Anda di halaman 1dari 1

Nomor : 14 / 11 / HAR / SIPIL / 17

Tanggal : 21 NOV 2017


Halaman : 01 HALAMAN
Group : PEK. FASILITAS SIPIL
( Gedung Kantor & Workshop,
Emplasement & Jalan,
MCK & Drainase )
RENCANA ANGGARAN BIAYA MATERIAL / JASA
( ESTIMASI HARGA / OWNER ESTIMATE )
DEPARTEMEN PEMELIHARAAN
NO MACAM / LOKASI / RENCANA KEBUTUHAN MATERIAL / PART / JASA ESTIMASI HARGA NO. SPR / KETERANGAN
URAIAN PEKERJAAN BAGIAN No Nama (Material / Part / Jasa) dan Spesifikasi Jml Sat Per Satuan Total OKR / MEMO (SKOPE OF WORK)
01 02 03 04 05 06 07 08 09 10 11 12
01 UPGRADDING TRACK CNC I MATERIAL & JASA
SPOT WELDING 1 PERSIAPAN (PREPARE), 2,000,000.00 (RUSH ORDER) U/. PERBAIKAN SESUAI
(Mobilisasi, Equipment, Tools, Cleaning Area) 1 ls Rp 2,000,000 Rp 2,000,000

LOKASI : 2 PEKERJAAN REL 49,937,250.00


WORKSHOP PRKB (Material Rel R-50, bantalan plate tebal 35 mm)
# pengadaan Rel R-50, berat : 50 kg/ m 1000.0 kg Rp 28,925 Rp 28,925,000
# machining Rel R-50 20.0 m Rp - Rp -
# instalasi Rel R-50 1000.0 kg Rp 5,000 Rp 5,000,000
# pekerjaan bantalan, L : 20 cm, tebal 3,5 cm, p : 10 m ; Qty : 2 bh 1099.0 kg Rp 12,750 Rp 14,012,250
# pekerjaan fastening (jepit + baut), jarak @ 40 cm 100.0 pcs Rp 20,000 Rp 2,000,000
# pengadaan rack gear S45C 20.0 m Rp - Rp -
# machining gigi rack gear, 100 gigi/ meter 2,000.0 gigi Rp - Rp -

PEKERJAAN : 3 PEKERJAAN CABLE HANGER 55,122,700.00


1 PERSIAPAN # Track Cable IWF beam 150x75x7/8. berat 14,01kg/m 140.10 kg Rp 21,000 Rp 2,942,100
2 PEKERJAAN REL # Dudukan track IWF, material UNP 100.50.6 Berat 10,6 kg/m 42.40 kg Rp 19,000 Rp 805,600
3 PEKERJAAN CABLE HANGER # Cable hanger Mirai CKI 75 9.00 bh Rp 3,500,000 Rp 31,500,000
# Cable power NYAF 1 x 95 15.00 m Rp 170,000 Rp 2,550,000
# cable ground NYAF 1 x 25 15.00 m Rp 50,000 Rp 750,000
# cable control NYYHY 10 x 1,5 15.00 m Rp 30,000 Rp 450,000
# cable control NYYHY 8 x 1,5 15.00 m Rp 25,000 Rp 375,000
# Hose (red) ex Bridgstone 3/4" incl installasion 15.00 m Rp 250,000 Rp 3,750,000
# Hose (Green) ex Bridgstone 3/4" incl installasion 15.00 m Rp 250,000 Rp 3,750,000
# Hose (black) ex Bridgstone 3/4" incl installasion 15.00 m Rp 250,000 Rp 3,750,000
# Hose (clear) ex Toyok 1/2" incl installasion 15.00 m Rp 300,000 Rp 4,500,000

1. PEKERJAAN OLEH PIHAK LUAR (SUBKONT) JUMLAH RP. 107,059,950.00


( Incl. material, equipment, tools)
2. PEKERJAAN SEGERA STAFF MANAGER SENIOR MANAGER
3. REFERENSI HARGA SATUAN POKOK KOTA MADIUN TAHUN 2017 HAR HAR - GEDUNG DEPT HAR
Tanggal 21 NOV 2017 21 NOV 2017 21 NOV 2017
Nama PUPUT INDRA DARMAJI PRAJITNO

Tanda Tangan

Page 1 of 1 472532822.xls

Anda mungkin juga menyukai