NO NAMA ALAT/BAHAN SPESIFIKASI JUMLAH DIBUTUHKAN KETERANGAN
1 KABEL UTP CAT 5e 1 ROLL TERSISA 43 METER 2 SWITCH 24 PORT 4 BUAH TERSEDIA 2 UNIT 3 KABEL FIBER OPTIK SINGLE CORE 1 ROLL TERSISA 100 METER 4 KONEKTOR UTP RJ 45 5 PCS BELUM TERSEDIA 5 KABEL ETERNA 2 X 1.5 50 METER BELUM TERSEDIA 6 STOP KONTAK 4 LUBANG 55 BUAH BELUM TERSEDIA 7 STEKER 10 BUAH BELUM TERSEDIA
MAINTENANCE 1 HARDISK 2,5 INCH 1 TB 5 BUAH PERBAIKAN KOMPUTER CLIENT
BIAYA PEMINDAHAN LAB
NO KEGIATAN BIAYA 1 PEMINDAHAN PC RP. 250.000 2 INSTALASI LISTRIK RP. 2 500.000 3 KONSUMSI RP. 500.000