II DATA KPA
JABATAN KPA :
:
:
NAMA KPA :
GOL. KPA :
NIP. KPA :
IIIDATA PPTK
JABATAN PPTK :
NAMA PPTK :
NIP. PPTK :
IVDATA KONSULTAN
NAMA PERUSAHAAN :
NAMA PENGURUS :
JABATAN PENGURUS :
JUMLAH HARGA
NO URAIAN
(Rp)
A PEKERJAAN PERSIAPAN #VALUE!
#NAME? #NAME? #REF!
III #NAME? #NAME?
IV Pondasi Tapak uk.50x50 cm #NAME?
V b. Besi Utama Ø 10 mm #VALUE!
VI #NAME? #NAME?
#NAME? #NAME? #REF!
JUMLAH HARGA #VALUE!
PEMBULATAN #VALUE!
WAN AKHYAR, ST
Direktur
RINCIAN ANGGARAN BIAYA
(RAB)
B PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 20.55 Sub Jumlah A #VALUE!
Urugan Tanah Kembali m3 6.85
C 0
1 PEKERJAAN PONDASI #REF! #REF!
2 Urugan Pasir Dibawah Pondasi m3 1.71
Pondasi Tapak uk.50x50 cm -
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
1 2 3 4 6 7 = (4 x 6)
a. Beton Cor m3 0.68 250,000.00 169,406.25
b. Besi Utama Ø 10 mm Kg 83.23
c. Begel Ø 6 mm Kg 6.92
d. Bekisting M2 4.68
Pondasi Menerus m3 11.99
PEKERJAAN BETON
Sloof uk. 15x20 cm
a. Beton Cor m3 1.88
b. Besi Utama Ø 10 mm Kg 192.96
c. Begel Ø 6 mm Kg 64.84
d. Bekisting m2 10.96
Kolom uk. 15x15 cm ( Lantai I)
a. Beton Cor m3 2.21
b. Besi Utama Ø 10 mm Kg 302.09
c. Begel Ø 6 mm Kg 85.29
d. Bekisting m2 19.60
Balok Latei uk. 11x11 cm ( Lantai I)
a. Beton Cor m3 0.48
b. Besi Utama Ø 10 mm Kg 97.16
c. Begel Ø 6 mm Kg 25.65
d. Bekisting m2 3.47
Ring Balok uk. 15x20 cm ( Lantai I)
a. Beton Cor m3 2.06
b. Besi Utama Ø 10 mm Kg 169.17
c. Begel Ø 6 mm Kg 71.05
d. Bekisting m2 9.15
Kolom uk. 15x15 cm ( Lantai 2)
a. Beton Cor m3 0.57
b. Besi Utama Ø 10 mm Kg 62.14
c. Begel Ø 6 mm Kg 21.93
d. Bekisting m2 5.04
Balok Latei uk. 11x11 cm ( Lantai 2)
a. Beton Cor m3 0.06
b. Besi Utama Ø 10 mm Kg 12.33
c. Begel Ø 6 mm Kg 3.26
d. Bekisting m2 0.37
Ring Balok uk. 15x20 cm ( Lantai 2)
a. Beton Cor m3 0.25
b. Besi Utama Ø 10 mm Kg 49.94
c. Begel Ø 6 mm Kg 13.18
d. Bekisting m2 1.49
Top Grevel ( Lantai 2)
a. Beton Cor m3 0.11
b. Besi Utama Ø 10 mm Kg 22.19
c. Begel Ø 6 mm Kg 5.86
d. Bekisting m2 0.66
Plat Tangga
a. Beton Cor m3 0.62
b. Besi Utama Ø 10 mm Kg 131.78
d. Bekisting m2 5.13
Plat Dak Lantai
a. Beton Cor m3 5.46
b. Besi Utama Ø 10 mm Kg 771.40
d. Bekisting m2 45.50
Plat Dak Canopy
a. Beton Cor m3 1.45
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
1 2 3 4 6 7 = (4 x 6)
b. Besi Utama Ø 10 mm Kg 119.50
PEKERJAAN PASANGAN
Pasangan Dinding Bata Lantai I m2 156.69
Plasteran Lantai I m2 313.38
Pasangan Dinding Batu Alam m2 9.98
Pasangan Dinding Keramik KM/WC Lantai I m2 15.60
Pasangan Dinding Bata Lantai II m2 70.00
Plasteran Lantai II m2 140.00
Pasangan Dinding Keramik KM/WC Lantai II m2 7.80
9 PEKERJAAN PENGECATAN
Pengecatan Bidang Tembok (Cat Jotun) Lantai I m2 313.38 -
Pengecatan Bidang Tembok (Cat Jotun) Lantai II m2 140.00 -
Pengecatan Bidang Kayu Ls 1.00 -
#REF! #REF!
#REF!
#REF!
ANALISA HARGA SATUAN PEKERJAAN
(AHSP)
PEKERJAAN : REHABILITASI GEDUNG BAWASLU KAB. ACEH TAMIANG
LOKASI : KP. KESEHATAN KEC. KARANG BARU KAB. ACEH TAMIANG
T.A : 2024
c. Penyiapan formulir -
5) P3K Org -
g Spanduk (Banner) Lb - -
h Poster Lb - -
i Papan Informasi K3 Bh -
a. APK :
3.
Satuan Harga Satuan Total Harga
No Uraian Pekerjaan Kuantitas Keterangan
Ukuran (Rp) (Rp)
I II III IV V VI (IV + V) VII
b. APD :
a Asuransi Ls -
e Ambulans Unit -
a Rambu petunjuk Bh -
b Rambu Larangan Bh -
c Rambu peringatan Bh -
d Rambu kewajiban Bh -
e Rambu informasi Bh -
a. Ahli Lingkungan -
b. Ahli Struktur -
c Sirine Bh -
d Bendera K3 Bh -
1) Limbah B3 Ls -
2) Polusi udara Ls -
j CCTV Unit -
Harga Satuan
No. Uraian Kode Satuan
(Rp)
A UPAH
1 Pekerja L.01 OH 100,000.00
2 Tukang L.02 OH 115,000.00
3 Kepala Tukang L.03 OH 135,000.00
4 Mandor L.04 OH 115,000.00
B BAHAN
1 Air Liter 80.00
2 Balok kayu kelas II m3 6,000,000.00
3 Batu Kali/Gunung m3 397,000.00
4 Bata merah Buah 1,000.00
5 Batako/HB-20 Buah 6,000.00
6 Besi beton polos Kg 18,000.00
7 Besi beton Ulir Kg 20,000.00
8 Cat dasar Tembok Kg 87,000.00
9 Cat Penutup Tembok Kg 48,000.00
10 Dolken kayu Ø 8-10/400 cm Batang 28,000.00
11 Kawat benrad Kg 25,000.00
12 Kawat beton Kg 25,000.00
13 Kerikil (Maks 30 mm) (1350 Kg/m3) M3 362,000.00
14 Kerikil (Maks 30 mm) Kg 268.15
15 Minyak bekisting Liter 21,250.00
16 Mortar Siap Pakai (semen instan) Kg 8,000.00
17 Plywood 9 mm Lbr 140,000.00
18 Plamuur Kg 24,000.00
19 Paku 5 - 10 cm Kg 28,000.00
20 Paku 5 - 12 cm kg 32,000.00
21 Paku 5 dan 7 cm Kg 25,000.00
22 Papan kayu Kelas I M3 8,855,000.00
23 Papan Kayu kelas III M3 5,300,000.00
24 Kayu Kelas III M3 5,300,000.00
25 Pasir beton (1400 Kg/m3) M3 189,000.00
26 Pasir beton Kg 135.00
27 Pasir pasang M3 155,000.00
28 Pasir Urug M3 97,000.00
29 Paving block 6cm berwarna M2 100,000.00
30 Plywood tebal 4 mm Lbr 75,000.00
31 Semen Portlan @ 40 Kg/zak Zak 65,000.00
32 Semen Portland Kg 1,625.00
33 Semen Warna @ 50 Kg/Zak Zak 150,000.00
34 Semen Warna Kg 3,000.00
35 Lem Kayu Kg 25,000.00
36 Keramik Uk.40/40 Dus 95,000.00
37 Keramik Uk.40/40 Buah 15,833.33
BACKUP KUANTITAS
1 2 3 4 5
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan 1.00 Ls
II PEKERJAAN TANAH
Galian Tanah Pondasi P L T 20.55 m3
68.50 0.50 0.60
Urugan Tanah Kembali 6.85 m3
PEKERJAAN PONDASI
Urugan Pasir Dibawah Pondasi P L T 1.71 m3
68.50 0.50 0.05
Pondasi Tapak uk.50x50 cm
a. Beton Cor P L T Unit 0.68 m3
Tapak 0.50 0.50 0.15 13.00 0.49
Stik 0.15 0.15 0.65 13.00 0.19
b. Besi Utama Ø 10 mm 83.23 Kg
Tapak 4.00 4.00 83.23 Kg
8.00 0.62 12.00 59.18 Kg
Stik 3.25 0.62 12.00 24.04 Kg
c. Begel Ø 6 mm 0.60 4.33 0.22 12.00 6.92 Kg
d. Bekisting 0.15 0.65 4.00 12.00 4.68 M2
Pondasi Menerus 68.50 0.35 0.50 11.99 m3
PEKERJAAN BETON
Sloof uk. 15x20 cm
a. Beton Cor P L T 1.88 m3
62.60 0.15 0.20
b. Besi Utama Ø 10 mm 313.00 0.62 192.96 Kg
c. Begel Ø 6 mm 417.33 0.70 0.22 64.84 Kg
d. Bekisting 68.50 0.20 2.00 10.96 m2
Plat Tangga
a. Beton Cor P L T 0.62 m3
NO URAIAN KEGIATAN PERHITUNGAN VOLUME VOLUME KET.
1 2 3 4 5
5.70 0.90 0.12
b. Besi Utama Ø 10 mm 47.50 7.50 -
42.75 42.75 0.62 131.78 Kg
d. Bekisting 5.70 0.90 5.13 m2
PEKERJAAN PASANGAN
Pasangan Dinding Bata Lantai I 56.60 3.50 198.10 156.69 m2
P1 2.93
P2 8.10
P3 4.20
P4 5.18
J1 5.23
J2 12.61
J3 3.18 41.41 -
156.69
PEKERJAAN LANTAI
Urugan Tanah Dibawah Lantai 15.43 m3
Urugan Pasir Dibawah Lantai 3.09 m3
Lantai Tumbuk 61.70 4.32 m3
Lantai Granite 60 x 60 cm Lantai I 61.70 m2
Lantai Granite 60 x 60 cm Lantai II 40.00 m2
Lantai Keramik 25 x 40 (KM/WC) Lantai I 8.50 m2
Lantai Keramik 25 x 40 (KM/WC) Lantai II 2.20 m2
Lantai Keramik 25 x 40 (Carport) 23.20 m2
PEKERJAAN ELEKTRIKAL
Lampu Downlight Plafond 23 Watt Lantai I 28.00 Bh
Saklar Ganda 4.00 Bh
Saklar Tunngal 2.00 Bh
Stop Kontak 8.00 Bh
Box Zekering 1.00 Bh
Lampu Strip Plafond 75.00 m'
Intalasi Titik Menyala 118.00 Titik
Peyambungan Arus 6 Amperre 1.00 Ls
PEKERJAAN SANITASI
Intaslasi Air Bersih Pipa PVC 3/4" 1.00 Ls
NO URAIAN KEGIATAN PERHITUNGAN VOLUME VOLUME KET.
1 2 3 4 5
Pengadaan Mesin Pompa Air 1.00 Bh
Pemasangan Kloset Duduk 2.00 Bh
Pemasangan Kloset Jongkok 1.00 Bh
Pemasangan Kran Air 4.00 Bh
Floor Drain 5.00 Bh
Bak Fiber 3.00 Bh
Pembuatan Septictank + Resapan 1.00 Ls
Pembuatan Resapan Limbah Cair 1.00 Ls
Pipa PVC 4" Limbah Padat dan Cair 20.00 m'
PEKERJAAN PENGECATAN
Pengecatan Bidang Tembok (Cat Jotun) Lantai I 313.38 m2
Pengecatan Bidang Tembok (Cat Jotun) Lantai II 140.00 m2
Pengecatan Bidang Kayu 1.00 Ls
-
= -
= 17.52 m2
3 Dinding Pemisah Playwood Rangka Kayu Klas II Panjang x Lebar x Sisi 69.30 m2
10.50 x 3.30 x 2.00 = 69.30 - = 69.30
1 2 3 4 5
V PEKERJAAN ELEKTRIKAL
1 Lampu LED 23 Watt 22.00 Bh
2 Saklar Tunggal 3.00 Bh
Saklar Ganda 3.00 Bh
3 Stop Kontak 4.00 Bh
4 Intaslasi Titik Menyala + Kabel 32.00 Titik
34,000,000.00
25,000,000.00
65,000,000.00
124,000,000.00