PEKERJAAN : RENCANA PENGADAAN METERISASI DAN ACESORIS PJU

LOKASI : DESA SULEWANA

TAHUN : 2021

NO. Uraian Pekerjaan Volume Satuan Harga Satuan


(Rp)
1 2 3 4 5
I. PENGADAAN MATERIAL
1. Meter Daya 7700 2 bh 7,700,000
2. MCB 35 Amper 2 bh 180,000
3. Persing Clam 476 bh 15,000
4. Box Panel 2 bh 650,000
5. Straing Clamp 238 bh 10,000
6. Pipa PVC 2" 4 bh 60,500
7. Kontaktor 95 Amper 2 bh 1,750,000
8. NFB 95 Amper 2 bh 1,300,000
9. Foto Sell 2 bh 200,000
10. Kabel TC 2 x 10 MM' 6000 mtr 7,000
11 Kabel NYM 2,5 MM 360 mtr 15,000
12 Lampu LED 50 Watt 238 bh 1,800,000
13 Tiang listrik 9 meter 45 bh 2,800,000
14 Stang 238 bh 300,000
Jumlah I

II. PEKERJAAN SIPIL / JASA


1. Upah Pemasangan Kabel TC 2 x 10 mm 6000 mtr 3,000.00
2. Upah Pemasangan Kabel NYM 2,5 mm 714 mtr 3,000.00
3. Upah Pemasangan Panel 1 Unit 350,000.00
4. Upah Pemasangan Persing Clam 476 bh 4,000.00
5. Upah Pemasangan Strihg Clam 238 bh 3,000.00
6. Pengurusan Administrasi Pelaporan 1 ls 250,000.00
7. Upah Penyambungan Daya 3500 1 Unit 660,000.00
8 Upah Pemasangan Stang Lampu 238 Unit 50,000.00
9 Upah pemasangan Tiang Listrik 45 bh 500,000.00
10 Sewa angkutan mobil skylife 1 kali 7,500,000.00
Jumlah II
Jumlah I + II

Kepala Desa Sulewana


.....................................
Jumlah Harga (Rp)

15,400,000.00
360,000.00
7,140,000.00
1,300,000.00
2,380,000.00
242,000.00
3,500,000.00
2,600,000.00
400,000.00
42,000,000.00
5,400,000.00
428,400,000.00
126,000,000.00
71,400,000.00
706,522,000.00

18,000,000.00
2,142,000.00
350,000.00
1,904,000.00
714,000.00
250,000.00
660,000.00
11,900,000.00
22,500,000.00
7,500,000.00
65,920,000.00
772,442,000.00