kepala Tukang L.03 OH 0.01 Rp 128,000.00 Rp 896.00
Mandor L.04 OH 0.00 Rp 128,000.00 Rp 512.00
Jumlah tenaga kerja Rp 18,488.00
B BAHAN
Besi beton (polos) kg 10.50 Rp 11,800.00 Rp 123,900.00
Kawat beton kg 0.15 Rp 20,000.00 Rp 3,000.00
Jumlah harga bahan Rp 126,900.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 145,388.00
E Overhead & profit 15% x D Rp 21,808.20
F Harga Satuan Pekerjaan (D+E) Rp 167,196.20
1 Kg Rp 16,719.62

11
Pemasangan 1 m² bekisting untuk pondasi
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.52 Rp 119,000.00 Rp 61,880.00
Tukang Kayu L.02 OH 0.26 Rp 125,000.00 Rp 32,500.00
Kepala Tukang L.03 OH 0.03 Rp 128,000.00 Rp 3,328.00
Mandor L.04 OH 0.03 Rp 128,000.00 Rp 3,328.00
Jumlah tenaga kerja Rp 101,036.00
B BAHAN
Kayu kelas III m³ 0.04 Rp 1,800,000.00 Rp 72,000.00
Paku 5 - 10 cm kg 0.30 Rp 20,000.00 Rp 6,000.00
Minyak bekisting liter 0.10 Rp 5,000.00 Rp 500.00
Jumlah harga bahan Rp 78,500.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 179,536.00
E Overhead & profit 15% x D Rp 26,930.40
F Harga Satuan Pekerjaan (D+E) Rp 206,466.40
12
Pemasangan 1 m² bekisting untuk sloof
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.52 Rp 119,000.00 Rp 61,880.00
Tukang Kayu L.02 OH 0.26 Rp 125,000.00 Rp 32,500.00
Kepala Tukang L.03 OH 0.03 Rp 128,000.00 Rp 3,328.00
Mandor L.04 OH 0.03 Rp 128,000.00 Rp 3,328.00
Jumlah tenaga kerja Rp 101,036.00
B BAHAN
Kayu kelas III m³ 0.05 Rp 1,800,000.00 Rp 81,000.00
Paku 5 - 10 cm kg 0.30 Rp 20,000.00 Rp 6,000.00
Minyak bekisting liter 0.10 Rp 5,000.00 Rp 500.00
Jumlah harga bahan Rp 87,500.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 188,536.00
E Overhead & profit 15% x D Rp 28,280.40
F Harga Satuan Pekerjaan (D+E) Rp 216,816.40

13
Pemasangan 1 m² bekisting untuk kolom
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.66 Rp 119,000.00 Rp 78,540.00
Tukang Kayu L.02 OH 0.33 Rp 125,000.00 Rp 41,250.00
Kepala Tukang L.03 OH 0.03 Rp 128,000.00 Rp 4,224.00
Mandor L.04 OH 0.03 Rp 128,000.00 Rp 4,224.00
Jumlah tenaga kerja Rp 128,238.00
B BAHAN
Kayu kelas III m³ 0.04 Rp 1,800,000.00 Rp 72,000.00
Paku 5 - 12 cm kg 0.40 Rp 20,000.00 Rp 8,000.00
Minyak bekisting liter 0.20 Rp 5,000.00 Rp 1,000.00
Balok kayu kelas II m³ 0.02 Rp 1,900,000.00 Rp 28,500.00
Plywood tebal 9 mm lembar 0.35 Rp 90,000.00 Rp 31,500.00
Dolken kayu Ø8-10cm - pj. 4m batang 2.00 Rp 8,000.00 Rp 16,000.00
Jumlah harga bahan Rp 157,000.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 285,238.00
E Overhead & profit 15% x D Rp 42,785.70
F Harga Satuan Pekerjaan (D+E) Rp 328,023.70

14
Pemasangan 1 m² bekisting untuk balok
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.66 Rp 119,000.00 Rp 78,540.00
Tukang Kayu L.02 OH 0.33 Rp 125,000.00 Rp 41,250.00
Kepala Tukang L.03 OH 0.03 Rp 128,000.00 Rp 4,224.00
Mandor L.04 OH 0.03 Rp 128,000.00 Rp 4,224.00
Jumlah tenaga kerja Rp 128,238.00
B BAHAN
Kayu kelas III m³ 0.04 Rp 1,800,000.00 Rp 72,000.00
Paku 5 - 12 cm kg 0.40 Rp 20,000.00 Rp 8,000.00
Minyak bekisting liter 0.20 Rp 5,000.00 Rp 1,000.00
Balok kayu kelas II m³ 0.02 Rp 1,900,000.00 Rp 34,200.00
Plywood tebal 9 mm lembar 0.35 Rp 90,000.00 Rp 31,500.00
Dolken kayu Ø8-10cm - pj. 4m batang 2.00 Rp 8,000.00 Rp 16,000.00
Jumlah harga bahan Rp 162,700.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 290,938.00
E Overhead & profit 15% x D Rp 43,640.70
F Harga Satuan Pekerjaan (D+E) Rp 334,578.70
15
Pemasangan 1 m² bekisting untuk lantai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.66 Rp 119,000.00 Rp 78,540.00
Tukang Kayu L.02 OH 0.33 Rp 125,000.00 Rp 41,250.00
Kepala Tukang L.03 OH 0.03 Rp 128,000.00 Rp 4,224.00
Mandor L.04 OH 0.03 Rp 128,000.00 Rp 4,224.00
Jumlah tenaga kerja Rp 128,238.00
B BAHAN
Kayu kelas III m³ 0.04 Rp 1,800,000.00 Rp 72,000.00
Paku 5 - 12 cm kg 0.40 Rp 20,000.00 Rp 8,000.00
Minyak bekisting liter 0.20 Rp 5,000.00 Rp 1,000.00
Balok kayu kelas II m³ 0.02 Rp 1,900,000.00 Rp 28,500.00
Plywood tebal 9 mm lembar 0.35 Rp 90,000.00 Rp 31,500.00
Dolken kayu Ø8-10cm - pj. 4m batang 6.00 Rp 8,000.00 Rp 48,000.00
Jumlah harga bahan Rp 189,000.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 317,238.00
E Overhead & profit 15% x D Rp 47,585.70
F Harga Satuan Pekerjaan (D+E) Rp 364,823.70

16
Pemasangan 1 m² bekisting untuk dinding
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.66 Rp 119,000.00 Rp 78,540.00
Tukang Kayu L.02 OH 0.33 Rp 125,000.00 Rp 41,250.00
Kepala Tukang L.03 OH 0.03 Rp 128,000.00 Rp 4,224.00
Mandor L.04 OH 0.03 Rp 128,000.00 Rp 4,224.00
Jumlah tenaga kerja Rp 128,238.00
B BAHAN
Kayu kelas III m³ 0.03 Rp 1,800,000.00 Rp 54,000.00
Paku 5 - 12 cm kg 0.40 Rp 20,000.00 Rp 8,000.00
Minyak bekisting liter 0.20 Rp 5,000.00 Rp 1,000.00
Balok kayu kelas II m³ 0.02 Rp 1,900,000.00 Rp 38,000.00
Plywood tebal 9 mm lembar 0.35 Rp 90,000.00 Rp 31,500.00
Dolken kayu Ø8-10cm - pj. 4m batang 3.00 Rp 8,000.00 Rp 24,000.00
Penjaga jarak
buah 4.00 Rp -
bekisting/spacer
Jumlah harga bahan Rp 156,500.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 284,738.00
E Overhead & profit 15% x D Rp 42,710.70
F Harga Satuan Pekerjaan (D+E) Rp 327,448.70
17
Pemasangan 1 m² bekisting untuk tangga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.66 Rp 119,000.00 Rp 78,540.00
Tukang Kayu L.02 OH 0.33 Rp 125,000.00 Rp 41,250.00
Kepala Tukang L.03 OH 0.03 Rp 128,000.00 Rp 4,224.00
Mandor L.04 OH 0.03 Rp 128,000.00 Rp 4,224.00
Jumlah tenaga kerja Rp 128,238.00
B BAHAN
Kayu kelas III m³ 0.03 Rp 1,800,000.00 Rp 54,000.00
Paku 5 - 12 cm kg 0.40 Rp 20,000.00 Rp 8,000.00
Minyak bekisting liter 0.15 Rp 5,000.00 Rp 750.00
Balok kayu kelas II m³ 0.02 Rp 1,900,000.00 Rp 28,500.00
Plywood tebal 9 mm lembar 0.35 Rp 90,000.00 Rp 31,500.00
Dolken kayu Ø8-10cm - pj. 4m batang 3.00 Rp 8,000.00 Rp 24,000.00
Jumlah harga bahan Rp 146,750.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 274,988.00
E Overhead & profit 15% x D Rp 41,248.20
F Harga Satuan Pekerjaan (D+E) Rp 316,236.20

18
Membuat 1 m¹ kolom praktis beton bertulang (11 x 11) cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.18 Rp 119,000.00 Rp 21,420.00
Tukang batu L.02 OH 0.02 Rp 125,000.00 Rp 2,500.00
Tukang Kayu L.02 OH 0.02 Rp 125,000.00 Rp 2,500.00
Tukang besi L.02 OH 0.02 Rp 125,000.00 Rp 2,500.00
Kepala Tukang L.03 OH 0.01 Rp 128,000.00 Rp 768.00
Mandor L.04 OH 0.01 Rp 128,000.00 Rp 1,152.00
Jumlah tenaga kerja Rp 30,840.00
B BAHAN
Kayu kelas III m³ 0.00 Rp 1,800,000.00 Rp 3,600.00
Paku 5 Cm - 12 Cm kg 0.01 Rp 20,000.00 Rp 200.00
Minyak bekisting liter 1.00 Rp 5,000.00 Rp 5,000.00
Besi beton polos kg 3.00 Rp 11,800.00 Rp 35,400.00
Kawat beton kg 0.45 Rp 20,000.00 Rp 9,000.00
Semen portland kg 4.00 Rp 1,100.00 Rp 4,400.00
Pasir beton m³ 0.01 Rp 120,000.00 Rp 720.00
Split m³ 0.01 Rp 200,000.00 Rp 1,800.00
Jumlah harga bahan Rp 60,120.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 90,960.00
E Overhead & profit 15% x D Rp 13,644.00
F Harga Satuan Pekerjaan (D+E) Rp 104,604.00
19
Membuat 1 m¹ ring balok beton bertulang (10 x 15) cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.30 Rp 119,000.00 Rp 35,343.00
Tukang batu L.02 OH 0.03 Rp 125,000.00 Rp 4,125.00
Tukang Kayu L.02 OH 0.03 Rp 125,000.00 Rp 4,125.00
Tukang besi L.02 OH 0.03 Rp 125,000.00 Rp 4,125.00
Kepala Tukang L.03 OH 0.01 Rp 128,000.00 Rp 1,280.00
Mandor L.04 OH 0.02 Rp 128,000.00 Rp 1,920.00
Jumlah tenaga kerja Rp 50,918.00
B BAHAN
Kayu kelas III m³ 0.00 Rp 1,800,000.00 Rp 5,400.00
Paku 5 Cm - 12 Cm kg 0.02 Rp 20,000.00 Rp 400.00
Minyak bekisting liter - Rp 5,000.00 Rp -
Besi beton polos kg 3.60 Rp 11,800.00 Rp 42,480.00
Kawat beton kg 0.05 Rp 20,000.00 Rp 1,000.00
Semen portland kg 5.50 Rp 1,100.00 Rp 6,050.00
Pasir beton m³ 0.01 Rp 120,000.00 Rp 1,080.00
Split m³ 0.02 Rp 200,000.00 Rp 3,000.00
Jumlah harga bahan Rp 59,410.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 110,328.00
E Overhead & profit 15% x D Rp 16,549.20
F Harga Satuan Pekerjaan (D+E) Rp 126,877.20
25
Pemasangan 1 m² dinding bata merah tebal 1 batu campuran 1 SP : 2PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.60 Rp 119,000.00 Rp 71,400.00
Tukang Batu L.02 OH 0.20 Rp 125,000.00 Rp 25,000.00
Kepala Tukang L.03 OH 0.02 Rp 128,000.00 Rp 2,560.00
Mandor L.04 OH 0.03 Rp 128,000.00 Rp 3,840.00
Jumlah tenaga kerja Rp 102,800.00
B BAHAN
Bata merah m³ 140.00 Rp 650.00 Rp 91,000.00
Semen portland kg 43.50 Rp 1,100.00 Rp 47,850.00
Pasir Pasang m³ 0.08 Rp 120,000.00 Rp 9,600.00
Jumlah harga bahan Rp 148,450.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 251,250.00
E Overhead & profit 15% x D Rp 37,687.50
F Harga Satuan Pekerjaan (D+E) Rp 288,937.50
26
Pemasangan 1 m² dinding bata merah tebal 1/2 batu campuran 1 SP : 4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.30 Rp 119,000.00 Rp 35,700.00
Tukang Batu L.02 OH 0.10 Rp 125,000.00 Rp 12,500.00
Kepala Tukang L.03 OH 0.01 Rp 128,000.00 Rp 1,280.00
Mandor L.04 OH 0.02 Rp 128,000.00 Rp 1,920.00
Jumlah tenaga kerja Rp 51,400.00
B BAHAN
Bata merah m³ 70.00 Rp 650.00 Rp 45,500.00
Semen portland kg 11.50 Rp 1,100.00 Rp 12,650.00
Pasir Pasang m³ 0.04 Rp 120,000.00 Rp 5,160.00
Jumlah harga bahan Rp 63,310.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 114,710.00
E Overhead & profit 15% x D Rp 17,206.50
F Harga Satuan Pekerjaan (D+E) Rp 131,916.50

27
Pemasangan 1 m² plesteran 1SP : 4PP tebal 15 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.30 Rp 119,000.00 Rp 35,700.00
Tukang Batu L.03 OH 0.15 Rp 125,000.00 Rp 18,750.00
Kepala Tukang L.03 OH 0.02 Rp 128,000.00 Rp 1,920.00
Mandor L.04 OH 0.02 Rp 128,000.00 Rp 1,920.00
Jumlah tenaga kerja Rp 58,290.00
B BAHAN
1. PC kg 6.24 Rp 1,100.00 Rp 6,864.00
2. PP m³ 0.02 Rp 120,000.00 Rp 2,880.00
Jumlah harga bahan Rp 9,744.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 68,034.00
E Overhead & profit 15% x D Rp 10,205.10
F Harga Satuan Pekerjaan (D+E) Rp 78,239.10

28
Pemasangan 1 m² acian
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Tukang Batu L.03 OH 0.10 Rp 125,000.00 Rp 12,500.00
Jumlah tenaga kerja Rp 12,500.00
B BAHAN
Semen PC kg 3.25 Rp 1,100.00 Rp 3,575.00
Jumlah harga bahan Rp 3,575.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 16,075.00
E Overhead & profit 15% x D Rp 2,411.25
F Harga Satuan Pekerjaan (D+E) Rp 18,486.25
29
Pemasangan 1 m² lantai granit ukuran 60 x 60 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.24 Rp 119,000.00 Rp 28,560.00
Tukang Batu L.02 OH 0.12 Rp 125,000.00 Rp 15,000.00
Kepala Tukang L.03 OH 0.01 Rp 128,000.00 Rp 1,536.00
Mandor L.04 OH 0.01 Rp 128,000.00 Rp 1,536.00
Jumlah tenaga kerja Rp 46,632.00
B BAHAN
Granit 60x60 bh 3.10 Rp 66,666.67 Rp 206,666.67
Semen portland kg 9.60 Rp 1,100.00 Rp 10,560.00
Semen warna kg 1.50 Rp 2,000.00 Rp 3,000.00
Pasir pasang m³ 0.05 Rp 120,000.00 Rp 5,400.00
Jumlah harga bahan Rp 225,626.67
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 272,258.67
E Overhead & profit 15% x D Rp 40,838.80
F Harga Satuan Pekerjaan (D+E) Rp 313,097.47

30
Pemasangan 1 m² lantai ukuran 40 x 40 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.70 Rp 119,000.00 Rp 83,300.00
Tukang Batu L.02 OH 0.35 Rp 125,000.00 Rp 43,750.00
Kepala Tukang L.03 OH 0.04 Rp 128,000.00 Rp 5,120.00
Mandor L.04 OH 0.04 Rp 128,000.00 Rp 4,480.00
Jumlah tenaga kerja Rp 136,650.00
B BAHAN
Keramik 60 x 60 cm Duz 1.05 Rp 200,000.00 Rp 210,000.00
Semen Portland kg 8.19 Rp 1,100.00 Rp 9,009.00
Semen warna kg 0.50 Rp 2,000.00 Rp 1,000.00
Pasir pasang m³ 0.05 Rp 120,000.00 Rp 6,000.00
Jumlah harga bahan Rp 226,009.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 362,659.00
E Overhead & profit 15% x D Rp 54,398.85
F Harga Satuan Pekerjaan (D+E) Rp 417,057.85

31
Pemasangan 1 m² lantai keramik ukuran 20 x 20 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.70 Rp 119,000.00 Rp 83,300.00
Tukang Batu L.02 OH 0.35 Rp 125,000.00 Rp 43,750.00
Kepala Tukang L.03 OH 0.04 Rp 128,000.00 Rp 4,480.00
Mandor L.04 OH 0.04 Rp 128,000.00 Rp 4,480.00
Jumlah tenaga kerja Rp 136,010.00
B BAHAN
Keramik 20x20 bh 25.00 Rp 2,000.00 Rp 50,000.00
Semen Portland kg 10.00 Rp 1,100.00 Rp 11,000.00
Semen warna kg 1.50 Rp 2,000.00 Rp 3,000.00
Pasir pasang m³ 0.05 Rp 120,000.00 Rp 5,400.00
Jumlah harga bahan Rp 69,400.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 205,410.00
E Overhead & profit 15% x D Rp 30,811.50
F Harga Satuan Pekerjaan (D+E) Rp 236,221.50
32
Pemasangan 1 m² dinding keramik ukuran 20 x 20 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.90 Rp 119,000.00 Rp 107,100.00
Tukang Batu L.02 OH 0.45 Rp 125,000.00 Rp 56,250.00
Kepala Tukang L.03 OH 0.05 Rp 128,000.00 Rp 6,400.00
Mandor L.04 OH 0.05 Rp 128,000.00 Rp 5,760.00
Jumlah tenaga kerja Rp 175,510.00
B BAHAN
Keramik 20 x 20 duz 1.05 Rp 51,000.00 Rp 53,550.00
Semen Portland kg 9.30 Rp 1,100.00 Rp 10,230.00
Semen warna kg 1.94 Rp 2,000.00 Rp 3,880.00
Pasir pasang m³ 0.02 Rp 120,000.00 Rp 2,160.00
Jumlah harga bahan Rp 69,820.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 245,330.00
E Overhead & profit 15% x D Rp 36,799.50
F Harga Satuan Pekerjaan (D+E) Rp 282,129.50

33
Pemasangan 1 m² keramik Motif ukuran 20 x 40 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.90 Rp 119,000.00 Rp 107,100.00
Tukang Batu L.02 OH 0.45 Rp 125,000.00 Rp 56,250.00
Kepala Tukang L.03 OH 0.05 Rp 128,000.00 Rp 6,400.00
Mandor L.04 OH 0.05 Rp 128,000.00 Rp 5,760.00
Jumlah tenaga kerja Rp 175,510.00
B BAHAN
Keramik Motif 20x40 duz 1.05 Rp 130,000.00 Rp 136,500.00
Semen Portland kg 9.30 Rp 1,100.00 Rp 10,230.00
Semen warna kg 1.94 Rp 2,000.00 Rp 3,880.00
Pasir pasang m³ 0.02 Rp 120,000.00 Rp 2,160.00
Jumlah harga bahan Rp 152,770.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 328,280.00
E Overhead & profit 15% x D Rp 49,242.00
F Harga Satuan Pekerjaan (D+E) Rp 377,522.00
33
Pemasangan 1 m² plafond gypsum board tebal 3.5 mm + rangka hollow modul 60 x 60 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.10 Rp 119,000.00 Rp 11,900.00
Tukang kayu L.02 OH 0.05 Rp 125,000.00 Rp 6,250.00
Kepala Tukang L.03 OH 0.01 Rp 128,000.00 Rp 640.00
Mandor L.04 OH 0.01 Rp 128,000.00 Rp 640.00
Jumlah tenaga kerja Rp 19,430.00
B BAHAN
Rangka Hollow batang 1.03 Rp 10,000.00 Rp 10,250.00
Gypsum board lembar 0.36 Rp 75,000.00 Rp 27,300.00
Paku skrup kg 0.11 Rp 20,000.00 Rp 2,200.00
Penggantung & Ramzet bh 4.00 Rp 17,500.00 Rp 70,000.00
Stifenner bh 3.00 Rp 6,000.00 Rp 18,000.00
Jumlah harga bahan Rp 127,750.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 147,180.00
E Overhead & profit 15% x D Rp 22,077.00
F Harga Satuan Pekerjaan (D+E) Rp 169,257.00

34
Pemasangan 1 m2 rangka kuda-kuda Baja Ringan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.20 Rp 119,000.00 Rp 23,800.00
Tukang Rangka L.02 OH 0.25 Rp 125,000.00 Rp 31,250.00
Kepala Tukang L.03 OH 0.03 Rp 128,000.00 Rp 3,840.00
Mandor L.04 OH 0.02 Rp 128,000.00 Rp 2,560.00
Jumlah tenaga kerja Rp 61,450.00
B BAHAN
Profil Truss C.75.0.75 m 4.98 Rp 11,000.00 Rp 54,780.00
Profil Reng U.35.30.40 m 5.20 Rp 9,040.00 Rp 47,008.00
Screw Kuda-Kuda 12-14x40 bh 14.00 Rp 500.00 Rp 7,000.00
Screw Reng 10-16x16 bh 11.00 Rp 500.00 Rp 5,500.00
Jumlah harga bahan Rp 114,288.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 175,738.00
E Overhead & profit 15% x D Rp 26,360.70
F Harga Satuan Pekerjaan (D+E) Rp 202,098.70

35
Pemasangan 1 m2 atap Spandek
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.02 Rp 119,000.00 Rp 2,380.00
Tukang Las Konstruksi L.02 OH 0.08 Rp 125,000.00 Rp 10,000.00
Kepala Tukang L.03 OH 0.01 Rp 128,000.00 Rp 1,280.00
Mandor L.04 OH 0.01 Rp 128,000.00 Rp 768.00
Jumlah tenaga kerja Rp 14,428.00
B BAHAN
Atap Spandek m2 1.10 Rp 60,000.00 Rp 66,000.00
Screw 12-4 x 50 bh 6.00 Rp 1,500.00 Rp 9,000.00
Screw 10 x 16-16 bh 2.00 Rp 1,000.00 Rp 2,000.00
Jumlah harga bahan Rp 77,000.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 91,428.00
E Overhead & profit 15% x D Rp 13,714.20
F Harga Satuan Pekerjaan (D+E) Rp 105,142.20
36
Pemasangan 1 m' Nok zincalume
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.02 Rp 119,000.00 Rp 2,380.00
Tukang Las Konstruksi L.02 OH 0.08 Rp 125,000.00 Rp 10,000.00
Kepala Tukang L.03 OH 0.01 Rp 128,000.00 Rp 1,280.00
Mandor L.04 OH 0.01 Rp 128,000.00 Rp 768.00
Jumlah tenaga kerja Rp 14,428.00
B BAHAN
Nok zincalume m2 1.10 Rp 60,000.00 Rp 66,000.00
Screw 10 x 16-16 bh 6.00 Rp 1,000.00 Rp 6,000.00
Jumlah harga bahan Rp 72,000.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 86,428.00
E Overhead & profit 15% x D Rp 12,964.20
F Harga Satuan Pekerjaan (D+E) Rp 99,392.20

37
Pengecatan 1 m² tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) - interior
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.02 Rp 119,000.00 Rp 2,380.00
Tukang cat L.02 OH 0.06 Rp 125,000.00 Rp 7,875.00
Kepala Tukang L.03 OH 0.01 Rp 128,000.00 Rp 806.40
Mandor L.04 OH 0.00 Rp 128,000.00 Rp 384.00
Jumlah tenaga kerja Rp 11,445.40
B BAHAN
Plamuur kg 0.10 Rp 20,000.00 Rp 2,000.00
Cat dasar / alkali kg 0.10 Rp 40,000.00 Rp 4,000.00
Cat Penutup kg 0.26 Rp 50,000.00 Rp 13,000.00
Jumlah harga bahan Rp 19,000.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 30,445.40
E Overhead & profit 15% x D Rp 4,566.81
F Harga Satuan Pekerjaan (D+E) Rp 35,012.21
38
Pengecatan 1 m² tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) - eksterior
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.02 Rp 119,000.00 Rp 2,380.00
Tukang cat L.02 OH 0.06 Rp 125,000.00 Rp 7,875.00
Kepala Tukang L.03 OH 0.01 Rp 128,000.00 Rp 806.40
Mandor L.04 OH 0.00 Rp 128,000.00 Rp 384.00
Jumlah tenaga kerja Rp 11,445.40
B BAHAN
Plamuur kg 0.10 Rp 20,000.00 Rp 2,000.00
Cat dasar / alkali kg 0.10 Rp 40,000.00 Rp 4,000.00
Cat Penutup kg 0.26 Rp 70,000.00 Rp 18,200.00
Jumlah harga bahan Rp 24,200.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 35,645.40
E Overhead & profit 15% x D Rp 5,346.81
F Harga Satuan Pekerjaan (D+E) Rp 40,992.21

39
Pemasangan 1 m2 Lantai Floordeck/bondex tebal 0,75 mm 1 x pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.66 Rp 119,000.00 Rp 78,540.00
Tukang cat L.02 OH 0.33 Rp 125,000.00 Rp 41,250.00
Kepala Tukang L.03 OH 0.03 Rp 128,000.00 Rp 4,224.00
Mandor L.04 OH 0.03 Rp 128,000.00 Rp 4,224.00
Jumlah tenaga kerja Rp 128,238.00
B BAHAN
Floordeck tebal 0,75 mm M2 1.10 Rp 170,000.00 Rp 187,000.00
Jumlah harga bahan Rp 187,000.00
C PERALATAN
Alat bantu Ls 1.00 Rp 10,000.00 Rp 10,000.00
Jumlah harga alat Rp 10,000.00
D Jumlah (A+B+C) Rp 325,238.00
E Overhead & profit 15% x D Rp 48,785.70
F Harga Satuan Pekerjaan (D+E) Rp 374,023.70

Kloset jongkok lengkap terpasang


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.00 Rp 119,000.00 Rp 119,000.00
Tukang Batu L.02 OH 1.50 Rp 125,000.00 Rp 187,500.00
Kepala Tukang L.03 OH 0.15 Rp 128,000.00 Rp 19,200.00
Mandor L.04 OH 0.05 Rp 128,000.00 Rp 6,400.00
Jumlah tenaga kerja Rp 332,100.00
B BAHAN
Closet jongkok Unit 1.00 Rp 125,000.00 Rp 125,000.00
Semen portland kg 6.00 Rp 1,100.00 Rp 6,600.00
pasir pasang m3 0.01 Rp 120,000.00 Rp 1,200.00
Bata merah bh 7.00 Rp 650.00 Rp 4,550.00
Jumlah harga bahan Rp 137,350.00
C PERALATAN

Jumlah harga alat Rp -


D Jumlah (A+B+C) Rp 469,450.00
E Overhead & profit 15% x D Rp 70,417.50
F Harga Satuan Pekerjaan (D+E) Rp 539,867.50
Instalasi stop kontak
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.01 Rp 119,000.00 Rp 1,190.00
Tukang Listrik L.02 OH 0.06 Rp 125,000.00 Rp 7,500.00

Jumlah tenaga kerja Rp 8,690.00


B BAHAN
Pipa Pvc 5/8 " Btg 0.80 Rp 15,000.00 Rp 12,000.00
Kabel NYA 4 mm Mtr 10.00 Rp 10,000.00 Rp 100,000.00
Isolator Bh 4.00 Rp 2,000.00 Rp 8,000.00
Inbow Dos Bh 1.00 Rp 10,000.00 Rp 10,000.00
Isolasi kecil roll 1.00 Rp 5,000.00 Rp 5,000.00
Alat bantu Ls 1.00 Rp 10,000.00 Rp 10,000.00
Jumlah harga bahan Rp 145,000.00
C PERALATAN

Jumlah harga alat Rp -


D Jumlah (A+B+C) Rp 153,690.00
E Overhead & profit 15% x D Rp 23,053.50
F Harga Satuan Pekerjaan (D+E) Rp 176,743.50
Instalasi Saklar Tunggal
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.01 Rp 119,000.00 Rp 1,190.00
Tukang Listrik L.02 OH 0.06 Rp 125,000.00 Rp 7,500.00

Jumlah tenaga kerja Rp 8,690.00


B BAHAN
Pipa Pvc 5/8 " Btg 0.80 Rp 15,000.00 Rp 12,000.00
Kabel NYA 4 mm Mtr 10.00 Rp 10,000.00 Rp 100,000.00
Isolator Bh 4.00 Rp 2,000.00 Rp 8,000.00
Inbow Dos Bh 1.00 Rp 10,000.00 Rp 10,000.00
Sakelar Tunggal set 1.00 Rp 17,000.00 Rp 17,000.00
Isolasi kecil roll 1.00 Rp 5,000.00 Rp 5,000.00
Alat bantu Ls 1.00 Rp 10,000.00 Rp 10,000.00
Jumlah harga bahan Rp 162,000.00
C PERALATAN

Jumlah harga alat Rp -


D Jumlah (A+B+C) Rp 170,690.00
E Overhead & profit 15% x D Rp 25,603.50
F Harga Satuan Pekerjaan (D+E) Rp 196,293.50

Instalasi Saklar Ganda


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.01 Rp 119,000.00 Rp 1,190.00
Tukang Listrik L.02 OH 0.06 Rp 125,000.00 Rp 7,500.00

Jumlah tenaga kerja Rp 8,690.00


B BAHAN
Pipa Pvc 5/8 " Btg 0.80 Rp 15,000.00 Rp 12,000.00
Kabel NYA 4 mm Mtr 10.00 Rp 10,000.00 Rp 100,000.00
Isolator Bh 4.00 Rp 2,000.00 Rp 8,000.00
Inbow Dos Bh 1.00 Rp 10,000.00 Rp 10,000.00
Sakelar Ganda set 1.00 Rp 21,000.00 Rp 21,000.00
Isolasi kecil roll 1.00 Rp 5,000.00 Rp 5,000.00
Alat bantu Ls 1.00 Rp 10,000.00 Rp 10,000.00
Jumlah harga bahan Rp 166,000.00
C PERALATAN

Jumlah harga alat Rp -


D Jumlah (A+B+C) Rp 174,690.00
E Overhead & profit 15% x D Rp 26,203.50
F Harga Satuan Pekerjaan (D+E) Rp 200,893.50
Instalasi Saklar Ganda Tiga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.01 Rp 119,000.00 Rp 1,190.00
Tukang Listrik L.02 OH 0.06 Rp 125,000.00 Rp 7,500.00

Jumlah tenaga kerja Rp 8,690.00


B BAHAN
Pipa Pvc 5/8 " Btg 0.80 Rp 15,000.00 Rp 12,000.00
Kabel NYA 4 mm Mtr 10.00 Rp 10,000.00 Rp 100,000.00
Isolator Bh 4.00 Rp 2,000.00 Rp 8,000.00
Inbow Dos Bh 1.00 Rp 10,000.00 Rp 10,000.00
Sakelar Ganda Tiga set 1.00 Rp 35,000.00 Rp 35,000.00
Isolasi kecil roll 1.00 Rp 5,000.00 Rp 5,000.00
Alat bantu Ls 1.00 Rp 10,000.00 Rp 10,000.00
Jumlah harga bahan Rp 180,000.00
C PERALATAN

Jumlah harga alat Rp -


D Jumlah (A+B+C) Rp 188,690.00
E Overhead & profit 15% x D Rp 28,303.50
F Harga Satuan Pekerjaan (D+E) Rp 216,993.50

Instalasi Titik Lampu


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.01 Rp 119,000.00 Rp 1,190.00
Tukang Listrik L.02 OH 0.06 Rp 125,000.00 Rp 7,500.00

Jumlah tenaga kerja Rp 8,690.00


B BAHAN
Pipa Pvc 5/8 " Btg 0.80 Rp 15,000.00 Rp 12,000.00
Kabel NYA 4 mm Mtr 10.00 Rp 10,000.00 Rp 100,000.00
Isolator Bh 4.00 Rp 2,000.00 Rp 8,000.00
Inbow Dos Bh 1.00 Rp 10,000.00 Rp 10,000.00
Fitting Stand lampu set 1.00 Rp 20,000.00 Rp 20,000.00
Isolasi kecil roll 1.00 Rp 5,000.00 Rp 5,000.00
Alat bantu Ls 1.00 Rp 10,000.00 Rp 10,000.00
Jumlah harga bahan Rp 165,000.00
C PERALATAN

Jumlah harga alat Rp -


D Jumlah (A+B+C) Rp 173,690.00
E Overhead & profit 15% x D Rp 26,053.50
F Harga Satuan Pekerjaan (D+E) Rp 199,743.50
ANALISA HARGA SATUAN

1
Penggalian 1 m³ tanah biasa sedalam 1 m
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.75 Rp 125,000.00 Rp 93,750.00
Mandor L.04 OH 0.03 Rp 150,000.00 Rp 3,750.00
Jumlah tenaga kerja Rp 97,500.00
B BAHAN
Jumlah harga bahan Rp -
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 97,500.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 97,500.00

2
PekerjaanPembuatan 1 m2 Pagar Sementara dari SengGelombang Tinggi 2 Meter
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.20 Rp 125,000.00 Rp 25,000.00
Tukang Kayu L.04 OH 0.40 Rp 135,000.00 Rp 54,000.00
Kepala Tukang OH 0.02 Rp 150,000.00 Rp 3,000.00
Mandor OH 0.02 Rp 150,000.00 Rp 3,000.00
Jumlah tenaga kerja Rp 85,000.00
B BAHAN
Dolken kayu 8-10/400 cm M.17 Batang 1.25 Rp 10,000.00 Rp 12,500.00
Seng gelombang Lbr 1.20 Rp 75,000.00 Rp 90,000.00
Kayu 5/7 m3 0.07 Rp 2,200,000.00 Rp 158,400.00
Paku biasa Kg 0.06 Rp 25,000.00 Rp 1,500.00
Jumlah harga bahan Rp 262,400.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 359,900.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 359,900.00

3
Pengurugan kembali 1 m³ galian tanah
Pengurugan kembali 1 m³ galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.50 Rp 125,000.00 Rp 62,500.00
Mandor L.04 OH 0.05 Rp 150,000.00 Rp 7,500.00
Jumlah tenaga kerja Rp 70,000.00
B BAHAN
Jumlah harga bahan Rp -
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 70,000.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 70,000.00
4
Pengurugan 1 m³ dengan tanah dipadatkan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.50 Rp 125,000.00 Rp 62,500.00
Mandor L.04 OH 0.05 Rp 150,000.00 Rp 7,500.00
Jumlah tenaga kerja Rp 70,000.00
B BAHAN
Tanah Urug m³ 1.20 Rp 100,000.00 Rp 120,000.00
Jumlah harga bahan Rp 120,000.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 190,000.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 190,000.00

5
Pengurugan 1 m³ dengan pasir urug
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.30 Rp 125,000.00 Rp 37,500.00
Mandor L.04 OH 0.01 Rp 150,000.00 Rp 1,500.00
Jumlah tenaga kerja Rp 39,000.00
B BAHAN
Pasir urug m³ 1.20 Rp 180,000.00 Rp 216,000.00
Jumlah harga bahan Rp 216,000.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 255,000.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 255,000.00
6
Pemasangan 1 m³ pondasi batu belah campuran 1SP : 4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.50 Rp 125,000.00 Rp 187,500.00
Tukang Batu L.02 OH 0.75 Rp 135,000.00 Rp 101,250.00
Kepala Tukang L.03 OH 0.08 Rp 150,000.00 Rp 11,250.00
Mandor L.04 OH 0.08 Rp 150,000.00 Rp 11,250.00
Jumlah tenaga kerja Rp 311,250.00
B BAHAN
Batu belah m³ 1.20 Rp 250,000.00 Rp 300,000.00
Semen Portland kg 163.00 Rp 1,200.00 Rp 195,600.00
Pasir Pasang m³ 0.52 Rp 180,000.00 Rp 93,600.00
Jumlah harga bahan Rp 589,200.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 900,450.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 900,450.00
Catatan : Bobot isi pasir = 1.400 kg/m³, Bobot isi kerikil = 1.350 kg/m³, Buckling factor pasir = 20%

Pekerjaan anstamping
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.78 Rp 125,000.00 Rp 97,500.00
Tukang Batu L.02 OH 0.39 Rp 135,000.00 Rp 52,650.00
Kepala Tukang L.03 OH 0.04 Rp 150,000.00 Rp 5,850.00
Mandor L.04 OH 0.04 Rp 150,000.00 Rp 5,850.00
Jumlah tenaga kerja Rp 161,850.00
B BAHAN
Batu belah m³ 1.20 Rp 250,000.00 Rp 300,000.00
Pasir Urug m³ 0.43 Rp 180,000.00 Rp 77,760.00

Jumlah harga bahan Rp 377,760.00


C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 539,610.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 539,610.00
Catatan : Bobot isi pasir = 1.400 kg/m³, Bobot isi kerikil = 1.350 kg/m³, Buckling factor pasir = 20%

7
Membuat 1 m³ lantai kerja beton mutu f'̜ = 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0,87
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.20 Rp 125,000.00 Rp 150,000.00
Tukang Batu L.02 OH 0.20 Rp 135,000.00 Rp 27,000.00
Kepala Tukang L.03 OH 0.02 Rp 150,000.00 Rp 3,000.00
Mandor L.04 OH 0.06 Rp 150,000.00 Rp 9,000.00
Jumlah tenaga kerja Rp 189,000.00
B BAHAN
Semen Portland kg 230.00 Rp 1,200.00 Rp 276,000.00
Pasir Beton kg 893.00 Rp 128.57 Rp 114,814.29
Split (Maks 30mm) kg 1,027.00 Rp 148.15 Rp 152,148.15
Air liter 200.00 Rp 20.00 Rp 4,000.00
Jumlah harga bahan Rp 546,962.43
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 735,962.43
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 735,962.43
Catatan : Bobot isi pasir = 1.400 kg/m³, Bobot isi kerikil = 1.350 kg/m³, Buckling factor pasir = 20%
8
Membuat 1 m³ beton mutu f'̹ = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.65 Rp 125,000.00 Rp 206,250.00
Tukang Batu L.02 OH 0.28 Rp 135,000.00 Rp 37,125.00
Kepala Tukang L.03 OH 0.03 Rp 150,000.00 Rp 4,200.00
Mandor L.04 OH 0.08 Rp 150,000.00 Rp 12,450.00
Jumlah tenaga kerja Rp 260,025.00
B BAHAN
Semen Portland kg 326.00 Rp 1,200.00 Rp 391,200.00
Pasir Beton kg 760.00 Rp 128.57 Rp 97,714.29
Split (Maks 30mm) kg 1,029.00 Rp 148.15 Rp 152,444.44
Air liter 215.00 Rp 20.00 Rp 4,300.00
Jumlah harga bahan Rp 645,658.73
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 905,683.73
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 905,683.73
Catatan : Bobot isi pasir = 1.400 kg/m³, Bobot isi kerikil = 1.350 kg/m³, Buckling factor pasir = 20%

9
Membuat 1 m³ beton mutu f'̹ = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.65 Rp 125,000.00 Rp 206,250.00
Tukang Batu L.02 OH 0.28 Rp 135,000.00 Rp 37,125.00
Kepala Tukang L.03 OH 0.03 Rp 150,000.00 Rp 4,200.00
Mandor L.04 OH 0.08 Rp 150,000.00 Rp 12,450.00
Jumlah tenaga kerja Rp 260,025.00
B BAHAN
Semen Portland kg 371.00 Rp 1,200.00 Rp 445,200.00
Pasir Beton kg 698.00 Rp 128.57 Rp 89,742.86
Split (Maks 30mm) kg 1,047.00 Rp 148.15 Rp 155,111.11
Air liter 215.00 Rp 20.00 Rp 4,300.00
Jumlah harga bahan Rp 694,353.97
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 954,378.97
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 954,378.97
Catatan : Bobot isi pasir = 1.400 kg/m³, Bobot isi kerikil = 1.350 kg/m³, Buckling factor pasir = 20%
10
Pembesian 10 kg dengan besi polos
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.07 Rp 125,000.00 Rp 8,750.00
Tukang Besi L.02 OH 0.07 Rp 135,000.00 Rp 9,450.00
Kepala Tukang L.03 OH 0.01 Rp 150,000.00 Rp 1,050.00
Mandor L.04 OH 0.00 Rp 150,000.00 Rp 600.00
Jumlah tenaga kerja Rp 19,850.00
B BAHAN
Besi beton (polos) kg 10.50 Rp 14,000.00 Rp 147,000.00
Kawat beton kg 0.15 Rp 25,000.00 Rp 3,750.00
Jumlah harga bahan Rp 150,750.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 170,600.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 170,600.00
1 Kg Rp 17,060.00

11
Pemasangan 1 m² bekisting untuk pondasi
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.52 Rp 125,000.00 Rp 65,000.00
Tukang Kayu L.02 OH 0.26 Rp 135,000.00 Rp 35,100.00
Kepala Tukang L.03 OH 0.03 Rp 150,000.00 Rp 3,900.00
Mandor L.04 OH 0.03 Rp 150,000.00 Rp 3,900.00
Jumlah tenaga kerja Rp 107,900.00
B BAHAN
Kayu kelas III m³ 0.04 Rp 2,000,000.00 Rp 80,000.00
Paku 5 - 10 cm kg 0.30 Rp 25,000.00 Rp 7,500.00
Minyak bekisting liter 0.10 Rp 10,000.00 Rp 1,000.00
Jumlah harga bahan Rp 88,500.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 196,400.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 196,400.00
12
Pemasangan 1 m² bekisting untuk sloof
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.52 Rp 125,000.00 Rp 65,000.00
Tukang Kayu L.02 OH 0.26 Rp 135,000.00 Rp 35,100.00
Kepala Tukang L.03 OH 0.03 Rp 150,000.00 Rp 3,900.00
Mandor L.04 OH 0.03 Rp 150,000.00 Rp 3,900.00
Jumlah tenaga kerja Rp 107,900.00
B BAHAN
Kayu kelas III m³ 0.05 Rp 2,000,000.00 Rp 90,000.00
Paku 5 - 10 cm kg 0.30 Rp 25,000.00 Rp 7,500.00
Minyak bekisting liter 0.10 Rp 10,000.00 Rp 1,000.00
Jumlah harga bahan Rp 98,500.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 206,400.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 206,400.00

13
Pemasangan 1 m² bekisting untuk kolom
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.66 Rp 125,000.00 Rp 82,500.00
Tukang Kayu L.02 OH 0.33 Rp 135,000.00 Rp 44,550.00
Kepala Tukang L.03 OH 0.03 Rp 150,000.00 Rp 4,950.00
Mandor L.04 OH 0.03 Rp 150,000.00 Rp 4,950.00
Jumlah tenaga kerja Rp 136,950.00
B BAHAN
Kayu kelas III m³ 0.04 Rp 2,000,000.00 Rp 80,000.00
Paku 5 - 12 cm kg 0.40 Rp 25,000.00 Rp 10,000.00
Minyak bekisting liter 0.20 Rp 10,000.00 Rp 2,000.00
Balok kayu kelas II m³ 0.02 Rp 2,200,000.00 Rp 33,000.00
Plywood tebal 9 mm lembar 0.35 Rp 125,000.00 Rp 43,750.00
Dolken kayu Ø8-10cm - pj. 4m batang 2.00 Rp 10,000.00 Rp 20,000.00
Jumlah harga bahan Rp 188,750.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 325,700.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 325,700.00

14
Pemasangan 1 m² bekisting untuk balok
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.66 Rp 125,000.00 Rp 82,500.00
Tukang Kayu L.02 OH 0.33 Rp 135,000.00 Rp 44,550.00
Kepala Tukang L.03 OH 0.03 Rp 150,000.00 Rp 4,950.00
Mandor L.04 OH 0.03 Rp 150,000.00 Rp 4,950.00
Jumlah tenaga kerja Rp 136,950.00
B BAHAN
Kayu kelas III m³ 0.04 Rp 2,000,000.00 Rp 80,000.00
Paku 5 - 12 cm kg 0.40 Rp 25,000.00 Rp 10,000.00
Minyak bekisting liter 0.20 Rp 10,000.00 Rp 2,000.00
Balok kayu kelas II m³ 0.02 Rp 2,200,000.00 Rp 39,600.00
Plywood tebal 9 mm lembar 0.35 Rp 125,000.00 Rp 43,750.00
Dolken kayu Ø8-10cm - pj. 4m batang 2.00 Rp 10,000.00 Rp 20,000.00
Jumlah harga bahan Rp 195,350.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 332,300.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 332,300.00
15
Pemasangan 1 m² bekisting untuk lantai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.66 Rp 125,000.00 Rp 82,500.00
Tukang Kayu L.02 OH 0.33 Rp 135,000.00 Rp 44,550.00
Kepala Tukang L.03 OH 0.03 Rp 150,000.00 Rp 4,950.00
Mandor L.04 OH 0.03 Rp 150,000.00 Rp 4,950.00
Jumlah tenaga kerja Rp 136,950.00
B BAHAN
Kayu kelas III m³ 0.04 Rp 2,000,000.00 Rp 80,000.00
Paku 5 - 12 cm kg 0.40 Rp 25,000.00 Rp 10,000.00
Minyak bekisting liter 0.20 Rp 10,000.00 Rp 2,000.00
Balok kayu kelas II m³ 0.02 Rp 2,200,000.00 Rp 33,000.00
Plywood tebal 9 mm lembar 0.35 Rp 125,000.00 Rp 43,750.00
Dolken kayu Ø8-10cm - pj. 4m batang 6.00 Rp 10,000.00 Rp 60,000.00
Jumlah harga bahan Rp 228,750.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 365,700.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 365,700.00

16
Pemasangan 1 m² bekisting untuk dinding
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.66 Rp 125,000.00 Rp 82,500.00
Tukang Kayu L.02 OH 0.33 Rp 135,000.00 Rp 44,550.00
Kepala Tukang L.03 OH 0.03 Rp 150,000.00 Rp 4,950.00
Mandor L.04 OH 0.03 Rp 150,000.00 Rp 4,950.00
Jumlah tenaga kerja Rp 136,950.00
B BAHAN
Kayu kelas III m³ 0.03 Rp 2,000,000.00 Rp 60,000.00
Paku 5 - 12 cm kg 0.40 Rp 25,000.00 Rp 10,000.00
Minyak bekisting liter 0.20 Rp 10,000.00 Rp 2,000.00
Balok kayu kelas II m³ 0.02 Rp 2,200,000.00 Rp 44,000.00
Plywood tebal 9 mm lembar 0.35 Rp 125,000.00 Rp 43,750.00
Dolken kayu Ø8-10cm - pj. 4m batang 3.00 Rp 10,000.00 Rp 30,000.00
Penjaga jarak bekisting/spacer buah 4.00 Rp -
Jumlah harga bahan Rp 189,750.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 326,700.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 326,700.00
17
Pemasangan 1 m² bekisting untuk tangga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.66 Rp 125,000.00 Rp 82,500.00
Tukang Kayu L.02 OH 0.33 Rp 135,000.00 Rp 44,550.00
Kepala Tukang L.03 OH 0.03 Rp 150,000.00 Rp 4,950.00
Mandor L.04 OH 0.03 Rp 150,000.00 Rp 4,950.00
Jumlah tenaga kerja Rp 136,950.00
B BAHAN
Kayu kelas III m³ 0.03 Rp 2,000,000.00 Rp 60,000.00
Paku 5 - 12 cm kg 0.40 Rp 25,000.00 Rp 10,000.00
Minyak bekisting liter 0.15 Rp 10,000.00 Rp 1,500.00
Balok kayu kelas II m³ 0.02 Rp 2,200,000.00 Rp 33,000.00
Plywood tebal 9 mm lembar 0.35 Rp 125,000.00 Rp 43,750.00
Dolken kayu Ø8-10cm - pj. 4m batang 3.00 Rp 10,000.00 Rp 30,000.00
Jumlah harga bahan Rp 178,250.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 315,200.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 315,200.00

18
Membuat 1 m¹ kolom praktis beton bertulang (11 x 11) cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.18 Rp 125,000.00 Rp 22,500.00
Tukang batu L.02 OH 0.02 Rp 135,000.00 Rp 2,700.00
Tukang Kayu L.02 OH 0.02 Rp 135,000.00 Rp 2,700.00
Tukang besi L.02 OH 0.02 Rp 135,000.00 Rp 2,700.00
Kepala Tukang L.03 OH 0.01 Rp 150,000.00 Rp 900.00
Mandor L.04 OH 0.01 Rp 150,000.00 Rp 1,350.00
Jumlah tenaga kerja Rp 32,850.00
B BAHAN
Kayu kelas III m³ 0.00 Rp 2,000,000.00 Rp 4,000.00
Paku 5 Cm - 12 Cm kg 0.01 Rp 25,000.00 Rp 250.00
Minyak bekisting liter 1.00 Rp 10,000.00 Rp 10,000.00
Besi beton polos kg 3.00 Rp 14,000.00 Rp 42,000.00
Kawat beton kg 0.45 Rp 25,000.00 Rp 11,250.00
Semen portland kg 4.00 Rp 1,200.00 Rp 4,800.00
Pasir beton m³ 0.01 Rp 180,000.00 Rp 1,080.00
Split m³ 0.01 Rp 200,000.00 Rp 1,800.00
Jumlah harga bahan Rp 75,180.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 108,030.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 108,030.00
19
Membuat 1 m¹ ring balok beton bertulang (10 x 15) cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.30 Rp 125,000.00 Rp 37,125.00
Tukang batu L.02 OH 0.03 Rp 135,000.00 Rp 4,455.00
Tukang Kayu L.02 OH 0.03 Rp 135,000.00 Rp 4,455.00
Tukang besi L.02 OH 0.03 Rp 135,000.00 Rp 4,455.00
Kepala Tukang L.03 OH 0.01 Rp 150,000.00 Rp 1,500.00
Mandor L.04 OH 0.02 Rp 150,000.00 Rp 2,250.00
Jumlah tenaga kerja Rp 54,240.00
B BAHAN
Kayu kelas III m³ 0.00 Rp 2,000,000.00 Rp 6,000.00
Paku 5 Cm - 12 Cm kg 0.02 Rp 25,000.00 Rp 500.00
Minyak bekisting liter - Rp 10,000.00 Rp -
Besi beton polos kg 3.60 Rp 14,000.00 Rp 50,400.00
Kawat beton kg 0.05 Rp 25,000.00 Rp 1,250.00
Semen portland kg 5.50 Rp 1,200.00 Rp 6,600.00
Pasir beton m³ 0.01 Rp 180,000.00 Rp 1,620.00
Split m³ 0.02 Rp 200,000.00 Rp 3,000.00
Jumlah harga bahan Rp 69,370.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 123,610.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 123,610.00
25
Pemasangan 1 m² dinding bata merah tebal 1 batu campuran 1 SP : 2PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.60 Rp 125,000.00 Rp 75,000.00
Tukang Batu L.02 OH 0.20 Rp 135,000.00 Rp 27,000.00
Kepala Tukang L.03 OH 0.02 Rp 150,000.00 Rp 3,000.00
Mandor L.04 OH 0.03 Rp 150,000.00 Rp 4,500.00
Jumlah tenaga kerja Rp 109,500.00
B BAHAN
Bata merah m³ 140.00 Rp 650.00 Rp 91,000.00
Semen portland kg 43.50 Rp 1,200.00 Rp 52,200.00
Pasir Pasang m³ 0.08 Rp 180,000.00 Rp 14,400.00
Jumlah harga bahan Rp 157,600.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 267,100.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 267,100.00
26
Pemasangan 1 m² dinding bata merah tebal 1/2 batu campuran 1 SP : 4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.30 Rp 125,000.00 Rp 37,500.00
Tukang Batu L.02 OH 0.10 Rp 135,000.00 Rp 13,500.00
Kepala Tukang L.03 OH 0.01 Rp 150,000.00 Rp 1,500.00
Mandor L.04 OH 0.02 Rp 150,000.00 Rp 2,250.00
Jumlah tenaga kerja Rp 54,750.00
B BAHAN
Bata merah m³ 70.00 Rp 650.00 Rp 45,500.00
Semen portland kg 11.50 Rp 1,200.00 Rp 13,800.00
Pasir Pasang m³ 0.04 Rp 180,000.00 Rp 7,740.00
Jumlah harga bahan Rp 67,040.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 121,790.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 121,790.00

27
Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.30 Rp 125,000.00 Rp 37,500.00
Tukang Batu L.02 OH 0.10 Rp 135,000.00 Rp 13,500.00
Kepala Tukang L.03 OH 0.01 Rp 150,000.00 Rp 1,500.00
Mandor L.04 OH 0.01 Rp 150,000.00 Rp 1,500.00
Jumlah tenaga kerja Rp 54,000.00
B BAHAN
Bata ringan tebal
m³ 0.10 Rp 850,000.00 Rp 85,000.00
7,5cm Rp 200,000.00 Rp
Mortar siap pakai Zak 0.11 21,000.00
Alat Banti Ls 1.00 Rp 10,000.00 Rp 10,000.00

Jumlah harga bahan Rp 116,000.00


C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 170,000.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 170,000.00
27
Pemasangan 1 m² plesteran 1SP : 4PP tebal 15 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.30 Rp 125,000.00 Rp 37,500.00
Tukang Batu L.03 OH 0.15 Rp 135,000.00 Rp 20,250.00
Kepala Tukang L.03 OH 0.02 Rp 150,000.00 Rp 2,250.00
Mandor L.04 OH 0.02 Rp 150,000.00 Rp 2,250.00
Jumlah tenaga kerja Rp 62,250.00
B BAHAN
1. PC kg 6.24 Rp 1,200.00 Rp 7,488.00
2. PP m³ 0.02 Rp 180,000.00 Rp 4,320.00
Jumlah harga bahan Rp 11,808.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 74,058.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 74,058.00

28
Pemasangan 1 m² acian
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Tukang Batu L.03 OH 0.10 Rp 135,000.00 Rp 13,500.00
Jumlah tenaga kerja Rp 13,500.00
B BAHAN
Semen PC kg 3.25 Rp 1,200.00 Rp 3,900.00
Jumlah harga bahan Rp 3,900.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 17,400.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 17,400.00
29
Pemasangan 1 m² lantai granit ukuran 60 x 60 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.24 Rp 125,000.00 Rp 30,000.00
Tukang Batu L.02 OH 0.12 Rp 135,000.00 Rp 16,200.00
Kepala Tukang L.03 OH 0.01 Rp 150,000.00 Rp 1,800.00
Mandor L.04 OH 0.01 Rp 150,000.00 Rp 1,800.00
Jumlah tenaga kerja Rp 49,800.00
B BAHAN
Granit 60x60 bh 3.10 Rp 91,666.67 Rp 284,166.67
Semen portland kg 9.60 Rp 1,200.00 Rp 11,520.00
Semen warna kg 1.50 Rp 2,000.00 Rp 3,000.00
Pasir pasang m³ 0.05 Rp 180,000.00 Rp 8,100.00
Jumlah harga bahan Rp 306,786.67
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 356,586.67
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 356,586.67

1
Pemasangan 1 m² lantai granit ukuran 60 x 60 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.24 Rp 125,000.00 Rp 30,000.00
Tukang Batu L.02 OH 0.12 Rp 135,000.00 Rp 16,200.00
Kepala Tukang L.03 OH 0.01 Rp 150,000.00 Rp 1,800.00
Mandor L.04 OH 0.01 Rp 150,000.00 Rp 1,800.00
Jumlah tenaga kerja Rp 49,800.00
B BAHAN
Granit 60x60 bh 3.10 Rp 66,666.67 Rp 206,666.67
Semen portland kg 9.60 Rp 1,200.00 Rp 11,520.00
Semen warna kg 1.50 Rp 2,000.00 Rp 3,000.00
Pasir pasang m³ 0.05 Rp 180,000.00 Rp 8,100.00
Jumlah harga bahan Rp 229,286.67
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 279,086.67
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 279,086.67
30
Pemasangan 1 m² lantai ukuran 40 x 40 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.70 Rp 125,000.00 Rp 87,500.00
Tukang Batu L.02 OH 0.35 Rp 135,000.00 Rp 47,250.00
Kepala Tukang L.03 OH 0.04 Rp 150,000.00 Rp 6,000.00
Mandor L.04 OH 0.04 Rp 150,000.00 Rp 5,250.00
Jumlah tenaga kerja Rp 146,000.00
B BAHAN
Keramik 60 x 60 cm Duz 1.05 Rp 200,000.00 Rp 210,000.00
Semen Portland kg 8.19 Rp 1,200.00 Rp 9,828.00
Semen warna kg 0.50 Rp 2,000.00 Rp 1,000.00
Pasir pasang m³ 0.05 Rp 180,000.00 Rp 9,000.00
Jumlah harga bahan Rp 229,828.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 375,828.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 375,828.00
31
Pemasangan 1 m² lantai keramik ukuran 25 x 25 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.70 Rp 125,000.00 Rp 87,500.00
Tukang Batu L.02 OH 0.35 Rp 135,000.00 Rp 47,250.00
Kepala Tukang L.03 OH 0.04 Rp 150,000.00 Rp 5,250.00
Mandor L.04 OH 0.04 Rp 150,000.00 Rp 5,250.00
Jumlah tenaga kerja Rp 145,250.00
B BAHAN
Keramik 20x20 bh 16.00 Rp 3,344.00 Rp 53,504.00
Semen Portland kg 10.00 Rp 1,200.00 Rp 12,000.00
Semen warna kg 1.50 Rp 2,000.00 Rp 3,000.00
Pasir pasang m³ 0.05 Rp 180,000.00 Rp 8,100.00
Jumlah harga bahan Rp 76,604.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 221,854.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 221,854.00
32
Keramik dinding polish 30 x 30 cm motif / warna
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.90 Rp 125,000.00 Rp 112,500.00
Tukang Batu L.02 OH 0.45 Rp 135,000.00 Rp 60,750.00
Kepala Tukang L.03 OH 0.05 Rp 150,000.00 Rp 7,500.00
Mandor L.04 OH 0.05 Rp 150,000.00 Rp 6,750.00
Jumlah tenaga kerja Rp 187,500.00
B BAHAN
Keramik 20 x 20 duz 1.05 Rp 83,600.00 Rp 87,780.00
Semen Portland kg 9.30 Rp 1,200.00 Rp 11,160.00
Semen warna kg 1.94 Rp 2,000.00 Rp 3,880.00
Pasir pasang m³ 0.02 Rp 180,000.00 Rp 3,240.00
Jumlah harga bahan Rp 106,060.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 293,560.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 293,560.00

33
Lantai granit tangga unpolish 30 x 60 cm motif / warna
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.90 Rp 125,000.00 Rp 112,500.00
Tukang Batu L.02 OH 0.45 Rp 135,000.00 Rp 60,750.00
Kepala Tukang L.03 OH 0.05 Rp 150,000.00 Rp 7,500.00
Mandor L.04 OH 0.05 Rp 150,000.00 Rp 6,750.00
Jumlah tenaga kerja Rp 187,500.00
B BAHAN
Keramik Motif 20x40 duz 1.05 Rp 93,500.00 Rp 98,175.00
Semen Portland kg 9.30 Rp 1,200.00 Rp 11,160.00
Semen warna kg 1.94 Rp 2,000.00 Rp 3,880.00
Pasir pasang m³ 0.02 Rp 180,000.00 Rp 3,240.00
Jumlah harga bahan Rp 116,455.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 303,955.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 303,955.00
33
Pemasangan 1 m² plafond gypsum board tebal 3.5 mm + rangka hollow modul 60 x 60 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.10 Rp 125,000.00 Rp 12,500.00
Tukang kayu L.02 OH 0.05 Rp 135,000.00 Rp 6,750.00
Kepala Tukang L.03 OH 0.01 Rp 150,000.00 Rp 750.00
Mandor L.04 OH 0.01 Rp 150,000.00 Rp 750.00
Jumlah tenaga kerja Rp 20,750.00
B BAHAN
Rangka Hollow batang 1.03 Rp 30,000.00 Rp 30,750.00
Gypsum board lembar 0.36 Rp 57,000.00 Rp 20,748.00
Paku skrup kg 0.11 Rp 20,000.00 Rp 2,200.00
Penggantung & Ramzet bh 4.00 Rp 17,500.00 Rp 70,000.00
Stifenner bh 3.00 Rp 6,000.00 Rp 18,000.00
Jumlah harga bahan Rp 141,698.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 162,448.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 162,448.00

34
Pemasangan 1 m2 rangka kuda-kuda Baja Ringan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.20 Rp 125,000.00 Rp 25,000.00
Tukang Rangka L.02 OH 0.25 Rp 135,000.00 Rp 33,750.00
Kepala Tukang L.03 OH 0.03 Rp 150,000.00 Rp 4,500.00
Mandor L.04 OH 0.02 Rp 150,000.00 Rp 3,000.00
Jumlah tenaga kerja Rp 66,250.00
B BAHAN
Profil Truss C.75.0.75 m 4.98 Rp 20,000.00 Rp 99,600.00
Profil Reng U.35.30.40 m 5.20 Rp 9,166.67 Rp 47,666.67
Screw Kuda-Kuda 12-14x40 bh 14.00 Rp 500.00 Rp 7,000.00
Screw Reng 10-16x16 bh 11.00 Rp 500.00 Rp 5,500.00
Jumlah harga bahan Rp 159,766.67
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 226,016.67
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 226,016.67

35
Pemasangan 1 m2 atap Spandek
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.02 Rp 125,000.00 Rp 2,500.00
Tukang Las Konstruksi L.02 OH 0.08 Rp 135,000.00 Rp 10,800.00
Kepala Tukang L.03 OH 0.01 Rp 150,000.00 Rp 1,500.00
Mandor L.04 OH 0.01 Rp 150,000.00 Rp 900.00
Jumlah tenaga kerja Rp 15,700.00
B BAHAN
Atap Spandek m2 1.10 Rp 110,000.00 Rp 121,000.00
Screw 12-4 x 50 bh 6.00 Rp 1,500.00 Rp 9,000.00
Screw 10 x 16-16 bh 2.00 Rp 1,000.00 Rp 2,000.00
Jumlah harga bahan Rp 132,000.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 147,700.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 147,700.00
36
Pemasangan 1 m' Nok zincalume
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.02 Rp 125,000.00 Rp 2,500.00
Tukang Las Konstruksi L.02 OH 0.08 Rp 135,000.00 Rp 10,800.00
Kepala Tukang L.03 OH 0.01 Rp 150,000.00 Rp 1,500.00
Mandor L.04 OH 0.01 Rp 150,000.00 Rp 900.00
Jumlah tenaga kerja Rp 15,700.00
B BAHAN
Nok Spandek m2 1.10 Rp 80,000.00 Rp 88,000.00
Screw 10 x 16-16 bh 6.00 Rp 1,000.00 Rp 6,000.00
Jumlah harga bahan Rp 94,000.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 109,700.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 109,700.00

37
Pengecatan 1 m² tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) - interior
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.02 Rp 125,000.00 Rp 2,500.00
Tukang cat L.02 OH 0.06 Rp 135,000.00 Rp 8,505.00
Kepala Tukang L.03 OH 0.01 Rp 150,000.00 Rp 945.00
Mandor L.04 OH 0.00 Rp 150,000.00 Rp 450.00
Jumlah tenaga kerja Rp 12,400.00
B BAHAN
Plamuur kg 0.10 Rp 11,600.00 Rp 1,160.00
Cat dasar / alkali kg 0.10 Rp 38,000.00 Rp 3,800.00
Cat Penutup kg 0.26 Rp 28,000.00 Rp 7,280.00
Jumlah harga bahan Rp 12,240.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 24,640.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 24,640.00
38
Pengecatan 1 m² tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) - eksterior
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.02 Rp 125,000.00 Rp 2,500.00
Tukang cat L.02 OH 0.06 Rp 135,000.00 Rp 8,505.00
Kepala Tukang L.03 OH 0.01 Rp 150,000.00 Rp 945.00
Mandor L.04 OH 0.00 Rp 150,000.00 Rp 450.00
Jumlah tenaga kerja Rp 12,400.00
B BAHAN
Plamuur kg 0.10 Rp 11,600.00 Rp 1,160.00
Cat dasar / alkali kg 0.10 Rp 38,000.00 Rp 3,800.00
Cat Penutup kg 0.26 Rp 70,000.00 Rp 18,200.00
Jumlah harga bahan Rp 23,160.00
C PERALATAN
Jumlah harga alat Rp -
D Jumlah (A+B+C) Rp 35,560.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 35,560.00

39
Pemasangan 1 m2 Lantai Floordeck/bondex tebal 0,75 mm 1 x pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.66 Rp 125,000.00 Rp 82,500.00
Tukang cat L.02 OH 0.33 Rp 135,000.00 Rp 44,550.00
Kepala Tukang L.03 OH 0.03 Rp 150,000.00 Rp 4,950.00
Mandor L.04 OH 0.03 Rp 150,000.00 Rp 4,950.00
Jumlah tenaga kerja Rp 136,950.00
B BAHAN
Floordeck tebal 0,75 mm M2 1.10 Rp 170,000.00 Rp 187,000.00
Jumlah harga bahan Rp 187,000.00
C PERALATAN
Alat bantu Ls 1.00 Rp 10,000.00 Rp 10,000.00
Jumlah harga alat Rp 10,000.00
D Jumlah (A+B+C) Rp 333,950.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 333,950.00

###
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.00 Rp 125,000.00 Rp 125,000.00
Tukang Batu L.02 OH 1.50 Rp 135,000.00 Rp 202,500.00
Kepala Tukang L.03 OH 0.15 Rp 150,000.00 Rp 22,500.00
Mandor L.04 OH 0.05 Rp 150,000.00 Rp 7,500.00
Jumlah tenaga kerja Rp 357,500.00
B BAHAN
Closet jongkok Unit 1.00 Rp 125,000.00 Rp 125,000.00
Semen portland kg 6.00 Rp 1,200.00 Rp 7,200.00
pasir pasang m3 0.01 Rp 180,000.00 Rp 1,800.00
Bata merah bh 7.00 Rp 650.00 Rp 4,550.00
Jumlah harga bahan Rp 138,550.00
C PERALATAN

Jumlah harga alat Rp -


D Jumlah (A+B+C) Rp 496,050.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 496,050.00
Instalasi stop kontak
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.01 Rp 125,000.00 Rp 1,250.00
Tukang Listrik L.02 OH 0.06 Rp 135,000.00 Rp 8,100.00

Jumlah tenaga kerja Rp 9,350.00


B BAHAN
Pipa Pvc 5/8 " Btg 0.80 Rp 15,000.00 Rp 12,000.00
Kabel NYA 4 mm Mtr 10.00 Rp 10,000.00 Rp 100,000.00
Isolator Bh 4.00 Rp 2,000.00 Rp 8,000.00
Inbow Dos Bh 1.00 Rp 10,000.00 Rp 10,000.00
Isolasi kecil roll 1.00 Rp 5,000.00 Rp 5,000.00
Alat bantu Ls 1.00 Rp 10,000.00 Rp 10,000.00
Jumlah harga bahan Rp 145,000.00
C PERALATAN

Jumlah harga alat Rp -


D Jumlah (A+B+C) Rp 154,350.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 154,350.00
Instalasi Saklar Tunggal
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.01 Rp 125,000.00 Rp 1,250.00
Tukang Listrik L.02 OH 0.06 Rp 135,000.00 Rp 8,100.00

Jumlah tenaga kerja Rp 9,350.00


B BAHAN
Pipa Pvc 5/8 " Btg 0.80 Rp 15,000.00 Rp 12,000.00
Kabel NYA 4 mm Mtr 10.00 Rp 10,000.00 Rp 100,000.00
Isolator Bh 4.00 Rp 2,000.00 Rp 8,000.00
Inbow Dos Bh 1.00 Rp 10,000.00 Rp 10,000.00
Sakelar Tunggal set 1.00 Rp 17,000.00 Rp 17,000.00
Isolasi kecil roll 1.00 Rp 5,000.00 Rp 5,000.00
Alat bantu Ls 1.00 Rp 10,000.00 Rp 10,000.00
Jumlah harga bahan Rp 162,000.00
C PERALATAN

Jumlah harga alat Rp -


D Jumlah (A+B+C) Rp 171,350.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 171,350.00

Instalasi Saklar Ganda


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.01 Rp 125,000.00 Rp 1,250.00
Tukang Listrik L.02 OH 0.06 Rp 135,000.00 Rp 8,100.00

Jumlah tenaga kerja Rp 9,350.00


B BAHAN
Pipa Pvc 5/8 " Btg 0.80 Rp 15,000.00 Rp 12,000.00
Kabel NYA 4 mm Mtr 10.00 Rp 10,000.00 Rp 100,000.00
Isolator Bh 4.00 Rp 2,000.00 Rp 8,000.00
Inbow Dos Bh 1.00 Rp 10,000.00 Rp 10,000.00
Sakelar Ganda set 1.00 Rp 21,000.00 Rp 21,000.00
Isolasi kecil roll 1.00 Rp 5,000.00 Rp 5,000.00
Alat bantu Ls 1.00 Rp 10,000.00 Rp 10,000.00
Jumlah harga bahan Rp 166,000.00
C PERALATAN

Jumlah harga alat Rp -


D Jumlah (A+B+C) Rp 175,350.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 175,350.00
Instalasi Saklar Ganda Tiga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.01 Rp 125,000.00 Rp 1,250.00
Tukang Listrik L.02 OH 0.06 Rp 135,000.00 Rp 8,100.00

Jumlah tenaga kerja Rp 9,350.00


B BAHAN
Pipa Pvc 5/8 " Btg 0.80 Rp 15,000.00 Rp 12,000.00
Kabel NYA 4 mm Mtr 10.00 Rp 10,000.00 Rp 100,000.00
Isolator Bh 4.00 Rp 2,000.00 Rp 8,000.00
Inbow Dos Bh 1.00 Rp 10,000.00 Rp 10,000.00
Sakelar Ganda Tiga set 1.00 Rp 35,000.00 Rp 35,000.00
Isolasi kecil roll 1.00 Rp 5,000.00 Rp 5,000.00
Alat bantu Ls 1.00 Rp 10,000.00 Rp 10,000.00
Jumlah harga bahan Rp 180,000.00
C PERALATAN

Jumlah harga alat Rp -


D Jumlah (A+B+C) Rp 189,350.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 189,350.00

Instalasi Titik Lampu


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.01 Rp 125,000.00 Rp 1,250.00
Tukang Listrik L.02 OH 0.06 Rp 135,000.00 Rp 8,100.00

Jumlah tenaga kerja Rp 9,350.00


B BAHAN
Pipa Pvc 5/8 " Btg 0.80 Rp 15,000.00 Rp 12,000.00
Kabel NYA 4 mm Mtr 10.00 Rp 10,000.00 Rp 100,000.00
Isolator Bh 4.00 Rp 2,000.00 Rp 8,000.00
Inbow Dos Bh 1.00 Rp 10,000.00 Rp 10,000.00
Fitting Stand lampu set 1.00 Rp 20,000.00 Rp 20,000.00
Isolasi kecil roll 1.00 Rp 5,000.00 Rp 5,000.00
Alat bantu Ls 1.00 Rp 10,000.00 Rp 10,000.00
Jumlah harga bahan Rp 165,000.00
C PERALATAN

Jumlah harga alat Rp -


D Jumlah (A+B+C) Rp 174,350.00
E Overhead & profit 15% x D
F Harga Satuan Pekerjaan (D+E) Rp 174,350.00
A. 2.2.1. HARGA SATUAN PEKERJAAN PERSIAPAN
A. 2.2.1.2. Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 m
1 No. Uraian Kode Satuan KoefisienHarga Satuan (Rp)Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang Kayu L.02 OH 0.400 110,000.00 44,000.00
Kepala Tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.020 150,000.00 3,000.00
JUMLAH TENAGA KERJA 65,500.00
B BAHAN
Dolken kayu Ø 8/10 - 4 m' btg 1.250 6,000.00 7,500.00
Sement Porland kg 2.500 1,150.00 2,875.00
Seng gelombang lbr 1.200 55,000.00 66,000.00
Pasir beton m3 0.005 150,000.00 750.00
koral beton m3 0.009 250,000.00 2,250.00
Kayu 5/7 Kelas I m3 0.072 1,400,000.00 100,800.00
Rupa rupa Paku kg 0.060 20,000.00 1,200.00
Menie besi ltr 0.450 40,000.00 18,000.00
JUMLAH HARGA BAHAN 199,375.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 264,875.00
E Overhead & Profit ( 10 %) 10 % X D 26,487.50
F Harga Satuan Pekerjaan (D + E) 291,362.50

A. 2.2.1.4. Pengukuran dan pemasangan 1 m' Bouwplank


2 No. Uraian Kode Satuan KoefisienHarga Satuan (Rp)Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang Kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.005 150,000.00 750.00
JUMLAH TENAGA KERJA 21,000.00
B BAHAN
Kayu balok 5/7 m3 0.012 2,800,000.00 33,600.00
Rupa rupa Paku kg 0.020 20,000.00 400.00
Kayu papan 3/20 Kelas II m3 0.007 1,800,000.00 12,600.00
JUMLAH HARGA BAHAN 46,600.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 67,600.00
E Overhead & Profit ( 10 %) 10 % X D 6,760.00
F Harga Satuan Pekerjaan (D + E) 74,360.00
A. 2.3.1.3. Pengalian 1 m3 tanah biasa sedalam 1 m
3 No. Uraian Kode Satuan KoefisienHarga Satuan (Rp)Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.750 80,000.00 60,000.00
Mandor L.04 OH 0.025 150,000.00 3,750.00
JUMLAH TENAGA KERJA 63,750.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 63,750.00
E Overhead & Profit ( 10 %) 10 % X D 6,375.00
F Harga Satuan Pekerjaan (D + E) 70,125.00

A. 2.3.1.9. Pengurugan kembali 1 m3 galian tanah


Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
4 No. Uraian Kode Satuan KoefisienHarga Satuan (Rp)Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Mandor L.04 OH 0.050 150,000.00 7,500.00
JUMLAH TENAGA KERJA 47,500.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 47,500.00
E Overhead & Profit ( 10 %) 10 % X D 4,750.00
F Harga Satuan Pekerjaan (D + E) 52,250.00

A. 2.3.1.11. Pengurugan 1 m3 dengan Pasir urug


5 No. Uraian Kode Satuan KoefisienHarga Satuan (Rp)Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Mandor L.04 OH 0.010 150,000.00 1,500.00
JUMLAH TENAGA KERJA 25,500.00
B BAHAN
Pasir Urug 1.200 150000 180,000.00
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 205,500.00
E Overhead & Profit ( 10 %) 10 % X D 20,550.00
F Harga Satuan Pekerjaan (D + E) 226,050.00
A. 2.3.1.11.A Pengurugan 1 m3 dengan Tanah urug
A. 2.3.1.9. Memadatkan 1 M3 Tanah ( Per 20 Cm )
6 No. Uraian Kode Satuan KoefisienHarga Satuan (Rp)Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Mandor L.04 OH 0.010 150,000.00 1,500.00
JUMLAH TENAGA KERJA 25,500.00
B BAHAN
Tanah Urug 1.200 140,000.00 168,000.00
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 193,500.00
E Overhead & Profit ( 10 %) 10 % X D 19,350.00
F Harga Satuan Pekerjaan (D + E) 212,850.00

A. 3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1 PS : 4 PP


7 No. Uraian Kode Satuan KoefisienHarga Satuan (Rp)Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang Batu L.02 OH 0.750 110,000.00 82,500.00
Kepala Tukang L.03 OH 0.075 125,000.00 9,375.00
Mandor L.04 OH 0.075 150,000.00 11,250.00
JUMLAH TENAGA KERJA 223,125.00
B BAHAN
Batu Belah m3 1.200 220,000.00 264,000.00
Semen Portland kg 163.000 1,150.00 187,450.00
Pasir Pasang m3 0.520 150,000.00 78,000.00
JUMLAH HARGA BAHAN 529,450.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 752,575.00
E Overhead & Profit ( 10 %) 10 % X D 75,257.50
F Harga Satuan Pekerjaan (D + E) 827,832.50
A. 3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping)
8 No. Uraian Kode Satuan KoefisienHarga Satuan (Rp)Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.780 80,000.00 62,400.00
Tukang Batu L.02 OH 0.390 110,000.00 42,900.00
Kepala Tukang L.03 OH 0.039 125,000.00 4,875.00
Mandor L.04 OH 0.039 150,000.00 5,850.00
JUMLAH TENAGA KERJA 116,025.00
B BAHAN
Batu Belah m3 1.200 220,000.00 264,000.00
Pasir Urug m3 0.432 150,000.00 64,800.00
JUMLAH HARGA BAHAN 328,800.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 444,825.00
E Overhead & Profit ( 10 %) 10 % X D 44,482.50
F Harga Satuan Pekerjaan (D + E) 489,307.50

A. 4.1.1.1. Membuat 1 m3 beton mutu f' c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c + 0,87
9 No. Uraian Kode Satuan KoefisienHarga Satuan (Rp)Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.275 110,000.00 30,250.00
Kepala Tukang L.03 OH 0.028 125,000.00 3,500.00
Mandor L.04 OH 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 178,200.00
B BAHAN
Semen Portland kg 247.000 1,150.00 284,050.00
Pasir Beton kg 869.000 107.14 93,107.14
Kerikil (max 30 mm) kg 999.000 185.19 185,000.00
Air ltr 215.000 70.00 15,050.00
JUMLAH HARGA BAHAN 577,207.14
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 755,407.14
E Overhead & Profit ( 10 %) 10 % X D 75,540.71
F Harga Satuan Pekerjaan (D + E) 830,947.86

A. 4.1.1.6. Membuat 1 m3 beton mutu f' c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c + 0,61
10 No. Uraian Kode Satuan KoefisienHarga Satuan (Rp)Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.275 110,000.00 30,250.00
Kepala Tukang L.03 OH 0.028 125,000.00 3,500.00
Mandor L.04 OH 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 178,200.00
B BAHAN
Semen Portland kg 352.000 1,150.00 404,800.00
Pasir Beton kg 731.000 107.14 78,321.43
Kerikil (max 30 mm) kg 1031.000 185.19 190,925.93
Air ltr 215.000 70.00 15,050.00
JUMLAH HARGA BAHAN 689,097.35
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 867,297.35
E Overhead & Profit ( 10 %) 10 % X D 86,729.74
F Harga Satuan Pekerjaan (D + E) 954,027.09

A. 4.1.1.7. Membuat 1 m3 beton mutu f' c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c + 0,58
11 No. Uraian Kode Satuan KoefisienHarga Satuan (Rp)Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.275 110,000.00 30,250.00
Kepala Tukang L.03 OH 0.028 125,000.00 3,500.00
Mandor L.04 OH 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 178,200.00
B BAHAN
Semen Portland kg 371.000 1,150.00 426,650.00
Pasir Beton kg 698.000 107.14 74,785.71
Kerikil (max 30 mm) kg 1047.000 185.19 193,888.89
Air ltr 215.000 70.00 15,050.00
JUMLAH HARGA BAHAN 710,374.60
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 888,574.60
E Overhead & Profit ( 10 %) 10 % X D 88,857.46
F Harga Satuan Pekerjaan (D + E) 977,432.06
A. 4.1.1.8. Membuat 1 m3 beton mutu f' c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c + 0,56
16 No. Uraian Kode Satuan KoefisienHarga Satuan (Rp)Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.275 110,000.00 30,250.00
Kepala Tukang L.03 OH 0.028 125,000.00 3,500.00
Mandor L.04 OH 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 178,200.00
B BAHAN
Semen Portland kg 384.000 1,150.00 441,600.00
Pasir Beton kg 692.000 107.14 74,142.86
Kerikil (max 30 mm) kg 1039.000 185.19 192,407.41
Air ltr 215.000 70.00 15,050.00
JUMLAH HARGA BAHAN 723,200.26
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 901,400.26
E Overhead & Profit ( 10 %) 10 % X D 90,140.03
F Harga Satuan Pekerjaan (D + E) 991,540.29

A. 4.1.1.9. Membuat 1 m3 beton mutu f' c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c + 0,53
17 No. Uraian Kode Satuan KoefisienHarga Satuan (Rp)Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.275 110,000.00 30,250.00
Kepala Tukang L.03 OH 0.028 125,000.00 3,500.00
Mandor L.04 OH 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 178,200.00
B BAHAN
Semen Portland kg 406.000 1,150.00 466,900.00
Pasir Beton kg 684.000 107.14 73,285.71
Kerikil (max 30 mm) kg 1026.000 185.19 190,000.00
Air ltr 215.000 70.00 15,050.00
JUMLAH HARGA BAHAN 745,235.71
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 923,435.71
E Overhead & Profit ( 10 %) 10 % X D 92,343.57
F Harga Satuan Pekerjaan (D + E) 1,015,779.29

A. 4.1.1.10. Membuat 1 m3 beton mutu f' c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c + 0,52
18 No. Uraian Kode Satuan KoefisienHarga Satuan (Rp)Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.275 110,000.00 30,250.00
Kepala Tukang L.03 OH 0.028 125,000.00 3,500.00
Mandor L.04 OH 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 178,200.00
B BAHAN
Semen Portland kg 413.000 1,150.00 474,950.00
Pasir Beton kg 681.000 107.14 72,964.29
Kerikil (max 30 mm) kg 1021.000 185.19 189,074.07
Air ltr 215.000 70.00 15,050.00
JUMLAH HARGA BAHAN 752,038.36
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 930,238.36
E Overhead & Profit ( 10 %) 10 % X D 93,023.84
F Harga Satuan Pekerjaan (D + E) 1,023,262.20

A. 4.1.1.17. Pembesian 10 kg dengan besi polos atau besi ulir


12 No. Uraian Kode Satuan KoefisienHarga Satuan (Rp)Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Tukang Besi L.02 OH 0.070 110,000.00 7,700.00
Kepala Tukang L.03 OH 0.007 125,000.00 875.00
Mandor L.04 OH 0.004 150,000.00 600.00
JUMLAH TENAGA KERJA 14,775.00
B BAHAN
Besi Beton (polos/ulir) kg 10.500 12,000.00 126,000.00
Kawat Beton kg 0.150 22,500.00 3,375.00
JUMLAH HARGA BAHAN 129,375.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 144,150.00
E Overhead & Profit ( 10 %) 10 % X D 14,415.00
F Harga Satuan Pekerjaan (D + E) 158,565.00
F Harga Satuan Pekerjaan (D + E) Dalam 1 Kg 15,856.50

A. 4.1.1.21. Pemasangan 1 m2 bekisting untuk sloof


13 No. Uraian Kode Satuan KoefisienHarga Satuan (Rp)Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.520 80,000.00 41,600.00
Tukang Kayu L.02 OH 0.260 110,000.00 28,600.00
Kepala Tukang L.03 OH 0.026 125,000.00 3,250.00
Mandor L.04 OH 0.026 150,000.00 3,900.00
JUMLAH TENAGA KERJA 77,350.00
B BAHAN
Kayu kelas III m3 0.045 1,500,000.00 67,500.00
Rupa rupa Paku kg 0.300 20,000.00 6,000.00
Minyak Bekisting ltr 0.100 2,500.00 250.00
JUMLAH HARGA BAHAN 73,750.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 151,100.00
E Overhead & Profit ( 10 %) 10 % X D 15,110.00
F Harga Satuan Pekerjaan (D + E) 166,210.00
A. 4.1.1.22. Pemasangan 1 m2 bekisting untuk kolom
14 No. Uraian Kode Satuan KoefisienHarga Satuan (Rp)Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala Tukang L.03 OH 0.033 125,000.00 4,125.00
Mandor L.04 OH 0.033 150,000.00 4,950.00
JUMLAH TENAGA KERJA 98,175.00
B BAHAN
Kayu kelas III m3 0.040 1,500,000.00 60,000.00
Rupa rupa Paku kg 0.400 20,000.00 8,000.00
Minyak Bekisting ltr 0.200 2,500.00 500.00
Balok Kayu Kelas III m3 0.015 1,400,000.00 21,000.00
Plywood tebal 9 mm lbr 0.350 120,000.00 42,000.00
Dolken Kayu Ø 5/7 - 4 m btg 2.000 6,000.00 12,000.00
JUMLAH HARGA BAHAN 143,500.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 241,675.00
E Overhead & Profit ( 10 %) 10 % X D 24,167.50
F Harga Satuan Pekerjaan (D + E) 265,842.50

A. 4.1.1.23. Pemasangan 1 m2 bekisting untuk balok


15 No. Uraian Kode Satuan KoefisienHarga Satuan (Rp)Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala Tukang L.03 OH 0.033 125,000.00 4,125.00
Mandor L.04 OH 0.033 150,000.00 4,950.00
JUMLAH TENAGA KERJA 98,175.00
B BAHAN
Kayu kelas III m3 0.040 1,500,000.00 60,000.00
Rupa rupa Paku kg 0.400 20,000.00 8,000.00
Minyak Bekisting ltr 0.200 2,500.00 500.00
Balok Kayu Kelas III m3 0.015 1,400,000.00 21,000.00
Plywood tebal 9 mm lbr 0.350 120,000.00 42,000.00
Dolken Kayu Ø 5/7 - 4 m btg 2.000 6,000.00 12,000.00
JUMLAH HARGA BAHAN 143,500.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 241,675.00
E Overhead & Profit ( 10 %) 10 % X D 24,167.50
F Harga Satuan Pekerjaan (D + E) 265,842.50
A. 4.1.1.26. Pemasangan 1 m2 bekisting Tangga
16 No. Uraian Kode Satuan KoefisienHarga Satuan (Rp)Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala Tukang L.03 OH 0.033 125,000.00 4,125.00
Mandor L.04 OH 0.033 150,000.00 4,950.00
JUMLAH TENAGA KERJA 98,175.00
B BAHAN
Kayu kelas III m3 0.040 1,500,000.00 60,000.00
Rupa rupa Paku kg 0.400 20,000.00 8,000.00
Minyak Bekisting ltr 0.200 2,500.00 500.00
Balok Kayu Kelas III m3 0.018 1,400,000.00 25,200.00
Plywood tebal 9 mm lbr 0.350 120,000.00 42,000.00
Dolken Kayu Ø 5/7 - 4 m btg 2.000 6,000.00 12,000.00
JUMLAH HARGA BAHAN 147,700.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 245,875.00
E Overhead & Profit ( 10 %) 10 % X D 24,587.50
F Harga Satuan Pekerjaan (D + E) 270,462.50

A. 4.1.1.24. Pemasangan 1 m2 bekisting untuk lantai


17 No. Uraian Kode Satuan KoefisienHarga Satuan (Rp)Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala Tukang L.03 OH 0.033 125,000.00 4,125.00
Mandor L.04 OH 0.033 150,000.00 4,950.00
JUMLAH TENAGA KERJA 98,175.00
B BAHAN
Kayu kelas III m3 0.040 1,500,000.00 60,000.00
Rupa rupa Paku kg 0.400 20,000.00 8,000.00
Minyak Bekisting ltr 0.200 2,500.00 500.00
Balok Kayu Kelas III m3 0.015 1,400,000.00 21,000.00
Plywood tebal 9 mm lbr 0.350 120,000.00 42,000.00
Dolken Kayu Ø 5/7 - 4 m btg 6.000 6,000.00 36,000.00
JUMLAH HARGA BAHAN 167,500.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 265,675.00
E Overhead & Profit ( 10 %) 10 % X D 26,567.50
F Harga Satuan Pekerjaan (D + E) 292,242.50
A. 4.4.1.7. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 SP : 4 PP
18 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang Batu L.03 OH 0.100 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 150,000.00 2,250.00
JUMLAH TENAGA KERJA 38,500.00
B BAHAN
Bata merah bj 70.000 600.00 42,000.00
Semen Portland kg 11.500 1,150.00 13,225.00
Pasir pasang m3 0.043 150,000.00 6,450.00
JUMLAH HARGA BAHAN 61,675.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 100,175.00
E Overhead & Profit ( 10 %) 10 % X D 10,017.50
F Harga Satuan Pekerjaan (D + E) 110,192.50

A. 4.4.1.7. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 SP : 2 PP
19 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang Batu L.03 OH 0.100 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 150,000.00 2,250.00
JUMLAH TENAGA KERJA 38,500.00
B BAHAN
Bata merah bj 70.000 600.00 42,000.00
Semen Portland kg 18.950 1,150.00 21,792.50
Pasir pasang m3 0.038 150,000.00 5,700.00
JUMLAH HARGA BAHAN 69,492.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 107,992.50
E Overhead & Profit ( 10 %) 10 % X D 10,799.25
F Harga Satuan Pekerjaan (D + E) 118,791.75
19.a A. 4.4.1.7a. Pemasangan 1 m2 dinding bata hebel / bata ringan (20 x 60 x 7,5) cm
No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang Batu L.03 OH 0.100 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 150,000.00 2,250.00
JUMLAH TENAGA KERJA 38,500.00
B BAHAN
Bata ringan bj 8.750 10,000.00 87,500.00
Mortar Prime kg 2.500 15,000.00 37,500.00

JUMLAH HARGA BAHAN 125,000.00


C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 163,500.00
E Overhead & Profit ( 10 %) 10 % X D 16,350.00
F Harga Satuan Pekerjaan (D + E) 179,850.00

A. 4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN


A. 4.4.2.2. Pemasangan 1 m2 plesteran campuran 1 SP : 2 PP tebal 15 mm
20 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang Batu L.03 OH 0.150 110,000.00 16,500.00
Kepala Tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.015 150,000.00 2,250.00
JUMLAH TENAGA KERJA 44,625.00
B BAHAN
1. PC kg 10.224 1,150.00 11,757.60
2. PP m3 0.020 150,000.00 3,000.00
JUMLAH HARGA BAHAN 14,757.60
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 59,382.60
E Overhead & Profit ( 10 %) 10 % X D 5,938.26
F Harga Satuan Pekerjaan (D + E) 65,320.86
A. 4.4.2.2. Pemasangan 1 m2 plesteran bata ringan campuran 1 SP : 4 PP tebal 10 mm
21 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang Batu L.03 OH 0.150 110,000.00 16,500.00
Kepala Tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.015 150,000.00 2,250.00
JUMLAH TENAGA KERJA 44,625.00
B BAHAN
1. PC kg 4.160 1,150.00 4,784.00
2. PP m3 0.016 150,000.00 2,400.00
JUMLAH HARGA BAHAN 7,184.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 51,809.00
E Overhead & Profit ( 10 %) 10 % X D 5,180.90
F Harga Satuan Pekerjaan (D + E) 56,989.90

A. 4.4.2.27 Pemasangan 1 M2 Acian


49 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang Batu L.03 OH 0.100 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.010 110,000.00 1,100.00
Mandor L.04 OH 0.010 150,000.00 1,500.00
JUMLAH TENAGA KERJA 29,600.00
B BAHAN
Semen PC Kg 3.250 1,150.00 3,737.50
JUMLAH HARGA BAHAN 3,737.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 33,337.50
E Overhead & Profit ( 10 %) 10 % X D 3,333.75
F Harga Satuan Pekerjaan (D + E) 36,671.25

A. 4.4.3.4. Pemasangan 1 m2 Lantai granit motif warna ukuran 60 cm x 60 cm


22 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang Batu L.03 OH 0.125 110,000.00 13,750.00
Kepala Tukang L.03 OH 0.013 125,000.00 1,625.00
Mandor L.04 OH 0.013 150,000.00 1,950.00
JUMLAH TENAGA KERJA 37,325.00
B BAHAN
granit 60 x 60 cm motif warna Bh 2.770 95,000.00 263,150.00
Semen Portland Kg 9.800 1,150.00 11,270.00
Semen Warna Kg 1.300 12,500.00 16,250.00
Pasir Pasang M3 0.045 150,000.00 6,750.00
JUMLAH HARGA BAHAN 297,420.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 334,745.00
E Overhead & Profit ( 10 %) 10 % X D 33,474.50
F Harga Satuan Pekerjaan (D + E) 368,219.50
A. 4.4.3.4. Pemasangan 1 m2 Lantai Granit anti slip warna ukuran 60 cm x 60 cm
23 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang Batu L.03 OH 0.125 110,000.00 13,750.00
Kepala Tukang L.03 OH 0.013 125,000.00 1,625.00
Mandor L.04 OH 0.013 150,000.00 1,950.00
JUMLAH TENAGA KERJA 37,325.00
B BAHAN
Granit anti slip warna 60x60 Bh 2.770 105,000.00 290,850.00
Semen Portland Kg 9.800 1,150.00 11,270.00
Semen Warna Kg 1.300 12,500.00 16,250.00
Pasir Pasang M3 0.045 150,000.00 6,750.00
JUMLAH HARGA BAHAN 325,120.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 362,445.00
E Overhead & Profit ( 10 %) 10 % X D 36,244.50
F Harga Satuan Pekerjaan (D + E) 398,689.50

A. 4.4.3.4. Pemasangan 1 m2 Lantai Granit anti slip warna ukuran 30 cm x 60 cm


24 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang Batu L.03 OH 0.125 110,000.00 13,750.00
Kepala Tukang L.03 OH 0.013 125,000.00 1,625.00
Mandor L.04 OH 0.013 150,000.00 1,950.00
JUMLAH TENAGA KERJA 37,325.00
B BAHAN
Granit anti slip warna 30x60 Bh 5.556 60,000.00 333,333.33
Semen Portland Kg 9.800 1,150.00 11,270.00
Semen Warna Kg 1.300 12,500.00 16,250.00
Pasir Pasang M3 0.045 150,000.00 6,750.00
JUMLAH HARGA BAHAN 367,603.33
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 404,928.33
E Overhead & Profit ( 10 %) 10 % X D 40,492.83
F Harga Satuan Pekerjaan (D + E) 445,421.17
25 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.270 80,000.00 21,600.00
Tukang Batu L.03 OH 0.135 110,000.00 14,850.00
Kepala Tukang L.03 OH 0.014 125,000.00 1,750.00
Mandor L.04 OH 0.014 150,000.00 2,100.00
JUMLAH TENAGA KERJA 40,300.00
B BAHAN
Keramik warna 30 x 30 cm Bh 11.111 8,500.00 94,444.44
Semen Portland Kg 10.400 1,150.00 11,960.00
Semen Warna Kg 1.620 12,500.00 20,250.00
Pasir Pasang M3 0.045 150,000.00 6,750.00
JUMLAH HARGA BAHAN 133,404.44
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 173,704.44
E Overhead & Profit ( 10 %) 10 % X D 17,370.44
F Harga Satuan Pekerjaan (D + E) 191,074.89

A. 4.4.3.6. Pemasangan 1 m2 Dinding Keramik warna ukuran 30 cm x 30 cm


26 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.270 80,000.00 21,600.00
Tukang Batu L.03 OH 0.135 110,000.00 14,850.00
Kepala Tukang L.03 OH 0.014 125,000.00 1,750.00
Mandor L.04 OH 0.014 150,000.00 2,100.00
JUMLAH TENAGA KERJA 40,300.00
B BAHAN
Keramik warna 30 x 30 cm Bh 11.111 6,000.00 66,666.67
Semen Portland Kg 10.400 1,150.00 11,960.00
Semen Warna Kg 1.620 12,500.00 20,250.00
Pasir Pasang M3 0.045 150,000.00 6,750.00
JUMLAH HARGA BAHAN 105,626.67
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 145,926.67
E Overhead & Profit ( 10 %) 10 % X D 14,592.67
F Harga Satuan Pekerjaan (D + E) 160,519.33
A. 4.4.3.6. Pemasangan 1 m2 granit dinding warna ukuran 60 cm x 60 cm
27 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.270 80,000.00 21,600.00
Tukang Batu L.03 OH 0.135 110,000.00 14,850.00
Kepala Tukang L.03 OH 0.014 125,000.00 1,750.00
Mandor L.04 OH 0.014 150,000.00 2,100.00
JUMLAH TENAGA KERJA 40,300.00
B BAHAN
granit dinding 60 x 60 cm warna Bh 2.770 105,000.00 290,850.00
Semen Portland Kg 10.400 1,150.00 11,960.00
Semen Warna Kg 1.620 12,500.00 20,250.00
Pasir Pasang M3 0.045 150,000.00 6,750.00
JUMLAH HARGA BAHAN 329,810.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 370,110.00
E Overhead & Profit ( 10 %) 10 % X D 37,011.00
F Harga Satuan Pekerjaan (D + E) 407,121.00

A. 4.5.1.7. Pemasangan 1 m2 Langit Langit gypsum board akustic ukuran (60x60x9 mm)
28 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang Batu L.03 OH 0.050 110,000.00 5,500.00
Kepala Tukang L.03 OH 0.005 125,000.00 625.00
Mandor L.04 OH 0.005 150,000.00 750.00
JUMLAH TENAGA KERJA 14,875.00
B BAHAN
Gypsum board (akustik)+ frame bh 2.770 42,500.00 117,725.00
Rangka besi hollow m2 1.100 70,000.00 77,000.00
Paku skrup Kg 0.110 25,000.00 2,750.00
JUMLAH HARGA BAHAN 197,475.00
C PERALATAN M2 1.000 70,000.00 70,000.00
JUMLAH HARGA ALAT 70,000.00
D Jumlah (A+B+C) 282,350.00
E Overhead & Profit ( 10 %) 10 % X D 28,235.00
F Harga Satuan Pekerjaan (D + E) 310,585.00
A. 4.7.1.10. Pengecatan 1 m2 tembok dalam baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
29 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.00
Tukang Cat L.02 OH 0.063 110,000.00 6,930.00
Kepala Tukang L.03 OH 0.0063 125,000.00 787.50
Mandor L.04 OH 0.003 150,000.00 450.00
JUMLAH TENAGA KERJA 9,767.50
B BAHAN
Plamuur Kg 0.10 20,000.00 2,000.00
Cat Dasar Kg 0.10 25,000.00 2,500.00
Cat dalam setara Jotun Kg 0.26 50,000.00 13,000.00
JUMLAH HARGA BAHAN 17,500.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 27,267.50
E Overhead & Profit ( 10 %) 10 % X D 2,726.75
F Harga Satuan Pekerjaan (D + E) 29,994.25

A. 4.7.1.10. Pengecatan 1 m2 tembok luar baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
30 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.00
Tukang Cat L.02 OH 0.063 110,000.00 6,930.00
Kepala Tukang L.03 OH 0.0063 125,000.00 787.50
Mandor L.04 OH 0.003 150,000.00 450.00
JUMLAH TENAGA KERJA 9,767.50
B BAHAN
Plamuur Kg 0.10 20,000.00 2,000.00
Cat Dasar Kg 0.10 25,000.00 2,500.00
Cat luar setara Joto shield Kg 0.26 95,000.00 24,700.00
JUMLAH HARGA BAHAN 29,200.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 38,967.50
E Overhead & Profit ( 10 %) 10 % X D 3,896.75
F Harga Satuan Pekerjaan (D + E) 42,864.25
A. 4.7.1.10. Pengecatan 1 m2 tembok luar baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
31 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 80,000.00 5,600.00
Tukang Cat L.02 OH 0.0090 110,000.00 990.00
Kepala Tukang L.03 OH 0.0060 125,000.00 750.00
Mandor L.04 OH 0.0030 150,000.00 450.00
JUMLAH TENAGA KERJA 7,790.00
B BAHAN
Cat Menie Kg 0.2000 45,000.00 9,000.00
Plamuur Kg 0.1500 20,000.00 3,000.00
Cat Dasar Kg 0.1700 25,000.00 4,250.00
Cat penutup Kg 0.2600 60,000.00 15,600.00
Pengencer Kg 0.0300 30,000.00 900.00
Ampelas lbr 0.2000 6,000.00 1,200.00
JUMLAH HARGA BAHAN 33,950.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 41,740.00
E Overhead & Profit ( 10 %) 10 % X D 4,174.00
F Harga Satuan Pekerjaan (D + E) 45,914.00

A. 5.1.1. HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


A. 5.1.1.1. Pemasanga 1 buah closet duduk / monoblock
32 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 3.300 80,000.00 264,000.00
Tukang Batu L.02 1.100 110,000.00 121,000.00
Kepala Tukang L.03 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.160 150,000.00 24,000.00
JUMLAH TENAGA KERJA 410,250.00
B BAHAN
Closet Duduk setara TOTO Unit 1.00 2,700,000.00 2,700,000.00
Perlengkapan Ls 6% x closet 162,000.00 162,000.00
JUMLAH HARGA BAHAN 2,862,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 3,272,250.00
E Overhead & Profit ( 10 %) 10 % X D 327,225.00
F Harga Satuan Pekerjaan (D + E) 3,599,475.00
A. 5.1.1.2. Pemasanga 1 buah closet jongkok porslen
33 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang Batu L.02 1.500 110,000.00 165,000.00
Kepala Tukang L.03 0.150 125,000.00 18,750.00
Mandor L.04 OH 0.160 150,000.00 24,000.00
JUMLAH TENAGA KERJA 287,750.00
B BAHAN
Closet Jongkok setara TOTO Unit 1.00 500,000.00 500,000.00
Semen Portland Kg 6.00 1,150.00 6,900.00
Pasir Pasang M3 0.01 150,000.00 1,500.00
JUMLAH HARGA BAHAN 508,400.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 796,150.00
E Overhead & Profit ( 10 %) 10 % X D 79,615.00
F Harga Satuan Pekerjaan (D + E) 875,765.00

A. 5.1.1.4. Pemasangan 1 buah uninoir


34 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang Batu L.02 1.000 110,000.00 110,000.00
Kepala Tukang L.03 0.100 125,000.00 12,500.00
Mandor L.04 OH 0.050 150,000.00 7,500.00
JUMLAH TENAGA KERJA 210,000.00
B BAHAN
Urinoir setara TOTO Unit 1.00 2,000,000.00 2,000,000.00
Semen Portland Kg 6.00 1,150.00 6,900.00
Pasir Pasang M3 0.01 150,000.00 1,500.00
Perlengkapan % 30.00 600,000.00 600,000.00
JUMLAH HARGA BAHAN 2,608,400.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,818,400.00
E Overhead & Profit ( 10 %) 10 % X D 281,840.00
F Harga Satuan Pekerjaan (D + E) 3,100,240.00
A. 5.1.1.5. Pemasangan 1 buah wastafel
35 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.200 80,000.00 96,000.00
Tukang Batu L.02 1.450 110,000.00 159,500.00
Kepala Tukang L.03 0.150 125,000.00 18,750.00
Mandor L.04 OH 0.060 150,000.00 9,000.00
JUMLAH TENAGA KERJA 283,250.00
B BAHAN
Wastafel setara TOTO Unit 1.20 700,000.00 840,000.00
Semen Portland Kg 6.00 1,150.00 6,900.00
Pasir Pasang M3 0.01 150,000.00 1,500.00
Perlengkapan % 12.00 84,000.00 1,008,000.00
JUMLAH HARGA BAHAN 1,856,400.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,139,650.00
E Overhead & Profit ( 10 %) 10 % X D 213,965.00
F Harga Satuan Pekerjaan (D + E) 2,353,615.00

A. 5.1.1.14. Pemasangan 1 buah floor drain stainless steel


36 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.010 80,000.00 800.00
Tukang Batu L.02 0.100 110,000.00 11,000.00
Kepala Tukang L.03 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.005 150,000.00 750.00
JUMLAH TENAGA KERJA 13,800.00
B BAHAN
Floor Drain stainless steel Unit 1.00 175,000.00 175,000.00
JUMLAH HARGA BAHAN 175,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 188,800.00
E Overhead & Profit ( 10 %) 10 % X D 18,880.00
F Harga Satuan Pekerjaan (D + E) 207,680.00
A. 5.1.1.19. Pemasangan 1 buah kran diameter 1/2" atau 3/4"
37 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.010 80,000.00 800.00
Tukang Batu L.02 0.400 110,000.00 44,000.00
Kepala Tukang L.03 0.040 125,000.00 5,000.00
Mandor L.04 OH 0.005 150,000.00 750.00
JUMLAH TENAGA KERJA 50,550.00
B BAHAN
Kran Air setara SAN EI Buah 1.00 225,000.00 225,000.00
Sealtape Buah 0.025 7,500.00 187.50
JUMLAH HARGA BAHAN 225,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 275,550.00
E Overhead & Profit ( 10 %) 10 % X D 27,555.00
F Harga Satuan Pekerjaan (D + E) 303,105.00

A. 5.1.1.25. Pemasangan 1 m' pipa PVC tipe AW diameter 1/2"


38 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.036 80,000.00 2,880.00
Tukang Batu L.02 0.060 110,000.00 6,600.00
Kepala Tukang L.03 0.006 125,000.00 750.00
Mandor L.04 OH 0.002 150,000.00 300.00
JUMLAH TENAGA KERJA 10,530.00
B BAHAN
Pipa PVC 1/2" M' 1.20 5,000.00 6,000.00
Perlengkapan % 35.00 1,750.00 1,750.00
JUMLAH HARGA BAHAN 7,750.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 18,280.00
E Overhead & Profit ( 10 %) 10 % X D 1,828.00
F Harga Satuan Pekerjaan (D + E) 20,108.00
A. 5.1.1.27. Pemasangan 1 m' pipa PVC tipe AW diameter 1"
39 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.036 80,000.00 2,880.00
Tukang Batu L.02 0.060 110,000.00 6,600.00
Kepala Tukang L.03 0.006 125,000.00 750.00
Mandor L.04 OH 0.002 150,000.00 300.00
JUMLAH TENAGA KERJA 10,530.00
B BAHAN
Pipa PVC 1" M' 1.20 8,750.00 10,500.00
Perlengkapan % 35.00 3,062.50 3,062.50
JUMLAH HARGA BAHAN 13,562.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 24,092.50
E Overhead & Profit ( 10 %) 10 % X D 2,409.25
F Harga Satuan Pekerjaan (D + E) 26,501.75
A. 5.1.1.29. Pemasangan 1 m' pipa PVC tipe AW diameter 2"
40 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang Batu L.02 0.090 110,000.00 9,900.00
Kepala Tukang L.03 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.003 150,000.00 450.00
JUMLAH TENAGA KERJA 15,795.00
B BAHAN
Pipa PVC 2" M' 1.20 18,750.00 22,500.00
Perlengkapan % 35.00 6,562.50 6,562.50
JUMLAH HARGA BAHAN 29,062.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 44,857.50
E Overhead & Profit ( 10 %) 10 % X D
F Harga Satuan Pekerjaan (D + E) 44,857.50

A. 5.1.1.30. Pemasangan 1 m' pipa PVC tipe AW diameter 21/2"


41 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.081 80,000.00 6,480.00
Tukang Batu L.02 0.135 110,000.00 14,850.00
Kepala Tukang L.03 0.0135 125,000.00 1,687.50
Mandor L.04 OH 0.004 150,000.00 600.00
JUMLAH TENAGA KERJA 23,617.50
B BAHAN
Pipa PVC 21/2" M' 1.20 28,750.00 34,500.00
Perlengkapan % 35.00 10,062.50 10,062.50
JUMLAH HARGA BAHAN 44,562.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 68,180.00
E Overhead & Profit ( 10 %) 10 % X D 6,818.00
F Harga Satuan Pekerjaan (D + E) 74,998.00
A. 5.1.1.32. Pemasangan 1 m' pipa PVC tipe AW diameter 4"
42 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.081 80,000.00 6,480.00
Tukang Batu L.02 0.135 110,000.00 14,850.00
Kepala Tukang L.03 0.0135 125,000.00 1,687.50
Mandor L.04 OH 0.004 150,000.00 600.00
JUMLAH TENAGA KERJA 23,617.50
B BAHAN
Pipa PVC 4" M' 1.20 62,500.00 75,000.00
Perlengkapan % 35.00 21,875.00 21,875.00
JUMLAH HARGA BAHAN 96,875.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 120,492.50
E Overhead & Profit ( 10 %) 10 % X D 12,049.25
F Harga Satuan Pekerjaan (D + E) 132,541.75

43 A. 5.1.1.32. Pemasangan 1 m' pipa PVC tipe AW diameter 8" 125,000.00 195,041.75

44 Pemasangan 1 kg rangka baja ( kolom, rafter, balok, pengaku, ikatan angin, dll )
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
( Rp ) ( Rp )
A TENAGA
Perakitan / fabrication kg 1.0000 4,000.00 4,000.00
Pemasangan / erection kg 1.0000 4,000.00 4,000.00
JUMLAH TENAGA KERJA 8,000.00
B BAHAN
Baja Profil WF, L dan plat landas kg 1.0000 13,500.00 13,500.00

JUMLAH HARGA BAHAN 13,500.00


C PERALATAN
Alat bantu ls 1.0000 2,000.00 2,000.00
JUMLAH HARGA ALAT 2,000.00

D JUMLAH ( A + B + C ) 23,500.00
E Overhead & profit 15% x D 3,525.00
F Harga Satuan Pekerjaan ( D + E ) 27,025.00
A. 5.1.1.21. Pekerjaan Pemasangan Smoke / Heat Detector
45 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja Terampil L.01 OH 0.004 80,000.00 320.00
Tukang Listrik L.02 0.800 110,000.00 88,000.00
Kepala Tukang Listrik L.03 0.200 125,000.00 25,000.00
JUMLAH TENAGA KERJA 113,320.00
B BAHAN
Smoke detector Buah 1.00 350,000.00 350,000.00
JUMLAH HARGA BAHAN 350,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 463,320.00
E Overhead & Profit ( 10 %) 10 % X D 46,332.00
F Harga Satuan Pekerjaan (D + E) 509,652.00

A. 5.1.1.22. Pekerjaan Pemasangan Fire Alarm


46 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja Terampil L.01 OH 0.500 80,000.00 40,000.00
Tukang Listrik L.02 0.500 110,000.00 55,000.00
Kepala Tukang Listrik L.03 0.500 125,000.00 62,500.00
JUMLAH TENAGA KERJA 157,500.00
B BAHAN
Panal Fire Alarm Buah 1.00 16,000,000.00 16,000,000.00
JUMLAH HARGA BAHAN 16,000,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 16,157,500.00
E Overhead & Profit ( 10 %) 10 % X D 1,615,750.00
F Harga Satuan Pekerjaan (D + E) 17,773,250.00

Pekerjaan Beton ready mix K.225 /M3


Kode Analisa : SNI 7394 : 2008 (6.7)
47 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja oh 1.65 80,000.00 132,000.00
Tk batu oh 0.275 110,000.00 30,250.00
Kepala Tk Batu oh 0.028 125,000.00 3,500.00
Mandor oh 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 178,200.00
B BAHAN
Beton Ready mix K. 225 m3 1.025 1,350,000.00 1,383,750.00
JUMLAH HARGA BAHAN 1,383,750.00
C PERALATAN
Peralatan (slang + tes Lab) ls 0.275 200,000.00 55,000.00
Concreete Pump Standar hr 0.010 5,000,000.00 50,000.00
JUMLAH HARGA ALAT 105,000.00
D Jumlah (A+B+C) 1,666,950.00
E Overhead & Profit ( 10 %) 10 % X D 166,695.00
F Harga Satuan Pekerjaan (D + E) 1,833,645.00
A. 5.1.1.24. Pekerjaan Pemasangan LPB Batu Belah 10/15 cm dipadatkan (m3)
48 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.300 80,000.00 24,000.00
Mandor OH 0.010 150,000.00 1,500.00
JUMLAH TENAGA KERJA 25,500.00
B BAHAN
Batu belah 10/15cm m3 1.10 320,000.00 352,000.00
JUMLAH HARGA BAHAN 352,000.00
C PERALATAN
Alat berat penggilas 6 s/d 12 ton m3 1 50,000.00 50,000.00
JUMLAH HARGA ALAT 50,000.00
D Jumlah (A+B+C) 427,500.00
E Overhead & Profit ( 10 %) 10 % X D 42,750.00
F Harga Satuan Pekerjaan (D + E) 470,250.00

A. 5.1.1.25. Pekerjaan Pengaspalan Hotmix tbl. 5 cm Dipadatkan (m2)


Kode Analisa : SNI 2836:20008 (6.4)
49 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.300 80,000.00 24,000.00
Mandor OH 0.075 150,000.00 11,250.00
JUMLAH TENAGA KERJA 35,250.00
B BAHAN
Aspal Hotmix m3 0.06 300,000.00 16,500.00
JUMLAH HARGA BAHAN 16,500.00
C PERALATAN
Alat berat penggilas 6 s/d 12 ton m3 1 50,000.00 50,000.00
JUMLAH HARGA ALAT 50,000.00
D Jumlah (A+B+C) 101,750.00
E Overhead & Profit ( 10 %) 10 % X D 10,175.00
F Harga Satuan Pekerjaan (D + E) 111,925.00

A. 5.1.1.26. Pekerjaan LPA Menghampar Splite 1/2cm Dipadatkan


Kode Analisa : SNI 2836:20008 (6.4)
50 No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.300 80,000.00 24,000.00
Mandor OH 0.075 150,000.00 11,250.00
JUMLAH TENAGA KERJA 35,250.00
B BAHAN
Splite 1/2cm m3 1.10 320,000.00 352,000.00
JUMLAH HARGA BAHAN 352,000.00
C PERALATAN
Alat berat penggilas 6 s/d 12 ton m3 1 50,000.00 50,000.00
JUMLAH HARGA ALAT 50,000.00
D Jumlah (A+B+C) 437,250.00
E Overhead & Profit ( 10 %) 10 % X D 43,725.00
F Harga Satuan Pekerjaan (D + E) 480,975.00
A SOSIALISASI DAN PROMOSI K3
1 Spanduk (banner) - 2.00 lbr 100,000.00 200,000.00
TOTAL - A 200,000.00

B ALAT PELINDUNG DIRI


1 Safety helmet - 5.00 Bh 50,000.00 250,000.00
2 Safety gloves - 5.00 Psg 5,000.00 25,000.00
4 Safety vest - 5.00 Bh 50,000.00 250,000.00
4 MBLB 1.00 Ls 1,000,000.00 1,000,000.00
TOTAL - B 1,525,000.00

C FASILITAS DAN SARANA KESEHATAN


1 Peralatan P3K - 1.00 ls 150,000.00 150,000.00
2 BPJS - 1.00 1,000,000.00 1,000,000.00
3 Protokol kesehatan COVID-19
- Hand Sanitizer - 6.00 Bh 50,000.00 300,000.00
- Masker Earloop - 6.00 kotak 77,500.00 465,000.00
- Sabun cuci tangan - 6.00 Bh 25,000.00 150,000.00
TOTAL - C 2,065,000.00
TOTAL - II 3,790,000.00
PERHITUNGAN TULANGAN
Detail Perhitungan Jarak Total Total
No. Uraian Sketsa Type Dia Ukuran Panjang Besi Jumlah Panjang Berat Berat SKETSA
(mm) a b c d Kait Kait (m) (m) Batang (m) (kg/m1) Kg

1 Bekesting BjTP 10 (0.08) 0.08 0.08 0.08 4.00 0.33 0.617 0.202

BjTP 8 (0.02) #VALUE! (0.02) #VALUE! 0.06 0.06 #VALUE! 0.20 2.00 #VALUE! 0.395 #VALUE!

#VALUE!

1 Sloof (SL2); beton bertulang (20x30) cm BjTP 10 (0.08) 0.08 0.08 0.08 4.00 0.33 0.617 0.202

BjTP 8 (0.02) (0.02) (0.02) (0.02) 0.06 0.06 0.07 0.20 2.00 0.13 0.395 0.052

0.254

2 0 BjTP 12 (0.08) 0.10 0.10 0.11 12.00 1.37 0.888 #NAME?

BjTP 10 (0.02) (0.02) (0.02) (0.02) 0.08 0.08 0.10 0.20 2.00 0.20 0.617 #NAME?

#NAME?

2 0 BjTP 12 #VALUE! 0.10 0.10 #VALUE! 6.00 #VALUE! 0.888 #VALUE!

BjTP 10 3.98 3.98 3.98 3.98 0.08 0.08 16.10 0.20 #VALUE! #VALUE! 0.617 #VALUE!

#VALUE!

3 0 BjTP 12 (0.08) 0.10 0.10 0.11 6.00 0.69 0.888 #NAME?

BjTP 10 3.98 3.98 3.98 3.98 0.08 0.08 16.10 0.20 2.00 32.20 0.617 #NAME?

#NAME?

3 0 BjTP 10 (0.08) 0.08 0.08 0.08 4.00 0.33 0.617 #NAME?

BjTP 8 (0.02) (0.02) (0.02) (0.02) 0.06 0.06 0.07 0.20 2.00 0.13 0.395 #NAME?

#NAME?

1 0 BjTP 10 (0.08) 0.08 0.08 0.08 4.00 0.33 0.617 0.202

BjTP 8 (0.02) (0.02) (0.02) (0.02) 0.06 0.06 0.07 0.20 2.00 0.13 0.395 0.052

0.254

1 0 BjTP 10 (0.08) 0.08 0.08 0.08 4.00 0.33 0.617 0.202

BjTP 8 (0.02) (0.02) (0.02) (0.02) 0.06 0.06 0.07 0.20 2.00 0.13 0.395 0.052

0.254

3 0 BjTP 10 (0.08) 0.08 0.08 0.08 4.00 0.33 0.617 0.202

BjTP 8 (0.02) (0.02) (0.02) (0.02) 0.06 0.06 0.07 0.20 2.00 0.13 0.395 0.052

0.254
PERHITUNGAN TULANGAN
1 0 - BjTP 10 - - 0.20 1.00 - 0.617 -

- BjTP 10 - - 0.20 1.00 - 0.617 -

- BjTP 10 - - 0.20 1.00 - 0.617 -

- BjTP 10 - - 0.20 1.00 - 0.617 -

- BjTP 10 - - 0.20 1.00 - 0.617 -

- BjTP 10 - - 0.20 1.00 - 0.617 -

7.90 BjTP 10 7.90 7.90 0.20 1.00 7.90 0.617 4.870

- BjTP 10 - - 0.20 1.00 - 0.617 -

- BjTP 10 - - 0.20 1.00 - 0.617 -

- BjTP 10 - - 0.20 1.00 - 0.617 -

Jumlah 4.870

1 0 - BjTP 10 - - 0.20 1.00 - 0.617 -

- BjTP 10 - - 0.20 1.00 - 0.617 -

Jumlah -
HARGA SATUAN BAHAN DAN UPAH

No. Uraian Satuan Harga

UPAH

1 Pekerja orang / hari Rp 125,000.00


2 Tukang (batu, kayu, besi, cat) orang / hari Rp 135,000.00
3 Kepala tukang orang / hari Rp 150,000.00
4 Mandor orang / hari Rp 150,000.00

BAHAN

TANAH Mulya Jaya HJ.IDAH BERKAT MITRA


1 Batu gunung M³ Rp 250,000.00
2 Pasir urug M³ Rp 180,000.00
3 Pasir beton / pasang M³ Rp 180,000.00
Kg Rp 128.57
4 Batu split M³ Rp 200,000.00
Kg Rp 148.15
5 Tanah urug pilihan / laterit M³ Rp 100,000.00
BETON
6 Beton ready mixed K-225 (slump 10±2) M³ Rp 1,100,000.00
7 Semen PC (50 kg) sejenis 3 Roda / Tonasa / Holcim Zak Rp 60,000.00 Rp 57,000.00
Kg Rp 1,200.00
8 Semen putih berwarna Zak Rp 80,000.00 Rp 140,000.00
Kg Rp 2,000.00
9 Air M³ Rp 20,000.00
Liter Rp 20.00
10 Besi tulangan polos Kg Rp 14,000.00 Rp 13,500.00
11 Kawat beton / bindrat Kg Rp 25,000.00 Rp 25,000.00
12 Papan kayu lanan M³ Rp 2,200,000.00
13 Balok kayu lanan M³ Rp 2,200,000.00
14 Kayu bekisting/cetakan M³ Rp 2,000,000.00
15 Plywood 9 mm Lembar Rp 125,000.00 Rp 120,000.00
16 Minyak bekisiting Liter Rp 10,000.00
17 Kayu galam diameter 8-10 cm panjang 4 m Batang Rp 10,000.00
18 Paku rupa-rupa Kg Rp 25,000.00 Rp 20,000.00
19 Batu bata Biji Rp 650.00 Rp 700.00
CAT-CATAN
19 Cat tembok interior setara Jotun / Dulux / Mowilex Kg Rp 50,000.00 Rp 80,000.00
20 Cat tembok eksterior setara Jotun / Dulux / Mowilex Kg Rp 70,000.00 Rp 140,000.00
21 Pengecatan dengan waterproofing setara No Droop / Aquaproof M² Rp 27,000.00 Rp 65,000.00
22 Cat dasar Kg Rp 23,000.00 Rp 35,000.00
23 Alkali Kg Rp 40,000.00 Rp 50,000.00
24 Dempul / plamir Kg Rp 20,000.00 Rp 15,000.00
25 Tepung gypsum / kompon Kg Rp 5,000.00 Rp 5,000.00
No. Uraian Satuan Harga

PENUTUP LANTAI / DINDING / LANGIT-LANGIT / ATAP


26 Granit lantai 60x60 Pak Rp 200,000.00 Rp 225,000.00
Granit lantai 60x60 Bh Rp 66,666.67
27 Keramik lantai 40x40 Pak Rp 80,000.00 Rp 75,000.00
m2 Rp 250,000.00
28 Keramik lantai 25x25 antislip Pak Rp 50,000.00 Rp 65,000.00
Bh Rp 3,125.00
29 Keramik dinding 20x40 Pak Rp 51,000.00 Rp 75,000.00
Bh Rp 5,100.00
30 Keramik Motif 20x40 Pak Rp 130,000.00 Rp 85,000.00 Rp 16.00
Bh Rp 13,000.00 Rp 10.00
30 Rangka hollow 4x4 M¹ Rp 10,000.00 Rp 5,000.00
31 Paku sekrup Kg Rp 20,000.00 Rp 150,000.00
32 Penggantung & Ramzet Bh Rp 17,500.00
33 Stifenner Bh Rp 6,000.00
34 kalsiboard tebal 3.5 mm Lembar Rp 75,000.00 Rp 57,000.00
35 Profil Truss C.75.0.75 m Rp 11,000.00 Rp 21,000.00 Rp 20,000.00
36 Profil Reng U.35.30.40 m Rp 9,040.00 Rp 10,000.00
37 Screw Kuda-Kuda 12-14x40 bh Rp 500.00 Rp 600.00
38 Screw Reng 10-16x16 bh Rp 500.00 Rp 250.00
39 Atap Spandek m Rp 70,000.00 Rp 50,000.00
40 Screw 12-4 x 50 bh Rp 1,500.00 Rp 800.00
41 Screw 10 x 16-16 bh Rp 1,000.00 Rp 250.00
42 Nok zincalume m' Rp 60,000.00 Rp 25,000.00
43 Topi pelindung (Safety Holmet ) bh Rp 30,000.00
44 Sarung Tangan (Safety Gloves) psg Rp 5,000.00
45 Sepatu Keselamatan (Safety Shoes) psg Rp 350,000.00
46 Rompi Keselamatan (Safety Vest) bh Rp 80,000.00
KUSEN / PINTU / JENDELA

47 Kusen Aluminium M¹ Rp 70,000.00


48 Kaca 5 mm (polos) M² Rp 140,000.00
49 Kaca 5 mm (gelap) M² Rp 150,000.00
ANALISA HARGA SATUAN PEKERJAAN (AHSP)

A.2.2.1.4 Pengukuran dan pemasangan 1 m' Bouwplank


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 125,000.00 12,500.00
Tukang L.02 OH 0.100 135,000.00 13,500.00
Kepala Tukang L.03 OH 0.010 150,000.00 1,500.00
Mandor L.04 OH 0.005 150,000.00 750.00
JUMLAH TENAGA KERJA 28,250.00
B BAHAN
Kayu Balok 5/7 M3 0.012 2,000,000.00 24,000.00
Paku Kg 0.020 20,000.00 400.00
Kayu Papan 3/20 M3 0.007 2,000,000.00 14,000.00
JUMLAH HARGA BAHAN 38,400.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 66,650.00


E Overheaad & Profit -
F Harga satuan Pekerjaan (D+E) 66,650.00

A.2.2.1.9 (K3) Pembersihan 1 m2 lapangan dan perataan


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 125,000.00 12,500.00
Mandor L.04 OH 0.050 150,000.00 7,500.00
JUMLAH TENAGA KERJA 20,000.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 20,000.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 20,000.00

A.2.3.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.750 125,000.00 93,750.00
Mandor L.04 OH 0.025 150,000.00 3,750.00
JUMLAH TENAGA KERJA 97,500.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 97,500.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 97,500.00

A.2.3.1.4 Penggalian 1 m3 tanah keras sedalam 1 m


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 125,000.00 125,000.00
Mandor L.04 OH 0.032 150,000.00 4,800.00
JUMLAH TENAGA KERJA 129,800.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 129,800.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 129,800.00

A.2.3.1.9 Pengurugan kembali 1m3 galian tanah


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 125,000.00 62,500.00
Mandor L.04 OH 0.050 150,000.00 7,500.00
JUMLAH TENAGA KERJA 70,000.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 70,000.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 70,000.00

A.2.3.1.11Pekerjaan 1m3 Urugan tanah/dipadatkan


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 125,000.00 37,500.00
Mandor L.04 OH 0.010 150,000.00 1,500.00
JUMLAH TENAGA KERJA 39,000.00
B BAHAN
Tanah M3 1.200 100,000.00 120,000.00
JUMLAH HARGA BAHAN 120,000.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 159,000.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 159,000.00

A.2.3.1.11Pengurugan 1m3 dengan pasir urug


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 125,000.00 37,500.00
Mandor L.04 OH 0.010 150,000.00 1,500.00
JUMLAH TENAGA KERJA 39,000.00
B BAHAN
Pasir urug M3 1.200 120,000.00 144,000.00
JUMLAH HARGA BAHAN 144,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 183,000.00
E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 183,000.00

A.3.2.1.2 Pemasangan 1 m3 pondasi batu belah camp. 1SP : 4PP


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 125,000.00 187,500.00
Tukang L.02 OH 0.750 120,000.00 90,000.00
Kepala Tukang L.03 OH 0.075 125,000.00 9,375.00
Mandor L.04 OH 0.075 150,000.00 11,250.00
JUMLAH TENAGA KERJA 298,125.00
B BAHAN
Batu belah M3 1.200 230,000.00 276,000.00
Semen portland Kg 163.000 1,100.00 179,300.00
Pasir pasang M3 0.520 118,000.00 61,360.00
JUMLAH HARGA BAHAN 516,660.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 814,785.00
E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 814,785.00

A.3.2.1.9 Pemasangan 1 m3 batu kosong (anstamping)


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.780 125,000.00 97,500.00
Tukang L.02 OH 0.390 120,000.00 46,800.00
Kepala Tukang L.03 OH 0.039 125,000.00 4,875.00
Mandor L.04 OH 0.039 150,000.00 5,850.00
JUMLAH TENAGA KERJA 155,025.00
B BAHAN
Batu belah M3 1.200 230,000.00 276,000.00
Pasir urug M3 0.432 120,000.00 51,840.00
JUMLAH HARGA BAHAN 327,840.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 482,865.00
E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 482,865.00

A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f'c=7,4 MPa (K-100) slump (3-6) cm, w/c=0,87
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 125,000.00 150,000.00
Tukang L.02 OH 0.200 120,000.00 24,000.00
Kepala Tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.060 150,000.00 9,000.00
JUMLAH TENAGA KERJA 185,500.00
B BAHAN
Semen portland Kg 230.000 1,100.00 253,000.00
Pasir beton Kg 893.000 84.29 75,267.14
Kerikil Kg 1,027.000 170.37 174,970.37
Air Liter 200.000 10.00 2,000.00
JUMLAH HARGA BAHAN 505,237.51
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 690,737.51


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 690,737.51

A.4.1.1.5 Membuat 1 m3 beton mutu f'c=19,3 MPa (K-225) slump (120±20) mm, w/c + 0,58
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 125,000.00 206,250.00
Tukang L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 125,000.00 3,500.00
Mandor L.04 OH 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 255,200.00
B BAHAN
Semen portland Kg 371.000 1,100.00 408,100.00
Pasir beton Kg 698.000 84.29 58,831.43
Kerikil Kg 1,047.000 170.37 178,377.78
Air Liter 215.000 10.00 2,150.00
JUMLAH HARGA BAHAN 647,459.21
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 902,659.21


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 902,659.21

A.4.1.1.5a
Pekerjaan Beton ready mix K.225 /M3
Kode Analisa : SNI 7394 : 2008 (6.7)
No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja oh 1.65 125,000.00 206,250.00
Tk batu oh 0.275 120,000.00 33,000.00
Kepala Tk Batu oh 0.028 125,000.00 3,500.00
Mandor oh 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 255,200.00
B BAHAN
Beton Ready mix K. 225 m3 1.025 950,000.00 973,750.00
JUMLAH HARGA BAHAN 973,750.00
C PERALATAN
Peralatan (slang + tes Lab) ls 0.275 200,000.00 55,000.00
Concreete Pump Standar hr 0.010 0.00 0.00
JUMLAH HARGA ALAT 55,000.00
D Jumlah (A+B+C) 1,283,950.00
E Overheaad & Profit 0% -
F Harga Satuan Pekerjaan (D + E) 1,283,950.00

A.4.1.1.17Pembesian 10 kg dengan besi polos atau besi ulir


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.070 125,000.00 8,750.00
Tukang L.02 OH 0.070 120,000.00 8,400.00
Kepala Tukang L.03 OH 0.007 125,000.00 875.00
Mandor L.04 OH 0.004 150,000.00 600.00
JUMLAH TENAGA KERJA 18,625.00
B BAHAN
Besi beton Kg 10.500 11,500.00 120,750.00
Kawat beton Kg 0.150 20,000.00 3,000.00
JUMLAH HARGA BAHAN 123,750.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 142,375.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 142,375.00
1 kg 14,237.50

A.4.1.1.20(K3) Pemasangan 1 m2 bekisting untuk pondasi


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 125,000.00 65,000.00
Tukang L.02 OH 0.260 120,000.00 31,200.00
Kepala Tukang L.03 OH 0.026 125,000.00 3,250.00
Mandor L.04 OH 0.026 150,000.00 3,900.00
JUMLAH TENAGA KERJA 103,350.00
B BAHAN
Kayu Kelas III M3 0.040 1,800,000.00 72,000.00
Paku Kg 0.300 20,000.00 6,000.00
Minyak bekisting Liter 0.100 5,000.00 500.00
JUMLAH HARGA BAHAN 78,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 181,850.00
E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 181,850.00
G 2 kali Pakai 0,5xF 90,925.00
A.4.1.1.21(K3) Pemasangan 1 m2 bekisting untuk sloof
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 125,000.00 65,000.00
Tukang L.02 OH 0.260 120,000.00 31,200.00
Kepala Tukang L.03 OH 0.026 125,000.00 3,250.00
Mandor L.04 OH 0.026 150,000.00 3,900.00
JUMLAH TENAGA KERJA 103,350.00
B BAHAN
Kayu Kelas III M3 0.045 1,800,000.00 81,000.00
Paku Kg 0.300 20,000.00 6,000.00
Minyak bekisting Liter 0.100 5,000.00 500.00
JUMLAH HARGA BAHAN 87,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 190,850.00
E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 190,850.00
G 2 kali Pakai 0,5xF 95,425.00
A.4.1.1.22(K3) Pemasangan 1 m2 bekisting untuk kolom
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 125,000.00 82,500.00
Tukang L.02 OH 0.330 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.033 125,000.00 4,125.00
Mandor L.04 OH 0.033 150,000.00 4,950.00
JUMLAH TENAGA KERJA 131,175.00
B BAHAN
Kayu Kelas III M3 0.040 1,800,000.00 72,000.00
Paku Kg 0.400 20,000.00 8,000.00
Minyak bekisting Liter 0.200 5,000.00 1,000.00
Balok kayu Kelas II M3 0.015 1,800,000.00 27,000.00
Plywood t=9mm Lbr 0.350 65,000.00 22,750.00
Dolken Kayu Ø(8-10) cm Panjang 4m batang 2.000 6,000.00 12,000.00
JUMLAH HARGA BAHAN 142,750.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 273,925.00
E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 273,925.00
r 2 kali Pakai 0,5xF 136,962.50
A.4.1.1.23(K3) Pemasangan 1 m2 bekisting untuk balok
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 125,000.00 82,500.00
Tukang L.02 OH 0.330 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.033 125,000.00 4,125.00
Mandor L.04 OH 0.033 150,000.00 4,950.00
JUMLAH TENAGA KERJA 131,175.00
B BAHAN
Kayu Kelas III M3 0.040 1,800,000.00 72,000.00
Paku Kg 0.400 20,000.00 8,000.00
Minyak bekisting Liter 0.200 5,000.00 1,000.00
Balok kayu Kelas II M3 0.018 1,800,000.00 32,400.00
Plywood t=9mm Lbr 0.350 65,000.00 22,750.00
Dolken Kayu Ø(8-10) cm Panjang 4m batang 2.000 6,000.00 12,000.00
JUMLAH HARGA BAHAN 148,150.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 279,325.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 279,325.00
G 2 kali Pakai 0,5xF 139,662.50

A.4.1.1.24(K3) Pemasangan 1 m2 bekisting untuk lantai


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 125,000.00 82,500.00
Tukang L.02 OH 0.330 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.033 125,000.00 4,125.00
Mandor L.04 OH 0.033 150,000.00 4,950.00
JUMLAH TENAGA KERJA 131,175.00
B BAHAN
Kayu Kelas III M3 0.040 1,800,000.00 72,000.00
Paku Kg 0.400 20,000.00 8,000.00
Minyak bekisting Liter 0.200 5,000.00 1,000.00
Balok kayu Kelas II M3 0.015 1,800,000.00 27,000.00
Plywood t=9mm Lbr 0.350 65,000.00 22,750.00
Dolken Kayu Ø(8-10) cm Panjang 4m batang 6.000 6,000.00 36,000.00
JUMLAH HARGA BAHAN 166,750.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 297,925.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 297,925.00
G 2 kali Pakai 0,5xF 148,962.50

A.4.1.1.26(K3) Pemasangan 1 m2 bekisting untuk tangga


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 125,000.00 82,500.00
Tukang L.02 OH 0.330 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.033 125,000.00 4,125.00
Mandor L.04 OH 0.033 150,000.00 4,950.00
JUMLAH TENAGA KERJA 131,175.00
B BAHAN
Kayu Kelas III M3 0.030 1,800,000.00 54,000.00
Paku Kg 0.400 20,000.00 8,000.00
Minyak bekisting Liter 0.150 5,000.00 750.00
Balok kayu Kelas II M3 0.015 1,800,000.00 27,000.00
Plywood t=9mm Lbr 0.350 65,000.00 22,750.00
Dolken Kayu Ø(8-10) cm Panjang 4m batang 2.000 6,000.00 12,000.00
JUMLAH HARGA BAHAN 124,500.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 255,675.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 255,675.00
G 2 kali Pakai 0,5xF 127,837.50

A.4.2.1.7 Pemasangan 1 m2 rolling door Allumunium


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 125,000.00 150,000.00
Tukang L.02 OH 1.200 120,000.00 144,000.00
Kepala Tukang L.03 OH 0.120 125,000.00 15,000.00
Mandor L.04 OH 0.006 150,000.00 900.00
JUMLAH TENAGA KERJA 309,900.00
B BAHAN
Pintu Gulung besi m2 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 309,900.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 309,900.00

A.4.4.1.7 Pemasangan 1 m2 dinding bata merah tebal 1/2 batu camp. 1SP : 2PP
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 119,000.00 35,700.00
Tukang L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 125,000.00 1,875.00
JUMLAH TENAGA KERJA 50,825.00
B BAHAN
Bata merah M3 70.000 550.00 38,500.00
Semen portland Kg 18.950 1,100.00 20,845.00
Pasir pasang M3 0.038 118,000.00 4,484.00
JUMLAH HARGA BAHAN 63,829.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 114,654.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 114,654.00

A.4.4.1.9 Pemasangan 1 m2 dinding bata merah tebal 1/2 batu camp. 1SP : 4PP
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 119,000.00 35,700.00
Tukang L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 125,000.00 1,875.00
JUMLAH TENAGA KERJA 50,825.00
B BAHAN
Bata merah M3 70.000 550.00 38,500.00
Semen portland Kg 11.500 1,100.00 12,650.00
Pasir pasang M3 0.043 118,000.00 5,074.00
JUMLAH HARGA BAHAN 56,224.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 107,049.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 107,049.00

A. 4.4.1.7a. Pemasangan 1 m2 dinding bata hebel / bata ringan (20 x 60 x 7,5) cm


No. Uraian Sat Vol Koefisien Harga Satuan Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 119,000.00 35,700.00
Tukang Batu L.03 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 125,000.00 1,875.00
JUMLAH TENAGA KERJA 50,825.00
B BAHAN
Bata ringan bj 8.750 8,108.11 70,945.95
Mortar Prime kg 2.500 2,500.00 6,250.00

JUMLAH HARGA BAHAN 77,195.95


C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 128,020.95
E Overhead & Profit 0% -
F Harga Satuan Pekerjaan (D + E) 128,020.95

A.4.4.2.2 Pemasangan 1 m2 plesteran camp. 1SP : 2PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 119,000.00 35,700.00
Tukang L.02 OH 0.150 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.015 125,000.00 1,875.00
JUMLAH TENAGA KERJA 57,450.00
B BAHAN
Semen portland Kg 10.224 1,100.00 11,246.40
Pasir pasang M3 0.020 118,000.00 2,360.00
JUMLAH HARGA BAHAN 13,606.40
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 71,056.40


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 71,056.40

A.4.4.2.4 Pemasangan 1 m2 plesteran camp. 1SP : 4PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 119,000.00 35,700.00
Tukang L.02 OH 0.150 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.015 125,000.00 1,875.00
JUMLAH TENAGA KERJA 57,450.00
B BAHAN
Semen portland Kg 6.240 1,100.00 6,864.00
Pasir pasang M3 0.024 118,000.00 2,832.00
JUMLAH HARGA BAHAN 9,696.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 67,146.00
E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 67,146.00

A.4.4.2.27Pemasangan 1 m2 acian
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 119,000.00 17,850.00
Tukang L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.008 125,000.00 1,000.00
JUMLAH TENAGA KERJA 32,100.00
B BAHAN
Semen portland Kg 3.250 1,100.00 3,575.00
JUMLAH HARGA BAHAN 3,575.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 35,675.00
E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 35,675.00

A.4.4.3.35Memasang 1 m2 lantai Keramik ukuran (40 x 40) cm


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.270 119,000.00 32,130.00
Tukang L.02 OH 0.135 120,000.00 16,200.00
Kepala Tukang L.03 OH 0.014 125,000.00 1,750.00
Mandor L.04 OH 0.014 125,000.00 1,750.00
JUMLAH TENAGA KERJA 51,830.00
B BAHAN
keramik 40 x 40 m2 1.200 70,000.00 84,000.00
Semen portland Kg 10.000 1,100.00 11,000.00
Pasir pasang M3 0.045 118,000.00 5,310.00
Semen warna kg 0.500 13,000.00 6,500.00
JUMLAH HARGA BAHAN 106,810.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 158,640.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 158,640.00

A.4.4.3.35Memasang 1 m2 lantai Keramik ukuran (40 x 40) cm Unpolish


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.270 119,000.00 32,130.00
Tukang L.02 OH 0.135 120,000.00 16,200.00
Kepala Tukang L.03 OH 0.014 125,000.00 1,750.00
Mandor L.04 OH 0.014 125,000.00 1,750.00
JUMLAH TENAGA KERJA 51,830.00
B BAHAN
keramik 40 x 40 unpolish m2 1.200 80,000.00 96,000.00
Semen portland Kg 10.000 1,100.00 11,000.00
Pasir pasang M3 0.045 118,000.00 5,310.00
Semen warna kg 0.500 13,000.00 6,500.00
JUMLAH HARGA BAHAN 118,810.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 170,640.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 170,640.00

A.4.4.3.35Memasang 1 m2 lantai Granit ukuran (60 x 60) cm Polish


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 119,000.00 29,750.00
Tukang L.02 OH 0.125 120,000.00 15,000.00
Kepala Tukang L.03 OH 0.013 125,000.00 1,625.00
Mandor L.04 OH 0.013 125,000.00 1,625.00
JUMLAH TENAGA KERJA 48,000.00
B BAHAN
Granit 60x60 Cm m2 1.000 180,000.00 180,000.00
Semen portland Kg 10.000 1,100.00 11,000.00
Pasir pasang M3 0.045 118,000.00 5,310.00
Semen warna kg 0.500 13,000.00 6,500.00
JUMLAH HARGA BAHAN 202,810.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 250,810.00
E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 250,810.00

A.4.4.3.35Memasang 1 m2 lantai Granit ukuran (60 x 60) cm Unpolish


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 119,000.00 29,750.00
Tukang L.02 OH 0.125 120,000.00 15,000.00
Kepala Tukang L.03 OH 0.013 125,000.00 1,625.00
Mandor L.04 OH 0.013 125,000.00 1,625.00
JUMLAH TENAGA KERJA 48,000.00
B BAHAN
Granit 60x60 Cm m2 1.000 200,000.00 200,000.00
Semen portland Kg 10.000 1,100.00 11,000.00
Pasir pasang M3 0.045 1,100.00 49.50
Semen warna kg 0.500 118,000.00 59,000.00
JUMLAH HARGA BAHAN 270,049.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 318,049.50
E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 318,049.50

A.4.4.3.36Memasang 1 m2 lantai Keramik ukuran (30 x 30) cm


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.270 119,000.00 32,130.00
Tukang L.02 OH 0.135 120,000.00 16,200.00
Kepala Tukang L.03 OH 0.014 125,000.00 1,750.00
Mandor L.04 OH 0.014 125,000.00 1,750.00
JUMLAH TENAGA KERJA 51,830.00
B BAHAN
Keramik m2 1.200 70,000.00 84,000.00
Semen portland Kg 10.400 1,100.00 11,440.00
Pasir pasang M3 0.045 118,000.00 5,310.00
Semen warna Kg 0.500 13,000.00 6,500.00
JUMLAH HARGA BAHAN 107,250.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 159,080.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 159,080.00

A.4.4.3.54Memasang 1 m2 Dinding Keramik ukuran (20 x20) cm


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.270 119,000.00 32,130.00
Tukang L.02 OH 0.135 120,000.00 16,200.00
Kepala Tukang L.03 OH 0.014 125,000.00 1,750.00
Mandor L.04 OH 0.014 125,000.00 1,750.00
JUMLAH TENAGA KERJA 51,830.00
B BAHAN
Keramik m2 1.200 80,000.00 96,000.00
Semen portland Kg 10.000 1,100.00 11,000.00
Pasir pasang M3 0.018 118,000.00 2,124.00
Semen warna Kg 1.940 13,000.00 25,220.00
JUMLAH HARGA BAHAN 134,344.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 186,174.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 186,174.00

A.4.4.3.54Memasang 1 m2 Dinding granit ukuran (30 x 60) cm


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.270 119,000.00 32,130.00
Tukang L.02 OH 0.135 120,000.00 16,200.00
Kepala Tukang L.03 OH 0.014 125,000.00 1,750.00
Mandor L.04 OH 0.014 125,000.00 1,750.00
JUMLAH TENAGA KERJA 51,830.00
B BAHAN
granit 30 x 60 cm m2 1.000 200,000.00 200,000.00
Semen portland Kg 10.000 1,100.00 11,000.00
Pasir pasang M3 0.018 118,000.00 2,124.00
Semen warna Kg 1.940 13,000.00 25,220.00
JUMLAH HARGA BAHAN 238,344.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 290,174.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 290,174.00

A.4.5.1.5aPemasangan 1 m2 langit-langit kalsium silikat ukuran (120 x 240 ) cm, tebal 3 mm - 6 mm


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 119,000.00 11,900.00
Tukang L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.005 125,000.00 625.00
JUMLAH TENAGA KERJA 25,775.00
B BAHAN
Kalsium silikat Lembar 0.375 35,000.00 13,125.00
Paku Kg 0.030 68,000.00 2,040.00
JUMLAH HARGA BAHAN 15,165.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 40,940.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 40,940.00

A.4.5.1.5bPemasangan 1 m2 langit-langit Gypsum board ukuran (120 x 240 ) cm, tebal 8 mm - 9 mm


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 119,000.00 11,900.00
Tukang L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.005 125,000.00 625.00
JUMLAH TENAGA KERJA 25,775.00
B BAHAN
Kalsibord Lembar 0.375 58,000.00 21,750.00
Paku Kg 0.030 68,000.00 2,040.00
JUMLAH HARGA BAHAN 23,790.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 49,565.00


E 0 0% -
F Harga satuan Pekerjaan (D+E) 49,565.00

A.4.5.1.10Pemasangan 1 m2 rangka besi hollow, modul 60 x 60


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 119,000.00 41,650.00
Tukang L.02 OH 0.350 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.018 125,000.00 2,250.00
JUMLAH TENAGA KERJA 90,275.00
B BAHAN
Rangka hollow 40.40.2 mm M1 4.000 30,000.00 120,000.00
Assesoris Ls 10% x rangka 3,000.00 3,000.00
JUMLAH HARGA BAHAN 123,000.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 213,275.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 213,275.00

A.4.5.2.32Pemasangan 1 m2 genteng metal ukuran 80x85cm model atap pelana


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 119,000.00 23,800.00
Tukang L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.001 125,000.00 125.00
JUMLAH TENAGA KERJA 37,175.00
B BAHAN
Genteng metal m2 1.640 35,000.00 57,400.00
Paku Kg 0.200 43,000.00 8,600.00
JUMLAH HARGA BAHAN 66,000.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 103,175.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 103,175.00

A.4.5.2.33Pemasangan 1 m2 genteng Onduvilla ukuran 40 x106 cm atap jurai


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 119,000.00 23,800.00
Tukang L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.001 125,000.00 125.00
JUMLAH TENAGA KERJA 37,175.00
B BAHAN
Genteng Lembar 2.450 35,000.00 85,750.00
Screw Bh 15.000 60.00 900.00
JUMLAH HARGA BAHAN 86,650.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 123,825.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 123,825.00

A.4.5.2.36Pemasangan 1 m' nok genteng metal


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 119,000.00 29,750.00
Tukang L.02 OH 0.150 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.013 125,000.00 1,625.00
JUMLAH TENAGA KERJA 51,250.00
B BAHAN
Nok Genteng metal Bh 1.100 50,000.00 55,000.00
Paku Kg 0.050 43,000.00 2,150.00
JUMLAH HARGA BAHAN 57,150.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 108,400.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 108,400.00

A.4.5.2.36Pemasangan 1 m' nok tepi


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 119,000.00 29,750.00
Tukang L.02 OH 0.150 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.013 125,000.00 1,625.00
JUMLAH TENAGA KERJA 51,250.00
B BAHAN
Nok Genteng metal Bh 1.100 35,000.00 38,500.00
Paku Kg 0.050 30,000.00 1,500.00
JUMLAH HARGA BAHAN 40,000.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 91,250.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 91,250.00
A.4.6.1.1 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu ulin
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 7.000 119,000.00 833,000.00
Tukang L.02 OH 21.000 120,000.00 2,520,000.00
Kepala Tukang L.03 OH 2.100 125,000.00 262,500.00
Mandor L.04 OH 0.350 125,000.00 43,750.00
JUMLAH TENAGA KERJA 3,659,250.00
B BAHAN
Kayu Ulin M3 1.100 9,000,000.00 9,900,000.00
Paku Kg 1.250 20,000.00 25,000.00
Lem kayu kg 1.000 25,000.00 25,000.00
JUMLAH HARGA BAHAN 9,950,000.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 13,609,250.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 13,609,250.00

A.4.6.2.2 Pemasangan 1 buah kunci tanam biasa


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 119,000.00 1,190.00
Tukang L.02 OH 0.500 120,000.00 60,000.00
Kepala Tukang L.03 OH 0.050 125,000.00 6,250.00
Mandor L.04 OH 0.005 125,000.00 625.00
JUMLAH TENAGA KERJA 68,065.00
B BAHAN
Kunci tanam 2 X slag bh 1.000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 20,000.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 88,065.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 88,065.00

A.4.6.2.5 Pemasangan 1 buah engsel pintu


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 119,000.00 1,785.00
Tukang L.02 OH 0.150 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.0008 125,000.00 100.00
JUMLAH TENAGA KERJA 21,760.00
B BAHAN
Engsel pintu 4" bh 1.000 55,000.00 55,000.00
JUMLAH HARGA BAHAN 55,000.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 76,760.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 76,760.00

A.4.6.2.6 Pemasangan 1 buah engsel jendela kupu-kupu


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 119,000.00 1,190.00
Tukang L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.0005 125,000.00 62.50
JUMLAH TENAGA KERJA 14,502.50
B BAHAN
Engsel jendela 3" bh 1.000 30,000.00 30,000.00
JUMLAH HARGA BAHAN 30,000.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 44,502.50


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 44,502.50

A.4.6.2.9 Pekerjaan pasangan kait angin


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 119,000.00 1,785.00
Tukang L.02 OH 0.150 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.001 125,000.00 100.00
JUMLAH TENAGA KERJA 21,760.00
B BAHAN
Kait angin bh 1.000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 20,000.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 41,760.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 41,760.00

A.4.6.2.17Memasang 1 m2 kaca mati polos t=5mm


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 119,000.00 1,785.00
Tukang L.02 OH 0.150 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.001 125,000.00 100.00
JUMLAH TENAGA KERJA 21,760.00
B BAHAN
Kaca bening tebal 5mm polos m2 1.100 50,000.00 55,000.00
Sealant Kg 0.050 50,000.00 2,500.00
JUMLAH HARGA BAHAN 57,500.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 79,260.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 79,260.00

A.4.6.2.17Memasang 1 m2 kaca mati polos t= 12mm


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 119,000.00 1,785.00
Tukang L.02 OH 0.150 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.001 125,000.00 100.00
JUMLAH TENAGA KERJA 21,760.00
B BAHAN
Kaca bening tebal 12 mm polos m2 1.100 1,250,000.00 1,375,000.00
Sealant Kg 0.050 75,000.00 3,750.00
JUMLAH HARGA BAHAN 1,378,750.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,400,510.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 1,400,510.00

A.4.7.1.4 Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 119,000.00 8,330.00
Tukang L.02 OH 0.009 120,000.00 1,080.00
Kepala Tukang L.03 OH 0.006 125,000.00 750.00
Mandor L.04 OH 0.003 125,000.00 375.00
JUMLAH TENAGA KERJA 10,535.00
B BAHAN
Cat menie Kg 0.200 30,000.00 6,000.00
Plamuur Kg 0.150 20,000.00 3,000.00
Cat dasar Kg 0.170 20,000.00 3,400.00
Cat penutup Kg 0.260 50,000.00 13,000.00
Kuas Bh 0.010 15,000.00 150.00
Pengencer Kg 0.030 20,000.00 600.00
Ampelas lbr 0.200 7,000.00 1,400.00
JUMLAH HARGA BAHAN 27,550.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 38,085.00
E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 38,085.00

A.4.7.1.10Pengecatan 1 m2 tembok baru interior (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 119,000.00 2,380.00
Tukang L.02 OH 0.063 120,000.00 7,560.00
Kepala Tukang L.03 OH 0.006 125,000.00 787.50
Mandor L.04 OH 0.003 125,000.00 375.00
JUMLAH TENAGA KERJA 11,102.50
B BAHAN
Plamuur Kg 0.100 18,000.00 1,800.00
Cat dasar Kg 0.100 20,000.00 2,000.00
Cat penutup Kg 0.260 50,000.00 13,000.00
JUMLAH HARGA BAHAN 16,800.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 27,902.50
E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 27,902.50

A.4.7.1.10Pengecatan 1 m2 tembok baru eksterior (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 119,000.00 2,380.00
Tukang L.02 OH 0.063 120,000.00 7,560.00
Kepala Tukang L.03 OH 0.006 125,000.00 787.50
Mandor L.04 OH 0.003 125,000.00 375.00
JUMLAH TENAGA KERJA 11,102.50
B BAHAN
Plamuur Kg 0.100 18,000.00 1,800.00
Cat dasar Kg 0.100 20,000.00 2,000.00
Cat penutup Kg 0.260 90,000.00 23,400.00
JUMLAH HARGA BAHAN 27,200.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 38,302.50
E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 38,302.50

A.4.7.1.10Pengecatan 1 m2 Waterproofing (2 lapis cat penutup)


Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 119,000.00 2,380.00
Tukang L.02 OH 0.063 120,000.00 7,560.00
Kepala Tukang L.03 OH 0.006 125,000.00 787.50
Mandor L.04 OH 0.003 125,000.00 375.00
JUMLAH TENAGA KERJA 11,102.50
B BAHAN
Plamuur Kg - - -
Cat dasar Kg - - -
Cat penutup Kg 0.600 29,000.00 17,400.00
JUMLAH HARGA BAHAN 17,400.00
C PERALATAN 0.100 17,400.00 1,740.00
JUMLAH HARGA ALAT 1,740.00
D Jumlah (A+B+C) 30,242.50
E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 30,242.50

A.5.1.1.3 (K3) Pemasangan 1 buah closet jongkok


Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 119,000.00 119,000.00
Tukang L.02 OH 1.500 120,000.00 180,000.00
Kepala Tukang L.03 OH 0.150 125,000.00 18,750.00
Mandor L.04 OH 0.050 125,000.00 6,250.00
JUMLAH TENAGA KERJA 324,000.00
B BAHAN
Closet jongkok Unit 1.000 150,000.00 150,000.00
Semen PC Kg 6.000 1,100.00 6,600.00
Pasir pasang M3 0.010 118,000.00 1,180.00
Bata merah bh 7.000 550.00 3,850.00
JUMLAH HARGA BAHAN 161,630.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 485,630.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 485,630.00

A.5.1.1.5 (K3) Pemasangan 1 buah wastafel


Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 119,000.00 142,800.00
Tukang L.02 OH 1.450 120,000.00 174,000.00
Kepala Tukang L.03 OH 0.150 125,000.00 18,750.00
Mandor L.04 OH 0.060 125,000.00 7,500.00
JUMLAH TENAGA KERJA 343,050.00
B BAHAN
wastafel Unit 1.200 1,400,000.00 1,680,000.00
Semen PC Kg 6.000 1,100.00 6,600.00
Pasir pasang M3 0.010 118,000.00 1,180.00
Perlengkapan % 12.000 1,400,000.00 168,000.00
JUMLAH HARGA BAHAN 1,855,780.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 2,198,830.00


E Overheaad & Profit 0% 219,883.00
F Harga satuan Pekerjaan (D+E) 2,418,713.00

A.5.1.1.7.b(K3) Pemasangan 1 buah bak mandi fiberglass Vol.0,3 m3


Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 119,000.00 35,700.00
Tukang L.02 OH 0.450 120,000.00 54,000.00
Kepala Tukang L.03 OH 0.050 125,000.00 6,250.00
Mandor L.04 OH 0.900 125,000.00 112,500.00
JUMLAH TENAGA KERJA 208,450.00
B BAHAN
Bak Fiberglass Unit 1.000 450,000.00 450,000.00
Perlengkapan % 12.000 54,000.00 54,000.00
JUMLAH HARGA BAHAN 504,000.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 712,450.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 712,450.00

A.5.1.1.14Memasang 1 Bh Floor Drain


Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 119,000.00 1,190.00
Tukang L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.005 125,000.00 625.00
JUMLAH TENAGA KERJA 15,065.00
B BAHAN
Floor Drain Bh 1.000 75,000.00 75,000.00
JUMLAH HARGA BAHAN 75,000.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 90,065.00


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 90,065.00

A.5.1.1.19Memasang 1 Bh Keran air


Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 119,000.00 1,190.00
Tukang L.02 OH 0.400 120,000.00 48,000.00
Kepala Tukang L.03 OH 0.040 125,000.00 5,000.00
Mandor L.04 OH 0.005 125,000.00 625.00
JUMLAH TENAGA KERJA 54,815.00
B BAHAN
Kran kualitas baik Bh 1.000 75,000.00 75,000.00
Seal Tape Bh 0.025 3,500.00 87.50
JUMLAH HARGA BAHAN 75,087.50
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 129,902.50


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 129,902.50

A.5.1.1.19Memasang 1 Bh Keran air wastafel


Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 119,000.00 1,190.00
Tukang L.02 OH 0.400 120,000.00 48,000.00
Kepala Tukang L.03 OH 0.040 125,000.00 5,000.00
Mandor L.04 OH 0.005 125,000.00 625.00
JUMLAH TENAGA KERJA 54,815.00
B BAHAN
Kran air Bh 1.000 100,000.00 100,000.00
Seal Tape Bh 0.025 3,500.00 87.50
JUMLAH HARGA BAHAN 100,087.50
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 154,902.50


E Overheaad & Profit 0% -
F Harga satuan Pekerjaan (D+E) 154,902.50

Sloof 13/17 (S2)


No Uraian Kode Satuan Koefisien

Beton Mutu 123 m3 1.00


Besi Tulangan Polos kg 227.82
Bekisting m2 7.69
Jumlah Harga Satuan Pekerjaan

Kolom 13/13 (K1)

No Uraian Kode Satuan Koefisien

Beton Mutu 123 m3 1.00


Besi Tulangan Polos kg 208.07
Bekisting m2 7.69
Jumlah Harga Satuan Pekerjaan

Kolom 13/17 (K2)

No Uraian Kode Satuan Koefisien

Beton Mutu 123 m3 1.00


Besi Tulangan Polos kg 159.12
Bekisting m2 7.69
Jumlah Harga Satuan Pekerjaan

Rinkbalk 13/13, gevel 13/13 (B1)

No Uraian Kode Satuan Koefisien

Beton Mutu 123 m3 1.00


Besi Tulangan Polos kg 297.92
Bekisting m2 7.69
Jumlah Harga Satuan Pekerjaan

Balok 13/17 (B2)

No Uraian Kode Satuan Koefisien

Beton Mutu 123 m3 1.00


Besi Tulangan Polos kg 227.82
Bekisting m2 7.69
Jumlah Harga Satuan Pekerjaan
SURVEY HARGA
No. Uraian Satuan HARGA RAB MULYA JAYA HJ. IDAH BERKAT MITRA

BAHAN
TANAH
1 Batu gunung M³ Rp 250,000.00 Rp 250,000.00
2 Pasir urug M³ Rp 180,000.00 Rp 180,000.00
3 Pasir beton / pasang M³ Rp 180,000.00 Rp 180,000.00
4 Batu split M³ Rp 200,000.00 Rp 200,000.00
5 Tanah urug pilihan / laterit M³ Rp 100,000.00 Rp 100,000.00
6 Tiang Pancang Kotak 25x25

BETON
7 Beton ready mixed K-100 (slump 10±2) M³ Rp 852,500.00
8 Beton ready mixed K-125 (slump 10±2) M³ Rp 880,000.00
9 Beton ready mixed K-150 (slump 10±2) M³ Rp 907,500.00
10 Beton ready mixed K-175 (slump 10±2) M³ Rp 962,500.00
11 Beton ready mixed K-200 (slump 10±2) M³ Rp 1,017,500.00
12 Beton ready mixed K-250 (slump 10±2) M³ Rp 1,322,500.00
13 Beton ready mixed K-300 (slump 12±2) M³ Rp 1,320,000.00
14 Beton ready mixed K-350 (slump 12±2) M³ Rp 1,402,500.00
15 Beton ready mixed K-450 (slump 12±2) M³ Rp 1,512,500.00
16 Semen PC (50 kg) sejenis 3 Roda / Tonasa / Holcim Zak Rp 60,000.00 Rp 60,000.00 Rp 57,000.00 Rp 56,000.00 Rp 53,000.00
17 Semen putih berwarna Zak Rp 80,000.00 Rp 140,000.00 Rp 140,000.00 Rp 135,000.00 Rp 90,000.00
18 Air M³ Rp 20,000.00 Rp 25,000.00
19 Besi tulangan polos Kg Rp 14,000.00 Rp 14,000.00 Rp 13,500.00
20 Kawat beton / bindrat Kg Rp 25,000.00 Rp 25,000.00 Rp 25,000.00 Rp 24,000.00 Rp 25,000.00
21 Papan kayu lanan M³ Rp 2,200,000.00 Rp 2,200,000.00
22 Balok kayu lanan M³ Rp 2,200,000.00 Rp 2,200,000.00
23 Kayu bekisting/cetakan M³ Rp 2,000,000.00 Rp 2,000,000.00
24 Plywood 9 mm Lembar Rp 125,000.00 Rp 125,000.00 Rp 120,000.00 Rp 115,000.00 Rp 115,000.00
25 Minyak bekisiting Liter Rp 10,000.00 Rp 10,000.00
26 Kayu galam diameter 8-10 cm panjang 4 m Batang Rp 10,000.00 Rp 10,000.00
27 Paku rupa-rupa Kg Rp 25,000.00 Rp 25,000.00 Rp 20,000.00 Rp 20,000.00 Rp 20,000.00
28 Batu bata Biji Rp 650.00 Rp 700.00 Rp 700.00
29 Bata ringan AXEL tb. 10 cm M³ Rp 880,000.00 Rp 900,000.00 Rp 850,000.00 Rp 850,000.00
30 Bata ringan AXEL tb. 7,5 cm M³ Rp 10,602.41 Rp 850,000.00 Rp 120,000.00 Rp 950,000.00 Rp 850,000.00
31 Semen mortar thin bed / perekat Zak Rp 880,000.00 Rp 200,000.00 Rp 140,000.00 Rp 110,000.00 Rp 100,000.00
32 Semen mortar acian & plester Zak Rp 7,927.93 Rp 150,000.00 Rp 125,000.00 Rp 125,000.00

CAT-CATAN
28 Cat tembok interior setara Jotun / Dulux / Mowilex Kg Rp 50,000.00 Rp 88,000.00 Rp 80,000.00 Rp 28,000.00 Rp 80,000.00
29 Cat tembok eksterior setara Jotun / Dulux / Mowilex Kg Rp 70,000.00 Rp 154,000.00 Rp 140,000.00 Rp 80,000.00 Rp 120,000.00
32 Alkali Kg Rp 40,000.00 Rp 165,000.00 Rp 50,000.00 Rp 38,000.00 Rp 150,000.00
33 Dempul / plamir Kg Rp 20,000.00 Rp 38,500.00 Rp 15,000.00 Rp 11,600.00 Rp 35,000.00
34 Tepung gypsum / kompon Kg Rp 5,000.00 Rp 82,500.00 Rp 5,000.00 Rp 75,000.00

PENUTUP LANTAI / DINDING / LANGIT-LANGIT / ATAP


35 Granit 60x60 ( Unpolish ) Pak Rp 266,666.67 Rp 275,000.00 Rp 225,000.00 Rp 240,000.00
36 Granit 60x60 ( Polish ) Pak Rp 200,000.00 Rp 170,000.00 Rp 160,000.00
36 Keramik 60/60 Pak Rp 165,000.00 Rp 145,000.00 Rp 115,000.00 Rp 150,000.00
37 Keramik 60/60 (Anti Slip) Pak Rp 176,000.00 Rp 120,000.00 Rp 160,000.00
38 Keramik lantai 40x40 Pak Rp 80,000.00 Rp 93,500.00 Rp 75,000.00 Rp 85,000.00 Rp 55,000.00
39 Keramik lantai 25x25 antislip Pak Rp 50,000.00 Rp 83,600.00 Rp 65,000.00 Rp 76,000.00 Rp 65,000.00
40 Keramik dinding 20x40 Pak Rp 51,000.00 Rp 82,500.00 Rp 75,000.00 Rp 75,000.00
41 Keramik Motif Batu Alam 20x40 Pak Rp 130,000.00 Rp 93,500.00 Rp 85,000.00 Rp 85,000.00
42 Rangka hollow 4x4 btg Rp 60,000.00 Rp 33,000.00 Rp 30,000.00 Rp 30,000.00 Rp 30,000.00
43 Paku sekrup ktk Rp 20,000.00 Rp 165,000.00 Rp 150,000.00 Rp 170,000.00 Rp 100,000.00
44 Penggantung & Ramzet Bh Rp 17,500.00
45 Stifenner Bh Rp 6,000.00
46 kalsiboard tebal 3.5 mm Lembar Rp 75,000.00 Rp 62,700.00 Rp 57,000.00 Rp 57,000.00 Rp 57,000.00
47 Profil Truss C.75.0.75 m Rp 11,000.00 Rp 23,100.00 Rp 21,000.00 Rp 20,416.67 Rp 20,000.00
48 Profil Reng U.35.30.40 m Rp 9,040.00 Rp 11,000.00 Rp 10,000.00 Rp 9,666.67 Rp 9,166.67
49 Screw Kuda-Kuda 12-14x40 bh Rp 500.00 Rp 660.00 Rp 600.00
50 Screw Reng 10-16x16 bh Rp 500.00 Rp 275.00 Rp 250.00
51 Atap spandek tbl.0,25 mm, Ukuran P = ,L= m Rp 70,000.00 Rp 55,000.00 Rp 50,000.00 Rp 44,000.00 Rp 50,000.00
52 Screw 12-4 x 50 bh Rp 1,500.00 Rp 880.00 Rp 800.00
53 Screw 10 x 16-16 bh Rp 1,000.00 Rp 275.00 Rp 250.00
54 Nok Atap m' Rp 60,000.00 Rp 48,400.00 Rp 60,000.00 Rp 30,000.00 Rp 44,000.00
55 List Plank m' Rp 30,000.00 Rp 16,500.00 Rp 15,000.00 Rp 14,250.00 Rp 14,250.00
56 ACP M² Rp 850,000.00 Rp 900,000.00 Rp 250,000.00
57 Pas. Dinding partisi kalsiboard 3.5mm + rangka metal stud M² #NAME? Rp 300,000.00
No. Uraian Satuan HARGA RAB MULYA JAYA HJ. IDAH BERKAT MITRA
KUSEN / PINTU / JENDELA dan Kunci

57 Kusen Aluminium M¹ Rp 70,000.00 Rp 80,000.00


58 Kaca 5 mm (polos) M² Rp 140,000.00 Rp 150,000.00 Rp 110,000.00
59 Kunci tanam 2 X slag bh #NAME? Rp 300,000.00 Rp 260,000.00 Rp 290,000.00 Rp 130,000.00
60 Pas. Kunci Pintu (Full Handle ) (Terpasang) bh #NAME? Rp 200,000.00
61 Engsel pintu 4" bh #NAME? Rp 60,000.00 Rp 55,000.00 Rp 55,000.00 Rp 25,000.00
62 Engsel jendela 3" bh #NAME? Rp 50,000.00 Rp 40,000.00 Rp 39,000.00 Rp 15,000.00
63 Grendel pintu bh #NAME? Rp 35,000.00 Rp 30,000.00 Rp 15,000.00 Rp 8,000.00
64 Grendel jendela bh #NAME? Rp 20,000.00 Rp 15,000.00 Rp 9,000.00 Rp 8,000.00
65 Kait angin bh #NAME? Rp 20,000.00 Rp 15,000.00 Rp 10,000.00 Rp 5,000.00
66 Pegangan jendela bh #NAME? Rp 20,000.00 Rp 20,000.00 Rp 10,000.00 Rp 8,000.00

PEKERJAAN MEKANIKAL - ELEKTRIKAL


67 Instalasi titik lampu Titik #NAME? Rp 200,000.00
68 Instalasi stop kontak Titik #NAME? Rp 200,000.00
69 Lampu Downlight Panel LED 18 watt Bh #NAME? Rp 160,000.00
70 Lampu TL 2 x 18 Watt / Armatur Bh Rp 400,000.00
71 Lampu SL 10 Watt Bh #NAME? Rp 50,000.00 Rp 35,000.00
72 Saklar tunggal Bh Rp 17,000.00 Rp 40,000.00 Rp 25,000.00 Rp 17,000.00
73 Saklar ganda Bh Rp 21,000.00 Rp 50,000.00 Rp 25,000.00 Rp 22,000.00
74 Stop kontak dinding Bh #NAME? Rp 50,000.00 Rp 25,000.00 Rp 17,000.00
75 Pas. MCB Bh Rp 200,000.00 Rp 200,000.00
76 Pas.Box MCB Unit Rp 800,000.00 Rp 800,000.00
77 Pemasangan KWH 2200 Watt bh #NAME? Rp 2,773,600.00
78 SLO bh #NAME? Rp 450,000.00

PEKERJAAN PLUMBING & SANITAIR


85 Kloset Jongkok Bh Rp 125,000.00Rp 310,000.00 Rp 310,000.00 Rp 400,000.00 Rp 120,000.00
86 Pas. Kloset duduk Bh #NAME? Rp 3,000,000.00 Rp 1,000,000.00
87 Pas. Wastafel Bh #NAME? Rp 1,500,000.00 Rp 75,000.00
88 Kran air Wastafel Bh #NAME? Rp 110,000.00 Rp 85,000.00 Rp 110,000.00 Rp 20,000.00
89 Floor Drain Bh #NAME? Rp 25,000.00 Rp 20,000.00
90 Bak fiberglass Vol.0,3 m3 Bh #NAME? Rp 550,000.00 Rp 550,000.00
91 Biofil septick tank kap. 600 ltr Bh Rp 2,650,000.00Rp 6,000,000.00 Rp 6,000,000.00
92 Gorong Gorong Diamater 80 Bh Rp 200,000.00Rp 200,000.00
93 Penutup Gorong Gorong Bh Rp 150,000.00Rp 150,000.00
94 Tandon 2200 L Bh Rp 3,000,000.00Rp 3,740,000.00 Rp 3,400,000.00 Rp 3,100,000.00 Rp 3,000,000.00
95 Tandon 1200 L Bh Rp 1,705,000.00 Rp 1,500,000.00 Rp 1,550,000.00 Rp 1,400,000.00
96 Tandon 800 L Bh Rp 1,210,000.00 Rp 1,100,000.00 Rp 950,000.00
97 Menara Tandon 2 m Bh Rp 2,000,000.00 Rp 1,870,000.00 Rp 1,700,000.00
98 Manara Tandon 1,5 m Bh Rp 1,540,000.00 Rp 1,400,000.00

#NAME?
99 Tulisan "RUMAH KEMASAN " LED Acrylic (Terpasang), L : 20 cm T : 15 cm cm Rp 17,000.00
100 Tulisan "DINAS TENAGA KERJA DAN PERINDUSTRIAN KAB.TANAH LAUT " LED Acrylic
bh