DAFTAR HARGA BAHAN
A B C G
Bahan/Material
1 Semen kg Rp51,000.00
2 Pasir cor m3 Rp291,900.00
3 Batu Split m Rp277,800.00
4 Besi Beton Polos Ø 8 mm kg Rp7,173.00
5 Besi Hollow t = 1.2 mm p=2 m Rp21,300.00
6 Atap Alderon m Rp11,833.33
7 Kayu Bengkirai m Rp350,000.00
8 Deck Kayu m Rp454,000.00
9 Cat Besi Hollow Anti Karat kg Rp85,500.00
10 Cat Biovernish Stain Colour kg Rp90,000.00
No ITEM PEKERJAAN VOLUME
A. Pekerjaan Persiapan
1 Pembersihan Lokasi
2 Mobilisasi Material
B. Pekerjaan Tanah
1 Galian Tanah Pondasi
2 Urugan Kembali
3 Urugan Tanah Bawah Lantai
C. Pekerjaan Pondasi
1 Pekerjaan Lantai Kerja
3 Atap Alderon 15
E. Pekerjaan Finishing
Pengerjaan Pengecatan
1 Cat Besi Hollow Anti Karat
2 Cat Biovernish Stain Colour
NO URAIAN KODE
A. Pekerjaan Persiapan
1 Pekerja L.01
2 Mandor L.04
B. Pekerjaan Pondasi
1 Pekerja L.01
2 Mandor L.04
C. Pekerjaan Struktur
1 Pekerja L.01
2 Mandor L.04
D. Pekerjaan Finishing
1 Tukang Cat L.01
2 Tukang Kayu L.016
3 Mandor L.03
NO URAIAN VOLUME
1 Waterpass 1
2 Cangkul 2
3 Ayakan 2
4 Pick up 1
HARGA SATUAN JUMLAH TOTAL
SATUAN
(Rp) (Rp)
m³
m Rp264,120.00
m Rp11,833.33 Rp177,500.00
OH Rp95,000.00
OH Rp150,000.00
OH Rp95,000.00
OH Rp150,000.00
OH Rp120,000.00
OH Rp150,000.00
OH Rp120,000.00
OH Rp120,000.00
OH Rp150,000.00
HARGA SATUAN JUMLAH TOTAL
SATUAN
(Rp) (Rp)
unit Rp70,000.00 Rp70,000.00
unit Rp35,000.00 Rp70,000.00
unit Rp60,000.00 Rp120,000.00
Hari Rp100,000.00 Rp100,000.00
NO ITEM PEKERJAAN VOLUME SATUAN
A PEKERJAAN PERSIAPAN
Pekerjaan Galiah Tanah
Mobilisasi Material
B PEKERJAAN PONDASI
Pekerjaan Lantai Kerja
Pekerjaan Besi Tulangan
Pekerjaan Cor Beton
C PEKERJAAN STRUKTUR
Besi Hollow
Kayu Bengkirai
Atap Alderon
D PEKERJAAN FINISHING
Finishing Cat Anti Karat
E PEKERJA
Pekerja Pondasi
Pekerja Struktur
Pekerja Finishing
Tukang Cat
Tukang Kayu
Mandor
F PERALATAN
Waterpass 1 Unit
Cangkul 2 Unit
Ayakan 2 Unit
Pick up 1 Unit
G BAHAN
Semen
Pasir cor
Batu Split
Besi Beton Polos Ø 8 mm
Besi Hollow t = 1.2 mm p=2 m 12.4 m
Atap Alderon 75.6 m
Kayu Bengkirai 15
Deck Kayu
Cat Besi Hollow Anti Karat
Cat Biovernish Stain Colour
JUMLAH (A+B+C+D+E+F+G)
MARGIN KONTRAKTOR + BIAYA TAK TERDUGA
JUMLAH TOTAL
JUMLAH TOTAL
HARGA SATUAN
(Rp)
Rp70,000.00 Rp70,000.00
Rp35,000.00 Rp70,000.00
Rp60,000.00 Rp120,000.00
Rp100,000.00 Rp100,000.00
Rp51,000.00
Rp291,900.00
Rp277,800.00
Rp7,173.00
Rp21,300.00
Rp11,833.33
Rp350,000.00
UGA
PEKERJAAN PEMBANGUNAN KANOPI
JUMLAH TOTAL
NO ITEM PEKERJAAN
(Rp)
A PEKERJAAN PERSIAPAN
B PEKERJAAN PONDASI
C PEKERJAAN STRUKTUR
D PEKERJAAN FINISHING
E PEKERJA
F PERALATAN
G BAHAN
JUMLAH (A+B+C+D+E+F+G)
MARGIN KONTRAKTOR + BIAYA TAK TERDUGA
JUMLAH TOTAL