REKAPITULASI RENCANA ANGGARAN BIAYA

KEGIATAN : RENCANA PEMBANGUNAN MASJID AL - AHSYAR


PEKERJAAN : PEMBANGUNAN MASJID AL - AHSYAR
LOKASI : PONDOK PESANTREN MODERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU
TAHUN ANGGARAN : 2022

NO URAIAN PEKERJAAN

PEKERJAAN LANTAI 1

I PEKERJAAN PERSIAPAN

II BIAYA KESELAMATAN KONTRUKSI

III PEKERJAAN PONDASI FOOTPLAT ( Tambahan )

IV PEKERJAAN DINDING

V PEKERJAAN BETON

VI PEKERJAAN BESI , ALUMUNIUM DAN KACA

VII PEKERJAAN LANTAI DAN DINDING

VIII PEKERJAAN LANGIT - LANGIT

IX PEKERJAAN INSTALASI LISTRIK

X PEKERJAAN DESAIN INTERIOR

JUMLAH TOTAL PEKERJAAN LANTAI 1

URAIAN PEKERJAAN LANTAI 2

I PEKERJAAN PASANGAN

II PEKERJAAN BETON

III PEKERJAAN BESI , ALUMUNIUM DAN KACA

IV PEKERJAAN LANTAI DAN DINDING

V PEKERJAAN LANGIT - LANGIT

VI PEKERJAAN INSTALASI LISTRIK

VII PEKERJAAN DESAIN INTERIOR

JUMLAH TOTAL PEKERJAAN LANTAI 2

URAIAN PEKERJAAN LANTAI 3

I PEKERJAAN PASANGAN

II PEKERJAAN BETON

III PEKERJAAN KUSEN BETON DAN KACA

IV PEKERJAAN PENGECATAN

V PEKERJAAN WATERPROOFING LANTAI 3 / DAK

VI PEKERJAAN LANGIT - LANGIT

VII PEKERJAAN DESAIN EXTERIOR


REKAPITULASI RENCANA ANGGARAN BIAYA

KEGIATAN : RENCANA PEMBANGUNAN MASJID AL - AHSYAR


PEKERJAAN : PEMBANGUNAN MASJID AL - AHSYAR
LOKASI : PONDOK PESANTREN MODERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU
TAHUN ANGGARAN : 2022

NO URAIAN PEKERJAAN

VII PEKERJAAN INSTALASI LISTRIK

JUMLAH TOTAL PEKERJAAN LANTAI 3


REKAPITULASI RENCANA ANGGARAN BIAYA

KEGIATAN : RENCANA PEMBANGUNAN MASJID AL - AHSYAR


PEKERJAAN : PEMBANGUNAN MASJID AL - AHSYAR
LOKASI : PONDOK PESANTREN MODERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU
TAHUN ANGGARAN : 2022

NO URAIAN PEKERJAAN

URAIAN PEKERJAAN LANTAI 4

I PEKERJAAN PASANGAN

II PEKERJAAN BETON

III PEKERJAAN PENGECATAN

IV PEKERJAAN WATERPROOFING LANTAI 4 / DAK

V PEKERJAAN LANGIT - LANGIT

VI PEKERJAAN DESAIN EXTERIOR

VII PEKERJAAN INSTALASI LISTRIK

JUMLAH TOTAL PEKERJAAN LANTAI 4

URAIAN PEKERJAAN LANTAI 5

I PEKERJAAN PASANGAN

II PEKERJAAN BETON

III PEKERJAAN KUSEN BETON DAN KACA

IV PEKERJAAN PENGECATAN

V PEKERJAAN WATERPROOFING LANTAI 5 / DAK

VI PEKERJAAN DESAIN EXTERIOR

VII PEKERJAAN INSTALASI LISTRIK

JUMLAH TOTAL PEKERJAAN LANTAI 5

URAIAN PEKERJAAN MENARA UTAMA

I PEKERJAAN PASANGAN

II PEKERJAAN BETON

III PEKERJAAN KUSEN BETON , KACA DAN ROSTER

IV PEKERJAAN PENGECATAN

V PEKERJAAN WATERPROOFING DEK PANDANG 1 DAN 2

VI PEKERJAAN PENUTUP LANTAI DEK PANDANG 1 DAN 2

VII PEKERJAAN DESAIN EXTERIOR DEK PANDANG 1 DAN 2

VIII PEKERJAAN INSTALASI LISTRIK

IX PEKERJAAN PENANGKAL PETIR , AMPLI DAN TOA

X PEKERJAAN MENARA RANGKA BESI DAN FINISHING GRC


REKAPITULASI RENCANA ANGGARAN BIAYA

KEGIATAN : RENCANA PEMBANGUNAN MASJID AL - AHSYAR


PEKERJAAN : PEMBANGUNAN MASJID AL - AHSYAR
LOKASI : PONDOK PESANTREN MODERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU
TAHUN ANGGARAN : 2022

NO URAIAN PEKERJAAN

( TINGGI MENARA 22.00 M )

JUMLAH TOTAL PEKERJAAN MENARA UTAMA


REKAPITULASI RENCANA ANGGARAN BIAYA

KEGIATAN : RENCANA PEMBANGUNAN MASJID AL - AHSYAR


PEKERJAAN : PEMBANGUNAN MASJID AL - AHSYAR
LOKASI : PONDOK PESANTREN MODERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU
TAHUN ANGGARAN : 2022

NO URAIAN PEKERJAAN

URAIAN PEKERJAAN 3 MENARA TINGGI 19,70 M

I PEKERJAAN 3 MENARA TINGGI 19.70 M

II PEKERJAAN INSTALASI LISTRIK

JUMLAH TOTAL PEKERJAAN 3 MENARA TINGGI 19,70 M

URAIAN PEKERJAAN PEMASANGAN KUBAH

I PEKERJAAN KUBAH ENAMEL

JUMLAH TOTAL PEKERJAAN PEMASANGAN KUBAH

URAIAN PEKERJAAN ORNAMEN FASAD

I PEK. PEMASANGAN ORNAMEN DAN FINISHING

JUMLAH TOTAL PEKERJAAN PEMASANGAN ORNAMEN FASAD

URAIAN PEKERJAAN PINTU JATI UKIRAN JEPARA

I PEK.PINTU JATI UKIRAN JEPARA

JUMLAH TOTAL PEKERJAAN PINTU JATI UKIRAN JEPARA

URAIAN PEKERJAAN TERAS MASJID

I PEKERJAN BETON

II PEKERJAAN DESAIN EXTERIOR

JUMLAH TOTAL PEKERJAAN TERAS MASJID

URAIAN PEKERJAAN INTERIOR MIHRAB

I PEK. PEMASANGAN ORNAMEN DAN FINISHING

JUMLAH TOTAL PEKERJAAN INTERIOR MIHRAB

URAIAN PEKERJAAN LAMBANG YAYASAN DI DEPAN PENGIMAMAN

I PEK. PEMASANGAN ORNAMEN DAN FINISHING

JUMLAH TOTAL PEKERJAAN LAMBANG YAYASAN DI DEPAN PENGIMAMAN


REKAPITULASI RENCANA ANGGARAN BIAYA

KEGIATAN : RENCANA PEMBANGUNAN MASJID AL - AHSYAR


PEKERJAAN : PEMBANGUNAN MASJID AL - AHSYAR
LOKASI : PONDOK PESANTREN MODERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU
TAHUN ANGGARAN : 2022

NO URAIAN PEKERJAAN

BIYAYA LAIN LAIN

I BIYAYA LAIN LAIN

JUMLAH TOTAL PEKERJAAN PINTU JATI UKIRAN LAMBANG YAYASAN DI DEPAN PENGIMAMAN

JUMLAH TOTAL

DIBULATKAN

DUA BELAS MILIAR EMPAT PULUH TUJUH JUTA RIBU RUPIAH

Berikut lampiran Rekapitulasi & Rencana Anggaran Biaya (RAB) ,dengan rincia seperti pada tabel tersebut, bila telah mencapai
kesepakatan atau persetujuan atas Perencanaan Anggaran,diketahui oleh :

Kepahiang, ...., Januari 2021

Ketua Pembangunan Konsultan Perencana


Masjid Al-Akhsyar Pembangunan

(................................) (................................)

Mengetahui/Menyetujui

Ketua Yayasan Al-Akhsyar Pimpinan Pones


Kepahiang Bengkulu Modern Darussalam

(................................) (................................)
APITULASI RENCANA ANGGARAN BIAYA

N MASJID AL - AHSYAR
L - AHSYAR
DERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU

JUMLAH

61,515,000.00

8,910,000.00

13,295,162.84

44,172,123.07

693,902,452.31

88,054,351.30

673,223,742.00

130,812,700.00

53,349,000.00

335,275,200.00

2,102,509,731.52

28,982,243.47

1,106,612,286.15

73,479,395.20

309,531,316.00

263,500,000.00

81,179,150.00

252,720,000.00

2,116,004,390.82

35,913,968.66

665,347,545.80

6,271,564.00

17,136,398.16

189,966,200.00

36,369,300.00

123,098,150.00
APITULASI RENCANA ANGGARAN BIAYA

N MASJID AL - AHSYAR
L - AHSYAR
DERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU

JUMLAH

4,681,400.00

1,078,784,526.62
APITULASI RENCANA ANGGARAN BIAYA

N MASJID AL - AHSYAR
L - AHSYAR
DERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU

JUMLAH

22,451,180.48

150,658,654.88

9,476,744.78

22,588,300.00

36,369,300.00

12,919,881.00

4,271,400.00

258,735,461.14

24,153,744.40

99,790,126.51

7,849,872.00

11,460,384.31

12,241,175.00

15,636,302.50

5,952,400.00

177,084,004.72

40,823,300.72

322,785,481.89

33,140,800.00

55,501,574.16

3,481,762.13

28,745,257.00

7,958,210.00

23,921,000.00

7,575,000.00

342,000,000.00
APITULASI RENCANA ANGGARAN BIAYA

N MASJID AL - AHSYAR
L - AHSYAR
DERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU

JUMLAH

865,932,385.89
APITULASI RENCANA ANGGARAN BIAYA

N MASJID AL - AHSYAR
L - AHSYAR
DERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU

JUMLAH

877,500,000.00

44,072,100.00

921,572,100.00

1,732,000,000.00

1,732,000,000.00

301,311,720.00

301,311,720.00

62,000,000.00

62,000,000.00

29,482,667.57

22,329,660.00

51,812,327.57

295,800,000.00

295,800,000.00

83,500,000.00

83,500,000.00
APITULASI RENCANA ANGGARAN BIAYA

N MASJID AL - AHSYAR
L - AHSYAR
DERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU

JUMLAH

2,000,000,000.00

2,000,000,000.00

12,047,046,648.29

12,047,000,000.00

LAS MILIAR EMPAT PULUH TUJUH JUTA RIBU RUPIAH

aran Biaya (RAB) ,dengan rincia seperti pada tabel tersebut, bila telah mencapai
n Anggaran,diketahui oleh :

n Perencana
angunan

..................)

mpinan Pones
Darussalam

..................)
RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : PEMBANGUNAN MASJID PONDOK PESANTREN MODERN DARUSSALAM KEPAHIANG

PEKERJAAN : PEMBANGUNAN MASJID AL - AHSYAR

LOKASI : PONDOK PESANTREN MODERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU

TAHUN ANGGARAN : 2022

HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
Rp. Rp.

URAIAN PEKERJAAN LANTAI 1

I PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan Bouwplank 1.000 ls 4,015,000.00 4,015,000.00
2 Kayu Dolken 1.000 ls 20,000,000.00 20,000,000.00
3 Pengadaan Air & Listrik Kerja 1.000 ls 7,500,000.00 7,500,000.00
4 Sewa Skafolding 1.000 ls 30,000,000.00 30,000,000.00
SUB TOTAL PEKERJAAN PERSIAPAN 61,515,000.00

II BIAYA KESELAMATAN KONTRUKSI


1 Alat Pelindung Kerja dan Alat Pelindung Diri
- Tali Keselamatan (Safety Line) 1.000 ls 1,000,000.00 1,000,000.00
- Pembatas Area (Restricted Area) 1.000 ls 400,000.00 400,000.00
- Helm pengaman 15.000 bh 75,000.00 1,125,000.00
- Sarung Tangan Kerja 60.000 psg 6,000.00 360,000.00
- Sepatu Kerja 15.000 psg 145,000.00 2,175,000.00
- Jas Hujan 10.000 bh 35,000.00 350,000.00
- Alat Pemadam Kebakaran Ringan ( APAR ) 1.000 bh 500,000.00 500,000.00
2 Prasarana dan Alat Kesehatan
- Peralatan P3K 1.000 ls 3,000,000.000 3,000,000.000
( Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, Dll )
SUB TOTAL BIAYA KESELAMATAN KONTRUKSI 8,910,000.00

III PEKERJAAN PONDASI FOOTPLAT ( Tambahan )


1 Pek. Galian Tanah 13.170 m³ 67,500.00 888,975.00
2 Pek. Urugan Tanah Kembali dan Peninggian 27.060 m³ 22,500.00 608,850.00
3 Pek. Urugan Pasir 0.507 m³ 111,000.00 56,277.00
4 Pek. Lantai Kerja
- Adukan Beton K 350 1.014 m³ 967,440.00 980,984.16
- Pembesian 4.100 kg 14,992.50 61,469.25
- Pas Plastik / Sekat Pembatas lapis cor 2.250 m² 15,180.00 34,155.00
5 Pek. Pembesian Footplat
- Pembesian Tulangan Kaki Footplat 272.720 kg 14,992.50 4,088,754.60
- Pembesian Tulangan Kolom ke Sloof 131.010 kg 14,992.50 1,964,167.43
6 Pek. Begesting
- Begesting Kaki Footplat 4.680 m² 208,300.00 974,844.00
- Begesting Kolom ke Sloof 7.200 m² 228,300.00 1,643,760.00
7 Pek. Beton
- Adukan Beton K 350 Kaki Footplat 1.520 m³ 967,440.00 1,470,508.80
- Adukan Beton K 350 Kolom ke Sloof 0.540 m³ 967,440.00 522,417.60
SUB TOTAL PEKERJAAN PONDASI FOOTPLAT 13,295,162.84

IV PEKERJAAN DINDING
1 Pek. Pas. Batu bata 1:3:10 tebal 1/2 bata 186.240 m² 102,087.70 19,012,813.25
2 Pek. Plesteran 1:3:10 372.480 m² 58,191.20 21,675,058.18
1 Pek. Pas. Batu Belah 1:3:10 ( Tambahan ) 7.680 m³ 453,678.60 3,484,251.65
SUB TOTAL PEKERJAAN DINDING 44,172,123.07

V PEKERJAAN BETON
1 Pek. Kolom 50/50 K6
RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : PEMBANGUNAN MASJID PONDOK PESANTREN MODERN DARUSSALAM KEPAHIANG

PEKERJAAN : PEMBANGUNAN MASJID AL - AHSYAR

LOKASI : PONDOK PESANTREN MODERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU

TAHUN ANGGARAN : 2022

HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
Rp. Rp.
- Adukan Beton K 350 7.500 m³ 967,440.00 7,255,800.00
- Pembesian 2,578.517 kg 14,992.50 38,658,421.12
- Begesting 15.000 m² 228,300.00 3,424,500.00
2 Pek. Kolom 40/40 K1
- Adukan Beton K 350 43.200 m³ 967,440.00 41,793,408.00
- Pembesian 7,145.415 kg 14,992.50 107,127,634.39
- Begesting 216.000 m² 228,300.00 49,312,800.00
Pek. Kolom 40/40 Teras Depan K1
- Adukan Beton K 350 6.560 m³ 967,440.00 6,346,406.40
- Pembesian 1,143.266 kg 14,992.50 17,140,421.50
- Begesting 8.200 m² 228,300.00 1,872,060.00
3 Pek. Kolom 40/40 Penyangga Dak K1
- Adukan Beton K 350 13.056 m³ 967,440.00 12,630,896.64
- Pembesian 2,134.097 kg 14,992.50 31,995,453.47
- Begesting 32.640 m² 228,300.00 7,451,712.00
4 Pek. Balok 70/25 B1
- Adukan Beton K 350 79.380 m³ 967,440.00 76,795,387.20
- Pembesian 14,279.252 kg 14,992.50 214,081,691.61
- Begesting 118.125 m² 238,300.00 28,149,187.50
5 Pek. Ring Balok 12/12 RB
- Adukan Beton K 350 1.094 m³ 967,440.00 1,058,766.34
- Pembesian 237.893 kg 14,992.50 3,566,616.44
- Begesting 7.296 m² 150,000.00 1,094,400.00
6 Pek. Tangga
- Adukan Beton K 350 Plat Tangga Tebal 12cm 14.570 m³ 967,440.00 14,095,600.80
- Adukan Beton K 350 Anak Tangga 5.670 m³ 967,440.00 5,485,384.80
- Pembesian 558.130 kg 14,992.50 8,367,764.03
- Begesting 32.430 m² 208,300.00 6,755,169.00
7 Pek. Sloof 70/25 ( Tambahan )
- Adukan Beton K 350 2.170 m³ 967,440.00 2,099,344.80
- Pembesian 203.386 kg 14,992.50 3,049,261.49
- Begesting 8.680 m² 208,300.00 1,808,044.00
8 Pek. Rabat Beton Tebal 8cm ( Tambahan )
- Adukan Beton K 350 2.570 m³ 967,440.00 2,486,320.80
SUB TOTAL PEKERJAAN BETON 693,902,452.31

VI PEKERJAAN BESI , ALUMUNIUM DAN KACA


1 Pek. Railing Pagar Pengaman 41.000 m² 576,500.00 23,636,500.00
2 Pek. Railing Tangga 11.000 m² 525,000.00 5,775,000.00
3 Pek. Kusen Alumunium Coklat 298.650 m' 142,682.00 42,611,979.30
4 Pek. Pas Kaca Polos Tebal 5mm 103.800 m² 154,440.00 16,030,872.00
SUB TOTAL PEKERJAAN BESI , ALUMUNIUM DAN KACA 88,054,351.30

VII PEKERJAAN LANTAI DAN DINDING


1 Urugan Pasir t 10cm 79.550 m³ 111,000.00 8,830,050.00
2 Pek.Pas Lantai Geranit 60 x 60cm 1,591.000 m² 359,350.00 571,725,850.00
3 Pek.Pas Plint Geranit 15 x 60cm 162.000 m' 124,500.00 20,169,000.00
4 Pek.Pas Lantai Geranit Tangga 60 x 60cm 51.800 m² 359,350.00 18,614,330.00
5 Pek.Pas Dinding Granit Luar Masjid 30 x 60cm 38.880 m² 321,200.00 12,488,256.00
6 Pek.Pas Dinding Granit Dalam Masjid 30 x 60cm 38.880 m² 321,200.00 12,488,256.00
7 Pek.Pas Granit Pada Balok Luar Masjid 30 x 60cm 90.000 m² 321,200.00 28,908,000.00
RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : PEMBANGUNAN MASJID PONDOK PESANTREN MODERN DARUSSALAM KEPAHIANG

PEKERJAAN : PEMBANGUNAN MASJID AL - AHSYAR

LOKASI : PONDOK PESANTREN MODERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU

TAHUN ANGGARAN : 2022

HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
Rp. Rp.
SUB TOTAL PEKERJAAN LANTAI DAN DINDING 673,223,742.00

VIII PEKERJAAN LANGIT - LANGIT


1 Pek. Kompon Langit Langit + Material 637.280 m² 65,000.00 41,423,200.00
2 Pek. Pemasangan List Profil Gypsum Uk. 20-24cm + Material 700.000 m' 90,000.00 63,000,000.00
3 Pek. Pengecatan Langit Langit 723.000 m² 36,500.00 26,389,500.00
( Weather Shied / Plamur 1 Lapis, Cat Dasar 1 Lapis
Cat Penutup 2 Lapis ) Merk Cat Dulux
SUB TOTAL PEKERJAAN LANGIT - LANGIT 130,812,700.00

IX PEKERJAAN INSTALASI LISTRIK


1 Pemasangan Instalasi Titik Lampu 62.000 ttk 214,800.00 13,317,600.00
2 Pemasangan Titik Lampu Pijar Phillip 20 - 40 Watt & Fitting 42.000 bh 176,500.00 7,413,000.00
3 Pemasangan Saklar Ganda ( Panasonic Putih WEJ Series ) 21.000 bh 80,500.00 1,690,500.00
4 Pemasangan Stop Kontak Ganda ( Panasonic WEJP Series ) 10.000 bh 246,990.00 2,469,900.00
5 Pemasangan Saklar Tunggal ( Panasonic Putih WEJ Series ) 20.000 bh 75,400.00 1,508,000.00
6 Pemasangan Lampu Hias Dinding Masjid ( model turki ) 20.000 bh 1,325,000.00 26,500,000.00
7 Pemasangan MCB 3 Phase 1.000 bh 450,000.00 450,000.00
SUB TOTAL PEKERJAAN INSTALASI LISTRIK 53,349,000.00

IX PEKERJAAN DESAIN INTERIOR


1 Pek. Cover Kolom GRC Relief Tebal 3 - 4 cm 573.120 m² 585,000.00 335,275,200.00
Dengan Finishing Pengecatan ( Cat Dulux Interior )
SUB TOTAL PEKERJAAN DESAIN INTERIOR 335,275,200.00

TOTAL PEKERJAAN LANTAI 1 2,102,509,731.52

URAIAN PEKERJAAN LANTAI 2

I PEKERJAAN PASANGAN
1 Pek. Pas. Batu bata 1:3:10 tebal 1/2 bata 132.660 m² 102,087.70 13,542,954.28
2 Pek. Plesteran 1:3:10 265.320 m² 58,191.20 15,439,289.18
SUB TOTAL PEKERJAAN PASANGAN 28,982,243.47
II PEKERJAAN BETON
1 Pek. Beton Plat Lantai 2 / Dak Tebal 15cm
- Adukan Beton K 350 136.082 m³ 967,440.00 131,650,686.36
- Pembesian 9,474.372 kg 14,992.50 142,044,522.21
- Begesting 453.605 m² 238,300.00 108,094,071.50
2 Pek. Kolom 40/40 K1
- Adukan Beton K 350 43.200 m3 967,440.00 41,793,408.00
- Pembesian 7,145.415 kg 14,992.50 107,127,634.39
- Begesting 216.000 m² 228,300.00 49,312,800.00
3 Pek. Balok 70/25 B1
- Adukan Beton K 350 122.220 m³ 967,440.00 118,240,516.80
- Pembesian 21,985.516 kg 14,992.50 329,617,842.63
- Begesting 181.875 m² 238,300.00 43,340,812.50
4 Pek. Ring Balok 12/15 RB
- Adukan Beton K 350 1.440 m³ 967,440.00 1,058,766.34
- Pembesian 313.018 kg 14,992.50 3,566,616.44
- Begesting 9.600 m² 150,000.00 1,440,000.00
5 Pek. Balok 70/40 B3
RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : PEMBANGUNAN MASJID PONDOK PESANTREN MODERN DARUSSALAM KEPAHIANG

PEKERJAAN : PEMBANGUNAN MASJID AL - AHSYAR

LOKASI : PONDOK PESANTREN MODERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU

TAHUN ANGGARAN : 2022

HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
Rp. Rp.
- Adukan Beton K 350 9.674 m³ 967,440.00 9,359,014.56
- Pembesian 1,102.823 kg 14,992.50 16,534,074.43
- Begesting 14.400 m² 238,300.00 3,431,520.00
SUB TOTAL PEKERJAAN BETON 1,106,612,286.15
III PEKERJAAN BESI , ALUMUNIUM DAN KACA
1 Pek. Railing Pagar Pengaman Balkon 59.750 m² 584,000.00 34,894,000.00
2 Pek. Kusen Alumunium Coklat 211.200 m' 142,682.00 30,134,438.40
3 Pek. Pas Kaca Polos Tebal 5mm 54.720 m² 154,440.00 8,450,956.80
SUB TOTAL PEKERJAAN BESI , ALUMUNIUM DAN KACA 73,479,395.20
IV PEKERJAAN LANTAI DAN DINDING
1 Urugan Pasir t 10cm 37.850 m³ 111,000.00 4,201,350.00
2 Pek.Pas Lantai Geranit 60 x 60cm 757.000 m² 359,350.00 272,027,950.00
3 Pek.Pas Dinding Granit Luar Masjid 30 x 60cm 51.840 m² 321,200.00 16,651,008.00
4 Pek.Pas Dinding Granit Dalam Masjid 30 x 60cm 51.840 m² 321,200.00 16,651,008.00
SUB TOTAL PEKERJAAN LANTAI DAN DINDING 309,531,316.00
V PEKERJAAN LANGIT - LANGIT
1 Pek. Kompon Langit Langit + Material 918.000 m² 65,000.00 59,670,000.00
2 Pek. Pemasangan List Profil Gypsum T 3- 4 cm L 65 cm + Material 1,000.000 m' 152,000.00 152,000,000.00
3 Pek. Pengecatan Langit Langit 1,420.000 m² 36,500.00 51,830,000.00
( Weather Shied / Plamur 1 Lapis, Cat Dasar 1 Lapis
Cat Penutup 2 Lapis ) Merk Cat Dulux
SUB TOTAL PEKERJAAN LANGIT - LANGIT 263,500,000.00
VI PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Instalasi Titik Lampu 110.000 ttk 214,800.00 23,628,000.00
2 Pemasangan Titik Lampu Pijar Phillip 20 - 40 Watt & Fitting 87.000 bh 176,500.00 15,355,500.00
3 Pemasangan Saklar Ganda ( Panasonic Putih WEJ Series ) 43.000 bh 80,500.00 3,461,500.00
4 Pemasangan Stop Kontak Ganda ( Panasonic WEJP Series ) 5.000 bh 246,990.00 1,234,950.00
5 Pemasangan Saklar Tunggal ( Panasonic Putih WEJ Series ) 23.000 bh 75,400.00 1,734,200.00
6 Pemasangan Lampu Hias Dinding Masjid ( model turki ) 20.000 bh 1,325,000.00 26,500,000.00
7 Pemasangan MCB 3 Phase 1.000 bh 450,000.00 450,000.00
8 Pemasangan Lampu LED STRIP RGB Merk VIOLINe 167.000 m' 41,000.00 6,847,000.00
9 Pemasangan Lampu LED STRIP RGB Merk VIOLINe 15.000 m' 41,000.00 615,000.00
Pada Logo Teks Masjid
10 Pemasangan Lampu LED STRIP RGB Merk VIOLINe 33.000 m' 41,000.00 1,353,000.00
Pada Logo Yayasan
SUB TOTAL PEKERJAAN INSTALASI LISTRIK 81,179,150.00
VII PEKERJAAN DESAIN INTERIOR
1 Pek. Cover Kolom GRC Relief Tebal 3 - 4 cm 432.000 m² 585,000.00 252,720,000.00
Dengan Finishing Pengecatan ( Cat Dulux Interior )
SUB TOTAL PEKERJAAN DESAIN INTERIOR 252,720,000.00

TOTAL PEKERJAAN LANTAI 2 2,116,004,390.82

URAIAN PEKERJAAN LANTAI 3

I PEKERJAAN PASANGAN
1 Pek. Pas. Batu bata 1:3:10 tebal 1/2 bata 106.600 m² 102,087.70 10,882,548.82
2 Pek. Plesteran 1:3:10 213.200 m² 58,191.20 12,406,363.84
RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : PEMBANGUNAN MASJID PONDOK PESANTREN MODERN DARUSSALAM KEPAHIANG

PEKERJAAN : PEMBANGUNAN MASJID AL - AHSYAR

LOKASI : PONDOK PESANTREN MODERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU

TAHUN ANGGARAN : 2022

HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
Rp. Rp.
3 Pek. Pas Acian 356.640 m² 35,400.00 12,625,056.00
SUB TOTAL PEKERJAAN PASANGAN 35,913,968.66
II PEKERJAAN BETON
1 Pek. Beton Plat Lantai 3 / Dak Tebal 12cm
- Adukan Beton K 350 151.092 m³ 967,440.00 146,172,444.48
- Pembesian 18,190.449 kg 14,992.50 272,720,306.63
- Begesting 677.040 m² 238,300.00 161,338,632.00
2 Pek. Kolom 40/40 K1
- Adukan Beton K 350 1.568 m³ 967,440.00 1,516,945.92
- Pembesian 274.384 kg 14,992.50 4,113,701.16
- Begesting 7.840 m² 228,300.00 1,789,872.00
3 Pek. Kolom 25/25 K5
- Adukan Beton K 350 2.450 m³ 967,440.00 2,370,228.00
- Pembesian 821.429 kg 14,992.50 12,315,279.28
- Begesting 9.800 m² 228,300.00 2,237,340.00
4 Pek. Balok 30/20 B4
- Adukan Beton K 350 6.525 m³ 967,440.00 6,312,546.00
- Pembesian 1,478.728 kg 14,992.50 22,169,826.34
- Begesting 13.050 m² 238,300.00 3,109,815.00
5 Pek. Balok 70/40 B3
- Adukan Beton K 350 9.674 m³ 967,440.00 9,359,014.56
- Pembesian 1,102.823 kg 14,992.50 16,534,074.43
- Begesting 14.400 m² 228,300.00 3,287,520.00
SUB TOTAL PEKERJAAN BETON 665,347,545.80
III PEKERJAAN KUSEN BETON DAN KACA
1 Pek. Kusen Beton 32.000 bh 84,500.00 2,704,000.00
2 Pek. Pas Kaca Polos Tebal 5mm 23.100 m² 154,440.00 3,567,564.00
SUB TOTAL PEKERJAAN KUSEN BETON DAN KACA 6,271,564.00
IV PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Luar Dan Dalam 213.200 m² 55,739.00 11,883,554.80
a. Cat Dasar Dulux Weathersield Primer 1 Layer
b. Cat Dasar Dulux Weathersield Exterior 2 Layer
2 Pek. Pengecatan Kolom Luar Dan Dalam 39.040 m² 55,739.00 2,176,050.56
a. Cat Dasar Dulux Weathersield Primer 1 Layer
b. Cat Dasar Dulux Weathersield Exterior 2 Layer
3 Pek. Pengecatan Balok Luar 55.200 m² 55,739.00 3,076,792.80
a. Cat Dasar Dulux Weathersield Primer 1 Layer
b. Cat Dasar Dulux Weathersield Exterior 2 Layer
SUB TOTAL PEKERJAAN PENGECATAN 17,136,398.16
V PEKERJAAN WATERPROOFING LANTAI 3 / DAK
1 Pek. Pengecatan Aquaproof 2 Layer 2,708.000 m² 52,450.00 142,034,600.00
2 Pek. Acian 1,354.000 m² 35,400.00 47,931,600.00
SUB TOTAL PEKERJAAN WATERPROOFING LANTAI 3 / DAK 189,966,200.00
VI PEKERJAAN LANGIT - LANGIT
1 Pek. Kompon Langit Langit + Material 161.200 m² 65,000.00 10,478,000.00
2 Pek. Pemasangan List Profil Gypsum T 3- 4 cm L 18 cm + Material 240.000 m' 75,000.00 18,000,000.00
3 Pek. Pengecatan Langit Langit 216.200 m² 36,500.00 7,891,300.00
( Weather Shied / Plamur 1 Lapis, Cat Dasar 1 Lapis
Cat Penutup 2 Lapis ) Merk Cat Dulux
RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : PEMBANGUNAN MASJID PONDOK PESANTREN MODERN DARUSSALAM KEPAHIANG

PEKERJAAN : PEMBANGUNAN MASJID AL - AHSYAR

LOKASI : PONDOK PESANTREN MODERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU

TAHUN ANGGARAN : 2022

HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
Rp. Rp.
SUB TOTAL PEKERJAAN LANGIT - LANGIT 36,369,300.00
VII PEKERJAAN DESAIN EXTERIOR
1 Pek. List Plang Grc 80 cm Keliling Dak Lantai 3 Tebal 3 - 4cm 370.220 m' 332,500.00 123,098,150.00
( Termasuk Pemasangan Dan Finishing Pengecatan )
SUB TOTAL PEKERJAAN DESAIN EXTERIOR 123,098,150.00
VIII PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Instalasi Titik Lampu 5.000 ttk 214,800.00 1,074,000.00
2 Pemasangan Titik Lampu Pijar Phillip 20 - 40 Watt & Fitting 4.000 bh 176,500.00 706,000.00
3 Pemasangan Saklar Ganda ( Panasonic Putih WEJ Series ) 2.000 bh 80,500.00 161,000.00
4 Pemasangan Saklar Tunggal ( Panasonic Putih WEJ Series ) 1.000 bh 75,400.00 75,400.00
5 Pemasangan Lampu LED STRIP RGB Merk VIOLINe 65.000 m' 41,000.00 2,665,000.00
SUB TOTAL PEKERJAAN INSTALASI LISTRIK 4,681,400.00

TOTAL PEKERJAAN LANTAI 3 1,078,784,526.62

URAIAN PEKERJAAN LANTAI 4

I PEKERJAAN PASANGAN
1 Pek. Pas. Batu bata 1:3:10 tebal 1/2 bata 64.800 m² 102,087.70 6,615,282.96
2 Pek. Plesteran 1:3:10 129.600 m² 58,191.20 7,541,579.52
3 Pek. Pas Acian 214.220 m² 35,400.00 7,583,388.00
4 Pek. Plesteran Skoning Bentuk Jendela Tebal 50mm 4.600 m² 154,550.00 710,930.00
SUB TOTAL PEKERJAAN PASANGAN 22,451,180.48
II PEKERJAAN BETON
1 Pek. Beton Plat Lantai 4 / Dak Tebal 12cm
- Adukan Beton K 350 19.344 m³ 967,440.00 18,714,159.36
- Pembesian 3,403.080 kg 14,992.50 51,020,676.90
- Begesting 80.600 m² 238,300.00 19,206,980.00
2 Pek. Kolom 40/40 K1
- Adukan Beton K 350 0.896 m³ 967,440.00 866,826.24
- Pembesian 167.679 kg 14,992.50 2,513,928.49
- Begesting 4.480 m2 228,300.00 1,022,784.00
3 Pek. Kolom 20/20 K3
- Adukan Beton K 350 0.896 m³ 967,440.00 866,826.24
- Pembesian 397.262 kg 14,992.50 5,955,951.73
- Begesting 8.960 m² 228,300.00 2,045,568.00
4 Pek. Balok 30/20 B4
- Adukan Beton K 350 2.843 m³ 967,440.00 2,749,948.20
- Pembesian 1,033.740 kg 14,992.50 15,498,345.11
- Begesting 4.264 m² 238,300.00 1,016,051.63
5 Pek. Balok 70/40 B3
- Adukan Beton K 350 9.674 m³ 967,440.00 9,359,014.56
- Pembesian 1,102.823 kg 14,992.50 16,534,074.43
- Begesting 14.400 m² 228,300.00 3,287,520.00
SUB TOTAL PEKERJAAN BETON 150,658,654.88
III PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Luar Dan Dalam 129.600 m² 55,739.00 7,223,774.40
a. Cat Dasar Dulux Weathersield Primer 1 Layer
RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : PEMBANGUNAN MASJID PONDOK PESANTREN MODERN DARUSSALAM KEPAHIANG

PEKERJAAN : PEMBANGUNAN MASJID AL - AHSYAR

LOKASI : PONDOK PESANTREN MODERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU

TAHUN ANGGARAN : 2022

HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
Rp. Rp.
b. Cat Dasar Dulux Weathersield Exterior 2 Layer
2 Pek. Pengecatan Kolom Luar Dan Dalam 17.920 m² 55,739.00 998,842.88
a. Cat Dasar Dulux Weathersield Primer 1 Layer
b. Cat Dasar Dulux Weathersield Exterior 2 Layer
3 Pek. Pengecatan Balok Luar 22.500 m² 55,739.00 1,254,127.50
a. Cat Dasar Dulux Weathersield Primer 1 Layer
b. Cat Dasar Dulux Weathersield Exterior 2 Layer
SUB TOTAL PEKERJAAN PENGECATAN 9,476,744.78
IV PEKERJAAN WATERPROOFING LANTAI 4 / DAK
1 Pek. Pengecatan Aquaproof 2 Layer 322.000 m² 52,450.00 16,888,900.00
2 Pek. Acian 161.000 m² 35,400.00 5,699,400.00
SUB TOTAL PEKERJAAN WATERPROOFING LANTAI 4 / DAK 22,588,300.00
V PEKERJAAN LANGIT - LANGIT
1 Pek. Kompon Langit Langit + Material 161.200 m² 65,000.00 10,478,000.00
2 Pek. Pemasangan List Profil Gypsum T 3- 4 cm L 18 cm + Material 240.000 m' 75,000.00 18,000,000.00
3 Pek. Pengecatan Langit Langit 216.200 m² 36,500.00 7,891,300.00
( Weather Shied / Plamur 1 Lapis, Cat Dasar 1 Lapis
Cat Penutup 2 Lapis ) Merk Cat Dulux
SUB TOTAL PEKERJAAN LANGIT - LANGIT 36,369,300.00
VI PEKERJAAN DESAIN EXTERIOR
1 Pek. List Plang Grc 50 cm Keliling Dak Lantai 4 Tebal 3 - 4cm 74.400 m' 143,650.00 10,687,560.00
( Termasuk Pemasangan Dan Finishing Pengecatan )
2 Pek. List Plang Grc 65 cm Leher Kubah Lingkaran 4 Tebal 3 - 4cm 15.540 m' 143,650.00 2,232,321.00
( Termasuk Pemasangan Dan Finishing Pengecatan )
SUB TOTAL PEKERJAAN DESAIN EXTERIOR 12,919,881.00
VII PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Instalasi Titik Lampu 5.000 ttk 214,800.00 1,074,000.00
2 Pemasangan Titik Lampu Pijar Phillip 20 - 40 Watt & Fitting 4.000 bh 176,500.00 706,000.00
3 Pemasangan Saklar Ganda ( Panasonic Putih WEJ Series ) 2.000 bh 80,500.00 161,000.00
4 Pemasangan Saklar Tunggal ( Panasonic Putih WEJ Series ) 1.000 bh 75,400.00 75,400.00
5 Pemasangan Lampu LED STRIP RGB Merk VIOLINe 55.000 m' 41,000.00 2,255,000.00
SUB TOTAL PEKERJAAN INSTALASI LISTRIK 4,271,400.00

TOTAL PEKERJAAN LANTAI 4 258,735,461.14

URAIAN PEKERJAAN LANTAI 5

I PEKERJAAN PASANGAN
1 Pek. Pas. Batu bata 1:3:10 tebal 1/2 bata 77.244 m² 102,087.70 7,885,662.30
2 Pek. Plesteran 1:3:10 154.488 m² 58,191.20 8,989,842.11
3 Pek. Pas Acian 205.600 m² 35,400.00 7,278,240.00
SUB TOTAL PEKERJAAN PASANGAN 24,153,744.40
II PEKERJAAN BETON
1 Pek. Beton Plat Lantai 5 / Dak Tebal 12cm
- Adukan Beton K 350 10.470 m³ 967,440.00 10,129,096.80
- Pembesian 1,745.928 kg 14,992.50 26,175,825.54
- Begesting 43.625 m² 238,300.00 10,395,837.50
2 Pek. Kolom 40/40 K1
RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : PEMBANGUNAN MASJID PONDOK PESANTREN MODERN DARUSSALAM KEPAHIANG

PEKERJAAN : PEMBANGUNAN MASJID AL - AHSYAR

LOKASI : PONDOK PESANTREN MODERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU

TAHUN ANGGARAN : 2022

HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
Rp. Rp.
- Adukan Beton K 350 3.834 m³ 967,440.00 3,709,164.96
- Pembesian 948.491 kg 14,992.50 14,220,244.72
- Begesting 25.560 m² 228,300.00 5,835,348.00
3 Pek. Balok 70/40 B3
- Adukan Beton K 350 9.674 m³ 967,440.00 9,359,014.56
- Pembesian 1,102.823 kg 14,992.50 16,534,074.43
- Begesting 14.400 m² 238,300.00 3,431,520.00
SUB TOTAL PEKERJAAN BETON 99,790,126.51
III PEKERJAAN KUSEN BETON DAN KACA
1 Pek. Pas Kusen Beton 36.000 bh 94,500.00 3,402,000.00
2 Pek. Pas Kaca Polos Tebal 5mm 28.800 m² 154,440.00 4,447,872.00
SUB TOTAL PEKERJAAN KUSEN BETON DAN KACA 7,849,872.00
IV PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Luar Dan Dalam 154.488 m² 55,739.00 8,611,006.63
a. Cat Dasar Dulux Weathersield Primer 1 Layer
b. Cat Dasar Dulux Weathersield Exterior 2 Layer
2 Pek. Pengecatan Kolom Luar Dan Dalam 51.120 m² 55,739.00 2,849,377.68
a. Cat Dasar Dulux Weathersield Primer 1 Layer
b. Cat Dasar Dulux Weathersield Exterior 2 Layer
SUB TOTAL PEKERJAAN PENGECATAN 11,460,384.31
V PEKERJAAN WATERPROOFING LANTAI 5 / DAK
1 Pek. Pengecatan Aquaproof 2 Layer 174.500 m² 52,450.00 9,152,525.00
2 Pek. Acian 87.250 m² 35,400.00 3,088,650.00
SUB TOTAL PEKERJAAN WATERPROOFING LANTAI 5 / DAK 12,241,175.00
VI PEKERJAAN DESAIN EXTERIOR
1 Pek. List Plang Grc 50 cm Keliling Dak Lantai 4 Tebal 3 - 4cm 63.930 m' 143,650.00 9,183,544.50
( Termasuk Pemasangan Dan Finishing Pengecatan )
2 Pek. List Plang Grc 140 cm Leher Kubah Lingkaran 44.920 m' 143,650.00 6,452,758.00
( Termasuk Pemasangan Dan Finishing Pengecatan )
SUB TOTAL PEKERJAAN DESAIN EXTERIOR 15,636,302.50
VII PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Instalasi Titik Lampu 5.000 ttk 214,800.00 1,074,000.00
2 Pemasangan Titik Lampu Pijar Phillip 20 - 40 Watt & Fitting 4.000 bh 176,500.00 706,000.00
3 Pemasangan Saklar Ganda ( Panasonic Putih WEJ Series ) 2.000 bh 80,500.00 161,000.00
4 Pemasangan Saklar Tunggal ( Panasonic Putih WEJ Series ) 1.000 bh 75,400.00 75,400.00
5 Pemasangan Lampu LED STRIP RGB Merk VIOLINe 96.000 m' 41,000.00 3,936,000.00
SUB TOTAL PEKERJAAN INSTALASI LISTRIK 5,952,400.00

TOTAL PEKERJAAN LANTAI 5 177,084,004.72

URAIAN PEKERJAAN MENARA UTAMA

I PEKERJAAN PASANGAN
1 - Pek. Pas. Batu bata 1:3:10 tebal 1/2 bata 141.125 m² 102,087.70 14,407,147.08
2 - Pek. Plesteran 1:3:10 282.250 m² 58,191.20 16,424,489.48
3 - Pek. Acian 282.250 m² 35,400.00 9,991,664.16
SUB TOTAL PEKERJAAN PASANGAN 40,823,300.72
II PEKERJAAN BETON
RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : PEMBANGUNAN MASJID PONDOK PESANTREN MODERN DARUSSALAM KEPAHIANG

PEKERJAAN : PEMBANGUNAN MASJID AL - AHSYAR

LOKASI : PONDOK PESANTREN MODERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU

TAHUN ANGGARAN : 2022

HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
Rp. Rp.
1 Pek. Kolom 80/40
- Adukan Beton K 350 12.032 m³ 967,440.00 11,640,238.08
- Pembesian 3,269.195 kg 14,992.50 49,013,401.04
- Begesting 30.080 m² 228,300.00 6,867,264.00
2 Pek. kolom 40/40
- Adukan Beton K 350 3.008 m³ 967,440.00 2,910,059.52
- Pembesian 1,634.597 kg 14,992.50 24,506,700.52
- Begesting 15.040 m² 228,300.00 3,433,632.00
3 Pek. Balok 70/35
- Adukan Beton K 350 13.328 m³ 967,440.00 12,894,040.32
- Pembesian 3,627.419 kg 14,992.50 54,384,074.36
- Begesting 21.560 m² 228,300.00 4,922,148.00
4 Pek. Kolom 15/15
- Adukan Beton K 350 0.821 m³ 967,440.00 794,074.75
- Pembesian 250.638 kg 14,992.50 3,757,695.25
- Begesting 5.472 m² 130,000.00 711,360.00
5 Pek. Ring Balk 15/12
- Adukan Beton K 350 0.883 m³ 967,440.00 853,978.64
- Pembesian 323.175 kg 14,992.50 4,845,196.67
- Begesting 3.530 m² 130,000.00 458,910.40
6 Pek. Kolom Suport 25/25
- Adukan Beton K 350 2.255 m³ 967,440.00 2,181,577.20
- Pembesian 904.369 kg 14,992.50 13,558,746.84
- Begesting 18.040 m² 130,000.00 2,345,200.00
7 Pek. Balok Suport 70/35
- Adukan Beton K 350 2.411 m³ 584,000.00 1,407,907.20
- Pembesian 577.358 kg 130,000.00 75,056,488.00
- Begesting 13.776 m² 130,000.00 1,790,880.00
8 Pek. Beton Plat Lantai Dek Pandang 1
- Adukan Beton K 350 5.892 m³ 967,440.00 5,700,446.71
- Pembesian 996.264 kg 14,992.50 14,936,488.02
- Begesting 24.551 m² 238,300.00 5,850,562.88
9 Pek. Beton Plat Lantai Dek Pandang 2
- Adukan Beton K 350 4.147 m³ 967,440.00 4,012,167.17
- Pembesian 655.956 kg 14,992.50 9,834,420.33
- Begesting 17.280 m² 238,300.00 4,117,824.00
SUB TOTAL PEKERJAAN BETON 322,785,481.89
III PEKERJAAN KUSEN BETON , KACA DAN ROSTER
1 Pek. Pemasangan Kusen Beton 12.000 bh 247,500.00 2,970,000.00
Dan Finishing Pengecatan
2 Pek. Pas Kaca Grafir 3d 27.000 bh 975,400.00 26,335,800.00
Dan Finishing Pengecatan
3 Pek. Pemasangan Roster Uk. 25x25 cm Tebal 10 cm 118.000 bh 32,500.00 3,835,000.00
Dan Finishing Pengecatan
SUB TOTAL PEKERJAAN KUSEN BETON , KACA DAN ROSTER 33,140,800.00
IV PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Luar Dan Dalam 282.250 m² 55,739.00 15,732,355.05
a. Cat Dasar Dulux Weathersield Primer 1 Layer
b. Cat Dasar Dulux Weathersield Exterior 2 Layer
RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : PEMBANGUNAN MASJID PONDOK PESANTREN MODERN DARUSSALAM KEPAHIANG

PEKERJAAN : PEMBANGUNAN MASJID AL - AHSYAR

LOKASI : PONDOK PESANTREN MODERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU

TAHUN ANGGARAN : 2022

HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
Rp. Rp.
2 Pek. Pengecatan Kolom Luar Dan Dalam 610.480 m² 55,739.00 34,027,544.72
a. Cat Dasar Dulux Weathersield Primer 1 Layer
b. Cat Dasar Dulux Weathersield Exterior 2 Layer
3 Pek. Pengecatan Balok 103.010 m² 55,739.00 5,741,674.39
a. Cat Dasar Dulux Weathersield Primer 1 Layer
b. Cat Dasar Dulux Weathersield Exterior 2 Layer
SUB TOTAL PEKERJAAN PENGECATAN 55,501,574.16
V PEKERJAAN WATERPROOFING DEK PANDANG 1 DAN 2
1 Pek. Pengecatan Aquaproof 2 Layer 66.383 m² 52,450.00 3,481,762.13
SUB TOTAL PEKERJAAN WATERPROOFING DEK PANDANG 1 DAN 2 3,481,762.13
VI PEKERJAAN PENUTUP LANTAI DEK PANDANG 1 DAN 2
1 Pek. Urugan Pasir T 10cm 51.840 m² 321,200.00 16,651,008.00
2 Pek. Pas Lantai Batu Andhesit Bakar 30x30 cm 61.990 m² 195,100.00 12,094,249.00
SUB TOTAL PEKERJAAN PENUTUP LANTAI DEK PANDANG 1 DAN 2 28,745,257.00
VII PEKERJAAN DESAIN EXTERIOR DEK PANDANG 1 DAN 2
1 Pek. List Plang Grc 90 cm Keliling Dek Pandang 1 Dan 2 Tebal 3 - 4cm 55.400 m' 143,650.00 7,958,210.00
( Termasuk Pemasangan Dan Finishing Pengecatan )
SUB TOTAL PEKERJAAN DESAIN EXTERIOR DEK PANDANG 1 DAN 2 7,958,210.00
VIII PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Instalasi Titik Lampu 17.000 ttk 214,800.00 3,651,600.00
2 Pemasangan Titik Lampu Sorot LED Warna Putih 17.000 bh 1,100,000.00 18,700,000.00
( Merk COB 100 Watt )
3 Pemasangan Titik Lampu Sorot LED Warna Putih 1.000 bh 850,000.00 850,000.00
( Merk KRISBO Type IP 65 100 Watt )
4 Pemasangan Saklar Ganda ( Panasonic Putih WEJ Series ) 8.000 bh 80,500.00 644,000.00
5 Pemasangan Saklar Tunggal ( Panasonic Putih WEJ Series ) 1.000 bh 75,400.00 75,400.00
SUB TOTAL PEKERJAAN INSTALASI LISTRIK 23,921,000.00
IX PEKERJAAN PENANGKAL PETIR , AMPLI DAN TOA
1 Pemasangan Penangkal Petir 1.000 bh 3,250,000.00 3,250,000.00
( Termasuk Pemasangan )
2 Pemasangan Instalasi Ampli Dan Toa 1.000 ls 4,325,000.00 4,325,000.00
SUB TOTAL PEKERJAAN PENANGKAL PETIR , AMPLI DAN TOA 7,575,000.00
X PEKERJAAN MENARA RANGKA BESI DAN FINISHING GRC
( TINGGI MENARA 22.00 M )
1 Pekerjaan Rangka Menara 1.000 ls 245,000,000.00 245,000,000.00
( Rangka Besi Dengan Penyambungan Sistim Pengelasan )
2 Pekerjaan Penutup Dinding Menara Dan finishing 1.000 ls 97,000,000.00 97,000,000.00
a. GRC Relief Tebal 3 - 5 cm ,
b. Lampu Dan Fitting
c. Instalasi Lampu
d. Pengecatan
SUB TOTAL PEKERJAAN MENARA RANGKA BESI DAN FINISHING GRC 342,000,000.00

TOTAL PEKERJAAN MENARA UTAMA 865,932,385.89

URAIAN PEKERJAAN 3 MENARA TINGGI 19,70 M

I PEKERJAAN 3 MENARA TINGGI 19.70 M


RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : PEMBANGUNAN MASJID PONDOK PESANTREN MODERN DARUSSALAM KEPAHIANG

PEKERJAAN : PEMBANGUNAN MASJID AL - AHSYAR

LOKASI : PONDOK PESANTREN MODERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU

TAHUN ANGGARAN : 2022

HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
Rp. Rp.
1 Pekerjaan Rangka Menara 3.000 ls 217,500,000.00 652,500,000.00
( Rangka Besi Dengan Penyambungan Sistim Pengelasan )
2 Pekerjaan Penutup Dinding Menara Dan finishing 3.000 ls 75,000,000.00 225,000,000.00
a. GRC Relief Tebal 3 - 5 cm ,
b. Lampu Dan Fitting
c. Instalasi Lampu
d. Pengecatan
SUB TOTAL PEKERJAAN 3 MENARA TINGGI 19,70 M 877,500,000.00
II PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Instalasi Titik Lampu 33.000 ttk 214,800.00 7,088,400.00
2 Pemasangan Titik Lampu Sorot LED Warna Putih 30.000 bh 1,100,000.00 33,000,000.00
( Merk COB 100 Watt )
3 Pemasangan Titik Lampu Sorot LED Warna Putih 3.000 bh 850,000.00 2,550,000.00
( Merk KRISBO Type IP 65 100 Watt )
4 Pemasangan Saklar Ganda ( Panasonic Putih WEJ Series ) 15.000 bh 80,500.00 1,207,500.00
5 Pemasangan Saklar Tunggal ( Panasonic Putih WEJ Series ) 3.000 bh 75,400.00 226,200.00
SUB TOTAL PEKERJAAN INSTALASI LISTRIK 44,072,100.00

TOTAL PEKERJAAN 3 MENARA TINGGI 19,70 M 921,572,100.00

URAIAN PEKERJAAN PEMASANGAN KUBAH

I PEKERJAAN KUBAH ENAMEL


1 Kubah Enamel Dia. 11 ( kubah Utama ) 1.000 Ls 1,554,500,000.00 1,554,500,000.00
a. Pemasangan
b. finishing
c. Plafond Dalam Kubah
2 Kubah Enamel Dia. 3 1.000 Ls 177,500,000.00 177,500,000.00
a. Pemasangan
b. finishing
c. Plafond Dalam Kubah
SUB TOTAL PEKERJAAN KUBAH ENAMEL 1,732,000,000.00

TOTAL PEKERJAAN PEMASANGAN KUBAH 1,732,000,000.00

URAIAN PEKERJAAN ORNAMEN FASAD

`
I PEK. PEMASANGAN ORNAMEN DAN FINISHING
1 GRC Krawangan Tebal 3 - 4 cm Lantai 1 Dan 2 232.310 m² 685,000.00 159,132,350.00
2 GRC Relief Tebal 3 - 4 cm Lantai 1 Dan 2 189.210 m² 575,000.00 108,795,750.00
3 List Profil Plengkung 15 cm Dengan Isian Beton Bertulang (Lt.1) 155.980 m' 98,500.00 15,364,030.00
4 List Profil Plengkung 15 cm Dengan Isian Beton Bertulang (Lt.2) 182.940 m' 98,500.00 18,019,590.00
SUB TOTAL PEKERJAAN ORNAMEN DAN FINISHING 301,311,720.00

TOTAL PEKERJAAN ORNAMEN FASAD 301,311,720.00

URAIAN PEKERJAAN PINTU JATI UKIRAN JEPARA


RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : PEMBANGUNAN MASJID PONDOK PESANTREN MODERN DARUSSALAM KEPAHIANG

PEKERJAAN : PEMBANGUNAN MASJID AL - AHSYAR

LOKASI : PONDOK PESANTREN MODERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU

TAHUN ANGGARAN : 2022

HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
Rp. Rp.
URAIAN PEKERJAAN PINTU JATI UKIRAN JEPARA

I PEK.PINTU JATI UKIRAN JEPARA


1 Pek. Pemasangan Pintu Ukir Jepara 4.000 ls 15,500,000.00 62,000,000.00
a. Pemasangan
b. Pengecatan
c. Finishing Lain-Lain
SUB TOTAL PEKERJAAN PINTU JATI UKIRAN JEPARA 62,000,000.00

TOTAL PEKERJAAN PINTU JATI UKIRAN JEPARA 62,000,000.00

URAIAN PEKERJAAN TERAS MASJID

I PEKERJAN BETON
1 Pek. Beton Plat Lantai / Dak Tebal 12cm Teras Masjid
- Adukan Beton K 350 8.316 m³ 967,440.00 8,045,231.04
- Pembesian 879.129 kg 14,992.50 13,180,341.53
- Begesting 34.650 m² 238,300.00 8,257,095.00
SUB TOTAL PEKERJAAN BETON 29,482,667.57
II PEKERJAAN DESAIN EXTERIOR
1 Pek. List Plang Grc 70 cm Keliling Dak Teras Masjid Tebal 3 - 4cm 33.400 m' 143,650.00 4,797,910.00
( Termasuk Pemasangan Dan Finishing Pengecatan )
2 Pek. GRC Relief Polos tebal 3- 4 cm Lebar 125 cm 19.240 m² 575,000.00 11,063,000.00
( Termasuk Pemasangan Dan Finishing Pengecatan )
3 Pek. GRC Relief Tulisan Masjid tebal 3- 4 cm Lebar 125 cm 11.250 m² 575,000.00 6,468,750.00
( Termasuk Pemasangan Dan Finishing Pengecatan )
SUB TOTAL PEKERJAAN DESAIN EXTERIOR 22,329,660.00

TOTAL PEKERJAAN TERAS MASJID 51,812,327.57

URAIAN PEKERJAAN INTERIOR MIHRAB

I PEK. PEMASANGAN ORNAMEN DAN FINISHING


1 Pek. GRC Relief Motif Islamic Tebal 3 - 4 cm 165.600 m' 1,000,000.00 165,600,000.00
( Termasuk Pemasangan Dan Finishing Pengecatan )
2 Pek. GRC Relief Motif Islamic Tulisan Arab Tebal 3 - 4 cm 55.200 m' 1,000,000.00 55,200,000.00
( Termasuk Pemasangan Dan Finishing Pengecatan )
3 Pek . Kongliong Mihrab 1.000 Ls 75,000,000.00 75,000,000.00
SUB TOTAL PEKERJAAN PEMASANGAN ORNAMEN DAN FINISHING 295,800,000.00

TOTAL PEKERJAAN INTERIOR MIHRAB 295,800,000.00

URAIAN PEKERJAAN LAMBANG YAYASAN DI DEPAN PENGIMAMAN

I PEK. PEMASANGAN ORNAMEN DAN FINISHING


1 Pek. Pemasangan Dan Pembuatan Lambang Yayasan 1.000 Ls 83,500,000.00 83,500,000.00
RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : PEMBANGUNAN MASJID PONDOK PESANTREN MODERN DARUSSALAM KEPAHIANG

PEKERJAAN : PEMBANGUNAN MASJID AL - AHSYAR

LOKASI : PONDOK PESANTREN MODERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU

TAHUN ANGGARAN : 2022

HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
Rp. Rp.
SUB TOTAL PEKERJAAN PEMASANGAN ORNAMEN DAN FINISHING 83,500,000.00

TOTAL PEKERJAAN LAMBANG YAYASAN DI DEPAN PENGIMAMAN 83,500,000.00

BIYAYA LAIN LAIN

I BIYAYA LAIN LAIN


1 Biyaya Lain Lain 1.000 Ls 2,000,000,000.00 2,000,000,000.00
SUB TOTAL BIYAYA LAIN LAIN 2,000,000,000.00

TOTAL BIYAYA LAIN LAIN 2,000,000,000.00

JUMLAH TOTAL 12,047,046,648.29

DIBULATKAN 12,047,000,000.00
DUA BELAS MILIAR EMPAT PULUH TUJUH JUTA RIBU RUPIAH
DAFTAR HARGA SATUAN PEKERJAAN

KEGIATAN PEMBANGUNAN MASJID PONDOK PESANTREN MODERN DARUSSALAM KEPAHIANG


PEKERJAAN PEMBANGUNAN MASJID AL - AHSYAR
LOKASI PONDOK PESANTREN MODERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKUL
TAHUN ANGGARAN 2022

NO URAIAN PEKERJAAN SAT.

1 Pek. Galian Tanah m3


2 Pek. Urugan Tanah Kembali m3
3 Pek. Urugan Pasir m3
4 Pek. Pas. Batu Belah 1 : 3 : 10 m3
5 Pek. Pas. Batu bata 1:3 tebal 1/2 bata m2
6 Pek. Pas. Batu bata 1:3:10 tebal 1/2 bata m2
7 Pek. Plesteran 1:3 m2
8 Pek. Plesteran 1:3:10 m2
9 Pek. Urugan Pasir Bawah Lantai m3
10 Pas. Keramik 30 X 30 m2
11 Adukan Beton m3
12 Pembesian kg
13 Begesting m2
14 Pek. Kusen Kayu Bangkirai m3
15 Pek. Daun Pintu Panil Rk Kayu Bangkirai m2
16 Pek. Daun Jendela Kaca 5 mm m2
17 Pas. Kaca 5 mm m2
18 Pemasangan 1m2 Atap Genteng Plentong Kecil m2
19 Pemasangan 1m' Atap Genteng Bubung Plentong m'
21 Pas. Penutup Plafond Saplek m2
22 Pas. Slot pintu bh
23 Pas. Engsel pintu bh
24 Pas. Grendel Pintu bh
25 Pas. Engsel Jendela bh
26 Pas. Grendel Jendela bh
27 Pas. Handle Jendela bh
28 Pas. Kait Angin bh
29 Pek. Cat Tembok m2
30 Pek. Cat Plafond m2
31 Pek. Cat Kayu m2
32 Pas. Instalasi Titik Lampu ttk
33 Pas. Lampu SL 20 Watt bh
34 Pas. Lampu SL 8 Watt bh
35 Pas. Saklar Ganda bh
36 Pas. Saklar Tunggal bh
37 Pas. Stop Kontak bh
38 Pas. MCB bh
DAFTAR HARGA SATUAN PEKERJAAN

SJID PONDOK PESANTREN MODERN DARUSSALAM KEPAHIANG

EN MODERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU

HARGA
SATUAN
Rp.
74,250.00
24,750.00
122,100.00
499,046.46
112,798.40
102,087.70
64,010.32
59,475.90
122,100.00
395,285.00
1,064,184.00
14,992.50
251,130.00
16,125,560.00
1,037,694.31
846,423.60
159,280.00
94,737.50
#N/A
40,425.00
192,280.00
52,910.00
25,220.00
33,440.00
15,730.00
15,600.00
170,005.00
61,312.90
#N/A
57,695.00
14,992.50
238,300.00
-
967,440.00
14,992.50
150,000.00
-
DAFTAR ANALISA PEKERJAAN

HARGA UPAH HARGA


NO. SNI URAIAN PEKERJAAN KOEFISIEN SAT SATUAN KERJA BAHAN
( Rp ) ( Rp ) ( Rp )
I PEKERJAAN TANAH
1 A.2.3.1.1 Menggali tanah 1 m³ tanah biasa sedalam 1 meter
Pekerja 0.7500 Oh 90,000.00 67,500.00
Mandor 0.0250 Oh - -
67,500.00
Overhead & Profit 10%
Jumlah harga
2 A.2.3.1.9 Mengurug kembali 1 m³ galian ( 1/3 galian )
Pekerja 0.2500 Oh 90,000.00 22,500.00
Mandor 0.0083 Oh - -
22,500.00
Overhead & Profit 10%
Jumlah harga
3 A.2.3.1.11 Mengurug 1 m³ Pasir Urug
Pasir Urug 1.2000 m3 70,000.00 84,000.00
Pekerja 0.3000 Oh 90,000.00 27,000.00
Mandor 0.0100 Oh - -
27,000.00 84,000.00
Overhead & Profit 10%
Jumlah harga
II PEKERJAAN PASANGAN
1 A.4.2.1.18 Memasang 1 m3 Batu belah,campuran 1 PC : 3 KP : 10 Psr
Batu Belah 15/20 1.2000 m3 80,000.00 96,000.00
Portland Cement 61.0000 kg 1,200.00 73,200.00
Kapur Pasang 0.1470 m3 93,800.00 13,788.60
Pasir Pasang 0.4920 m3 70,000.00 34,440.00
Pekerja 1.5000 Oh 90,000.00 135,000.00
Tukang Batu 0.7500 Oh 120,000.00 90,000.00
Kepala Tukang 0.0750 Oh 150,000.00 11,250.00
Mandor 0.0750 Oh - -
236,250.00 217,428.60
Overhead & Profit 10%
Jumlah harga
2 A.4.4.1.8 Memasang 1 m2 Dinding Bata Merah 1/2 Bata 1 PC : 3 Psr
Bata merah 70.0000 Bh 600.00 42,000.00
Portland Cement 14.3700 kg 1,200.00 17,244.00
Pasir Pasang 0.0400 m3 70,000.00 2,800.00
Pekerja 0.3000 Oh 90,000.00 27,000.00
Tukang Batu 0.1000 Oh 120,000.00 12,000.00
Kepala Tukang 0.0100 Oh 150,000.00 1,500.00
Mandor 0.0150 Oh - -
40,500.00 62,044.00
Overhead & Profit 10%
Jumlah harga
3 A.4.4.1.13 Memasang 1 m2 Dinding Bata Merah 1/2 Bata 1 PC : 3 Kp : 10Psr
Bata merah 70.0000 Bh 600.00 42,000.00
Portland Cement 4.5000 kg 1,200.00 5,400.00
Pasir Pasang 0.0500 m3 70,000.00 3,500.00
Kapur Pasang 0.0150 m3 93,800.00 1,407.00
Pekerja 0.3000 Oh 90,000.00 27,000.00
Tukang Batu 0.1000 Oh 120,000.00 12,000.00
Kepala Tukang 0.0100 Oh 150,000.00 1,500.00
Mandor 0.0150 Oh - -
40,500.00 52,307.00
Overhead & Profit 10%
Jumlah harga
DAFTAR ANALISA PEKERJAAN

HARGA UPAH HARGA


NO. SNI URAIAN PEKERJAAN KOEFISIEN SAT SATUAN KERJA BAHAN
( Rp ) ( Rp ) ( Rp )
4 A.4.4.2.3 Memasang 1 m² Plesteran 1 PC : 3 Psr ,tebal 15 mm
Portland Cement 7.776 kg 1,200.00 9,331.20
Pasir Pasang 0.0230 m3 70,000.00 1,610.00
Pekerja 0.3000 Oh 90,000.00 27,000.00
Tukang Batu 0.1500 Oh 120,000.00 18,000.00
Kepala Tukang 0.0150 Oh 150,000.00 2,250.00
Mandor 0.0150 Oh - -
47,250.00 10,941.20
Overhead & Profit 10%
Jumlah harga
5 A.4.4.2.10 Memasang 1 m² Plesteran 1 PC : 3 kp : 10 Psr ,tebal 15 mm
Portland Cement 3.0000 kg 1,200.00 3,600.00
Pasir Pasang 0.0200 m3 70,000.00 1,400.00
Kapur Pasang 0.0050 m3 93,800.00 469.00
Pekerja 0.3600 Oh 90,000.00 32,400.00
Tukang Batu 0.1200 Oh 120,000.00 14,400.00
Kepala Tukang 0.0120 Oh 150,000.00 1,800.00
Mandor 0.0180 Oh - -
48,600.00 5,469.00
Overhead & Profit 10%
Jumlah harga
6 A.4.4.2.27 Memasang 1 m² Acian
Portland Cement 3.2500 kg 1,200.00 3,900.00
Pekerja 0.2000 Oh 90,000.00 18,000.00
Tukang Batu 0.1000 Oh 120,000.00 12,000.00
Kepala Tukang 0.0100 Oh 150,000.00 1,500.00
Mandor 0.0100 Oh - -
31,500.00 3,900.00
Overhead & Profit 10%
Jumlah harga
III PEKERJAAN PENUTUP LANTAI
1 A.2.3.1.11 Mengurug 1 m³ Pasir Urug
Pasir Urug 1.2000 m3 -
Pekerja 0.3000 Oh 90,000.00 27,000.00
Mandor 0.0100 Oh - -
27,000.00 -
Overhead & Profit 10%
Jumlah harga
2 A.4.4.3.35 Mamasang 1 m2 Lantai Keramik Ukuran (60x60) cm
Granit 60 x 60 1.0000 m2 229,000.00 229,000.00
Portland Cement 10.0000 kg 1,200.00 12,000.00
Pasir Pasang 0.0450 m3 70,000.00 3,150.00
Semen Warna 1.5000 Kg 3,300.00 4,950.00
Pekerja 0.7000 Oh 90,000.00 63,000.00
Tukang batu 0.3500 Oh 120,000.00 42,000.00
Kepala Tukang 0.0350 Oh 150,000.00 5,250.00
Mandor 0.0350 Oh - -
110,250.00 249,100.00
Overhead & Profit 10%
Jumlah harga
IV PEKERJAAN BETON
1 A.4.1.1.7 Membuat 1 m3 Beton Mutu K 350
Portland Cement 448.000 kg 1,300.00 582,400.00
Pasir beton 0.667 m3 70,000.00 46,690.00
Split beton 2/3 1.000 m3 200,000.00 200,000.00
Air 215.000 ltr 10.00 2,150.00
Pekerja 1.650 Oh 90,000.00 99,000.00
Tukang Batu 0.275 Oh 120,000.00 33,000.00
Kepala Tukang 0.028 Oh 150,000.00 4,200.00
Mandor 0.083 Oh -
136,200.00 831,240.00
Overhead & Profit 10%
Jumlah harga
DAFTAR ANALISA PEKERJAAN

HARGA UPAH HARGA


NO. SNI URAIAN PEKERJAAN KOEFISIEN SAT SATUAN KERJA BAHAN
( Rp ) ( Rp ) ( Rp )
2 A.4.1.1.17 Pembesian 10 kg dengan besi polos atau ulir
Besi beton 10.500 kg 12,500.00 131,250.00
Kawat Beton 0.150 kg 19,500.00 2,925.00
Pekerja 0.070 Oh 90,000.00 6,300.00
Tukang Besi 0.070 Oh 120,000.00 8,400.00
Kepala Tukang 0.007 Oh 150,000.00 1,050.00
Mandor 0.004 Oh - -
15,750.00 134,175.00
Pembesian per 1 kgbesi polos atau ulir 157.480 : 10 kg
Overhead & Profit 10%
Jumlah harga
3 A.4.1.1.21 Membuat 1 m² Begisting Slof Kolom Balok untuk pengecoran beton
Kayu Kelas III 0.0400 m³ 1,650,000.00 66,000.00
Balok Kayu Kelas II 0.015 m³ 2,500,000.00 37,500.00
Paku 0.300 kg 18,000.00 5,400.00
Minyak Begisting 0.100 btg 25,000.00 2,500.00
Plywood Tebal 9mm 0.350 Lbr 100,000.00 35,000.00
Pekerja 0.520 Oh 90,000.00 46,800.00
Tukang Kayu 0.260 Oh 120,000.00 31,200.00
Kepala Tukang 0.026 Oh 150,000.00 3,900.00
Mandor 0.026 Oh - -
81,900.00 146,400.00
Overhead & Profit 10%
Jumlah harga
4 A.4.1.1.2 Membuat 1m3 Rabat Beton Mutu f'c =9,8 Mpa (K125)
Portland Cement 276.000 kg 1,200.00 331,200.00
Pasir Beton 0.591 m3 70,000.00 41,400.00
Split beton 2/3 0.750 m3 200,000.00 149,925.93
Air 215.000 liter 50.00 10,750.00
Pekerja 1.650 OH 90,000.00 148,500.00
Tukang Batu 0.280 OH 120,000.00 33,600.00
Kepala Tukang 0.030 OH 150,000.00 4,500.00
Mandor 0.080 OH - -
186,600.00 202,075.93
Overhead & Profit 10%
Jumlah harga
V PEKERJAAN KAYU DAN KACA
1 A.4.6.1.2 Membuat dan Memasang 1 m3 kusen pintu/jendela kayu Bangkirai
Kayu Bangkirai Balok 1.100 m3 10,591,000.00 11,650,100.00
Paku 1.250 Kg 18,000.00 22,500.00
Lem Kayu 1.000 Kg 17,000.00 17,000.00
Pekerja 6.000 Oh 90,000.00 540,000.00
Tukang Kayu 18.000 Oh 120,000.00 2,160,000.00
Kepala Tukang 1.800 Oh 150,000.00 270,000.00
Mandor 0.300 Oh - -
2,970,000.00 11,689,600.00
Overhead & Profit 10%
Jumlah harga
2 A.4.6.1.5 Membuat dan Memasang 1 m2 daun pintu panil kayu Bangkirai + rangka Bangkirai
Kayu Bangkirai Papan 0.040 m3 11,849,000.00 473,960.00
Lem kayu 0.500 kg 17,000.00 8,500.00
Kayu Kruing Papan 0.00054 m3 11,849,000.00 6,398.46
Pekerja 1.000 Oh 90,000.00 90,000.00
Tukang Kayu 3.000 Oh 120,000.00 360,000.00
Kepala Tukang 0.030 Oh 150,000.00 4,500.00
Mandor 0.050 Oh - -
454,500.00 488,858.46
Overhead & Profit 10%
Jumlah harga
DAFTAR ANALISA PEKERJAAN

HARGA UPAH HARGA


NO. SNI URAIAN PEKERJAAN KOEFISIEN SAT SATUAN KERJA BAHAN
( Rp ) ( Rp ) ( Rp )
3 A.4.6.1.6 Membuat dan Memasang 1 m2 Pintu dan jendela kaca+rangka kayu Bangkirai
Kayu Bangkirai Papan 0.024 m3 11,849,000.00 284,376.00
Lem Kayu 0.300 kg 17,000.00 5,100.00
Kaca Bening 5 mm 0.750 m2 112,000.00 84,000.00
Pekerja 0.800 Oh 90,000.00 72,000.00
Tukang Kayu 2.400 Oh 120,000.00 288,000.00
Kepala Tukang 0.240 Oh 150,000.00 36,000.00
Mandor 0.040 Oh - -
396,000.00 373,476.00
Overhead & Profit 10%
Jumlah harga
3 A.4.6.1.7 Pembuatan dan Pemasangan 1m2 Pintu dan Jendela Jalusi Kayu Bangkirai
Kayu Bangkirai Papan 0.064 m3 11,849,000.00 758,336.00
Lem Kayu 0.500 kg 17,000.00 8,500.00
Pekerja 1.000 OH 90,000.00 90,000.00
Tukang Kayu 3.000 OH 120,000.00 360,000.00
Kepala Tukang 0.300 OH 150,000.00 45,000.00
Mandor 0.050 OH - -
405,000.00 766,836.00
Overhead & Profit 10%
Jumlah harga
4 A.4.6.2.17 Pek. Kaca Bening 5 mm
Kaca Bening 5 mm 1.100 m² 112,000.00 123,200.00
Pekerja 0.015 Oh 90,000.00 1,350.00
Tukang kayu 0.150 Oh 120,000.00 18,000.00
Kepala Tukang 0.015 Oh 150,000.00 2,250.00
Mandor 0.001 Oh - -
20,250.00 124,550.00
Overhead & Profit 10%
Jumlah harga
VI PEKERJAAN RANGKA ATAP
1 A.4.6.1.13 Pembuatan dan Pemasangan 1m3 Konstruksi Kuda-kuda Konvensional Kayu Klas I , II , dan III Bentang 6m
Kayu Kruing Balok 1.10 m3 6,572,250.00 7,229,475.00
Paku 5.60 kg 18,000.00 100,800.00
Besi Strip 15.00 20,000.00 300,000.00
Pekerja 4.00 OH 90,000.00 360,000.00
Tukang Kayu 12.00 OH 120,000.00 1,440,000.00
Kepala Tukang 1.20 OH 150,000.00 180,000.00
Mandor 0.2 OH - -
1,980,000.00 7,630,275.00
Overhead & Profit 10%
Jumlah harga
2 A.4.6.1.14 Pemasangan 1m3 Konstruksi nok/jurai, Kayu Klas II
Kayu Kruing Balok 1.1 m2 10,500.00 11,550.00
kg 18,000.00 -
Pekerja 0.0 OH 90,000.00 1,170.00
Tukang Kayu 0.0 OH 120,000.00 480.00
Kepala Tukang 0.00 OH 150,000.00 600.00
Mandor OH - 2,250.00 11,550.00
Overhead & Profit 10%
Jumlah harga
3 A.4.6.1.15 Pemasangan 1m3 Konstruksi Gording, Kayu Klas II
Kayu Kruing Balok 1.1 m3 10,500.00 11,550.00
Paku 3.00 kg 18,000.00 54,000.00
Besi Strip 15.00 20,000.00 300,000.00
Pekerja 2.4 OH 90,000.00 216,000.00
Tukang Kayu 7.2 OH 120,000.00 864,000.00
Kepala Tukang 0.72 OH 150,000.00 108,000.00
Mandor 0.1 OH - -
1,188,000.00 365,550.00
Overhead & Profit 10%
Jumlah harga
DAFTAR ANALISA PEKERJAAN

HARGA UPAH HARGA


NO. SNI URAIAN PEKERJAAN KOEFISIEN SAT SATUAN KERJA BAHAN
( Rp ) ( Rp ) ( Rp )
4 A.4.6.1.17 Pemasangan 1m2 Rangka Atap Genting Beton kayu klas II
Usuk Kayu Kruing 0.014 m3 6,826,000.00 95,564.00
Paku 0.25 kg 18,000.00 4,500.00
Reng Kayu Kruing 0.01 6,875,000.00 49,500.00
Pekerja 0.1 OH 90,000.00 9,000.00
Tukang Kayu 0.1 OH 120,000.00 12,000.00
Kepala Tukang 0.01 OH 150,000.00 1,500.00
Mandor 0.005 OH - -
22,500.00 149,564.00
Overhead & Profit 10%
Jumlah harga
5 A.4.6.1.21 Pemasangan Lisplank Uk. (3x20)cm, Kayu klas I atau II
Kayu Kruing Papan 0.011 m3 100,000.00 1,080.00
Paku 0.050 kg 18,000.00 900.00
Pekerja 0.100 OH 90,000.00 9,000.00
Tukang Kayu 0.200 OH 120,000.00 24,000.00
Kepala Tukang 0.020 OH 150,000.00 3,000.00
Mandor 0.005 OH - -
36,000.00 1,980.00
Total
Overhead & Profit 10%
5 A.4.6.1.21A Pemasangan Lisplang beton polos lebar 20 cm (GRC)
Lisplang beton polos lebar 20 cm (GRC) 1.100 m3 17,400.00 19,140.00
Paku 0.050 kg 18,000.00 900.00
Pekerja 0.100 OH 90,000.00 9,000.00
Tukang Kayu 0.200 OH 120,000.00 24,000.00
Kepala Tukang 0.020 OH 150,000.00 3,000.00
Mandor 0.005 OH - -
36,000.00 20,040.00
Total
Overhead & Profit 10%
VII PEKERJAAN PENUTUP ATAP
1 A.4.5.2.1 Pemasangan 1m2 Atap Genteng Plentong Kecil
Genteng Plentong Kebumen 25 bh 2,500.00 62,500.00
Pekerja 0.15 Oh 90,000.00 13,500.00
Tukang Kayu 0.075 Oh 120,000.00 9,000.00
Kepala Tukang 0.0075 Oh 150,000.00 1,125.00
Mandor 0.008 Oh - -
23,625.00 62,500.00
Overhead & Profit 10%
Jumlah harga
2 A.4.5.2.4 Pemasangan 1m' Atap Genteng Bubung Plentong
Bubungan Genteng Sejenins 5.000 bh #N/A #N/A
Portland Cement 8.000 kg 1,200.00 9,600.00
Pasir Pasang 0.032 m3 70,000.00 2,240.00
Pekerja 0.4 OH 90,000.00 36,000.00
Tukang Kayu 0.2 OH 120,000.00 24,000.00
Kepala Tukang 0.02 OH 150,000.00 3,000.00
Mandor 0.002 OH - 0.00
63,000.00 #N/A
Overhead & Profit 10%
Jumlah harga
VIII PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 A.4.6.2.11 Memasang 1 bh Kunci slot pintu
Slot Pintu 1.000 Bh 146,000.00 146,000.00
Tukang kayu 0.200 Oh 120,000.00 24,000.00
Kepala Tukang 0.020 Oh 150,000.00 3,000.00
Pekerja 0.020 Oh 90,000.00 1,800.00
Mandor 0.0010 Oh - -
28,800.00 146,000.00
Overhead & Profit 10%
Jumlah harga
DAFTAR ANALISA PEKERJAAN

HARGA UPAH HARGA


NO. SNI URAIAN PEKERJAAN KOEFISIEN SAT SATUAN KERJA BAHAN
( Rp ) ( Rp ) ( Rp )
2 A.4.6.2.5 Memasang 1 bh Engsel Pintu
Engsel Pintu 1.000 Bh 26,500.00 26,500.00
Tukang kayu 0.150 Oh 120,000.00 18,000.00
Kepala Tukang 0.015 Oh 150,000.00 2,250.00
Pekerja 0.015 Oh 90,000.00 1,350.00
Mandor 0.00075 Oh - -
21,600.00 26,500.00
Overhead & Profit 10%
Jumlah harga
3 A.4.6.2.6 Memasang 1 bh Engsel Jendela
Engsel Jendela 1.000 Bh 16,000.00 16,000.00
Tukang kayu 0.100 Oh 120,000.00 12,000.00
Kepala Tukang 0.010 Oh 150,000.00 1,500.00
Pekerja 0.010 Oh 90,000.00 900.00
Mandor 0.0005 Oh - -
14,400.00 16,000.00
Overhead & Profit 10%
Jumlah harga
4 A.4.6.2.9 Memasang 1 m2 Plesteran Skoning 1 PC : 2 PP Tebal 50mm
Portland Cement 2.500 kg 1,200.00 3,000.00
Pasir Pasang 0.065 m3 70,000.00 4,550.00
Pekerja 0.400 Oh 90,000.00 36,000.00
Tukang batu 0.900 Oh 120,000.00 108,000.00
Kepala Tukang 0.02 Oh 150,000.00 3,000.00
151,550.00 3,000.00
Overhead & Profit 10%
Jumlah harga

IX PEKERJAAN LANGIT- LANGIT + PLAFON


1 A.4.6.1.19 Pemasangan 1m2 Rangka Langit-langit (50x100)cm, Kayu Lokal
Kayu Lokal Balok 0.0154 m3 5,150,000.00 79,310.00
Paku 0.2 kg 18,000.00 3,600.00
Pekerja 0.15 Oh 90,000.00 13,500.00
Tukang Kayu 0.30 Oh 120,000.00 36,000.00
Kepala Tukang 0.030 Oh 150,000.00 4,500.00
Mandor 0.075 Oh - -
54,000.00 82,910.00
Overhead & Profit 10%
Jumlah harga
2 A.4.5.1.1 Memasang 1 m2 Langit - langit Saplek 100 x 100
GRC Board 1.000 m2 22,500.00 22,500.00
Paku Triplek 0.100 Kg 21,000.00 2,100.00
Pekerja 0.030 Oh 90,000.00 2,700.00
Tukang Kayu 0.070 Oh 120,000.00 8,400.00
Kepala Tukang 0.007 Oh 150,000.00 1,050.00
Mandor 0.004 Oh - -
12,150.00 24,600.00
Overhead & Profit 10%
Jumlah harga
3 A.4.5.1.10 Pemasangan 1m' Langit-langit Kayu Profil
List Kayu profil 1.0500 m' 5,100.00 5,355.00
Paku 0.0100 kg 18,000.00 180.00
Pekerja 0.0500 Oh 90,000.00 4,500.00
Tukang Kayu 0.0500 Oh 120,000.00 6,000.00
Kepala Tukang 0.0050 Oh 150,000.00 750.00
Mandor 0.0030 Oh - -
11,250.00 5,535.00
Overhead & Profit 10%
Jumlah harga
DAFTAR ANALISA PEKERJAAN

HARGA UPAH HARGA


NO. SNI URAIAN PEKERJAAN KOEFISIEN SAT SATUAN KERJA BAHAN
( Rp ) ( Rp ) ( Rp )
X PEKERJAAN CAT-CATAN /PLITURAN
1 A.4.7.1.11 Pekerjaan 1 m2 Mengecat tembok baru 2 kali
Cat Dulux Weathersield Primer 1 layer 0.1430 Kg 68,000.00 9,724.00
Cat Dulux Weathersield 2 layer 0.2600 Kg 136,500.00 35,490.00
Amplas 0.0500 Lbr 4,400.00 220.00
Pekerja 0.0200 Oh 90,000.00 1,800.00
Tukang Cat 0.0630 Oh 120,000.00 7,560.00
Kepala Tukang 0.0063 Oh 150,000.00 945.00
Mandor 0.0025 Oh - -
10,305.00 45,434.00
Overhead & Profit 10%
Jumlah harga
2 A.4.7.1.10 Pekerjaan 1 m2 Mengecat eternit baru 2 kali
Cat Tembok Sekualitas Decolit 0.2600 Kg #N/A #N/A
Plamur Tembok 0.0200 Kg 23,000.00 460.00
Pekerja 0.0200 Oh 90,000.00 1,800.00
Tukang Cat 0.0630 Oh 120,000.00 7,560.00
Kepala Tukang 0.0063 Oh 150,000.00 945.00
Mandor 0.0025 Oh - -
10,305.00 #N/A
Overhead & Profit 10%
Jumlah harga
3 A.4.7.1.4 Pekerjaan Water Proofing 1 M2
Aquaproof 0.450 Kg 62,000.00 27,900.00
Kuas 0.200 Unit 15,500.00 3,100.00
Pekerja 0.015 Oh 90,000.00 1,350.00
Tukang Cat 0.160 Oh 120,000.00 19,200.00
Kepala Tukang 0.006 Oh 150,000.00 900.00
Mandor 0.0025 Oh - -
21,450.00 31,000.00
Overhead & Profit 10%
Jumlah harga
XI PEKERJAAN LISTRIK ( Dihit )
1 1 Instalasi Titik Lampu
Kabel NYA 3X2,5 mm 7.000 m' 15,800.00 110,600.00
Pipa Conduit 20 mm 3.500 Btg 15,400.00 53,900.00
Socket Pipa 1.000 Bh 900.00 900.00
Isolator 1.000 Bh 4,800.00 4,800.00
Las Dop 1.000 Bh 10,800.00 10,800.00
T Dos 1.000 Bh 2,300.00 2,300.00
Pekerja 0.001 Oh 90,000.00 90.00
Tukang Listrik 0.200 Oh 120,000.00 24,000.00
Kepala Tukang 0.050 Oh 150,000.00 7,500.00
31,500.00 183,300.00
Overhead & Profit 10%
Jumlah Harga
2 1 Buah Pasang Lampu SL 40 watt
Lampu SL 40 watt 1.000 Bh 148,000.00 148,000.00
Fitting 1.000 Bh 15,000.00 15,000.00
Tukang Listrik 0.100 Oh 120,000.00 12,000.00
Kepala Tukang 0.010 Oh 150,000.00 1,500.00
13,500.00 163,000.00
Overhead & Profit 10%
Jumlah Harga
3 1 Meter Lampu led rgb strip
Lampu SL 8 Watt 1.000 Bh 27,500.00 27,500.00
-
Tukang Listrik 0.100 Oh 120,000.00 12,000.00
Kepala Tukang 0.010 Oh 150,000.00 1,500.00
13,500.00 27,500.00
Overhead & Profit 10%
Jumlah Harga
DAFTAR ANALISA PEKERJAAN

HARGA UPAH HARGA


NO. SNI URAIAN PEKERJAAN KOEFISIEN SAT SATUAN KERJA BAHAN
( Rp ) ( Rp ) ( Rp )
4 1 Buah Pasang Saklar Tunggal
Saklar tunggal 1.000 Bh 43,900.00 43,900.00
Pekerja 0.001 Oh 90,000.00 90.00
Tukang Listrik 0.200 Oh 120,000.00 24,000.00
Kepala Tukang 0.050 Oh 150,000.00 7,500.00
31,500.00 43,900.00
Overhead & Profit 10%
Jumlah Harga
5 1 Buah Pasang Saklar Ganda
Saklar ganda 1.000 Bh 49,000.00 49,000.00
Pekerja 0.001 Oh 90,000.00 90.00
Tukang Listrik 0.200 Oh 120,000.00 24,000.00
Kepala Tukang 0.050 Oh 150,000.00 7,500.00
31,500.00 49,000.00
Overhead & Profit 10%
Jumlah Harga
6 1 Buah Pasang Stop Kontak
Stop Kontak 1.000 bh 33,000.00 33,000.00
Kabel NYA 3X2,5 mm 7.000 m' 15,800.00 110,600.00
Pipa PVC 20 mm2 3.500 Btg 15,400.00 53,900.00
Isolator 1.000 Bh 4,800.00 4,800.00
Las Dop 1.000 Bh 10,800.00 10,800.00
T Dos 1.000 Bh 2,300.00 2,300.00
Pekerja 0.001 Oh 90,000.00 90.00
Tukang Listrik 0.200 Oh 120,000.00 24,000.00
Kepala Tukang 0.050 Oh 150,000.00 7,500.00
31,590.00 215,400.00
Overhead & Profit 10%
Jumlah Harga
TAR ANALISA PEKERJAAN

JUMLAH
( Rp )

67,500.00
6,750.00
74,250.00

22,500.00
2,250.00
24,750.00

111,000.00
11,100.00
122,100.00

453,678.60
45,367.86
499,046.46

102,544.00
10,254.40
112,798.40

92,807.00
9,280.70
102,087.70
TAR ANALISA PEKERJAAN

JUMLAH
( Rp )

58,191.20
5,819.12
64,010.32

54,069.00
5,406.90
59,475.90

35,400.00
3,540.00
38,940.00

27,000.00
2,700.00
29,700.00

359,350.00
35,935.00
395,285.00

967,440.00
96,744.00
1,064,184.00
TAR ANALISA PEKERJAAN

JUMLAH
( Rp )

149,925.00
14,992.50

14,992.50

228,300.00
22,830.00
251,130.00

388,675.93
38,867.59
427,543.52

14,659,600.00
1,465,960.00
16,125,560.00

943,358.46
94,335.85
1,037,694.31
TAR ANALISA PEKERJAAN

JUMLAH
( Rp )

769,476.00
76,947.60
846,423.60

1,171,836.00
117,183.60
1,289,019.60

144,800.00
14,480.00
159,280.00

9,610,275.00
961,027.50
10,571,302.50

13,800.00
1,380.00
15,180.00

1,553,550.00
155,355.00
1,708,905.00
TAR ANALISA PEKERJAAN

JUMLAH
( Rp )

172,064.00
17,206.40
189,270.40

37,980.00
3,798.00
41,778.00

56,040.00
5,604.00
61,644.00

86,125.00
8,612.50
94,737.50

#N/A
#N/A
#N/A

174,800.00
17,480.00
192,280.00
TAR ANALISA PEKERJAAN

JUMLAH
( Rp )

48,100.00
4,810.00
52,910.00

30,400.00
3,040.00
33,440.00

154,550.00
15,455.00
170,005.00

136,910.00
13,691.00
150,601.00

36,750.00
3,675.00
40,425.00

16,785.00
1,678.50
18,463.50
TAR ANALISA PEKERJAAN

JUMLAH
( Rp )

55,739.00
5,573.90
61,312.90

#N/A
#N/A
#N/A

52,450.00
5,245.00
57,695.00

214,800.00
21,480.00
236,280.00

176,500.00
17,650.00
194,150.00

41,000.00
4,100.00
45,100.00
TAR ANALISA PEKERJAAN

JUMLAH
( Rp )

75,400.00
7,540.00
82,940.00

80,500.00
8,050.00
88,550.00

246,990.00
24,699.00
271,689.00
DAFTAR HARGA UPAH & MATERIAL

KEGIATAN RENCANA PEMBANGUNAN MASJID AL - AHSYAR


PEKERJAAN PEMBANGUNAN MASJID AL - AHSYAR
LOKASI PONDOK PESANTREN MODERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU
TAHUN ANGGARAN 2022

NO JENIS TENAGA HARGA (Rp.) SATUAN


1 Pekerja 90,000.00 Hari
2 Tukang Batu 120,000.00 Hari
3 Tukang Besi 120,000.00 Hari
4 Tukang Cat 120,000.00 Hari
5 Tukang Listrik 120,000.00 Hari
6 Tukang Kayu 120,000.00 Hari
7 Kepala Tukang 150,000.00 Hari
8 Mandor - Hari

NO JENIS MATERIAL HARGA (Rp.) SATUAN


1 Pasir urug m3
2 Pasir pasang 70,000.00 m3
3 Pasir beton 70,000.00 m3
4 Split beton 2/3 200,000.00 m3
5 Bata merah 600.00 bh
6 Batu Belah 15/20 80,000.00 m3
7 Portland Cement 50 kg 60,000.00 zak
8 Portland Cement 1,200.00 kg
9 Semen Warna 3,300.00 kg
10 Kapur Pasang 93,800.00 m3
11 Granit 60 x 60 155,000.00 m2
12 Kayu Kelas III 1,650,000.00 m3
13 Balok Kayu Kelas II 2,500,000.00 m3
14 Kayu Lokal Balok 5,150,000.00 m3
15 Usuk Kayu Lokal 5,150,000.00 m3
16 Usuk Kayu Kruing 6,826,000.00 m3
17 Reng Kayu Kruing 6,875,000.00 m3
18 Kayu Bangkirai Balok 10,591,000.00 m3
19 Kayu Bangkirai Papan 11,849,000.00 m3
20 Kayu Kruing Balok 6,572,250.00 m3
21 Plywood Tebal 9mm 100,000.00 m3
22 Kaca Bening 5 mm 112,000.00 m2
23 Paku 18,000.00 kg
24 Paku Triplek 21,000.00 kg
25 Besi beton 12,500.00 kg
26 Buis beton U 20 cm 32,000.00 m'
27 Besi Strip 20,000.00 kg
28 Kawat beton 19,500.00 kg
29 Besi Hollow 40x40x2mm 4,280.00 m'
29 Genteng Pres Lokal 2,500.00 bh
30 Kuas 15,500.00 bh
31 GRC Board 22,500.00 m2
DAFTAR HARGA UPAH & MATERIAL

KEGIATAN RENCANA PEMBANGUNAN MASJID AL - AHSYAR


PEKERJAAN PEMBANGUNAN MASJID AL - AHSYAR
LOKASI PONDOK PESANTREN MODERN DARUSSALAM KEC. KEPAHIANG KAB. KEPAHIANG PROV. BENGKULU
TAHUN ANGGARAN 2022

32 Lisplang beton polos lebar 20 cm (GRC) 17,400.00 m'


32 Aquaproof 62,000.00 kg

33 GRC Board 31,000.00 m2

33 List Kayu Profil 5,100.00 m'


34 Lem Kayu 17,000.00 kg
35 Cat Dulux Weathersield Primer 68,000.00 kg
36 Cat Dulux Weathersield Exterior 136,500.00 kg
37 Plamur Kayu 31,000.00 kg
38 Plamur Tembok 23,000.00 kg
39 Meni Kayu 32,000.00 kg
40 Minyak Cat 28,000.00 ltr
41 Amplas 4,400.00 lbr
42 Slot Pintu 146,000.00 bh
43 Engsel Pintu 26,500.00 bh
44 Grendel Pintu 19,400.00 bh
45 Engsel Jendela 16,000.00 bh
46 Grendel Jendela 12,100.00 bh
47 Handle Jendela 12,000.00 bh
48 Kait Angin 12,000.00 bh
49 Minyak Begisting 25,000.00 ltr
50 Air 50.00 ltr
51 Lampu SL 40 Watt 148,000.00 bh
52 Lampu SL 8 Watt 40,000.00 bh
53 Saklar Ganda 49,000.00 bh
54 Saklar Tunggal 43,900.00 bh
55 Stop Kontak ganda 33,000.00 bh
56 Kabel NYA 3X2,5 mm 15,800.00 m'
57 Pipa Conduit 20 mm 15,400.00 btg
58 Klem Pipa 800.00 bh
59 Socket Pipa 900.00 bh
60 Isolator 4,800.00 bh
61 Las Dop 10,800.00 bh
62 T Dus 2,300.00 bh
63 Fitting 15,000.00 bh
62 Besi Hollow 40x40x2mm 4,280.00 m'

###

###

###
DAFTAR KUNTITAS DAN HARGA
KEGIATAN : DAK DAN PENDAMPINGAN DAK
PEKERJAAN : PEMBANGUNAN BANK SAMPAH
LOKASI : PERUM MARON PERMAI KELURAHAN SIDEREJO TEMANGGUNG
TAHUN ANGGARAN : 2015

HARGA JUMLAH SUB


NO URAIAN PEKERJAAN ANALISA VOLUME SAT. SATUAN HARGA TOTAL
Rp. Rp. Rp.
I PEKERJAAN PERSIAPAN
1 Pengukuran/Bouplank - 1.000 ls 400,000.00 400,000.00 400,000.00

II PEKERJAAN TANAH
1 Pek. Galian Tanah A.2.3.1.1 24.120 m3 74,250.00 1,790,910.00 ###
2 Pek. Urugan Tanah Kembali A.2.3.1.9 7.960 m3 24,750.00 197,000.10 ###
3 Pek. Urugan Pasir A.2.3.1.11 2.680 m3 122,100.00 327,228.00 2,315,138.10

III PEKERJAAN PASANGAN


1 Pek. Pas. Batu Belah 1 : 3 : 10 A.4.2.1.18 14.740 m3 499,046.46 7,355,944.82
2 Pek. Pas. Batu bata 1:3 tebal 1/2 bata A.4.4.1.8 11.890 m2 112,798.40 1,341,172.98
3 Pek. Pas. Batu bata 1:3:10 tebal 1/2 bata A.4.4.1.13 83.804 m2 102,087.70 8,555,357.61
4 Pek. Plesteran 1:3 A.4.4.2.3 20.100 m2 64,010.32 1,286,607.43
5 Pek. Plesteran 1:2:8 A.4.4.2.10 167.608 m2 59,475.90 9,968,636.65
6 Pek. Acian A.4.4.2.27 187.708 m2 38,940.00 7,309,349.52 ###
7 Pek. Sponengan 1 : 2 A.4.4.2.20 26.400 m' #REF! #REF! #REF!

IV PEKERJAAN LANTAI
1 Pek. Urugan Pasir Bawah Lantai A.2.3.1.11 1.876 m3 122,100.00 229,059.60
2 Pas. Keramik 30 X 30 A.4.4.3.35 5.000 m2 395,285.00 1,976,425.00
3 Pek. Lantai Rabat Beton A.4.1.1.5 1.751 m3 #REF! #REF! #REF!

V PEKERJAAN BETON
1 Pek. Sloof 12/20
Adukan Beton A.4.1.1.7 0.804 m3 1,064,184.00 855,603.94
Pembesian A.4.1.1.17 149.598 kg 14,992.50 2,242,842.02
Begesting A.4.1.1.21 6.700 m2 251,130.00 1,682,571.00
2 Pek. Kolom Praktis 12/12
Adukan Beton A.4.1.1.7 0.518 m3 1,064,184.00 551,672.99
Pembesian A.4.1.1.17 152.237 kg 14,992.50 2,282,410.22
Begesting A.4.1.1.21 5.400 m2 251,130.00 1,356,102.00
3 Pek. Ring Balk 12/20
Adukan Beton A.4.1.1.7 0.804 m3 1,064,184.00 855,603.94
Pembesian A.4.1.1.17 149.598 kg 14,992.50 2,242,842.02
Begesting A.4.1.1.21 6.700 m2 251,130.00 1,682,571.00
4 Pek. Balok Latai 12/12
Adukan Beton A.4.1.1.7 0.101 m3 1,064,184.00 107,269.75
Pembesian A.4.1.1.17 29.602 kg 14,992.50 443,801.99
Begesting A.4.1.1.21 1.050 m2 251,130.00 263,686.50 14,566,977.35

VI PEKERJAAN KAYU DAN KACA


1 Pek. Kusen Kayu Kruing A.4.6.1.2 0.255 m3 16,125,560.00 4,113,565.85
2 Pek. Daun Pintu Kaca Rk Kayu Kruing A.4.6.1.6 4.000 m2 846,423.60 3,385,694.40
3 Pek. Daun Pintu Panil Rk Kayu Kruing A.4.6.1.5 4.800 m2 1,037,694.31 4,980,932.67
4 Pek. Daun Jendela Kaca 5 mm A.4.6.1.6 4.320 m2 846,423.60 3,656,549.95 16,136,742.87

VII PEKERJAAN RANGKA ATAP


1 Pas. Rangka Atap Baja ringan - 72.000 m2 197,000.00 14,184,000.00 14,184,000.00

VIII PEKERJAAN PENUTUP ATAP


1 Pas. Genteng Press Plentong Lokal A.4.5.2.1 72.000 m2 8,612.50 620,100.00
2 Pas. Bubungan Genteng Sejenis A.4.5.2.4 9.000 m' #REF! #REF! #REF!

IX PEKERJAAN LANGIT - LANGIT


1 Pas. Rangka Plafond Kayu Lokal A.4.6.1.19 35.000 m2 #REF! #REF!
2 Pas. Penutup Plafond Saplek A.4.5.1.1 35.000 m2 40,425.00 1,414,875.00 #REF!

X PEKERJAAN PENGGANTUNG DAN PENGUNCI


1 Pas. Slot pintu A.4.6.2.11 4.000 bh 192,280.00 769,120.00
2 Pas. Engsel pintu A.4.6.2.5 10.000 bh 52,910.00 529,100.00
3 Pas. Grendel Pintu - 1.000 bh 25,220.00 25,220.00
4 Pas. Engsel Jendela A.4.6.2.6 12.000 bh 33,440.00 401,280.00
5 Pas. Grendel Jendela - 12.000 bh 15,730.00 188,760.00
6 Pas. Handle Jendela - 6.000 bh 15,600.00 93,600.00
7 Pas. Kait Angin A.4.6.2.9 12.000 bh 170,005.00 2,040,060.00 4,047,140.00

XI PEKERJAAN CAT - CATAN


1 Pek. Cat Tembok A.4.7.1.11 187.708 m2 61,312.90 11,508,921.83
2 Pek. Cat Plafond A.4.7.1.10 35.000 m2 #N/A #N/A
3 Pek. Cat Kayu A.4.7.1.4 49.277 m2 57,695.00 2,843,024.98 #N/A

SUB TOTAL LEMBAR A #N/A


HARGA JUMLAH SUB
NO URAIAN PEKERJAAN ANALISA VOLUME SAT. SATUAN HARGA TOTAL
Rp. Rp. Rp.

XII PEKERJAAN INTALASI LISTRIK


1 Penyambungan Listrik + Pulsa 100 rb - 1.000 paket 1,760,000.00 1,760,000.00
2 Pas. Instalasi Listrik - 10.000 titik 160,000.00 1,600,000.00
3 Pas. Stop Kontak - 3.000 bh 16,600.00 49,800.00
4 Pas. Saklar Ganda - 2.000 bh 18,000.00 36,000.00
5 Pas. Saklar Tunggal - 3.000 bh 14,500.00 43,500.00
6 Pas. Lampu SL 18 watt - 7.000 bh 44,500.00 311,500.00 3,800,800.00

SUB TOTAL LEMBAR B 3,800,800.00

JUMLAH A + B Rp. #N/A

Temanggung, Maret 2015


Menyetujui : Dibuat Oleh :
Pejabat Pembuat Komitmen Konsultan Perencana
CV. DWI PERTIWI
Temanggung

WIDYAWATI VIRGANANDA S. D., SE., MM Ir. H. ASRUL ANTUL, MM


NIP. 19730920 199603 2 006 Direktur

Mengetahui :
Kepala Badan Lingkungan Hidup
Kabupaten Temanggung

Ir. ANDRISTI, M.Si


NIP. 19601022 198703 2 004
BACK UP VOLUME PEKERJAA

SKET / GAMBAR VOLUME PE


Pekerjaan Kolom k1 40/40 Lantai 1
Adukan Beton =
=
=

pokok ø 16 =
=
isian ø 12 =
=
=

begel ø 10 =
=
=
begesting =
=

Pekerjaan Kolom k1 40/40 LT 3 Penyangga Kubah


Adukan Beton =
=
=

pokok ø 16 =
=
isian ø 12 =
=
=

begel ø 10 =
=
=
begesting =
=

Pekerjaan Kolom k1 40/40 LT 4 Penyangga Kubah


Adukan Beton =
=
=
pokok ø 16 =
=
isian ø 12 =
=
=

begel ø 10 =
=
=
begesting =
=

Pekerjaan Kolom k2 80/40 Menara


Adukan Beton =
=
=

pokok ø 22 =
=
begel ø 12 =
=
=
=
begesting =
=
Pekerjaan Kolom k1 40/40 Menara
Adukan Beton =
=
` =

pokok ø 22 =
=
begel ø 12 =
=
=
=
begesting =
=

Pekerjaan Balok B2 70/35 Menara


Adukan Beton =
=
=
=
=
=

pokok ø p 3,6 22 =
=
isian ø 16 =
=
pokok ø p 1,6 22 =
=
isian ø 16 =
=
=

begel ø 12 =
=
=
begesting =
=

Pekerjaan Pas. Bata 1: 3 : 10 MENARA UTAMA


A dinding =
=
=
Luas Jendela
jendela =

Total Pas. Bata Dinding =


=
=
=

B dinding =
=
=

Luas Jendela
jendela =

Total Pas. Bata Dinding =


=
=
=

C dinding =
=
=
=
=
=
=
Luas Jendela
jendela =

Total Pas. Bata Dinding =


=
=
=

Pekerjaan Plester + acian 1 : 3


Pas. Bata Volume =
=
=
Pekerjaan Kolom k1 50/50 Lantai 1
Adukan Beton =
=
=

pokok ø 22 =
=
isian ø 22 =
=
=

begel ø 12 =
=
=
begesting =
=

Pekerjaan Kolom k1 40/40 Lantai 1 teras depan


Adukan Beton =
=
=

pokok ø 16 =
=
isian ø 12 =
=
=
-
begel ø 10 =
=
=
begesting =
=

Pekerjaan Kolom k1 40/40 Lantai 1 penyangga dak


Adukan Beton =
=
=

pokok ø 16 =
=
isian ø 12 =
=
=

begel ø 10 =
=
=
begesting =
=

Pekerjaan Balok B1 70/25 Lantai 1


Adukan Beton =
=
=

pokok ø 16 =
=
isian ø 12 =
=
=

begel ø 10 =
=
=
begesting =
=

Pekerjaan Balok B1 70/25 Lantai 2


Adukan Beton =
=
=

pokok ø 16 =
=
isian ø 12 =
=
=

begel ø 10 =
=
=
begesting =
=

Pekerjaan Balok B3 70/40 Lantai 3


Adukan Beton =
=
=

pokok ø 16 =
=
isian ø 12 =
=
=

begel ø 10 =
=
=
begesting =
=

Pekerjaan Pas. Bata 1: 3 : 10


A dinding =
=
=
=
=
Total Pas. Bata =
=

Pekerjaan Plester + acian 1 : 3 : 10


Pas. Bata Volume =
=
=

Pekerjaan Pas. Bata 1: 3 : 10 LANTAI 3


A dinding =
=
=

Luas Jendela
jendela =

Total Pas. Bata Dinding =


=
=
=
Pekerjaan Plester + acian 1 : 3 : 10
Pas. Bata Volume =
=
=

Pekerjaan Pas. Bata 1: 3 : 10 LANTAI 4


A dinding =
=
=
=
=
=

Pekerjaan Plester + acian 1 : 3 : 10


Pas. Bata Volume =
=
=

Pekerjaan Pas. Bata 1: 3 : 10 LANTAI 5 / LEHER KUBAH


A dinding =
=
=
=
=
=

Pekerjaan Plester + acian 1 : 3 : 10


Pas. Bata Volume =
=
=

Pekerjaan Sloof Beton


Adukan Beton =
=
=
pokok ø 16 =
=
pokok ø 12 =
=
begel ø 10 =
=
begesting =
=
=
Pekerjaan RingBalk
Adukan Beton =
=
=

pokok ø 22 =
=

begel ø 10 =
=
Begesting =
=
=
Pekerjaan Kolom 25/25 lt 3
Adukan Beton =
=
=

pokok ø 16 =
=

begel ø 10 =
=
=
begesting =
=

Pekerjaan Balok B4 30/20 Lantai 3


Adukan Beton =
=
=

pokok ø 12 =
=
isian ø 12 =
=
=

begel ø 10 =
=
=
begesting =
=

Pekerjaan Kolom k3 80/40 Lantai 1


Adukan Beton =
=
=

pokok ø 16 =
=

begel ø 10 =
=
=
begesting =
=

Pekerjaan ring balk lt 1


adukan beton =
=
=

pokok ø 10 =
=
begel ø 8 =
=
begesting =
=
=

Pekerjaan Urugan Pasir Bawah Lantai


=
ruang kelas =
=
teras =
=
Total Urugan Pasir =

Pekerjaan Keramik 30 x 30
=
Gedung =

Total Rabat Beton =

Pek. Finising Kolom 40/40


Pekerjaan Plester + acian 1 : 3 : 10
=
=
=

Pek. Plat Lantai 15 cm LANTAI 2


Adukan Beton =
=
=

pokok ø 10 =
=
begel ø =
=
begesting =
=
=

Pek. Plat Lantai 12 cm LANTAI 3


Adukan Beton =
=
=

pokok ø 10 =
=
begel ø =
=
begesting =
=
=

Pek. Plat Lantai 12 cm LANTAI 4


Adukan Beton =
=
=

pokok ø 10 =
=
begel ø =
=
begesting =
=
=

Pekerjaan Kolom 20/20 Lt 4


Adukan Beton =
=
=

pokok ø 16 =
=

begel ø 10 =
=
=
begesting =
=

Pek. Plat Lantai 12 cm LANTAI 5


Adukan Beton =
=
=

pokok ø 10 =
=
begel ø =
=
begesting =
=
=

Pekerjaan Kolom 30/30 Lt 5


Adukan Beton =
=
=

pokok ø 16 =
=

begel ø 10 =
=
=
begesting =
=

Pekerjaan Balok B4 20/15 Lantai 4


Adukan Beton =
=
=
=
=
=

pokok ø 12 =
=
pokok ø 12 =
=
=

begel ø 10 =
=
=
begesting =
=
=
=
=

Pekerjaan Kolom k1 40/40 Lantai 2


Adukan Beton =
=
=

pokok ø 16 =
=

begel ø 10 =
=
=
begesting =
=

Pekerjaan Kolom 30/30


Adukan Beton =
=
=

pokok ø 16 =
=

begel ø 10 =
=
=
begesting =
=

Pekerjaan Kolom 15/15 MENARA UTAMA


Adukan Beton =
=
=

pokok ø 12 =
=

begel ø 10 =
=
=
begesting =
=

Pekerjaan Ring Balk 15/12 MENARA UTAMA


Adukan Beton =
=
=

pokok ø 12 =
=

begel ø 10 =
=
=
begesting =
=

Adukan Beton =
=
=
=
=
=

pokok ø 12 =
=
pokok ø 12 =
=
=
begel ø 10 =
=
begel ø 10 =
=

=
begesting =
=

=
begesting =
=

Pekerjaan Kolom Suport 25/25 MENARA UTAMA


Adukan Beton =
a =
=

pokok ø 16 =
=

begel ø 10 =
=
=
begesting =
=

Adukan Beton =
b =
=

pokok ø 16 =
=

begel ø 10 =
=
=
begesting =
=

Pekerjaan Balok Suport 70/35 MENARA UTAMA


Adukan Beton =
a =
=

pokok ø 22 =
=
pokok ø 16 =
=
=

begel ø 12 =
=
=
begesting =
=

Pek. Plat Lantai 12 cm Dek Pandang 1


Adukan Beton =
=
=

pokok ø 10 =
=
begel ø =
=
begesting =
=
=

Pek. Plat Lantai 12 cm Dek Pandang 2


Adukan Beton =
=
=

pokok ø 10 =
=
begel ø =
=
begesting =
=
=
Pek. Plat Lantai 12 cm Teras Masjid
Adukan Beton =
=
=

pokok ø 10 =
=
begel ø =
=
begesting =
=
=

532
120
192
844

pekerjaan plat tangga


adukan beton

pokok ø 10

begel ø 10

begesting
VOLUME PEKERJAAN

VOLUME PEKERJAAN

P x L x T x JML
0.40 0.40 3.60 x 75.00
43.20 m3
P JMl BJ
281.25 x 8.00 x 1.58
3,551.04 kg
281.25 x 6.00 x 0.89
1,501.88
5,052.92 kg

1.80 x 1,875.00 x 0.620


2,092.50 kg
T x L x jml / dipakai 2x
3.60 0.40 4.00 2.00
216.00 m 2

5.76 432.00

P x L x T x JML
0.40 0.40 2.45 x 4.00
1.57 m3
P JMl BJ
10.80 x 8.00 x 1.58
136.36 kg
10.80 x 6.00 x 0.89
57.67
194.03 kg

1.80 x 72.00 x 0.620


80.35 kg
T x L x jml / dipakai 2x
2.45 0.40 4.00 2.00
7.84 m 2

3.92 15.68

P x L x T x JML
0.40 0.40 1.40 x 4.00
0.90 m3
P JMl BJ
6.60 x 8.00 x 1.58
83.33 kg
6.60 x 6.00 x 0.89
35.24
118.58 kg

1.80 x 44.00 x 0.620


49.10 kg
T x L x jml / dipakai 2x
1.40 0.40 4.00 2.00
4.48 m2
2.24 8.96

P x L x T x JML
0.8 0.40 9.40 x 4.00
12.03 m3
P JMl BJ
37.6 x 24.00 x 2.98
2689.152 kg
2.6 x 250.67 x 0.89
580.042666666667 kg
3269.19466666667
T x L x jml / dipakai 2x
9.4 1.60 4.00 2.00
30.08 m2
P x L x T x JML
0.4 0.40 9.40 x 2.00
3.01 m3
P JMl BJ
18.8 x 24.00 x 2.98
1344.576 kg
2.6 x 125.33 x 0.89
290.021333333333 kg
1634.59733333333
T x L x jml / dipakai 2x
9.4 1.60 2.00 2.00
15.04 m2

P x L x T x JML
3.60 0.35 0.70 x 8.00
7.06 m3
1.60 x 0.35 x 0.70 x 16.00
6.27 m3
13.33 m3
P JMl BJ
31.20 x 12.00 x 2.98 8.00
1,115.71 kg
31.20 x 6.00 x 1.58 8.00
295.78 kg
30.40 x 12.00 x 2.98 16.00
1,087.10 kg
30.40 x 6.00 x 1.58 16.00
288.19 kg
2,786.78 kg
61.60

2.30 x 410.67 x 0.89


840.63 kg
P x L x jml / dipakai 2x
61.60 0.35 2.00 2.00
21.56 m2

P x L x jml
8.70 x 1.60 x 12.00
167.04 m2
7.17 x 0.67 x 12.00 = 57.65

167.04 - 57.65
109.39 m2 x 1.00 = 109.39
109.39 X 1.00
109.39

P x L x jml
1.65 x 0.80 x 16.00
21.12 m2

0.25 x 0.25 x 64.00 = 4.00

21.12 - 4.00
17.12 m2 x 1.00 = 17.12
17.12 X 1.00
17.12

P x L x jml
1.65 x 0.80 x 8.00
10.56 m2
P x L x jml
1.18 x 0.80 x 8.00
7.55 m2
18.11

0.25 x 0.25 x 56.00 = 3.50

18.11 - 3.50
14.61 m2 x 1.00 = 14.61
14.61 X 1.00
14.61

L. pas bata x Jml


141.13 x 2.00
282.25 m 2

P x L x T x JML
0.50 0.50 7.50 x 4.00
7.50 m3
P JMl BJ
32.80 x 8.00 x 2.98
781.95 kg
32.80 x 6.00 x 2.98
586.46
1,368.42 kg

2.20 x 218.67 x 0.89


428.15 kg
T x L x jml / dipakai 2x
7.50 1.00 4.00 2.00
15.00 m2

P x L x T x JML
0.40 0.40 8.20 x 5.00
6.56 m3
P JMl BJ
45.00 x 8.00 x 1.58
568.17 kg
45.00 x 6.00 x 0.89
240.30
808.47 kg

1.80 x 300.00 x 0.620


334.80 kg
T x L x jml / dipakai 2x
8.20 0.40 5.00 2.00
8.20 m2

P x L x T x JML
0.40 0.40 6.80 x 12.00
13.06 m3
P JMl BJ
84.00 x 8.00 x 1.58
1,060.58 kg
84.00 x 6.00 x 0.89
448.56
1,509.14 kg

1.80 x 560.00 x 0.62


624.96 kg
T x L x jml / dipakai 2x
6.80 0.80 12.00 2.00
32.64 m2

P x L x T x JML
3.60 0.25 0.70 x 126.00
79.38 m3
P JMl BJ
472.50 x 11.00 x 1.58
8,202.90 kg
472.50 x 4.00 x 0.89
1,682.10
9,885.00 kg

2.25 x 3,150.00 x 0.62


4,394.25 kg
T x L x jml / dipakai 2x
472.50 0.25 2.00 2.00
118.13 m2

P x L x T x JML
3.60 0.25 0.70 x 194.00
122.22 m3
P JMl BJ
727.50 x 11.00 x 1.58
12,629.87 kg
727.50 x 4.00 x 0.89
2,589.90
15,219.77 kg

2.25 x 4,850.00 x 0.62


6,765.75 kg
T x L x jml / dipakai 2x
727.50 0.25 2.00 2.00
181.88 m2

P x L x T x JML
34.55 0.40 0.70 x 1.00
9.67 m3
P JMl BJ
36.00 x 11.00 x 1.58
624.98 kg
36.00 x 4.00 x 0.89
128.16
753.14 kg

2.35 x 240.00 x 0.62


349.68 kg
P x L x jml / dipakai 2x
36.00 0.40 2.00 2.00
14.40 m2

P x L x T
3.60 x x 0.45 x 19.00
30.78
3.60 x x 3.20 x 8.00
92.16
122.94 - 32.52
186.24 m 2

L. pas bata x Jml


186.24 x 2.00
372.48 m 2

P x L x jml
2.15 x 3.75 x 16.00
129.00 m2

0.70 x 1.00 x 32.00 = 22.40

129.00 - 22.40
106.60 m2 x 1.00 = 106.60
106.60 X 1.00
106.60
L. pas bata x Jml
106.60 x 2.00
213.20 m2

P x L x jml
2.75 x 1.20 x 8.00
26.40 m2
4.00 x 1.20 x 8.00
38.40 m2
64.80 m2

L. pas bata x Jml


64.80 x 2.00
129.60 m2

P x L x jml
3.55 x 2.66 x 12.00
113.32 m2
1.67 x 0.60 x 36.00
36.07 m2
77.24 m2

L. pas bata x Jml


77.24 x 2.00
154.49 m2

P x L x T
12.40 0.25 0.70
2.17 m3 pondasi footplat
P JMl BJ
12.40 x 4.00 x 1.58
78.28 kg
12.40 x 8.00 x 0.89
88.07 kg 203.39
2.25 x 82.67 x 0.620
115.32 kg
P x L x jml / dipakai 2x
12.40 0.70 2.00 2.00
8.68 m 2

P x L x T
436.43 351.56 0.45
69,044.10 m3
P JMl BJ
6,304.00 x 1.00 x 2.98
18,810.25 kg

1.70 x 435.00 x 0.329


243.30 kg
P x L x jml
788.00 0.25 2.00
394.00 m2

P x L x T x JML
0.25 0.25 2.45 x 16.00
2.45 m3
P JMl BJ
40.00 x 10.00 x 1.58
631.30 kg

1.15 x 266.67 x 0.620


190.13 kg
T x L x jml / dipakai 2x
2.45 0.50 16.00 2.00
9.80 m 2

P x L x T x JML
3.75 0.20 0.30 x 29.00
6.53 m3
P JMl BJ
116.00 x 7.00 x 0.89
720.86 kg
116.00 x 2.00 x 0.89
206.48
927.34 kg

1.15 x 773.33 x 0.62


551.39 kg
P x L x T / dipakai 2x
3.75 0.20 0.30 2.00
13.05 m2

P x L x T x JML
0.40 0.80 20.00 x 4.00
25.60 m3
P JMl BJ
80.00 x 14.00 x 1.58
1,767.63 kg

2.30 x 544.00 x 0.329


411.64 kg
T x L x jml / dipakai 2x
20.00 1.60 4.00 1.00
128.00 m 2

P x L x T x JML
3.20 0.12 0.15 x 19.00
1.09 m3
P JMl BJ
60.80 x 4.00 x 0.62
149.93 kg
0.55 x 405.33 x 0.39
87.96 kg
P x L x jml / dipakai 2x
3.20 0.24 19.00 2.00
7.30 m 2

P x L x T
16.00 x 8.00 x 0.05 x 1.00
6.40 m3
16.00 x 2.50 x 0.05
2.00 m3
8.40 m3

P x L
9.00 x 7.00 = 63.00

63.00 m2

168.00 m3

L. Kolom x Jml x Jml


1.44 x 4.00 84.00
483.84 m2

P x L x T
35.30 25.70 0.15
136.08 m3
P JMl BJ
7,684.00 x 2.00 x 0.62
9,474.37 kg
x x
kg
P x L x jml / dipakai 2x
35.30 25.70 1.00 2.00
453.61 m2

P x L x T
37.20 36.40 0.12 1,354.08
151.09 m3 94.98
P JMl BJ
14,753.00 x 2.00 x 0.62
18,190.45 kg
x x
kg
P x L x jml / dipakai 2x
37.20 36.40 1.00 2.00
677.04 m2

1,354.00 2,708.00

P x L x T
13.00 12.40 0.12 161.20
19.34 m3
P JMl BJ
2,760.00 x 2.00 x 0.62
3,403.08 kg
x x
kg
P x L x jml / dipakai 2x
13.00 12.40 1.00 2.00
80.60 m2

P x L x T x JML
0.20 0.20 1.40 x 16.00
0.90 m3
P JMl BJ
24.00 x 8.00 x 1.58
303.02 kg

0.95 x 160.00 x 0.620


94.24 kg
T x L x jml / dipakai 2x
1.40 0.20 4.00 2.00
8.96 m 2

P x L x T
13.50 13.50 0.12 182.25
10.47 m3 95.00
P JMl BJ
1,416.00 x 2.00 x 0.62
1,745.93 kg
x x
kg
P x L x jml / dipakai 2x
13.50 13.50 1.00 2.00
43.63 m 2

P x L x T x JML
0.30 0.30 3.55 x 12.00
3.83 m3
P JMl BJ
44.40 x 10.00 x 1.58
700.74 kg

1.35 x 296.00 x 0.620


247.75 kg
T x L x jml / dipakai 2x
3.55 0.30 4.00 2.00
25.56 m2

4.26 51.12

P x L x T x JML
2.75 0.15 0.20 x 17.00
1.40 m3
4.00 0.15 0.20 x 12.00
1.44 m3
2.84 m3

P JMl BJ
49.30 x 8.00 x 0.89
350.13 kg
48.00 x 8.00 x 0.89
341.76 kg 97.30
691.89 kg

0.85 x 648.67 x 0.62


341.85 kg
P x L x T / dipakai 2x
2.75 0.15 0.60 2.00
2.10 m2
4.00 0.15 0.60 2.00
2.16 m2
4.26 m2

P x L x T x JML
0.40 0.40 3.60 x 86.00
48.38 m3
P JMl BJ
302.40 x 8.00 x 1.58
3,818.08 kg

1.60 x 2,030.00 x 0.62


1,068.59 kg
T x L x jml / dipakai 2x
3.60 0.80 84.00 1.00
241.92 m2

P x L x T x JML
0.30 0.30 6.80 x 12.00
7.34 m3
P JMl BJ
81.60 x 10.00 x 1.58
1,287.84 kg

1.50 x 580.00 x 0.620


539.40 kg
T x L x jml / dipakai 2x
6.80 0.60 12.00 1.00
48.96 m2

P x L x T x JML
0.15 0.15 1.14 x 16.00
0.41 m3 2.00
P JMl BJ
19.20 x 4.00 x 0.89
68.18 kg TOTAL BESI

0.72 x 128.00 x 0.620


57.14 kg
T x L x jml / dipakai 2x
1.14 0.15 4.00 2.00
5.47 m 2

0.68 10.94

P x L x T x JML
1.65 0.15 0.12 x 16.00
0.48 m3 2.00
P JMl BJ
27.20 x 4.00 x 0.89
96.59 kg

0.68 x 181.33 x 0.620


76.45 kg
P x L x T / dipakai 2x
1.65 0.12 0.30 1.00
0.95 m2 16.00
0.06 0.95

P x L x T x JML
1.65 0.15 0.12 x 8.00
0.24 m3 2.00
1.18 0.15 0.12 x 8.00
0.17 m3
0.41 m3

0.17 m3 2.00
P JMl BJ
13.60 x 4.00 x 0.89
48.29 kg
10.00 x 4.00 x 0.89
35.51 kg
83.80 kg
0.68 x 90.67 x 0.620
38.23 kg
0.68 x 66.67 x 0.620
28.11 kg

P x L x T / dipakai 2x
1.65 0.12 0.30 2.00
0.48 m 2
8.00

P x L x T / dipakai 2x
1.18 0.12 0.30 2.00
0.34 m 2
8.00

P x L x T x JML
0.96 0.25 0.25 x 12.00
0.72 m3
P JMl BJ
14.40 x 10.00 x 1.58
227.27 kg TOTAL BESI

1.20 x 96.00 x 0.620


71.42 kg
T x L x jml / dipakai 2x
0.96 0.50 2.00 2.00
5.76 m 2

0.96 11.52

P x L x T x JML
1.63 0.25 0.25 x 4.00
0.41 m3
P JMl BJ
7.40 x 10.00 x 1.58
116.79 kg TOTAL BESI

1.20 x 49.33 x 0.620


36.70 kg
T x L x jml / dipakai 2x
1.63 0.50 2.00 2.00
3.26 m 2

1.63 6.52
P x L x T x JML
1.23 0.35 0.70 x 8.00
2.41 m3
P JMl BJ
10.00 x 12.00 x 2.98
358.06 kg
10.00 x 6.00 x 1.58
94.69 kg
452.76 kg

2.10 x 66.67 x 0.890


124.60 kg
T x L x jml / dipakai 2x
1.23 1.40 1.00 1.00
13.78 m 2

P x L x T
7.45 7.45 0.12 55.50
5.89 m3 6.40
P JMl BJ
808.00 x 2.00 x 0.62
996.26 kg
x x
kg
P x L x jml / dipakai 2x
7.45 7.45 1.00 2.00
24.55 m 2

P x L x T
6.40 6.40 0.12 40.96
4.15 m3 6.40
P JMl BJ
532.00 x 2.00 x 0.62
655.96 kg
x x
kg
P x L x jml / dipakai 2x
6.40 6.40 1.00 2.00
17.28 m 2
P x L x T
7.70 9.00 0.12 69.30
8.32 m3
P JMl BJ
713.00 x 2.00 x 0.62
879.13 kg
x x
kg
P x L x jml / dipakai 2x
7.70 9.00 1.00 2.00
34.65 m2

53.20 1,591.00
12.00 84.40
19.20

159.10

5.50 0.50 0.12

= P x L x T x JML
= 5.50 1.50 0.12 x
= 7.12 m3 -
P JMl BJ
= 2.00 x 30.00 x 0.62
= 97.44 kg
= x x 0.62
= kg
= P x L x jml / dipakai 2x
= 5.00 1.50 1.00 2
= 15.22 m2 2.00 30.43
32.43

1.50 0.20 12.00

3.60

4.90 0.42 2.00

4.12

0.50
beton anak tangga 1.50 0.36 0.25 0.05
0.14 18.00 0.81

2.43 2.00 4.86


5.67
besi p =
3.75

total besi
7,145.42

besi p =
2.7

total besi
274.38

besi p =
1.65
total besi
167.68
besi p =
3.75

3.9

3.9

1.9

1.9

total besi
3,627.42
total pas. Bata
141.13 m2

8.2
total besi
2,578.52

9.00

total besi
1,143.27

25.00 0.25 0.6


3.75

2,134.10
besi p =
3.75

total besi
14,279.25

besi p =
3.75

total besi
21,985.52

besi p =
36
total besi
1,102.82

LANTAI 2
P X T
3.60 0.45
2.00 = 40.50
0.6 1.92 3.60 3.20
3.84 30.78 = 92.16

= 132.66

PLESTER = 132.66 X 2.00


265.32

pondasi footplat
galian tanah = 4.39 m3 13.17
3.00

urugan kembali = 1.46 m3


27.06
peninggian tanah = 25.60

besi p =
2.5

total besi
821.43

besi p =
4
total besi
1,478.73

29

25.00 1.44

ok 237.89
80.00 197.28 313.02
533.33 115.74

237.89
0.12
14.40
23.04
68.40

105.96

379.94

1,259.10
besi p =
1.5

total besi
397.26

16 1.12
17.92

87.25

182.25
87.25

besi p =
3.7

total besi
948.49

16

besi p =
2.9

total besi
1,033.74
1,827.24

162.00
pasir urug 0.10 16.20

1.20
0.82

TOTAL BESI
125.32 250.64

10.94

1.70

total besi
173.04
total
0.88
323.17
1.77 3.53

1.70

1.25

total besi
150.14
1.20 1.13 2.00
total beton 2.26

TOTAL BESI 452.18 2.00


298.69 total besi 904.37

9.02 2.00
total begisting 18.04
11.52

1.85

TOTAL BESI
153.49

6.52
1.25

total besi
577.36

49.10

182.25
87.25

34.56

182.25
87.25
69.30

182.25
87.25

6.50 15.00 0.62

0.33

JML

2.00 14.24 14.57


36.99 60.45

194.88
254.06 2.00 508.13

dipakai 2x 96.00 59.18


558.13

7.50
JML
25.00

8.00
PERHITUNGAN VOLUME

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

NO SKET/GAMBAR PERHITUNGAN

Galian Tanah
PJG m LBR m H m
Kerprasan 24 x 14 x 1.15 = 386.40 m3
Kerprasan 530 x 0.2 = 106.00 m3
492.40 m3

Bang. Induk 225 x 1 x 1.3 = 292.50 m3


Teras 33.8 x 0.6 x 1.05 = 21.29 m3
FP 1.5 x 1.5 x 1 x 7 = 15.75 m3
329.54 m3

Urugan Tanah Bekas Galian


PJG m LBR m H m
Urugan Kembali 292.50 x 1/3 = 97.50 m3
= 97.50 m3
Urugan Pasir
PJG m LBR m H m
Bang. Induk 225 x 1 x 0.05 = 11.25 m3
Teras 33.8 x 0.6 x 0.05 = 1.01 m3
FP 1 x 1 x 0.05 x 7 = 0.35 m3
12.61 m3

Aanstamping
PJG m LBR m H m
225 x 1 x 0.2 = 45.00 m3

Pas. Batu Belah 1:3:10


PJG m LBR m H m
Bang. Induk 225 x 0.3 + 0.8 x 0.8 = 99.00 m3
2
Teras 33.8 x 0.3 + 0.6 x 0.6 = 9.13 m3
2 108.13 m3

Lantai Kerja PJG m LBR m H m


1 x 1 x 0.05 x 7 = 0.35 m3

Foot Plat
PJG m LBR m H m
1 x 1 x 0.2 x 7 = 1.40 m3
0.0875 + 1 x 0.15 x 7 = 0.57 m3
2 1.97 m3

Sloof 20/25
PJG m LBR m H m
Bang. Induk 242 x 0.2 x 0.25 = 12.10 m3
Teras 33.8 x 0.2 x 0.25 = 1.69 m3
13.79 m3
Ring Balk 20/30
PJG m LBR m H m
181.4 x 0.2 x 0.3 = 10.88 m3
10.88 m3
Ring Teras 20/30
PJG m LBR m H m
17.4 x 0.2 x 0.3 = 1.04 m3
1.04 m3
Ring Balk 15/20
PJG m LBR m H m
126.2 x 0.15 x 0.2 = 3.79 m3
3.79 m3
Balok Latei 12/12
PJG m LBR m H m
124.7 x 0.12 x 0.12 = 1.80 m3
1.80 m3
Kolom 15/15
PJG m LBR m H m
4.5 x 0.15 x 0.15 x 32 = 3.24 m3
3.24 m3

Kolom Struktur 25/35


PJG m LBR m H m
4.5 x 0.25 x 0.35 x 30 = 11.81 m3
5.25 x 0.25 x 0.35 x 7 = 3.22 m3
15.03 m3

Kolom Sudut 25/35


PJG m LBR m H m
4.5 x 0.25 x 0.35 x 4 = 1.58 m3
4.5 x 0.25 x 0.1 x 4 = 0.45 m3
2.03 m3

Kolom Teras 35/35


PJG m LBR m H m
4 x 0.35 x 0.35 x 4 = 1.96 m3
1.96 m3

Plat 10 cm PJG m LBR m H m


Teras Belakan 2.7 x 0.7 x 0.1 x 2 = 0.38 m3
4 x 0.7 x 0.1 x 1 = 0.28 m3
Teras depan 6.4 x 0.7 x 0.1 x 2 = 0.90 m3
6 x 0.7 x 0.1 x 1 = 0.42 m3
Lisplank 9.4 x 0.6 x 0.1 = 0.56 m3
18.8 x 0.6 x 0.1 = 1.13 m3
3.67 m3

Topi-topi PJG m LBR m H m


dibawah Bata 1 ba 80 x 0.3 x 0.08 = 1.92 m3
atas jdl 80 x 0.6 x 0.08 = 3.84 m3
5.76 m3
Rabat Beton PJG m LBR m H m
100.00 x 1 x 0.05 = 5.00 m3
8.00 x 4.5 x 0.05 = 1.80 m3
6.80 m3

Saluran U 20 39 + 6 + 6 + 39 +
7 + 7 + 6 = 110.00 m
110.00 m

Gril saluran 18.00 x 0.4 = 7.2 m2

Pas. Batu Bata 1:4


PJG m H m
202.5 x 0.3 = 60.75 m2

Pas. Batu Bata 1:3:10 tebal 1 bata


PJG m H m
96.00 x 1 = 96.00 m2

Pas. Batu Bata 1:3:10 tebal 1/2 bata


PJG m H m
225 x 4.3 = 967.50 m2
Dikurangi Trasram = 60.75 m2
Dikurangi Pas. Bata 1 bata = 96.00 m2
Dikurangi PJ = 167.56 m2
643.19 m2
Plesteran 1:4
Tembok 60.75 x 2 = 121.50 m2
Kolom 4 x 1.2 x 4 = 19.2 m2
13.2 x 0.5 = 6.6 m2
14.4 x 0.5 x 2 = 14.4 m2
11.2 x 0.5 = 5.6 m2
12.4 x 0.5 x 2 = 12.4 m2
= 179.70 m2

Plesteran 1:2:8 643.19 x 2 = 1286.386 m2


Dikurangi batu Andesit = 69.80 m2
= 1216.59 m2
Acian
179.70 + 1216.59 = 1396.29 m2
1396.286 m2

Pasang Sekat 40.00 x 1.4 = 56.00 m2

Water Proofing #REF! x #REF! = #REF! m2


#REF! x 0.1 = #REF! m2
#REF! m2

Batu Tempel 96.00 x 0.5 = 48.00 m2

Batu Andesit 20x 87.25 x 0.8 = 69.80 m2

Batu Andesit 20x2 0.00 x 0.7 x 2 = 0.00 m2

Batu Marmo Bakar


0.00 x 2.7 = 0 m2
R. tamu 4.00 x 3.2 = 12.80 m2
= 12.80 m2
Sponeng
Kolom 6 x 0.3 x 30 = 54.00 m
Klom Teras 6 x 1.6 x 4 = 38.40 m
Atas Andesit = 87.25 m
atas Jendela 87.25 m
atas Roster 30 + 10 + 14 = 54.00 m
Lisplank 34.20 x 4 = 136.80 m
11.20 x 4 = 44.80 m
19.20 x 4 = 76.80 m
579.30 m

Pas. Keramik 40x40 PJG m L m


37 x 16 = 592.00 m2
4.4 x 2.4 = 10.56 m2
6 x 1.6 = 9.60 m2
8 x 0.4 = 3.20 m2
6 x 0.4 = 2.40 m2
Dikurangi KM 1.5 x 2 x 2 = 6.00 m2
3.5 x 1.5 = 5.25 m2
606.51 m2
Pas. Keramik Lantai KM 25/25
PJG m L m
KM 1 1.5 x 2 x 2 = 6.00 m2
KM 2 3.5 x 1.5 = 5.25 m2
11.25 m2
Pas. Keramik Dinding 25/40
PJG m L m
KM 1 6.2 x 4 x 2 = 49.60 m2
KM 2 6.2 x 4 x 1 = 24.80 m2
KM 2 5.2 x 4 x 1 = 20.80 m2
Bak KM Atas 0.6 x 2 x 3 = 3.60 m2
Bak KM Luar 0.6 x 2 x 3 = 3.60 m2
dapur 5 x 1.5 x 1 = 7.50 m2
4.2 x 0.7 x 1 = 2.94 m2
Dikurangi P KM 0.8 x 2 x 4 = 6.40 m2
106.44 m2
Plint keramik
6.2 x 3 = 18.60 m
5.2 x 1 = 5.20 m
23.80 m

Pas. Keramik dinding 40x40


PJG m L m
Kolom 0.4 x 0.4 x 8 x 4 = 5.12 m2
Tembok pintu 0.4 x 0.4 x 6 x 1 = 0.96 m2
0.4 x 0.4 x 5 x 8 = 6.40 m2
Tembok dalam 0.4 x 0.4 x 10 x 2 = 3.20 m2
0.4 x 0.05 x 10 x 4 = 0.80 m2
16.48 m2

Urugan Pasir Bawah Keramik


606.51 + 11.25 + 136.00 x 0.05 = 37.69 m3

Kusen PJG m L m JML bh


p2 8.6 x 0.12 x 0.06 x 3 = 0.19 m3
p3 7.28 x 0.12 x 0.06 x 12 = 0.63 m3
pj 12.99 x 0.12 x 0.06 x 0 = 0.00 m3
j1 14.74 x 0.12 x 0.06 x 17 = 1.80 m3
j2 9.93 x 0.12 x 0.06 x 9 = 0.64 m3
j3 12.33 x 0.12 x 0.06 x 2 = 0.18 m3
j4 5.3 x 0.12 x 0.06 x 4 = 0.15 m3
BV1 4.32 x 0.12 x 0.06 x 3 = 0.09 m3
BV2 2.48 x 0.12 x 0.06 x 1 = 0.02 m3
3.70 m3
Kusen Alumuniu PJG m L m JML bh
5.2 x 4 = 20.80 m

Daun Pintu Alum PJG m L m JML bh


2.2 x 0.8 x 4 = 7.04 m2

Daun Pintu panil PJG m L m JML bh


p2 2.2 x 1.2 x 3 = 7.92 m2
p3 2.2 x 0.8 x 12 = 21.12 m2
pj 2.2 x 0.8 x 0 = 0.00 m2
29.04 m2
Daun Jendela & B PJG m L m JML bh
Daun Boven
p2 0.6 x 0.4 x 2 x 3 = 1.44 m2
p3 0.8 x 0.4 x 1 x 12 = 3.84 m2
pj 0.8 x 0.4 x 1 x 0 = 0.00 m2
j1 0.6 x 0.4 x 2 x 17 = 8.16 m2
j2 0.6 x 0.4 x 2 x 9 = 4.32 m2
pj 1.22 x 0.4 x 1 x 0 = 0.00 m2
j3 1 x 0.4 x 2 x 2 = 1.60 m2
j4 0.6 x 0.4 x 1 x 3 = 0.72 m2
BV1 0.6 x 0.4 x 2 x 3 = 1.44 m2
BV2 0.6 x 0.4 x 3 x 1 = 0.72 m2
Daun Jendela
j1 1.35 x 0.6 x 2 x 17 = 27.54 m2
j2 1.35 x 0.6 x 2 x 9 = 14.58 m2
j4 1.35 x 0.6 x 1 x 4 = 3.24 m2
67.60 m2
Kaca Mati 5 mm PJG m L m JML bh
j1 1.35 x 0.9 x 1 x 17 = 20.66 m2
0.4 x 0.9 x 1 x 17 = 6.12 m2
j3 1.35 x 1 x 2 x 2 = 5.40 m2
pj 1.35 x 1.2 x 1 x 0 = 0.00 m2
32.18 m2

Alumunium CompoPJG m L m JML bh


2.5 x 1.05 x 2 = 5.25 m2
2.4 x 1.05 x 1 = 2.52 m2
7.77 m2

Slot Pintu 3 + 12 = 15.00 bh


Engsel Pintu 15 x 3 = 45.00 bh

Engsel Jendela 56 x 2 = 112.00 bh


86 x 2 = 172.00 bh
284.00 bh

Kait Angin 56 x 2 = 112.00 bh


86 x 2 = 172.00 bh
= 284.00 bh

Handel Jendela 56 + 86 = 142.00 bh

Gerendel jendela 56 x 2 = 112.00 bh

Gerendel Boven 86 x 2 = 172.00 bh

Genteng baru PJG m L m JML bh


1 21 + 39 x 10.4 x 2 = 624.00 m2
2
2 0.5 x 18 x 10.4 x 2 = 187.20 m2
3 8.7 + 4.7 x 4.6 x 2 = 61.64 m2
2
4 2 x 3.5 x 2 = 14.00 m2
886.84 m2
Bubungan
14.8 + 14.8 + 14.8 + 14.8 +
21 + 8.7 + 2 + 4.9 +
4.9 = 100.70 m
100.70 m

Talang Seng 6.55 + 6.55 + 4.9 + 4.9 = 22.90 m


22.90 m

Plafon PJG m L m
39 x 18 = 702.00 m2
6 x 2 = 12.00 m2
8 x 5.7 = 45.60 m2
759.60 m2
List Plafon PJG m JML bh
R. Arsip 7 + 7 + 5 + 5 = 24.00 m
R. rapat 2 + 2 + 1.5 + 1.5 = 7.00 m
R. Staf 1.5 + 1.5 + 1.5 + 1.5 = 6.00 m
Media Center 17 + 17 + 8 + 8 = 50.00 m
Perpustakaan 6 + 6 + 8 + 8 = 28.00 m
R. Sekretraris 3.5 + 3.5 + 4 + 4 = 15.00 m
R. Ketua 3.5 + 3.5 + 4 + 4 = 15.00 m
Pantry 30 + 30 + 8 + 8 = 76.00 m
Data Center 4 + 4 + 3.5 + 3.5 = 15.00 m
R. Komisioner 4 + 4 + 3.5 + 3.5 = 15.00 m
5 + 5 + 6 + 6 = 22.00 m
5 + 5 + 6 + 6 = 22.00 m
5 + 5 + 6 + 6 = 22.00 m
R. Tamu 5 + 5 + 6 + 6 = 22.00 m
Toilet 3 + 3 + 6 + 6 = 18.00 m
2 + 2 + 1.5 + 1.5 = 7.00 m
Teras 2 + 2 + 1.5 + 1.5 = 7.00 m
11 + 11 + 7 + 7 = 36.00 m
Keliling 5.7 + 5.7 + 6 + 6 = 23.40 m
2 + 2 + 4 + 22 = 30.00 m
44.7 + 44.7 + 16 + 23 = 128.40 m
46.7 + 46.7 + 18 + 24 = 135.40 m
724.20 m

Lisplank PJG m JML bh


39 + 18 + 39 + 18 +
5.7 + 5.7 + 2 + 2 = 129.40 m
129.40 m

Rooster 5 x 18 = 90.00 bh
3 x 1 = 3.00 bh
6 x 2 = 12.00 bh
105.00 bh

Luas P & J PJG m H m JML bh


P1 1.8 x 2.5 x 1 = 4.50 m2
p2 2.72 x 1.32 x 3 = 10.77 m2
p3 2.72 x 0.92 x 12 = 30.03 m2
Pkm 2 x 0.8 x 4 = 6.40 m2
pj 2.72 x 0.92 x 0 = 0.00 m2
1.93 x 1.22 x 0 = 0.00 m2
j1 2.34 x 1.93 x 17 = 76.78 m2
j2 1.38 x 1.93 x 9 = 23.97 m2
j3 2.18 x 1.93 x 2 = 8.41 m2
j4 0.72 x 1.93 x 3 = 4.17 m2
BV1 1.38 x 0.52 x 3 = 2.15 m2
BV2 0.72 x 0.52 x 1 = 0.37 m2
167.56 m2

Cat Kayu Baru PJG m H m JML bh


kusen 514.41 x 0.24 = 123.46 m2
Daun Pintu 29.04 x 2 = 58.08 m2
Daun Jendela 3.48 x 0.08 x 4 x 17 = 18.93 m2
1.68 x 0.08 x 4 x 3 = 1.61 m2
1.68 x 0.08 x 6 x 1 = 0.81 m2
Lisplank 42.95 x 0.25 = 10.74 m2
213.63 m2

Cat Tembok Baru


Sama dengan Acian 1396.29 m2
1396.29 m2

Cat eternit
Sama dengan Plafon 759.60 m2
759.60 m2
Tulisan Identitas
KOMISI PEMILIHAN UMUM 19.00 bh
KABUPATEN TEMANGGUNG 19.00 bh
38.00 bh

Harga Pasar = 6000


ditambah 25% = 1500
7500

19.00 x 25 x 7500 = 3,562,500


19.00 x 10 x 7500 = 1,425,000
19.00 x 8 x 7500 = 1,140,000
6,127,500

harga rata-rata 6,127,500 / 57.00 = 107,500

LOGO 80 CM 1.00 x 80 x 7500 = 600,000


Sloof 0.25
Pas. Batu 0.8
Aanstamping 0.2
Urugan Pasir 0.05
1.3

Cekungan 11.5 x 9

Panjang Bangunan 238

OK

OK 107
101.2
208.2

OK
OK 35.5
33.2
68.7

OK

OK

OK

OK

Panjang 59

dikrangi kolom 7.6


51.40
7.2

2.2

615.36

11.25
604.11
Jumlah Daun
6
12
0
34
18
0
4
3
6
3
86
34
18
4
56
PERHITUNGAN VOLUME

SKET / GAMBAR VOLUME PEKERJAAN

GALIAN TANAH
Foot Plat Volume = P x L x T jml
= 1.20 x 1.20 x 1.65 x 6.00
= 14.26 m³

Pondasi Volume = P x L x T
= 1.55 x 0.80 x 1.10
= 1.36 m³

Total Volume = 15.62 m³

Urugan Tanah Kembali


Volume = 1/3 Galian Tanah
= 5.15 m³
Urugan Pasir
Footplat Volume = P x L x T
= 1.20 x 1.20 x 0.10 x 6.00
= 0.86 m³

Urugan Pasir Volume = P x L x T


= 1.55 x 0.80 x 0.10
= 0.12 m³

Total Volume = 0.99 m³

Lantai Kerja
Volume = P x L x T
= 1.20 x 1.20 x 0.10 x 6.00
= 0.86 m³

Pondasi batu kali = P x L x T


= 1.55 x 0.30 + 0.80 x 0.80
###
= 0.68 m³
Foot Plat
Beton = P x L x T
= 1.50 x 1.50 x 0.25 x 6.00
= 3.38 m³

Besi I = P x jml besi x bj x jml


= 1.70 x 10.00 x 0.89 x 6.00
= 90.47 kg
II = 1.45 x 10.00 x 0.89 x 6.00
= 77.17
III = P x jml besi x bj x jml
= 1.70 x 10.00 x 0.89 x 6.00
= 90.47 kg
IV = 1.45 x 10.00 x 0.89 x 6.00
= 77.17

TOTAL = 335.29 kg

Begesting = P x L x Jml
= 6.00 x 0.25 x 6.00
= 9.00 m2
Kolom 35 / 35 (K1)
Beton = P x L x T
= 0.35 x 0.35 x 5.00 x 6.00
= 3.68 m³
PERHITUNGAN VOLUME

SKET / GAMBAR VOLUME PEKERJAAN


Besi I = P x jml besi x bj x jml
= 5.10 x 8.00 x 3.85 x 6.00
= 943.46 kg
II = 5.10 x 2.00 x 1.38 x 6.00
= 84.27 kg
IV = 1.10 x 34.00 x 0.39 x 6.00
= 86.84
TOTAL = 1,114.57 kg

Begesting = P x L x Jml
= 1.30 x 5.00 x 6.00
= 39.00 m2

Kolom 15 / 20 (K2)
Beton = P x L x T
= 0.15 x 0.20 x 3.60 x 14.00
= 1.51 m³

Kolom 15 / 15 (K3)
Beton = P x L x T
= 0.15 x 0.15 x 3.60 x 1.00
= 0.08 m³

Sloof 20 / 30 ( SL )
Beton = P x L x T
= 32.05 x 0.20 x 0.30 x 1.00
= 1.92 m³

Besi I = P x jml besi x bj x jml


= 32.05 x 5.00 x 1.38 x 1.00
= 220.66 kg
II = 32.05 x 2.00 x 0.89 x 1.00
= 56.86
III = P x jml besi x bj x jml
= 0.94 x 213.67 x 0.39 x 1.00
= 77.73 kg

TOTAL = 355.25 kg

Begesting = P x L x Jml
= 32.05 x 0.30 x 1.00
= 9.62 m2

SKET / GAMBAR VOLUME PEKERJAAN

Balok 25 / 40 (B1)
Beton = P x L x T
= 42.25 x 0.25 x 0.40 x 1.00
= 4.23 m³

Besi I = P x jml besi x bj x jml


= 42.25 x 5.00 x bj x 1.00
= #VALUE! kg
II = 42.25 x 2.00 x - x 1.00
= -
PERHITUNGAN VOLUME

SKET / GAMBAR VOLUME PEKERJAAN


III = P x jml besi x bj x jml
= 0.94 x 281.67 x - x 1.00
= - kg

TOTAL = #VALUE! kg

Begesting = P x L x Jml
= 42.25 x 0.30 x 1.00
= 12.68 m2
Balok 20 / 35 (B2)
Beton = P x L x T
= 4.15 x 0.20 x 0.35 x 1.00
= 0.29 m³

Balok 15 / 30 (B3)
Beton = P x L x T
= 27.15 x 0.15 x 0.30 x 1.00
= 1.22 m³

Balok 20 / 30 (RB1)
Beton = P x L x T
= 22.65 x 0.20 x 0.30 x 1.00
= 1.36 m³

Balok 15 / 20 (RB2)
Beton = P x L x T
= 28.65 x 0.15 x 0.20 x 1.00
= 0.86 m³

Balok 25 / 40 (Tangga)
Beton = P x L x T
= 1.20 x 0.25 x 0.40 x 3.00
= 0.36 m³

Plat Lantai = P x L x T tangga


= 7.55 x 9.80 x 0.12 - 3.71
= 5.17 m³

Tangga Plat = P x L x T
= 7.05 x 1.35 x 0.15
= 1.43 m3

Trap = P x L x T x jml
= 0.25 x 1.35 x 0.09 x 19.00
= 0.58 m3

Total Plat Tangga = 2.00 m3

Kolom Gunungan
= P x L x T
= 0.15 x 0.20 x 2.54
= 0.08 m³

Ring Gunungan
= P x L x T
= 11.50 x 0.15 x 0.20
= 0.35 m³

Pekerjaan Pas. Bata 1: 3 KM/WC


PERHITUNGAN VOLUME

SKET / GAMBAR VOLUME PEKERJAAN


dinding = P x L x T
= - 1.00 1.50
= - m2

SKET / GAMBAR VOLUME PEKERJAAN

Pekerjaan Pas. Bata 1: 3 : 10


A dinding = P x L x T
= 7.85 7.85 3.50
= 215.68 m2
Luas Pintu Jendela
jendela 1 = P x L x Jml
= 2.03 0.52 2.00
= 2.11
jendela 2 = P x L x Jml
= 1.38 1.38 2.00
= 3.81
pintu 1 = P x L x Jml
= 0.80 2.52 1.00
= 2.02
Jumlah = 7.94
volume dinding = 215.68 - 7.94
= 207.74 m2

gunungan = - x L x T
= - x 9.80 x 2.54
= - m2

Tangga = P x L x T
= - 1.00 3.50
= - m2

Total pas. Bata = 207.74 m2

Pekerjaan Plester + acian 1 : 3


Pas. Bata Volume = L. pas bata x Jml
= - x 2.00
= - m2

Pekerjaan Plester + acian 1 : 3 : 10


Pas. Bata Volume = L. pas bata x Jml
= 207.74 x 2.00
= 415.49 m2

Pekerjaan Urugan Pasir Bawah Lantai


1.00 = P x L x T
= 6.05 9.65 0.05
= 2.92 m3
2.00 = P x L x T
= 4.00 1.50 x 0.05
= 0.30 m2
KM / WC = P x L x T
= - 1.35 x 0.05
= - m2
PERHITUNGAN VOLUME

SKET / GAMBAR VOLUME PEKERJAAN


Total Urugan pasir = 3.22 m3

Pekerjaan Keramik 30 x 30
Lantai ruangan = P x L
= 7.85 7.85
= 61.62 m2
teras = P x L
= 4.00 1.73
= 6.92 m2
Tangga - Trap 1 = P x L x jml
= - x 1.35 x 19.00
= -
- Trap 2 = P x L x jml
= - x 1.35 x 19.00
= -
Bordes = P x L
- 1.22
- m2

SKET / GAMBAR VOLUME PEKERJAAN

Total Pas. Keramik = 68.54 m2

Pekerjaan Keramik 20 x20


= P x L
= 1.50 1.35
= 2.03 m2

Pekerjaan Keramik 20 x25


= P x L
= 6.00 1.50
= 9.00 m2

Rabat Beton = P x L x T
= 8.12 11.60 x 0.05
= 4.71 m3

Pekerjaan Kuda - kuda jml 3.00 bh

Balok Tarik = 7.00 m'


= 7.00 x 0.14 x 0.08
= 0.08 m3
Kaki kuda kuda = 5.61 m'
= 5.61 x 0.12 x 0.08 x 2.00
= 0.11 m3
Ander = 6.42 m'
= 6.42 x 0.12 x 0.08
= 0.06 m3
skur = 3.51
= 3.51 x 0.12 x 0.08 x 2.00
= 0.07 m3
Box = 1.00
= 1.00 x 0.12 x 0.08 x 3.00
= 0.03 m3
PERHITUNGAN VOLUME

SKET / GAMBAR VOLUME PEKERJAAN


Gapit = 4.91
= 4.91 x 0.12 x 0.06
= 0.04 m3
Kres Angin = 2.68
= 2.68 x 0.12 x 0.06 x 2.00
= 0.04 m3

Pekerjaan 1/2 Kuda - kuda jml - bh

Balok Tarik = 5.00 m'


= 5.00 x 0.14 x 0.08
= 0.06 m3
Kaki kuda kuda = 5.61 m'
= 5.61 x 0.12 x 0.08 x 1.00
= 0.05 m3
Ander = 5.18 m'
= 5.18 x 0.12 x 0.08
= 0.05 m3
skur = 3.92
= 3.92 x 0.12 x 0.08 x 1.00
= 0.04 m3
Box = 1.00
= 1.00 x 0.12 x 0.08 x 1.00
= 0.01 m3
Gapit = 4.41
= 4.41 x 0.12 x 0.06
= 0.03 m3
total 1/2 kuda2 = 0.24 m3
= 0.24 x 2.00
= 0.48

Total Kuda - kuda = 0.42 x 3.00


= 1.25 m3

grand total kuda2 = 1.73 m3

Pekerjaan Nok Nok = 21.20 m'


jurai 9.67 x -
= 21.20 x 0.12 x 0.08
= 0.20 m3
Skur nok = - m'
= - x 0.12 x 0.08 x 7.00
= - m3

Pekerjaan Gording, muplat = 17.68 x 2.00 = 35.36


12.30 x 2.00 = 24.60
7.04 x 2.00 = 14.08
= 74.04 x 0.12 x 0.08

= 0.71 m3 x 0.50
= 0.36 m3
Usuk Reng Depan = 2.00 m'
= 14.80 m'
= 6.74
= 8.40 x 6.74 x 2.00
= 113.23 m2
Belakang = 13.78 m'
= 6.94 m'
PERHITUNGAN VOLUME

SKET / GAMBAR VOLUME PEKERJAAN


= 6.89 x 6.94 x 2.00
= 95.63 m2
tritis = 1.00
= 14.80
= 14.80 m2
Total = 223.67 m2 x 0.50
= 111.83 m2
Bubungan Genteng = 40.68 m'

Lisplank = 28.58 x 2.00


= 57.16 m'

Pekerjaan Kusen Pintu Jendela


Jendela = 17.64
= 17.64 x 0.12 x 0.06 x 1.00
= 0.13 m3
Total Kusen = 0.13 m3

Pekerjaan Cat Kusen Pintu Jendela


1.00 = 17.64
= 17.64 x 0.24
= 4.23 m2
Total Cat Kayu = 4.23 m2

Temanggung, April 2019

Dibuat Oleh
Konsultan Perencana
CV. KARISMA PERSADA

ARIF SETYONO, ST
Direktur
TIME SCHEDULE
KEGIATAN : DAK BIDANG LINKUNGAN HIDUP
PEKERJAAN : PEMBANGUNAN GEDUNG BANK SAMPAH
LOKASI : KABUPATEN TEMANGGUNG
TAHUN ANGGARAN : 2018

Jangka Waktu Pelaksanaan 90 Hari Kalender


NO URAIAN PEKERJAAN BOBOT Mei Juni Juli Agustus KETERANGAN
% 16s/d19 20s/d26 27s/d02 03s/d09 10s/d16 17s/d23 24s/d30 01s/d07 08s/d14 15s/d21 22s/d28 29s/d04 05s/d11 12s/d16
I PEKERJAAN PERSIAPAN 100
1 Pengukuran/Bouplank 12.78 12.78
2 Papan Nama Kegiatan 0.00 0.00
II PEKERJAAN TANAH
1 Pek. Galian Tanah #REF! #REF!
2 Pek. Urugan Tanah Kembali #REF! #REF!
3 Pek. Urugan Pasir #REF! #REF!
III PEKERJAAN PASANGAN
1 Pek. Pas. Batu Belah 1 : 3 : 10 #REF! #REF! #REF!
2 Pek. Pas. Batu bata 1:3 tebal 1/2 bata 0.00 0.00
3 Pek. Pas. Batu bata 1:3:10 tebal 1/2 bata #REF! #REF! #REF!
4 Pek. Plesteran 1:3 #REF! #REF!
5 Pek. Plesteran 1:2:8 0.00 0.00 0.00
6 Pek. Acian 0.00 0.00
IV PEKERJAAN LANTAI
1 Pek. Urugan Pasir Bawah Lantai #REF! #REF!
2 Pas. Keramik 40 X 40 #REF! #REF!
3 Pas. Keramik 20 x 20 #REF! #REF!
4 Pas. Keramik Dinding 20 x25 #REF! #REF!
5 Pek. Rabat beton T = 10 cm #REF! #REF!
6 Pembesian Lantai Rabat beton Ø 8mm #REF! #REF!
V PEKERJAAN BETON 75
1 Pek. Sloof 15/20
Adukan Beton 0.00 0.00
Pembesian 0.00 0.00
Begesting 0.00 0.00
2 Pek. Kolom Praktis 15/15 Libur Hari Raya
Adukan Beton 0.00 0.00
Pembesian 0.00 0.00
Begesting 0.00 0.00
3 Pek. Ring Balk 15/20
Adukan Beton #REF! #REF!
Pembesian #REF! #REF!
Begesting 0.00 0.00
4 Pek. Balok Latai 12/12
Adukan Beton 0.00 0.00
Pembesian 0.00 0.00
Begesting 0.00 0.00
VI PEKERJAAN KAYU DAN KACA
1 Pek. Kusen Kayu Bangkirai 0.00 0.00 0.00
2 Pek. Daun Pintu Panil Rk Kayu Bangkirai #REF! #REF!
3 Pek. Daun Jendela Kaca 5 mm 0.00 0.00
4 Pas. Kaca 5 mm 0.00 0.00 50
5 Pas. Pintu PVC #REF! #REF!
6 Pas. Dinding Kawat Harmonika Rangka
Besi Siku 50.50.5 Rangkap #REF! #REF!
7 Pas. Pintu Kawat Harmonika Rangka
Pipa GI Ø 1,5 " #REF! #REF!
VII PEKERJAAN RANGKA ATAP
1 Pas. Rangka Atap Baja ringan #REF! #REF!
VIII PEKERJAAN PENUTUP ATAP
1 Pas. Atap Galvalume #REF! #REF!
2 Pas. Bubungan Galvalume #REF! #REF!
IX PEKERJAAN LANGIT - LANGIT
1 Pas. Rangka Plafond besi Hollow 0.00 0.00
2 Pas. Penutup Plafond Saplek #REF! #REF!
3 Pas. List Plafond Kayu Profil #REF! #REF!
X PEKERJAAN PENGGANTUNG DAN PENGUNCI #REF!
1 Pas. Slot pintu #REF! #REF!
2 Pas. Engsel pintu #REF! #REF!
3 Pas. Grendel Pintu #REF! #REF!
4 Pas. Engsel Jendela #REF! #REF!
5 Pas. Grendel Jendela #REF! #REF!
6 Pas. Handle Jendela #REF! #REF!
7 Pas. Kait Angin #REF! 25
XI PEKERJAAN CAT - CATAN
1 Pek. Cat Tembok #REF! #REF!
2 Pek. Cat Plafond 0.00 0.00
3 Pek. Cat Kayu 0.00 0.00
XII PEKERJAAN KM/WC
1 Penyambungan PDAM #REF! #REF!
2 Pas. Instalasi Air Bersih Ø 3/4" #REF! #REF!
3 Pek. Instalasi Air Kotor Ø 3" #REF! #REF!
4 Pas. Bak Mandi Fiber #REF! #REF!
5 Pas. Kloset jongkok #REF! #REF!
6 Pas. Floordrain #REF! #REF!
7 Pas. Kran Air #REF! #REF!
8 Septictank dan Resapan #REF! #REF!
XIII PEKERJAAN INTALASI LISTRIK
1 Penyambungan Listrik + Pulsa 100 rb #REF! #REF!
2 Pas. Instalasi Listrik #REF! #REF!
3 Pas. Stop Kontak #REF! #REF!
4 Pas. Saklar Ganda #REF! #REF!
5 Pas. Saklar Tunggal #REF! #REF!
6 Pas. Lampu SL 18 watt #REF! #REF!
7 Pas. Lampu SL 5 watt #REF! #REF! 0
Jumlah Total 12.78 #REF! #REF! #REF! 0.00 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Rencana 12.78 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF!
Pelaksanaan #REF! #REF! #VALUE! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Deviasi (+/-) #REF! #REF! #VALUE! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Diperiksa : Dibuat :
Konsultan Pengawas Kontraktor Pelaksanan
CV. BARUNA JAYA CV. NJ MAJU

EKO HARI TRIYANTO ARIF CHABIBI


Inspector Pelaksana
20
Lapiran Berita Acara Uitzet

KEGIATAN : DAK BIDANG LINKUNGAN HIDUP


PEKERJAAN : PEMBANGUNAN GEDUNG BANK SAMPAH
LOKASI : TPA SRANGGRAHAN KECAMATAN KRANGGAN TEMANGGUNG
TAHUN ANGGARAN : 2018

Volume Volume
No Uraian Pekerjaan Sat. Keterangan
Kontrak Lapangan

I PEKERJAAN PERSIAPAN
1 Pengukuran/Bouplank ls 1.000 1.000 Tetap
2 Papan Nama Kegiatan bh 1.000 1.000 Tetap

II PEKERJAAN TANAH
1 Pek. Galian Tanah m3 #REF! #REF! Tetap
2 Pek. Urugan Tanah Kembali m3 #REF! #REF! Tetap
3 Pek. Urugan Pasir m3 #REF! #REF! Tetap

III PEKERJAAN PASANGAN


1 Pek. Pas. Batu Belah 1 : 3 : 10 m3 #REF! #REF! Tetap
2 Pek. Pas. Batu bata 1:3 tebal 1/2 bata m2 #REF! #REF! Tetap
3 Pek. Pas. Batu bata 1:3:10 tebal 1/2 bata m2 #VALUE! #VALUE! Tetap
4 Pek. Plesteran 1:3 m2 #REF! #REF! Tetap
5 Pek. Plesteran 1:2:8 m2 #REF! #REF! Tetap
6 Pek. Acian m2 #REF! #REF! Tetap

IV PEKERJAAN LANTAI
1 Pek. Urugan Pasir Bawah Lantai m3 #REF! #REF! Tetap
2 Pas. Keramik 40 X 40 m2 #REF! #REF! Tetap
3 Pas. Keramik 20 x 20 m2 #REF! #REF! Tetap
4 Pas. Keramik Dinding 20 x25 m2 #REF! #REF! Tetap
5 Pek. Rabat beton T = 10 cm m3 #REF! #REF! Tetap
6 Pembesian Lantai Rabat beton Ø 8mm kg #REF! #REF! Tetap

V PEKERJAAN BETON
1 Pek. Sloof 15/20
Adukan Beton m3 #REF! #REF! Tetap
Pembesian kg #VALUE! #VALUE! Tetap
Begesting m2 #REF! #REF! Tetap
2 Pek. Kolom Praktis 15/15 0.000 Tetap
Adukan Beton m3 #REF! #REF! Tetap
Pembesian kg #VALUE! #VALUE! Tetap
Begesting m2 #REF! #REF! Tetap
3 Pek. Ring Balk 15/20
Adukan Beton m3 #REF! #REF! Tetap
Pembesian kg #VALUE! #VALUE! Tetap
Begesting m2 #REF! #REF! Tetap
4 Pek. Balok Latai 12/12
Adukan Beton m3 #REF! #REF! Tetap
Pembesian kg #VALUE! #VALUE! Tetap
Begesting m2 #REF! #REF! Tetap

VI PEKERJAAN KAYU DAN KACA


1 Pek. Kusen Kayu Bangkirai m3 #REF! #REF! Tetap
2 Pek. Daun Pintu Panil Rk Kayu Bangkirai m2 #REF! #REF! Tetap
3 Pek. Daun Jendela Kaca 5 mm m2 #REF! #REF! Tetap
4 Pas. Kaca 5 mm m2 #REF! #REF! Tetap
5 Pas. Pintu PVC bh 1.000 1.000 Tetap
6 Pas. Dinding Kawat Harmonika Rangka
Besi Siku 50.50.5 Rangkap m2 #REF! #REF! Tetap
7 Pas. Pintu Kawat Harmonika Rangka
Pipa GI Ø 1,5 " m2 #REF! #REF! Tetap

VII PEKERJAAN RANGKA ATAP


1 Pas. Rangka Atap Baja ringan m2 #REF! #REF! Tetap

VIII PEKERJAAN PENUTUP ATAP


1 Pas. Atap Galvalume m2 #REF! #REF! Tetap
2 Pas. Bubungan Galvalume m' #REF! #REF! Tetap

IX PEKERJAAN LANGIT - LANGIT


1 Pas. Rangka Plafond besi Hollow m2 #REF! #REF! Tetap
2 Pas. Penutup Plafond Saplek m2 #REF! #REF! Tetap
3 Pas. List Plafond Kayu Profil m' #REF! #REF! Tetap
No Uraian Pekerjaan Sat. Volume Volume Keterangan

X PEKERJAAN PENGGANTUNG DAN PENGUNCI


1 Pas. Slot pintu bh 2.000 2.000 Tetap
2 Pas. Engsel pintu bh 6.000 6.000 Tetap
3 Pas. Grendel Pintu bh 1.000 1.000 Tetap
4 Pas. Engsel Jendela bh 12.000 12.000 Tetap
5 Pas. Grendel Jendela bh 12.000 12.000 Tetap
6 Pas. Handle Jendela bh 6.000 6.000 Tetap
7 Pas. Kait Angin bh 12.000 12.000 Tetap

XI PEKERJAAN CAT - CATAN


1 Pek. Cat Tembok m2 #REF! #REF! Tetap
2 Pek. Cat Plafond m2 #REF! #REF! Tetap
3 Pek. Cat Kayu m2 #REF! #REF! Tetap

XII PEKERJAAN KM/WC


1 Penyambungan PDAM ls 1.000 1.000 Tetap
2 Pas. Instalasi Air Bersih Ø 3/4" m' 12.000 12.000 Tetap
3 Pek. Instalasi Air Kotor Ø 3" m' 6.000 6.000 Tetap
4 Pas. Bak Mandi Fiber bh 1.000 1.000 Tetap
5 Pas. Kloset jongkok bh 1.000 1.000 Tetap
6 Pas. Floordrain bh 1.000 1.000 Tetap
7 Pas. Kran Air bh 1.000 1.000 Tetap
8 Septictank dan Resapan unit 1.000 1.000 Tetap

XIII PEKERJAAN INTALASI LISTRIK


1 Penyambungan Listrik + Pulsa 100 rb paket 1.000 1.000 Tetap
2 Pas. Instalasi Listrik titik 8.000 8.000 Tetap
3 Pas. Stop Kontak bh 2.000 2.000 Tetap
4 Pas. Saklar Ganda bh 2.000 2.000 Tetap
5 Pas. Saklar Tunggal bh 3.000 3.000 Tetap
6 Pas. Lampu SL 18 watt bh 6.000 6.000 Tetap
7 Pas. Lampu SL 5 watt bh 1.000 1.000 Tetap

Konsultan Pengawas Kontraktor Pelaksanan


CV. BARUNA JAYA CV. NJ MAJU

EKO HARI TRIYANTO ARIF CHABIBI


Inspector Pelaksana

Mengetahui
#REF!

#REF!
#REF!
LAPORAN KEMAJUAN PEKERJAAN

Minggu Ke : I (satu) : Tanggal 16-May-18 s/d 19-May-18


KEGIATAN : DAK BIDANG LINKUNGAN HIDUP
PEKERJAAN : PEMBANGUNAN GEDUNG BANK SAMPAH
LOKASI : TPA SRANGGRAHAN KECAMATAN KRANGGAN TEMANGGUNG
TAHUN ANGGARAN : 2018

Realisasi Kemajuan Pekerjaan


Nilai s/d Dalam s/d Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Minggu ini Bobot
% lalu Ini Volume (%)
I PEKERJAAN PERSIAPAN
1 Pengukuran/Bouplank 1.000 ls 12.78 1.00 1.00 12.78
2 Papan Nama Kegiatan 1.000 bh 0.00

II PEKERJAAN TANAH
1 Pek. Galian Tanah #REF! m3 #REF! #REF! #REF! #REF!
2 Pek. Urugan Tanah Kembali #REF! m3 #REF!
3 Pek. Urugan Pasir #REF! m3 #REF!

III PEKERJAAN PASANGAN


1 Pek. Pas. Batu Belah 1 : 3 : 10 #REF! m3 #REF!
2 Pek. Pas. Batu bata 1:3 tebal 1/2 bata #REF! m2 0.00
3 Pek. Pas. Batu bata 1:3:10 tebal 1/2 bata #VALUE! m2 #REF!
4 Pek. Plesteran 1:3 #REF! m2 #REF!
5 Pek. Plesteran 1:2:8 #REF! m2 0.00
6 Pek. Acian #REF! m2 0.00

IV PEKERJAAN LANTAI
1 Pek. Urugan Pasir Bawah Lantai #REF! m3 #REF!
2 Pas. Keramik 40 X 40 #REF! m2 #REF!
3 Pas. Keramik 20 x 20 #REF! m2 #REF!
4 Pas. Keramik Dinding 20 x25 #REF! m2 #REF!
5 Pek. Rabat beton T = 10 cm #REF! m3 #REF!
6 Pembesian Lantai Rabat beton Ø 8mm #REF! kg #REF!

V PEKERJAAN BETON
1 Pek. Sloof 15/20
Adukan Beton #REF! m3 0.00
Pembesian #VALUE! kg 0.00
Begesting #REF! m2 0.00
2 Pek. Kolom Praktis 15/15
Adukan Beton #REF! m3 0.00
Pembesian #VALUE! kg 0.00
Begesting #REF! m2 0.00
3 Pek. Ring Balk 15/20
Adukan Beton #REF! m3 #REF!
Pembesian #VALUE! kg #REF!
Begesting #REF! m2 0.00
4 Pek. Balok Latai 12/12
Adukan Beton #REF! m3 0.00
Pembesian #VALUE! kg 0.00
Begesting #REF! m2 0.00

VI PEKERJAAN KAYU DAN KACA


1 Pek. Kusen Kayu Bangkirai #REF! m3 0.00
2 Pek. Daun Pintu Panil Rk Kayu Bangkirai #REF! m2 #REF!
3 Pek. Daun Jendela Kaca 5 mm #REF! m2 0.00
4 Pas. Kaca 5 mm #REF! m2 0.00
5 Pas. Pintu PVC 1.000 bh #REF!
6 Pas. Dinding Kawat Harmonika Rangka
Besi Siku 50.50.5 Rangkap #REF! m2 #REF!
7 Pas. Pintu Kawat Harmonika Rangka
Pipa GI Ø 1,5 " #REF! m2 #REF!

VII PEKERJAAN RANGKA ATAP


1 Pas. Rangka Atap Baja ringan #REF! m2 #REF!

VIII PEKERJAAN PENUTUP ATAP


1 Pas. Atap Galvalume #REF! m2 #REF!
2 Pas. Bubungan Galvalume #REF! m' #REF!

IX PEKERJAAN LANGIT - LANGIT


1 Pas. Rangka Plafond besi Hollow #REF! m2 0.00
2 Pas. Penutup Plafond Saplek #REF! m2 #REF!
3 Pas. List Plafond Kayu Profil #REF! m' #REF!

SUB TOTAL LEMBAR A #REF!


Realisasi Kemajuan Pekerjaan
Nilai s/d Dalam s/d Minggu ini Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Volume Bobot
% lalu Ini (%)
X PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pas. Slot pintu 2.000 bh #REF!
2 Pas. Engsel pintu 6.000 bh #REF!
3 Pas. Grendel Pintu 1.000 bh #REF!
4 Pas. Engsel Jendela 12.000 bh #REF!
5 Pas. Grendel Jendela 12.000 bh #REF!
6 Pas. Handle Jendela 6.000 bh #REF!
7 Pas. Kait Angin 12.000 bh #REF!

XI PEKERJAAN CAT - CATAN


1 Pek. Cat Tembok #REF! m2 #REF!
2 Pek. Cat Plafond #REF! m2 0.00
3 Pek. Cat Kayu #REF! m2 0.00

XII PEKERJAAN KM/WC


1 Penyambungan PDAM 1.000 ls #REF!
2 Pas. Instalasi Air Bersih Ø 3/4" 12.000 m' #REF!
3 Pek. Instalasi Air Kotor Ø 3" 6.000 m' #REF!
4 Pas. Bak Mandi Fiber 1.000 bh #REF!
5 Pas. Kloset jongkok 1.000 bh #REF!
6 Pas. Floordrain 1.000 bh #REF!
7 Pas. Kran Air 1.000 bh #REF!
8 Septictank dan Resapan 1.000 unit #REF!

XIII PEKERJAAN INTALASI LISTRIK


1 Penyambungan Listrik + Pulsa 100 rb 1.000 paket #REF!
2 Pas. Instalasi Listrik 8.000 titik #REF!
3 Pas. Stop Kontak 2.000 bh #REF!
4 Pas. Saklar Ganda 2.000 bh #REF!
5 Pas. Saklar Tunggal 3.000 bh #REF!
6 Pas. Lampu SL 18 watt 6.000 bh #REF!
7 Pas. Lampu SL 5 watt 1.000 bh #REF!

SUB TOTAL LEMBAR B 0.00

Realisasi Fisik s/d Minggu ini #REF!

Rencana Time Schedule 12.78

Deviasi (+/-) Cepat / Lambat #REF!

Diperiksa : Dibuat :
Konsultan Pengawas Kontraktor Pelaksanan
CV. BARUNA JAYA CV. NJ MAJU

EKO HARI TRIYANTO ARIF CHABIBI


Inspector Pelaksana
LAPORAN KEMAJUAN PEKERJAAN

Minggu Ke : II (dua) : Tanggal 20-May-18 s/d 26-May-18


KEGIATAN : DAK BIDANG LINKUNGAN HIDUP
PEKERJAAN : PEMBANGUNAN GEDUNG BANK SAMPAH
LOKASI : TPA SRANGGRAHAN KECAMATAN KRANGGAN TEMANGGUNG
TAHUN ANGGARAN : 2018

Realisasi Kemajuan Pekerjaan


Nilai s/d Dalam s/d Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Minggu ini Bobot
% lalu Ini Volume (%)
I PEKERJAAN PERSIAPAN
1 Pengukuran/Bouplank 1.000 ls 12.78 1.00 1.00 12.78
2 Papan Nama Kegiatan 1.000 bh 0.00

II PEKERJAAN TANAH
1 Pek. Galian Tanah #REF! m3 #REF! #REF! #REF! #REF! #REF!
2 Pek. Urugan Tanah Kembali #REF! m3 #REF!
3 Pek. Urugan Pasir #REF! m3 #REF! #REF! #REF! #REF!

III PEKERJAAN PASANGAN


1 Pek. Pas. Batu Belah 1 : 3 : 10 #REF! m3 #REF! #REF! #REF! #REF!
2 Pek. Pas. Batu bata 1:3 tebal 1/2 bata #REF! m2 0.00
3 Pek. Pas. Batu bata 1:3:10 tebal 1/2 bata #VALUE! m2 #REF!
4 Pek. Plesteran 1:3 #REF! m2 #REF!
5 Pek. Plesteran 1:2:8 #REF! m2 0.00
6 Pek. Acian #REF! m2 0.00

IV PEKERJAAN LANTAI
1 Pek. Urugan Pasir Bawah Lantai #REF! m3 #REF!
2 Pas. Keramik 40 X 40 #REF! m2 #REF!
3 Pas. Keramik 20 x 20 #REF! m2 #REF!
4 Pas. Keramik Dinding 20 x25 #REF! m2 #REF!
5 Pek. Rabat beton T = 10 cm #REF! m3 #REF!
6 Pembesian Lantai Rabat beton Ø 8mm #REF! kg #REF!

V PEKERJAAN BETON
1 Pek. Sloof 15/20
Adukan Beton #REF! m3 0.00
Pembesian #VALUE! kg 0.00
Begesting #REF! m2 0.00
2 Pek. Kolom Praktis 15/15
Adukan Beton #REF! m3 0.00
Pembesian #VALUE! kg 0.00
Begesting #REF! m2 0.00
3 Pek. Ring Balk 15/20
Adukan Beton #REF! m3 #REF!
Pembesian #VALUE! kg #REF!
Begesting #REF! m2 0.00
4 Pek. Balok Latai 12/12
Adukan Beton #REF! m3 0.00
Pembesian #VALUE! kg 0.00
Begesting #REF! m2 0.00

VI PEKERJAAN KAYU DAN KACA


1 Pek. Kusen Kayu Bangkirai #REF! m3 0.00
2 Pek. Daun Pintu Panil Rk Kayu Bangkirai #REF! m2 #REF!
3 Pek. Daun Jendela Kaca 5 mm #REF! m2 0.00
4 Pas. Kaca 5 mm #REF! m2 0.00
5 Pas. Pintu PVC 1.000 bh #REF!
6 Pas. Dinding Kawat Harmonika Rangka
Besi Siku 50.50.5 Rangkap #REF! m2 #REF!
7 Pas. Pintu Kawat Harmonika Rangka
Pipa GI Ø 1,5 " #REF! m2 #REF!

VII PEKERJAAN RANGKA ATAP


1 Pas. Rangka Atap Baja ringan #REF! m2 #REF!

VIII PEKERJAAN PENUTUP ATAP


1 Pas. Atap Galvalume #REF! m2 #REF!
2 Pas. Bubungan Galvalume #REF! m' #REF!

IX PEKERJAAN LANGIT - LANGIT


1 Pas. Rangka Plafond besi Hollow #REF! m2 0.00
2 Pas. Penutup Plafond Saplek #REF! m2 #REF!
3 Pas. List Plafond Kayu Profil #REF! m' #REF!

SUB TOTAL LEMBAR A #REF!


Realisasi Kemajuan Pekerjaan
Nilai s/d Dalam s/d Minggu ini Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Volume Bobot
% lalu Ini (%)
X PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pas. Slot pintu 2.000 bh #REF!
2 Pas. Engsel pintu 6.000 bh #REF!
3 Pas. Grendel Pintu 1.000 bh #REF!
4 Pas. Engsel Jendela 12.000 bh #REF!
5 Pas. Grendel Jendela 12.000 bh #REF!
6 Pas. Handle Jendela 6.000 bh #REF!
7 Pas. Kait Angin 12.000 bh #REF!

XI PEKERJAAN CAT - CATAN


1 Pek. Cat Tembok #REF! m2 #REF!
2 Pek. Cat Plafond #REF! m2 0.00
3 Pek. Cat Kayu #REF! m2 0.00

XII PEKERJAAN KM/WC


1 Penyambungan PDAM 1.000 ls #REF!
2 Pas. Instalasi Air Bersih Ø 3/4" 12.000 m' #REF!
3 Pek. Instalasi Air Kotor Ø 3" 6.000 m' #REF!
4 Pas. Bak Mandi Fiber 1.000 bh #REF!
5 Pas. Kloset jongkok 1.000 bh #REF!
6 Pas. Floordrain 1.000 bh #REF!
7 Pas. Kran Air 1.000 bh #REF!
8 Septictank dan Resapan 1.000 unit #REF!

XIII PEKERJAAN INTALASI LISTRIK


1 Penyambungan Listrik + Pulsa 100 rb 1.000 paket #REF!
2 Pas. Instalasi Listrik 8.000 titik #REF!
3 Pas. Stop Kontak 2.000 bh #REF!
4 Pas. Saklar Ganda 2.000 bh #REF!
5 Pas. Saklar Tunggal 3.000 bh #REF!
6 Pas. Lampu SL 18 watt 6.000 bh #REF!
7 Pas. Lampu SL 5 watt 1.000 bh #REF!

SUB TOTAL LEMBAR B 0.00

Realisasi Fisik s/d Minggu ini #REF!

Rencana Time Schedule #REF!

Deviasi (+/-) Cepat / Lambat #REF!

Diperiksa : Dibuat :
Konsultan Pengawas Kontraktor Pelaksanan
CV. BARUNA JAYA CV. NJ MAJU

EKO HARI TRIYANTO ARIF CHABIBI


Inspector Pelaksana
LAPORAN KEMAJUAN PEKERJAAN

Minggu Ke : III (tiga) : Tanggal 27-May-18 s/d 2-Jun-18


KEGIATAN : DAK BIDANG LINKUNGAN HIDUP
PEKERJAAN : PEMBANGUNAN GEDUNG BANK SAMPAH
LOKASI : TPA SRANGGRAHAN KECAMATAN KRANGGAN TEMANGGUNG
TAHUN ANGGARAN : 2018

Realisasi Kemajuan Pekerjaan


Nilai s/d Dalam s/d Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Minggu ini Bobot
% lalu Ini Volume (%)
I PEKERJAAN PERSIAPAN
1 Pengukuran/Bouplank 1.000 ls 12.78 1.00 1.00 12.78
2 Papan Nama Kegiatan 1.000 bh 0.00 1.00 1.00 0.00

II PEKERJAAN TANAH
1 Pek. Galian Tanah #REF! m3 #REF! #REF! #REF! #REF!
2 Pek. Urugan Tanah Kembali #REF! m3 #REF! #REF! #REF! #REF!
3 Pek. Urugan Pasir #REF! m3 #REF! #REF! #REF! #REF!

III PEKERJAAN PASANGAN


1 Pek. Pas. Batu Belah 1 : 3 : 10 #REF! m3 #REF! #REF! #REF! #REF!
2 Pek. Pas. Batu bata 1:3 tebal 1/2 bata #REF! m2 0.00
3 Pek. Pas. Batu bata 1:3:10 tebal 1/2 bata #VALUE! m2 #REF!
4 Pek. Plesteran 1:3 #REF! m2 #REF!
5 Pek. Plesteran 1:2:8 #REF! m2 0.00
6 Pek. Acian #REF! m2 0.00

IV PEKERJAAN LANTAI
1 Pek. Urugan Pasir Bawah Lantai #REF! m3 #REF!
2 Pas. Keramik 40 X 40 #REF! m2 #REF!
3 Pas. Keramik 20 x 20 #REF! m2 #REF!
4 Pas. Keramik Dinding 20 x25 #REF! m2 #REF!
5 Pek. Rabat beton T = 10 cm #REF! m3 #REF!
6 Pembesian Lantai Rabat beton Ø 8mm #REF! kg #REF!

V PEKERJAAN BETON
1 Pek. Sloof 15/20
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
2 Pek. Kolom Praktis 15/15
Adukan Beton #REF! m3 0.00
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00
3 Pek. Ring Balk 15/20
Adukan Beton #REF! m3 #REF!
Pembesian #VALUE! kg #REF!
Begesting #REF! m2 0.00
4 Pek. Balok Latai 12/12
Adukan Beton #REF! m3 0.00
Pembesian #VALUE! kg 0.00
Begesting #REF! m2 0.00

VI PEKERJAAN KAYU DAN KACA


1 Pek. Kusen Kayu Bangkirai #REF! m3 0.00
2 Pek. Daun Pintu Panil Rk Kayu Bangkirai #REF! m2 #REF!
3 Pek. Daun Jendela Kaca 5 mm #REF! m2 0.00
4 Pas. Kaca 5 mm #REF! m2 0.00
5 Pas. Pintu PVC 1.000 bh #REF!
6 Pas. Dinding Kawat Harmonika Rangka
Besi Siku 50.50.5 Rangkap #REF! m2 #REF!
7 Pas. Pintu Kawat Harmonika Rangka
Pipa GI Ø 1,5 " #REF! m2 #REF!

VII PEKERJAAN RANGKA ATAP


1 Pas. Rangka Atap Baja ringan #REF! m2 #REF!

VIII PEKERJAAN PENUTUP ATAP


1 Pas. Atap Galvalume #REF! m2 #REF!
2 Pas. Bubungan Galvalume #REF! m' #REF!

IX PEKERJAAN LANGIT - LANGIT


1 Pas. Rangka Plafond besi Hollow #REF! m2 0.00
2 Pas. Penutup Plafond Saplek #REF! m2 #REF!
3 Pas. List Plafond Kayu Profil #REF! m' #REF!

SUB TOTAL LEMBAR A #VALUE!


Realisasi Kemajuan Pekerjaan
Nilai s/d Dalam s/d Minggu ini Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Volume Bobot
% lalu Ini (%)
X PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pas. Slot pintu 2.000 bh #REF!
2 Pas. Engsel pintu 6.000 bh #REF!
3 Pas. Grendel Pintu 1.000 bh #REF!
4 Pas. Engsel Jendela 12.000 bh #REF!
5 Pas. Grendel Jendela 12.000 bh #REF!
6 Pas. Handle Jendela 6.000 bh #REF!
7 Pas. Kait Angin 12.000 bh #REF!

XI PEKERJAAN CAT - CATAN


1 Pek. Cat Tembok #REF! m2 #REF!
2 Pek. Cat Plafond #REF! m2 0.00
3 Pek. Cat Kayu #REF! m2 0.00

XII PEKERJAAN KM/WC


1 Penyambungan PDAM 1.000 ls #REF!
2 Pas. Instalasi Air Bersih Ø 3/4" 12.000 m' #REF!
3 Pek. Instalasi Air Kotor Ø 3" 6.000 m' #REF!
4 Pas. Bak Mandi Fiber 1.000 bh #REF!
5 Pas. Kloset jongkok 1.000 bh #REF!
6 Pas. Floordrain 1.000 bh #REF!
7 Pas. Kran Air 1.000 bh #REF!
8 Septictank dan Resapan 1.000 unit #REF!

XIII PEKERJAAN INTALASI LISTRIK


1 Penyambungan Listrik + Pulsa 100 rb 1.000 paket #REF!
2 Pas. Instalasi Listrik 8.000 titik #REF!
3 Pas. Stop Kontak 2.000 bh #REF!
4 Pas. Saklar Ganda 2.000 bh #REF!
5 Pas. Saklar Tunggal 3.000 bh #REF!
6 Pas. Lampu SL 18 watt 6.000 bh #REF!
7 Pas. Lampu SL 5 watt 1.000 bh #REF!

SUB TOTAL LEMBAR B 0.00

Realisasi Fisik s/d Minggu ini #VALUE!

Rencana Time Schedule #REF!

Deviasi (+/-) Cepat / Lambat #VALUE!

Diperiksa : Dibuat :
Konsultan Pengawas Kontraktor Pelaksanan
CV. BARUNA JAYA CV. NJ MAJU

EKO HARI TRIYANTO ARIF CHABIBI


Inspector Pelaksana
LAPORAN KEMAJUAN PEKERJAAN

Minggu Ke : IV (empat) : Tanggal 3-Jun-18 s/d 9-Jun-18


KEGIATAN : DAK BIDANG LINKUNGAN HIDUP
PEKERJAAN : PEMBANGUNAN GEDUNG BANK SAMPAH
LOKASI : TPA SRANGGRAHAN KECAMATAN KRANGGAN TEMANGGUNG
TAHUN ANGGARAN : 2018

Realisasi Kemajuan Pekerjaan


Nilai s/d Dalam s/d Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Minggu ini Bobot
% lalu Ini Volume (%)
I PEKERJAAN PERSIAPAN
1 Pengukuran/Bouplank 1.000 ls 12.78 1.00 1.00 12.78
2 Papan Nama Kegiatan 1.000 bh 0.00 1.00 1.00 0.00

II PEKERJAAN TANAH
1 Pek. Galian Tanah #REF! m3 #REF! #REF! #REF! #REF!
2 Pek. Urugan Tanah Kembali #REF! m3 #REF! #REF! #REF! #REF!
3 Pek. Urugan Pasir #REF! m3 #REF! #REF! #REF! #REF!

III PEKERJAAN PASANGAN


1 Pek. Pas. Batu Belah 1 : 3 : 10 #REF! m3 #REF! #REF! #REF! #REF!
2 Pek. Pas. Batu bata 1:3 tebal 1/2 bata #REF! m2 0.00 #REF! #REF! #REF!
3 Pek. Pas. Batu bata 1:3:10 tebal 1/2 bata #VALUE! m2 #REF! #VALUE! #VALUE! #VALUE!
4 Pek. Plesteran 1:3 #REF! m2 #REF!
5 Pek. Plesteran 1:2:8 #REF! m2 0.00
6 Pek. Acian #REF! m2 0.00

IV PEKERJAAN LANTAI
1 Pek. Urugan Pasir Bawah Lantai #REF! m3 #REF!
2 Pas. Keramik 40 X 40 #REF! m2 #REF!
3 Pas. Keramik 20 x 20 #REF! m2 #REF!
4 Pas. Keramik Dinding 20 x25 #REF! m2 #REF!
5 Pek. Rabat beton T = 10 cm #REF! m3 #REF!
6 Pembesian Lantai Rabat beton Ø 8mm #REF! kg #REF!

V PEKERJAAN BETON
1 Pek. Sloof 15/20
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
2 Pek. Kolom Praktis 15/15
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
3 Pek. Ring Balk 15/20
Adukan Beton #REF! m3 #REF!
Pembesian #VALUE! kg #REF!
Begesting #REF! m2 0.00
4 Pek. Balok Latai 12/12
Adukan Beton #REF! m3 0.00
Pembesian #VALUE! kg 0.00
Begesting #REF! m2 0.00

VI PEKERJAAN KAYU DAN KACA


1 Pek. Kusen Kayu Bangkirai #REF! m3 0.00 0.071 0.071 #REF!
2 Pek. Daun Pintu Panil Rk Kayu Bangkirai #REF! m2 #REF!
3 Pek. Daun Jendela Kaca 5 mm #REF! m2 0.00
4 Pas. Kaca 5 mm #REF! m2 0.00
5 Pas. Pintu PVC 1.000 bh #REF!
6 Pas. Dinding Kawat Harmonika Rangka
Besi Siku 50.50.5 Rangkap #REF! m2 #REF!
7 Pas. Pintu Kawat Harmonika Rangka
Pipa GI Ø 1,5 " #REF! m2 #REF!

VII PEKERJAAN RANGKA ATAP


1 Pas. Rangka Atap Baja ringan #REF! m2 #REF!

VIII PEKERJAAN PENUTUP ATAP


1 Pas. Atap Galvalume #REF! m2 #REF!
2 Pas. Bubungan Galvalume #REF! m' #REF!

IX PEKERJAAN LANGIT - LANGIT


1 Pas. Rangka Plafond besi Hollow #REF! m2 0.00
2 Pas. Penutup Plafond Saplek #REF! m2 #REF!
3 Pas. List Plafond Kayu Profil #REF! m' #REF!

SUB TOTAL LEMBAR A #REF!


Realisasi Kemajuan Pekerjaan
Nilai s/d Dalam s/d Minggu ini Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Volume Bobot
% lalu Ini (%)
X PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pas. Slot pintu 2.000 bh #REF!
2 Pas. Engsel pintu 6.000 bh #REF!
3 Pas. Grendel Pintu 1.000 bh #REF!
4 Pas. Engsel Jendela 12.000 bh #REF!
5 Pas. Grendel Jendela 12.000 bh #REF!
6 Pas. Handle Jendela 6.000 bh #REF!
7 Pas. Kait Angin 12.000 bh #REF!

XI PEKERJAAN CAT - CATAN


1 Pek. Cat Tembok #REF! m2 #REF!
2 Pek. Cat Plafond #REF! m2 0.00
3 Pek. Cat Kayu #REF! m2 0.00

XII PEKERJAAN KM/WC


1 Penyambungan PDAM 1.000 ls #REF!
2 Pas. Instalasi Air Bersih Ø 3/4" 12.000 m' #REF!
3 Pek. Instalasi Air Kotor Ø 3" 6.000 m' #REF!
4 Pas. Bak Mandi Fiber 1.000 bh #REF!
5 Pas. Kloset jongkok 1.000 bh #REF!
6 Pas. Floordrain 1.000 bh #REF!
7 Pas. Kran Air 1.000 bh #REF!
8 Septictank dan Resapan 1.000 unit #REF!

XIII PEKERJAAN INTALASI LISTRIK


1 Penyambungan Listrik + Pulsa 100 rb 1.000 paket #REF!
2 Pas. Instalasi Listrik 8.000 titik #REF!
3 Pas. Stop Kontak 2.000 bh #REF!
4 Pas. Saklar Ganda 2.000 bh #REF!
5 Pas. Saklar Tunggal 3.000 bh #REF!
6 Pas. Lampu SL 18 watt 6.000 bh #REF!
7 Pas. Lampu SL 5 watt 1.000 bh #REF!

SUB TOTAL LEMBAR B 0.00

Realisasi Fisik s/d Minggu ini #REF!

Rencana Time Schedule #REF!

Deviasi (+/-) Cepat / Lambat #REF!

Diperiksa : Dibuat :
Konsultan Pengawas Kontraktor Pelaksanan
CV. BARUNA JAYA CV. NJ MAJU

EKO HARI TRIYANTO ARIF CHABIBI


Inspector Pelaksana
LAPORAN KEMAJUAN PEKERJAAN

Minggu Ke : V (lima) : Tanggal 10-Jun-18 s/d 16-Jun-18


KEGIATAN : DAK BIDANG LINKUNGAN HIDUP
PEKERJAAN : PEMBANGUNAN GEDUNG BANK SAMPAH
LOKASI : TPA SRANGGRAHAN KECAMATAN KRANGGAN TEMANGGUNG
TAHUN ANGGARAN : 2018

Realisasi Kemajuan Pekerjaan


Nilai s/d Dalam s/d Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Minggu ini Bobot
% lalu Ini Volume (%)
I PEKERJAAN PERSIAPAN
1 Pengukuran/Bouplank 1.000 ls 12.78 1.00 1.00 12.78
2 Papan Nama Kegiatan 1.000 bh 0.00 1.00 1.00 0.00

II PEKERJAAN TANAH
1 Pek. Galian Tanah #REF! m3 #REF! #REF! #REF! #REF!
2 Pek. Urugan Tanah Kembali #REF! m3 #REF! #REF! #REF! #REF!
3 Pek. Urugan Pasir #REF! m3 #REF! #REF! #REF! #REF!

III PEKERJAAN PASANGAN


1 Pek. Pas. Batu Belah 1 : 3 : 10 #REF! m3 #REF! #REF! #REF! #REF!
2 Pek. Pas. Batu bata 1:3 tebal 1/2 bata #REF! m2 0.00 #REF! #REF! #REF!
3 Pek. Pas. Batu bata 1:3:10 tebal 1/2 bata #VALUE! m2 #REF! #VALUE! #VALUE! #VALUE!
4 Pek. Plesteran 1:3 #REF! m2 #REF!
5 Pek. Plesteran 1:2:8 #REF! m2 0.00
6 Pek. Acian #REF! m2 0.00

IV PEKERJAAN LANTAI
1 Pek. Urugan Pasir Bawah Lantai #REF! m3 #REF!
2 Pas. Keramik 40 X 40 #REF! m2 #REF!
3 Pas. Keramik 20 x 20 #REF! m2 #REF!
4 Pas. Keramik Dinding 20 x25 #REF! m2 #REF!
5 Pek. Rabat beton T = 10 cm #REF! m3 #REF!
6 Pembesian Lantai Rabat beton Ø 8mm #REF! kg #REF!

V PEKERJAAN BETON
1 Pek. Sloof 15/20
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
2 Pek. Kolom Praktis 15/15
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
3 Pek. Ring Balk 15/20
Adukan Beton #REF! m3 #REF!
Pembesian #VALUE! kg #REF!
Begesting #REF! m2 0.00
4 Pek. Balok Latai 12/12
Adukan Beton #REF! m3 0.00
Pembesian #VALUE! kg 0.00
Begesting #REF! m2 0.00

VI PEKERJAAN KAYU DAN KACA


1 Pek. Kusen Kayu Bangkirai #REF! m3 0.00 0.07 0.071 #REF!
2 Pek. Daun Pintu Panil Rk Kayu Bangkirai #REF! m2 #REF!
3 Pek. Daun Jendela Kaca 5 mm #REF! m2 0.00
4 Pas. Kaca 5 mm #REF! m2 0.00
5 Pas. Pintu PVC 1.000 bh #REF!
6 Pas. Dinding Kawat Harmonika Rangka
Besi Siku 50.50.5 Rangkap #REF! m2 #REF!
7 Pas. Pintu Kawat Harmonika Rangka
Pipa GI Ø 1,5 " #REF! m2 #REF!

VII PEKERJAAN RANGKA ATAP


1 Pas. Rangka Atap Baja ringan #REF! m2 #REF!

VIII PEKERJAAN PENUTUP ATAP


1 Pas. Atap Galvalume #REF! m2 #REF!
2 Pas. Bubungan Galvalume #REF! m' #REF!

IX PEKERJAAN LANGIT - LANGIT


1 Pas. Rangka Plafond besi Hollow #REF! m2 0.00
2 Pas. Penutup Plafond Saplek #REF! m2 #REF!
3 Pas. List Plafond Kayu Profil #REF! m' #REF!

SUB TOTAL LEMBAR A #REF!


Realisasi Kemajuan Pekerjaan
Nilai s/d Dalam s/d Minggu ini Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Volume Bobot
% lalu Ini (%)
X PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pas. Slot pintu 2.000 bh #REF!
2 Pas. Engsel pintu 6.000 bh #REF!
3 Pas. Grendel Pintu 1.000 bh #REF!
4 Pas. Engsel Jendela 12.000 bh #REF!
5 Pas. Grendel Jendela 12.000 bh #REF!
6 Pas. Handle Jendela 6.000 bh #REF!
7 Pas. Kait Angin 12.000 bh #REF!

XI PEKERJAAN CAT - CATAN


1 Pek. Cat Tembok #REF! m2 #REF!
2 Pek. Cat Plafond #REF! m2 0.00
3 Pek. Cat Kayu #REF! m2 0.00

XII PEKERJAAN KM/WC


1 Penyambungan PDAM 1.000 ls #REF!
2 Pas. Instalasi Air Bersih Ø 3/4" 12.000 m' #REF!
3 Pek. Instalasi Air Kotor Ø 3" 6.000 m' #REF!
4 Pas. Bak Mandi Fiber 1.000 bh #REF!
5 Pas. Kloset jongkok 1.000 bh #REF!
6 Pas. Floordrain 1.000 bh #REF!
7 Pas. Kran Air 1.000 bh #REF!
8 Septictank dan Resapan 1.000 unit #REF!

XIII PEKERJAAN INTALASI LISTRIK


1 Penyambungan Listrik + Pulsa 100 rb 1.000 paket #REF!
2 Pas. Instalasi Listrik 8.000 titik #REF!
3 Pas. Stop Kontak 2.000 bh #REF!
4 Pas. Saklar Ganda 2.000 bh #REF!
5 Pas. Saklar Tunggal 3.000 bh #REF!
6 Pas. Lampu SL 18 watt 6.000 bh #REF!
7 Pas. Lampu SL 5 watt 1.000 bh #REF!

SUB TOTAL LEMBAR B 0.00

Realisasi Fisik s/d Minggu ini #REF!

Rencana Time Schedule #REF!

Deviasi (+/-) Cepat / Lambat #REF!

Diperiksa : Dibuat :
Konsultan Pengawas Kontraktor Pelaksanan
CV. BARUNA JAYA CV. NJ MAJU

EKO HARI TRIYANTO ARIF CHABIBI


Inspector Pelaksana
LAPORAN KEMAJUAN PEKERJAAN

Minggu Ke : VI (enam) : Tanggal 17-Jun-18 s/d 23-Jun-18


KEGIATAN : DAK BIDANG LINKUNGAN HIDUP
PEKERJAAN : PEMBANGUNAN GEDUNG BANK SAMPAH
LOKASI : TPA SRANGGRAHAN KECAMATAN KRANGGAN TEMANGGUNG
TAHUN ANGGARAN : 2018

Realisasi Kemajuan Pekerjaan


Nilai s/d Dalam s/d Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Minggu ini Bobot
% lalu Ini Volume (%)
I PEKERJAAN PERSIAPAN
1 Pengukuran/Bouplank 1.000 ls 12.78 1.00 1.00 12.78
2 Papan Nama Kegiatan 1.000 bh 0.00 1.00 1.00 0.00

II PEKERJAAN TANAH
1 Pek. Galian Tanah #REF! m3 #REF! #REF! #REF! #REF!
2 Pek. Urugan Tanah Kembali #REF! m3 #REF! #REF! #REF! #REF!
3 Pek. Urugan Pasir #REF! m3 #REF! #REF! #REF! #REF!

III PEKERJAAN PASANGAN


1 Pek. Pas. Batu Belah 1 : 3 : 10 #REF! m3 #REF! #REF! #REF! #REF!
2 Pek. Pas. Batu bata 1:3 tebal 1/2 bata #REF! m2 0.00 #REF! #REF! #REF!
3 Pek. Pas. Batu bata 1:3:10 tebal 1/2 bata #VALUE! m2 #REF! #VALUE! #VALUE! #VALUE!
4 Pek. Plesteran 1:3 #REF! m2 #REF!
5 Pek. Plesteran 1:2:8 #REF! m2 0.00
6 Pek. Acian #REF! m2 0.00

IV PEKERJAAN LANTAI
1 Pek. Urugan Pasir Bawah Lantai #REF! m3 #REF!
2 Pas. Keramik 40 X 40 #REF! m2 #REF!
3 Pas. Keramik 20 x 20 #REF! m2 #REF!
4 Pas. Keramik Dinding 20 x25 #REF! m2 #REF!
5 Pek. Rabat beton T = 10 cm #REF! m3 #REF!
6 Pembesian Lantai Rabat beton Ø 8mm #REF! kg #REF!

V PEKERJAAN BETON
1 Pek. Sloof 15/20
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
2 Pek. Kolom Praktis 15/15
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
3 Pek. Ring Balk 15/20
Adukan Beton #REF! m3 #REF!
Pembesian #VALUE! kg #REF!
Begesting #REF! m2 0.00
4 Pek. Balok Latai 12/12
Adukan Beton #REF! m3 0.00
Pembesian #VALUE! kg 0.00
Begesting #REF! m2 0.00

VI PEKERJAAN KAYU DAN KACA


1 Pek. Kusen Kayu Bangkirai #REF! m3 0.00 0.07 0.071 #REF!
2 Pek. Daun Pintu Panil Rk Kayu Bangkirai #REF! m2 #REF!
3 Pek. Daun Jendela Kaca 5 mm #REF! m2 0.00
4 Pas. Kaca 5 mm #REF! m2 0.00
5 Pas. Pintu PVC 1.000 bh #REF!
6 Pas. Dinding Kawat Harmonika Rangka
Besi Siku 50.50.5 Rangkap #REF! m2 #REF!
7 Pas. Pintu Kawat Harmonika Rangka
Pipa GI Ø 1,5 " #REF! m2 #REF!

VII PEKERJAAN RANGKA ATAP


1 Pas. Rangka Atap Baja ringan #REF! m2 #REF!

VIII PEKERJAAN PENUTUP ATAP


1 Pas. Atap Galvalume #REF! m2 #REF!
2 Pas. Bubungan Galvalume #REF! m' #REF!

IX PEKERJAAN LANGIT - LANGIT


1 Pas. Rangka Plafond besi Hollow #REF! m2 0.00
2 Pas. Penutup Plafond Saplek #REF! m2 #REF!
3 Pas. List Plafond Kayu Profil #REF! m' #REF!

SUB TOTAL LEMBAR A #REF!


Realisasi Kemajuan Pekerjaan
Nilai s/d Dalam s/d Minggu ini Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Volume Bobot
% lalu Ini (%)
X PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pas. Slot pintu 2.000 bh #REF!
2 Pas. Engsel pintu 6.000 bh #REF!
3 Pas. Grendel Pintu 1.000 bh #REF!
4 Pas. Engsel Jendela 12.000 bh #REF!
5 Pas. Grendel Jendela 12.000 bh #REF!
6 Pas. Handle Jendela 6.000 bh #REF!
7 Pas. Kait Angin 12.000 bh #REF!

XI PEKERJAAN CAT - CATAN


1 Pek. Cat Tembok #REF! m2 #REF!
2 Pek. Cat Plafond #REF! m2 0.00
3 Pek. Cat Kayu #REF! m2 0.00

XII PEKERJAAN KM/WC


1 Penyambungan PDAM 1.000 ls #REF!
2 Pas. Instalasi Air Bersih Ø 3/4" 12.000 m' #REF!
3 Pek. Instalasi Air Kotor Ø 3" 6.000 m' #REF!
4 Pas. Bak Mandi Fiber 1.000 bh #REF!
5 Pas. Kloset jongkok 1.000 bh #REF!
6 Pas. Floordrain 1.000 bh #REF!
7 Pas. Kran Air 1.000 bh #REF!
8 Septictank dan Resapan 1.000 unit #REF!

XIII PEKERJAAN INTALASI LISTRIK


1 Penyambungan Listrik + Pulsa 100 rb 1.000 paket #REF!
2 Pas. Instalasi Listrik 8.000 titik #REF!
3 Pas. Stop Kontak 2.000 bh #REF!
4 Pas. Saklar Ganda 2.000 bh #REF!
5 Pas. Saklar Tunggal 3.000 bh #REF!
6 Pas. Lampu SL 18 watt 6.000 bh #REF!
7 Pas. Lampu SL 5 watt 1.000 bh #REF!

SUB TOTAL LEMBAR B 0.00

Realisasi Fisik s/d Minggu ini #REF!

Rencana Time Schedule #REF!

Deviasi (+/-) Cepat / Lambat #REF!

Diperiksa : Dibuat :
Konsultan Pengawas Kontraktor Pelaksanan
CV. BARUNA JAYA CV. NJ MAJU

EKO HARI TRIYANTO ARIF CHABIBI


Inspector Pelaksana
LAPORAN KEMAJUAN PEKERJAAN

Minggu Ke : VII (tujuh) : Tanggal 24-Jun-18 s/d 30-Jun-18


KEGIATAN : DAK BIDANG LINKUNGAN HIDUP
PEKERJAAN : PEMBANGUNAN GEDUNG BANK SAMPAH
LOKASI : TPA SRANGGRAHAN KECAMATAN KRANGGAN TEMANGGUNG
TAHUN ANGGARAN : 2018

Realisasi Kemajuan Pekerjaan


Nilai s/d Dalam s/d Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Minggu ini Bobot
% lalu Ini Volume (%)
I PEKERJAAN PERSIAPAN
1 Pengukuran/Bouplank 1.000 ls 12.78 1.00 1.00 12.78
2 Papan Nama Kegiatan 1.000 bh 0.00 1.00 1.00 0.00

II PEKERJAAN TANAH
1 Pek. Galian Tanah #REF! m3 #REF! #REF! #REF! #REF!
2 Pek. Urugan Tanah Kembali #REF! m3 #REF! #REF! #REF! #REF!
3 Pek. Urugan Pasir #REF! m3 #REF! #REF! #REF! #REF!

III PEKERJAAN PASANGAN


1 Pek. Pas. Batu Belah 1 : 3 : 10 #REF! m3 #REF! #REF! #REF! #REF!
2 Pek. Pas. Batu bata 1:3 tebal 1/2 bata #REF! m2 0.00 #REF! #REF! #REF!
3 Pek. Pas. Batu bata 1:3:10 tebal 1/2 bata #VALUE! m2 #REF! #VALUE! #VALUE! #VALUE! #VALUE!
4 Pek. Plesteran 1:3 #REF! m2 #REF!
5 Pek. Plesteran 1:2:8 #REF! m2 0.00
6 Pek. Acian #REF! m2 0.00

IV PEKERJAAN LANTAI
1 Pek. Urugan Pasir Bawah Lantai #REF! m3 #REF!
2 Pas. Keramik 40 X 40 #REF! m2 #REF!
3 Pas. Keramik 20 x 20 #REF! m2 #REF!
4 Pas. Keramik Dinding 20 x25 #REF! m2 #REF!
5 Pek. Rabat beton T = 10 cm #REF! m3 #REF!
6 Pembesian Lantai Rabat beton Ø 8mm #REF! kg #REF!

V PEKERJAAN BETON
1 Pek. Sloof 15/20
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
2 Pek. Kolom Praktis 15/15
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF! #REF!
3 Pek. Ring Balk 15/20
Adukan Beton #REF! m3 #REF! #REF! #REF! #REF!
Pembesian #VALUE! kg #REF! #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
4 Pek. Balok Latai 12/12
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!

VI PEKERJAAN KAYU DAN KACA


1 Pek. Kusen Kayu Bangkirai #REF! m3 0.00 0.07 #REF! #REF! #REF!
2 Pek. Daun Pintu Panil Rk Kayu Bangkirai #REF! m2 #REF!
3 Pek. Daun Jendela Kaca 5 mm #REF! m2 0.00
4 Pas. Kaca 5 mm #REF! m2 0.00
5 Pas. Pintu PVC 1.000 bh #REF!
6 Pas. Dinding Kawat Harmonika Rangka
Besi Siku 50.50.5 Rangkap #REF! m2 #REF!
7 Pas. Pintu Kawat Harmonika Rangka
Pipa GI Ø 1,5 " #REF! m2 #REF!

VII PEKERJAAN RANGKA ATAP


1 Pas. Rangka Atap Baja ringan #REF! m2 #REF!

VIII PEKERJAAN PENUTUP ATAP


1 Pas. Atap Galvalume #REF! m2 #REF!
2 Pas. Bubungan Galvalume #REF! m' #REF!

IX PEKERJAAN LANGIT - LANGIT


1 Pas. Rangka Plafond besi Hollow #REF! m2 0.00
2 Pas. Penutup Plafond Saplek #REF! m2 #REF!
3 Pas. List Plafond Kayu Profil #REF! m' #REF!

SUB TOTAL LEMBAR A #REF!


Realisasi Kemajuan Pekerjaan
Nilai s/d Dalam s/d Minggu ini Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Volume Bobot
% lalu Ini (%)
X PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pas. Slot pintu 2.000 bh #REF!
2 Pas. Engsel pintu 6.000 bh #REF!
3 Pas. Grendel Pintu 1.000 bh #REF!
4 Pas. Engsel Jendela 12.000 bh #REF!
5 Pas. Grendel Jendela 12.000 bh #REF!
6 Pas. Handle Jendela 6.000 bh #REF!
7 Pas. Kait Angin 12.000 bh #REF!

XI PEKERJAAN CAT - CATAN


1 Pek. Cat Tembok #REF! m2 #REF!
2 Pek. Cat Plafond #REF! m2 0.00
3 Pek. Cat Kayu #REF! m2 0.00

XII PEKERJAAN KM/WC


1 Penyambungan PDAM 1.000 ls #REF!
2 Pas. Instalasi Air Bersih Ø 3/4" 12.000 m' #REF!
3 Pek. Instalasi Air Kotor Ø 3" 6.000 m' #REF!
4 Pas. Bak Mandi Fiber 1.000 bh #REF!
5 Pas. Kloset jongkok 1.000 bh #REF!
6 Pas. Floordrain 1.000 bh #REF!
7 Pas. Kran Air 1.000 bh #REF!
8 Septictank dan Resapan 1.000 unit #REF!

XIII PEKERJAAN INTALASI LISTRIK


1 Penyambungan Listrik + Pulsa 100 rb 1.000 paket #REF!
2 Pas. Instalasi Listrik 8.000 titik #REF!
3 Pas. Stop Kontak 2.000 bh #REF!
4 Pas. Saklar Ganda 2.000 bh #REF!
5 Pas. Saklar Tunggal 3.000 bh #REF!
6 Pas. Lampu SL 18 watt 6.000 bh #REF!
7 Pas. Lampu SL 5 watt 1.000 bh #REF!

SUB TOTAL LEMBAR B 0.00

Realisasi Fisik s/d Minggu ini #REF!

Rencana Time Schedule #REF!

Deviasi (+/-) Cepat / Lambat #REF!

Diperiksa : Dibuat :
Konsultan Pengawas Kontraktor Pelaksanan
CV. BARUNA JAYA CV. NJ MAJU

EKO HARI TRIYANTO ARIF CHABIBI


Inspector Pelaksana
LAPORAN KEMAJUAN PEKERJAAN

Minggu Ke : VIII (delapan) : Tanggal 1-Jul-18 s/d 7-Jul-18


KEGIATAN : DAK BIDANG LINKUNGAN HIDUP
PEKERJAAN : PEMBANGUNAN GEDUNG BANK SAMPAH
LOKASI : TPA SRANGGRAHAN KECAMATAN KRANGGAN TEMANGGUNG
TAHUN ANGGARAN : 2018

Realisasi Kemajuan Pekerjaan


Nilai s/d Dalam s/d Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Minggu ini Bobot
% lalu Ini Volume (%)
I PEKERJAAN PERSIAPAN
1 Pengukuran/Bouplank 1.000 ls 12.78 1.00 1.00 12.78
2 Papan Nama Kegiatan 1.000 bh 0.00 1.00 1.00 0.00

II PEKERJAAN TANAH
1 Pek. Galian Tanah #REF! m3 #REF! #REF! #REF! #REF!
2 Pek. Urugan Tanah Kembali #REF! m3 #REF! #REF! #REF! #REF!
3 Pek. Urugan Pasir #REF! m3 #REF! #REF! #REF! #REF!

III PEKERJAAN PASANGAN


1 Pek. Pas. Batu Belah 1 : 3 : 10 #REF! m3 #REF! #REF! #REF! #REF!
2 Pek. Pas. Batu bata 1:3 tebal 1/2 bata #REF! m2 0.00 #REF! #REF! #REF!
3 Pek. Pas. Batu bata 1:3:10 tebal 1/2 bata #VALUE! m2 #REF! #VALUE! #VALUE! #VALUE!
4 Pek. Plesteran 1:3 #REF! m2 #REF! #REF! #REF! #REF!
5 Pek. Plesteran 1:2:8 #REF! m2 0.00
6 Pek. Acian #REF! m2 0.00

IV PEKERJAAN LANTAI
1 Pek. Urugan Pasir Bawah Lantai #REF! m3 #REF!
2 Pas. Keramik 40 X 40 #REF! m2 #REF!
3 Pas. Keramik 20 x 20 #REF! m2 #REF!
4 Pas. Keramik Dinding 20 x25 #REF! m2 #REF!
5 Pek. Rabat beton T = 10 cm #REF! m3 #REF!
6 Pembesian Lantai Rabat beton Ø 8mm #REF! kg #REF!

V PEKERJAAN BETON
1 Pek. Sloof 15/20
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
2 Pek. Kolom Praktis 15/15
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
3 Pek. Ring Balk 15/20
Adukan Beton #REF! m3 #REF! #REF! #REF! #REF!
Pembesian #VALUE! kg #REF! #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
4 Pek. Balok Latai 12/12
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!

VI PEKERJAAN KAYU DAN KACA


1 Pek. Kusen Kayu Bangkirai #REF! m3 0.00 #REF! #REF! #REF!
2 Pek. Daun Pintu Panil Rk Kayu Bangkirai #REF! m2 #REF!
3 Pek. Daun Jendela Kaca 5 mm #REF! m2 0.00
4 Pas. Kaca 5 mm #REF! m2 0.00
5 Pas. Pintu PVC 1.000 bh #REF!
6 Pas. Dinding Kawat Harmonika Rangka
Besi Siku 50.50.5 Rangkap #REF! m2 #REF!
7 Pas. Pintu Kawat Harmonika Rangka
Pipa GI Ø 1,5 " #REF! m2 #REF!

VII PEKERJAAN RANGKA ATAP


1 Pas. Rangka Atap Baja ringan #REF! m2 #REF! #REF! #REF! #REF!

VIII PEKERJAAN PENUTUP ATAP


1 Pas. Atap Galvalume #REF! m2 #REF! #REF! #REF! #REF!
2 Pas. Bubungan Galvalume #REF! m' #REF!

IX PEKERJAAN LANGIT - LANGIT


1 Pas. Rangka Plafond besi Hollow #REF! m2 0.00
2 Pas. Penutup Plafond Saplek #REF! m2 #REF!
3 Pas. List Plafond Kayu Profil #REF! m' #REF!

SUB TOTAL LEMBAR A #REF!


Realisasi Kemajuan Pekerjaan
Nilai s/d Dalam s/d Minggu ini Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Volume Bobot
% lalu Ini (%)
X PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pas. Slot pintu 2.000 bh #REF!
2 Pas. Engsel pintu 6.000 bh #REF!
3 Pas. Grendel Pintu 1.000 bh #REF!
4 Pas. Engsel Jendela 12.000 bh #REF!
5 Pas. Grendel Jendela 12.000 bh #REF!
6 Pas. Handle Jendela 6.000 bh #REF!
7 Pas. Kait Angin 12.000 bh #REF!

XI PEKERJAAN CAT - CATAN


1 Pek. Cat Tembok #REF! m2 #REF!
2 Pek. Cat Plafond #REF! m2 0.00
3 Pek. Cat Kayu #REF! m2 0.00

XII PEKERJAAN KM/WC


1 Penyambungan PDAM 1.000 ls #REF!
2 Pas. Instalasi Air Bersih Ø 3/4" 12.000 m' #REF!
3 Pek. Instalasi Air Kotor Ø 3" 6.000 m' #REF!
4 Pas. Bak Mandi Fiber 1.000 bh #REF!
5 Pas. Kloset jongkok 1.000 bh #REF!
6 Pas. Floordrain 1.000 bh #REF!
7 Pas. Kran Air 1.000 bh #REF!
8 Septictank dan Resapan 1.000 unit #REF!

XIII PEKERJAAN INTALASI LISTRIK


1 Penyambungan Listrik + Pulsa 100 rb 1.000 paket #REF!
2 Pas. Instalasi Listrik 8.000 titik #REF!
3 Pas. Stop Kontak 2.000 bh #REF!
4 Pas. Saklar Ganda 2.000 bh #REF!
5 Pas. Saklar Tunggal 3.000 bh #REF!
6 Pas. Lampu SL 18 watt 6.000 bh #REF!
7 Pas. Lampu SL 5 watt 1.000 bh #REF!

SUB TOTAL LEMBAR B 0.00

Realisasi Fisik s/d Minggu ini #REF!

Rencana Time Schedule #REF!

Deviasi (+/-) Cepat / Lambat #REF!

Diperiksa : Dibuat :
Konsultan Pengawas Kontraktor Pelaksanan
CV. BARUNA JAYA CV. NJ MAJU

EKO HARI TRIYANTO ARIF CHABIBI


Inspector Pelaksana
LAPORAN KEMAJUAN PEKERJAAN

Minggu Ke : IX (sembilan) : Tanggal 8-Jul-18 s/d 14-Jul-18


KEGIATAN : DAK BIDANG LINKUNGAN HIDUP
PEKERJAAN : PEMBANGUNAN GEDUNG BANK SAMPAH
LOKASI : TPA SRANGGRAHAN KECAMATAN KRANGGAN TEMANGGUNG
TAHUN ANGGARAN : 2018

Realisasi Kemajuan Pekerjaan


Nilai s/d Dalam s/d Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Minggu ini Bobot
% lalu Ini Volume (%)
I PEKERJAAN PERSIAPAN
1 Pengukuran/Bouplank 1.000 ls 12.78 1.00 1.00 12.78
2 Papan Nama Kegiatan 1.000 bh 0.00 1.00 1.00 0.00

II PEKERJAAN TANAH
1 Pek. Galian Tanah #REF! m3 #REF! #REF! #REF! #REF!
2 Pek. Urugan Tanah Kembali #REF! m3 #REF! #REF! #REF! #REF!
3 Pek. Urugan Pasir #REF! m3 #REF! #REF! #REF! #REF!

III PEKERJAAN PASANGAN


1 Pek. Pas. Batu Belah 1 : 3 : 10 #REF! m3 #REF! #REF! #REF! #REF!
2 Pek. Pas. Batu bata 1:3 tebal 1/2 bata #REF! m2 0.00 #REF! #REF! #REF!
3 Pek. Pas. Batu bata 1:3:10 tebal 1/2 bata #VALUE! m2 #REF! #VALUE! #VALUE! #VALUE!
4 Pek. Plesteran 1:3 #REF! m2 #REF! #REF! #REF! #REF!
5 Pek. Plesteran 1:2:8 #REF! m2 0.00 #REF! #REF! #REF!
6 Pek. Acian #REF! m2 0.00 #REF! #REF! #REF!

IV PEKERJAAN LANTAI
1 Pek. Urugan Pasir Bawah Lantai #REF! m3 #REF!
2 Pas. Keramik 40 X 40 #REF! m2 #REF!
3 Pas. Keramik 20 x 20 #REF! m2 #REF!
4 Pas. Keramik Dinding 20 x25 #REF! m2 #REF!
5 Pek. Rabat beton T = 10 cm #REF! m3 #REF!
6 Pembesian Lantai Rabat beton Ø 8mm #REF! kg #REF!

V PEKERJAAN BETON
1 Pek. Sloof 15/20
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
2 Pek. Kolom Praktis 15/15
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
3 Pek. Ring Balk 15/20
Adukan Beton #REF! m3 #REF! #REF! #REF! #REF!
Pembesian #VALUE! kg #REF! #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
4 Pek. Balok Latai 12/12
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!

VI PEKERJAAN KAYU DAN KACA


1 Pek. Kusen Kayu Bangkirai #REF! m3 0.00 #REF! #REF! #REF!
2 Pek. Daun Pintu Panil Rk Kayu Bangkirai #REF! m2 #REF!
3 Pek. Daun Jendela Kaca 5 mm #REF! m2 0.00
4 Pas. Kaca 5 mm #REF! m2 0.00
5 Pas. Pintu PVC 1.000 bh #REF!
6 Pas. Dinding Kawat Harmonika Rangka
Besi Siku 50.50.5 Rangkap #REF! m2 #REF!
7 Pas. Pintu Kawat Harmonika Rangka
Pipa GI Ø 1,5 " #REF! m2 #REF!

VII PEKERJAAN RANGKA ATAP


1 Pas. Rangka Atap Baja ringan #REF! m2 #REF! #REF! #REF! #REF!

VIII PEKERJAAN PENUTUP ATAP


1 Pas. Atap Galvalume #REF! m2 #REF! #REF! #REF! #REF! #REF!
2 Pas. Bubungan Galvalume #REF! m' #REF! #REF! #REF! #REF!

IX PEKERJAAN LANGIT - LANGIT


1 Pas. Rangka Plafond besi Hollow #REF! m2 0.00 #REF! #REF! #REF!
2 Pas. Penutup Plafond Saplek #REF! m2 #REF! #REF! #REF! #REF!
3 Pas. List Plafond Kayu Profil #REF! m' #REF! #REF! #REF! #REF!

SUB TOTAL LEMBAR A #REF!


Realisasi Kemajuan Pekerjaan
Nilai s/d Dalam s/d Minggu ini Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Volume Bobot
% lalu Ini (%)
X PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pas. Slot pintu 2.000 bh #REF!
2 Pas. Engsel pintu 6.000 bh #REF!
3 Pas. Grendel Pintu 1.000 bh #REF!
4 Pas. Engsel Jendela 12.000 bh #REF!
5 Pas. Grendel Jendela 12.000 bh #REF!
6 Pas. Handle Jendela 6.000 bh #REF!
7 Pas. Kait Angin 12.000 bh #REF!

XI PEKERJAAN CAT - CATAN


1 Pek. Cat Tembok #REF! m2 #REF!
2 Pek. Cat Plafond #REF! m2 0.00
3 Pek. Cat Kayu #REF! m2 0.00

XII PEKERJAAN KM/WC


1 Penyambungan PDAM 1.000 ls #REF!
2 Pas. Instalasi Air Bersih Ø 3/4" 12.000 m' #REF! 12.00 12.00 #REF!
3 Pek. Instalasi Air Kotor Ø 3" 6.000 m' #REF! 6.00 6.00 #REF!
4 Pas. Bak Mandi Fiber 1.000 bh #REF!
5 Pas. Kloset jongkok 1.000 bh #REF!
6 Pas. Floordrain 1.000 bh #REF!
7 Pas. Kran Air 1.000 bh #REF!
8 Septictank dan Resapan 1.000 unit #REF! 1.00 1.00 #REF!

XIII PEKERJAAN INTALASI LISTRIK


1 Penyambungan Listrik + Pulsa 100 rb 1.000 paket #REF!
2 Pas. Instalasi Listrik 8.000 titik #REF!
3 Pas. Stop Kontak 2.000 bh #REF!
4 Pas. Saklar Ganda 2.000 bh #REF!
5 Pas. Saklar Tunggal 3.000 bh #REF!
6 Pas. Lampu SL 18 watt 6.000 bh #REF!
7 Pas. Lampu SL 5 watt 1.000 bh #REF!

SUB TOTAL LEMBAR B #REF!

Realisasi Fisik s/d Minggu ini #REF!

Rencana Time Schedule #REF!

Deviasi (+/-) Cepat / Lambat #REF!

Diperiksa : Dibuat :
Konsultan Pengawas Kontraktor Pelaksanan
CV. BARUNA JAYA CV. NJ MAJU

EKO HARI TRIYANTO ARIF CHABIBI


Inspector Pelaksana
LAPORAN KEMAJUAN PEKERJAAN

Minggu Ke : X (sepuluh) : Tanggal 15-Jul-18 s/d 21-Jul-18


KEGIATAN : DAK BIDANG LINKUNGAN HIDUP
PEKERJAAN : PEMBANGUNAN GEDUNG BANK SAMPAH
LOKASI : TPA SRANGGRAHAN KECAMATAN KRANGGAN TEMANGGUNG
TAHUN ANGGARAN : 2018

Realisasi Kemajuan Pekerjaan


Nilai s/d Dalam s/d Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Minggu ini Bobot
% lalu Ini Volume (%)
I PEKERJAAN PERSIAPAN
1 Pengukuran/Bouplank 1.000 ls 12.78 1.00 1.00 12.78
2 Papan Nama Kegiatan 1.000 bh 0.00 1.00 1.00 0.00

II PEKERJAAN TANAH
1 Pek. Galian Tanah #REF! m3 #REF! #REF! #REF! #REF!
2 Pek. Urugan Tanah Kembali #REF! m3 #REF! #REF! #REF! #REF!
3 Pek. Urugan Pasir #REF! m3 #REF! #REF! #REF! #REF!

III PEKERJAAN PASANGAN


1 Pek. Pas. Batu Belah 1 : 3 : 10 #REF! m3 #REF! #REF! #REF! #REF!
2 Pek. Pas. Batu bata 1:3 tebal 1/2 bata #REF! m2 0.00 #REF! #REF! #REF!
3 Pek. Pas. Batu bata 1:3:10 tebal 1/2 bata #VALUE! m2 #REF! #VALUE! #VALUE! #VALUE!
4 Pek. Plesteran 1:3 #REF! m2 #REF! #REF! #REF! #REF!
5 Pek. Plesteran 1:2:8 #REF! m2 0.00 #REF! #REF! #REF! #REF!
6 Pek. Acian #REF! m2 0.00 #REF! #REF! #REF! #REF!

IV PEKERJAAN LANTAI
1 Pek. Urugan Pasir Bawah Lantai #REF! m3 #REF! #REF! #REF! #REF!
2 Pas. Keramik 40 X 40 #REF! m2 #REF! #REF! #REF! #REF!
3 Pas. Keramik 20 x 20 #REF! m2 #REF! #REF! #REF! #REF!
4 Pas. Keramik Dinding 20 x25 #REF! m2 #REF! #REF! #REF! #REF!
5 Pek. Rabat beton T = 10 cm #REF! m3 #REF!
6 Pembesian Lantai Rabat beton Ø 8mm #REF! kg #REF!

V PEKERJAAN BETON
1 Pek. Sloof 15/20
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
2 Pek. Kolom Praktis 15/15
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
3 Pek. Ring Balk 15/20
Adukan Beton #REF! m3 #REF! #REF! #REF! #REF!
Pembesian #VALUE! kg #REF! #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
4 Pek. Balok Latai 12/12
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!

VI PEKERJAAN KAYU DAN KACA


1 Pek. Kusen Kayu Bangkirai #REF! m3 0.00 #REF! #REF! #REF!
2 Pek. Daun Pintu Panil Rk Kayu Bangkirai #REF! m2 #REF!
3 Pek. Daun Jendela Kaca 5 mm #REF! m2 0.00
4 Pas. Kaca 5 mm #REF! m2 0.00
5 Pas. Pintu PVC 1.000 bh #REF!
6 Pas. Dinding Kawat Harmonika Rangka
Besi Siku 50.50.5 Rangkap #REF! m2 #REF! #REF! #REF! #REF!
7 Pas. Pintu Kawat Harmonika Rangka
Pipa GI Ø 1,5 " #REF! m2 #REF!

VII PEKERJAAN RANGKA ATAP


1 Pas. Rangka Atap Baja ringan #REF! m2 #REF! #REF! #REF! #REF!

VIII PEKERJAAN PENUTUP ATAP


1 Pas. Atap Galvalume #REF! m2 #REF! #REF! #REF! #REF!
2 Pas. Bubungan Galvalume #REF! m' #REF! #REF! #REF! #REF!

IX PEKERJAAN LANGIT - LANGIT


1 Pas. Rangka Plafond besi Hollow #REF! m2 0.00 #REF! #REF! #REF!
2 Pas. Penutup Plafond Saplek #REF! m2 #REF! #REF! #REF! #REF!
3 Pas. List Plafond Kayu Profil #REF! m' #REF! #REF! #REF! #REF!

SUB TOTAL LEMBAR A #REF!


Realisasi Kemajuan Pekerjaan
Nilai s/d Dalam s/d Minggu ini Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Volume Bobot
% lalu Ini (%)
X PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pas. Slot pintu 2.000 bh #REF!
2 Pas. Engsel pintu 6.000 bh #REF!
3 Pas. Grendel Pintu 1.000 bh #REF!
4 Pas. Engsel Jendela 12.000 bh #REF!
5 Pas. Grendel Jendela 12.000 bh #REF!
6 Pas. Handle Jendela 6.000 bh #REF!
7 Pas. Kait Angin 12.000 bh #REF!

XI PEKERJAAN CAT - CATAN


1 Pek. Cat Tembok #REF! m2 #REF!
2 Pek. Cat Plafond #REF! m2 0.00
3 Pek. Cat Kayu #REF! m2 0.00

XII PEKERJAAN KM/WC


1 Penyambungan PDAM 1.000 ls #REF!
2 Pas. Instalasi Air Bersih Ø 3/4" 12.000 m' #REF! 12.00 12.00 #REF!
3 Pek. Instalasi Air Kotor Ø 3" 6.000 m' #REF! 6.00 6.00 #REF!
4 Pas. Bak Mandi Fiber 1.000 bh #REF! 1.00 1.00 #REF!
5 Pas. Kloset jongkok 1.000 bh #REF! 1.00 1.00 #REF!
6 Pas. Floordrain 1.000 bh #REF! 1.00 1.00 #REF!
7 Pas. Kran Air 1.000 bh #REF! 1.00 1.00 #REF!
8 Septictank dan Resapan 1.000 unit #REF! 1.00 1.00 #REF!

XIII PEKERJAAN INTALASI LISTRIK


1 Penyambungan Listrik + Pulsa 100 rb 1.000 paket #REF!
2 Pas. Instalasi Listrik 8.000 titik #REF! 8.00 8.00 #REF!
3 Pas. Stop Kontak 2.000 bh #REF! 2.00 2.00 #REF!
4 Pas. Saklar Ganda 2.000 bh #REF! 2.00 2.00 #REF!
5 Pas. Saklar Tunggal 3.000 bh #REF! 3.00 3.00 #REF!
6 Pas. Lampu SL 18 watt 6.000 bh #REF!
7 Pas. Lampu SL 5 watt 1.000 bh #REF!

SUB TOTAL LEMBAR B #REF!

Realisasi Fisik s/d Minggu ini #REF!

Rencana Time Schedule #REF!

Deviasi (+/-) Cepat / Lambat #REF!

Diperiksa : Dibuat :
Konsultan Pengawas Kontraktor Pelaksanan
CV. BARUNA JAYA CV. NJ MAJU

EKO HARI TRIYANTO ARIF CHABIBI


Inspector Pelaksana
LAPORAN KEMAJUAN PEKERJAAN

Minggu Ke : XI (sebelas) : Tanggal 22-Jul-18 s/d 28-Jul-18


KEGIATAN : DAK BIDANG LINKUNGAN HIDUP
PEKERJAAN : PEMBANGUNAN GEDUNG BANK SAMPAH
LOKASI : TPA SRANGGRAHAN KECAMATAN KRANGGAN TEMANGGUNG
TAHUN ANGGARAN : 2018

Realisasi Kemajuan Pekerjaan


Nilai s/d Dalam s/d Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Minggu ini Bobot
% lalu Ini Volume (%)
I PEKERJAAN PERSIAPAN
1 Pengukuran/Bouplank 1.000 ls 12.78 1.00 1.00 12.78
2 Papan Nama Kegiatan 1.000 bh 0.00 1.00 1.00 0.00

II PEKERJAAN TANAH
1 Pek. Galian Tanah #REF! m3 #REF! #REF! #REF! #REF!
2 Pek. Urugan Tanah Kembali #REF! m3 #REF! #REF! #REF! #REF!
3 Pek. Urugan Pasir #REF! m3 #REF! #REF! #REF! #REF!

III PEKERJAAN PASANGAN


1 Pek. Pas. Batu Belah 1 : 3 : 10 #REF! m3 #REF! #REF! #REF! #REF!
2 Pek. Pas. Batu bata 1:3 tebal 1/2 bata #REF! m2 0.00 #REF! #REF! #REF!
3 Pek. Pas. Batu bata 1:3:10 tebal 1/2 bata #VALUE! m2 #REF! #VALUE! #VALUE! #VALUE!
4 Pek. Plesteran 1:3 #REF! m2 #REF! #REF! #REF! #REF!
5 Pek. Plesteran 1:2:8 #REF! m2 0.00 #REF! #REF! #REF!
6 Pek. Acian #REF! m2 0.00 #REF! #REF! #REF!

IV PEKERJAAN LANTAI
1 Pek. Urugan Pasir Bawah Lantai #REF! m3 #REF! #REF! #REF! #REF!
2 Pas. Keramik 40 X 40 #REF! m2 #REF! #REF! #REF! #REF!
3 Pas. Keramik 20 x 20 #REF! m2 #REF! #REF! #REF! #REF!
4 Pas. Keramik Dinding 20 x25 #REF! m2 #REF! #REF! #REF! #REF!
5 Pek. Rabat beton T = 10 cm #REF! m3 #REF! #REF! #REF! #REF!
6 Pembesian Lantai Rabat beton Ø 8mm #REF! kg #REF! #REF! #REF! #REF!

V PEKERJAAN BETON
1 Pek. Sloof 15/20
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
2 Pek. Kolom Praktis 15/15
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
3 Pek. Ring Balk 15/20
Adukan Beton #REF! m3 #REF! #REF! #REF! #REF!
Pembesian #VALUE! kg #REF! #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
4 Pek. Balok Latai 12/12
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!

VI PEKERJAAN KAYU DAN KACA


1 Pek. Kusen Kayu Bangkirai #REF! m3 0.00 #REF! #REF! #REF!
2 Pek. Daun Pintu Panil Rk Kayu Bangkirai #REF! m2 #REF! #REF! #REF! #REF!
3 Pek. Daun Jendela Kaca 5 mm #REF! m2 0.00 #REF! #REF! #REF!
4 Pas. Kaca 5 mm #REF! m2 0.00 #REF! #REF! #REF!
5 Pas. Pintu PVC 1.000 bh #REF! 1.00 1.000 #REF!
6 Pas. Dinding Kawat Harmonika Rangka
Besi Siku 50.50.5 Rangkap #REF! m2 #REF! #REF! #REF! #REF!
7 Pas. Pintu Kawat Harmonika Rangka
Pipa GI Ø 1,5 " #REF! m2 #REF! #REF! #REF! #REF!

VII PEKERJAAN RANGKA ATAP


1 Pas. Rangka Atap Baja ringan #REF! m2 #REF! #REF! #REF! #REF!

VIII PEKERJAAN PENUTUP ATAP


1 Pas. Atap Galvalume #REF! m2 #REF! #REF! #REF! #REF!
2 Pas. Bubungan Galvalume #REF! m' #REF! #REF! #REF! #REF!

IX PEKERJAAN LANGIT - LANGIT


1 Pas. Rangka Plafond besi Hollow #REF! m2 0.00 #REF! #REF! #REF!
2 Pas. Penutup Plafond Saplek #REF! m2 #REF! #REF! #REF! #REF!
3 Pas. List Plafond Kayu Profil #REF! m' #REF! #REF! #REF! #REF!

SUB TOTAL LEMBAR A #REF!


Realisasi Kemajuan Pekerjaan
Nilai s/d Dalam s/d Minggu ini Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Volume Bobot
% lalu Ini (%)
X PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pas. Slot pintu 2.000 bh #REF! 2.00 2.00 #REF!
2 Pas. Engsel pintu 6.000 bh #REF! 6.00 6.00 #REF!
3 Pas. Grendel Pintu 1.000 bh #REF! 1.00 1.00 #REF!
4 Pas. Engsel Jendela 12.000 bh #REF! 12.00 12.00 #REF!
5 Pas. Grendel Jendela 12.000 bh #REF! 12.00 12.00 #REF!
6 Pas. Handle Jendela 6.000 bh #REF! 6.00 6.00 #REF!
7 Pas. Kait Angin 12.000 bh #REF! 12.00 12.00 #REF!

XI PEKERJAAN CAT - CATAN


1 Pek. Cat Tembok #REF! m2 #REF!
2 Pek. Cat Plafond #REF! m2 0.00
3 Pek. Cat Kayu #REF! m2 0.00

XII PEKERJAAN KM/WC


1 Penyambungan PDAM 1.000 ls #REF!
2 Pas. Instalasi Air Bersih Ø 3/4" 12.000 m' #REF! 12.00 12.00 #REF!
3 Pek. Instalasi Air Kotor Ø 3" 6.000 m' #REF! 6.00 6.00 #REF!
4 Pas. Bak Mandi Fiber 1.000 bh #REF! 1.00 1.00 #REF!
5 Pas. Kloset jongkok 1.000 bh #REF! 1.00 1.00 #REF!
6 Pas. Floordrain 1.000 bh #REF! 1.00 1.00 #REF!
7 Pas. Kran Air 1.000 bh #REF! 1.00 1.00 #REF!
8 Septictank dan Resapan 1.000 unit #REF! 1.00 1.00 #REF!

XIII PEKERJAAN INTALASI LISTRIK


1 Penyambungan Listrik + Pulsa 100 rb 1.000 paket #REF!
2 Pas. Instalasi Listrik 8.000 titik #REF! 8.00 8.00 #REF!
3 Pas. Stop Kontak 2.000 bh #REF! 2.00 2.00 #REF!
4 Pas. Saklar Ganda 2.000 bh #REF! 2.00 2.00 #REF!
5 Pas. Saklar Tunggal 3.000 bh #REF! 3.00 3.00 #REF!
6 Pas. Lampu SL 18 watt 6.000 bh #REF!
7 Pas. Lampu SL 5 watt 1.000 bh #REF!

SUB TOTAL LEMBAR B #REF!

Realisasi Fisik s/d Minggu ini #REF!

Rencana Time Schedule #REF!

Deviasi (+/-) Cepat / Lambat #REF!

Diperiksa : Dibuat :
Konsultan Pengawas Kontraktor Pelaksanan
CV. BARUNA JAYA CV. NJ MAJU

EKO HARI TRIYANTO ARIF CHABIBI


Inspector Pelaksana
LAPORAN KEMAJUAN PEKERJAAN

Minggu Ke : XII (duabelas) : Tanggal 29-Jul-18 s/d 4-Aug-18


KEGIATAN : DAK BIDANG LINKUNGAN HIDUP
PEKERJAAN : PEMBANGUNAN GEDUNG BANK SAMPAH
LOKASI : TPA SRANGGRAHAN KECAMATAN KRANGGAN TEMANGGUNG
TAHUN ANGGARAN : 2018

Realisasi Kemajuan Pekerjaan


Nilai s/d Dalam s/d Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Minggu ini Bobot
% lalu Ini Volume (%)
I PEKERJAAN PERSIAPAN
1 Pengukuran/Bouplank 1.000 ls 12.78 1.00 1.00 12.78
2 Papan Nama Kegiatan 1.000 bh 0.00 1.00 1.00 0.00

II PEKERJAAN TANAH
1 Pek. Galian Tanah #REF! m3 #REF! #REF! #REF! #REF!
2 Pek. Urugan Tanah Kembali #REF! m3 #REF! #REF! #REF! #REF!
3 Pek. Urugan Pasir #REF! m3 #REF! #REF! #REF! #REF!

III PEKERJAAN PASANGAN


1 Pek. Pas. Batu Belah 1 : 3 : 10 #REF! m3 #REF! #REF! #REF! #REF!
2 Pek. Pas. Batu bata 1:3 tebal 1/2 bata #REF! m2 0.00 #REF! #REF! #REF!
3 Pek. Pas. Batu bata 1:3:10 tebal 1/2 bata #VALUE! m2 #REF! #VALUE! #VALUE! #VALUE!
4 Pek. Plesteran 1:3 #REF! m2 #REF! #REF! #REF! #REF!
5 Pek. Plesteran 1:2:8 #REF! m2 0.00 #REF! #REF! #REF!
6 Pek. Acian #REF! m2 0.00 #REF! #REF! #REF!

IV PEKERJAAN LANTAI
1 Pek. Urugan Pasir Bawah Lantai #REF! m3 #REF! #REF! #REF! #REF!
2 Pas. Keramik 40 X 40 #REF! m2 #REF! #REF! #REF! #REF!
3 Pas. Keramik 20 x 20 #REF! m2 #REF! #REF! #REF! #REF!
4 Pas. Keramik Dinding 20 x25 #REF! m2 #REF! #REF! #REF! #REF!
5 Pek. Rabat beton T = 10 cm #REF! m3 #REF! #REF! #REF! #REF!
6 Pembesian Lantai Rabat beton Ø 8mm #REF! kg #REF! #REF! #REF! #REF!

V PEKERJAAN BETON
1 Pek. Sloof 15/20
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
2 Pek. Kolom Praktis 15/15
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
3 Pek. Ring Balk 15/20
Adukan Beton #REF! m3 #REF! #REF! #REF! #REF!
Pembesian #VALUE! kg #REF! #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
4 Pek. Balok Latai 12/12
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!

VI PEKERJAAN KAYU DAN KACA


1 Pek. Kusen Kayu Bangkirai #REF! m3 0.00 #REF! #REF! #REF!
2 Pek. Daun Pintu Panil Rk Kayu Bangkirai #REF! m2 #REF! #REF! #REF! #REF!
3 Pek. Daun Jendela Kaca 5 mm #REF! m2 0.00 #REF! #REF! #REF!
4 Pas. Kaca 5 mm #REF! m2 0.00 #REF! #REF! #REF!
5 Pas. Pintu PVC 1.000 bh #REF! 1.00 1.000 #REF!
6 Pas. Dinding Kawat Harmonika Rangka
Besi Siku 50.50.5 Rangkap #REF! m2 #REF! #REF! #REF! #REF!
7 Pas. Pintu Kawat Harmonika Rangka
Pipa GI Ø 1,5 " #REF! m2 #REF! #REF! #REF! #REF!

VII PEKERJAAN RANGKA ATAP


1 Pas. Rangka Atap Baja ringan #REF! m2 #REF! #REF! #REF! #REF!

VIII PEKERJAAN PENUTUP ATAP


1 Pas. Atap Galvalume #REF! m2 #REF! #REF! #REF! #REF!
2 Pas. Bubungan Galvalume #REF! m' #REF! #REF! #REF! #REF!

IX PEKERJAAN LANGIT - LANGIT


1 Pas. Rangka Plafond besi Hollow #REF! m2 0.00 #REF! #REF! #REF!
2 Pas. Penutup Plafond Saplek #REF! m2 #REF! #REF! #REF! #REF!
3 Pas. List Plafond Kayu Profil #REF! m' #REF! #REF! #REF! #REF!

SUB TOTAL LEMBAR A #REF!


Realisasi Kemajuan Pekerjaan
Nilai s/d Dalam s/d Minggu ini Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Volume Bobot
% lalu Ini (%)
X PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pas. Slot pintu 2.000 bh #REF! 2.00 2.00 #REF!
2 Pas. Engsel pintu 6.000 bh #REF! 6.00 6.00 #REF!
3 Pas. Grendel Pintu 1.000 bh #REF! 1.00 1.00 #REF!
4 Pas. Engsel Jendela 12.000 bh #REF! 12.00 12.00 #REF!
5 Pas. Grendel Jendela 12.000 bh #REF! 12.00 12.00 #REF!
6 Pas. Handle Jendela 6.000 bh #REF! 6.00 6.00 #REF!
7 Pas. Kait Angin 12.000 bh #REF! 12.00 12.00 #REF!

XI PEKERJAAN CAT - CATAN


1 Pek. Cat Tembok #REF! m2 #REF! #REF! #REF! #REF!
2 Pek. Cat Plafond #REF! m2 0.00 #REF! #REF! #REF!
3 Pek. Cat Kayu #REF! m2 0.00 #REF! #REF! #REF!

XII PEKERJAAN KM/WC


1 Penyambungan PDAM 1.000 ls #REF!
2 Pas. Instalasi Air Bersih Ø 3/4" 12.000 m' #REF! 12.00 12.00 #REF!
3 Pek. Instalasi Air Kotor Ø 3" 6.000 m' #REF! 6.00 6.00 #REF!
4 Pas. Bak Mandi Fiber 1.000 bh #REF! 1.00 1.00 #REF!
5 Pas. Kloset jongkok 1.000 bh #REF! 1.00 1.00 #REF!
6 Pas. Floordrain 1.000 bh #REF! 1.00 1.00 #REF!
7 Pas. Kran Air 1.000 bh #REF! 1.00 1.00 #REF!
8 Septictank dan Resapan 1.000 unit #REF! 1.00 1.00 #REF!

XIII PEKERJAAN INTALASI LISTRIK


1 Penyambungan Listrik + Pulsa 100 rb 1.000 paket #REF!
2 Pas. Instalasi Listrik 8.000 titik #REF! 8.00 8.00 #REF!
3 Pas. Stop Kontak 2.000 bh #REF! 2.00 2.00 #REF!
4 Pas. Saklar Ganda 2.000 bh #REF! 2.00 2.00 #REF!
5 Pas. Saklar Tunggal 3.000 bh #REF! 3.00 3.00 #REF!
6 Pas. Lampu SL 18 watt 6.000 bh #REF!
7 Pas. Lampu SL 5 watt 1.000 bh #REF!

SUB TOTAL LEMBAR B #REF!

Realisasi Fisik s/d Minggu ini #REF!

Rencana Time Schedule #REF!

Deviasi (+/-) Cepat / Lambat #REF!

Diperiksa : Dibuat :
Konsultan Pengawas Kontraktor Pelaksanan
CV. BARUNA JAYA CV. NJ MAJU

EKO HARI TRIYANTO ARIF CHABIBI


Inspector Pelaksana
LAPORAN KEMAJUAN PEKERJAAN

Minggu Ke : XIII (tigabelas) : Tanggal 5-Aug-18 s/d 11-Aug-18


KEGIATAN : DAK BIDANG LINKUNGAN HIDUP
PEKERJAAN : PEMBANGUNAN GEDUNG BANK SAMPAH
LOKASI : TPA SRANGGRAHAN KECAMATAN KRANGGAN TEMANGGUNG
TAHUN ANGGARAN : 2018

Realisasi Kemajuan Pekerjaan


Nilai s/d Dalam s/d Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Minggu ini Bobot
% lalu Ini Volume (%)
I PEKERJAAN PERSIAPAN
1 Pengukuran/Bouplank 1.000 ls 12.78 1.00 1.00 12.78
2 Papan Nama Kegiatan 1.000 bh 0.00 1.00 1.00 0.00

II PEKERJAAN TANAH
1 Pek. Galian Tanah #REF! m3 #REF! #REF! #REF! #REF!
2 Pek. Urugan Tanah Kembali #REF! m3 #REF! #REF! #REF! #REF!
3 Pek. Urugan Pasir #REF! m3 #REF! #REF! #REF! #REF!

III PEKERJAAN PASANGAN


1 Pek. Pas. Batu Belah 1 : 3 : 10 #REF! m3 #REF! #REF! #REF! #REF!
2 Pek. Pas. Batu bata 1:3 tebal 1/2 bata #REF! m2 0.00 #REF! #REF! #REF!
3 Pek. Pas. Batu bata 1:3:10 tebal 1/2 bata #VALUE! m2 #REF! #VALUE! #VALUE! #VALUE!
4 Pek. Plesteran 1:3 #REF! m2 #REF! #REF! #REF! #REF!
5 Pek. Plesteran 1:2:8 #REF! m2 0.00 #REF! #REF! #REF!
6 Pek. Acian #REF! m2 0.00 #REF! #REF! #REF!

IV PEKERJAAN LANTAI
1 Pek. Urugan Pasir Bawah Lantai #REF! m3 #REF! #REF! #REF! #REF!
2 Pas. Keramik 40 X 40 #REF! m2 #REF! #REF! #REF! #REF!
3 Pas. Keramik 20 x 20 #REF! m2 #REF! #REF! #REF! #REF!
4 Pas. Keramik Dinding 20 x25 #REF! m2 #REF! #REF! #REF! #REF!
5 Pek. Rabat beton T = 10 cm #REF! m3 #REF! #REF! #REF! #REF!
6 Pembesian Lantai Rabat beton Ø 8mm #REF! kg #REF! #REF! #REF! #REF!

V PEKERJAAN BETON
1 Pek. Sloof 15/20
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
2 Pek. Kolom Praktis 15/15
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
3 Pek. Ring Balk 15/20
Adukan Beton #REF! m3 #REF! #REF! #REF! #REF!
Pembesian #VALUE! kg #REF! #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!
4 Pek. Balok Latai 12/12
Adukan Beton #REF! m3 0.00 #REF! #REF! #REF!
Pembesian #VALUE! kg 0.00 #VALUE! #VALUE! #VALUE!
Begesting #REF! m2 0.00 #REF! #REF! #REF!

VI PEKERJAAN KAYU DAN KACA


1 Pek. Kusen Kayu Bangkirai #REF! m3 0.00 #REF! #REF! #REF!
2 Pek. Daun Pintu Panil Rk Kayu Bangkirai #REF! m2 #REF! #REF! #REF! #REF!
3 Pek. Daun Jendela Kaca 5 mm #REF! m2 0.00 #REF! #REF! #REF!
4 Pas. Kaca 5 mm #REF! m2 0.00 #REF! #REF! #REF!
5 Pas. Pintu PVC 1.000 bh #REF! 1.00 1.000 #REF!
6 Pas. Dinding Kawat Harmonika Rangka
Besi Siku 50.50.5 Rangkap #REF! m2 #REF! #REF! #REF! #REF!
7 Pas. Pintu Kawat Harmonika Rangka
Pipa GI Ø 1,5 " #REF! m2 #REF! #REF! #REF! #REF!

VII PEKERJAAN RANGKA ATAP


1 Pas. Rangka Atap Baja ringan #REF! m2 #REF! #REF! #REF! #REF!

VIII PEKERJAAN PENUTUP ATAP


1 Pas. Atap Galvalume #REF! m2 #REF! #REF! #REF! #REF!
2 Pas. Bubungan Galvalume #REF! m' #REF! #REF! #REF! #REF!

IX PEKERJAAN LANGIT - LANGIT


1 Pas. Rangka Plafond besi Hollow #REF! m2 0.00 #REF! #REF! #REF!
2 Pas. Penutup Plafond Saplek #REF! m2 #REF! #REF! #REF! #REF!
3 Pas. List Plafond Kayu Profil #REF! m' #REF! #REF! #REF! #REF!

SUB TOTAL LEMBAR A #REF!


Realisasi Kemajuan Pekerjaan
Nilai s/d Dalam s/d Minggu ini Nilai
No Uraian Pekerjaan Volume Sat. Keterangan
Bobot Minggu Minggu Volume Bobot
% lalu Ini (%)
X PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pas. Slot pintu 2.000 bh #REF! 2.00 2.00 #REF!
2 Pas. Engsel pintu 6.000 bh #REF! 6.00 6.00 #REF!
3 Pas. Grendel Pintu 1.000 bh #REF! 1.00 1.00 #REF!
4 Pas. Engsel Jendela 12.000 bh #REF! 12.00 12.00 #REF!
5 Pas. Grendel Jendela 12.000 bh #REF! 12.00 12.00 #REF!
6 Pas. Handle Jendela 6.000 bh #REF! 6.00 6.00 #REF!
7 Pas. Kait Angin 12.000 bh #REF! 12.00 12.00 #REF!

XI PEKERJAAN CAT - CATAN


1 Pek. Cat Tembok #REF! m2 #REF! #REF! #REF! #REF!
2 Pek. Cat Plafond #REF! m2 0.00 #REF! #REF! #REF!
3 Pek. Cat Kayu #REF! m2 0.00 #REF! #REF! #REF!

XII PEKERJAAN KM/WC


1 Penyambungan PDAM 1.000 ls #REF! 1.00 1.00 #REF!
2 Pas. Instalasi Air Bersih Ø 3/4" 12.000 m' #REF! 12.00 12.00 #REF!
3 Pek. Instalasi Air Kotor Ø 3" 6.000 m' #REF! 6.00 6.00 #REF!
4 Pas. Bak Mandi Fiber 1.000 bh #REF! 1.00 1.00 #REF!
5 Pas. Kloset jongkok 1.000 bh #REF! 1.00 1.00 #REF!
6 Pas. Floordrain 1.000 bh #REF! 1.00 1.00 #REF!
7 Pas. Kran Air 1.000 bh #REF! 1.00 1.00 #REF!
8 Septictank dan Resapan 1.000 unit #REF! 1.00 1.00 #REF!

XIII PEKERJAAN INTALASI LISTRIK


1 Penyambungan Listrik + Pulsa 100 rb 1.000 paket #REF! 1.00 1.00 #REF!
2 Pas. Instalasi Listrik 8.000 titik #REF! 8.00 8.00 #REF!
3 Pas. Stop Kontak 2.000 bh #REF! 2.00 2.00 #REF!
4 Pas. Saklar Ganda 2.000 bh #REF! 2.00 2.00 #REF!
5 Pas. Saklar Tunggal 3.000 bh #REF! 3.00 3.00 #REF!
6 Pas. Lampu SL 18 watt 6.000 bh #REF! 6.00 6.00 #REF!
7 Pas. Lampu SL 5 watt 1.000 bh #REF! 1.00 1.00 #REF!

SUB TOTAL LEMBAR B #REF!

Realisasi Fisik s/d Minggu ini #REF!

Rencana Time Schedule #REF!

Deviasi (+/-) Cepat / Lambat #REF!

Diperiksa : Dibuat :
Konsultan Pengawas Kontraktor Pelaksanan
CV. BARUNA JAYA CV. NJ MAJU

EKO HARI TRIYANTO ARIF CHABIBI


Inspector Pelaksana
TIME SCHEDULE
KEGIATAN : DAK BIDANG LINKUNGAN HIDUP
PEKERJAAN : PEMBANGUNAN BANK SAMPAH
LOKASI : KOMPLEK KANTOR BLH KABUPATEN TEMANGGUNG
TAHUN ANGGARAN : 2015

NO URAIAN PEKERJAAN VOLUME SAT. BOBOT Agustus September Oktober KETERANGAN


% 01s/d06 07s/d13 14s/d20 21s/d27 28s/d03 04s/d10 11s/d17 18s/d24 25s/d01 02s/d08 09s/d15 16s/d22 23s/d29
I PEKERJAAN PERSIAPAN 100
1 Pengukuran/Bouplank 1.000 ls #REF! #REF!
II PEKERJAAN TANAH
1 Pek. Galian Tanah #REF! m3 #REF! #REF!
2 Pek. Urugan Tanah Kembali #REF! m3 #REF! #REF!
3 Pek. Urugan Pasir #REF! m3 #REF! #REF!
III PEKERJAAN PASANGAN
1 Pek. Pas. Batu Belah 1 : 3 : 10 #REF! m3 #REF! #REF! #REF!
2 Pek. Pas. Batu bata 1:3 tebal 1/2 bata #REF! m2 #REF! #REF!
3 Pek. Pas. Batu bata 1:3:10 tebal 1/2 bata #VALUE! m2 #VALUE! #VALUE! #VALUE!
4 Pek. Plesteran 1:3 #REF! m2 #REF! #REF!
5 Pek. Plesteran 1:2:8 #REF! m2 #REF! #REF!
6 Pek. Acian #REF! m2 #REF! #REF!
7 Pek. Sponengan 1 : 2 26.400 m' #REF! #REF!
IV PEKERJAAN LANTAI
1 Pek. Urugan Pasir Bawah Lantai #REF! m3 #REF! #REF! 75
2 Pas. Keramik 30 X 30 #REF! m2 #REF! #REF!
3 Pek. Lantai Plester 1:3 #REF! m2 #REF! #REF!
4 Acian Lantai #REF! m2 #REF! #REF!
V PEKERJAAN BETON
1 Pek. Sloof 12/20
Adukan Beton #REF! m3 #REF! #REF!
Pembesian #VALUE! kg #VALUE! #VALUE!
Begesting #REF! m2 #REF! #REF!
2 Pek. Kolom Praktis 12/12
Adukan Beton #REF! m3 #REF! #REF!
Pembesian #VALUE! kg #VALUE! #VALUE!
Begesting #REF! m2 #REF! #REF!
3 Pek. Ring Balk 12/20
Adukan Beton #REF! m3 #REF! #REF!
Pembesian #VALUE! kg #VALUE! #VALUE!
Begesting #REF! m2 #REF! #REF!
4 Pek. Balok Latai 12/12 50
Adukan Beton #REF! m3 #REF! #REF!
Pembesian #VALUE! kg #VALUE! #VALUE!
Begesting #REF! m2 #REF! #REF!
VI PEKERJAAN KAYU DAN KACA
1 Pek. Kusen Kayu Kruing #REF! m3 #REF! #REF!
2 Pek. Daun Pintu Kaca Rk Kayu Kruing #VALUE! m2 #VALUE! #VALUE!
3 Pek. Daun Pintu Panil Rk Kayu Kruing #REF! m2 #REF! #REF!
4 Pek. Daun Jendela Kaca 5 mm #REF! m2 #REF! #REF!
VII PEKERJAAN RANGKA ATAP
1 Pas. Rangka Atap Baja ringan #REF! m2 #REF! #REF! #REF!
VIII PEKERJAAN PENUTUP ATAP
1 Pas. Genteng Press Plentong Lokal #REF! m2 #REF! #REF!
2 Pas. Bubungan Genteng Sejenis #REF! m' #REF! #REF!
IX PEKERJAAN LANGIT - LANGIT
1 Pas. Rangka Plafond Kayu Lokal #REF! m2 #REF! #REF!
2 Pas. Penutup Plafond Saplek #REF! m2 #REF! #REF!
X PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pas. Slot pintu 2.000 bh #REF! #REF! #REF!
2 Pas. Engsel pintu 6.000 bh #REF! #REF! #REF!
3 Pas. Grendel Pintu 1.000 bh #REF! #REF!
4 Pas. Engsel Jendela 12.000 bh #REF! #REF! 25
5 Pas. Grendel Jendela 12.000 bh #REF! #REF!
6 Pas. Handle Jendela 6.000 bh #REF! #REF!
7 Pas. Kait Angin 12.000 bh #REF! #REF!
XI PEKERJAAN CAT - CATAN
1 Pek. Cat Tembok #REF! m2 #REF! #REF! #REF!
2 Pek. Cat Plafond #REF! m2 #REF! #REF!
3 Pek. Cat Kayu #REF! m2 #REF! #REF! #REF!
XII PEKERJAAN INTALASI LISTRIK
1 Penyambungan Listrik + Pulsa 100 rb 1.000 paket #REF! #REF!
2 Pas. Instalasi Listrik 7.000 titik #REF! #REF!
3 Pas. Stop Kontak 2.000 bh #REF! #REF!
4 Pas. Saklar Ganda 2.000 bh #REF! #REF!
5 Pas. Saklar Tunggal 2.000 bh #REF! #REF!
6 Pas. Lampu SL 18 watt 5.000 bh #REF! #REF! 0
Jumlah Total #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Rencana #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF!
Pelaksanaan #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Deviasi (+/-) #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Menyetujui Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :


Pejabat Pembuat Komitmen Staf Teknis Konsultan Supervisi Kontraktor Pelaksana
DAK Bidang Lingkungan Hidup CV. AMANAT JAYA CV. NJ. MAJU
Temanggung

TOTOK PURWANTO, ST HANI EKO PRAPTIWI, SKM, Msi BETTY ARDY KUSUMA. ST DJUWARI AZHAR HAMID
NIP. 19740318 200312 1 007 NIP. 19800304 200501 2 010 Team Leader Direktur

Anda mungkin juga menyukai