Anda di halaman 1dari 2

Nomor : 11 / 12 / HAR / SIPIL / 17

Tanggal : 21 DESEMBER 2017


Halaman : 01 HALAMAN
Group : PEK. FASILITAS SIPIL
( Gedung Kantor & Workshop,
Emplasement & Jalan,
MCK & Drainase )
RENCANA ANGGARAN BIAYA MATERIAL / JASA
( ESTIMASI HARGA / OWNER ESTIMATE )

DEPARTEMEN PEMELIHARAAN DAN FASILITAS


NO MACAM / LOKASI / RENCANA KEBUTUHAN MATERIAL / PART / JASA ESTIMASI HARGA NO. SPR / KETERANGAN
URAIAN PEKERJAAN BAGIAN No Nama (Material / Part / Jasa) dan Spesifikasi Jml Sat Per Satuan Total OKR / MEMO (SKOPE OF WORK)
01 02 03 04 05 06 07 08 09 10 11 12
PENGECATAN MARKA JALAN I MATERIAL & JASA
AREA TIANG LISTRIK 1 PERSIAPAN (PREPARE), 1.00 LS 1,500,000.00 1,500,000.00 (RUSH ORDER) U/. PERBAIKAN SESUAI
(Mobilisasi, Equipment, Tools, Cleaning Area) DENGAN PERMINTAAN

LOKASI : 2 PENGECATAN 2,400,000.00


Tiang Listrik Selatan Tambangan 6-7 # Cat marka jalan, spec ex Propan Fermacoat road marking 80 m 30,000.00 2,400,000.00

VOLUME :
80 M

PEKERJAAN :
1 PERSIAPAN
2 PENGECATAN

Catatan :
1. PEKERJAAN OLEH PIHAK LUAR (SUBKONT) JUMLAH RP. 3,900,000.00
( Incl. material, equipment, tools)
2. PEKERJAAN SEGERA STAFF MANAGER SENIOR MANAGER
3. REFERENSI HARGA SATUAN POKOK KOTA MADIUN TAHUN 2017 FAS-HAR FASILITAS DEPT HAR & FAS
Tanggal 21 DESEMBER 2017 21 DESEMBER 2017 21 DESEMBER 2017
Nama PUPUT INDRA DARMAJI PRAJITNO

Tanda Tangan

Page 1 of 2 481360850.xls
UTARA GD. INTERNASIONAL