PERINCIAN

ANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIK
BESERTA BAHAN SAKLAR NATIONAL KREM
DI RUMAH PAK D. JUHARI DI PERUM LESTARI

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI LAMPU TL 69 TITIK RP. 95,000 RP. 6,555,000
2 INSTALASI LAMPU HALOGEN 16 TITIK RP. 95,000 RP. 1,520,000
3 INSTALASI LAMPU DOLET 95 TITIK RP. 95,000 RP. 9,025,000
4 INSTALASI LAMPU GANTUNG 2 TITIK RP. 150,000 RP. 300,000
5 INSTALASI LAMPU KACA WASTAFEL 4 TITIK RP. 95,000 RP. 380,000
6 INSTALASI LAMPU DINDING 7 TITIK RP. 150,000 RP. 1,050,000
7 INSTALASI LAMPU KITC. SET 7 TITIK RP. 95,000 RP. 665,000
8 INSTALASI LAMPU PEN 6 TITIK RP. 150,000 RP. 900,000
9 STOP KONTAK LILSTRIK 45 TITIK RP. 95,000 RP. 4,275,000
10 STOP KONTAK TV UHF 8 TITIK RP. 225,000 RP. 1,800,000
11 STOP KONTAK TELEPON 6 TITIK RP. 225,000 RP. 1,350,000
12 KABEL PARABOLA UHF 6 TITIK RP. 225,000 RP. 1,350,000
13 KABEL STOP KONTAK AC 6 TITIK RP. 375,000 RP. 2,250,000
14 KABEL WARHITR 2 TITIK RP. 375,000 RP. 750,000
15 KABEL INDUK 4x6 85 METER RP. 45,000 RP. 3,825,000
16 PASANG WARHITR 2 SET RP. 250,000 RP. 500,000
17 BOX SENTRAL TELEPON 1 SET RP. 350,000 RP. 350,000
18 BOX PANEL LISTRIK 2 SET RP. 1,500,000 RP. 3,000,000
19 OHM SAKLAR LISTRIK 1 SET RP. 1,500,000 RP. 1,500,000
20 ARDE INSTALASI 1 SET RP. 1,500,000 RP. 1,500,000
21 MASA BUMI HPR 1 SET RP. 1,500,000 RP. 1,500,000

JUMLAH TOTAL RP. 44,345,000


JUMLAH PINJAMAN RP. 30,000,000
JUMLAH SISA RP. 14,345,000
JAMBI, 8 SEPTEMBER 2005
HORMAT KAMI,

SUGIYONO
PERINCIAN
ANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIK
BESERTA BAHAN SAKLAR GLIFSAL PUTIH
DI KANTOR PAK DJUNAID DI KANTOR JELUTUNG

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 PASANG SAKLAR 18 TITIK RP. 65,000 RP. 1,170,000
2 PASANG STOP KONTAK 15 TITIK RP. 65,000 RP. 975,000
3 INSTALASI TAMBAH KABEL PLAFON 24 TITIK RP. 30,000 RP. 720,000
4 INSTALASI LAMPU 4 TITIK RP. 95,000 RP. 380,000
5 INSTALASI STOP KONTAK 2 TITIK RP. 95,000 RP. 190,000
6 INSTALASI KABEL AC 5 TITIK RP. 375,000 RP. 1,875,000
7 INSTALASI PIPA AIR AC 5 TITIK RP. 200,000 RP. 1,000,000
8 INSTALASI KABEL INDUK 4X6 50 METER RP. 50,000 RP. 2,500,000
9 INSTALASI PANEL BOX INDUK 30X40 3 SET RP. 1,500,000 RP. 4,500,000

JUMLAH TOTAL RP. 13,310,000

JAMBI, 27 SEPTEMBER 2005


HORMAT KAMI, DISETUJUI OLEH

SUGIYONO PAK DJUNAID


PERINCIAN
ANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIK
BESERTA BAHAN SAKLAR NATIONAL KREM
DI RUMAH PAK AYONG DI MURNI

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI LAMPU 44 TITIK RP. 95,000 RP. 4,180,000
2 INSTALASI STOP KONTAK 19 TITIK RP. 95,000 RP. 1,805,000
3 INSTALASI KABEL AC 3 TITIK RP. 350,000 RP. 1,050,000
4 INSTALASI KABEL PARABOLA 3 TITIK RP. 225,000 RP. 675,000
5 INSTALASI KABEL GENSET 3X6 28 METER RP. 40,000 RP. 1,120,000
6 INSTALASI KABEL INDUK 3X6 25 TITIK RP. 40,000 RP. 1,000,000
7 INSTALASI SAKLAR GENSET 1 SET RP. 1,000,000 RP. 1,000,000
8 PASANG BOX PANEL INDUK 1 SET RP. 1,000,000 RP. 1,000,000
9 PASANG BOX MCB 1 SET RP. 750,000 RP. 750,000
10 INSTALASI GROUND 1 SET RP. 750,000 RP. 750,000
11 INSTALASI KABEL TELEPON 2 TITIK RP. 225,000 RP. 450,000

JUMLAH TOTAL RP. 13,780,000

JAMBI, 11 OKTOBER 2005


HORMAT KAMI, DISETUJUI OLEH

SUGIYONO PAK AYONG


PERINCIAN
ANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIK
BESERTA BAHAN SAKLAR GLIFSAL PUTIH
DI KANTOR PAK DJUNAID DI KANTOR JELUTUNG

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 PASANG SAKLAR 18 TITIK RP. 65,000 RP. 1,170,000
2 PASANG STOP KONTAK 15 TITIK RP. 65,000 RP. 975,000
3 INSTALASI TAMBAH KABEL PLAFON 24 TITIK RP. 30,000 RP. 720,000
4 INSTALASI LAMPU TAMBAH BARU 39 TITIK RP. 95,000 RP. 3,705,000
5 INSTALASI STOP KONTAK TAMBAH BARU 13 TITIK RP. 95,000 RP. 1,235,000
6 INSTALASI KABEL AC 4 TITIK RP. 375,000 RP. 1,500,000
7 INSTALASI PIPA AIR AC 4 TITIK RP. 200,000 RP. 800,000
8 INSTALASI PIPA SELANG AC 2 TITIK RP. 200,000 RP. 400,000
9 INSTALASI KABEL INDUK 4X6 50 METER RP. 50,000 RP. 2,500,000
10 INSTALASI PANEL BOX INDUK 30X40 3 SET RP. 1,500,000 RP. 4,500,000
11 INSTALASI PANEL ARDE 12 M 1 SET RP. 1,500,000 RP. 1,500,000
12 INSTALASI HPR MASSA BUMI 25 M 1 SET RP. 2,000,000 RP. 2,000,000
13 INSTALASI KABEL INDUK TELEPON 3 TITIK RP. 225,000 RP. 675,000
14 INSTALASI BOX INDUK TELEPON 1 SET RP. 225,000 RP. 225,000
15 INSTALASI KABEL TELEPON 6 TITIK RP. 225,000 RP. 1,350,000
16 INSTALASI KABEL AIPON 4 TITIK RP. 225,000 RP. 900,000
17 INSTALASI KABEL PARABOLA UHF 2 TITIK RP. 250,000 RP. 500,000
18 INSTALASI KABEL TV PARABOLA 2 TITIK RP. 250,000 RP. 500,000
19 INSTALASI KABEL TV UHF 2 TITIK RP. 250,000 RP. 500,000
20 INSTALASI OM SAKLAR GENSET 1 SET RP. 1,500,000 RP. 1,500,000
21 INSTALASI KABEL GENSET 25 METER RP. 50,000 RP. 1,250,000

JUMLAH TOTAL RP. 28,405,000


JAMBI, 25 NOVEMBER 2005
HORMAT KAMI, DISETUJUI OLEH

SUGIYONO PAK DJUNAID


PERINCIAN
ANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIK
BESERTA BAHAN SAKLAR GLIFSAL PUTIH
DI KANTOR PAK DJUNAID DI KANTOR JELUTUNG

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI LAMPU TAMBAH BARU 34 TITIK RP. 95,000 RP. 3,230,000
2 INSTALASI STOP KONTAK TAMBAH BARU 11 TITIK RP. 95,000 RP. 1,045,000
3 INSTALASI PIPA SELANG AC 2 TITIK RP. 200,000 RP. 400,000
4 INSTALASI PANEL ARDE 12 M 1 SET RP. 1,500,000 RP. 1,500,000
5 INSTALASI HPR MASSA BUMI 25 M 1 SET RP. 2,000,000 RP. 2,000,000
6 INSTALASI KABEL INDUK TELEPON 3 TITIK RP. 225,000 RP. 675,000
7 INSTALASI BOX INDUK TELEPON 1 SET RP. 225,000 RP. 225,000
8 INSTALASI KABEL TELEPON 6 TITIK RP. 225,000 RP. 1,350,000
9 INSTALASI KABEL AIPON 4 TITIK RP. 225,000 RP. 900,000
10 INSTALASI KABEL PARABOLA UHF 2 TITIK RP. 250,000 RP. 500,000
11 INSTALASI KABEL TV PARABOLA 2 TITIK RP. 250,000 RP. 500,000
12 INSTALASI KABEL TV UHF 2 TITIK RP. 250,000 RP. 500,000
13 INSTALASI OM SAKLAR GENSET 1 SET RP. 1,500,000 RP. 1,500,000
14 INSTALASI KABEL GENSET 25 METER RP. 50,000 RP. 1,250,000

JUMLAH TOTAL RP. 15,575,000

JAMBI, 26 NOVEMBER 2005


HORMAT KAMI, DISETUJUI OLEH

SUGIYONO PAK DJUNAID


PERINCIAN
ANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIK
BESERTA BAHAN SAKLAR GLIFSAL PUTIH
DI KANTOR PAK DJUNAID DI KANTOR JELUTUNG

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 PASANG SAKLAR 18 TITIK RP. 65,000 RP. 1,170,000
2 PASANG STOP KONTAK 15 TITIK RP. 65,000 RP. 975,000
3 INSTALASI TAMBAH KABEL PLAFON 24 TITIK RP. 30,000 RP. 720,000
4 INSTALASI LAMPU 4 TITIK RP. 95,000 RP. 380,000
5 INSTALASI STOP KONTAK 2 TITIK RP. 95,000 RP. 190,000
6 INSTALASI KABEL AC 4 TITIK RP. 375,000 RP. 1,500,000
7 INSTALASI PIPA AIR AC 4 TITIK RP. 200,000 RP. 800,000
8 INSTALASI KABEL INDUK 4X6 50 METER RP. 50,000 RP. 2,500,000
9 INSTALASI PANEL BOX INDUK 30X40 3 SET RP. 1,500,000 RP. 4,500,000
JUMLAH A RP. 12,735,000
1 INSTALASI LAMPU TAMBAH BARU 34 TITIK RP. 95,000 RP. 3,230,000
2 INSTALASI STOP KONTAK TAMBAH BAR 12 TITIK RP. 95,000 RP. 1,140,000
3 INSTALASI PIPA AIR AC 2 TITIK RP. 200,000 RP. 400,000
4 INSTALASI KABEL AC 2 TITIK RP. 375,000 RP. 750,000
5 INSTALASI PIPA SELANG AC 2 TITIK RP. 200,000 RP. 400,000
6 INSTALASI PANEL ARDE 12 M 1 SET RP. 1,250,000 RP. 1,250,000
7 INSTALASI HPR MASSA BUMI 25 M 1 SET RP. 1,500,000 RP. 1,500,000
8 INSTALASI KABEL INDUK TELEPON 3 TITIK RP. 175,000 RP. 525,000
9 INSTALASI BOX INDUK TELEPON 1 SET RP. 175,000 RP. 175,000
10 INSTALASI KABEL TELEPON 6 TITIK RP. 175,000 RP. 1,050,000
11 INSTALASI KABEL AIPON 4 TITIK RP. 175,000 RP. 700,000
12 INSTALASI KABEL PARABOLA UHF 2 TITIK RP. 175,000 RP. 350,000
13 INSTALASI KABEL TV PARABOLA 2 TITIK RP. 175,000 RP. 350,000
14 INSTALASI KABEL TV UHF 2 TITIK RP. 175,000 RP. 350,000
15 INSTALASI OM SAKLAR GENSET 1 SET RP. 1,250,000 RP. 1,250,000
16 INSTALASI KABEL GENSET 20 METER RP. 50,000 RP. 1,000,000
JUMLAH B RP. 14,420,000
TOTAL A + B RP. 27,155,000
PINJAMAN RP. 14,000,000
SISA RP. 13,155,000

JAMBI, 3 JANUARI 2006


HORMAT KAMI, DISETUJUI OLEH

SUGIYONO PAK DJUNAID


PERINCIAN ANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIK
BESERTA BAHAN SAKLAR VYBA PUTIH
DENGAN KABEL STANDAR PARABA 2,5/1,5 BIASA
PITING PLAFON STANDAR VYBA SEGIEMPAT
DI PERUMAHAN PT. NUSA UNGGUL ABADI

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA


1 INSTALASI LAMPU @ TITIK RP. 50,000
2 INSTALASI STOP KONTAK @ TITIK RP. 50,000
3 INSTALASI BOX MCB @ TITIK RP. 50,000
4 INSTALASI GROUND KWH @ TITIK RP. 50,000

DEMIKIANLAH PERINCIAN PEKERJAAN PEMASANGAN (INSTALASI)


LISTRIK. KAMI MOHON UNTUK DIPERTIMBANGKAN OLEH
BAPAK PIMPINAN PT. NUSA UNGGUL ABADI.

SEBELUM DAN SESUDAHNYA KAMI UCAPKAN TERIMA KASIH

JAMBI, 4 JANUARI 2006


HORMAT KAMI,

SUGIYONO
PERINCIAN
ANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIK
JAS KERJA DI RUMAH BARU IBU XXXXXXX

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 PASANG LAMPU 37 TITIK RP. 25,000 RP. 925,000
2 PASANG STOP KONTAK 20 TITIK RP. 25,000 RP. 500,000
3 INSTALASI STOP KONTAK TV 2 TITIK RP. 75,000 RP. 150,000
4 INSTALASI STOP KONTAK TELEPON 2 TITIK RP. 25,000 RP. 50,000
5 INSTALASI BOX MCB 1 TITIK RP. 150,000 RP. 150,000
6 INSTALASI LAMPU TAMAN 2 TITIK RP. 75,000 RP. 150,000
7 INSTALASI PINDAH KWH 1 TITIK RP. 150,000 RP. 150,000
8 INSTALASI PASANG ARDE 1 METER RP. 150,000 RP. 150,000
9 INSTALASI PASANG KABEL IB 12 SET RP. 10,000 120,000
10 PEKERJAAN BOR LAMPU DONLET 20 METER RP. 10,000 200,000
JUMLAH RP. 2,545,000
PINJAMAN RP. 1,000,000
SISA RP. 1,545,000

JAMBI, 1 MARET 2006


HORMAT KAMI, DISETUJUI OLEH

SUGIYONO
PERINCIAN
ANGGARAN BIAYA
PERBAIKAN DAN PENGGANTIAN TRAFO DAN LAMPU
DI KANTOR PELAYANAN PAJAK

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 GANTI LAMPU TL 40 WATT 36 BUAH RP. 15,000 RP. 540,000
2 GANTI TRAFO 40 WATT 25 BUAH RP. 25,000 RP. 625,000
3 GANTI STARTER 40 WATT 40 BUAH RP. 3,500 RP. 140,000
4 GANTI MCB 16A 1 BUAH RP. 60,000 RP. 60,000
5 GANTI SAKLAR SERI 1 BUAH RP. 20,000 RP. 20,000
6 JASA PERBAIKAN LANTAI I 40 TITIK RP. 20,000 RP. 800,000
JUMLAH UNTUK RUANGAN LANTAI I RP. 2,185,000
7 GANTI LAMPU TL 20 WATT 25 BUAH RP. 12,500 RP. 312,500
8 GANTI TRAFO 20 WATT 15 BUAH RP. 25,000 RP. 375,000
9 GANTI STARTER 20 WATT 30 BUAH RP. 3,500 RP. 105,000
10 GANTI MCB AC 10A 1 BUAH RP. 60,000 RP. 60,000
11 GANTI SAKLAR ENGKEL 1 BUAH RP. 20,000 RP. 20,000
12 GANTI LAMPU TL 2 X 40 WATT 1 SET RP. 185,000 RP. 185,000
13 JASA PERBAIKAN LANTAI II 30 TITIK RP. 20,000 RP. 600,000
JUMLAH UNTUK RUANGAN LANTAI II RP. 1,657,500
TOTAL PEKERJAAN LANTAI I DAN II RP. 3,842,500

JAMBI, 27 MARET 2006


HORMAT KAMI, DISETUJUI OLEH

SUGIYONO SIHOMBING
PERINCIAN
ANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIK
DI KANTOR JELUTUNG

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI DONLET 24 TITIK RP. 35,000 RP. 840,000
2 INSTALASI LAMPU TL RM 9 TITIK RP. 35,000 RP. 315,000
3 INSTALASI LAMPU HALOGEN 2 TITIK RP. 35,000 RP. 70,000
4 INSTALASI LAMPU MERK 2 TITIK RP. 100,000 RP. 200,000
5 INSTALASI STOP KONTAK 14 TITIK RP. 35,000 RP. 490,000
6 INSTALASI KIPAS ANGIN 1 TITIK RP. 125,000 RP. 125,000
7 INSTALASI KABEL AC 3 TITIK RP. 125,000 RP. 375,000
8 INSTALASI PIPA SELONGSONG AC 2 TITIK RP. 50,000 RP. 100,000
9 INSTALASI PIPA AIR AC 3 TITIK RP. 50,000 RP. 150,000
10 INSTALASI KABEL INDUK 62 METER RP. 10,000 RP. 620,000
11 INSTALASI BOX PANEL MCB 1 SET RP. 250,000 RP. 250,000
12 INSTALASI TASOPEN 1 TITIK RP. 50,000 RP. 50,000
13 INSTALASI ARDEK/HPR 1 SET RP. 2,250,000 RP. 2,250,000
TOTAL BIAYA INSTALASI RP. 5,835,000

JAMBI, 17 APRIL 2006


HORMAT KAMI,

SUGIYONO
PERINCIAN
ANGGARAN BIAYA
PEMASANGAN DAN INSTALASI LISTRIK
DI KANTOR PAK AKAK

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI LAMPPUU TLRM 3 TITIK RP. 35,000 RP. 105,000
2 INSTALASI LAMPPU DONLET 4 TITIK RP. 35,000 RP. 140,000
3 INSTALASI STOP KONTAK 4 TITIK RP. 35,000 RP. 140,000
4 INSTALASI BOX PANEL MCB 2 TITIK RP. 250,000 RP. 500,000
5 INSTALASI KABEL AC 1 TITIK RP. 125,000 125,000
6 INSTALASI KABEL INDUK 10 METER RP. 10,000 RP. 100,000
TOTAL BIAYA INSTALASI RP. 1,110,000

JAMBI, 2 MEI 2006


HORMAT KAMI,

SUGIYONO

PERINCIAN
ANGGARAN BIAYA
PERBAIKAN DAN PENGGANTIAN MCB
DI RUMAH PAK CIPTO, JL. LINGKAR SELATAN, JAMBI

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI MCB CLIPSAL 14 BUAH RP. 50,000 RP. 700,000
2 INSTALASI SELEP MCB 2 BUAH RP. 25,000 RP. 50,000
3 JASA KERJA 2 SET RP. 150,000 RP. 300,000
TOTAL BIAYA INSTALASI RP. 1,050,000

JAMBI, 2 MEI 2006


HORMAT KAMI,

SUGIYONO
PERINCIAN
ANGGARAN BIAYA
PERBAIKAN DAN PENGGANTIAN TRAFO DAN LAMPU
DI HALAMAN KANTOR PELAYANAN PAJAK

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 GANTI LAMPU TL 40 WATT 14 BUAH RP. 17,500 RP.
2 GANTI TRAFO 40 WATT 14 BUAH RP. 27,500 RP.
3 GANTI STARTER 40 WATT 14 BUAH RP. 3,500 RP.
4 GANTI BOX MCB OB 1 BUAH RP. 10,000 RP.
5 GANTI MCB 6 AMPHERE 1 BUAH RP. 65,000 RP.
6 PASANG LAMPU TAMAN 3 SET RP. 150,000 RP.
7 PASANG LAMPU PIJAR 40 WATT 14 BUAH RP. 5,000 RP.
8 PASANG LAMPU TL 20 WATT 14 BUAH RP. 15,000 RP.
9 PASANG TRAFO 20 WATT 14 BUAH RP. 25,000 RP.
10 PASANG STARTER 20 WATT 14 BUAH RP. 3,500 RP.
11 PASANG FITTING PLAFON 20 BUAH RP. 7,500 RP.
12 PASANG LAMPU LIQUID 18 WATT 23 BUAH RP. 22,500 RP.
13 PASANG KABEL LAMPU TAMAN 15 METER RP. 10,000 RP.
14 PASANG SAKLAR KIPAS ANGIN LT. II 1 TITIK RP. 50,000 RP.
15 JASA PERBAIKAN LAMPU 72 TITIK RP. 25,000 RP.
16 JASA PERBAIKAN KIPAS ANGIN 2 TITIK RP. 50,000 RP.
17 JASA PASANG KABEL LAMPU TAMAN 15 TITIK RP. 5,000 RP.
18 JASA PASANG MCB BELBOT/TAMAN 3 TITIK RP. 50,000 RP.
TOTAL PEKERJAAN RP.

JAMBI, 15 MEI 2006


HORMAT KAMI, DISETUJUI OLEH

SUGIYONO SIHOMBING
PERINCIAN
NGGARAN BIAYA
ENGGANTIAN TRAFO DAN LAMPU
KANTOR PELAYANAN PAJAK

TOTAL
245,000
385,000
49,000
10,000
65,000
450,000
70,000
210,000
350,000
49,000
150,000
517,500
150,000
50,000
1,800,000
100,000
75,000
150,000
4,875,500

DISETUJUI OLEH

SIHOMBING
PERINCIAN
ANGGARAN BIAYA
INSTALASI LISTRIK BESERTA BAHAN KABEL DISTRIBUSI
DI KOLAM RENANG KOTA BARU JAMBI

NO JENIS BARANG/INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 MATERIAL KABEL NYY 4 X 120 MM2 353 METER RP. 550,000 RP.
2 PASANG KABEL NYY 4 X 120 MM2 353 METER RP. 100,000 RP.
JUMLAH RP.
KABEL DARI PANEL SDP I/SDP II KE DISTRIBUSI
3 MATERIAL KABEL NYFGBY 4 X 50 MM2 360 METER RP. 275,000 RP.
4 PASANG KABEL NYFGBY 4 X 50 MM2 360 METER RP. 50,000 RP.
JUMLAH RP.
KABEL DARI PANEL PP.KO.LP.T KE DISTRIBUSI
5 MATERIAL KABEL NYFGBY 4 X 10 MM2 60 METER RP. 75,000 RP.
6 PASANG KABEL NYFGBY 4 X 10 MM2 60 METER RP. 25,000 RP.
JUMLAH RP.
KABEL DARI PANEL PP.KRA/LP.F/PP.LI KE DISTRIBUSI
7 MATERIAL KABEL NYFGBY 4 X 6 MM 2 100 METER RP. 60,000 RP.
8 PASANG KABEL NYFGBY 4 X 6 MM 2 100 METER RP. 20,000 RP.
JUMLAH RP.
KABEL DARI PANEL LP.PL2/LP.KRA/PP.KO/LP.PL1/LP-B/PP-ACT/PP-AIR/PP-BEEP/LP-KD/
LP-K/LP-ME/PP-KA KE DISTRIBUSI
9 MATERIAL KABEL NYFGBY 4 X 4 MM 2 531 METER RP. 50,000 RP.
10 JASA KABEL NYFGBY 4 X 4 MM 2 531 METER RP. 20,000 RP.
JUMLAH RP.
PENERANGAN LAMPU LUAR TAMAN NYFGBY
11 INSTALASI KABEL LAMPU TAMAN 1 TITIK RP. 600,000 RP.
12 PASANG LAMPU TAMAN 1 TITIK RP. 300,000 RP.
JUMLAH RP.
TOTAL PEKERJAAN RP.

JAMBI, 29 MEI 2006


HORMAT KAMI, DISETUJUI OLEH
SUGIYONO PAK SUSENO
PIMPINAN PROYEK PT. WI
PERINCIAN
NGGARAN BIAYA
BESERTA BAHAN KABEL DISTRIBUSI
RENANG KOTA BARU JAMBI

TOTAL
194,150,000
35,300,000
229,450,000
RIBUSI
99,000,000
18,000,000
117,000,000
RIBUSI
4,500,000
1,500,000
6,000,000
E DISTRIBUSI
6,000,000
2,000,000
8,000,000
O/LP.PL1/LP-B/PP-ACT/PP-AIR/PP-BEEP/LP-KD/

26,550,000
10,620,000
37,170,000
GBY
600,000
300,000
900,000
392,520,000

DISETUJUI OLEH
PAK SUSENO
PIMPINAN PROYEK PT. WIKA
PERINCIAN
ANGGARAN BIAYA
INSTALASI LISTRIK BESERTA BAHAN SAKLAR GIFSAL PUTIH DAN KABEL NYM
DI KOLAM RENANG KOTA BARU JAMBI

NO JENIS BARANG/INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


PENERANGAN LP-T RG. TRIBUN
1 INSTALASI LAMPU TAMAN 113 TITIK RP. 115,000 RP. 12,995,000
2 INSTALASI STOP KONTAK 22 TITIK RP. 115,000 RP. 2,530,000
3 PASANG EXHAUST FAN 7 TITIK RP. 115,000 RP. 805,000
4 PASANG HALOGEN SOROT 500 W 3 TITIK RP. 115,000 RP. 345,000
JUMLAH RP. 16,675,000
PENERANGAN KOLAM RENANG OLYMPIC
5 INSTALASI LAMPU 24 TITIK RP. 115,000 RP. 2,760,000
JUMLAH RP. 2,760,000
PENERANGAN LP-F-RG. FITNESS
6 INSTALASI LAMPU 39 TITIK RP. 115,000 RP. 4,485,000
7 INSTALASI STOP KONTAK 6 TITIK RP. 115,000 RP. 690,000
8 INSTALASI KABEL AC 3 TITIK RP. 250,000 RP. 750,000
9 INSTALASI EXHAUST FAN 4 TITIK RP. 115,000 RP. 460,000
JUMLAH RP. 6,385,000
PENERANGAN KOLAM DEWASA
10 INSTALASI LAMPU 26 METER RP. 115,000 RP. 2,990,000
JUMLAH RP. 2,990,000
PENERANGAN LAMPU KOLAM LONCAT INDAH
11 INSTALASI LAMPU 12 METER RP. 115,000 RP. 1,380,000
JUMLAH RP. 1,380,000
PENERANGAN KOLAM RENANG ANAK
12 INSTALASI LAMPU 18 TITIK RP. 115,000 RP. 2,070,000
13 INSTALASI STOP KONTAK 1 TITIK RP. 115,000 RP. 115,000
JUMLAH RP. 2,185,000
PENERANGAN LP-B.2
14 INSTALASI LAMPU 55 TITIK RP. 115,000 RP. 6,325,000
15 INSTALASI EXHAUST FAN 9 TITIK RP. 115,000 RP. 1,035,000
JUMLAH RP. 7,360,000
ENERANGAN LP-KD/LP-KA
14 INSTALASI LAMPU 19 TITIK RP. 115,000 RP. 2,185,000
15 INSTALASI STOP KONTAK 2 TITIK RP. 115,000 RP. 230,000
JUMLAH RP. 2,415,000
PENERANGAN LP-ME
1 INSTALASI LAMPU 8 TITIK RP. 115,000 RP. 920,000
2 INSTALASI STOP KONTAK 4 TITIK RP. 115,000 RP. 460,000
3 PASANG EXHAUST FAN 1 TITIK RP. 115,000 RP. 115,000
4 PASANG KIPAS ANGIN 1 TITIK RP. 115,000 RP. 115,000
JUMLAH RP. 1,610,000
PENERANGAN LP-B-RG. BILAS
1 INSTALASI LAMPU 62 TITIK RP. 115,000 RP. 7,130,000
2 INSTALASI STOP KONTAK 7 TITIK RP. 115,000 RP. 805,000
3 PASANG KABEL AC 2 TITIK RP. 250,000 RP. 500,000
4 PASANG EXHAUST FAN 9 TITIK RP. 115,000 RP. 1,035,000
JUMLAH RP. 9,470,000
TOTAL PEKERJAAN RP. 53,230,000

JAMBI, 29 MEI 2006


HORMAT KAMI, DISETUJUI OLEH

SUGIYONO PAK SUSENO


PIMPINAN PROYEK PT. WIKA
PERINCIAN
ANGGARAN BIAYA
INSTALASI LISTRIK BESERTA BAHAN PANEL INDUK DISTRIBUSI
DI KOLAM RENANG KOTA BARU JAMBI

NO JENIS BARANG/INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


PANEL DISTRIBUSI INDUK
1 MATERIAL PANEL BOX 100 X 150 CM 1 BUAH RP. 1,500,000 RP. 1,500,000
2 MATERIAL NOPIYOS BELSEKKER 250 A 2 BUAH RP. 2,000,000 RP. 4,000,000
3 MATERIAL NOPIYOS BELSEKKER 125 A 2 BUAH RP. 1,750,000 RP. 3,500,000
4 MATERIAL MCB 3 PASS 20A + 25A 10 BUAH RP. 250,000 RP. 2,500,000
5 MATERIAL MCB 1 PASS 6A 6 BUAH RP. 75,000 RP. 450,000
6 MATERIAL POL AMPER 250A 6 METER RP. 200,000 RP. 1,200,000
7 MATERIAL POL METER 2 BUAH RP. 200,000 RP. 400,000
8 MATERIAL HZ 2 BUAH RP. 200,000 RP. 400,000
9 MATERIAL RST SAKLAR 2 BUAH RP. 250,000 RP. 500,000
10 MATERIAL CT 6 BUAH RP. 250,000 RP. 1,500,000
11 MATERIAL PILOT LEM 6 BUAH RP. 25,000 RP. 150,000
12 MATERIAL REL MCB 6 BATANG RP. 25,000 RP. 150,000
13 MATERIAL PIYOS BASKOPR 5 BATANG RP. 250,000 RP. 1,250,000
14 MATERIAL SELKON 50M2 - 250M2 100 BUAH RP. 2,500 RP. 250,000
15 MATERIAL SELONGSONG SELKON 100 BUAH RP. 2,500 RP. 250,000
16 MATERIAL OM SAKLAR GERMANY 400A 1 METER RP. 4,500,000 RP. 4,500,000
17 JASA PASANG PANEL INDUK 1 SET RP. 2,500,000 RP. 2,500,000
JUMLAH RP. 25,000,000
PANEL DISTRIBUSI 2 - SDP-I
18 MATERIAL BOX PANEL 40 X 60 1 BUAH RP. 500,000 RP. 500,000
19 MATERIAL NOPIYOS BELSEKER 100A 1 BUAH RP. 1,250,000 RP. 1,250,000
20 MATERIAL MCB 3 PASS 40A 5 BUAH RP. 250,000 RP. 1,250,000
21 MATERIAL MCB 1 PASS 6A 6 BUAH RP. 75,000 RP. 450,000
22 MATERIAL PIYOS BARNOL/GROUND 2 BUAH RP. 75,000 RP. 150,000
23 MATERIAL PILOT LEM 3 BUAH RP. 25,000 RP. 75,000
24 MATERIAL REL MCB 2A 1 BATANG RP. 25,000 RP. 25,000
25 MATERIAL KABEL GROUND 1 X 25M2 20 METER RP. 25,000 RP. 500,000
26 MATERIAL SELKON 50M2 20 BUAH RP. 2,500 RP. 50,000
27 JASA PASANG GROUND 1 SET RP. 250,000 RP. 250,000
21 JASA PASANG PANEL 1 SET RP. 1,000,000 RP. 1,000,000
JUMLAH RP. 5,500,000
PANEL DISTRIBUSI 2 - SDP-II
22 MATERIAL BOX PANEL 40 X 50 1 BUAH RP. 500,000 RP. 500,000
23 MATERIAL NOPIYOS BELSEKER 100A 1 BUAH RP. 1,250,000 RP. 1,250,000
24 MATERIAL MCB 3 PASS 40A 4 BUAH RP. 250,000 RP. 1,000,000
25 MATERIAL MCB 1 PASS 6A 6 BUAH RP. 75,000 RP. 450,000
26 MATERIAL PIYOS BARNOL/GROUND 2 BUAH RP. 75,000 RP. 150,000
27 MATERIAL PILOT LEM 3 BUAH RP. 25,000 RP. 75,000
28 MATERIAL REL MCB 2A 1 BATANG RP. 25,000 RP. 25,000
29 MATERIAL KABEL GROUND 1 X 25M 2
20 METER RP. 25,000 RP. 500,000
30 MATERIAL SELKON 50M2 20 BUAH RP. 2,500 RP. 50,000
31 JASA PASANG GROUND 1 SET RP. 250,000 RP. 250,000
25 JASA PASANG PANEL 1 SET RP. 1,000,000 RP. 1,000,000
JUMLAH RP. 5,250,000
TOTAL PEKERJAAN RP. 35,750,000

JAMBI, 29 MEI 2006


HORMAT KAMI, DISETUJUI OLEH

SUGIYONO PAK SUSENO


PIMPINAN PROYEK PT. WIKA
PERINCIAN
ANGGARAN BIAYA
INSTALASI LISTRIK BESERTA BAHAN PANEL MCB GLIFSAL
DI KOLAM RENANG KOTA BARU JAMBI

NO JENIS BARANG/INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


PANEL PENERANGAN LP-KD KOLAM DEWASA
1 MATERIAL PANEL BOX 30 X 40 1 BUAH RP. 400,000 RP. 400,000
2 MATERIAL MCB 3 PASS 10A 1 BUAH RP. 250,000 RP. 250,000
3 MATERIAL MCB 1 PASS 10A 3 BUAH RP. 75,000 RP. 225,000
4 MATERIAL MCB 1 PASS 6A 6 BUAH RP. 75,000 RP. 450,000
5 MATERIAL PILOT LEM 3 BUAH RP. 25,000 RP. 75,000
6 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000 RP. 30,000
7 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000 RP. 150,000
8 MATERIAL REL MCB 1 BATANG RP. 25,000 RP. 25,000
9 MATERIAL KABEL GROUND 1 X 6MM 2
10 METER RP. 15,000 RP. 150,000
10 JASA PASANG PANEL 1 SET RP. 500,000 RP. 500,000
11 JASA PASANG GROUND 1 SET RP. 200,000 RP. 200,000
JUMLAH RP. 2,455,000
PANEL PENERANGAN LP-B-RG BILAS
12 MATERIAL PANEL BOX 40 X 50 1 BUAH RP. 450,000 RP. 450,000
13 MATERIAL MCB 3 PASS 16A 1 BUAH RP. 250,000 RP. 250,000
14 MATERIAL MCB 1 PASS 10A 6 BUAH RP. 75,000 RP. 450,000
15 MATERIAL MCB 1 PASS 6A 9 BUAH RP. 75,000 RP. 675,000
16 MATERIAL PILOT LEM 2A 3 BUAH RP. 25,000 RP. 75,000
17 MATERIAL MCB 1 PASS 2A 3 BUAH RP. 25,000 RP. 75,000
18 MATERIAL PIYOS BARNOL/GROUND 2 BUAH RP. 75,000 RP. 150,000
19 MATERIAL SICER MCB 2 BATANG RP. 25,000 RP. 50,000
20 MATERIAL REL MCB 1 BATANG RP. 25,000 RP. 25,000
21 MATERIAL KABEL GROUND 1 X 6MM2 20 METER RP. 15,000 RP. 300,000
22 JASA PASANG PANEL 1 SET RP. 1,000,000 RP. 1,000,000
23 JASA PASANG GROUND 1 SET RP. 350,000 RP. 350,000
JUMLAH RP. 3,850,000
PANEL PENERANGAN LP-F-RG FITNESS
24 MATERIAL PANEL BOX 30 X 40 1 BUAH RP. 400,000 RP. 400,000
25 MATERIAL MCB 3 PASS 10A 1 BUAH RP. 250,000 RP. 250,000
26 MATERIAL MCB 1 PASS 10A 6 BUAH RP. 75,000 RP. 450,000
27 MATERIAL MCB 1 PASS 6A 6 BUAH RP. 75,000 RP. 450,000
28 MATERIAL PILOT LEM 2A 3 BUAH RP. 25,000 RP. 75,000
29 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000 RP. 30,000
30 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000 RP. 150,000
31 MATERIAL SICER MCB 1 BATANG RP. 25,000 RP. 25,000
32 MATERIAL REL MCB 1 BATANG RP. 25,000 RP. 25,000
33 MATERIAL KABEL GROUND 1 X 6MM2 10 METER RP. 15,000 RP. 150,000
34 JASA PASANG PANEL 1 SET RP. 500,000 RP. 500,000
35 JASA PASANG GROUND 1 SET RP. 200,000 RP. 200,000
JUMLAH RP. 2,705,000
PANEL PENERANGAN LP-T-RG TRIBUN
36 MATERIAL PANEL BOX 40 X 60 1 BUAH RP. 500,000 RP. 500,000
37 MATERIAL MCB 3 PASS 16A 1 BUAH RP. 250,000 RP. 250,000
38 MATERIAL MCB 1 PASS 10A 7 BUAH RP. 75,000 RP. 525,000
39 MATERIAL MCB 1 PASS 6A 20 BUAH RP. 75,000 RP. 1,500,000
40 MATERIAL PILOT LEM 2A 3 BUAH RP. 25,000 RP. 75,000
41 MATERIAL MCB 1 PASS 2A 3 BUAH RP. 25,000 RP. 75,000
42 MATERIAL PIYOS BARNOL/GROUND 2 BUAH RP. 75,000 RP. 150,000
43 MATERIAL SICER MCB 3 BATANG RP. 25,000 RP. 75,000
44 MATERIAL REL MCB 2 BATANG RP. 25,000 RP. 50,000
45 MATERIAL KABEL GROUND 1 X 6MM 2
20 METER RP. 15,000 RP. 300,000
46 JASA PASANG PANEL 1 SET RP. 1,000,000 RP. 1,000,000
47 JASA PASANG GROUND 1 SET RP. 350,000 RP. 350,000
JUMLAH RP. 4,850,000
PANEL PENERANGAN LP-KRA KOLAM
48 MATERIAL PANEL BOX 30 X 40 1 BUAH RP. 400,000 RP. 400,000
49 MATERIAL MCB 3 PASS 10A 1 BUAH RP. 250,000 RP. 250,000
50 MATERIAL MCB 1 PASS 10A 3 BUAH RP. 75,000 RP. 225,000
51 MATERIAL MCB 1 PASS 6A 6 BUAH RP. 75,000 RP. 450,000
52 MATERIAL PILOT LEM 3 BUAH RP. 25,000 RP. 75,000
53 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000 RP. 30,000
54 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000 RP. 150,000
55 MATERIAL SICER MCB 1 BATANG RP. 25,000 RP. 25,000
56 MATERIAL REL MCB 1 BATANG RP. 25,000 RP. 25,000
57 MATERIAL KABEL GROUND 1 X 6MM 2
10 METER RP. 15,000 RP. 150,000
58 JASA PASANG PANEL 1 SET RP. 500,000 RP. 500,000
59 JASA PASANG GROUND 1 SET RP. 200,000 RP. 200,000
JUMLAH RP. 2,480,000
PANEL PENERANGAN LP-LI KOLAM LONCAT INDAH
60 MATERIAL PANEL BOX 30 X 40 1 BUAH RP. 400,000 RP. 400,000
61 MATERIAL MCB 3 PASS 10A 1 BUAH RP. 250,000 RP. 250,000
62 MATERIAL MCB 1 PASS 10A 3 BUAH RP. 75,000 RP. 225,000
63 MATERIAL MCB 1 PASS 6A 6 BUAH RP. 75,000 RP. 450,000
64 MATERIAL PILOT LEM 2A 3 BUAH RP. 25,000 RP. 75,000
65 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000 RP. 30,000
66 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000 RP. 150,000
67 MATERIAL REL MCB 1 BATANG RP. 25,000 RP. 25,000
68 MATERIAL KABEL GROUND 1 X 6MM2 10 METER RP. 15,000 RP. 150,000
69 JASA PASANG PANEL 1 SET RP. 500,000 RP. 500,000
70 JASA PASANG GROUND 1 SET RP. 200,000 RP. 200,000
JUMLAH RP. 2,455,000
PANEL PENERANGAN LP-K-KOLAM OLYMPIC
71 MATERIAL PANEL BOX 30 X 40 1 BUAH RP. 400,000 RP. 400,000
72 MATERIAL MCB 3 PASS 10A 1 BUAH RP. 250,000 RP. 250,000
73 MATERIAL MCB 1 PASS 10A 3 BUAH RP. 75,000 RP. 225,000
74 MATERIAL MCB 1 PASS 6A 9 BUAH RP. 75,000 RP. 675,000
75 MATERIAL PILOT LEM 3 BUAH RP. 25,000 RP. 75,000
76 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000 RP. 30,000
77 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000 RP. 150,000
78 MATERIAL SICER MCB 1 BATANG RP. 25,000 RP. 25,000
79 MATERIAL REL MCB 1 BATANG RP. 25,000 RP. 25,000
80 MATERIAL KABEL GROUND 1 X 6MM 2
10 METER RP. 15,000 RP. 150,000
81 JASA PASANG PANEL 1 SET RP. 500,000 RP. 500,000
82 JASA PASANG GROUND 1 SET RP. 200,000 RP. 200,000
JUMLAH RP. 2,705,000
PANEL PENERANGAN LP-ME
83 MATERIAL PANEL BOX 25 X 30 1 BUAH RP. 350,000 RP. 350,000
84 MATERIAL MCB 3 PASS 10A 1 BUAH RP. 250,000 RP. 250,000
85 MATERIAL MCB 1 PASS 10A 1 BUAH RP. 75,000 RP. 75,000
86 MATERIAL MCB 1 PASS 6A 5 BUAH RP. 75,000 RP. 375,000
87 MATERIAL PILOT LEM 3 BUAH RP. 25,000 RP. 75,000
88 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000 RP. 30,000
89 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000 RP. 150,000
90 MATERIAL SICER MCB 1 BATANG RP. 25,000 RP. 25,000
91 MATERIAL REL MCB 1 BATANG RP. 25,000 RP. 25,000
92 MATERIAL KABEL GROUND 1 X 6MM 2
10 METER RP. 15,000 RP. 150,000
93 JASA PASANG PANEL 1 SET RP. 500,000 RP. 500,000
94 JASA PASANG GROUND 1 SET RP. 200,000 RP. 200,000
JUMLAH RP. 2,205,000
PANEL PENERANGAN LUAR 1-LP-PL 1
95 MATERIAL PANEL BOX 30 X 40 1 BUAH RP. 400,000 RP. 400,000
96 MATERIAL MCB 3 PASS 16A 1 BUAH RP. 250,000 RP. 250,000
97 MATERIAL MCB 1 PASS 10A 3 BUAH RP. 75,000 RP. 225,000
98 MATERIAL MCB 1 PASS 6A 3 BUAH RP. 75,000 RP. 225,000
99 MATERIAL CONTEXTOR 3 PASS 1 BUAH RP. 500,000 RP. 500,000
100 MATERIAL TIMER 5A 1 BUAH RP. 450,000 RP. 450,000
101 MATERIAL PILOT LEM 2 A 3 BUAH RP. 25,000 RP. 75,000
102 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000 RP. 30,000
103 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000 RP. 150,000
104 MATERIAL REL MCB 1 BATANG RP. 25,000 RP. 25,000
105 MATERIAL KABEL GROUND 1 X 6MM2 10 METER RP. 15,000 RP. 150,000
106 JASA PASANG PANEL 1 SET RP. 500,000 RP. 500,000
107 JASA PASANG GROUND 1 SET RP. 200,000 RP. 200,000
JUMLAH RP. 3,180,000
PANEL PENERANGAN LUAR 2-LP-PL 2
108 MATERIAL PANEL BOX 30 X 40 1 BUAH RP. 400,000 RP. 400,000
109 MATERIAL MCB 3 PASS 16A 1 BUAH RP. 250,000 RP. 250,000
110 MATERIAL MCB 1 PASS 10A 3 BUAH RP. 75,000 RP. 225,000
111 MATERIAL MCB 1 PASS 6A 3 BUAH RP. 75,000 RP. 225,000
112 MATERIAL CONTEXTOR 3 PASS 1 BUAH RP. 500,000 RP. 500,000
113 MATERIAL TIMER 5A 1 BUAH RP. 450,000 RP. 450,000
114 MATERIAL PILOT LEM 2 A 3 BUAH RP. 25,000 RP. 75,000
115 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000 RP. 30,000
116 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000 RP. 150,000
117 MATERIAL REL MCB 1 BATANG RP. 25,000 RP. 25,000
118 MATERIAL KABEL GROUND 1 X 6MM2 10 METER RP. 15,000 RP. 150,000
119 JASA PASANG PANEL 1 SET RP. 500,000 RP. 500,000
120 JASA PASANG GROUND 1 SET RP. 200,000 RP. 200,000
JUMLAH RP. 3,180,000
BOX PANEL PP AIR BERSIH
121 MATERIAL PANEL BOX 30 X 40 1 BUAH RP. 400,000 RP. 400,000
122 MATERIAL CONTEXTOR 32A 1 BUAH RP. 600,000 RP. 600,000
123 MATERIAL OPR LOT 25A 1 BUAH RP. 200,000 RP. 200,000
124 MATERIAL OMERON 25A 1 BUAH RP. 200,000 RP. 200,000
125 MATERIAL KABEL GROUND 1 X 6MM2 10 METER RP. 15,000 RP. 150,000
126 MATERIAL MCB 3 PASS 32A 1 BUAH RP. 250,000 RP. 250,000
127 MATERIAL PELAMPUNG 1 BUAH RP. 150,000 RP. 150,000
128 MATERIAL PILOT LEM 3 BUAH RP. 25,000 RP. 75,000
129 MATERIAL TERMINAL 1 BATANG RP. 25,000 RP. 25,000
130 MATERIAL KABEL PELAMPUNG 50 METER RP. 2,500 RP. 125,000
131 JASA PASANG PANEL 1 SET RP. 500,000 RP. 500,000
132 JASA PASANG GROUND 1 SET RP. 200,000 RP. 200,000
JUMLAH RP. 2,875,000
PANEL PENERANGAN DEEP WELL
133 MATERIAL PANEL BOX 25 X 30 1 BUAH RP. 350,000 RP. 350,000
134 MATERIAL MCB 3 PASS 16A 1 BUAH RP. 250,000 RP. 250,000
135 MATERIAL MCB 1 PASS 10A 3 BUAH RP. 75,000 RP. 225,000
136 MATERIAL MCB 1 PASS 6A 3 BUAH RP. 75,000 RP. 225,000
137 MATERIAL PILOT LEM 3 BUAH RP. 25,000 RP. 75,000
138 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000 RP. 30,000
139 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000 RP. 150,000
140 MATERIAL SICER MCB 1 BATANG RP. 25,000 RP. 25,000
141 MATERIAL REL MCB 1 BATANG RP. 25,000 RP. 25,000
142 MATERIAL KABEL GROUND 1 X 6MM2 10 METER RP. 15,000 RP. 150,000
143 JASA PASANG PANEL 1 SET RP. 500,000 RP. 500,000
144 JASA PASANG GROUND 1 SET RP. 200,000 RP. 200,000
JUMLAH RP. 2,205,000
KABEL WIRING PANEL PP-DEEP WELL
145 MATERIAL KABEL NYY 3 X 2,5MM 6 METER RP. 15,000 RP. 90,000
146 JASA PASANG KABEL 6 METER RP. 15,000 RP. 90,000
JUMLAH RP. 180,000
PANEL PP-KRA-KOLAM RENANG ANAK
147 MATERIAL PANEL BOX 25 X 30 1 BUAH RP. 350,000 RP. 350,000
148 MATERIAL MCB 3 PASS 32A 1 BUAH RP. 250,000 RP. 250,000
149 MATERIAL MCB 1 PASS 10A 6 BUAH RP. 75,000 RP. 450,000
150 MATERIAL MCB 1 PASS 6A 3 BUAH RP. 75,000 RP. 225,000
151 MATERIAL PILOT LEM 3 BUAH RP. 25,000 RP. 75,000
152 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000 RP. 30,000
153 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000 RP. 150,000
154 MATERIAL SICER MCB 1 BATANG RP. 25,000 RP. 25,000
155 MATERIAL REL MCB 1 BATANG RP. 25,000 RP. 25,000
156 MATERIAL KABEL GROUND 1 X 6MM 2
10 METER RP. 15,000 RP. 150,000
157 JASA PASANG PANEL 1 SET RP. 500,000 RP. 500,000
158 JASA PASANG GROUND 1 SET RP. 200,000 RP. 200,000
JUMLAH RP. 2,430,000
KABEL WIRING PANEL PP-KRA-KOLAM RENANG ANAK
159 MATERIAL KABEL NYY 3 X 2,5MM 11 METER RP. 15,000 RP. 165,000
160 JASA PASANG KABEL 11 METER RP. 15,000 RP. 165,000
JUMLAH RP. 330,000
PANEL PP-KO-KOLAM OLYMPIC
161 MATERIAL PANEL BOX 25 X 30 1 BUAH RP. 350,000 RP. 350,000
162 MATERIAL MCB 3 PASS 32A 1 BUAH RP. 250,000 RP. 250,000
163 MATERIAL MCB 1 PASS 10A 6 BUAH RP. 75,000 RP. 450,000
164 MATERIAL MCB 1 PASS 6A 3 BUAH RP. 75,000 RP. 225,000
165 MATERIAL PILOT LEM 3 BUAH RP. 25,000 RP. 75,000
166 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000 RP. 30,000
167 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000 RP. 150,000
168 MATERIAL SICER MCB 1 BATANG RP. 25,000 RP. 25,000
169 MATERIAL REL MCB 1 BATANG RP. 25,000 RP. 25,000
170 MATERIAL KABEL GROUND 1 X 6MM 2
10 METER RP. 15,000 RP. 150,000
171 JASA PASANG PANEL 1 SET RP. 500,000 RP. 500,000
172 JASA PASANG GROUND 1 SET RP. 200,000 RP. 200,000
JUMLAH RP. 2,430,000
KABEL WIRING PANEL PP-KO-KOLAM OLYMPIC
173 MATERIAL KABEL NYY 3 X 2,5MM 16.5 METER RP. 15,000 RP. 247,500
174 JASA PASANG KABEL 16.5 METER RP. 15,000 RP. 247,500
JUMLAH RP. 495,000
PANEL PP-LI-LONCAT INDAH
175 MATERIAL PANEL BOX 25 X 30 1 BUAH RP. 350,000 RP. 350,000
176 MATERIAL MCB 3 PASS 32A 1 BUAH RP. 250,000 RP. 250,000
177 MATERIAL MCB 1 PASS 10A 6 BUAH RP. 75,000 RP. 450,000
178 MATERIAL MCB 1 PASS 6A 3 BUAH RP. 75,000 RP. 225,000
179 MATERIAL PILOT LEM 3 BUAH RP. 25,000 RP. 75,000
180 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000 RP. 30,000
181 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000 RP. 150,000
182 MATERIAL SICER MCB 1 BATANG RP. 25,000 RP. 25,000
183 MATERIAL REL MCB 1 BATANG RP. 25,000 RP. 25,000
184 MATERIAL KABEL GROUND 1 X 6MM2 10 METER RP. 15,000 RP. 150,000
185 JASA PASANG PANEL 1 SET RP. 500,000 RP. 500,000
186 JASA PASANG GROUND 1 SET RP. 200,000 RP. 200,000
JUMLAH RP. 2,430,000
KABEL WIRING PANEL PP-LI-LONCAT INDAH
187 MATERIAL KABEL NYY 3 X 2,5MM 16.5 METER RP. 15,000 RP. 247,500
188 JASA PASANG KABEL 16.5 METER RP. 15,000 RP. 247,500
JUMLAH RP. 495,000
PANEL PP-KD KOLAM DEWASA
175 MATERIAL PANEL BOX 25 X 30 1 BUAH RP. 350,000 RP. 350,000
176 MATERIAL MCB 3 PASS 40A 1 BUAH RP. 250,000 RP. 250,000
177 MATERIAL MCB 1 PASS 10A 6 BUAH RP. 75,000 RP. 450,000
178 MATERIAL MCB 1 PASS 6A 3 BUAH RP. 75,000 RP. 225,000
179 MATERIAL PILOT LEM 3 BUAH RP. 25,000 RP. 75,000
180 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000 RP. 30,000
181 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000 RP. 150,000
182 MATERIAL SICER MCB 1 BATANG RP. 25,000 RP. 25,000
183 MATERIAL REL MCB 1 BATANG RP. 25,000 RP. 25,000
184 MATERIAL KABEL GROUND 1 X 6MM 2
10 METER RP. 15,000 RP. 150,000
185 JASA PASANG PANEL 1 SET RP. 500,000 RP. 500,000
186 JASA PASANG GROUND 1 SET RP. 200,000 RP. 200,000
JUMLAH RP. 2,430,000
KABEL WIRING PANEL PP-KD KOLAM DEWASA
187 MATERIAL KABEL NYY 3 X 2,5MM 16.5 METER RP. 15,000 RP. 247,500
188 JASA PASANG KABEL 16.5 METER RP. 15,000 RP. 247,500
JUMLAH RP. 495,000
PANEL PP-KA KOLAM ANAK
189 MATERIAL PANEL BOX 25 X 30 1 BUAH RP. 350,000 RP. 350,000
190 MATERIAL MCB 3 PASS 16A 1 BUAH RP. 250,000 RP. 250,000
191 MATERIAL MCB 1 PASS 10A 3 BUAH RP. 75,000 RP. 225,000
192 MATERIAL MCB 1 PASS 6A 3 BUAH RP. 75,000 RP. 225,000
193 MATERIAL PILOT LEM 3 BUAH RP. 25,000 RP. 75,000
194 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000 RP. 30,000
195 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000 RP. 150,000
196 MATERIAL SICER MCB 1 BATANG RP. 25,000 RP. 25,000
197 MATERIAL REL MCB 1 BATANG RP. 25,000 RP. 25,000
198 MATERIAL KABEL GROUND 1 X 6MM 2
10 METER RP. 15,000 RP. 150,000
199 JASA PASANG PANEL 1 SET RP. 500,000 RP. 500,000
200 JASA PASANG GROUND 1 SET RP. 200,000 RP. 200,000
JUMLAH RP. 2,205,000
KABEL WIRING PANEL PP-KA KOLAM ANAK
201 MATERIAL KABEL NYY 3 X 2,5MM 5.5 METER RP. 15,000 RP. 82,500
202 JASA PASANG KABEL 5.5 METER RP. 15,000 RP. 82,500
JUMLAH RP. 165,000
PANEL PP-AIR BERSIH
203 MATERIAL PANEL BOX 25 X 30 1 BUAH RP. 350,000 RP. 350,000
204 MATERIAL MCB 3 PASS 40A 1 BUAH RP. 250,000 RP. 250,000
205 MATERIAL MCB 1 PASS 10A 6 BUAH RP. 75,000 RP. 450,000
206 MATERIAL MCB 1 PASS 6A 3 BUAH RP. 75,000 RP. 225,000
207 MATERIAL PILOT LEM 3 BUAH RP. 25,000 RP. 75,000
208 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000 RP. 30,000
209 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000 RP. 150,000
210 MATERIAL SICER MCB 1 BATANG RP. 25,000 RP. 25,000
211 MATERIAL REL MCB 1 BATANG RP. 25,000 RP. 25,000
212 MATERIAL KABEL GROUND 1 X 6MM 2
10 METER RP. 15,000 RP. 150,000
213 JASA PASANG PANEL 1 SET RP. 500,000 RP. 500,000
214 JASA PASANG GROUND 1 SET RP. 200,000 RP. 200,000
JUMLAH RP. 2,430,000
KABEL WIRING PANEL PANEL PP-AIR BERSIH
215 MATERIAL KABEL NYY 3 X 2,5MM 15 METER RP. 15,000 RP. 225,000
216 JASA PASANG KABEL 15 METER RP. 15,000 RP. 225,000
JUMLAH RP. 450,000
TOTAL PEKERJAAN RP. 52,110,000

JAMBI, 29 MEI 2006


HORMAT KAMI, DISETUJUI OLEH

SUGIYONO PAK SUSENO


PIMPINAN PROYEK PT. WIKA
PERINCIAN
ANGGARAN BIAYA
INSTALASI LISTRIK
DI KOLAM RENANG KOTA BARU JAMBI

NO JENIS BARANG/INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL

1 TOTAL INSTALASI LISTRIK BESERTA BAHAN KABEL DISTRIBUSI RP. 392,520,000

TOTAL INSTALASI LISTRIK BESERTA BAHAN SAKLAR GIFSAL PUTIH


2 RP. 53,230,000
DAN KABEL NYM

3 TOTAL INSTALASI LISTRIK BESERTA BAHAN PANEL INDUK DISTRIBUSI RP. 35,750,000

4 TOTAL INSTALASI LISTRIK BESERTA BAHAN PANEL MCB GLIFSAL RP. 52,110,000

TOTAL PEKERJAAN RP. 533,610,000

JAMBI, 29 MEI 2006


HORMAT KAMI, DISETUJUI OLEH

SUGIYONO PAK SUSENO


PIMPINAN PROYEK PT. WIKA
ORDER KABEL
UNTUK KOLAM RENANG
TANGO RAJO JAMBI

NO NAMA BARANG SPESIFIKASI JUMLAH


1 KABEL NYY 4 X 120 40 METER
2 KABEL NYFGBY 4 X 50 375 METER
3 KABEL NYFGBY 4 X 25 40 METER
4 KABEL NYFGBY 4 X 10 1 ROLL
5 KABEL NYFGBY 4X6 2 ROLL
6 KABEL NYFGBY 4X4 16 ROLL
7 KABEL NYFGBY 3X4 6 ROLL
8 KABEL NYFGBY 2X4 5 ROLL
9 KABEL NYY 3 X 2,5 2 ROLL
10 SOLASI BAN 3M,TM 23 RUBBER 2 ROLL

21 JULI 2006
HORMAT KAMI TTD

SUGIYONO PAK SUSENO


PIMPINAN PROYEK PT. WIKA
PERINCIAN
ANGGARAN BIAYA
UNTUK KOLAM RENANG
TANGGO RAJO JAMBI

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 PASANG KABEL 4 x 120 40 METER RP. 100,000 RP.
2 PASANG KABEL 4 x 50 375 METER RP. 50,000 RP.
3 PASANG KABEL 4 x 25 50 METER RP. 25,000 RP.
4 PASANG KABEL 4 x 10 100 METER RP. 20,000 RP.
5 PASANG KABEL 4 x 6 200 METER RP. 15,000 RP.
6 PASANG KABEL 2 x 4 500 METER RP. 15,000 RP.
7 PASANG KABEL 3 x 4 500 METER RP. 15,000 RP.
8 PASANG KABEL 3 x 2,5 300 METER RP. 15,000 RP.
9 PASANG KABEL 4 x 4 1300 METER RP. 15,000 RP.
TOTAL PEKERJAAN RP.

JAMBI, 08 SEPTEMBER 2006


HORMAT KAMI, TTD

SUGIYONO PAK SUSENO


PIMPINAN PROYEK PT. WIK
PERINCIAN
NGGARAN BIAYA
UK KOLAM RENANG
NGGO RAJO JAMBI

TOTAL
4,000,000
18,750,000
1,250,000
2,000,000
3,000,000
7,500,000
7,500,000
4,500,000
19,500,000
68,000,000

TTD

PAK SUSENO
PIMPINAN PROYEK PT. WIKA
PERINCIAN
ANGGARAN BIAYA
UNTUK KOLAM RENANG
TANGGO RAJO JAMBI

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 PANEL INDOK 1 TITIK RP. 3,500,000 RP. 3,500,000
2 PANEL SDP I SDP II 2 TITIK RP. 1,000,000 RP. 2,000,000
3 PANEL POS 1 TITIK RP. 500,000 RP. 500,000
4 PANEL AIR 1 TITIK RP. 500,000 RP. 500,000
5 PANEL TEMER LP-PL I 1 TITIK RP. 1,000,000 RP. 1,000,000
6 PANEL SETOFPAN KWH 1 1 TITIK RP. 500,000 RP. 500,000
7 GRON PANEL DISTRIBUSI INDUK 1 TITIK RP. 1,500,000 RP. 1,500,000
8 GRON PANEL ATS 1 TITIK RP. 500,000 RP. 500,000
9 GRON PANEL TMR 1 TITIK RP. 500,000 RP. 500,000
10 GRON PANEL SDP I 1 TITIK RP. 500,000 RP. 500,000
11 GRON PANEL SDP II 1 TITIK RP. 500,000 RP. 500,000
12 GRON PANEL AIR BERSIH 1 TITIK RP. 500,000 RP. 500,000
13 GRON PANEL KWH 1 TITIK RP. 500,000 RP. 500,000
14 GRON PANEL POS 1 TITIK RP. 200,000 RP. 200,000
15 GRON GENSET 1 TITIK RP. 500,000 RP. 500,000
16 GRON BOX MCB CANTIN 1 TITIK RP. 200,000 RP. 200,000
17 LAMPU HIYAS 9 TITIK RP. 600,000 RP. 5,400,000
18 LAMPU TAMAN 54 TITIK RP. 300,000 RP. 16,200,000
19 LAMPU JALAN 7 TITIK RP. 600,000 RP. 4,200,000
20 PERBAIKI PANEL 3 SET RP. 300,000 RP. 900,000
21 PERBAIKI LAMPU 20 TITIK RP. 10,000 RP. 200,000
22 LAMPU R. BILAS WANITA 20 TITIK RP. 35,000 RP. 700,000
23 SETOF KONTAK R. BILAS WANITA 5 TITIK RP. 35,000 RP. 175,000
24 LAMPU R. KANTIN 5 TITIK RP. 35,000 RP. 175,000
25 SETOF KONTAK R. KANTIN 1 TITIK RP. 35,000 RP. 35,000
26 BOX MCB 1 TITIK RP. 200,000 RP. 200,000
27 LAMPU GAJIBU 5 TITIK RP. 35,000 RP. 175,000
28 LAMPU POS 5 TITIK RP. 35,000 RP. 175,000
29 SETOF KONTAK 2 TITIK RP. 35,000 RP. 70,000
30 BOX MCB 1 TITIK RP. 200,000 RP. 200,000
TOTAL PEKERJAAN RP. 42,205,000

JAMBI, 08 SEPTEMBER 2006


HORMAT KAMI, TTD

SUGIYONO PAK SUSENO


PIMPINAN PROYEK PT. WIKA
DAFTAR GAJI HARIAN
UNTUK KOLAM RENANG
TANGGO RAJO JAMBI

JUMLAH
NO NAMA BARANG PER HARI TOTAL
HARI
1 PAK SUGIYONO 250,000 6 1,500,000
2 IBNU YASIN 75,000 6 450,000
3 BAGIO 75,000 6 450,000
4 SYAFRIZAL 100,000 5 500,000
5 UDIN 100,000 5 500,000

TOTAL 3,400,000

DAFTAR GAJI LEMBUR


UNTUK KOLAM RENANG
TANGGO RAJO JAMBI

JUMLAH
NO NAMA BARANG PER HARI TOTAL
HARI
1 PAK SUGIYONO 200,000 6 1,200,000
2 IBNU YASIN 50,000 6 300,000
3 BAGIO 50,000 6 300,000
4 SYAFRIZAL 80,000 5 400,000
5 UDIN 80,000 5 400,000

TOTAL 2,600,000

TOTAL HARIAN DAN LEMBUR 6,000,000

JAMBI, 08 SEPTEMBER 2006


HORMAT KAMI TTD

SUGIYONO PAK SUSENO


PIMPINAN PROYEK PT. WIKA
PERINCIAN
ANGGARAN BIAYA
INSTALASI LISTRIK
DI KOTA BARU JAMBI

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI LAMPU 13 TITIK RP. 120,000 RP. 1,560,000
2 INSTALASI STOP KONTAK 11 TITIK RP. 120,000 RP. 1,320,000
3 INSTALASI EOSOPEN 1 TITIK RP. 175,000 RP. 175,000
4 INSTALASI KABEL AC 1 TITIK RP. 375,000 RP. 375,000
TOTAL RP. 3,430,000

JAMBI, 01 SEPTEMBER 2006


HORMAT KAMI, DISETUJUI OLEH

GIOK PAK HALIM


PERINCIAN
ANGGARAN BIAYA
INSTALASI LISTRIK
BESERTA BAHAN KABEL PANEL MCB
DI KANTOR PAK MARJUKI

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI BOX PANEL 1 BUAH RP. 150,000 RP. 150,000
2 INSTALASI MCB HAGER 7 BUAH RP. 60,000 RP. 420,000
3 INSTALASI PIYOS BAR 2 BUAH RP. 50,000 RP. 100,000
4 INSTALASI KABEL INDUK 5M RP. 30,000 RP. 150,000
5 INSTALASI KABEL AC 3 TITIK RP. 300,000 RP. 900,000
6 INSTALASI KABEL LAMPU 3 TITIK RP. 300,000 RP. 900,000
TOTAL RP. 2,620,000

JAMBI, 11 NOVEMBER 2006


HORMAT KAMI, DISETUJUI OLEH

GIOK PAK MARJUKI


PERINCIAN
ANGGARAN BIAYA SATUAN
INSTALASI LISTRIK DAN UPAH KERJA

KANTOR KANWIL DITJEN PAJAK JAMBI

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA


1 PASANG KABEL 4X120 MM2 1 METER RP. 100,000
2 PASANG KABEL 4X70 MM2 1 METER RP. 70,000
3 PASANG KABEL 4X50 MM2 1 METER RP. 50,000
4 PASANG KABEL 4X35 MM2 1 METER RP. 35,000
5 PASANG KABEL 4X25 MM2 1 METER RP. 25,000
6 PASANG KABEL 4X16 MM2 1 METER RP. 20,000
7 PASANG KABEL 4X10 MM2 1 METER RP. 20,000
8 PASANG KABEL 4X6 MM2 1 METER RP. 15,000
9 PASANG KABEL 4X4 MM2 1 METER RP. 15,000
10 PASANG KABEL 3X4 MM2 1 METER RP. 15,000
11 PASANG KABEL 3X2,5 MM2 1 METER RP. 15,000
12 PASANG PANEL INDUK 100X150 MM2 1 SET RP. 3,500,000
13 PASANG SOF 4X60 MM2 1 SET RP. 1,000,000
14 PASANG GROUND PENANGKAL PETIR 1 TITIK RP. 1,500,000
15 PASANG JARUM RADAR PETIR/BC 1 TITIK RP. 1,500,000
16 PASANG GROUND PANEL SOF 1 TITIK RP. 500,000
17 INSTALASI LAMPU JALAN 1 TITIK RP. 500,000
18 INSTALASI LAMPU TAMAN 1 TITIK RP. 200,000
19 INSTALASI LAMPU RUANGAN 1 TITIK RP. 35,000
20 INSTALASI STOP KONTAK 1 TITIK RP. 35,000
21 INSTALASI KABEL AC 1 TITIK RP. 250,000
22 INSTALASI TELEPON PABX 1 TITIK RP. 200,000
23 INSTALASI PIPA DI BALOK COR 1 TITIK RP. 15,000
24 INSTALASI BOX MCB 1 TITIK RP. 200,000

JAMBI, 15 NOVEMBER 2006


HORMAT KAMI, DISETUJUI OLEH
SUGIYONO PAK SUSENO
PERINCIAN
ANGGARAN BIAYA
PEMASANGAN (INSTALASI) LISTRIK DAN JASA KERJA
PASAR BARU JAMBI

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI BARU LAMPU 18 TITIK RP. 35,000 RP.
2 INSTALASI BARU STOP KONTAK 4 TITIK RP. 35,000 RP.
3 BONGKAR PASANG PANEL BOX MCB 1 SET RP. 1,000,000 RP.
4 PASANG KABEL BAGI GROF AC-LAMPU 9 TITIK RP. 75,000 RP.
5 PASANG BOX MCB WARHIT 1 SET RP. 150,000 RP.
6 INSTALASI KABEL INDUK 4X6 12 METER RP. 25,000 RP.
7 PASANG PIPA AUDIO/TV 2 TITIK RP. 25,000 RP.
8 PASANG LAMPU PENERANGAN 15 TITIK RP. 15,000 RP.
9 PASANG STOP KONTAK 4 TITIK RP. 15,000 RP.
10 PERBAIKAN SAKLAR 10 TITIK RP. 15,000 RP.
TOTAL PEKERJAAN RP.
PINJAMAN RP.
JUMLAH SISA RP.

JAMBI, 23 JANUARI 2007


HORMAT KAMI, TTD

SUGIYONO RIKI
PERINCIAN
NGGARAN BIAYA
TALASI) LISTRIK DAN JASA KERJA
ASAR BARU JAMBI

TOTAL
630,000
140,000
1,000,000
675,000
150,000
300,000
50,000
225,000
60,000
150,000
3,380,000
1,000,000
2,380,000

TTD

RIKI
PERINCIAN
ANGGARAN BIAYA
PENAMBAHAN DAYA DI KANTOR BUANA PINANCEK
CABANG JAMBI, JL. HAYAM WURUK

NO JENIS INSTALASI/PEMASANGAN HARGA


TAMBAH DAYA DARI 2200 KE 16500 VA
1 SETOR BP RP. 6,500,000
2 SETOR UJL RP. 3,950,000
3 JASA GAMBAR RP. 1,500,000
4 JASA KERJA RP. 1,000,000
5 KABEL S.R 4 X 16 RP. 1,500,000
TOTAL PEKERJAAN 14,450,000

JAMBI, 26 MARET 2007


HORMAT KAMI, DISETUJUI OLEH

SUGIYONO PAK RUDI


PIMPINAN
BUANA PINANCEK
PERINCIAN
ANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIK
BESERTA BAHAN SAKLAR PUTIH
DI BANGUNAN RUKO KOTA BARU

JENIS INSTALASI PEMASANGAN

Instalasi Lampu Donlet 4 Titik 95,000 380,000


Instalasi Lampu TL.RM 1 95,000 95,000
Instalasi Lampu Piteng 28 95,000 2,660,000
Instalasi Stop Kontak 10 95,000 950,000
Instalasi Lobang Lampu 5 10,000 50,000
Instalasi Box MCB 6 150,000 900,000
Instalasi Kabel i.B. 3x4 6 30,000 180,000
Instalasi Kabel Arde 3 50,000 150,000
Jumlah 5,365,000

Jambi, 05 April 2007


Hormat kami

GIOK
PERINCIAN
ANGGARAN BIAYA
PEMASANGAN (INSTALASI) PANEL LISTRIK
PENGGANTIAN DAN PEMBAGIAN DAYA DI LT. II
KANTOR PELAYANAN PAJAK

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI BOX PANEL 1 PCS RP. 500,000 RP.
2 INSTALASI MCB 3 POL 1 PCS RP. 400,000 RP.
3 INSTALASI MCB 1 POL 29 PCS RP. 55,000 RP.
4 INSTALASI REL MCB 3 PCS RP. 75,000 RP.
5 INSTALASI SISCR MCB 3 PCS RP. 75,000 RP.
6 INSTALASI PLAT KOPR. NOL 2 PCS RP. 150,000 RP.
7 INSTALASI PLAT ELEM 3 PCS RP. 50,000 RP.
8 INSTALASI AMP. METER 3 PCS RP. 150,000 RP.
9 INSTALASI CT. AMP METER 3 PCS RP. 150,000 RP.
10 INSTALASI WERENG KABEL PANEL 20 PCS RP. 5,000 RP.
11 INSTALASI DAK KABEL 2 PCS RP. 250,000 RP.
12 INSTALASI KABEL TIS 2 PCS RP. 75,000 RP.
13 JASA KERJA PASANG PANEL 1 SET RP. 1,750,000 RP.
TOTAL PEKERJAAN RP.

JAMBI, 15 APRIL 2007


HORMAT KAMI, DIKETAHUI

SUGIYONO
PERINCIAN
NGGARAN BIAYA
N (INSTALASI) PANEL LISTRIK
DAN PEMBAGIAN DAYA DI LT. II
OR PELAYANAN PAJAK

TOTAL
500,000
400,000
1,595,000
225,000
225,000
300,000
150,000
450,000
450,000
100,000
500,000
150,000
1,750,000
6,795,000

DIKETAHUI
PERINCIAN
ANGGARAN BIAYA
PEMASANGAN (INSTALASI) KABEL
PENGGANTIAN DAN PEMBAGIAN DAYA DI LT. II
KANTOR PELAYANAN PAJAK

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI KABEL NYY 4 x 16 25 METER RP. 100,000 RP. 2,500,000
2 INSTALASI KABEL GROUND 1 x 16 25 METER RP. 25,000 RP. 625,000
3 INSTALASI KABEL MWM 3 x 4 50 METER RP. 15,000 RP. 750,000
4 INSTALASI KABEL MWM 3 x 2,5 100 METER RP. 12,500 RP. 1,250,000
5 JASA PASANG KABEL 4 x 16 25 METER RP. 20,000 RP. 500,000
6 JASA PASANG KABEL 3 x 4 + 3 x 2,5 150 METER RP. 10,000 RP. 1,500,000
TOTAL PEKERJAAN RP. 7,125,000

JAMBI, 1 MEI 2007


HORMAT KAMI, DIKETAHUI

SUGIYONO
PERINCIAN
ANGGARAN BIAYA
PEMASANGAN (INSTALASI) LISTRIK DAN JASA KERJA
RUMAH ASENG

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI BARU LAMPU 23 TITIK RP. 35,000 RP.
2 INSTALASI EXHAUST FAN 2 TITIK RP. 75,000 RP.
3 INSTALASI KABEL AC 1 TITIK RP. 150,000 RP.
4 INSTALASI ANTENNA TV 1 TITIK RP. 75,000 RP.
5 INSTALASI STOP KONTAK 5 TITIK RP. 35,000 RP.
6 INSTALASI STOP GROUND 1 TITIK RP. 75,000 RP.
7 PERBAIKAN SAKLAR WC 1 TITIK RP. 35,000 RP.
TOTAL PEKERJAAN RP.

JAMBI, 19 MEI 2007


HORMAT KAMI, TTD

SUGIYONO RIKI
PERINCIAN
NGGARAN BIAYA
TALASI) LISTRIK DAN JASA KERJA
RUMAH ASENG

TOTAL
805,000
150,000
150,000
75,000
175,000
75,000
35,000
1,465,000

TTD

RIKI
PERINCIAN
ANGGARAN BIAYA
PEMASANGAN (INSTALASI) LISTRIK DAN JASA KERJA
RUMAH ACAI

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI BARU LAMPU 23 TITIK RP. 35,000 RP.
2 INSTALASI EXHAUST FAN 1 TITIK RP. 75,000 RP.
3 PERBAIKAN LAMPU 3 TITIK RP. 15,000 RP.
4 PERBAIKAN STOP KONTAK 1 TITIK RP. 15,000 RP.
TOTAL PEKERJAAN RP.

JAMBI, 19 MEI 2007


HORMAT KAMI, TTD

SUGIYONO RIKI
PERINCIAN
NGGARAN BIAYA
TALASI) LISTRIK DAN JASA KERJA
RUMAH ACAI

TOTAL
805,000
75,000
45,000
15,000
940,000

TTD

RIKI
PERINCIAN
ANGGARAN BIAYA
PEMASANGAN (INSTALASI) LISTRIK DAN JASA KERJA
KANTOR

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI BARU LAMPU 12 TITIK RP. 35,000 RP.
2 INSTALASI STOP KONTAK 3 TITIK RP. 35,000 RP.
3 PERBAIKAN BOX MCB 2 TITIK RP. 50,000 RP.
4 INSTALASI KABEL ANTENNA 2 TITIK RP. 75,000 RP.
TOTAL PEKERJAAN RP.

JAMBI, 19 MEI 2007


HORMAT KAMI, TTD

SUGIYONO RIKI
PERINCIAN
NGGARAN BIAYA
TALASI) LISTRIK DAN JASA KERJA
KANTOR

TOTAL
420,000
105,000
100,000
150,000
775,000

TTD

RIKI
PERINCIAN
ANGGARAN BIAYA
PEMASANGAN (INSTALASI) PANEL INDUK
PENGGANTIAN DAN PEMBAGIAN DAYA LISTRIK
DI LT. I KANTOR PELAYANAN PAJAK

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI BOX PANEL 1 PCS RP. 1,000,000 RP.
2 INSTALASI MCB 1 POL 39 PCS RP. 55,000 RP.
3 INSTALASI REL MCB 3 PCS RP. 75,000 RP.
4 INSTALASI SISCR MCB 3 PCS RP. 75,000 RP.
5 INSTALASI PLAT KOPR. NOL 5 PCS RP. 150,000 RP.
6 INSTALASI PLAT LEM 3 PCS RP. 50,000 RP.
7 INSTALASI AMP. METER 6 PCS RP. 150,000 RP.
8 INSTALASI CT. AMP METER 6 PCS RP. 150,000 RP.
9 JASA PEMASANGAN PANEL INDUK 1 PCS RP. 3,500,000 RP.
TOTAL PEKERJAAN RP.

JAMBI, 07 MEI 2007


HORMAT KAMI, DIKETAHUI

SUGIYONO
PERINCIAN
NGGARAN BIAYA
N (INSTALASI) PANEL INDUK
DAN PEMBAGIAN DAYA LISTRIK
NTOR PELAYANAN PAJAK

TOTAL
1,000,000
2,145,000
225,000
225,000
750,000
150,000
900,000
900,000
3,500,000
9,795,000

DIKETAHUI
PERINCIAN
ANGGARAN BIAYA
PEMASANGAN (INSTALASI) KABEL AC DI LT. I
PENGGANTIAN KABEL DAN PEMBAGIAN DAYA
DAN PEMASANGAN DI KANTOR PELAYANAN PAJAK

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI KABEL NYM 3 x 4 100 MTR RP. 15,000 RP.
2 INSTALASI KABEL NYM 3 x 2.5 150 MTR RP. 12,500 RP.
3 INSTALASI KABEL NYAF 1 x 50 10 MTR RP. 100,000 RP.
4 INSTALASI KABEL NYAF 1 x 16 25 MTR RP. 20,000 RP.
5 INSTALASI SEKUN KABEL 50 C 100 PCS RP. 5,000 RP.
6 INSTALASI SELONG SEKUN 50 C 100 PCS RP. 2,500 RP.
7 INSTALASI DAK KABEL 30 x 30 C 2 PCS RP. 250,000 RP.
8 INSTALASI KABEL TIS 300 C 2 PCS RP. 75,000 RP.
9 JASA PEMASANGAN KABEL 3 x 4 + 3 x 25 250 MTR RP. 10,000 RP.
TOTAL PEKERJAAN RP.

JAMBI, 22 MEI 2007


HORMAT KAMI, DIKETAHUI

SUGIYONO
PERINCIAN
NGGARAN BIAYA
INSTALASI) KABEL AC DI LT. I
KABEL DAN PEMBAGIAN DAYA
N DI KANTOR PELAYANAN PAJAK

TOTAL
1,500,000
1,875,000
1,000,000
500,000
500,000
250,000
500,000
150,000
2,500,000
8,775,000

DIKETAHUI
PERINCIAN
ANGGARAN BIAYA
PEMASANGAN (INSTALASI) KABEL PANEL INDUK
DISTRIBUSI LISTRIK DI LT. I
DAN JASA PEMASANGAN DI KANTOR PELAYANAN PAJAK

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI NOPIYUS BLXKER 1 PCS RP. 1,500,000 RP.
2 INSTALASI KABEL NYY 4 x 50 10 MTR RP. 350,000 RP.
3 INSTALASI MCB 3 VOLT 6 PCS RP. 400,000 RP.
4 INSTALASI WERENG PANEL 100 PCS RP. 5,000 RP.
9 JASA PEMASANGAN KABEL INDUK 4 x 50 10 MTR RP. 75,000 RP.
TOTAL PEKERJAAN RP.

JAMBI, 14 MEI 2007


HORMAT KAMI, DIKETAHUI

SUGIYONO
PERINCIAN
NGGARAN BIAYA
NSTALASI) KABEL PANEL INDUK
IBUSI LISTRIK DI LT. I
GAN DI KANTOR PELAYANAN PAJAK

TOTAL
1,500,000
3,500,000
2,400,000
500,000
750,000
8,650,000

DIKETAHUI
PERINCIAN
ANGGARAN BIAYA
PEMASANGAN, INSTALASI LISTRIK DAN JASA KERJA
TAMBAHAN DAN PERBAIKAN RUMAH ASENG

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI BARU LAMPU 14 TITIK RP. 30,000 RP.
2 INSTALASI EXHAUST FAN 1 TITIK RP. 50,000 RP.
3 PERBAIKAN SAKLAT 6 TITIK RP. 15,000 RP.
4 PERBAIKAN OM SAKLAR 1 TITIK RP. 250,000 RP.
5 PERBAIKAN STOP KONTAK 4 TITIK RP. 15,000 RP.
TOTAL PEKERJAAN RP.

JAMBI, 23 JUNI 2007


HORMAT KAMI, DIKETAHUI

SUGIYONO RIKI
PERINCIAN
NGGARAN BIAYA
TALASI LISTRIK DAN JASA KERJA
AN PERBAIKAN RUMAH ASENG

TOTAL
420,000
50,000
90,000
250,000
60,000
870,000

DIKETAHUI

RIKI
PERINCIAN
ANGGARAN BIAYA SATUAN
PEMASANGAN, INSTALASI LISTRIK DAN JASA KERJA

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI LAMPU 1 TITIK RP. 35,000 RP.
2 INSTALASI STOP KONTAK 1 TITIK RP. 35,000 RP.
3 INSTALASI KABEL AC 1 TITIK RP. 17,500 RP.
4 INSTALASI KABEL 4x6 1 METER RP. 20,000 RP.
5 INSTALASI KABEL TV 1 TITIK RP. 100,000 RP.
6 INSTALASI KABEL TELEPON 1 TITIK RP. 100,000 RP.
7 INSTALASI KABEL PARABOLA 1 TITIK RP. 100,000 RP.
8 INSTALASI BOX PANEL 1 TITIK RP. 500,000 RP.
9 INSTALASI OM SAKLAR 1 TITIK RP. 500,000 RP.
10 PASANG LAMPU 1 TITIK RP. 5,000 RP.

JAMBI, 28 JUNI 2007


HORMAT KAMI, DIKETAHUI

SUGIYONO ANTONI
PERINCIAN
ARAN BIAYA SATUAN
TALASI LISTRIK DAN JASA KERJA

TOTAL
35,000
35,000
17,500
20,000
100,000
100,000
100,000
500,000
500,000
5,000

DIKETAHUI

ANTONI
PERINCIAN PEMASANGAN PENANGKIS PETIR
BESERTA ARDE ENTALASI PANEL BESERTA MASA BUMI
BESERTA PENGADAAN BAHAN TERSEBUT DI BAWAH INI

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 PEMASANGAN PENANGKIS PETIR 1 SET RP. 5,000,000 RP.
2 PEMASANGAN MASA BUMI 1 SET RP. 1,500,000 RP.
3 PEMASANGAN ARDE PANEL 1 SET RP. 1,500,000 RP.
TOTAL PEKERJAAN RP.

Demikianlah penawaran ini kami tersebut di atas.

HORMAT KAMI

SOGIYONO/GIYO
ASANGAN PENANGKIS PETIR
ALASI PANEL BESERTA MASA BUMI
N BAHAN TERSEBUT DI BAWAH INI

TOTAL
5,000,000
1,500,000
1,500,000
8,000,000

HORMAT KAMI

SOGIYONO/GIYO
PERINCIAN
ANGGARAN BIAYA PEMASANGAN INSTALASI LISTRIK
DI RUKO BARU SIMPANG PULE

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI BOX MCB 3 SET RP. 150,000 RP.
2 INSTALASI LAMPU 22 TITIK RP. 85,000 RP.
3 INSTALASI SETOP KONTAK 9 TITIK RP. 85,000 RP.
4 INSTALASI KABEL IB KAWH 3 METER RP. 30,000 RP.
5 INSTALASI KABEL GRON 1 TITIK RP. 50,000 RP.
TOTAL PEKERJAAN RP.

JAMBI, 28 JUNI 2007


HORMAT KAMI, DIKETAHUI

SUGIYONO HALIM
PERINCIAN
PEMASANGAN INSTALASI LISTRIK
O BARU SIMPANG PULE

TOTAL
450,000
1,870,000
765,000
90,000
50,000
3,225,000

DIKETAHUI

HALIM
PERINCIAN
ANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA
APOTEK WTC LANTAI I

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI LAMPU 55 TITIK RP. 35,000 RP. 1,925,000
2 INSTALASI STOP KONTAK 25 TITIK RP. 35,000 RP. 875,000
3 INSTALASI KABEL AC 4 TITIK RP. 175,000 RP. 700,000
4 INSTALASI KABEL INDUK 4 X 6 KWH 25 MTR RP. 20,000 RP. 500,000
5 INSTALASI KABEL INDUK 4 X 6 GENESET 25 MTR RP. 20,000 RP. 500,000
6 INSTALASI KABEL ARDE 1 X 10 GENESET 25 MTR RP. 10,000 RP. 250,000
7 INSTALASI KABEL ARDE 1 X 10 KWH 25 MTR RP. 10,000 RP. 250,000
8 INSTALASI KABEL DATA KOMPUTER 5 TITIK RP. 100,000 RP. 500,000
9 INSTALASI KABEL DATA KAMERA CCTV 3 TITIK RP. 100,000 RP. 300,000
10 INSTALASI KABEL INDOK TELEPON 3 TITIK RP. 100,000 RP. 300,000
11 INSTALASI KABEL TELEPON PABX 6 TITIK RP. 100,000 RP. 600,000
12 INSTALASI KABEL ALARM 2 TITIK RP. 100,000 RP. 200,000
13 INSTALASI KABEL AUDIO 2 TITIK RP. 100,000 RP. 200,000
14 INSTALASI KABEL MEREK/ REKLAME 2 TITIK RP. 250,000 RP. 500,000
15 INSTALASI STOP KONTAK CCTV 3 TITIK RP. 100,000 RP. 300,000
16 INSTALASI STOP KONTAK KABEL TV 2 TITIK RP. 100,000 RP. 200,000
17 INSTALASI BOX PANEL INDUK 1 SET RP. 500,000 RP. 500,000
18 INSTALASI BOX OM.SAKELAR 1 SET RP. 500,000 RP. 500,000
19 INSTALASI BOX PANEL GENESET 1 SET RP. 500,000 RP. 500,000
20 INSTALASI PASANG LAMPU DONLET 55 TITIK RP. 5,000 RP. 275,000
21 PASANG BOR ARDE PANEL KWH 1 SET RP. 1,500,000 RP. 1,500,000
22 PASANG BOR HPR PANEL 1 SET RP. 2,000,000 RP. 2,000,000
JUMLAH RP. 13,375,000
PERINCIAN
ANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA
APOTEK WTC LANTAI II
PANEL PENERANGAN LP-B-RG BILAS
1 INSTALASI LAMPU 20 TITIK RP. 35,000 RP. 700,000
2 INSTALASI STOP KONTAK 18 TITIK RP. 35,000 RP. 630,000
3 INSTALASI KABEL AC 2 TITIK RP. 175,000 RP. 350,000
4 INSTALASI KABEL 4 X 6 KE LT.II 10 MTR RP. 20,000 RP. 200,000
5 INSTALASI KABEL DATA KOMPUTER 4 TITIK RP. 100,000 RP. 400,000
6 INSTALASI KABEL DATA KAMERA CCTV 1 TITIK RP. 100,000 RP. 100,000
7 INSTALASI STOP KONTAK KE KABEL TV 2 TITIK RP. 100,000 RP. 200,000
8 INSTALASI KABEL ARDE PANEL SOF 10 MTR RP. 10,000 RP. 100,000
9 INSTALASI KABEL TELEPON PABX 4 TITIK RP. 100,000 RP. 400,000
10 INSTALASI STOP KONTAK KAMERA CCTV 1 TITIK RP. 100,000 RP. 100,000
11 INSTALASI BOX PANEL SOF 1 SET RP. 350,000 RP. 350,000
12 PASANG ESOS PEN 2 TITIK RP. 75,000 RP. 150,000
13 PASANG LAMPU DONLET 20 TITIK RP. 5,000 RP. 100,000
JUMLAH RP. 3,780,000
PERINCIAN
ANGGARAN BIAYA TOTAL
PEMASANG INSTALASI LISTRIK DAN JASA
APOTEK WTC
1 INSTALASI LANTAI I RP. 13,375,000
2 INSTALASI LANTAI II RP. 3,780,000
JUMLAH RP. 17,155,000

JAMBI, 16 JANUARI 2008


HORMAT KAMI,

SUGIYONO
PERINCIAN
ANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA KERJA
RUMAH DI WTC LANTAI I

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI LAMPU 13 TITIK RP. 35,000 RP. 455,000
2 INSTALASI STOP KONTAK 8 TITIK RP. 35,000 RP. 280,000
3 INSTALASI KABEL KE ON SAKELAR 4 X 6 40 MTR RP. 20,000 RP. 800,000
4 INSTALASI KABEL KAMERA CCTV 2 TITIK RP. 100,000 RP. 200,000
5 INSTALASI STOP KONTAK CCTV ###
2 TITIK RP. 100,000 RP. 200,000
6 INSTALASI STOP KONTAK KABEL TV 2 TITIK RP. 100,000 RP. 200,000
7 INSTALASI KABEL DATA KOMPUTER 1 TITIK RP. 100,000 RP. 100,000
8 INSTALASI KABEL TELEPON 1 TITIK RP. 100,000 RP. 100,000
9 INSTALASI KABEL IB KWH 4 X 6 5 MTR RP. 20,000 RP. 100,000
10 INSTALASI KABEL ARDE KWH 1 X 10 5 MTR RP. 10,000 RP. 50,000
11 INSTALASI KABEL ARDE OM SAKELAR 40 MTR RP. 10,000 RP. 400,000
12 INSTALASI PASANG LAMPU DONLET 13 TITIK RP. 5,000 RP. 65,000
13 INSTALASI BOR ARDE PANEL 1 SET RP. 1,500,000 RP. 1,500,000
14 INSTALASI BOR HPR PANEL 1 SET RP. 2,000,000 RP. 2,000,000
15 INSTALASI GALIAN TIMBUN 1 TITIK RP. 500,000 RP. 500,000
16 INSTALASI BOX PANEL INDUK 1 SET RP. 500,000 RP. 500,000
17 INSTALASI KABEL BEL RUMAH 1 TITIK RP. 100,000 RP. 100,000
18 INSTALASI EXHAUST FAN 1 TITIK RP. 500,000 RP. 500,000
JUMLAH RP. 8,050,000
PERINCIAN
ANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA KERJA
RUMAH DI WTC LANTAI II
PANEL PENERANGAN LP-B-RG BILAS
1 INSTALASI LAMPU 26 TITIK RP. 35,000 RP. 910,000
2 INSTALASI STOP KONTAK 15 TITIK RP. 35,000 RP. 525,000
3 INSTALASI KABEL AC 1 TITIK RP. 175,000 RP. 175,000
4 INSTALASI KABEL 4 X 6 KE LT.II 20 MTR RP. 20,000 RP. 400,000
5 INSTALASI KABEL DATA KOMPUTER 2 TITIK RP. 100,000 RP. 200,000
6 INSTALASI KABEL DATA KAMERA CCTV 2 TITIK RP. 100,000 RP. 200,000
7 INSTALASI STOP KONTAK KE KABEL TV 2 TITIK RP. 100,000 RP. 200,000
8 INSTALASI KABEL PARABOLA 2 TITIK RP. 100,000 RP. 200,000
9 INSTALASI KABEL ANTNE UHF 1 TITIK RP. 100,000 RP. 100,000
10 INSTALASI KABEL ARDE PANEL 20 MTR RP. 10,000 RP. 200,000
11 INSTALASI KABEL TELEPON PABX 1 TITIK RP. 100,000 RP. 100,000
12 INSTALASI STOP KONTAK KAMERA CCTV 1 TITIK RP. 100,000 RP. 100,000
13 INSTALASI BOX PANEL SOF 1 SET RP. 350,000 RP. 350,000
14 PASANG EXHAUST FAN 3 TITIK RP. 75,000 RP. 225,000
15 PASANG KIPAS ANGIN 1 TITIK RP. 75,000 RP. 75,000
16 PASANG LAMPU DONLET 26 TITIK RP. 5,000 RP. 130,000
JUMLAH RP. 4,090,000
PERINCIAN
ANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA KERJA
RUMAH DI WTC LANTAI III

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI LAMPU 55 TITIK RP. 35,000 RP. 1,925,000
2 INSTALASI STOP KONTAK 25 TITIK RP. 35,000 RP. 875,000
3 INSTALASI KABEL AC 4 TITIK RP. 175,000 RP. 700,000
4 INSTALASI KABEL 4x6 KE LT. I 30 MTR RP. 20,000 RP. 600,000
5 INSTALASI KABEL ARDE 1x10 KE LT. I 30
### MTR RP. 10,000 RP. 300,000
6 INSTALASI KABEL 4x6 KE LT. II 20 MTR RP. 20,000 RP. 400,000
7 INSTALASI KABEL ARDE 1x10 KE LT. II 20 MTR RP. 10,000 RP. 200,000
8 INSTALASI KABEL DATA KOMPUTER 4 TITIK RP. 100,000 RP. 400,000
9 INSTALASI KABEL CAMERA CCTV 2 MTR RP. 100,000 RP. 200,000
10 INSTALASI STOP KONTAK CCTV 2 MTR RP. 100,000 RP. 200,000
11 INSTALASI KABEL TELEPON PABX 4 MTR RP. 100,000 RP. 400,000
12 INSTALASI BOX PANEL SOF 2 SET RP. 350,000 RP. 700,000
13 INSTALASI PASANG LAMPU DONLET 55 TITIK RP. 5,000 RP. 275,000
14 INSTALASI STOP KONTAK KABEL TV 8 TITIK RP. 100,000 RP. 800,000
15 INSTALASI KABEL INDUK TELEPON 3 TITIK RP. 100,000 RP. 300,000
16 INSTALASI KABEL DATA PARALEL CCTV 1 TITIK RP. 100,000 RP. 100,000
18 INSTALASI EXHAUST FAN 3 TITIK RP. 75,000 RP. 225,000
JUMLAH RP. 8,600,000
PERINCIAN
ANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA KERJA
RUMAH DI WTC LANTAI IV

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI LAMPU 12 TITIK RP. 35,000 RP. 420,000
2 INSTALASI STOP KONTAK 11 TITIK RP. 35,000 RP. 385,000
3 INSTALASI KABEL SOLAHART 1 TITIK RP. 175,000 RP. 175,000
4 INSTALASI KABEL ARDE 1x10 20 MTR RP. 10,000 RP. 200,000
5 INSTALASI KABEL ENSET 4x6 20
### MTR RP. 20,000 RP. 400,000
6 INSTALASI STOP KONTAK TV 1 TITIK RP. 100,000 RP. 100,000
7 INSTALASI OM SAKLAR 1 SRT RP. 350,000 RP. 350,000
8 INSTALASI BOX PANEL SOF 1 SRT RP. 350,000 RP. 350,000
9 INSTALASI BOX PANEL GENSET 1 SRT RP. 500,000 RP. 500,000
10 INSTALASI KABEL 4x6 PANEL SOF 40 MTR RP. 20,000 RP. 800,000
11 INSTALASI KABEL 1x10 ARDE PANEL 40 MTR RP. 10,000 RP. 400,000
18 INSTALASI EXHAUST FAN 1 TITIK RP. 75,000 RP. 75,000
JUMLAH RP. 4,155,000
PERINCIAN
ANGGARAN BIAYA TOTAL
PEMASANG INSTALASI LISTRIK DAN JASA KERJA
RUMAH DI WTC LANTAI I-IV
1 INSTALASI LANTAI I RP. 8,050,000
2 INSTALASI LANTAI II RP. 4,090,000
3 INSTALASI LANTAI III RP. 8,600,000
4 INSTALASI LANTAI IV RP. 4,155,000
JUMLAH RP. 24,895,000

JAMBI, 16 JANUARI 2008


HORMAT KAMI,

SUGIYONO
PERINCIAN
ANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA KERJA
APOTIK SIPIN LANTAI I

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI LAMPU 61 TITIK RP. 35,000 RP. 2,135,000
2 INSTALASI STOP KONTAK 34 TITIK RP. 35,000 RP. 1,190,000
3 INSTALASI KABEL AC 3 TITIK RP. 175,000 RP. 525,000
4 INSTALASI KABEL REKLAME 2 TITIK RP. 25,000 RP. 50,000
5 INSTALASI KABEL INDUK 4x6 30 MTR RP. 20,000 RP. 600,000
6 INSTALASI KABEL TV ###
1 TITIK RP. 100,000 RP. 100,000
7 INSTALASI KABEL TELEPON INDUK 4 TITIK RP. 100,000 RP. 400,000
8 INSTALASI KABEL TELEPON 6 TITIK RP. 100,000 RP. 600,000
9 INSTALASI KABEL PARABOLA 1 TITIK RP. 100,000 RP. 100,000
10 INSTALASI KABEL DATA KOMPUTER 6 SET RP. 100,000 RP. 600,000
11 INSTALASI KABEL DATA CCTV 3 SET RP. 100,000 RP. 300,000
12 INSTALASI STOP KONTAK CCTV 3 MTR RP. 100,000 RP. 300,000
13 INSTALASI KABEL AUDIO 2 TITIK RP. 100,000 RP. 200,000
14 INSTALASI KABEL ALARM 1 TITIK RP. 100,000 RP. 100,000
15 INSTALASI KABEL ARDE PANEL 1x10 45 MTR RP. 10,000 RP. 450,000
16 INSTALASI BOX PANEL INDUK 1 SET RP. 500,000 RP. 500,000
17 INSTALASI OM SAKELAR 1 SET RP. 500,000 RP. 500,000
18 INSTALASI BOX PANEL GENSET 1 SET RP. 500,000 RP. 500,000
19 INSTALASI BOX ARDE 1 SET RP. 1,500,000 RP. 1,500,000
20 PASANG LAMPU DONLET 61 TITIK RP. 5,000 RP. 305,000
21 PASANG KABEL GENSET 4x6 15 MTR RP. 20,000 RP. 300,000
22 PASANG HPR 1 SET RP. 1,500,000 RP. 1,500,000
JUMLAH RP. 12,755,000
PERINCIAN
ANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA KERJA
RUMAH DI WTC LANTAI II
PANEL PENERANGAN LP-B-RG BILAS
1 INSTALASI LAMPU 26 TITIK RP. 35,000 RP. 910,000
2 INSTALASI STOP KONTAK 15 TITIK RP. 35,000 RP. 525,000
3 INSTALASI KABEL AC 1 TITIK RP. 175,000 RP. 175,000
4 INSTALASI KABEL 4 X 6 KE LT.II 20 MTR RP. 20,000 RP. 400,000
5 INSTALASI KABEL DATA KOMPUTER 2 TITIK RP. 100,000 RP. 200,000
6 INSTALASI KABEL DATA KAMERA CCTV 2 TITIK RP. 100,000 RP. 200,000
7 INSTALASI STOP KONTAK KE KABEL TV 2 TITIK RP. 100,000 RP. 200,000
8 INSTALASI KABEL PARABOLA 2 TITIK RP. 100,000 RP. 200,000
9 INSTALASI KABEL ANTNE UHF 1 TITIK RP. 100,000 RP. 100,000
10 INSTALASI KABEL ARDE PANEL 20 MTR RP. 10,000 RP. 200,000
11 INSTALASI KABEL TELEPON PABX 1 TITIK RP. 100,000 RP. 100,000
12 INSTALASI STOP KONTAK KAMERA CCTV 1 TITIK RP. 100,000 RP. 100,000
13 INSTALASI BOX PANEL SOF 1 SET RP. 350,000 RP. 350,000
14 PASANG EXHAUST FAN 3 TITIK RP. 75,000 RP. 225,000
15 PASANG KIPAS ANGIN 1 TITIK RP. 75,000 RP. 75,000
16 PASANG LAMPU DONLET 26 TITIK RP. 5,000 RP. 130,000
JUMLAH RP. 4,090,000
PERINCIAN
ANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA KERJA
RUMAH DI WTC LANTAI III

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI LAMPU 55 TITIK RP. 35,000 RP. 1,925,000
2 INSTALASI STOP KONTAK 25 TITIK RP. 35,000 RP. 875,000
3 INSTALASI KABEL AC 4 TITIK RP. 175,000 RP. 700,000
4 INSTALASI KABEL 4x6 KE LT. I 30 MTR RP. 20,000 RP. 600,000
5 INSTALASI KABEL ARDE 1x10 KE LT. I 30
### MTR RP. 10,000 RP. 300,000
6 INSTALASI KABEL 4x6 KE LT. II 20 MTR RP. 20,000 RP. 400,000
7 INSTALASI KABEL ARDE 1x10 KE LT. II 20 MTR RP. 10,000 RP. 200,000
8 INSTALASI KABEL DATA KOMPUTER 4 TITIK RP. 100,000 RP. 400,000
9 INSTALASI KABEL CAMERA CCTV 2 MTR RP. 100,000 RP. 200,000
10 INSTALASI STOP KONTAK CCTV 2 MTR RP. 100,000 RP. 200,000
11 INSTALASI KABEL TELEPON PABX 4 MTR RP. 100,000 RP. 400,000
12 INSTALASI BOX PANEL SOF 2 SET RP. 350,000 RP. 700,000
13 INSTALASI PASANG LAMPU DONLET 55 TITIK RP. 5,000 RP. 275,000
14 INSTALASI STOP KONTAK KABEL TV 8 TITIK RP. 100,000 RP. 800,000
15 INSTALASI KABEL INDUK TELEPON 3 TITIK RP. 100,000 RP. 300,000
16 INSTALASI KABEL DATA PARALEL CCTV 1 TITIK RP. 100,000 RP. 100,000
18 INSTALASI EXHAUST FAN 3 TITIK RP. 75,000 RP. 225,000
JUMLAH RP. 8,600,000
PERINCIAN
ANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA KERJA
RUMAH DI WTC LANTAI IV

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI LAMPU 12 TITIK RP. 35,000 RP. 420,000
2 INSTALASI STOP KONTAK 11 TITIK RP. 35,000 RP. 385,000
3 INSTALASI KABEL SOLAHART 1 TITIK RP. 175,000 RP. 175,000
4 INSTALASI KABEL ARDE 1x10 20 MTR RP. 10,000 RP. 200,000
5 INSTALASI KABEL ENSET 4x6 20
### MTR RP. 20,000 RP. 400,000
6 INSTALASI STOP KONTAK TV 1 TITIK RP. 100,000 RP. 100,000
7 INSTALASI OM SAKLAR 1 SRT RP. 350,000 RP. 350,000
8 INSTALASI BOX PANEL SOF 1 SRT RP. 350,000 RP. 350,000
9 INSTALASI BOX PANEL GENSET 1 SRT RP. 500,000 RP. 500,000
10 INSTALASI KABEL 4x6 PANEL SOF 40 MTR RP. 20,000 RP. 800,000
11 INSTALASI KABEL 1x10 ARDE PANEL 40 MTR RP. 10,000 RP. 400,000
18 INSTALASI EXHAUST FAN 1 TITIK RP. 75,000 RP. 75,000
JUMLAH RP. 4,155,000
PERINCIAN
ANGGARAN BIAYA TOTAL
PEMASANG INSTALASI LISTRIK DAN JASA KERJA
APOTIK SIPIN
1 TOTAL A LANTAI I RP. 12,755,000
2 TOTAL B LANTAI II RP. 4,415,000
3 TOTAL C LANTAI III RP. 3,760,000
JUMLAH RP. 20,930,000

JAMBI, 04 OKTOBER 2007


HORMAT KAMI,

SUGIYONO
PERINCIAN
ANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK BESERTA BAHAN SAKLAR PUTIH
DI BANGUNAN RUKO SIMPANG RIMBO

NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL


1 INSTALASI LAMPU 60 TITIK RP. 90,000 RP. 5,400,000
2 INSTALASI STOP KONTAK 24 TITIK RP. 90,000 RP. 2,160,000
3 INSTALASI KABEL 1 B 3 X 4 20 METER RP. 20,000 RP. 400,000
4 INSTALASI BOX MCB 8 SET RP. 150,000 RP. 1,200,000
JUMLAH RP. 9,160,000
PERINCIAN
ANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK BESERTA BAHAN SAKLAR PUTIH
DI BANGUNAN KEBUN HANDIL
PANEL PENERANGAN LP-B-RG BILAS
1 INSTALASI LAMPU 36 TITIK RP. 90,000 RP. 3,240,000
2 INSTALASI STOP KONTAK 16 TITIK RP. 90,000 RP. 1,440,000
3 INSTALASI KABEL 1 B 3 X 4 25 METER RP. 20,000 RP. 500,000
4 INSTALASI BOX MCB 4 SET RP. 150,000 RP. 600,000
JUMLAH RP. 5,780,000

JAMBI, 01 MARET 2008


HORMAT KAMI,

GIOK