DEPARTEMEN PEMELIHARAAN
NO MACAM / LOKASI / RENCANA KEBUTUHAN MATERIAL / PART / JASA ESTIMASI HARGA NO. SPR / KETERANGAN
URAIAN PEKERJAAN BAGIAN No Nama (Material / Part / Jasa) dan Spesifikasi Jml Sat Per Satuan Total OKR / MEMO (SKOPE OF WORK)
01 02 03 04 05 06 07 08 09 10 11 12
RENOVASI RUANG LOKER EQ BARAT I MATERIAL & JASA
1 PERSIAPAN (PREPARE), 1.00 LS 1,500,000.00 1,500,000.00 (RUSH ORDER) U/. PERBAIKAN SESUAI
(Mobilisasi, Equipment, Tools, Cleaning Area) DENGAN PERMINTAAN
Catatan :
1. PEKERJAAN OLEH PIHAK LUAR (SUBKONT) JUMLAH RP. 14,370,450.00
( Incl. material, equipment, tools)
2. PEKERJAAN SEGERA STAFF MANAGER SENIOR MANAGER
3. REFERENSI HARGA SATUAN POKOK KOTA MADIUN TAHUN 2017 FAS-HAR FASILITAS DEPT HAR & FAS
Tanggal 18 OKT 2017 18 OKT 2017 18 OKT 2017
Nama PUPUT INDRA SUMONO PRAJITNO
Tanda Tangan
Page 1 of 1 486761753.xls