Anda di halaman 1dari 83

ketinggian

no segmen panjang keterangan BEDA TINGGI


awal akhir
1 A-B 177 37.185 28.334 MENURUN -8.85
2 B-C 124 28.334 23.401 MENURUN -4.93
3 C-D 139 23.401 12.133 MENURUN -11.27
4 D-E 152 12.133 12.133 DATAR 0.00
5 E-F 206 12.133 3.813 MENURUN -8.32
JUMLAH 798
BRAT TOTAL KENDARAAN 26,000.000 Kg LEBAR JALAN YANG DI BUAT 8,7 M
berat kosong 7,440.000 kg
berat isi 18,560.000 kg
tenaga maksimum 235.000 PS DIMANA 1 PS = 0.986 HP
231.785 HP

RIMPULL KECEPATAN
HP GEAR
(LB) (MPH)
231.785 1 9647 7.65849163
231.785 2 6993 10.5650606
231.785 3 5021 14.71449288
231.785 4 3636 20.31943585
231.785 5 2653 27.84827318
231.785 6 1923 38.41990055
231.785 7 1380 53.5372962
231.785 8 1000 73.88146875
PIT KE SP
JARAK HORIZONTAL GRADE % GR (LB/TON) RR (lb/ton) TR (lb/ton) GMW (TON)
176.778561480175 -5.006829 -100.13657681 200 300.1365768 26
123.901838206703 -3.981378 -79.627551478 200 279.6275515 26
138.542528401932 -8.133243 -162.66485288 200 362.6648529 26
152 0 0 200 200 26
205.831915892555 -4.042133 -80.842661974 200 280.842662 26

NG DI BUAT 8,7 M GMW = BERAT TRUK + BERAT MUATAN


BERAT MUATAN = KAPASITAS EXA X JUMLA

S = 0.986 HP
SP
TENAGA
TENAGA YANG DIBUTUHKAN (lb)
TERSEDIA KECEPATAN KECEPATAN
YANG GEAR
(TR*GMW) (mph) (km/jam)
(lb)
7803.55099705693 9647 1 7.6584916295221 4.755923301933
7270.31633842316 9647 1 7.6584916295221 4.755923301933
9429.28617485684 9647 1 7.6584916295221 4.755923301933
5200 6993 2 10.565060596311 6.560902630309
7301.90921132872 9647 1 7.6584916295221 4.755923301933

ERAT TRUK + BERAT MUATAN


ERAT MUATAN = KAPASITAS EXA X JUMLAH MUATAN X DENSITAS
1.6
KECEPATAN WAKTU WAKTU
(m/SEKON) SEKON MENIT (T2)
1.284099291522 137.839808159 2.297330136
1.284099291522 96.5657413089 1.6094290218
1.284099291522 108.247080983 1.8041180164
1.771443710183 85.8057183111 1.4300953052
1.284099291522 160.423731529 2.6737288588
588.882080291 9.8147013382
ketinggian
no segmen panjang keterangan BEDA TINGGI
awal akhir
1 F-E 206 3.813 12.133 MENDAKI 8.32
2 E-D 152 12.133 12.133 DATAR 0.00
3 D-C 139 12.133 23.401 MENDAKI 11.27
4 C-B 124 23.401 28.334 MENDAKI 4.93
5 B-A 177 28.334 37.185 MENDAKI 8.85
JUMLAH 798
BRAT TOTAL KENDARAAN 26,000.000 Kg
berat kosong 7,440.000 kg
berat isi 18,560.000 kg
tenaga maksimum 235.000 PS DIMANA 1 PS = 0.986 HP
231.785 HP

RIMPULL KECEPATAN
HP GEAR
(LB) (MPH)
231.785 1 9647 7.65849163
231.785 2 6993 10.5650606
231.785 3 5021 14.7144929
231.785 4 3636 20.3194358
231.785 5 2653 27.8482732
231.785 6 1923 38.4199005
231.785 7 1380 53.5372962
231.785 8 1000 73.8814688
SP KE PIT

JARAK HORIZONTAL GRADE % GR (LB/TON) RR (LB/TON) TR (LB/TON) BERAT KOSONG (TON)

176.804348362816 4.705767 94.1153323099 200 294.11533231 7.44


124 0 0 200 200 7.44
138.542528401932 8.133243 162.664852879 200 362.664852879 7.44
151.919931249984 3.247105 64.9421041652 200 264.942104165 7.44
205.809766043791 4.300573 86.0114674842 200 286.011467484 7.44

S = 0.986 HP
TENAGA YANG DIBUTUHKAN (lb) TENAGA YANG KECEPATAN KECEPATAN
GEAR
(TR*GMW) TERSEDIA (lb) (mph) (km/jam)
2188.21807238558 2653 5 27.8482731813 17.29377764559
1488 1923 6 38.41990054602 23.85875823908
2698.22650542057 3636 4 20.31943584984 12.61836966275
1971.16925498877 2653 5 27.8482731813 17.29377764559
2127.92531808222 2653 5 27.8482731813 17.29377764559

18.56
KECEPATAN WAKTU WAKTU
(m/SEKON) SEKON MENIT (T4)
4.66931996431 44.11777 0.7352962229
6.44186472455 23.59565 0.3932608711
3.40695980894 40.79884 0.6799806269
4.66931996431 26.55633 0.4426054934
4.66931996431 37.90702 0.6317836478
172.9756 2.8829268622
T1 (MENIT) T2 (MENIT) T3 (MENIT) T4 (MENIT)
No
1.153846153846 9.814701338 0.3 2.882926862
1
𝜇_i=1/𝑇_𝑃i (𝑢𝑛𝑖𝑡/𝑚𝑒𝑛𝑖𝑡) 2
3
4
5
PERSAMAAN-1 6

Tingkat Pelayanan
No Tahap No
Truck
1 Tahap-1 (m1) 0.8667 1
2 Tahap-2 (m2) 0.1019 2
3 Tahap-3 (m3) 3.3333 3
4 Tahap-4 (m4) 0.3469 4
1
[■(𝐾+𝑀−1@@𝐾)]=(𝐾+𝑀−1)!/(𝑀−1)!𝐾! 2
3
4
5
PERSAMAAN-2 6
7
8
Probabliltas Pelayanan
9

35
Uraian Nilai Satuan No

KAPASITAS BAKET DUM TRUK TIPE FM 235 JD NEW 32 TON 1


KAPASITAS BUKET EXA TIPE PC1250-7 JAPAN 8.32 TON 2
2814930 TONASE 3
CADANGAN
1941331 VOLUME 4
CT EXA 0.3 MENIT 5
JUMLAH PEMUATAN 3.846154

Uraian Nilai Satuan

Waktu edar tahap 1 1.153846 menit


Waktu edar tahap 2 9.814701 menit
Waktu edar tahap 3 0.3 menit
Waktu edar tahap 4 2.882927 menit
Kapasitas bucket Excavator TIPE PC1250-7 japan 32 TON
Faktor pengisian 81 %
faktor pengembanagan 80 %
Kapasitas bak Dump Truck TIPE FM 235 JD NEW 8.32 TON
Jumlah pengisian loader ke Dump Truck TIPE FM 235 JD 0.00 kali
Waktu excavator sekali pemuatan ke Dump Truck TIPE F 0.25 menit
Efisiensi Kerja 83 %
Jumlah Tahap (M) 4 tahap
Jumlah Truck (K) 4 unit
Uraian Nilai Satuan

Kapasitas bak Dump Truck TIPE FM 235 JD NEW 32 TON


Faktor pengisian 85 %
Kapasitas bucket Excavator TIPE PC1250-7 japan 8.32 TON
jumlah pengisian 4.524887 KALI
di bulatkan jumlah pengisian 5 KALI
No. NAMA/JENIS ALAT JUMLAH (UNIT)
1 Bulldozer D6 – D8 2
2 Excavator PC1250-7 JAPAN 1
3 Dump Truck tipe FM 235 JD NEW (Kapasitas 32 Ton) 4
4 Motor Grader 2
5 Compactor (kapasitas 30 Ton) 2
6 Whell Loader 2
7 Light Vehicle 4 WD 4
8 Fuel Truck 1
9 Water Truck 1
10 Ambulance 1
11 Mobil Pemadam Kebakaran 1
12 Lighting Plant 4
13 Chain Saw 2
KETERANGAN

Peralatan Utama

Peralatan Penunjang
Keadaan Sistem
No Tahap Tingkat Pelayanan Truck No
n1 n2
1 Tahap-1 (m1) 0.8667 1 4 0
2 Tahap-2 (m2) 0.1019 2 3 0
3 Tahap-3 (m3) 3.3333 3 3 1
4 Tahap-4 (m4) 0.3469 4 3 0
5 Jumlah Tahap (M) 4 5 2 0
6 Jumlah Truck (K) 4 6 2 1
7 2 0
𝑃(𝑛_1,𝑛_2,𝑛_3,𝑛_4 )=(𝜇_1^(𝐾−𝑛_1 ))/(𝑛_2 !𝜇_2^(𝑛_2 ) 8 2 2
𝜇_3^(𝑛_3 ) 𝑛_4 !𝜇_4^(𝑛_4 ) ) 𝑃(𝐾,0,0,0) 9 2 1
10 2 0
11 1 0
= (𝜇_1^(𝐾−𝑛_1
Koefisien
12 1 1
))/(𝑛_2 !𝜇_2^(𝑛_2 ) 𝜇_3^(𝑛_3 ) 13 1 0
𝑛_4 !𝜇_4^(𝑛_4 ) ) 14 1 2
PERSAMAAN 3 15 1 1
16 1 0
17 1 3
18 1 2
19 1 1
20 1 0
21 0 0
22 0 1
23 0 0
24 0 2
25 0 1
26 0 0
27 0 3
28 0 2
29 0 1
30 0 0
31 0 4
32 0 3
33 0 2
34 0 1
35 0 0
JUMLAH
Keadaan Sistem Probabilitas Keadaan
Koefisien
n3 n4 Antrian

0 0 1.000 0.0010

1 0 0.260 0.0003

0 0 8.506 0.0086
0 1 2.499 0.0025
2 0 0.068 0.0001
1 0 2.212 0.0022
1 1 0.650 0.0007
0 0 36.177 0.0366
0 1 21.253 0.0215
0 2 3.121 0.0032
3 0 0.018 0.0000
2 0 0.575 0.0006
2 1 0.169 0.0002
1 0 9.406 0.0095
1 1 5.526 0.0056
1 2 0.812 0.0008
0 0 102.574 0.1039
0 1 90.389 0.0915
0 2 26.550 0.0269
0 3 2.600 0.0026
4 0 0.005 0.0000
3 0 0.150 0.0002
3 1 0.044 0.0000
2 0 2.446 0.0025
2 1 1.437 0.0015
2 2 0.211 0.0002
1 0 26.669 0.0270
1 1 23.501 0.0238
1 2 6.903 0.0070
1 3 0.676 0.0007
0 0 218.125 0.2209
0 1 256.284 0.2595
0 2 112.920 0.1144
0 3 22.112 0.0224
0 4 1.624 0.0016
JUMLAH 987.467 1.0000
Keadaan Sistem Probabilitas
No Koefisien
n1 n2 n3 n4 Keadaan Antrian
1 4 0 0 0 1.000 0.0010
2 3 0 1 0 0.260 0.0003
3 3 1 0 0 8.506 0.0086
4 3 0 0 1 2.499 0.0025
5 2 0 2 0 0.068 0.0001
6 2 1 1 0 2.212 0.0022
7 2 0 1 1 0.650 0.0007
8 2 2 0 0 36.177 0.0366
9 2 1 0 1 21.253 0.0215
10 2 0 0 2 3.121 0.0032
11 1 0 3 0 0.018 0.0000
12 1 1 2 0 0.575 0.0006
13 1 0 2 1 0.169 0.0002
14 1 2 1 0 9.406 0.0095
15 1 1 1 1 5.526 0.0056
16 1 0 1 2 0.812 0.0008
17 1 3 0 0 102.574 0.1039
18 1 2 0 1 90.389 0.0915
19 1 1 0 2 26.550 0.0269
20 1 0 0 3 2.600 0.0026
21 0 0 4 0 0.005 0.0000
22 0 1 3 0 0.150 0.0002
23 0 0 3 1 0.044 0.0000
24 0 2 2 0 2.446 0.0025
25 0 1 2 1 1.437 0.0015
26 0 0 2 2 0.211 0.0002
27 0 3 1 0 26.669 0.0270
28 0 2 1 1 23.501 0.0238
29 0 1 1 2 6.903 0.0070
30 0 0 1 3 0.676 0.0007
31 0 4 0 0 218.125 0.2209
32 0 3 0 1 256.284 0.2595
33 0 2 0 2 112.920 0.1144
34 0 1 0 3 22.112 0.0224
35 0 0 0 4 1.624 0.0016
JUMLAH 987.467 1.0000
Tingkat Penggunaan Tahap 1

1 = Jumlah probabilitas dari keadaan


dimana n11 unit
Tingkat Penggunaan Truck Pada Tahap-1
0.3184 31.83512 %

Jumlah truck terlayani pada tahap-1

11

0.275904 truck/menit
Keadaan Sistem Probabilitas Keadaan
No Koefisien
n1 n2 n3 n4 Antrian
1 0 0 4 0 0.005 0.0000
2 1 0 3 0 0.018 0.0000
3 0 1 3 0 0.150 0.0002
4 0 0 3 1 0.044 0.0000
5 2 0 2 0 0.068 0.0001
6 1 1 2 0 0.575 0.0006
7 1 0 2 1 0.169 0.0002
8 0 2 2 0 2.446 0.0025
9 0 1 2 1 1.437 0.0015
10 0 0 2 2 0.211 0.0002
11 3 0 1 0 0.260 0.0003
12 2 1 1 0 2.212 0.0022
13 2 0 1 1 0.650 0.0007
14 1 2 1 0 9.406 0.0095
15 1 1 1 1 5.526 0.0056
16 1 0 1 2 0.812 0.0008
17 0 3 1 0 26.669 0.0270
18 0 2 1 1 23.501 0.0238
19 0 1 1 2 6.903 0.0070
20 0 0 1 3 0.676 0.0007
21 4 0 0 0 1.000 0.0010
22 3 1 0 0 8.506 0.0086
23 3 0 0 1 2.499 0.0025
24 2 2 0 0 36.177 0.0366
25 2 1 0 1 21.253 0.0215
26 2 0 0 2 3.121 0.0032
27 1 3 0 0 102.574 0.1039
28 1 2 0 1 90.389 0.0915
29 1 1 0 2 26.550 0.0269
30 1 0 0 3 2.600 0.0026
31 0 4 0 0 218.125 0.2209
32 0 3 0 1 256.284 0.2595
33 0 2 0 2 112.920 0.1144
34 0 1 0 3 22.112 0.0224
35 0 0 0 4 1.624 0.0016
JUMLAH 987.467 1.0000
Tingkat Penggunaan Tahap 3

3 = Jumlah probabilitas dari keadaan


dimana n31 unit

Tingkat Penggunaan Truck Pada Tahap-3


0.0828 8.27713 %

Jumlah truck terlayani pada tahap-3

33

0.275904 truck/menit
Keadaan Sistem Koefisie Probabilitas
No
n1 n2 n3 n4 n Keadaan Antrian
1 4 0 0 0 1.000 0.0010
2 3 0 1 0 0.260 0.0003
3 3 1 0 0 8.506 0.0086
4 3 0 0 1 2.499 0.0025
5 2 0 2 0 0.068 0.0001
6 2 1 1 0 2.212 0.0022
7 2 0 1 1 0.650 0.0007
8 2 2 0 0 36.177 0.0366
9 2 1 0 1 21.253 0.0215
10 2 0 0 2 3.121 0.0032
11 1 0 3 0 0.018 0.0000
12 1 1 2 0 0.575 0.0006
13 1 0 2 1 0.169 0.0002
14 1 2 1 0 9.406 0.0095
15 1 1 1 1 5.526 0.0056
16 1 0 1 2 0.812 0.0008
17 1 3 0 0 102.574 0.1039
18 1 2 0 1 90.389 0.0915
19 1 1 0 2 26.550 0.0269
20 1 0 0 3 2.600 0.0026
21 0 0 4 0 0.005 0.0000
22 0 1 3 0 0.150 0.0002
23 0 0 3 1 0.044 0.0000
24 0 2 2 0 2.446 0.0025
25 0 1 2 1 1.437 0.0015
26 0 0 2 2 0.211 0.0002
27 0 3 1 0 26.669 0.0270
28 0 2 1 1 23.501 0.0238
29 0 1 1 2 6.903 0.0070
30 0 0 1 3 0.676 0.0007
31 0 4 0 0 218.125 0.2209
32 0 3 0 1 256.284 0.2595
33 0 2 0 2 112.920 0.1144
34 0 1 0 3 22.112 0.0224
35 0 0 0 4 1.624 0.0016
JUMLAH 987.467 1.0000
Jumlah truk yang antri (Lq1) Wq1 Jumlah Truck yang antri

𝐿𝑞1=∑ ( 𝑛1 −1 ) 𝑃
𝐿_𝑞1=∑▒(𝑛_1−1)𝑃(𝑛_1,𝑛
0.00303807652724 0.326702
0.000526599931388
0.017228070170626 dimana n1  2
0.005060496959089 PERSAMA
6.84579910804813E-05
0.002239649122181
0.000657864604682 Waktu tunggu truck antri pad
0.036635812060206 𝑊_𝑞1=𝐿_𝑞1/(𝜂_1 𝜇_1 )
0.021522482052637 (𝑚𝑒𝑛𝑖𝑡)
0.003160959233993
0.090138468653122 PERSAMAAN 5
Jumlah Truck yang antri pada Tahap 1

𝐿𝑞1=∑ ( 𝑛1 −1 ) 𝑃 ( 𝑛1 ,𝑛2 ,…,𝑛 𝑀 )


𝐿_𝑞1=∑▒(𝑛_1−1)𝑃(𝑛_1,𝑛_2,…,𝑛_𝑀 )

dimana n1  2
PERSAMAAN 4

Waktu tunggu truck antri pada tahap 1 adalah


𝑊_𝑞1=𝐿_𝑞1/(𝜂_1 𝜇_1 )
(𝑚𝑒𝑛𝑖𝑡)

PERSAMAAN 5
Keadaan Sistem Koefisie Probabilitas
No
n1 n2 n3 n4 n Keadaan Antrian
1 0 0 4 0 0.005 0.0000
2 1 0 3 0 0.018 0.0000
3 0 1 3 0 0.150 0.0002
4 0 0 3 1 0.044 0.0000
5 2 0 2 0 0.068 0.0001
6 1 1 2 0 0.575 0.0006
7 1 0 2 1 0.169 0.0002
8 0 2 2 0 2.446 0.0025
9 0 1 2 1 1.437 0.0015
10 0 0 2 2 0.211 0.0002
11 3 0 1 0 0.260 0.0003
12 2 1 1 0 2.212 0.0022
13 2 0 1 1 0.650 0.0007
14 1 2 1 0 9.406 0.0095
15 1 1 1 1 5.526 0.0056
16 1 0 1 2 0.812 0.0008
17 0 3 1 0 26.669 0.0270
18 0 2 1 1 23.501 0.0238
19 0 1 1 2 6.903 0.0070
20 0 0 1 3 0.676 0.0007
21 4 0 0 0 1.000 0.0010
22 3 1 0 0 8.506 0.0086
23 3 0 0 1 2.499 0.0025
24 2 2 0 0 36.177 0.0366
25 2 1 0 1 21.253 0.0215
26 2 0 0 2 3.121 0.0032
27 1 3 0 0 102.574 0.1039
28 1 2 0 1 90.389 0.0915
29 1 1 0 2 26.550 0.0269
30 1 0 0 3 2.600 0.0026
31 0 4 0 0 218.125 0.2209
32 0 3 0 1 256.284 0.2595
33 0 2 0 2 112.920 0.1144
34 0 1 0 3 22.112 0.0224
35 0 0 0 4 1.624 0.0016
JUMLAH 987.467 1.0000
Jumlah truk yang antri (Lq1) Wq3 Jumlah Truck yang antri pada Tahap 3

𝐿𝑞3=∑ ( 𝑛3 −1 ) 𝑃 ( 𝑛 1 ,𝑛2 ,…
𝐿_𝑞3=∑▒(𝑛_3−1)𝑃(𝑛_1,𝑛_2,…,𝑛_𝑀 )
1.38832806E-05 1.960179E-02
3.55981554E-05
3.02800561E-04 dimana n3  2
8.89432946E-05 PERSAMAAN 4
6.84579911E-05
5.82308772E-04 Waktu tunggu truck antri pada tahap 3 adal
1.71044797E-04 𝑊_𝑞3=𝐿_𝑞3/(𝜂_3 𝜇_3 )
2.47658090E-03 (𝑚𝑒𝑛𝑖𝑡)
1.45491979E-03
2.13680844E-04 PERSAMAAN 5
5.40821838E-03
Truck yang antri pada Tahap 3

∑ (𝑛3 −1) 𝑃 (𝑛1 ,𝑛2 ,…,𝑛𝑀 )


▒(𝑛_3−1)𝑃(𝑛_1,𝑛_2,…,𝑛_𝑀 )

n3  2
PERSAMAAN 4

nggu truck antri pada tahap 3 adalah


_𝑞3/(𝜂_3 𝜇_3 )

ERSAMAAN 5
Total Waktu Edar Truck (CT)
𝐶𝑇=∑_(𝑖=1)^𝑀▒(1/𝜇_𝑖 +𝑊_𝑞𝑖 )

Tingkat Pelayanan
No. Tahap No
Truck
1 Tahap-1 (m1) 0.8667 1.153846 1
2 Tahap-2 (m2) 0.1019 9.814701 2
3 Tahap-3 (m3) 3.3333 0.3 3
4 Tahap-4 (m4) 0.3469 2.882927 4
Waktu Tunggu 5
Tahap 1 Wq1 0.326702 6
Tahap 3 Wq3 0.019602 7
Total CT 14.49778 9
Uraian Nilai Satuan

Kapasitas bucket Excavator TIPE PC1250-7 8.32 TON


Faktor pengisian 81 %
faktor pengembanagan 80 %
Kapasitas bak Dump Truck TIPE FM 235 JD NEW 32 TON
Jumlah pengisian loader ke Dump Truck TIPE FM 235 JD NEW 5.00 kali
Waktu excavator sekali pemuatan ke Dump Truck TIPE FM 235 JD NEW 0.25 menit
Efisiensi Kerja 83 %
Jumlah Truck (K) 4 unit

target produksi
2814930 938310
3.1
908041.935483871 888929.8
kapasitas produksi truk KETERANGAN

370.38741751412 TON/JAM
2963.09934011296 TON/HARI
74077.4835028241 TON/BULAN
888929.802033889 TON/TAHUN
3 UMUR TAMBANG
CADANGAN UMUR TAMBANG TARGET PRODUKSI
(TON) (TAHUN) (TON/TAHUN)
2814930 3.16665049766515 888929.802033889
JUMLAH PRODUKSI HARGA JUAL PENDAPATAN
No. TAHUN KE... cadangan
(TON/TAHUN) (Rp/TON) PERTAHUN (Rp)
1 1 888929.802033889 396,032 352,044,647,359 2,814,930.00
2 2 888929.802033889 392,635 349,024,656,512 2666789.406102
3 3 888929.802033889 406,641 361,475,204,859 28142427200
jumlah (Rp) 2666789.40610167 1,062,544,508,730
1,062,544,508,730
MASALAH 354,181,502,910
323,902,220,159

JUMLAH PRODUKSI HARGA JUAL PENDAPATAN PENGELUARAN


No. TAHUN KE...
(TON/TAHUN) (Rp/TON) PERTAHUN (Rp)
1 1 888929.802033889 396,032 323,902,220,159
2 2 888929.802033889 392,635 320,882,229,312 28142427200
3 3 888929.802033889 406,641 333,332,777,659
JUMLAH PRODUKSI
HARGA JUAL
No. TAHUN KE...
(TON/TAHUN) (Rp/TON)
1 1 888,929.80 241,400,000
2 2 888,929.80 241,400,000
3 3 888,929.80 241,400,000
4 1 bln terakhir 148,140.59 241,400,000
jumlah (Rp) 2,814,930

CSR KEUNTUNGAN KEUNTUNGAN


2%SEBELUM ADA CSR SETELAH ADA CSR
562,848,544.00 295,759,792,959 295,196,944,415.09
562,848,544.00 292,739,802,112 292,176,953,567.64
562,848,544.00 305,190,350,459 304,627,501,914.89

1,688,545,632.00

11284000000
34784000000
1500000000
2808000000
50376000000
1007520000
51383520000
PENDAPATAN
PERTAHUN (Rp)
214,587,654,210,981
214,587,654,210,981
214,587,654,210,981
35,761,139,367,058
679,524,102,000,000
JAM
NO KERJA MINGGU SENIN SELASA RABU KAMIS JUMAT SABTU
SHIFT
SHIFT 07.00 S/D 07.00 S/D 07.00 07.00 07.00 S/D
1 07.00 S/D 17.00 07.00 S/D 17.00
SIANG 17.00 17.00 S/D 17.00 S/D 17.00 12.00

SHIFT 19.00 S/D 19.00 19.00 13.00 S/D


2 19.00 S/D 5.00 19.00 S/D 5.00 19.00 S/D 5.00
MALAM 5.00 S/D 5.00 S/D 5.00 18.00
No Uraian Jumlah (Rp)
A Perizinan
1 Biaya Pembuatan Dokumen 7000000
Persyaratan IUP Op Produksi
2 Biaya Study dan Pembuatan Dokumen Amdal (+ Izin Lingkungan) 5000000
3 Biaya Pembuatan Study 3000000
Kelayakan (FS)
Sub Total A 15000000
B Eksplorasi
1 Eksplorasi Pendahuluan 8000000
2 Eksplorasi Detail 15000000
Sub Total B 23000000
Grand Total (A+B) 38000000
Keterangan

RKAB, RR, RPT & RSP

KA, RKL, RPL, ANDAL


No. peralatan unit biaya/hari biaya/bul biaya/hutan fuel tank
1 Excavator TIPE PC 1 200,000 520000062400000 1360
2 Dump Truck TIPE 4 120000031200000 3.74E+08
Total 4.37E+08
9800/

fuel tank harga solar/liter BBM harga solar/ha Biaya


No. peralatan unit
(liter) (Rp) (Liter/Jam) (Rp) Perbulan (Rp)
1 Excavator TIPE PC125 1 1360 9800 170 13328000 346528000
2 Dump Truck TIPE FM 4 200 9800 25 1960000 50960000
jumlah 15288000 397488000
harg solar/liter
liter 9800 13328000

Biaya
Pertahun (Rp)
4158336000
611520000
4769856000
Biaya Biaya
No. peralatan unit
Perbulan (Rp) Pertahun (Rp)
1 Excavator TIPE PC1250-7 japan 1 5000000 60000000
2 Dump Truck TIPE FM 235 JD NE 4 16000000 192000000
jumlah 21000000 252000000
perawatan
konsumsi
harga makan/hari biaya makan/hari biaya makan/bulan
jum tenaga kerja
(Rp) (Rp) (Rp)
30 50000 1500000 39000000
biaya makan/tahun
(Rp)
468000000
analisis kelayakan
No Komponen Biaya Biaya Pertahun (Rp)
1 Gaji Karyawan 1200000000
2 Bahan Bakar Minyak 4769856000
3 Perawatan (Maintenance) 252000000
4 Konsumsi Karyawan 468000000
5 Pengembangan Masyarakat 114816000
Jumlah (Rp) 6804672000
No. NAMA/JENIS ALATJUMLAH (UNIT) HARGA/UNIT (Rp) HARGA BELI/SEWA (Rp) No.
1 Bulldozer D6 – D8 2 200,000 400,000 1
2 Excavator PC1250-7 JAPA 1 300,000 300,000 2
3 Dump Truck tipe FM 235 4 150,000 600,000 3
4 Motor Grader GD511 2 250,000 500,000 4
5 Compactor (kapasitas 30 To 2 170,000 340,000 5
6 Whell Loader 2 180,000 360,000 6
7 Light Vehicle 4 WD 4 213,000,000 852,000,000
8 Fuel Truck 1 350,000,000 350,000,000
9 Water Truck 1 401,039,520 401,039,520
10 Ambulance 1 518,000,000 518,000,000
11 Mobil Pemadam Kebakaran 1 347,200,000 347,200,000
12 Lighting Plant 4 103,500 414,000
13 Chain Saw 2 1,050,000 2,100,000
JUMLAH 2,473,253,520
NAMA/JENIS ALAT JUMLAH (UNIT)
HARGA/UNIT (Rp) HARGA (Rp)
Bulldozer D6 – D8 2 1,546,866,720 3093733440
Excavator PC1250-7 JAPAN 1 943,105,381 943105381
Dump Truck tipe FM 235 JD NEW ( 32 Ton) 4 969,587,500 3878350000
Motor Grader GD511 2 1,100,000,000 2200000000
Compactor (kapasitas 30 Ton) 2 1,089,000,000 2178000000
Whell Loader 2 195,000,000 390000000
ALAT YANG UNITHARGA SEWA BIAYA PENAMBANGAN (RP)
DIGUNAKAN (Rp) PERHARI (8PERBULAN
JAM) (26PERTAHUN
HARI) (12 BULAN)
Excavator PC1 1 300,000 2,400,000 62,400,000 748,800,000
Dump Truck t 4 600,000 4,800,000 124,800,000 1,497,600,000
TOTAL (Rp)
BIAYA TOTAL
PRODUKSI (Rp)
748,800,000
5,990,400,000
6,739,200,000

672500000

201750
biaya produksi sebelum ada csr biaya produksi setelah ada csr
No. Komponen Biaya Biaya Pertahun (Rp) No.
1 Gaji Karyawan 1,200,000,000 1
2 Biaya Land Clearing 7,488,000,000 2
3 Biaya pengupasan OB 2,288,000,000 3
4 Biaya penambangan dan pengangkutan 6,739,200,000 4
5 Bahan Bakar Minyak 1,519,627,200 5
6 Perawatan (Maintenance) 8,439,600,000 6
7 Konsumsi Karyawan 468,000,000 7
Jumlah (Rp) 28,142,427,200 8
Jumlah (R
tahun 1
No. Komponen Biaya Biaya Pertahun (Rp)
1 Gaji Karyawan 1,200,000,000
2 Biaya Land Clearing 7,488,000,000
3 Biaya pengupasan OB 2,288,000,000
4 Biaya penambangan dan pengangkutan 6,739,200,000
5 Bahan Bakar Minyak 1,519,627,200
6 Perawatan (Maintenance) 8,439,600,000
7 Konsumsi Karyawan 468,000,000
8 Pengembangan Masyarakat 5,915,195,859
Jumlah (Rp) 34,057,623,059

tahun 2
No. Komponen Biaya Biaya Pertahun (Rp)
1 Gaji Karyawan 1,200,000,000
2 Biaya Land Clearing 7,488,000,000
3 Biaya pengupasan OB 2,288,000,000
4 Biaya penambangan dan pengangkutan 6,739,200,000
2 Bahan Bakar Minyak 1,519,627,200
3 Perawatan (Maintenance) 8,439,600,000
4 Konsumsi Karyawan 468,000,000
5 Pengembangan Masyarakat 5,854,796,042
Jumlah (Rp) 33,997,223,242

tahun 3
No. Komponen Biaya Biaya Pertahun (Rp)
1 Gaji Karyawan 1,200,000,000
2 Biaya Land Clearing 7,488,000,000
3 Biaya pengupasan OB 2,288,000,000
4 Biaya penambangan dan pengangkutan 6,739,200,000
2 Bahan Bakar Minyak 1,519,627,200
3 Perawatan (Maintenance) 8,439,600,000
4 Konsumsi Karyawan 468,000,000
5 Pengembangan Masyarakat 6,103,807,009
Jumlah (Rp) 34,246,234,209
biaya produksi setelah ada csr
Komponen Biaya Biaya Pertahun (Rp)
Gaji Karyawan 1,200,000,000
Biaya Land Clearing 7,488,000,000
Biaya pengupasan OB 2,288,000,000
Biaya penambangan dan pengangkutan 6,739,200,000
Bahan Bakar Minyak 1,519,627,200
Perawatan (Maintenance) 8,439,600,000
Konsumsi Karyawan 468,000,000
Pengembangan Masyarakat 562,848,544 121,050,000,000
Jumlah (Rp) 28,705,275,744

tahun biaya produksi


1 34,057,623,059
2 33,997,223,242
3 34,246,234,209
total 102,301,080,511
CASH FLOW
No. URAIAN JUMLAH/TAHUN (Rp)KETERANGAN
1 MODAL TETAP
Termasuk biaya
eksplorasi, study
A. Dokumen & Perizinan 38,000,000
AMDAL, dan
study kelayakan
UntuK Jalan
B. Pembebasan Lahan 4,700,000,000
Akses/Hauling
C. Peralatan 2,473,253,520
D. Konstruksi 2,910,000,000
2 MODAL KERJA
A. Gaji Karyawan 1,200,000,000
B. Biaya Land Clearing 7,488,000,000
C. Biaya pengupasan OB 2,288,000,000
Biaya penambangan dan
D. 6,739,200,000
pengangkutan
E. Bahan Bakar Minyak 1,519,627,200 Solar Industri
F. Perawatan (Maintenance) 8,439,600,000
G. Konsumsi Karyawan 468,000,000
H. Pengembangan Masyarakat 562,848,544
3 PAJAK

A. Iuran Tetap Tahunan (4$) 2,632,000 47 Ha

B. Royalti (5%) 53,127,225,434 888929.80203389


Jumlah (Rp) 91,956,386,698
ALIRAN KAS BERSIH SISA INVESTASI
INVESTASI AWAL
TAHUN KE-1 202,657,135,635
TAHUN KE-2 74,217,600,349
TAHUN KE-3 83,555,511,609
TEKNIK PENILAIAN INVESTASI
PAYBACK PERIOD (PP) TAHUN 0.5 < 3
NET PRESENT VALUE (NPV) Rp
INTERNAL RATE OF RETURN (IRR)

542,831,613,309

tingkat bunga 12%


year cast flow present value
0 -259771029022 - 259,771,029,022
1 609,671,049,920 544,349,151,715
2 609,671,049,920 486,026,028,317
3 609,671,049,920 433,951,810,997
nvp 1,204,555,962,006

193%

tingkat bunga 12%


year cast flow present value
0 -259771029022 - 259,771,029,022
1 640,154,602,416 571,566,609,300
2 640,154,602,416 510,327,329,732
3 640,154,602,416 455,649,401,547
nvp 1,277,772,311,557

204%

tingkat bunga 12%


year cast flow present value
0 -259771029022 - 259,771,029,022
1 579,187,497,424 517,131,694,129
2 579,187,497,424 461,724,726,901
3 579,187,497,424 412,254,220,447
nvp 1,131,339,612,454

182%
SISA INVESTASI TINGKAT BUNGA 16,888,094,636.29
- 91,956,386,698 12% 6,184,800,029.07
110,700,748,937 6,962,959,300.78
184,918,349,286 -
268,473,860,895 #VALUE!
PENILAIAN 30,035,853,966.14
PROJECT IS FEASIBLE
PROJECT IS FEASIBLE
PROJECT IS FEASIBLE

360,430,247,594 0.711780247813411
144,247,346,223.77

76482593484.4724 74217600348.89

259,771,029,022

1,464,326,991,028
1,204,555,962,006 609,671,049,920 30,483,552,496.02

121,050,000,000 6,052,500,000
127,102,500,000
114,997,500,000

ALIRAN KAS BERSIH


INVESTASI AWAL
TAHUN KE-1 354,181,502,910
TAHUN KE-2 354,181,502,910
TAHUN KE-3 354,181,502,910
TEKNIK PENILAIAN INVESTASI
PAYBACK PERIOD (PP) 0.4 < 3
NET PRESENT VALUE (NPV) Rp
INTERNAL RATE OF RETURN (IRR)

259,771,029,022

1,391,110,641,477
1,131,339,612,454
- 75,068,292,062.17 -107,394,984,400 4,161,963,516 -103,233,020,884
- 58,180,197,425.88 4,161,963,516 -99,071,057,368
- 41,292,102,789.59 4,161,963,516 -94,909,093,852
- 24,404,008,153.30 4,161,963,516 -90,747,130,336
- 7,515,913,517.01 4,161,963,516 -86,585,166,820
9,372,181,119.28 4,161,963,516 -82,423,203,304
26,260,275,755.57 4,161,963,516 -78,261,239,788
43,148,370,391.86 4,161,963,516 -74,099,276,272
60,036,465,028.15 4,161,963,516 -69,937,312,756
76,924,559,664.44 4,161,963,516 -65,775,349,240
93,812,654,300.73 4,161,963,516 -61,613,385,724
110,700,748,937.02 4,161,963,516 -57,451,422,208
4,161,963,516 -53,289,458,692
83555511609.322 4,161,963,516 -49,127,495,176
4,161,963,516 -44,965,531,660
4,161,963,516 -40,803,568,144
16,888,094,636.29 - 75,068,292,062.17 4,161,963,516 -36,641,604,628
- 58,180,197,425.88 4,161,963,516 -32,479,641,112
- 41,292,102,789.59 4,161,963,516 -28,317,677,596
- 24,404,008,153.30 4,161,963,516 -24,155,714,080
- 7,515,913,517.01 4,161,963,516 -19,993,750,564
9,372,181,119.28 4,161,963,516 -15,831,787,048
4,161,963,516 -11,669,823,532
4,161,963,516 -7,507,860,016
4,161,963,516 -3,345,896,500
4,161,963,516 816,067,016
4,161,963,516 4,978,030,532
4,161,963,516 9,139,994,048
4,161,963,516 13,301,957,564
4,161,963,516 17,463,921,080
SISA INVESTASI TINGKAT BUNGA 4,161,963,516 21,625,884,596
- 260,189,109,566 12% 4,161,963,516 25,787,848,112
93,992,393,343 4,161,963,516 29,949,811,628
448,173,896,253 4,161,963,516 34,111,775,144
802,355,399,163 4,161,963,516 38,273,738,660
PENILAIAN 4,161,963,516 42,435,702,176
0.4 < 3 PROJECT IS FEASIBLE 4,161,963,516 46,597,665,692
PROJECT IS FEASIBLE 4,161,963,516 50,759,629,208
PROJECT IS FEASIBLE 4,161,963,516 54,921,592,724
4,161,963,516 59,083,556,240
4,161,963,516 63,245,519,756
4,161,963,516 67,407,483,272
4,161,963,516 71,569,446,788
4,161,963,516 75,731,410,304
4,161,963,516 79,893,373,820
4,161,963,516 84,055,337,336
4,161,963,516 88,217,300,852
4,161,963,516 92,379,264,368
4,161,963,516 96,541,227,884
4,161,963,516 100,703,191,400
4,161,963,516 104,865,154,916
4,161,963,516 109,027,118,432
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
AWAL
No. INVESTASI AWAL JUMLAH PENERIMAAN ALIRAN KAS KETERANGAN
BERSIH (Rp/BULAN)

- 91,956,386,698 TARGET PRODUKSI BIJIH NIKEL


74077.48 TON/BULAN
1 16,888,094,636
2 16,888,094,636
3 16,888,094,636
4 16,888,094,636
5 16,888,094,636
6 16,888,094,636
JUMLAH 101,328,567,818
Waktu pengembalian modal adalah selama 6 bulan atau 0.5 tahun. 

KENAIKAN 5%
JUMLAH PENERIMAAN ALIRAN KAS
No. INVESTASI AWAL KETERANGAN
BERSIH (Rp/BULAN)
TARGET PRODUKSI BIJIH NIKEL
- 91,956,386,698
74077.48 TON/BULAN
1 17,988,234,159
2 17,988,234,159
3 17,988,234,159
4 17,988,234,159
5 17,988,234,159
6 17,988,234,159
JUMLAH 107,929,404,956
Waktu pengembalian modal adalah selama 6 bulan atau 0.5 tahun. 

KENAIKAN 5%
JUMLAH PENERIMAAN ALIRAN KAS
No. INVESTASI AWAL KETERANGAN
BERSIH (Rp/BULAN)
TARGET PRODUKSI BIJIH NIKEL
- 91,956,386,698
74077.48 TON/BULAN
1 15,787,955,113
2 15,787,955,113
3 15,787,955,113
4 15,787,955,113
5 15,787,955,113
6 15,787,955,113
JUMLAH 94,727,730,680
Waktu pengembalian modal adalah selama 6 bulan atau 0.5 tahun. 
JUMLAH PENERIMAAN ALIRAN KAS
No. INVESTASI AWAL KETERANGAN
BERSIH (Rp/BULAN)
TARGET PRODUKSI BIJIH NIKEL
- 91,956,386,698 74077.48 TON/BULAN
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
JUMLAH -
Waktu pengembalian modal adalah selama 6 bulan atau 0.5 tahun. 
KAS BERSIH (Rp/TAHUN)

202657135635
74217600349
83555511609

KAS BERSIH (Rp/TAHUN)

215858809911
87306024968.0766
97110831791.5302

KAS BERSIH (Rp/TAHUN)

189455461360
61129175729.7034
70000191427.1139
cash flow pertambangan bijih nikel dalam rupiah
tahun 0 tahun 1
investasi awal 259,771,029,022
penerimaan :
penjualan bijih nikel 1,062,544,508,730
total penerimaan 1,062,544,508,730

pengeluaran :
Gaji Karyawan 1,200,000,000
Biaya Land Clearing 7,488,000,000
Biaya pengupasan OB 2,288,000,000

Biaya penambangan dan


6,739,200,000
pengangkutan

Bahan Bakar Minyak 1,519,627,200


Perawatan (Maintenance) 8,439,600,000
Konsumsi Karyawan 468,000,000
Pengembangan Masyarakat 144,768,000

Iuran Tetap Tahunan 168,235,354,868

Royalti (5%) 53,127,225,434

total pengeluaran 249,649,775,502

laba sebelum pajak 812,894,733,227


pajak (25%) 203,223,683,307
laba setelah pajak 609,671,049,920
sisa investasi
aliran kas bersih 609,671,049,920
n bijih nikel dalam rupiah
tahun 2 tahun 3

1,062,544,508,730 1,062,544,508,730
1,062,544,508,730 1,062,544,508,730

1,200,000,000 1,200,000,000
7,488,000,000 7,488,000,000
2,288,000,000 2,288,000,000

6,739,200,000 6,739,200,000

1,519,627,200 1,519,627,200
8,439,600,000 8,439,600,000
468,000,000 468,000,000
144,768,000 144,768,000

168,235,354,868 168,235,354,868

53,127,225,434 53,127,225,434

249,649,775,502 249,649,775,502

812,894,733,227 812,894,733,227
203,223,683,307 203,223,683,307
609,671,049,920 609,671,049,920

609,671,049,920 609,671,049,920
cash flow pertambangan bijih nikel dalam rupiah
tahun 0 tahun 1
investasi awal 91,956,386,698
penerimaan :
penjualan bijih nikel 352,044,647,359
total penerimaan 352,044,647,359

pengeluaran :
Gaji Karyawan 1,200,000,000
Biaya Land Clearing 7,488,000,000
Biaya pengupasan OB 2,288,000,000
Biaya penambangan dan
6,739,200,000
pengangkutan
Bahan Bakar Minyak 1,519,627,200
Perawatan (Maintenance) 8,439,600,000
Konsumsi Karyawan 468,000,000
Pengembangan Masyarakat 562,848,544
Iuran Tetap Tahunan 2,632,000
Royalti (5%) 53,127,225,434
total pengeluaran 81,835,133,178

laba sebelum pajak 270,209,514,181


pajak (25%) 67,552,378,545
laba setelah pajak 202,657,135,635
sisa investasi
aliran kas bersih 202,657,135,635
n bijih nikel dalam rupiah
tahun 2 tahun 3 INVESTASI AWAL
TAHUN KE-1
TAHUN KE-2
349,024,656,512 361,475,204,859 TAHUN KE-3
349,024,656,512 361,475,204,859 TEKNIK PENILAIAN INVESTASI
PAYBACK PERIOD (PP) TAHUN
NET PRESENT VALUE (NPV) Rp
1,200,000,000 1,200,000,000 INTERNAL RATE OF RETURN (IRR) %
7,488,000,000 7,488,000,000
2,288,000,000 2,288,000,000 tingkat bunga 12%
6,739,200,000 6,739,200,000
year
1,519,627,200 1,519,627,200 0
8,439,600,000 8,439,600,000 1
468,000,000 468,000,000 2
562,848,544 562,848,544 3
168,235,354,868 168,235,354,868 NPV
53,127,225,434 53,127,225,434
IRR
250,067,856,046 250,067,856,046

98,956,800,465 111,407,348,812
24,739,200,116 27,851,837,203
74,217,600,349 83,555,511,609

74,217,600,349 83,555,511,609
ALIRAN KAS BERSIH SISA INVESTASI TINGKAT BUNGA
- 91,956,386,698 12%
202,657,135,635 110,700,748,937
74,217,600,349 184,918,349,286
83,555,511,609 268,473,860,895
PENILAIAN
0.5 < 3 PROJECT IS FEASIBLE
207626463768.768 > 0.00 PROJECT IS FEASIBLE
1.36 > 0.12 PROJECT IS FEASIBLE

tingkat bunga 12%

cast flow present value


-91956386698 - 91,956,386,698
202,657,135,635 180,943,871,103
74,217,600,349 59,165,816,605
83,555,511,609 59,473,162,759 121050000000
NPV 207,626,463,769 6052500000
136% 127102500000
RR
1.36
PP (TAHUN) NPV (Rp) IRR (%)
HARGA NAIK 5% 0.5 239496094075 152
HARGA NORMAL 0.5 207626463769 136
HARGA TURUN 5% 0.5 175756833462 119
cash flow pertambangan bijih nikel dalam rupiah
tahun 0 tahun 1 tahun 2
investasi awal 91,956,386,698
penerimaan :
penjualan bijih nikel 369,646,879,727 366,475,889,337
total penerimaan 369,646,879,727 366,475,889,337

pengeluaran :
Gaji Karyawan 1,200,000,000 1,200,000,000
Biaya Land Clearing 7,488,000,000 7,488,000,000
Biaya pengupasan OB 2,288,000,000 2,288,000,000
Biaya penambangan dan
6,739,200,000 6,739,200,000
pengangkutan
Bahan Bakar Minyak 1,519,627,200 1,519,627,200
Perawatan (Maintenance) 8,439,600,000 8,439,600,000
Konsumsi Karyawan 468,000,000 468,000,000
Pengembangan Masyarakat 562,848,544 562,848,544

Iuran Tetap Tahunan 2,632,000 168,235,354,868

Royalti (5%) 53,127,225,434 53,127,225,434

total pengeluaran 81,835,133,178 250,067,856,046

laba sebelum pajak 287,811,746,549 116,408,033,291


pajak (25%) 71,952,936,637 29,102,008,323
laba setelah pajak 215,858,809,911 87,306,024,968
sisa investasi
aliran kas bersih 215,858,809,911 87,306,024,968
h ALIRAN KAS BERSIH
tahun 3 INVESTASI AWAL
TAHUN KE-1 215,858,809,911
TAHUN KE-2 87,306,024,968
379,548,965,102 TAHUN KE-3 97,110,831,792
379,548,965,102 TEKNIK PENILAIAN INVESTASI
PAYBACK PERIOD (PP) TAHUN 0.5 < 3
NET PRESENT VALUE (NPV) Rp
1,200,000,000 INTERNAL RATE OF RETURN (IRR) %
7,488,000,000
2,288,000,000 tingkat bunga 12%
6,739,200,000 year cast flow
1,519,627,200 0- 91,956,386,698
8,439,600,000 1 215,858,809,911
468,000,000 2 87,306,024,968
562,848,544 3 97,110,831,792

168,235,354,868
NPV
53,127,225,434
IRR
250,067,856,046

129,481,109,055 352044647359 349024656512


32,370,277,264 17602232367.9543
97,110,831,792 369646879727
PENJUALAN BIJIH
97,110,831,792 352,044,647,359 349,024,656,512
5% 17,602,232,367.95 17,451,232,825.58
+ 369,646,879,727.04 366,475,889,337.22
- 334,442,414,991.13 331,573,423,686.06
SISA INVESTASI TINGKAT BUNGA
- 91,956,386,698 12% 17,988,234,159.29
123,902,423,213
211,208,448,181
308,319,279,973
PENILAIAN
0.5 < 3 PROJECT IS FEASIBLE
239,496,094,075 > 0.00 PROJECT IS FEASIBLE
1.52 > 0.12 PROJECT IS FEASIBLE

present value
- 91,956,386,698
192,731,080,278
69,599,828,578
69,121,571,918 91956386698 349024656512 361475204859

239,496,094,075 4597819334.92276 17451232825.5821 18073760242.9442

152% 96554206033 366475889337 379548965102


152% 1.52

361475204859

361,475,204,859
18,073,760,242.94
379,548,965,101.83
343,401,444,615.94
- 73,968,152,539.17 7,275,502,080.67 131,177,925,293.66
- 55,979,918,379.88 138,453,427,374.33
- 37,991,684,220.60 145,728,929,455.00
- 20,003,450,061.31 153,004,431,535.68
- 2,015,215,902.02 160,279,933,616.35
15,973,018,257.26 167,555,435,697.02
33,961,252,416.55 174,830,937,777.69
51,949,486,575.84 182,106,439,858.37
69,937,720,735.12 189,381,941,939.04
87,925,954,894.41 196,657,444,019.71
105,914,189,053.70 203,932,946,100.39
123,902,423,212.98 211,208,448,181.06
218,483,950,261.73
225,759,452,342.41
17,988,234,159.29 1 233,034,954,423.08

17,988,234,159.29 2 240,310,456,503.75

17,988,234,159.29 3 247,585,958,584.43
17,988,234,159.29 4 254,861,460,665.10
17,988,234,159.29 5 262,136,962,745.77
17,988,234,159.29 6 269,412,464,826.44
17,988,234,159.29 7 276,687,966,907.12
17,988,234,159.29 8 283,963,468,987.79
17,988,234,159.29 9 291,238,971,068.46
17,988,234,159.29 10
17,988,234,159.29 11
17,988,234,159.29 12
7,275,502,080.67 13
7,275,502,080.67 14
7,275,502,080.67 15
7,275,502,080.67 16
7,275,502,080.67 17
7,275,502,080.67 18
7,275,502,080.67 19
7,275,502,080.67 20
7,275,502,080.67 21
7,275,502,080.67 22
7,275,502,080.67 23
7,275,502,080.67 24
25
303,164,834,879.52 26
27
28
29

215,858,809,911.44
cash flow pertambangan bijih nikel dalam rupiah
tahun 0 tahun 1 tahun 2
investasi awal 91,956,386,698
penerimaan :
penjualan bijih nikel 334,442,414,991 331,573,423,686
total penerimaan 334,442,414,991 331,573,423,686

pengeluaran :
Gaji Karyawan 1,200,000,000 1,200,000,000
Biaya Land Clearing 7,488,000,000 7,488,000,000
Biaya pengupasan OB 2,288,000,000 2,288,000,000
Biaya penambangan dan
6,739,200,000 6,739,200,000
pengangkutan
Bahan Bakar Minyak 1,519,627,200 1,519,627,200
Perawatan (Maintenance) 8,439,600,000 8,439,600,000
Konsumsi Karyawan 468,000,000 468,000,000
Pengembangan Masyarakat 562,848,544 562,848,544
Iuran Tetap Tahunan 2,632,000 168,235,354,868
Royalti (5%) 53,127,225,434 53,127,225,434
total pengeluaran 81,835,133,178 250,067,856,046

laba sebelum pajak 252,607,281,813 81,505,567,640


pajak (25%) 63,151,820,453 20,376,391,910
laba setelah pajak 189,455,461,360 61,129,175,730
sisa investasi
aliran kas bersih 189,455,461,360 61,129,175,730

PENJUALAN BIJIH
352044647359 349024656512 361475204859
5% 17602232368 17451232826 18073760243
+ 369646879727 366475889337 379548965102
- 334442414991 331573423686 343401444616
h ALIRAN KAS BERSIH SISA INVESTASI
tahun 3 INVESTASI AWAL
TAHUN KE-1 189,455,461,360
TAHUN KE-2 61,129,175,730
343,401,444,616 TAHUN KE-3 70,000,191,427
343,401,444,616 TEKNIK PENILAIAN INVESTASI
PAYBACK PERIOD (PP) TAHUN 0.5 < 3
NET PRESENT VALUE (NPV) Rp 175,756,833,462 > 0.00
1,200,000,000 INTERNAL RATE OF RETURN (IRR) % 1.19 > 0.12
7,488,000,000
2,288,000,000 tingkat bunga 12%
6,739,200,000 year cast flow present value
1,519,627,200 0- 91,956,386,698 - 91,956,386,698
8,439,600,000 1 189,455,461,360 169,156,661,928
468,000,000 2 61,129,175,730 48,731,804,631
562,848,544 3 70,000,191,427 49,824,753,601
168,235,354,868 NPV 175,756,833,462
53,127,225,434 119%
IRR
250,067,856,046 1.19

93,333,588,569
23,333,397,142
70,000,191,427

70,000,191,427
SISA INVESTASI TINGKAT BUNGA
- 91,956,386,698 12%
97,499,074,661
158,628,250,391
228,628,441,818
PENILAIAN
3 PROJECT IS FEASIBLE
3,462 > 0.00 PROJECT IS FEASIBLE
PROJECT IS FEASIBLE

15,787,955,113.29 - 76,168,431,585.16
- 60,380,476,471.87
- 44,592,521,358.58
- 28,804,566,245.29
- 13,016,611,131.99
2,771,343,981.30
6 BULAN
JumHarga sewa Satuan Total Total Total Total
Biaya sewa
No. Deskripsi Harga/jam Harga/hari Harga/bulan Harga/tahun
lah
(Rp/jam) (Rp) (Rp) (Rp) (Rp) 3 tahun (Rp)
1 Excavator PC12 1 200,000 200,000 1,600,000 41,600,000 499,200,000
2 Dump Truk FM 4 300,000 1,200,000 9,600,000 249,600,000 2,995,200,000
3 Bulldozer D6 – 2 150,000 300,000 2,400,000 62,400,000 748,800,000
4 Motor Grader G 2 250,000 500,000 4,000,000 104,000,000 1,248,000,000 21,715,200,000
5 Compactor ( 30 2 170,000 340,000 2,720,000 70,720,000 848,640,000
6 Whell Loader 2 180,000 360,000 2,880,000 74,880,000 898,560,000
TOTAL 2,900,000 23,200,000 603,200,000 7,238,400,000
No. NAMA/JENIS ALAT JUMLAH (UNIT) HARGA/UNIT (Rp)
1 Bulldozer D6 – D8 2 1,546,866,720
2 Excavator PC1250-7 J 1 943,105,381
3 Dump Truck tipe FM 2 4 969,587,500
4 Motor Grader GD511 2 1,100,000,000
5 Compactor (kapasitas 3 2 1,089,000,000
6 Whell Loader 2 195,000,000

PENGEMBANGGAN MASYARAKAT (CSR)


PERSENTASE CSR BP/BULAN BP/TAHUN
2% 603,200,000 7,238,400,000
NILAI CSR 12,064,000 144,768,000
HARGA SEWA (Rp)
3093733440
943105381
3878350000
2200000000
2178000000
390000000
biaya perawatan/habiaya perawatan biaya perawatan
No. NAMA/JENIS ALAT JUMLAH (UNIT)
(Rp) Perbulan (Rp) Pertahun (Rp)
1 Bulldozer D6 – D8 2 2500000 65000000 780000000
2 Excavator PC1250-7 JAPAN 1 2500000 65000000 780000000
3 Dump Truck tipe FM 235 4 1500000 39000000 468000000
4 Motor Grader 2 1250000 32500000 390000000
5 Compactor (kapasitas 30 T 2 1800000 46800000 561600000
6 Whell Loader 2 2000000 52000000 624000000
7 Light Vehicle 4 WD 4 3000000 78000000 936000000
8 Fuel Truck 1 2000000 52000000 624000000
9 Water Truck 1 2000000 52000000 624000000
10 Ambulance 1 2000000 52000000 624000000
11 Mobil Pemadam Kebakara 1 2000000 52000000 624000000
12 Lighting Plant 4 2500000 65000000 780000000
13 Chain Saw 2 2000000 52000000 624000000
jumlah 27050000 703300000 8439600000
Harga Waktu Biaya Land
Harga Harga Harga
sewa Land Clearing
No. Deskripsi Unit Satuan Sewa/jam Sewa/hari sewa/bulan
Clearing Perbulan
(Rp/jam) (Rp) (Rp) (Rp) (BULAN) (Rp)
1 Bulldozer D6 – D8 2 150,000 300,000 2,400,000 62,400,000 124,800,000
2 Motor Grader GD511 2 250,000 500,000 4,000,000 104,000,000 208,000,000
2
3 Compactor ( 30 Ton) 2 170,000 340,000 2,720,000 70,720,000 141,440,000
4 Whell Loader 2 180,000 360,000 2,880,000 74,880,000 149,760,000
TOTAL 8 1,500,000 12,000,000 312,000,000 624,000,000
Biaya Land
Clearing Pertahun

(Rp)
1,497,600,000
2,496,000,000
1,697,280,000
1,797,120,000
7,488,000,000
harga solar/liter BBM harga solar/h Biaya Biaya
NAMA/JENIS
No. JUMLAH
ALAT (UNIT) No.
(Rp) (Liter/Jam) (Rp) Perbulan (Rp) Pertahun (Rp)
1 Bulldozer D6 2 9800 17.5 343000 8918000 107016000 1
2 Excavator PC 1 9800 170 1666000 43316000 519792000 2
3 Dump Truck t 4 9800 25 980000 25480000 305760000 3
4 Motor Grader 2 9800 15 294000 7644000 91728000 4
5 Compactor (k 2 9800 10 196000 5096000 61152000 5
6 Whell Loader 2 9800 15 294000 7644000 91728000 6
7 Light Vehicl 4 9800 10 392000 10192000 122304000 7
8 Fuel Truck 1 9800 5 49000 1274000 15288000
9 Water Truck 1 9800 5 49000 1274000 15288000 ASUMSI JIKA BBM
10 Ambulance 1 9800 2 19600 509600 6115200
11 Mobil Pemad 1 9800 10 98000 2548000 30576000
12 Lighting Plan 4 9800 10 392000 10192000 122304000
13 Chain Saw 2 9800 5 98000 2548000 30576000
jumlah 4870600 126635600 1519627200
harga solar/liter BBM harga solar/ha Biaya Biaya
NAMA/JENISJUMLAH
ALAT (UNIT)
(Rp) (Liter/Jam) (Rp) Perbulan (Rp)Pertahun (Rp)
Light Vehicl 4 9800 10 392000 10192000 122304000
Fuel Truck 1 9800 5 49000 1274000 15288000
Water Truck 1 9800 5 49000 1274000 15288000
Ambulance 1 9800 2 19600 509600 6115200
Mobil Pemad 1 9800 10 98000 2548000 30576000
Lighting Plan 4 9800 10 392000 10192000 122304000
Chain Saw 2 9800 5 98000 2548000 30576000
jumlah 1097600 28537600 342451200
ASUMSI JIKA BBM ALAT YANG DI SEWA DI TANGGUNG OLEH PEMILIK ALAT

Anda mungkin juga menyukai