19
bidang persamaan
reference level
15.00
18.846
18.846
16.905
18.846
18.846
18.554
18.403
18.352
18.352
17.644
ELEVASI DESAIN
DESIGN LEVEL
18.145
18.113
17.317
17.320
18.159
18.249
17.776
17.665
17.651
17.642
17.645
17.647
17.653
17.648
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.20
0.20
1.80 1.50 2.00 1.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
DISTANCE (m)
1+725
19
bidang persamaan
reference level
15.00
18.836
18.836
16.895
18.836
18.836
18.544
18.393
18.342
18.342
17.497
ELEVASI DESAIN
DESIGN LEVEL
18.113
18.088
17.253
17.266
18.105
18.145
17.672
17.605
17.538
17.496
17.480
17.471
17.466
17.453
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.20
0.20
1.50 1.50 3.00 1.00 4.00 5.00 5.00 5.00 5.00 5.00 5.00
DISTANCE (m)
KABUPATEN :
LEMBAR PENGESAHAN PROVINSI :
PPK IRIGASI & RAWA I KONSULTAN SUPERVISI PT. INDO TEKNIK PEMBANGUNAN :
DIGAMBAR : Muh. Fadly NO REGISTER
PT. INDOTEKNIK PEMBANGUNAN DIPERIKSA : Jaya Radja Purba NO. LEMBAR :
DISETUJUI : Marianus Bagung TANGGAL NO. KONTRAK
STRUCTURE ENGINEER : Ir. Muhammad Sigit Husein 11-11-2020 HK.02.03/PPK-IRG.I/SNVT-PJPAC/11/2020
DIPERIKSA
DIREKSI PEKERJAAN : Yulianto, A.Md