Kata Kunci : Manajemen Risiko, Bahaya dan Risiko, Penilaian dan Pengendalian Risiko
vii
ABSTRACK
Research conducted at PT. Rimau Energy Mining District Karusen Janang District
of East Barito Central Kalimantan Province.
This study aims to determine the hazards and risks, analyze the assessment and risk
control efforts, and analyze the implementation of risk management.
The method used in this research is descriptive quantitative research method.
Risk assessment uses semiquantitative techniques whereas risk control efforts use
risk control hierarchy, to analyze the application of risk management using media in the
form of questionnaire and tested the validity, reliability test, and hypothesis test.
The results showed that the level of risk that have the highest value in production
activities is ADT unit upside down and stuck with the risk value in 1500 and the ADT
unit hits the LV facility with a 900 risk value that falls into the very high category and the
result of analysis of risk management application from 41 population, it can be taken with
N calculation of 37 samples to be more representative and analysis of data of Ho
hypothesis that is Application of Risk Management on Production Activities at PT.
Rimau Energy Mining is not going well and Ha Risk Management Implementation on
Production Activities at PT. Rimau Energy Mining went well and got t hitung = 2,4768 and
ttabel = 1,6883 with Ho interpretation rejected.
The results of the analysis recommend that the company further improve the
Application of Risk Management by performing risk identification and assessment in
more detail and conducted riview periodically to prevent the occurrence of accidents and
more disseminating about the conscious K3 to all employees for corporate integrity can
be realized properly.
Keywords: Risk Management, Hazards and Risks, Risk Assessment and Control
viii