Anda di halaman 1dari 1

D25-80 D25-80 D25-80 D20-200 D25-80 D25-80

D20-200 D20-200 D20-200 D20-200 D20-200 D20-200 D20-200 D20-200 D20-200

D20-150 D20-150 D20-150 D20-150 D20-150 D20-150 D20-150 D20-150 D20-150


0.6 m

D20-100 D20-200 D20-100 D20-100 D20-100

7m
TAMPAK ATAS
SKALA 1 : 25

4 D-22 4 D-22
0.8 m
4 D-22

4 D-22 0.8 m 0.8 m


D16-250
5 D-22

5 D-22 D16-250

7m
POTONGAN MELINTANG
SKALA 1 : 25

Mata Kuliah Digambar Oleh: Mutu Material: Pekerjaan: Judul Gambar: Kode Gambar: Tanda Tangan:

Perencanaan Bangunan KELOMPOK III:


Rekayasa Sipil II 1. Amrullah (NIM 1710811110056)
fc' = 25 MPa Struktur Atas Jembatan
(HSKK 732) 2. Balqis Azizah (NIM 1710811120009) Fy = 320 MPa Jembatan Tipe Pile Slab Penulangan Voute
Dosen : 3. Nudiya Nur Azima (NIM 1710811120040) fy = 240 MPa Bentang 30 m 05
Program Studi Teknik Sipil 4. Nur Hatini Wardani (NIM 1710811120041) Kelas-A (1 - 7 - 1)
Fakultas Teknik 5. Ratri Handayanti (NIM 1710811120043)
Universitas Lambung Mangkurat M. Arsyad, S.T., M.T. Ir. Markawie, M.T.
6. Yordy Rexzy Ery P (NIM 1710811110056)
Banjarbaru

Anda mungkin juga menyukai