Anda di halaman 1dari 2

PT.

PLN (PERSERO)
UIP PEMBANGKIT SUMATERA

DATA TENAGA KERJA PEGAWAI DAN KONTRAKTOR PROYEK DIBAWAH KENDALI PLN UPP KITSUM I
PERIODE MINGGU KE-2 11-NOVEMBER-2016

JUMLAH TENAGA KERJA (ORANG)

NO. UNIT PROYEK PEMBANGKIT Konsultan Supervisi / Kontraktor & Subkontraktor TOTAL
PLN UPP PLN Pusmankon PLN Pusertif PLN Batam
Konsultan Engineer

PT.PP (62)
GE (5)
PT.PSM (68)
PT.KALIMUTU (13)
PT.GMS (30)
PT.GUT (40)
1 MPP Paya Pasir 3 x 25 MW - PLN E (7) GS (3) - - 6 438
PT. HAP (12)
CV.EKA CIPTA (4)
MANDOR MAMAN (97)
MANDOR SUTOYO (55)
MANDOR NAZRI (36)
TOTAL : 425

Medan, 11 November 2016


Mengetahui,

Manajer / Asisten Manajer


PT. PLN (PERSERO)
UIP PEMBANGKIT SUMATERA

FORM DAFTAR TENAGA KERJA


PROYEK DIBAWAH KENDALI PLN UPP KITSUM XX
PERIODE MINGGU KE-1/2/3/4 - TANGGAL DD-MM-YYYY

Nama Perusahaan /
Company Name :

JABATAN / JUMLAH TENAGA KERJA / MAN WNI / WNA / KETERANGAN /


NO.
OCCUPATION POWER QUANTITY Local Man Power Foreign Man Power REMARK

1 Project Manager 1 1 0
2 Civil Engineer 1 0 1
3 Mechanical Engineer 3 1 2
4 Electrical Engineer 1 0 1
5 HSE Engineer 1 1 0
6 Material Control 1 1 0
7 …
8 …
9 …
10
11
12
13
14
15
16
17
18
19
20
TOTAL

Lhokseumawe, Oktober 2016


Mengetahui,

Project Manager