TOTAL R E K A P I T U L A S I
HARGA
NO URAIAN PEKERJAAN SATUAN JUMLAH
(Rp) (Rp)
A B D E
JUMLAH #REF!
PPN 10 % #REF!
TOTAL #REF!
DIBULATKAN #REF!
Terbilang : ###
PEKANBARU, 2015
DIBUAT OLEH,
KONSULTAN PERENCANA
CV. GRAMINDO RANAH CIPTA KONSULTAN
E R M A N, ST
DIREKTUR
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN : REHABILITASI SEDANG/ BERAT GEDUNG KANTOR
PEKERJAAN : REHABILITASI DAN PENGECATAN GEDUNG KANTOR
LOKASI : KOTA PEKANBARU
HARGA JUMLAH
NO URAIAN PEKERJAAN VOL SAT STN STN
(Rp) (Rp)
A B C D E F
TOTAL Err:509
PPN 10% Err:509
JUMLAH TOTAL Err:509
DIBULATKAN 96,900,000.00
Terbilang : Sembilan Puluh Enam Juta Sembilan Ratus Ribu Rupiah
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN : REHABILITASI SEDANG/ BERAT GEDUNG KANTOR
PEKERJAAN : REHABILITASI DAN PENGECATAN GEDUNG KANTOR
LOKASI : KOTA PEKANBARU
HARGA JUMLAH
NO URAIAN PEKERJAAN VOL SAT STN STN
(Rp) (Rp)
A B C D E F
TOTAL Err:509
PPN 10% Err:509
JUMLAH TOTAL Err:509
DIBULATKAN 96,900,000.00
Terbilang : Sembilan Puluh Enam Juta Sembilan Ratus Ribu Rupiah
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN : REHABILITASI SEDANG/ BERAT GEDUNG KANTOR
PEKERJAAN : REHABILITASI DAN PENGECATAN GEDUNG KANTOR
LOKASI : KOTA PEKANBARU
HARGA JUMLAH
NO URAIAN PEKERJAAN VOL SAT STN STN
(Rp) (Rp)
A B C D E F
TOTAL 86,214,722.68
PPN 10% 8,621,472.27
JUMLAH TOTAL 94,836,194.95
DIBULATKAN 97,000,000.00
Terbilang : Sembilan Puluh Tujuh Juta Rupiah
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN : REHABILITASI SEDANG/ BERAT GEDUNG KANTOR
PEKERJAAN : REHABILITASI DAN PENGECATAN GEDUNG KANTOR
LOKASI : KOTA PEKANBARU
HARGA JUMLAH
NO URAIAN PEKERJAAN VOL SAT STN STN
(Rp) (Rp)
A B C D E F
TOTAL 88,208,279.07
PPN 10% 8,820,827.91
JUMLAH TOTAL 97,029,106.98
DIBULATKAN 97,000,000.00
Terbilang : Sembilan Puluh Tujuh Juta Rupiah
DAFTAR ANALISA PEKERJAAN
BERSADARKAN SNI
A I.UPAH
1 Mandor OH 105,000
2 Kepala Tukang OH 95,000
3 Tukang Kayu OH 85,000
4 Tukang Kaca OH 85,000
5 Tukang Cat OH 85,000
6 Pekerja OH 75,000
B BAHAN
1 Blockboard 12 mm Lbr 168,500
2 Triplek 9 mm Lbr 127,000
3 Triplek 6 mm Lbr 88,000
4 HPL Lbr 279,500
5 Profil Stainless Steel M' 40,500
6 Lem Putih Kg 22,000
7 Lem Kuning/ Lem Vinyl Kg 29,900
8 Lem Kaca Pcs 34,500
9 Rangka Kosen Alumunium M' 58,000
10 Rangka Casmen Alumunium M' 63,500
11 Kaca Gelap Tebal 5 mm M2 120,000
12 Kaca Bening Tebal 8 mm M2 185,000
13 Karet List Kaca M' 5,000
14 Kunci Tanam Alumunium 2 slagh Bh 225,000
15 Grendel Pintu 3" Bh 27,500
16 Handle Pintu Bh 140,000
17 Alat Bantu Ls 27,500
18 Paku Kayu 1 - 1 1/2 inch Kg 18,000
19 Paku Triplek Kg 15,000
20 Paku Tembak Kg 18,000
21 Seng Plat Lbr 75,000
22 Amplas Lbr 5,000
23 Karpet (Kwalitas Bagus) M2 310,000.00
24 Parquet (Kwalitas Bagus) M2 354,000.00
25 Water Profing M2 41,000.00
26 Wall Papper + Upah Pasang M2 250,000.00
27 Semen PC Type I @ 50 Kg Zak 70,000.00
28 Semen PC Type I @ 50 Kg Kg 1,400.00
29 Semen Warna (Pengisi Nat) Setara AA Kg 2,600.00
30 Pasir Pasang M3 140,000.00
31 Granit 60 x 60 Cm M2 332,000.00 ( 4 Keping / m2 )
32 Plint Granit 10 x 60 Cm Bh 10,583.33 ( 6 Bh )
PPN
611000
#REF! <= angka
2 <= jumlah desimal
b <="b" atau "saja"
#REF!
#REF!
#REF! #REF!
#REF! `
#REF! #REF!
#REF! #REF!
100 #REF!
#REF! #REF!
#REF! #REF! Nama Range yang ada :
#REF! #REF! NUMBER A1
#REF! #REF! NUMTEXT A1..A5
#REF! #REF! TEXT A5
#REF! #REF! \T B9
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
0
1 satu
2 dua
3 tiga
4 empat
5 lima
6 enam
7 tujuh
8 delapan
9 sembilan
10 sepuluh
11 sebelas
12 dua belas
13 tiga belas
14 empat belas
15 lima belas
16 enam belas
17 tujuh belas
18 delapan belas
19 sembilan belas
20 dua puluh
30 tiga puluh
40 empat puluh
50 lima puluh
60 enam puluh
70 tujuh puluh
80 delapan puluh
90 sembilan puluh
Perhatian : Masukkan angka di sel A1
Baca terbilangnya di sel A4 atau A5 atau A7 atau D10