PROPOSAL 90% SAVING ENERGY LISTRIK


SYSTEM PENDINGINAN ADSORPTION CHILLER
SEKILAS PENGHEMATAN / SAVING LISTRIK
No CHILLER ADSORPTION Qty Unit No Air Cool - CHILLER COMPRESSOR Qty Unit
1 Cooling Capacity 100 TR 1 Cooling Capacity 100 TR
2 Electrical Consumption 1.9 Kw 2 Electrical Consumption 350 Kw
- Circulation Pump 5 Kw - Circulation Pump 5 Kw
- Distribution Pump 10 Kw - Distribution Pump 10 Kw
- Hot Water / Electric Heater 5 Kw
- Cooling Tower 15 Kw
3 TOTAL Power Consumption 137 Kw 3 TOTAL Power Consumption 465 Kw
4 Tarif PLN per KWH 1,450 Rp 4 Tarif PLN per KWH 1,450 Rp
5 Beban Biaya PLN 142,923,600 Rp/Bulan 5 Beban Biaya PLN 485,460,000 Rp/Bulan
6 Laju Beban PLN 1,429,236 Rp/TR 6 Laju Beban PLN 4,854,600 Rp/TR

Penghematan Saving Listrik , Per Bulan 342,536,400


Prosentase Penghematan Bila dengan Adsorption Chiller , Potensi nya 240%

NOTE :
AMAZIIING … SAVING !!!!
Boleh untuk di diskusikan mengingat sangat baik nya penghematan listrik tsb.
Bila perlu akan di lakukan survey tambahan untuk validasi , bila di setuji proposal ini .

Best Regards