Anda di halaman 1dari 1

Analisa EI-531a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 5.3.(1d) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Perkerasan Beton Semen
TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja jam
2 Mandor jam

JUMLAH HARGA TENAGA

B. BAHAN
1. Semen Kg
2 Pasir M3
3 Agregat Kasar M3
4 Air M3
5 Plasticizer M3
6 Polytene 125 mikron Kg
7 Curing Compound Ltr
8 Formwork Plate M2

JUMLAH HARGA BAHAN

C. PERALATAN
1 Wheel Loader jam
2 Concrete Mixing Plant jam
3 Truck Mixer Agitator jam
4 Concrete Vibrator (for manual) jam
5 Alat Bantu Ls

JUMLAH HARGA PERALATAN


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PROFIT 10,0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
G. HARGA SATUAN PEKERJAAN / M3
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN