Halaman : 01 HALAMAN Group : PEK. FASILITAS SIPIL ( Gedung Kantor & Workshop, Emplasement & Jalan, MCK & Drainase ) RENCANA ANGGARAN BIAYA MATERIAL / JASA ( ESTIMASI HARGA / OWNER ESTIMATE ) DEPARTEMEN PEMELIHARAAN NO MACAM / LOKASI / RENCANA KEBUTUHAN MATERIAL / PART / JASA ESTIMASI HARGA NO. SPR / KETERANGAN URAIAN PEKERJAAN BAGIAN No Nama (Material / Part / Jasa) dan Spesifikasi Jml Sat Per Satuan Total OKR / MEMO (SKOPE OF WORK) 01 02 03 04 05 06 07 08 09 10 11 12 01 UPGRADDING TRACK CNC I MATERIAL & JASA SPOT WELDING 1 PERSIAPAN (PREPARE), 2,000,000.00 (RUSH ORDER) U/. PERBAIKAN SESUAI (Mobilisasi, Equipment, Tools, Cleaning Area) 1 ls Rp 2,000,000 Rp 2,000,000
LOKASI : 2 PEKERJAAN REL 49,937,250.00
WORKSHOP PRKB (Material Rel R-50, bantalan plate tebal 35 mm) # pengadaan Rel R-50, berat : 50 kg/ m 1000.0 kg Rp 28,925 Rp 28,925,000 # machining Rel R-50 20.0 m Rp - Rp - # instalasi Rel R-50 1000.0 kg Rp 5,000 Rp 5,000,000 # pekerjaan bantalan, L : 20 cm, tebal 3,5 cm, p : 10 m ; Qty : 2 bh 1099.0 kg Rp 12,750 Rp 14,012,250 # pekerjaan fastening (jepit + baut), jarak @ 40 cm 100.0 pcs Rp 20,000 Rp 2,000,000 # pengadaan rack gear S45C 20.0 m Rp - Rp - # machining gigi rack gear, 100 gigi/ meter 2,000.0 gigi Rp - Rp -
1 PERSIAPAN # Track Cable IWF beam 150x75x7/8. berat 14,01kg/m 140.10 kg Rp 21,000 Rp 2,942,100 2 PEKERJAAN REL # Dudukan track IWF, material UNP 100.50.6 Berat 10,6 kg/m 42.40 kg Rp 19,000 Rp 805,600 3 PEKERJAAN CABLE HANGER # Cable hanger Mirai CKI 75 9.00 bh Rp 3,500,000 Rp 31,500,000 # Cable power NYAF 1 x 95 15.00 m Rp 170,000 Rp 2,550,000 # cable ground NYAF 1 x 25 15.00 m Rp 50,000 Rp 750,000 # cable control NYYHY 10 x 1,5 15.00 m Rp 30,000 Rp 450,000 # cable control NYYHY 8 x 1,5 15.00 m Rp 25,000 Rp 375,000 # Hose (red) ex Bridgstone 3/4" incl installasion 15.00 m Rp 250,000 Rp 3,750,000 # Hose (Green) ex Bridgstone 3/4" incl installasion 15.00 m Rp 250,000 Rp 3,750,000 # Hose (black) ex Bridgstone 3/4" incl installasion 15.00 m Rp 250,000 Rp 3,750,000 # Hose (clear) ex Toyok 1/2" incl installasion 15.00 m Rp 300,000 Rp 4,500,000
1. PEKERJAAN OLEH PIHAK LUAR (SUBKONT) JUMLAH RP. 107,059,950.00
( Incl. material, equipment, tools) 2. PEKERJAAN SEGERA STAFF MANAGER SENIOR MANAGER 3. REFERENSI HARGA SATUAN POKOK KOTA MADIUN TAHUN 2017 HAR HAR - GEDUNG DEPT HAR Tanggal 21 NOV 2017 21 NOV 2017 21 NOV 2017 Nama PUPUT INDRA DARMAJI PRAJITNO