Jenis
Volume Sub Komponen
Kode Uraian Sub Output/Komponen/Sub Komponen/Detil Output (Utama/ Rincian Perhitungan Harga Satuan Jumlah
Pendukung)
1 2 3 4 5 6 7
2087.032.WORKSHOP TATA KELOLA MUTU - 73,110,000
011 Pelaksanaan Workshop Utama - 73,110,000
521211Belanja Bahan -
- ATK 1 pt x 1 tr 1 PT 300,000 300,000
- Penggandaan 1 pt x 1 tr 1 PT 300,000 300,000
- Spanduk 1 pt x 1 tr 1 PT 300,000 300,000
- Computer Supply 1 pt x 1 tr 1 PT 500,000 500,000
-
522151Belanja Jasa Profesi - -
- Honor Narasumber Setara Eselon II (50% ) 1 or x 1 tr x 1.5 jam 2 OJ 500,000 750,000
- Honor Narasumber (setara es. 3 SBM) 2 or x 3 jam x 2 hr 12 OJ 900,000 10,800,000
- Honor Moderator (sesuai SBM) 2 or x 1 tr x 1 kali 2 OK 700,000 1,400,000
-
524114Belanja Perjalanan Dinas Paket Meeting Dalam Kota - -
- Paket Meeting Fullboard 44 or x 1 tr x 2 hr 88 OH 370,000 32,560,000
- Uang Harian Peserta 44 or x 1 tr x 2 hr 88 OH 150,000 13,200,000
- Transport Lokal Peserta 44 or x 1 tr 44 OH 150,000 6,600,000
-
524119Belanja Perjalanan Dinas Paket Meeting Luar Kota - -
- Transport Narasumber 2 or x 1 tr x 1 hr 2 OT 2,200,000 4,400,000
- Biaya Penginapan Narasumber 2 or x 1 tr x 2 hr 4 OH 500,000 2,000,000
Mengetahui,
Kepala Dinas Kesehatan dan Keluarga Berencana
Kabupaten Kayong Utara