Anda di halaman 1dari 9

REKAPITULASI 

 BIAYA
PEKERJAAN PEMBANGUNAN RUKO REST AREA UKURAN 3 X 3 M
JALAN CIATER-SUBANG KM 27 CILIMUS DESA CISAAT KEC.CIATER KAB.SUBANG BANDUNG

( Rp
No. URAIAN PEKERJAAN )
1 2 3

A PEKERJAAN GALIAN TANAH Rp.


B PEKERJAAN BETON BERTULANG Rp.
C PEKERJAAN PASANGAN Rp.
D PEKERJAAN PINTU & JENDELA Rp.
E PEKERJAAN INSTALASI LISTRIK Rp.
F PEKERJAAN PLAFOND Rp.
G PEKERJAAN ATAP Rp.
H PEKERJAAN PENGECATAN Rp.

JUMLAH Rp.
DIBULATKAN Rp.
Dua Puluh Dua Juta Lima Ratus Ribu Rupiah

2,142,935.24
NG BANDUNG

JUMLAH HARGA
SELURUH PEKERJAAN

393,120.00
2,785,800.00
7,558,300.00
2,250,000.00
2,840,000.00
1,660,000.00
1,790,100.00
3,223,500.00

22,500,820.00
22,500,000.00
iah
S
u
D
b
ia
Eb
n
d
u
ga
w
,a
t
r
d
O
0
l
9
e
h
F
e:
b
r
u
a
r
i

2
0
2
1
RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN PEMBANGUNAN RUKO REST AREA UKURAN 3 X 3 M
JALAN CIATER-SUBANG KM 27 CILIMUS DESA CISAAT KEC.CIATER KAB.SUBANG BANDUNG
Volume
Seluruh
No. Uraian Pekerjaan Sat Pek

1 2 3 4.00

A PEKERJAAN GALIAN TANAH


1 Galian tanah pondasi batum kali L=60cm x T=60cm m3 3.24
2 Urugan kembali m3 1.08
3 Urugan Bawah pasir bawah Lantai t=10cm M3 0.90

B PEKERJAAN BETON BERTULANG


1 Sloof 15/20 m3 0.27
2 Kolom 15 x 15 m3 0.32
3 Ring Balok 15/20 m3 0.27
4 Dak Beton Canopy t=12 cm m3 1.44
5 Listplang Beton 12/40 m3 0.240

C PEKERJAAN PASANGAN
1 Pasangan dinding batu bata merah 1 : 4 m2 53.00
2 Plesteran dinding m2 59.10
3 Acian dinding m2 59.10
4 Pasangan keramik Lantai ruang 30 x 30 m2 14.40
5 Pasangan rollag bata depan teras m' 5.00
6 Pasangan glass box unit 15.00

D PEKERJAAN PINTU & JENDELA


1 Pasangan Folding gate uk. L=220 T=200 unit 1.00

E PEKERJAAN INSTALASI LISTRIK


1 Lampu downlight 3' ruangan dalam titik 4.00
2 Saklar tunggal titik 2.00
3 Stop Kontak titik 2.00
4 Armature ls 1.00

F PEKERJAAN PLAFOND
1 Pasangan plafond grc t= 4 mm m2 12.00
2 List Plafond grc m' 20.00
3 Rangka Plafond kaso 5/7 m2 12.00

G PEKERJAAN ATAP
1 Rangka Atap Baja Ringan m2 9.18
2 Penutup Atap Metal Roof m' 9.18
1 2 3 4.00

H PEKERJAAN PENGECATAN
1 Pek.Pengecatan Dinding m2 59.10
2 Pek.Pengecatan Plafond m' 12.00
RAB )

G
Harga Satuan Jumlah Harga ( Rp
)

5.00 6=(4X5)

60,000.00 259,200.00
20,000.00 25,920.00
9,000.00 108,000.00

Jumlah 393,120.00

1,500,000.00 675,000.00
1,600,000.00 604,800.00
1,500,000.00 810,000.00
1,600,000.00 576,000.00
1,600,000.00 120,000.00

Jumlah 2,785,800.00

65,000.00 3,445,000.00
28,000.00 1,654,800.00
24,000.00 1,418,400.00
54,000.00 777,600.00
16,500.00 82,500.00
12,000.00 180,000.00

Jumlah 7,558,300.00

2,250,000.00 2,250,000.00

Jumlah 2,250,000.00

300,000.00 1,200,000.00
160,000.00 320,000.00
160,000.00 320,000.00
1,000,000.00 1,000,000.00

Jumlah 2,840,000.00

60,000.00 720,000.00
20,000.00 400,000.00
45,000.00 540,000.00

Jumlah 1,660,000.00

135,000.00 1,239,300.00
60,000.00 550,800.00
5.00 6=(4X5)

Jumlah 1,790,100.00

45,000.00 2,659,500.00
47,000.00 564,000.00

Jumlah 3,223,500.00
PEKERJAAN GALIAN TANAH sat qty harga satuan

pasir m3 1.08
pasir m3 0.9

PEKERJAAN BETON BERTULANG

2.54 m3
semen Zak 19
pasir m3 1.3
split m3 1.5
tulangan 10 btg 29
kawat bendrat kg 4
tulangan 6 btg 38
wiremesh m8 lbr 1.5
Multiplek tebal 12 mm Lbr 5
Kayu kelas IV m3 0.01
Paku Campur Kg 5.1

PEKERJAAN PASANGAN
Bata merah bh 7420
semen zak 28
pasir m3 5
semen plester ZAK 15
pasir m3 1
semen acian zak 2

PEKERJAAN KERAMIK
keramik 30x30 bh 160
Semen zak 5
pasir m3 0.3
Semen warna kg 28
rollag bh 100
glass box bh 15

PEKERJAAN PINTU & JENDELA


folding gate l=220, t=200 bh 1

PEKERJAAN PLAFOND
grc lbr 5
paku kg 1.3
list m 20
kaso 5/7 btg 9

PEKERJAAN ATAP
cnp btg 9
reng 40 btg 1.5
paku sekrup kg
atap metal lbr 15
paku kg 2

PEKERJAAN PENGECATAN
cat dinding kg 13

Pekerjaan plafond dan pengecatan plafond Rp 70,000 per m2

PEKERJAAN INSTALASI LISTRIK


Lampu downlight 3' ruangan dalam titik 4.00
Saklar tunggal titik 2.00
Stop Kontak titik 2.00
Armature ls 1.00
total harga

0
0

Anda mungkin juga menyukai