LEMBAR KERJA ANALISIS FREKUENSI

Nama Stasiun : Pantai Raja


Significance Level : 0.05 5
Proyek : Perencanaan Teknis Drainase Lingkun

Analisis Frekuensi Curah Hujan Harian Maksimum Tahunan Stasiun Hujan Pantai Raja

Hujan Hujan Probabilitas Dalam %


No. Tahun Asli Diurutkan Empiris Normal Log Normal 2 Par. Log Normal 3 Par. Gumbel Pearson III Log Pearson III
(mm) (mm) Teoritis Beda Teoritis Beda Teoritis Beda Teoritis Beda Teoritis Beda Ln x Teoritis Beda
(1) (2) (3) (4) (5) (6) (7) (8) (9) ( 10 ) ( 11 ) ( 12 ) ( 13 ) ( 14 ) ( 15 ) ( 16 ) ( 17 ) ( 18 )
1 2002 111.2 197 6.25 0.39 5.86 1.44 4.81 2.04 4.21 3.87 2.38 2.20 4.05 5.28 2.60 3.65
2 2003 128.6 147 12.50 15.62 3.12 14.93 2.43 13.79 1.29 19.23 6.73 14.20 1.70 4.99 13.30 0.80
3 2004 111.5 144 18.75 18.12 0.63 16.89 1.86 15.44 3.31 21.05 2.30 15.80 2.95 4.97 14.70 4.05
4 2005 98 141 25.00 20.85 4.15 19.05 5.95 17.29 7.71 23.02 1.98 17.60 7.40 4.95 16.40 8.60
5 2006 197 128.6 31.25 34.42 3.17 30.31 0.94 27.25 4.00 32.81 1.56 27.10 4.15 4.86 25.50 5.75
6 2007 92 111.5 37.50 56.55 19.05 51.74 14.24 48.45 10.95 50.76 13.26 47.10 9.60 4.71 46.40 8.90
7 2008 111 111.2 43.75 56.94 13.19 52.16 8.41 48.90 5.15 51.12 7.37 47.60 3.85 4.71 46.90 3.15
8 2009 94.5 111 50.00 57.20 7.20 52.44 2.44 49.20 0.80 51.35 1.35 47.80 2.20 4.71 47.20 2.80
9 2010 144 99 56.25 71.85 15.60 69.48 13.23 68.69 12.44 66.06 9.81 67.20 10.95 4.60 68.50 12.25
10 2011 147 98 62.50 72.96 10.46 70.86 8.36 70.37 7.87 67.30 4.80 68.90 6.40 4.58 70.40 7.90
11 2012 141 95 68.75 76.14 7.39 74.89 6.14 75.33 6.58 70.98 2.23 74.20 5.45 4.55 76.10 7.35
12 2013 93.4 94.5 75.00 76.65 1.65 75.55 0.55 76.14 1.14 71.58 3.42 75.10 0.10 4.55 77.00 2.00
13 2014 95 93.4 81.25 77.75 3.50 76.97 4.28 77.90 3.35 72.90 8.35 77.00 4.25 4.54 79.10 2.15
14 2015 84 92 87.50 79.11 8.39 78.73 8.77 80.10 7.40 74.56 12.94 79.40 8.10 4.52 81.60 5.90
15 2016 99 84 93.75 85.88 7.87 87.56 6.19 90.95 2.80 83.37 10.38 92.20 1.55 4.43 93.90 0.15
Jumlah Data 15 Delta Maks 19.05 14.24 12.44 13.26 10.95 12.25
2 1 1 outlier atas ok 2 1 ok
1 1 outlier bawah ok
Test Outlier Atas Stasiun Pantai Raja

Menurut Water Resources Council (1981), bila :


- Koefisien Skew > + 0,4, maka perlu dilakukan pemeriksaan Outlier atas
- Koefisien Skew < - 0,4, maka perlu dilakukan pemeriksaan Outlier bawah
- - 0,4 < Koefisien Skew < + 0,4, maka perlu dilakukan pemeriksaan Outlier atas dan Outlier bawah

Koef. Skew stasiun Pantai Raja = 1.4759011 > 0,4, maka perlu diperiksa Outlier Atas

High Outlier Threshold dapat dicari sebagai berikut :

YH = yrata-2 + Kn sy

Dari perhitungan di muka diperoleh :


yrata-2 = 4.730
Kn = 2.2470
sy = 0.234

maka YH = 5.257
Maka High Outlier Threshold R = 191.95 mm
Nilai maksimum curah hujan harian maksimum tahunan dalam seri data Pantai Raja adalah : 197
Maka pada sample data stasiun Pantai Raja ada Outlier
Koef. Skew = 1.476

mm > 191.95 mm
Test for Absence of Trend Stasiun Pantai Raja

Spearman's Rank-Correlation Method

Hujan Hujan
No. Tahun Asli Dirangking Kyi Kxi Di Di2
(mm) (mm)
(1) (2) (3) (4) (5) (6) (7) (8)
1 2002 111.2 84 14 1 -13 169
2 2003 128.6 92 6 2 -4 16
3 2004 111.5 93.4 12 3 -9 81
4 2005 98 94.5 8 4 -4 16
5 2006 197 95 13 5 -8 64
6 2007 92 98 4 6 2 4
7 2008 111 99 15 7 -8 64
8 2009 94.5 111 7 8 1 1
9 2010 144 111.2 1 9 8 64
10 2011 147 111.5 3 10 7 49
11 2012 141 128.6 2 11 9 81
12 2013 93.4 141 11 12 1 1
13 2014 95 144 9 13 4 16
14 2015 84 147 10 14 4 16
15 2016 99 197 5 15 10 100
Jml Data : 15 Jumlah 742.00
Rsp = -0.3250
tt = -1.239

Dengan Significance level 5 % :

- Batas bawah dari tt = t{nu,2,5 %}, dimana nu adalah derajad kebebasan = n - 2 = 13


Dengan demikian batas bawah = t (13, 2,5 %) = -2.160

- Batas atas dari tt = t{nu,97,5 %} =t (13, 97,5 %) = 2.160

Karena -2.160 < tt = -1.239 < 2.160 maka data stasiun Pantai Raja tidak ada Trend ------> (O.K.)

Test for Stability of Variance and Mean

1. The F-Test for Stability of Variance

Data dibagi menjadi 2, n1 data No. 1 s/d 7 dan n2 data No. 8 s/d 15

s1 = 35.3301 n1 = n1-1 = 6 1
s2 = 26.6827 n2 = n2-1 = 7 8
Ft = (s1)2/(s2)2 = 1.7532

- Batas bawah dari Ft = F{nu1,nu2,2,5%} = F{6,7, 2,5 %} = 0.176


- Batas atas dari Ft = F{n1,n2,97,5%} = F{6,7, 97,5 %} = 5.119

Karena 0.176 < Ft = 1.753 < 5.119 maka variance data stasiun Pantai Raja tidak ada Trend ------> (O.K.)
2. The t-Test for Stability of Mean

x1 = 121.3286
x2 = 112.2375
tt = 0.567

Karena -2.160 < tt = 0.567 < 2.160 maka mean data stasiun Pantai Raja tidak ada Trend ------> (O.K.)
1 1
2 1
3 1
3 3 ok

13
t (13, 2,5 %) =
t (13, 97,5 %) = - Batas atas dari tt = t{nu,97,5 %} =
-2.160 2.160 -1.239
Karena tt = -1.239 < -2.160 , maka data stasiun Pantai Raja ada Trend -------> (tidak
Karena tt = -1.239 > 2.160 , maka data stasiun Pantai Raja ada Trend -------> (tidak O
Karena -2.160 < tt = -1.239 < 2.160 maka data stasiun Pantai Raja tidak ada Trend --

n1 = 7 7
n2 = 8 8
7 11 17
15 18 25

0.176 5.119 1.753


Karena Ft = 1.753 < 0.176 , maka variance data stasiun Pantai Raja ada Trend ------->
Karena Ft = 1.753 > 5.119 , maka variance data stasiun Pantai Raja ada Trend ------->
------> (O.K.) Karena 0.176 < Ft = 1.753 < 5.119 maka variance data stasiun Pantai Raja tidak ada T
N O P

-2.160 2.160 0.567


Karena tt = 0.567 < -2.160 , maka mean data stasiun Pantai Raja ada Trend -------> (t
Karena tt = 0.567 > 2.160 , maka mean data stasiun Pantai Raja ada Trend -------> (ti
Karena -2.160 < tt = 0.567 < 2.160 maka mean data stasiun Pantai Raja tidak ada Tre
i Raja ada Trend -------> (tidak O.K.)
Raja ada Trend -------> (tidak O.K.)
n Pantai Raja tidak ada Trend ------> (O.K.)

un Pantai Raja ada Trend -------> (tidak O.K.)


un Pantai Raja ada Trend -------> (tidak O.K.)
a stasiun Pantai Raja tidak ada Trend ------> (O.K.)
Pantai Raja ada Trend -------> (tidak O.K.)
antai Raja ada Trend -------> (tidak O.K.)
tasiun Pantai Raja tidak ada Trend ------> (O.K.)
1

Pemeriksaan Independensi Stasiun Pantai Raja

(1) (2) (3) (4) (5)


i Xi Xi - Xav (3)i * (3)i+1 (3)i * (3)i
2002 111.2 -5.3 -63.99 27.88
2003 128.6 12.1 -60.36 146.89
2004 111.5 -5.0 92.03 24.80
2005 98.0 -18.5 -1,488.01 341.51
2006 197.0 80.5 -1,971.13 6,483.47
2007 92.0 -24.5 134.15 599.27
2008 111.0 -5.5 120.45 30.03
2009 94.5 -22.0 -604.89 483.12
2010 144.0 27.5 839.91 757.35
2011 147.0 30.5 748.35 931.47
2012 141.0 24.5 -565.92 601.23
2013 93.4 -23.1 495.76 532.69
2014 95.0 -21.5 697.67 461.39
2015 84.0 -32.5 567.75 1,054.95
2016 99.0 -17.5 305.55

Jumlah 1,747.2 -1,058.23 12,781.60


Rata-2 116.5
r1 = -0.0828

Dengan Significance level 5 % :

- Batas bawah dari r1 = (-1-1,96(n-2)^0,5)/(n-1) = -0.5762

- Batas atas dari r1 = (-1+1,96(n-2)^0,5)/(n-1) = 0.4333

Karena -0.5762 < r1 = -0.0828 < 0.4333 maka data stasiun Pantai Raja Independen ------> (O.K.)
1 ok

-0.5762 0.4333 -0.0828


Karena r1 = -0.0828 < -0.5762 , maka data stasiun Pantai Raja tidak Independen -------> (
Karena r1 = -0.0828 > 0.4333 , maka data stasiun Pantai Raja tidak Independen -------> (t
Karena -0.5762 < r1 = -0.0828 < 0.4333 maka data stasiun Pantai Raja Independen ------>
a tidak Independen -------> (tidak O.K.)
a tidak Independen -------> (tidak O.K.)
antai Raja Independen ------> (O.K.)
Kala Ulang T Distribusi Probabilitas Diprogram Oleh : BaR

(Tahun) t Lognormal Lognormal Log


Normal Gumbel I Pearson III
2 Paramet. 3 Paramet. Pearson III
2 0.0000 116.5 112.7 110.5 112.1 109.5 109.2
5 0.8416 141.9 139.8 137.1 145.7 137.3 135.4
10 1.2816 155.2 156.4 155.4 167.9 156.4 155.0
20 1.6449 166.2 171.6 173.5 189.2 175.0 175.6
25 1.7507 169.4 176.3 179.3 196.0 180.9 182.6
50 2.0537 178.5 190.4 197.5 216.8 199.0 205.2
100 2.3263 186.8 204.1 216.1 237.5 217.0 229.7
500 2.8782 203.4 235.0 261.3 285.3 258.6 295.7
1000 3.0902 209.9 248.1 281.8 305.8 276.6 328.7
Penyimpangan Maksimum 19.05 14.24 12.44 13.26 10.95 12.25
Delta Kritis (Sig. Level 5 %) 33.8 33.8 33.8 33.8 33.8 33.8
Probabilitas Normal Stasiun Pantai Raja Probabilitas Log Normal 2 Parameter Stasiun Pantai Raja
Curah Hujan [mm]

Curah Hujan [mm]


250 300

250
200

200
150

150

100
100

50
50

0 0
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100
Probabilitas >= [ % ] Probabilitas >= [ % ]
Empiris Teoritis Teoritis Empiris Teoritis Teoritis
Diprogram Oleh BaR Delta Maks = 19.05 < 33.8 Delta Maks = 14.24 < 33.8
Diprogram Oleh BaR

Probabilitas Log Normal 3 Parameter Stasiun Pantai Raja Probabilitas Gumbel Tipe I Stasiun Pantai Raja
Curah Hujan [mm]

Curah Hujan [mm]


300 350

300
250

250
200

200
150

150

100
100

50
50

0 0
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100
Probabilitas >= [ % ] Probabilitas >= [ % ]
Empiris Teoritis Teoritis Empiris Teoritis Teoritis
Delta Maks = 12.44 < 33.8 Delta Maks = 13.26 < 33.8
Diprogram Oleh BaR Diprogram Oleh BaR
Log normal dan log pearson
n= 15
K= 1 + 3,332 Log n
K= 4.906975
K= 5

DK = Derajat Kebebasan
DK = K-2
DK = 3

Ef = n / K
Ef = 3

Delta X = log Xmax - Log Xmin / (K-1)


No Probabilitas Of
Delta X = 0.092547
1 1.878< P <=1.9706 3
X awal = X min - Deltax /2 2 1.9706< P <=2.0631 7
X awal = 1.878006 3 2.0631< P <=2.1556 2
untuk pembagian kelas 4 2.1556< P <=2.2482 2
X akhir = X max - Delta x/2 5 2.2482< P <=2.3407 1
X akhir = 2.248193 15

log ranking batas kelas


2002 111.2 2.046105 1.924279 1 1.878006 < P <=
2003 128.6 2.109241 1.963788 Kelas 1 2 1.97055265357435 < P <=
2004 111.5 2.047275 1.970347 3 2.06309938859927 < P <=
2005 98 1.991226 1.975432 4 2.1556461236242 < P <=
2006 197 2.294466 1.977724 5 2.24819285864913 < P <=
2007 92 1.963788 1.991226
2008 111 2.045323 1.995635 REKAP
Kelas 2
2009 94.5 1.975432 2.045323 UJI CHI KUADRAT dengan tingkat kepercaya
2010 144 2.158362 2.046105 Tabel Perbandingan X2 dan X2cr
2011 147 2.167317 2.047275
Distribusi X2cr
2012 141 2.149219 2.109241 Kelas 3
2013 93.4 1.970347 2.149219 Log Normal 2 Parameter 7.815
2014 95 1.977724 2.158362 Log Normal 3 Parameter 7.815
Kelas 4
2015 84 1.924279 2.167317 Log Pearson III 7.815
2016 99 1.995635 2.294466 Kelas 5 Normal 7.815
MAX 197 2.294466 Pearson III 7.815
MIN 84 1.924279 Gumbel tipe I 7.815
Gumbel, Normal dan Pearson
n= 15
K= 1 + 3,332 Log n
K= 4.906975
K= 5

DK = Derajat Kebebasan
DK = K -3
DK = 2

Ef = n / K
Ef = 3

Delta X = Xmax - Xmin / (K-1)


Ef X2 = ((Of-Ef)^2)/Ef
Delta X = 28.25
3 0
3 5.33333333333333 X awal = Xmin - Deltax /2
3 0.33333333333333 X awal = 69.875
3 0.33333333333333 untuk pembagian kelas
3 1.33333333333333 X akhir = Xmax - Deltax/2
7.33333333333333 X akhir = 162.0625

batas kelas
1.970553 2002 111.2 84
2.063099 2003 128.6 92
2.155646 2004 111.5 93.4
Kelas 1
2.248193 2005 98 94.5
2.34074 2006 197 95
2007 92 98
REKAP 2008 111 99
dengan tingkat kepercayaan 0.5% 2009 94.5 111
Kelas 2
erbandingan X2 dan X2cr 2010 144 111.2
Persyaratan 2011 147 111.5
X2
X2 < X2cr 2012 141 128.6
7.333 MEMENUHI 2013 93.4 141 Kelas 3
7.333 MEMENUHI 2014 95 144
7.333 MEMENUHI 2015 84 147
7.585 MEMENUHI 2016 99 197 Kelas 5
7.585 MEMENUHI MAX 197
7.585 MEMENUHI MIN 84
No Probabilitas Of Ef X2 = ((Of-Ef)^2)/Ef
1 69.875< P <=98.125 6 4.33 0.644087759815242
2 98.125< P <=126.375 4 4.33 0.025150115473441
3 126.375< P <=154.625 4 4.33 0.025150115473441
untuk pembagian kelas 4 154.625< P <=182.875 0 4.33 4.33
5 182.875< P <=211.125 1 4.33 2.56094688221709
15 7.58533487297922

batas kelas
1 69.875 < P <= 98.125
2 98.125 < P <= 126.375
3 126.375 < P <= 154.625
4 154.625 < P <= 182.875
5 182.875 < P <= 211.125

Kelas 4 kosong
1996 90
1997 120.2
1998 120.4
1999 99.5
2000 186.8
2001 125.4
2002 120
2003 100.2
2004 83
2005 55
2006 175

Delta X = log Xmax - Log Xmin / (K-1)


Delta X =
REKAP
Uji Smirnov-Kolmogorov dengan tingkat kepercayaan 1%
Tabel Perbandingan
Delta Delta Persyaratan
Distribusi
Kritik Max Xmax< Xkritik
Log Normal 2 Parameter 0.34 0.063922 MEMENUHI
Log Normal 3 Parameter 0.34 0.085676 MEMENUHI
Log Pearson III 0.34 0.101645 MEMENUHI
Normal 0.34 0.108958 MEMENUHI
Pearson III 0.34 0.10061 MEMENUHI
Gumbel tipe I 0.34 0.119644 MEMENUHI
∆max=((log⁡(maksimum)-log⁡(minimum)))/((n-1))
perhitungan intensitas curah hujan dengan mononobe dengan rumus mononobe I=R24/24×(24/T
dengan analisis frekwensi pearson III I = (R24/24) x (24/t)^2/3
dikarenakan simpangannya kecil

R24
t (jam) R2 R5 R10 R20 R25 R50 R100
109.5 137.3 156.4 175 180.9 199 217
1 37.962 47.599 54.221 60.669 62.715 68.989 75.230
2 23.914 29.986 34.157 38.219 39.508 43.461 47.392
3 18.250 22.883 26.067 29.167 30.150 33.167 36.167
4 15.065 18.890 21.518 24.077 24.888 27.378 29.855
5 12.983 16.279 18.543 20.749 21.448 23.594 25.728
6 11.497 14.416 16.421 18.374 18.993 20.894 22.784
7 10.374 13.008 14.817 16.579 17.138 18.853 20.558
8 9.490 11.900 13.555 15.167 15.679 17.247 18.807
9 8.774 11.001 12.532 14.022 14.495 15.945 17.387
10 8.179 10.255 11.682 13.071 13.511 14.863 16.208
11 7.675 9.624 10.962 12.266 12.680 13.948 15.210
12 7.243 9.081 10.345 11.575 11.965 13.162 14.353
13 6.866 8.609 9.807 10.973 11.343 12.478 13.607
14 6.535 8.194 9.334 10.444 10.796 11.877 12.951
15 6.241 7.826 8.915 9.975 10.311 11.343 12.369
16 5.979 7.496 8.539 9.555 9.877 10.865 11.848
17 5.742 7.199 8.201 9.176 9.486 10.435 11.379
18 5.527 6.930 7.894 8.833 9.131 10.045 10.953
19 5.331 6.685 7.615 8.521 8.808 9.689 10.565
20 5.152 6.460 7.359 8.234 8.512 9.363 10.210
21 4.987 6.253 7.123 7.971 8.239 9.064 9.883
22 4.835 6.062 6.906 7.727 7.988 8.787 9.582
23 4.694 5.885 6.704 7.502 7.754 8.530 9.302
24 4.563 5.721 6.517 7.292 7.538 8.292 9.042
Jumlah 237.857 298.244 339.733 380.136 392.952 432.269 471.369
STDEV 7.643 9.583 10.916 12.214 12.626 13.889 15.146

Hyetograph
R2 R5 R10
t (jam) Infiltrasi Infiltrasi
Rtot (mm) Reff (mm) Rtot (mm) Reff (mm) Rtot (mm)
(mm/H) (mm/H)
1 37.962 75.473614 0 47.599 93.24583508 0 54.221
2 23.914 30.293673 0 29.986 36.83170794 0 34.157
3 18.250 13.672902 4.577098 22.883 16.07811037 6.805223 26.067
4 15.065 7.5584617 7.506581 18.890 8.443288493 10.44649 21.518
5 12.983 5.3090849 7.673576 16.279 5.634594488 10.64412 18.543
6 11.497 4.4815854 7.015194 14.416 4.601333707 9.814263 16.421
7 10.374 4.1771654 6.196805 13.008 4.221218308 8.786509 14.817
8 9.490 4.0651755 5.425207 11.900 4.081381668 7.818431 13.555
9 8.774 4.0239767 4.749708 11.001 4.029938642 6.971221 12.532
10 8.179 4.0088205 4.169743 10.255 4.011013811 6.243934 11.682
11 7.675 4.0032449 3.671818 9.624 4.004051755 5.619565 10.962
12 7.243 4.0011937 3.241324 9.081 4.001490557 5.079766 10.345
13 6.866 4.0004391 2.865735 8.609 4.000548345 4.608819 9.807
14 6.535 4.0001616 2.53503 8.194 4.000201725 4.194153 9.334
15 6.241 4.0000594 2.241353 7.826 4.00007421 3.825916 8.915
16 5.979 4.0000219 1.978544 7.496 4.000027301 3.496385 8.539
17 5.742 4.000008 1.741744 7.199 4.000010043 3.199465 8.201
18 5.527 4.000003 1.527072 6.930 4.000003695 2.930292 7.894
19 5.331 4.0000011 1.331399 6.685 4.000001359 2.684942 7.615
20 5.152 4.0000004 1.152172 6.460 4.0000005 2.460212 7.359
21 4.987 4.0000001 0.987285 6.253 4.000000184 2.253463 7.123
22 4.835 4.0000001 0.834986 6.062 4.000000068 2.062499 6.906
23 4.694 4 0.693806 5.885 4.000000025 1.885476 6.704
24 4.563 4 0.5625 5.721 4.000000009 1.720833 6.517

Hujan Efektif i [mm]


Hyetograph R2
9
8
20
7 18
Hujan Efektif i [mm]

6 16
5 14
12
4
10
3
8
2 6
1 4
2
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 0
Time [H] 1 2 3
Hujan Efektif i [mm]

Hujan Efektif i [mm]


Hyetograph R5
12
25
10

20
8

6 15

4 10

2
5
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Time [H] 0
1 2 3
Hujan Efektif i [mm]

Hujan Efektif i [mm]

Hyetograph R10
14

12 25
10
20
8

6 15

4
10
2
5
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Time [H]
0
1 2 3
8

6 15

4
10
2
5
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Time [H]
0
1 2 3
Hujan Efektif i [mm]

Hujan Efektif i [mm]


Hyetograph R20
16
14
30
12
10 25
8
20
6
15
4
2 10
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 5
Time [H]
0
1 2
Hujan Efektif i [mm]

Hyetograph R25
18
16
14
12
10
8
6
4
2
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Time [H]
H
y
e
t
o
g
r
a
p
hT
i
m
eR
2[
H
]
I=R24/24×(24/T)^(2/3)

R500 R1000 HUJAN MONONOBE

Debit (m3/s)
258.6 276.6 120.0
89.652 95.892
100.0 R2
56.477 60.408
R5
43.100 46.100
80.0
35.578 38.055 R10
30.660 32.795 R20
60.0
27.151 29.041 R25
24.500 26.205 R50
40.0
22.413 23.973 R100
20.720 22.163
20.0 R500
19.315 20.659
R100
18.126 19.387 0.0 0
17.104 18.295 0 5 10 15 20 25
Time
16.215 17.344
15.434 16.508
14.740 15.766
14.119 15.102
13.560 14.504
13.053 13.962
12.591 13.467
12.168 13.015
11.778 12.598
11.419 12.213
11.085 11.857 Infiltrasi Horton, fo = 80%
10.775 11.525 fo = 190.2854248 238.5953
561.733 600.833 fc = 4 mm
18.049 19.306 k= 1 mm/jam

R10 R20 R25


Infiltrasi Infiltrasi Infiltrasi
Reff (mm) Rtot (mm) Reff (mm) Rtot (mm) Reff (mm)
(mm/H) (mm/H) (mm/H)
105.4562463 0 60.669 117.3470133 0 62.715 121.1188157 0
41.32366719 0 38.219 45.69803589 0 39.508 47.08560446 0
17.73060983 8.336057 29.167 19.33985014 9.826817 30.150 19.85030809 10.29969
9.051209071 12.46635 24.077 9.643215498 14.43334 24.888 9.831002483 15.05727
5.85823597 12.68503 20.749 6.076022964 14.67252 21.448 6.145105935 15.30296
4.68360681 11.73736 18.374 4.763726168 13.61012 18.993 4.789140373 14.20417
4.251484891 10.56577 16.579 4.280959156 12.29845 17.138 4.290308519 12.84806
4.092516121 9.462697 15.167 4.103359097 11.06392 15.679 4.106798536 11.57183
4.034034779 8.497511 14.022 4.038023687 9.983847 14.495 4.039288986 10.45532
4.012520695 7.669008 13.071 4.013988133 9.056776 13.511 4.01445361 9.496982
4.004606106 6.957766 12.266 4.005145946 8.260936 12.680 4.005317186 8.674306
4.001694492 6.342869 11.575 4.001893088 7.572906 11.965 4.001956083 7.963079
4.000623369 5.806405 10.973 4.000696428 6.972641 11.343 4.000719603 7.342576
4.000229325 5.334054 10.444 4.000256202 6.444114 10.796 4.000264727 6.79623
4.000084364 4.91459 9.975 4.000094251 5.974765 10.311 4.000097388 6.311058
4.000031036 4.539218 9.555 4.000034673 5.554752 9.877 4.000035827 5.876883
4.000011417 4.200993 9.176 4.000012756 5.176303 9.486 4.00001318 5.485676
4.0000042 3.894375 8.833 4.000004692 4.83322 9.131 4.000004849 5.131026
4.000001545 3.614894 8.521 4.000001726 4.520501 8.808 4.000001784 4.807764
4.000000568 3.358901 8.234 4.000000635 4.234065 8.512 4.000000656 4.51167
4.000000209 3.123391 7.971 4.000000234 3.970546 8.239 4.000000241 4.239268
4.000000077 2.905862 7.727 4.000000086 3.727147 7.988 4.000000089 3.987662
4.000000028 2.704213 7.502 4.000000032 3.501517 7.754 4.000000033 3.754425
4.00000001 2.516667 7.292 4.000000012 3.291667 7.538 4.000000012 3.5375

Infiltrasi )mm/H)
Hujan Efektif i [mm]

Hyetograph R50 Infiltr


20 80
70
18
60
16
50
14
40
12 30
10 20
8 10
6 0
4 0 4 8
2
0

Infiltrasi )mm/H)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Time [H]

Infiltra
Hujan Efektif i [mm]

100
90
80
Hyetograph R100 70
60
25 50
40
30
20
20
10
15 0
0 4 8

10
Infiltrasi )mm/H)

Infiltras
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 120
Time [H]
100
80
Hujan Efektif i [mm]

60
40

Hyetograph R500 20

25 0
0 4 8

20
Infiltrasi )mm/H)

15

10 Infiltras
140
5 120
100
0 80
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Infiltrasi )mm/H)
15

10 Infiltras
140
5 120
100
0 80
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Time [H] 60
40
20
Hujan Efektif i [mm]

0
0 4 8

Hyetograph R1000

Infiltrasi )mm/H)
30

25
Infiltrasi
20 140
120
15
100
10 80
60
5
40

0 20
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Time [H] 0
0 4 8
R2
R5
R10
R20
R25
R50
R100
R500
R100
0
20 25

271.7867 304.1091264 314.3619 345.8155 377.0953168 449.3864 480.6662

R50 R100 R500


Infiltrasi Infiltrasi Infiltrasi
Rtot (mm) Reff (mm) Rtot (mm) Reff (mm) Rtot (mm)
(mm/H) (mm/H) (mm/H)
68.989 132.6899383 0 75.230 144.1971322 0 89.652 170.7915357
43.461 51.3423826 0 47.392 55.57564264 0 56.477 65.35917693
33.167 21.41628926 11.75038 36.167 22.97361859 13.19305 43.100 26.57277972
27.378 10.40709476 16.97139 29.855 10.9800042 18.87492 35.578 12.30406159
23.594 6.357038439 17.23702 25.728 6.567800046 19.16039 30.660 7.054893537
20.894 4.867105984 16.02658 22.784 4.944640846 17.83893 27.151 5.123832527
18.853 4.318990465 14.53416 20.558 4.347513947 16.21095 24.500 4.413434882
17.247 4.117350034 13.13001 18.807 4.127843236 14.67958 22.413 4.152094193
15.945 4.043170665 11.9017 17.387 4.047030898 13.34009 20.720 4.055952327
14.863 4.0158816 10.84744 16.208 4.017301701 12.19045 19.315 4.020583711
13.948 4.005842514 9.942444 15.210 4.00636494 11.20358 18.126 4.007572324
13.162 4.002149341 9.160051 14.353 4.002341531 10.35041 17.104 4.002785702
12.478 4.000790698 8.477462 13.607 4.000861401 9.606077 16.215 4.001024803
11.877 4.000290882 7.876451 12.951 4.000316892 8.950703 15.434 4.000377004
11.343 4.000107009 7.342733 12.369 4.000116578 8.368709 14.740 4.000138692
10.865 4.000039367 6.865118 11.848 4.000042887 7.847892 14.119 4.000051022
10.435 4.000014482 6.434768 11.379 4.000015777 7.378616 13.560 4.00001877
10.045 4.000005328 6.044634 10.953 4.000005804 6.953193 13.053 4.000006905
9.689 4.00000196 5.689027 10.565 4.000002135 6.565422 12.591 4.00000254
9.363 4.000000721 5.363308 10.210 4.000000785 6.21024 12.168 4.000000934
9.064 4.000000265 5.06365 9.883 4.000000289 5.883477 11.778 4.000000344
8.787 4.000000098 4.78687 9.582 4.000000106 5.581662 11.419 4.000000126
8.530 4.000000036 4.530296 9.302 4.000000039 5.301881 11.085 4.000000047
8.292 4.000000013 4.291667 9.042 4.000000014 5.041667 10.775 4.000000017

Infiltrasi )mm/H)
Infiltrasi )mm/H)

Infiltrasi Horton R2 Infiltrasi Horton R50


80 140
70 120
60 100
50 80
40
60
30
40
20
10 20
0 0
0 4 8 12 16 20 24 0 4 8 12 16
Time (H) Time (H)

Infiltrasi )mm/H)
Infiltrasi )mm/H)

Infiltrasi Horton R5 Infiltrasi Horton R100


100 160
90 140
80 120
70
100
60
50 80
40 60
30 40
20
20
10
0 0
0 4 8 12 16 20 24 0 4 8 12 16
Time (H) Time (H)
Infiltrasi )mm/H)

Infiltrasi )mm/H)

Infiltrasi Horton R10 Infiltrasi Horton R500


120 180
100 160
140
80 120
60 100
80
40 60
20 40
20
0 0
0 4 8 12 16 20 24 0 4 8 12 16
Time (H) Time (H)
Infiltrasi )mm/H)

Infiltrasi )mm/H)

Infiltrasi Horton R20 Infiltrasi Horton R1000


140 200
120 180
160
100
140
80 120
100
Infiltrasi )mm/H)

Infiltrasi )mm/H)
Infiltrasi Horton R20 Infiltrasi Horton R1000
140 200
120 180
160
100
140
80 120
60 100
80
40 60
20 40
20
0 0
0 4 8 12 16 20 24 0 4 8 12 16
Time (H) Time (H)
Infiltrasi )mm/H)

Infiltrasi Horton R25


140
120
100
80
60
40
20
0
0 4 8 12 16 20 24
Time (H)
R500 R1000
Infiltrasi
Reff (mm) Rtot (mm) Reff (mm)
(mm/H)
0 95.892 182.2987295 0
0 60.408 69.59243697 0
16.52722 46.100 28.13010906 17.96989
23.2742 38.055 12.87697103 25.17774
23.60553 32.795 7.265655144 25.5289
22.02747 29.041 5.201367389 23.83981
20.08619 26.205 4.441958364 21.76298
18.26081 23.973 4.162587396 19.81038
16.66437 22.163 4.05981256 18.10276
15.29427 20.659 4.022003811 16.63727
14.11819 19.387 4.00809475 15.37932
13.10146 18.295 4.002977892 14.29182
12.21443 17.344 4.001095505 13.34305
11.43342 16.508 4.000403014 12.50767
10.73985 15.766 4.000148261 11.76583
10.11919 15.102 4.000054542 11.10197
9.559954 14.504 4.000020065 10.5038
9.052976 13.962 4.000007381 9.961536
8.590866 13.467 4.000002715 9.467261
8.167595 13.015 4.000000999 9.014527
7.77819 12.598 4.000000368 8.598018
7.418516 12.213 4.000000135 8.213308
7.085098 11.857 4.00000005 7.856683
6.775 11.525 4.000000018 7.525

Infiltrasi Horton R50

4 8 12 16 20 24
Time (H)

Infiltrasi Horton R100

4 8 12 16 20 24
Time (H)

Infiltrasi Horton R500

8 12 16 20 24
Time (H)

nfiltrasi Horton R1000


nfiltrasi Horton R1000

8 12 16 20 24
Time (H)
Metode Rasional
A. Luas Sub Basin
Luas (km2) Luas (Ha) Keterangan Panjang (m) Slope
Sub basin 1 = 15.45 1545 Sei Rumbai 6045.33 0.025
Sub basin 2 = 10.5 1050 Sei Cuda 9388.33 0.015
Sub basin 3 = 40.334 4033.4 Sei Kampar unknown 0.007
Sub basin 4 = 17.23 1723 Sei Lintaga 2703.09 0.025
Sub basin 5 = 25.05 2505 Sei Keruh 13197.1 0.025
Sub basin 6 = 5.35 535 Sei Kulim 12584.5 0.005

B. Hitung Waktu Konsentrasi (Tc)

Tc (jam)
Sub basin 1 = 13.08022533
Sub basin 2 = 15.08006015 I=R24/24×(24/T)^(2/3)
Sub basin 3 = unknown
Sub basin 4 = 7.03808334
Sub basin 5 = 23.86108932
Sub basin 6 = 12.37918511

C. Intensitas Hujan (I)

R2 R5 R10 R20 R25 R50 R100 R500


109.5 137.3 156.4 175 180.9 199 217 258.6

basin 1 = 5.1200436 6.419926753 7.313012 8.182718 8.458592 9.304919 10.14657 12.09172


basin 2 = 3.8521036 4.830080583 5.502 6.15633 6.363886 7.000627 7.633849 9.097297
basin 3 =
basin 4 = 17.684602 22.17439166 25.2591 28.26306 29.21593 32.13914 35.0462 41.76473
basin 5 = 1.5385924 1.929212163 2.197588 2.458938 2.541839 2.796163 3.049083 3.633607
basin 6 = 5.7163655 7.167643725 8.164745 9.135744 9.443749 10.38865 11.32832 13.50002

C. Debit
Q p =0 , 278 C I A
Sub Basin 1

Catchment Deskripsi Luas (A) Ckomposit


Nilai C CxA
Area Permukaan (Km)
Pemukiman 0.5 8.35 4.175
Sub Basin Ladang 0.35 7.1 2.485
1 0.431068

Total 0.85 15.45 6.66

R2 R5 R10 R20 R25 R50 R100 R500


Debit
9.4796582 11.88636599 13.5399 15.15014 15.66091 17.22787 18.78617 22.38758
(m3/dtk)
Sub Basin 2

Catchment Deskripsi Luas (A) Ckomposit


Nilai C CxA
Area Permukaan (Km)
Pemukiman 0.5 4.5 2.25
Sub Basin Ladang 0.35 6 2.1
1 0.414286

Total 0.85 10.5 4.35

R2 R5 R10 R20 R25 R50 R100 R500


Debit
4.6583489 5.841016449 6.653569 7.44485 7.695848 8.465858 9.231614 11.00136
(m3/dtk)

Sub Basin 4

Catchment Deskripsi Luas (A) Ckomposit


Nilai C CxA
Area Permukaan (Km)
Pemukiman 0.5 0
Sub Basin Ladang 0.35 17.23 6.0305
1 0.35

Total 0.85 17.23 6.0305

R2 R5 R10 R20 R25 R50 R100 R500


Debit
29.647864 37.17490195 42.34636 47.38243 48.9799 53.88059 58.75422 70.0177
(m3/dtk)

Sub Basin 5

Catchment Deskripsi Luas (A) Ckomposit


Area Permukaan Nilai C (Km) CxA
Pemukiman 0.5 0
Sub Basin Ladang 0.35 25.05 8.7675
1 0.35

Total 0.85 25.05 8.7675

R2 R5 R10 R20 R25 R50 R100 R500


Debit
3.7501112 4.702194205 5.356323 5.993328 6.195389 6.815271 7.431727 8.856427
(m3/dtk)

Sub Basin 6

Catchment Deskripsi Luas (A) Ckomposit


Area Permukaan Nilai C (Km) CxA
Pemukiman 0.5 4.23 2.115
Sub Basin Ladang 0.35 1.12 0.392
1 0.468598
Sub Basin
1 0.468598

Total 0.85 5.35 2.507

R2 R5 R10 R20 R25 R50 R100 R500


Debit
3.9839981 4.995460623 5.690386 6.36712 6.581783 7.240325 7.895229 9.408785
(m3/dtk)
0.1
0.005
0.0525

(24/T)^(2/3)

R1000
276.6

12.93337
9.730519

44.67179
3.886526
14.4397

R1000

23.94588
R1000
11.76712

R1000
74.89132

R1000
9.472884
R1000
10.06369