Start: Fri 01/03/13 ID: 1 Start: Fri 01/03/13 ID: 2 Start: Mon 04/03/13 ID: 3
Finish: Tue 05/03/13Dur: 5 days Finish: Sun 03/03/13Dur: 3 days Finish: Tue 05/03/13Dur: 2 days
Comp: 0% Res: Surveyor; Perangkat Desa; Warga Desa; PerlengkapanRes:
Survey[2]
Alat Pemetaan[2]; Petugas Pemetaan; Perangkat Desa; Warga Desa
Pemasangan Paving Menimbun Jalan (pasir) dan Pemadatan Memasang dan Merekatkan Paving
Start: Fri 15/03/13 ID: 11 Start: Fri 15/03/13 ID: 12 Start: Mon 18/03/13
ID: 13
Finish: Wed 27/03/13Dur: 13 days Finish: Sun 17/03/13Dur: 3 days Finish: Wed 27/03/13
Dur: 10 days
Comp: 0% Res: Pasir[1]; Pekerja[500%]; Tali[1]; Cangkul[1]; Sekop[1] Res: Air[1]; Paku[2]; Paving[125.000]; Pekerja[500%]; Tali[5]; Palu / Martil[5]; Cetok[5]
Page 1