Persiapan Survey Lokasi Pengukuran dan Pemetaan Lokasi

Start: Fri 01/03/13 ID: 1 Start: Fri 01/03/13 ID: 2 Start: Mon 04/03/13 ID: 3
Finish: Tue 05/03/13Dur: 5 days Finish: Sun 03/03/13Dur: 3 days Finish: Tue 05/03/13Dur: 2 days
Comp: 0% Res: Surveyor; Perangkat Desa; Warga Desa; PerlengkapanRes:
Survey[2]
Alat Pemetaan[2]; Petugas Pemetaan; Perangkat Desa; Warga Desa

Pekerjaan Awal Membersihkan Jalan Membersihkan Saluran Air (Drainase)


Start: Wed 06/03/13 ID: 4 Start: Wed 06/03/13ID: 5 Start: Fri 08/03/13 ID: 6
Finish: Sat 09/03/13Dur: 4 days Finish: Thu 07/03/13
Dur: 2 days Finish: Sat 09/03/13Dur: 2 days
Comp: 0% Res: Peralatan Kebersihan[5]; Pekerja[500%]; Perangkat Desa;
Res: Warga
Peralatan
Desa Kebersihan[5]; Pekerja[500%]; Perangkat Desa; Warga Desa

Pembuatan Gorong-gorong Baru Memasang Batu Dinding Gorong


Start: Sun 10/03/13ID: 7 Start: Sun 10/03/13ID: 8
Finish: Thu 14/03/13
Dur: 5 days Finish: Tue 12/03/13Dur: 3 days
Comp: 0% Res: Batu Kerikil[1]; Semen[10]; Pasir[1]; Paku[1]; Papan[1]; Air[1]; Pekerja[500%]; Tali[1]; Kapur[10]; Sendok Penghalus Semen[1]; Pengayak[1]

Cor dan Beton Plester Dasar dan Dinding


Start: Sun 10/03/13ID: 9 Start: Wed 13/03/13 ID: 10
Finish: Tue 12/03/13Dur: 3 days Finish: Thu 14/03/13 Dur: 2 days
Res: Batu Kerikil[1]; Semen[20]; Pasir[1]; Paku[1]; Papan[1];
Res:
Air[1];
Semen[10];
Pekerja[500%];
Pasir[1];
Kapur[20];
Paku[1];Tali[1];
Papan[1];Sendok
Air[1];
Penghalus
Pekerja[500%];
Semen[1];
Tali[1];
Pengayak[1]
Kapur[10]; Sendok Penghalus Semen[2]; Pengayak[1]

Pemasangan Paving Menimbun Jalan (pasir) dan Pemadatan Memasang dan Merekatkan Paving
Start: Fri 15/03/13 ID: 11 Start: Fri 15/03/13 ID: 12 Start: Mon 18/03/13
ID: 13
Finish: Wed 27/03/13Dur: 13 days Finish: Sun 17/03/13Dur: 3 days Finish: Wed 27/03/13
Dur: 10 days
Comp: 0% Res: Pasir[1]; Pekerja[500%]; Tali[1]; Cangkul[1]; Sekop[1] Res: Air[1]; Paku[2]; Paving[125.000]; Pekerja[500%]; Tali[5]; Palu / Martil[5]; Cetok[5]

Finishing Mengecat Paving (yang ditentukan) Merapikan Hasil Kerja


Start: Thu 28/03/13ID: 14 Start: Thu 28/03/13ID: 15 Start: Sat 30/03/13ID: 16
Finish: Sun 31/03/13
Dur: 4 days Finish: Fri 29/03/13Dur: 2 days Finish: Sun 31/03/13
Dur: 2 days
Comp: 0% Res: Cat[5]; Kuas[5]; Thinner[5]; Pekerja[500%] Res: Pekerja[500%]; Peralatan Kebersihan[2]; Perangkat Desa; Warga Desa