Anda di halaman 1dari 1

B4

33
30
+28.00
MAB +27.00
+26.50 MAN +26.60
25
bidang persamaan
reference level
20.00
27.689

30.378

28.367

27.689

25.368

24.789

23.192

22.975

23.643

24.953

25.879

27.878

29.534

31.695

32.378
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
4.34 8.96 4.99 15.74 5.79 15.86 14.16 30.89 11.59 4.77 8.43 8.43 11.38 4.31
DISTANCE (m)
B5
33
30
+28.00
MAB +27.00
+26.50 MAN +26.60
25
bidang persamaan
reference level
20.00
28.684

29.432

25.152

23.097

22.683

21.784

22.543

24.854

25.732

28.509

29.812

30.537

31.476
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
9.47 10.86 4.57 16.57 35.18 7.46 16.52 9.43 22.27 8.25 5.53 5.90
DISTANCE (m)
B6
33
30
+28.00
MAB +27.00
+26.50 MAN +26.60
25
bidang persamaan
reference level
20.00
29.764

28.179

26.321

24.487

23.438

22.623

21.592

21.733

22.693

25.643

26.689

29.838

31.783
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
12.70 5.71 12.96 7.43 14.46 27.05 25.03 5.63 19.41 7.68 16.57 12.56
DISTANCE (m)
PROPINSI : KALIMANTAN TIMUR
C:\ Users\ LENO VO \Deskt op\2.jpg
PEKERJAAN :
PERENCANAAN FS DAN DED
PEMBANGUNAN EMBUNG DESA BUKIT BIRU
20m BAGIAN GAMBAR : KECAMATAN TENGGARONG
0 2 4 10
SKALA V = 1 : 200
PETA TOPOGRAFI KECAMATAN :: TENGGARONG
0 2 4 10 20m KABUPATEN :: KUTAI KERTANEGARA
SKALA H = 1 : 200
KETUA TEAM Ir. Iwan Gunawanudin NO REGISTRASI :
NO REV TGL YANG DIREV OLEH DIRENC. DISETUJUI
PERENCANA Ir. Budi Wahyono NO. GBR/LBR :
DISETUJUI PPK Muhammad Firdaus, ST. ,MM.
NOMOR SPK
PPTK Syarifah Rositah, ST. 610/SPK.601/170/DPU-SDA/08/2019
DIPERIKSA TANGGAL 02 AGUSTUS 2019
PENGAWAS

Anda mungkin juga menyukai