DESA :
ASAL USULAN :
DESA SEJEGI
KECAMATAN MEMPAWAH TIMUR
KABUPATEN MEMPAWAH
TAHUN ANGGARAN 2019
DAFTAR HARGA UPAH DAN BAHAN
UNIT KERJA :
PEKERJAAN : JALAN RABAT BETON (+ BARAU, JEMBATAN, BOKS )
LOKASI :
SUMBER DANA :
TH. ANGGARAN :
A. HARGA BAHAN
NO. U R A I A N SATUAN HARGA BAHAN
I. BAHAN KAYU
1 Kayu Belian 8/8 - 4 M Tidak Ketam M³ Rp. -
2 Kayu Belian 4/8 - 4 M Tidak Ketam M³ Rp. 6,240,000.00
3 Kayu Belian 10/10 - 4 M Tidak Ketam M³ Rp. 8,750,000.00
4 Kayu Belian 5/10 - 4 M Tidak Ketam M³ Rp. 6,250,000.00
5 Papan kls IV / Bekisting M³ Rp. 900,000.00
6 Cerucuk ø 6 s/d ø 8 cm Panjang 4.00 M' M³ Rp. 6,000.00
M³
II. BAHAN PENGISI
1 Semen Porland @ 50 Kg Zak Rp. 85,000.00
2 Pasir Beton M³ Rp. 120,000.00
3 Pasir Urug M³ Rp. 120,000.00
4 Batu Splite uk. 3/5 M³ Rp. 270,000.00
5 Batu Splite uk. 1/2 cm - 2/3 cm M³ Rp. 335,000.00
6 Batu uk. 10/15 M³ Rp. 220,000.00
7 Tanah Laterit/Tanah Merah Berpasir M³ Rp. 100,000.00
III. BAHAN BESI
1 Kawat Ikat Beton (Bendrat) / Kawat Las Kg Rp. 17,000.00
2 Besi Beton U.24 . . . Polos Kg Rp. 14,000.00
3 Baut ø 12mm Panjang 26 s/d 30 Cm Batang Rp. 12,600.00
4 Baut ø 12mm Panjang 31 s/d 35 Cm Batang Rp. 16,500.00
5 Baut ø 12mm Panjang 12 s/d 18 Cm Batang Rp. 17,000.00
6 Baut ø 5/8" Panjang 12 s/d 18 Cm Batang Rp. 14,000.00
7 Baut ø 5/8" Panjang 24 s/d 30 Cm Batang Rp. 17,500.00
8 Cekak 32 mm Buah Rp. 63,000.00
9 Beughel 4 x 40 x 1000 mm Buah Rp. 41,000.00
I. PENGADAAN PIPA
1 Pipa GIP ø 4" ............. # Medium B # M' Rp. 250,000.00
2 Pipa GIP ø 3" ............. # Medium B # M' Rp. 200,000.00
3 Pipa GIP ø 2" ............. # Medium B # M' Rp. 100,000.00
4 Pipa PVC ø 4" ............. # AW (10 Kg/Cm2) # M' Rp. 80,000.00
5 Pipa PVC ø 3" ............. # AW (10 Kg/Cm ) #
2
M' Rp. 50,000.00
6 Pipa PVC ø 2" ............. # AW (10 Kg/Cm2) # M' Rp. 25,000.00
7 Pipa PVC ø 1" ............. # AW (10 Kg/Cm ) #
2
M' Rp. 7,000.00
8 Pipa PVC ø 3/4" ............. # AW (10 Kg/Cm ) #
2
M' Rp. 6,000.00
9 Pipa PVC ø 1/2" ............. # AW (10 Kg/Cm2) # M' Rp. 4,500.00
Sub Total 3) 0 0
Lembar :
Take Of Sheet
0.15
Panjang TPT yang akan di buat untuk 1 sisi = 120 M
1.2
SNI 2837 - 2008
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 5 PP 0.3
KEBUTUHAN BAHAN
A. Luas TPT
= 0.15 + 0.3 x 1.50 0.3
2
= 0.3375 M²
Take Of Sheet
C.
D.
TAKE OF SHEET
Lapisan Tanah Penutup ( Tanah Timbunan, Tebal 30 Cm ) Faktor Loose (FL) 25%
Volume Lapisan Penutup = 2.2 x 120 x 0.30 = 19.8 M³
= 79 M³ Volume Timbunan = 79 + 19.8
= 99 M³
Jlh Pekerja Untuk Penghamparan Tanah Timbunan = 0.5 x 99
= 50 HOK
=
Proyek
Pekerjaan
Lokasi
Dusun : Bemban
Desa : Sejegi
0,15 m Kecamatan : Mempawah Timur
Kabupaten : Mempawah
Propinsi : Kalimantan Barat
Gambar
1,2 m
Diukur
Digambar
H 1 : 100
Skala
V
0,30 m No. Gambar
Jlh. Gambar
Dibuat oleh
0,30 m
YOYOK
Diketahui Oleh,
MUHAMMAD IDRIS.ZH
Kode Gbr Jlh Lmbr No Lmbr
TPT