C. PEKERJAAN DPT/TALUD
I. TALUD TIPE A (SAMPING ASRAMA PUTRA) :
II. TALUD TIPE B (DIATAS BUKIT BELAKANG ASRAMA PUTRI) : 0%
JUMLAH TOTAL
PROGRESS (%)
PROGRESS RENCANA
PROGRESS KOMULATIF (%)