JUMLAH HARGA
JUMLAH HARGA ADDENDUM
NO. U R A I A N
KONTRAK (Rp.) KONTRAK 01
(Rp.)
a b c d
TERBILANG
Tiga Belas Milyar Sembilan Ratus Lima Puluh Enam Juta Dua Ratus Dua Puluh Delapan Ribu Rupiah
Erwin Syahril, ST, MM Erick Ady Novendra, ST, MT H. Satriya Madjid, ST, MSP
Nip .19720917 200312 1 011 Nip. 19821123 200901 1 004 Team Leader
DAFTAR KUANTITAS DAN HARGA
VOLUME
VOLUME HARGA JUMLAH HARGA JUMLAH HARGA
ADD
NO. U R A I A N ANALISA KONTRAK SAT SATUAN KONTRAK AWAL ADD KONTRAK 01
KONTRAK
AWAL (Rp.) (Rp.) (Rp.)
01
a b c d e f g h=dxg i=fxg
A PEKERJAAN LANTAI ANJUNGAN
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi ---- 1.00 Ls 1.00 80,000,000.00 80,000,000.00 80,000,000.00
2 Pembuatan Diresi Keet --- 1.00 Ls 1.00 16,000,000.00 16,000,000.00 16,000,000.00
3 Pasangan Bowplank SNI-1.6.4 644 M1 644.00 58,200.00 37,480,800.00 37,480,800.00
4 Papan Proyek ---- 1.00 Ls 1.00 300,000.00 300,000.00 300,000.00
133,780,800.00 133,780,800.00
II. PEKERJAAN TANAH
1 Galian Tanah SNI-2.6.1 53.23 M3 64.76 51,250.00 2,728,037.50 3,318,950.00
2 Galian Tanah Drainase SNI-2.6.1 354.45 M3 441.40 51,250.00 18,165,562.50 22,621,750.00
3 Urugan Kembali SNI-2.6.9a 17.74 M3 168.72 21,000.00 372,540.00 3,543,120.00
4 Urugan Tanah Timbunan Biasa SNI-2.6.15 1,170.15 M3 1,931.05 138,750.00 162,358,312.50 267,933,187.50
5 Urugan Pasir Bawah Lantai SNI-2.6.11 1,103.63 M3 1,750.61 152,500.00 168,303,575.00 266,968,025.00
351,928,027.50 564,385,032.50
III. PEKERJAAN DINDING DAN PAS. BATU
1 Pas. Batu Bata T= 1/2 bata, 1 Pc : 3 Ps Trasraam Drainase SNI-4.6.10 1,575.34 M2 1,612.57 106,299.50 167,457,854.33 171,415,384.72
2 Pas. Plesteran Trasram 1:3 Tebal 15 mm SNI-5.6.3 1,339.04 M2 1,328.00 40,527.60 54,268,077.50 53,820,652.80
3 Pek. Pas. Batu Tanggul (mengganti tanggul yang rusak) SNI-3.6.6 M3 22.97 546,440.00 - 12,551,726.80
221,725,931.83 237,787,764.32
IV. PASANGAN BETON BERTULANG
1 Pek. Talud Beton SNI-7.6.42a 423.46 M3 423.48 4,174,200.00 1,767,606,732.00 1,767,690,216.00
2 Pek. Beton Penutup Drainase SNI-7.6.1 29.96 M3 - 776,350.00 23,259,446.00
Pek. Beton Penutup Drainase (BETON BERTULANG) 37.94 4,174,200.00 158,369,148.00
1,790,866,178.00 1,926,059,364.00
V. PEKERJAAN PIPA SALURAN
1 Pek. Pipa Saluran PVC 3" SNI-10.6.31 209.80 M" 160.00 118,575.00 24,877,035.00 18,972,000.00
24,877,035.00 18,972,000.00
VI. PEKERJAAN LANTAI
1 Pas. Lantai Keramik 60 x 60 Granit Kasar Stage SNI-13.6.45a 2,814.80 M2 2,576.88 348,533.00 981,050,688.40 898,127,717.04
2 Pas. Lantai Keramik 30 x 30 Anti Slip Tangga Pelataran SNI-13.6.49 432.00 M2 810.90 187,558.00 81,025,056.00 152,090,782.20
3 Pek.Lantai Kerja Beton SNI-7.6.1 1,199.38 M3 1,255.05 776,350.00 931,138,663.00 974,358,067.50
4 Pek. Lantai Anjungan Keramik 40 x 40 Anti slip SNI-13.6.48 9,311.38 M2 8,317.56 185,481.50 1,727,088,729.47 1,542,753,505.14
5 Pek.Beton Lantai Jogging Track SNI-7.6.1 109.26 M3 109.25 776,350.00 84,824,001.00 84,816,237.50
6 Pas. Lantai Keramik 40 x 40 Anti Slip (Motif Pola Lantai) SNI-13.6.48 1,320.00 M2 1,484.39 185,481.50 244,835,580.00 275,326,883.79
7 Pas. Lantai Keramik 30 x 30 Anti Slip (Motif Pola Lantai) SNI-13.6.49 2,595.91 M2 2,205.54 187,558.00 486,883,687.78 413,666,671.32
8 Pas. Koral Lantai - 3,947.66 M2 3,901.75 135,000.00 532,934,100.00 526,736,291.08
5,069,780,505.65 4,867,876,155.57
JUMLAH REAL COST 7,592,958,477.98 7,748,861,116.38
selisih 155,902,638.40
a b c d e f g h=dxg i=fxg
B PEKERJAAN SCULPTURE PERSAHABATAN
-
II. PEKERJAAN TANAH
1 Galian Tanah SNI-2.6.1 12.25 M3 26.81 51,250.00 627,812.50 1,374,012.50
2 Urugan Kembali SNI-2.6.9a 4.08 M3 8.94 21,000.00 85,680.00 187,740.00
3 Urugan Tanah Timbunan Biasa SNI-2.6.15 112.01 M3 47.12 138,750.00 15,541,387.50 6,537,900.00
4 Urugan Pasir Bawah Pondasi SNI-2.6.11 2.45 M3 2.34 152,500.00 373,625.00 356,850.00
5 Urugan Pasir Bawah Lantai SNI-2.6.11 5.28 M3 - 152,500.00 805,200.00 -
(Sudah terhitung di luasan anjungan)
17,433,705.00 8,456,502.50
III. PEKERJAAN PONDASI
1 Pas. Batu Kosong Bawah Pondasi SNI-3.6.14 4.90 M3 - 281,220.00 1,377,978.00 -
2 Pas. Pondasi Batu Kali / Bt.Gunung SNI-3.6.6 21.85 M3 - 546,440.00 11,939,714.00 -
3 Pek.Pondasi Poerplat SNI-7.6.42a - M3 13.86 4,174,200.00 - 57,854,412
4 Pek.Lantai Kerja Pondasi Poer SNI-7.6.1 - M3 1.10 776,350.00 - 853,985
5 Pek. Kolom dan Ring Balk Stand Gong Perdamaian SNI-7.6.42a - M3 2.03 4,174,200.00 - 8,473,626
13,317,692.00 67,182,023.00
IV. PEKERJAAN DINDING DAN PAS. BATU
1 Pas. Pondasi Batu Bata T= 1 bata, 1 Pc : 3 Ps Trasraam SNI-4.6.3 105.20 M2 80.43 219,492.50 23,090,611.00 17,653,781.78
23,090,611.00 17,653,781.78
V. PEKERJAAN LANTAI
1 Pas. Lantai Granito 60x60 SNI-13.6.45a 27.15 M2 78.50 348,533.00 9,462,670.95 27,359,840.50
2 Pas. Lantai Granito Tangga 40x40 SNI-13.6.45b 78.53 M2 61.34 339,158.00 26,634,077.74 20,803,951.72
36,096,748.69 48,163,792.22
VI PEKERJAAN SCULPTURE DAN PRASASTI
1 Pembuatan Sculpture persahabatan Plat Alcupan --- 89.58 M2 90.40 1,350,000.00 120,933,000.00 122,040,000.00
2 Pembuatan Pilar Prasasti SNI-7.6.1 0.20 M3 0.20 776,350.00 155,270.00 155,270.00
3 Pembuatan Plakat Prasasti --- 1.00 Ls 1.00 1,167,000.00 1,167,000.00 1,167,000.00
122,255,270.00 123,362,270.00
VII. PEKERJAAN LAMPU SOROT
1 Lampu Sorot SpotLight + Instalasi 6.00 Bh 6.00 650,000.00 3,900,000.00 3,900,000.00
3,900,000.00 3,900,000.00
Pejabat Pelaksana Teknis Kegiatan Konsultan Supervisi Kontraktor Pelaksana Panitia Peneliti Kontrak
PT. Anugrah Cipta Dimensi PT. Karya Mandala Putera
No. Nama Jabatan Tanda Tangan
a b c d e f g h=dxg i=fxg
C PEKERJAAN PAGAR KELILING
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi ---- - Ls -
1 Pasangan Bowplank SNI-1.6.4 418 M1 418.00 58,200.00 24,327,600.00 24,327,600.00
2 Papan Proyek ---- - Ls -
24,327,600.00 24,327,600.00
IV. PEKERJAAN DINDING DAN PAS. BATU
1 Pas. Dinding Batu Bata T= 1/2 bata, 1 Pc : 3 Ps Trasraam SNI-4.6.10 83.60 M2 222.88 106,299.50 8,886,638.20 23,692,245.16
2 Pas. Dinding Batu Bata T= 1/2 bata, 1 Pc : 6 SNI-4.6.13 167.2 M2 - 99,122.00 16,573,198.40 -
3 Plesteran 1 Pc : 2 Ps Trasraam, tebal 15 mm SNI-5.6.2 167.20 M2 780.93 43,502.40 7,273,601.28 33,972,329.23
4 Plesteran 1 Pc : 5 Ps, Dinding batu bata tebal 15 mm SNI-5.6.5 334.40 M2 - 37,358.40 12,492,648.96 -
45,226,086.84 57,664,574.39
V. PASANGAN BETON BERTULANG
1 Pek. Kolom beton bertulang SNI-7.6.40 20.58 M3 20.70 6,300,450.00 129,663,261.00 130,419,315.00
129,663,261.00 130,419,315.00
VI. PEKERJAAN PENGECATAN
1 Cat Dinding Tembok SNI-14.6.14 710.60 M2 780.93 41,468.00 29,467,160.80 32,383,605.24
29,467,160.80 32,383,605.24
VII. PEKERJAAN BESI / STAINLES
1 Railing Pagar Aluminium Dia. 2" SNI-11.6.31b 167.20 M2 165.07 946,270.00 158,216,344.00 156,200,788.90
GANTI STEINLESS STELL
158,216,344.00 156,200,788.90
JUMLAH REAL COST 386,900,452.64 400,995,883.53
SELISIH 14,095,430.89
Pejabat Pelaksana Teknis Kegiatan Konsultan Supervisi Kontraktor Pelaksana Panitia Peneliti Kontrak
PT. Anugrah Cipta Dimensi PT. Karya Mandala Putera
No. Nama Jabatan Tanda Tangan
a b c d e f g h=dxg i=fxg
D PEKERJAAN FONT MARK
I. PEKERJAAN PERSIAPAN
1 Pasangan Bowplank SNI-1.6.4 104 M1 104.00 58,200.00 6,052,800.00 6,052,800.00
6,052,800.00 6,052,800.00
II. PEKERJAAN TANAH
1 Galian Tanah SNI-2.6.1 259.85 M3 184.12 51,250.00 13,317,543.13 9,436,150.00
2 Urugan Kembali SNI-2.6.9a 86.62 M3 61.37 21,000.00 1,818,981.50 1,288,770.00
15,136,524.63 10,724,920.00
III. PEKERJAAN PONDASI
1 Pas. Pondasi Batu Kali / Bt.Gunung SNI-3.6.6 519.71 M3 503.21 546,440.00 283,989,785.96 274,974,072.40
2 Pek.Pondasi Poerplat 65.90 4,174,200.00 275,079,780.00
3 Pek.Lantai Kerja Pondasi Poer 2.64 776,350.00 2,049,564.00
283,989,785.96 552,103,416.40
IV. PEKERJAAN BESI / STAINLES
1 Pek.Rangka Huruf dan Pas.Plat Alcupan - 461.63 M2 485.34 1,350,000.00 623,200,500.00 655,209,000.00
623,200,500.00 655,209,000.00
V. PEKERJAAN PLESTERAN
1 Plesteran Pondasi 1 Pc : 2 Ps Trasraam, tebal 15 mm SNI-5.6.2 734.76 M2 372.08 43,502.40 31,963,866.93 16,186,372.99
2 Plesteran Dinding Kolam 1 Pc : 2 Ps Trasraam, tebal 15 mm SNI-5.6.2 394.11 M2 313.58 43,502.40 17,144,904.87 13,641,482.59
31,963,866.93 29,827,855.58
VI. PEKERJAAN KOLAM AIR MANCUR
1 Pek. Dinding Kolam Beton K225 SNI-7.6.35 32.41 M3 1,319,800.00 42,773,398.20
1 Pek. Dinding Kolam Beton K225 (beton bertulang) 25.72 4,174,200.00 107,360,424.00
2 Pek. Lantai Kolam Beton K225 SNI-7.6.35 13.16 M3 1,319,800.00 17,371,207.60
1 Pek. Lantai Kolam Beton K225 (beton bertulang) 15.58 4,174,200.00 65,034,036.00
60,144,605.80 172,394,460.00
VII. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Kolam SNI-14.6.14 394.11 M2 181.71 41,468.00 16,343,119.35 7,535,150.28
16,343,119.35 7,535,150.28
VIII. PEKERJAAN PERLENGKAPAN KOLAM
1 Pek.Pompa Air Mancur + Kelengkapan + Instalasi 1 1.00 Ls 1.00 40,000,000.00 40,000,000.00 40,000,000.00
2 Lampu Sorot SpotLight + Instalasi 30 30.00 Bh 30.00 750,000.00 22,500,000.00 22,500,000.00
62,500,000.00 62,500,000.00
JUMLAH REAL COST 1,099,331,202.66 1,496,347,602.26
SELISIH 397,016,399.60
Pejabat Pelaksana Teknis Kegiatan Konsultan Supervisi Kontraktor Pelaksana Panitia Peneliti Kontrak
PT. Anugrah Cipta Dimensi PT. Karya Mandala Putera
No. Nama Jabatan Tanda Tangan
VOLUME
JUMLAH HARGA JUMLAH HARGA
VOLUME ADD HARGA SATUAN
NO. U R A I A N ANALISA SAT KONTRAK AWAL ADD KONTRAK
KONTRAK KONTRAK (Rp.)
(Rp.) 01 (Rp.)
01
a b c d e f g h=dxg I=Fxg
E PEKERJAAN SCULPTURE SANDEQ DAN KOLAM
II. PEKERJAAN TANAH
1 Galian Tanah SNI-2.6.1 75.24 M3 0.00 51,250.00 3,855,793.75 -
2 Urugan Kembali SNI-2.6.9a 25.08 M3 0.00 21,000.00 526,645.00 -
3 Urugan Tanah Timbunan Biasa SNI-2.6.15 5.81 M3 0.00 138,750.00 806,415.00 -
4 Urugan Pasir Bawah Lantai SNI-2.6.11 2.91 M3 0.00 152,500.00 443,165.00 -
5,632,018.75 -
III. PEKERJAAN DINDING DAN PAS. BATU
1 Pas. Pondasi Batu Bata T= 1 bata, 1 Pc : 3 Ps Trasraam SNI-4.6.3 32.93 M2 0.00 219,492.50 7,227,888.03 -
2 Plesteran 1 Pc : 2 Ps Trasraam, tebal 15 mm SNI-5.6.2 262.94 M2 0.00 43,502.40 11,438,521.06 -
18,666,409.08 -
IV. PASANGAN BETON BERTULANG
1 Pek. Sloof beton bertulang 20/30 SNI-7.6.39 4.60 M3 6.39 5,049,800.00 23,224,939.16 32,268,222.00
2 Pek. Dinding Kolam Beton Bertulang SNI-7.6.40 63.51 M3 22.23 6,300,450.00 400,135,279.05 140,059,003.50
3 Pek. Pilar beton Sculpture Sandeq SNI-7.6.40 15.07 M3 0.00 6,300,450.00 94,960,382.40 -
4 Pek. Plat Beton Dudukan Sculpture Sandeq SNI-7.6.40 3.62 M3 4.94 6,300,450.00 22,795,028.10 31,124,223.00
5 Pek. Plat Lantai Kolam SNI-7.6.40 - M3 45.14 6,300,450.00 - 284,402,313.00
541,115,628.71 487,853,761.50
V. PEKERJAAN LANTAI
1 Pas. Lantai Keramik 40x40 Kasar SNI-13.6.48 58.12 M2 68.56 185,481.50 10,780,184.78 12,716,611.64
10,780,184.78 12,716,611.64
VI. PEKERJAAN PENGECATAN
1 Cat Kolam SNI-14.6.14 262.94 M2 250.20 41,468.00 10,903,595.92 10,375,293.60
10,903,595.92 10,375,293.60
VII. PEKERJAAN SCULPTURE
1 Pembuatan Sculpture Perahu Sandeq 1 1.00 Ls 1.00 635,000,000.00 635,000,000.00 635,000,000.00
635,000,000.00 635,000,000.00
VIII. PEKERJAAN LAMPU KOLAM
1 Lampu Kolam Inbow 1 8.00 Bh 8.00 1,235,000.00 9,880,000.00 9,880,000.00
9,880,000.00 9,880,000.00
IX. PEKERJAAN AIR MANCUR
1 Pek.Pompa Air Mancur + Kelengkapan + Instalasi 1 1.00 Ls 1.00 40,000,000.00 40,000,000.00 40,000,000.00
40,000,000.00 40,000,000.00
Pejabat Pelaksana Teknis Kegiatan Konsultan Supervisi Kontraktor Pelaksana Panitia Peneliti Kontrak
PT. Anugrah Cipta Dimensi PT. Karya Mandala Putera
No. Nama Jabatan Tanda Tangan
a b c d e f g h=dxg i=fxg
F PEKERJAAN BANGKU TAMAN
I. PEKERJAAN DINDING DAN PAS. BATU
1 Pas. Dinding Batu Bata T= 1/2 bata, 1 Pc : 3 Ps Trasraam SNI-4.6.10 77.28 M2 0.00 106,299.50 8,214,825.36 -
2 Plesteran 1 Pc : 5 Ps, Dinding batu bata tebal 15 mm SNI-5.6.5 154.56 M2 0.00 37,358.40 5,774,114.30 -
13,988,939.66 -
II. PASANGAN BETON BERTULANG
1 Pek. Plat Beton Bangku Taman SNI-7.6.42a 9.41 M3 0.00 4,174,200.00 39,270,873.60 -
39,270,873.60 -
III. PEKERJAAN PENGECATAN
1 Cat Dinding Tembok SNI-14.6.14 271.44 M2 0.00 41,468.00 11,256,073.92 -
11,256,073.92 -
IV. PEKERJAAN TAMAN
1 Pek.Taman Depan Font Mark Ls 60.37 M2 47.93 125,000.00 7,546,250.00 5,991,250.00
2 Pek.Taman Anjungan Ls 523.25 M2 550.58 125,000.00 65,406,250.00 68,822,500.00
72,952,500.00 74,813,750.00
JUMLAH REAL COST 137,468,387.18 74,813,750.00
SELISIH (62,654,637.18)
Pejabat Pelaksana Teknis Kegiatan Konsultan Supervisi Kontraktor Pelaksana Panitia Peneliti Kontrak
PT. Anugrah Cipta Dimensi PT. Karya Mandala Putera
No. Nama Jabatan Tanda Tangan
a b c d e f g h=dxg i=fxg
G PEKERJAAN PAYUNG HIAS,LAMPU TAMAN
I. PAYUNG HIAS
1 Payung Hias ( 6m x 6m ) + Instalasi --- 10.00 Bh 165,000,000.00 1,650,000,000.00 -
1 Payung Hias (6mx6m) Spesifikasi Produk Lain BH 10.00 103,950,000.00 1,039,500,000.00
2 LED SET 10.00 10,000,000.00 100,000,000.00
3 Galian pondasi 14.40 51,250.00 738,000.00
4 Urugan Kembali 4.80 21,000.00 100,800.00
5 Urugan Pasir 1.44 152,500.00 219,600.00
6 Lantai kerja 0.72 776,350.00 558,972.00
7 Beton pondasi M3 6.72 4,174,200.00 28,050,624.00
1,650,000,000.00 1,169,167,996.00
II. INSTALASI DAYA, LAMPU TAMAN DAN LAMPU SOROT
1 Lampu Taman Solar Cell --- 25.00 Bh 25.00 9,250,000.00 231,250,000.00 231,250,000.00
2 Lampu Sorot 500 watt + Kabel + Instalasi --- 8.00 Bh 8.00 7,500,000.00 60,000,000.00 60,000,000.00
3 Tiang Lampu Sorot Pipa Gip 5" Tinggi 9 m --- 2.00 Bh 2.00 7,500,000.00 15,000,000.00 15,000,000.00
4 Instalasi Daya 11.000 watt --- 1.00 Ls 1.00 16,500,000.00 16,500,000.00 16,500,000.00
5 Box Fuse (40 x 60 x 20 ) + MCB PANEL --- 1.00 Ls 1.00 10,000,000.00 10,000,000.00 10,000,000.00
332,750,000.00 332,750,000.00
JUMLAH REAL COST 1,982,750,000.00 1,501,917,996.00
SELISIH (480,832,004.00)
Pejabat Pelaksana Teknis Kegiatan Konsultan Supervisi Kontraktor Pelaksana Panitia Peneliti Kontrak
PT. Anugrah Cipta Dimensi PT. Karya Mandala Putera
No. Nama Jabatan Tanda Tangan
a b c d
A PEKERJAAN LANTAI ANJUNGAN
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 1 1.00 Ls
2 Pembuatan Diresi Keet 1 1.00 Ls
3 Pasangan Bowplank 644 644 M1
4 Papan Proyek 1 1.00 Ls
6 Pas. Lantai Keramik 40 x 40 Anti Slip (Motif Pola Lantai) 1484.39 1,320.00 M2
T.6 = ALTECA CHOCO 946,56 MOTIF TENGAH 946.56
T.6 = ALTECO CHOCO 537,83 BIS 537.83
7 Pas. Lantai Keramik 30 x 30 Anti Slip (Motif Pola Lantai) 2,205.54 2,595.91 M2
T.3 = ALASKA GREEN 600-(5,29*6) 568.26
T.4 = ALASKA BEIGE 800-(5,29*8) 757.68
T.5 = ALASKA TERRACOTA 400-(5,29*4) 378.84
T.8 =ATTILA TERRACOTA 500,76 500.76
a b c d
B PEKERJAAN SCULPTURE PERSAHABATAN
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi - - Ls
2 Pengukuran Awal dan Pasangan Bowplank - - M1
3 Papan Proyek - - Ls
V. PEKERJAAN LANTAI
1 Pas. Lantai Granito 60x60 78.5 27.15 M2
= 0,25 * 3,14 * 10 * 10 78.50
a b c d
C PEKERJAAN PAGAR KELILING
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 0 - Ls
1 Pasangan Bowplank 418 418 M1
2 Papan Proyek 0 - Ls
a b c d
D PEKERJAAN FONT MARK
I. PEKERJAAN PERSIAPAN
1 Pasangan Bowplank 104 104 M1
V. PEKERJAAN PLESTERAN
1 Plesteran Pondasi 1 Pc : 2 Ps Trasraam, tebal 15 mm 372.08 734.76 M2
= (1,3+1,5+1,3)*(21,57+19,53+20,53) 252.68
= 1,10 * 105 115.50
= 1,5 * 1,3 * 2 3.90
BEKISTING
a b c d
E PEKERJAAN SCULPTURE SANDEQ DAN KOLAM
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 0 - Ls
2 Pengukuran Awal dan Pasangan Bowplank 0 - M1
2 Papan Proyek 0 - Ls
V. PEKERJAAN LANTAI
1 Pas. Lantai Keramik 40x40 Kasar 68.562 58.12 M2
T.9 = AREA 208,59-150,47 58.12
= 0,2 * 52,21 OPTREDE 10.442
a b c d
F PEKERJAAN BANGKU TAMAN
I. PEKERJAAN DINDING DAN PAS. BATU
1 Pas. Dinding Batu Bata T= 1/2 bata, 1 Pc : 3 Ps Trasraam 77.28 M2
PAS. DINDING BANGKU
= 1,1 * 0,4 * 2 * 4 * 18 63.36
PAS. DINDING TAMAN
= 2,3 * 1,2 * 2 * 18 99.36
= 2 * 1,2 * 2 * 18 86.4
a b c d
G PEKERJAAN PAYUNG HIAS,LAMPU TAMAN
I. PAYUNG HIAS
1 Payung Hias ( 6m x 6m ) + Instalasi 10 10.00 Bh
2 LED 10
3 Galian Pondasi
= 1,2 * 1,2* 1 * 10 14.4
4 Urugan kembali
= 1/3 * 14.4 4.8
5 Urugan pasir
= 1,2 * 1,2 * 0,1 * 10 1.44
6 lanati kerja
= 1,2 * 1,2 * 0,05 * 10 0.72