TABEL UPAH PEMASANGAN PIPA

I PIPA PVC
NO. UKURAN SATUAN HARGA
1 4" /m = Rp 27,000.00
2 3" /m = Rp 27,000.00
3 2.5 " /m = Rp 25,000.00
4 2" /m = Rp 25,000.00
5 1½ " /m = Rp 20,000.00
6 1¼" /m = Rp 20,000.00
7 1" /m = Rp 17,000.00
8 ¾" /m = Rp 17,000.00
9 ½" /m = Rp 17,000.00

II AIR PANAS
NO. JENIS PIPA UKURAN SATUAN HARGA
1 PPR ½ s.d ¾ /m = Rp 20,000.00
2 PPR 1 s.d 1½ /m = Rp 25,000.00
3 PAPS ½ s.d ¾ /m = Rp 20,000.00
4 ERA ½ s.d ¾ /m = Rp 20,000.00
5 WESPEX ½ s.d ¾ /m = Rp 20,000.00
*termasuk galian/bobokan dan plester ulang

III PEMASANGAN SANITARY


NO. JENIS PEMASANGAN SATUAN HARGA
1 CLOSET DUDUK bh = Rp 250,000.00
2 CLOSET JONGKOK bh = Rp 150,000.00
3 WASTAFEL MEJA bh = Rp 250,000.00
4 WASTAFEL DINDING bh = Rp 250,000.00
5 BATHTUBE bh = Rp 600,000.00
6 BIDED bh = Rp 250,000.00
7 URINOIR bh = Rp 250,000.00
8 WATER HEATER 15 L s.d 30 L bh = Rp 300,000.00

Denpasar, 2014

Misdi
PEKERJAAN SUMUR DAN PIPA
Jln. Hayam Wuruk XVI Remaja No. 15 Denpasar - Bali, telp. 0818550891

INVOICE

Denpasar,
Kepada Yt :

Hal :

TANGGAL NO JENIS PEKERJAAN HARGA JUMLAH

TOTAL

Yang Menerima, Hormat kami,

(_______________________) ( Pak Misdi )


(_______________________) ( Pak Misdi )
PEKERJAAN SUMUR DAN PIPA
Jln. Hayam Wuruk XVI Remaja No. 15 Denpasar - Bali, telp. 0818550891

INVOICE

Denpasar,
Kepada Yth:

Hal : BROSUR HARGA POMPA SUBMERSIBLE

TANGGAL NO JENIS PEKERJAAN HARGA (Rp) JUMLAH (Rp)


Harga Pompa Submersible
1 GRUNDFOS 1,5 PK - ###
2 PEDROLLO 1,5 PK - ###
3 FRANKLIN 1,5 PK - ###
4 DAB 1,5 PK - 8,000,000.00
5 SHIMIZU 1,5 PK - 5,750,000.00
6 SHIMIZU ¾ PK R. - 4,500,000.00
7 SHIMIZU ¾ PK G. - 5,000,000.00
8 NASIONAL ¾ PK R. - 3,200,000.00

TOTAL

Yang Menerima, Hormat kami,

(_______________________) ( Pak Misdi )


PEKERJAAN SUMUR DAN PIPA
Jln. Hayam Wuruk XVI Remaja No. 15 Denpasar - Bali, telp. 0818550891

INVOICE

Denpasar,
Kepada Yth: Dirut Rumah Sakit Permata Hati Klungkung

Hal :

TANGGAL NO JENIS PEKERJAAN HARGA (Rp) JUMLAH (Rp)

1. Borongan sumur bor sampai air


- ###
mampu dengan ukuran pipa 4' s/d 5'

2. Aksesoris
1 Kabel Pompa 75 m 25,000.00 1,875,000.00
2 Kabel Otomatis Sensor Bawah 75 m 13,000.00 975,000.00
3 Sensor Otomatis - 600,000.00
4 Kabel Otomatis Tower+Radar TASIN - 700,000.00
5 Jasa Pasang Tukang 2,500,000.00

TOTAL ###

Yang Menerima, Hormat kami,

(_______________________) ( Pak Misdi )


PEKERJAAN SUMUR DAN PIPA
Jln. Hayam Wuruk XVI Remaja No. 15 Denpasar - Bali, telp. 0818550891

INVOICE

Denpasar,
Kepada Yth:

Hal :

TANGGAL NO JENIS PEKERJAAN HARGA (Rp)JUMLAH (Rp)

1. Pembuatan Pen Cup (Closet duduk) 300,000.00 300,000.00

2. Pembuatan Resapan air hujan


terpasang buis beton 25"/ 100cm
kedalaman 1,50m
a Buis beton dia. 100m x 3bh 250,000.00 750,000.00
b Tutup buis beton dia. 100cm x 1bh 200,000.00 200,000.00
c Upah tenaga (gali + pasang + buang ke ### ###
aman / belakang)

TOTAL ###

Yang Menerima, Hormat kami,

(_______________________) ( Pak Misdi )


LAH (Rp)

)
PEKERJAAN SUMUR DAN PIPA
Jln. Hayam Wuruk XVI Remaja No. 15 Denpasar - Bali, telp. 0818550891

Denpasar, 28 Agustus 2018


Kepada Yth: Ubud Barong

Hal : Penawaran

TANGGAL NO JENIS PEKERJAAN HARGA (Rp)JUMLAH (Rp)

I Kamar Mandi Atas


1 Pindah Wastafel 700,000.00
2 Pindah Closet 700,000.00
3 Pindah Bathtube + Kran ###
4 Pasang Shower Head ###
5 Pasang Floor Drain (2 bh) 200,000.00
6 Pasang Push up Floor Drain (2 bh) 200,000.00
7 Ganti Kran Wastafel + Sipon 700,000.00
8 Pasang Vetrap 375,000.00
9 Plumbing
a PPR air panas
¾ × ½ (24m) 70,000.00 ###
b PPR air dingin
¾ × ½ (26m) 70,000.00 ###
Valve ¾ (2bh) 300,000.00
Valve ½ (2bh) 250,000.00
c Valve PVC 1½ (1bh) 250,000.00
d PVC 3" × 8m 100,000.00 800,000.00
PVC 2" × 4m 800,000.00 ###
PVC 4" × 4m 125,000.00 500,000.00
Super Cement (2bh) 60,000.00 120,000.00
Glasswool (15m) 100,000.00 ###

TOTAL ###

Yang Menerima, Hormat kami,

(_______________________) ( Pak Misdi )


PEKERJAAN SUMUR DAN PIPA
Jln. Hayam Wuruk XVI Remaja No. 15 Denpasar - Bali, telp. 0818550891

Denpasar, 28 Agustus 2018


Kepada Yth: Ubud Barong

Hal : Penawaran

TANGGAL NO JENIS PEKERJAAN HARGA (Rp)JUMLAH (Rp)

II Kamar Mandi Bawah


1 Pindah / Bongkar pasang
Closet duduk (1bh) 700,000.00
Wastafel (1bh) 700,000.00
Bathtube + kran (1bh) 200,000.00
Pasang Shower Head ###
Pasang Floor Drain (2bh) 100,000.00 200,000.00
Push up Floor drain (2bh) 100,000.00 200,000.00
Votrap 3" (2bh) 125,000.00 250,000.00
2 PPR ¾ × ½ (24m) 70,000.00 ###
PPR ¾ × ½ (25m) 70,000.00 ###
3 PVC 3" 8m 100,000.00 800,000.00
PVC 2" 4m 80,000.00 320,000.00
4 Valve ¾ (2bh) 150,000.00 300,000.00
Valve ½ (2bh) 125,000.00 250,000.00
Valve 1½ (1bh) 250,000.00 250,000.00

TOTAL ###