33
30
+28.00
MAB +27.00
+26.50 MAN +26.60
25
bidang persamaan
reference level
20.00
27.689
30.378
28.367
27.689
25.368
24.789
23.192
22.975
23.643
24.953
25.879
27.878
29.534
31.695
32.378
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
4.34 8.96 4.99 15.74 5.79 15.86 14.16 30.89 11.59 4.77 8.43 8.43 11.38 4.31
DISTANCE (m)
B5
33
30
+28.00
MAB +27.00
+26.50 MAN +26.60
25
bidang persamaan
reference level
20.00
28.684
29.432
25.152
23.097
22.683
21.784
22.543
24.854
25.732
28.509
29.812
30.537
31.476
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
9.47 10.86 4.57 16.57 35.18 7.46 16.52 9.43 22.27 8.25 5.53 5.90
DISTANCE (m)
B6
33
30
+28.00
MAB +27.00
+26.50 MAN +26.60
25
bidang persamaan
reference level
20.00
29.764
28.179
26.321
24.487
23.438
22.623
21.592
21.733
22.693
25.643
26.689
29.838
31.783
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
12.70 5.71 12.96 7.43 14.46 27.05 25.03 5.63 19.41 7.68 16.57 12.56
DISTANCE (m)
PROPINSI : KALIMANTAN TIMUR
C:\ Users\ LENO VO \Deskt op\2.jpg
PEKERJAAN :
PERENCANAAN FS DAN DED
PEMBANGUNAN EMBUNG DESA BUKIT BIRU
20m BAGIAN GAMBAR : KECAMATAN TENGGARONG
0 2 4 10
SKALA V = 1 : 200
PETA TOPOGRAFI KECAMATAN :: TENGGARONG
0 2 4 10 20m KABUPATEN :: KUTAI KERTANEGARA
SKALA H = 1 : 200
KETUA TEAM Ir. Iwan Gunawanudin NO REGISTRASI :
NO REV TGL YANG DIREV OLEH DIRENC. DISETUJUI
PERENCANA Ir. Budi Wahyono NO. GBR/LBR :
DISETUJUI PPK Muhammad Firdaus, ST. ,MM.
NOMOR SPK
PPTK Syarifah Rositah, ST. 610/SPK.601/170/DPU-SDA/08/2019
DIPERIKSA TANGGAL 02 AGUSTUS 2019
PENGAWAS