BILL OF QUANTITY (BOQ)

PROGRAM
PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS

PEKERJAAN
RENOVASI MESJID NURUL ILMI

LOKASI
KAMPUS UNIVERSITAS ANDALAS, LIMAU MANIS - PADANG

TAHUN ANGGARAN
2023
REKAPITULASI
BILL OF QUANTITY (BOQ)
PROGRAM : PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS
PEKERJAAN : RENOVASI MESJID NURUL ILMI
LOKASI : KAMPUS UNIVERSITAS ANDALAS, LIMAU MANIS - PADANG
TAHUN ANGGARAN : 2023

JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.)

A FINISHING LANTAI 1 MASJID NURUL ‘ILMI


I PEKERJAAN PERSIAPAN
II PEKERJAAN BONGKARAN / PENYAMBUNGAN STRUKTUR
III PEKERJAAN TANAH
IV PEKERJAAN PONDASI
V PEKERJAAN PONDASI PLAT SETEMPAT (P1)
VI PEKERJAAN PONDASI PLAT SETEMPAT (P2) TANGGA
VII PEKERJAAN TIE BEAM / SLOOF (TB1 20 / 40)
VIII PEKERJAAN TIE BEAM / SLOOF (TB2 20 / 30)
IX PEKERJAAN KOLOM INDUK (K1 40 / 40)
X PEKERJAAN KOLOM TANGGA (K2 20 / 20)
XI PEKERJAAN BALOK INDUK (B1 20 / 40)
XII PEKERJAAN BALOK TANGGA (B2 15 / 30)
XIII PEKERJAAN PLAT LANTAI TANGGA
XIV PEKERJAAN PLAT LANTAI 2
XV PEKERJAAN KOLOM PRAKTIS ( KP 15 / 20 )
XVI PEKERJAAN BALOK LATEI 15 / 20
XVII PEKERJAAN RING BALOK 15 / 20
XVIII PEKERJAAN LISPLANK BETON JENDELA
XIX PEKERJAAN DINDING
XX PEKERJAAN PINTU DAN JENDELA ALUMINIUM (KUSEN)
XXI PEKERJAAN KAP / ATAP
XXII PEKERJAAN PLESTERAN
XXIII PEKERJAAN PLAFOND
XXIV PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
XXV PEKERJAAN PENGECATAN
XXVI PEKERJAAN ELEKTRIKAL
XXVII PEKERJAAN INTERIOR MIHRAB
JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.)
B FINISHING LANTAI 2 MASJID NURUL ‘ILMI
I PEKERJAAN BONGKARAN
II PEKERJAAN KOLOM PRAKTIS ( KP 15 / 20 )
III PEKERJAAN BALOK LATEI 15 / 20
IV PEKERJAAN RING BALOK 15 / 20
V PEKERJAAN DINDING
VI PEKERJAAN PINTU DAN JENDELA ALUMINIUM (KUSEN)
VII PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
VIII PEKERJAAN PLESTERAN
IX PEKERJAAN PLAFOND
X PEKERJAAN PENGECATAN
XI PEKERJAAN NAMA MASJID

C FINISHING LANTAI 3 / DAK BETON MASJID NURUL ‘ILMI


I PEKERJAAN BONGKARAN
II PEKERJAAN KOLOM INDUK ( K1 25 / 50 )
III PEKERJAAN KOLOM PRAKTIS ( KP 13 / 13 )
IV PEKERJAAN KOLOM PRAKTIS ( KP 15 / 20 )
V PEKERJAAN RING BALOK 15 / 20
VI PEKERJAAN DINDING
VII PEKERJAAN KAP / ATAP
VIII PEKERJAAN PENUTUP ATAP
IX PEKERJAAN PLESTERAN
X PEKERJAAN PLAFOND
XI PEKERJAAN PENGECATAN
XII PEKERJAAN ELEKTRIKAL

D PEMBANGUNAN MENARA MASJID NURUL ‘ILMI (2 UNIT)


I PEKERJAAN KOLOM INDUK ( K1 40 / 40 )
II PEKERJAAN KOLOM INDUK ( K2 20 / 20 )
III PEKERJAAN KOLOM PRAKTIS ( KP 13 / 13 )
IV PEKERJAAN BALOK INDUK 20 / 30
V PEKERJAAN RING BALOK 15 / 20
VI PEKERJAAN LISPLANK BETON JENDELA
VII PEKERJAAN DINDING
VIII PEKERJAAN BESI DAN ALUMINIUM (KUSEN)
IX PEKERJAAN KAP / ATAP
X PEKERJAAN PENUTUP ATAP
XI PEKERJAAN PLESTERAN
XII PEKERJAAN PLAFOND
XIII PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
XIV PEKERJAAN PENGECATAN
XV PEKERJAAN ELEKTRIKAL
JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.)
E PEMBANGUNAN PLANK NAMA MASJID NURUL ‘ILMI
I PEKERJAAN TANAH
II PEKERJAAN PONDASI BATU KALI
III PEKERJAAN PONDASI BATU BATA
IV PEKERJAAN PONDASI PLAT SETEMPAT
V PEKERJAAN KOLOM INDUK ( K1 20 / 40 )
VI PEKERJAAN SLOOF INDUK 20 /40
VII PEKERJAAN BALOK INDUK 20 / 40
VIII PEKERJAAN DINDING
IX PEKERJAAN PLESTERAN
X PEKERJAAN PENGECATAN
XI PEKERJAAN NAMA MASJID
XII PEKERJAAN ELEKTRIKAL

F PEMBANGUNAN TAMAN POT BUNGA MASJID


I PEKERJAAN POT BUNGA

G REHABILITASI MENARA UTAMA MASJID


I PENGECATAN ULANG MENARA UTAMA MASJID
II PERLENGKAPAN MENARA UTAMA MASJID

TOTAL A + B + C + D + E + F + G -
PPN 11 % -
TOTAL FISIK + PPN 11 % -
DIBULATKAN -

Terbilang :

Padang, 2023

Penawar,
Kontraktor Pelaksana
CV….................................

NAMA JELAS
............................................
BILL OF QUANTITY (BOQ)
PROGRAM : PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS
PEKERJAAN : RENOVASI MESJID NURUL ILMI
LOKASI : KAMPUS UNIVERSITAS ANDALAS, LIMAU MANIS - PADANG
TAHUN ANGGARAN : 2023

SAT VOLUME HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN
(Rp.) (Rp.)

A FINISHING LANTAI 1 MASJID NURUL ‘ILMI

I PEKERJAAN PERSIAPAN
1 Peralatan K3 konstruksi (Keselamatan dan Kesehatan Kerja) Unit 1.00 -
JUMLAH I -

II PEKERJAAN BONGKARAN / PENYAMBUNGAN STRUKTUR


1 Pembongkaran 1 m3 beton bertulang M3 0.12 -
2 Pembongkaran 1 m3 dinding tembok bata M3 0.35 -
3 Pembongkaran Atap Kanopi Kanan Masjid Ls 1.00 -
JUMLAH II -

III PEKERJAAN TANAH


1 Penggalian 1 m3 tanah biasa sedalam 1 m M3 10.46 -
2 Pengurugan kembali 1 m3 galian tanah M3 3.45 -
JUMLAH III -

IV PEKERJAAN PONDASI
1 Membuat Lantai kerja beton mutu f3c = 7,4 Mpa (K 100), slump (3 - 6) Cm, M3 0.42 -
2 Pemasangan 1 m2 pondasi dinding Bata Merah (5x11x22) Cm tebal 1/2 ba M2 6.00 -
3 Pemasangan 1 m2 Plesteran 1PC : 2 Pasir Pasang tebal 15 mm M2 8.40 -
4 Pemasangan 1 m2 Acian M2 8.40 -
JUMLAH IV -

V PEKERJAAN PONDASI PLAT SETEMPAT (P1)


1 Pengurugan 1 m3 dengan pasir urug M3 0.22 -
2 Membuat Lantai kerja beton mutu f3c = 7,4 Mpa (K 100), slump (3 - 6) Cm, M3 0.22 -
3 Penulangan Plat Setempat Besi D 16 Kg 163.50 -
4 Begisting Pondasi Plat Setempat M2 4.16 -
5 Beton Ready Mix K-250/M3 M3 1.35 -
JUMLAH V -

VI PEKERJAAN PONDASI PLAT SETEMPAT (P2) TANGGA


1 Pengurugan 1 m3 dengan pasir urug M3 0.32 -
2 Membuat Lantai kerja beton mutu f3c = 7,4 Mpa (K 100), slump (3 - 6) Cm, M3 0.32 -
3 Penulangan Plat Setempat Besi D 13 Kg 137.11 -
4 Begisting Pondasi Plat Setempat M2 3.76 -
5 Beton Ready Mix K-250/M3 M3 0.86 -
JUMLAH VI -

VII PEKERJAAN TIE BEAM / SLOOF (TB1 20 / 40)


1 Membuat Lantai kerja beton mutu f3c = 7,4 Mpa (K 100), slump (3 - 6) Cm, M3 0.50 -
2 Penulangan Besi D 16 Kg 204.53 -
3 Penulangan Sengkang Besi Ø 10 - 10/15 Kg 88.93 -
4 Begisting Sloof (2 x Pakai) M2 14.72 -
5 Beton Ready Mix K-250/M3 M3 1.47 -
6 Stek Besi Kolom Praktis Ø 10 Kg 14.79 -
JUMLAH VII -
SAT VOLUME HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.) (Rp.)

VIII PEKERJAAN TIE BEAM / SLOOF (TB2 20 / 30)


1 Membuat Lantai kerja beton mutu f3c = 7,4 Mpa (K 100), slump (3 - 6) Cm, M3 0.20 -
2 Penulangan Besi D 16 Kg 83.33 -
3 Penulangan Sengkang Besi Ø 10 - 10/15 Kg 26.98 -
4 Begisting Sloof (2 x Pakai) M2 4.32 -
5 Beton Ready Mix K-250/M3 M3 0.43 -
6 Stek Besi Kolom Praktis Ø 10 Kg 14.79 -
JUMLAH VIII -

IX PEKERJAAN KOLOM INDUK (K1 40 / 40)


1 Penulangan Besi D 16 Kg 176.76 -
2 Penulangan Sengkang Besi Ø 10 - 10/15 Kg 76.22 -
3 Begisting Kolom (2 x Pakai) M2 19.20 -
4 Beton Ready Mix K-250/M3 M3 1.92 -
5 Stek Besi Balok Latei Ø 10 Kg 14.79 -
JUMLAH IX -

X PEKERJAAN KOLOM TANGGA (K2 20 / 20)


1 Penulangan Besi D 13 Kg 129.19 -
2 Penulangan Sengkang Besi Ø 8 - 10/15 Kg 47.95 -
3 Begisting Kolom (2 x Pakai) M2 19.20 -
4 Beton Ready Mix K-250/M3 M3 1.20 -
JUMLAH X -

XI PEKERJAAN BALOK INDUK (B1 20 / 40)


1 Penulangan Besi D 16 Kg 383.82 -
2 Penulangan Sengkang Besi Ø 10 - 10/15 Kg 123.73 -
3 Begisting Balok (2 x Pakai) M2 19.45 -
4 Beton Ready Mix K-250/M3 M3 1.43 -
JUMLAH XI -

XII PEKERJAAN BALOK TANGGA (B2 15 / 30)


1 Penulangan Besi D 16 Kg 189.38 -
2 Penulangan Sengkang Besi Ø 8 - 10/15 Kg 61.70 -
3 Begisting Balok Tangga 15 / 30 (2 x Pakai) M2 13.06 -
4 Beton Ready Mix K-250/M3 M3 0.49 -
JUMLAH XII -

XIII PEKERJAAN PLAT LANTAI TANGGA


1 Penulangan Besi D 16 Kg 517.66 -
2 Penulangan Sengkang Besi Ø 10 - 15 Kg 252.76 -
3 Penulangan Sengkang Besi Ø 8 - 15 Kg 118.36 -
4 Begisting Plat Lantai Tangga (2 x Pakai) M2 30.75 -
5 Beton Ready Mix K-250/M3 M3 6.44 -
JUMLAH XIII -

XIV PEKERJAAN PLAT LANTAI 2


1 Penulangan Plat lantai 2 Besi Ø 10 -15 Kg 789.12 -
2 Begisting Plat Lantai (2 x Pakai) M2 48.00 -
3 Beton Ready Mix K-250/M3 M3 5.76 -
JUMLAH XIV -

XV PEKERJAAN KOLOM PRAKTIS ( KP 15 / 20 )


1 Penulangan Kolom Praktis 15 / 20 Besi Ø 12 Kg 199.56 -
2 Penulangan Sengkang Kolom Praktis 15 / 20 Besi Ø 8 - 15 Kg 106.43 -
3 Stek Besi Dinding Batu Bata Ø 8 Kg 8.52 -
4 Begisting Kolom Praktis 15 / 20 (2 x Pakai) M2 39.34 -
5 Beton K-175/M3 M3 1.68 -
JUMLAH XV -

XVI PEKERJAAN BALOK LATEI 15 / 20


1 Penulangan Balok Latei 15 / 20 Besi Ø 12 Kg 42.61 -
2 Penulangan Sengkang Balok Latei 15 / 20 Besi Ø 8 - 15 Kg 21.96 -
3 Begisting Balok Latei 15 / 20 (2 x Pakai) M2 4.80 -
SAT VOLUME HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.) (Rp.)
4 Beton K-175/M3 M3 0.36 -
JUMLAH XVI -
SAT VOLUME HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.) (Rp.)
XVII PEKERJAAN RING BALOK 15 / 20
1 Penulangan Ring Balok 15 / 20 Besi Ø 12 Kg 66.04 -
2 Penulangan Sengkang Ring Balok 15 / 20 Besi Ø 8 - 15 Kg 35.22 -
3 Begisting Ring Balok 15 / 20 (2 x Pakai) M2 7.44 -
4 Beton K-175/M3 M3 0.55 -
JUMLAH XVII -

XVIII PEKERJAAN LISPLANK BETON JENDELA


1 Penulangan Plat Lisplank Beton Besi Ø 10 - 15 Kg 67.19 -
2 Penulangan Sengkang Plat Lisplank Beton Besi Ø 8 - 12,5 Kg 43.00 -
3 Begisting Plat Lisplank Beton M2 16.35 -
4 Beton Ready Mix K-250/M3 M3 1.96 -
JUMLAH XVIII -

XIX PEKERJAAN DINDING


1 Pemasangan 1 m2 dinding Bata Merah tebal 1/2 batu Camp, 1PC : 4 Pasir P M2 37.12 -
2 Pemasangan 1 m2 GRC Ornament Uk. 5x36x60 M2 20.50 -
JUMLAH XIX -

XX PEKERJAAN PINTU DAN JENDELA ALUMINIUM (KUSEN)


1 Pek. Pasang Kuzen dan Pintu Aluminium Merk Alexindo Type P3 + Aceseori Unit 2.00 -
2 Pek. Pasang Kuzen dan Jendela Aluminium Merk Alexindo Type J1 + Aceseo Unit 2.00 -
3 Pek. Pasang Kuzen dan Jendela Aluminium Merk Alexindo Type V1 + Acese Unit 1.00 -
4 Pemasangan Railling Tangga Besi Pipa Stainles Steel M2 46.98 -
JUMLAH XX -

XXI PEKERJAAN KAP / ATAP


1 Pasangan Angkur Panjang 50 Cm D 16 Kg 12.62 -
2 Pas. Base Plate Plat 10 mm Kg 19.62 -
3 Memasang 1 M' Pipa Hitam Klas Medium Diameter 4" ( Tiang / Kolom ) M1 6.90 -
4 Memasang 1 M' Pipa Hitam Klas Medium Diameter 4" ( Ring Balok ) M1 12.00 -
5 Pengecatan 1 m2 Permukaan Baja Galvanis Secara Semprot Sistem 3 Lapis M2 2.26 -
6 Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Ringan (Canai Dingin) prof M2 106.80 -
7 Pemasangan Lisplank GRC Double / M1 M1 52.60 -
8 Pemasangan 1 m2 Atap Spandek Berpasir SAMMA ROOF Tebal 0,35 mm M2 106.80 -
9 Pemasangan 1 m1 Perabung Atap Spandek Berpasir SAMMA ROOF Tebal M1 28.00 -
10 Bola Bola / Flashing Atap Zincalume M1 28.80 -
11 Pemasangan 1 m Talang Air 1/2 Lingkaran D-15 Cm, Seng Plat BJLS 30 leb M1 28.00 -
JUMLAH XXI -

XXII PEKERJAAN PLESTERAN


1 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang tebal 15 mm M2 40.97 -
2 Pemasangan 1 m2 Acian M2 40.97 -
3 Pemasangan 1 m2 Plesteran Granit Chip tebal 1 Cm M2 75.77 -
JUMLAH XXII -

XXIII PEKERJAAN PLAFOND


1 1 M2 Anal. Pek. Memasang Plafond PVC Merk Kingfon (Shunda Plafond) + R M2 174.30 -
2 Pemasangan 1 m' Les Plafond PVC M1 230.80 -
JUMLAH XXIII -

XXIV PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


1 Pengurugan 1 m3 sirtu padat M3 6.75 -
2 Pengurugan 1 m3 dengan pasir urug M3 4.50 -
3 Membuat beton mutu f3c = 14,5 Mpa (K 175), slump (12 ± 2) Cm, w/c 0,6 M3 3.15 -
4 Pemasangan 1 m2 Lantai Granit 60 x 60 (silver pearls, Granito) M2 63.04 -
5 Pemasangan 1 m2 Lantai Granit 40 x 40 (Pearls White, Merk Granito) M2 101.29 -
6 Pemasangan 1 m' Step Nosing Granit pjg = 30 cm M1 75.00 -
7 Pemasangan 1 m' Bon Bon Keramik ukuran 10 Cm M1 15.00 -
JUMLAH XXIV -

XXV PEKERJAAN PENGECATAN


1 Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2lapis cat M2 40.97 -
JUMLAH XXV -
SAT VOLUME HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.) (Rp.)
XXVI PEKERJAAN ELEKTRIKAL
Pekerjaan Instalasi Penerangan dan Stop Kontak
1 Pekerjaan Armature, Saklar dan Stop Kontak
a. Pemasangan Lampu LED Panel Light Philips 48 watt Buah 6.00 -
b. Lampu Down Light LED 4" Philips 18 W Buah 34.00 -
2 Pekerjaan Instalasi
a. Instalasi Penerangan NYM 3 X 2.5mm2 + pipa counduit dia 20 mm2 Titik 40.00 -
JUMLAH XXVI -

XXVII PEKERJAAN INTERIOR MIHRAB


1 Pemasangan 1 m2 Dinding Pemisah Teakwood / Multiplek, Lapis HPL ( KhusuM2 147.00 -
2 Pemasangan 1 m2 Les Back Ground Dinding Triplek Finishing HPL, rangka M2 28.62 -
3 Pemasangan 1 m2 Dinding ACP Merk Seven (Motif Cutting) M2 147.00 -
JUMLAH XXVII -

B FINISHING LANTAI 2 MASJID NURUL ‘ILMI

I PEKERJAAN BONGKARAN
1 Pembongkaran 1 m3 beton bertulang M3 0.75 -
2 Pembongkaran 1 m3 dinding tembok bata M3 5.40 -
3 Membongkar Plafond PVC (sunda plafond) + Rangka Furing Hollow 4x4 (60 M2 93.55 -
JUMLAH I -

II PEKERJAAN KOLOM PRAKTIS ( KP 15 / 20 )


1 Penulangan Kolom Praktis 15 / 20 Besi Ø 12 Kg 990.74 -
2 Penulangan Sengkang Kolom Praktis 15 / 20 Besi Ø 8 - 15 Kg 528.39 -
3 Stek Besi Dinding Batu Bata Ø 8 Kg 46.87 -
4 Begisting Kolom Praktis 15 / 20 (2 x Pakai) M2 195.30 -
5 Beton K-175/M3 M3 8.37 -
JUMLAH II -

III PEKERJAAN BALOK LATEI 15 / 20


1 Penulangan Balok Latei 15 / 20 Besi Ø 12 Kg 184.47 -
2 Penulangan Sengkang Balok Latei 15 / 20 Besi Ø 8 - 15 Kg 95.10 -
3 Begisting Balok Latei 15 / 20 (2 x Pakai) M2 20.78 -
4 Beton K-175/M3 M3 1.55 -
JUMLAH III -

IV PEKERJAAN RING BALOK 15 / 20


1 Penulangan Ring Balok 15 / 20 Besi Ø 12 Kg 310.18 -
2 Penulangan Sengkang Ring Balok 15 / 20 Besi Ø 8 - 15 Kg 165.43 -
3 Begisting Ring Balok 15 / 20 (2 x Pakai) M2 34.94 -
4 Beton K-175/M3 M3 2.62 -
JUMLAH IV -

V PEKERJAAN DINDING
1 Pemasangan 1 m2 dinding Bata Merah tebal 1/2 batu Camp, 1PC : 4 Pasir P M2 41.80 -
2 Pemasangan 1 m2 GRC Ornament Uk. 5x36x60 M2 66.92 -
3 Pemasangan 1 m2 GRC Ornament Uk. 8x100x100 M2 4.00 -
4 Pemasangan 1 m2 GRC Ornament Uk. 8x200x200 M2 4.00 -
5 Hiasan Kaca Tempered Hias T 10 (Tulisan ALLAH) Unit 6.00 -
JUMLAH V -

VI PEKERJAAN PINTU DAN JENDELA ALUMINIUM (KUSEN)


1 Pek. Pasang Kuzen dan Pintu Aluminium Merk Alexindo Type P2 + Aceseori Unit 2.00 -
2 Pek. Pasang Kuzen dan Jendela Aluminium Merk Alexindo Type J1 + Aceseo Unit 20.00 -
3 Pek. Pasang Kuzen dan Jendela Aluminium Merk Alexindo Type J2 + Aceseo Unit 10.00 -
4 Pemasangan Railling Tangga Besi Pipa Stainles Steel M2 23.58 -
5 Pek. Pasang Partisi Kuzen dan Pintu Aluminium Merk Alexindo Type PT1 + Unit 4.00 -
6 Pek. Pasang Partisi Kuzen dan Pintu Aluminium Merk Alexindo Type PT2 + Unit 2.00 -
7 Pek. Pasang Partisi Kuzen dan Pintu Aluminium Merk Alexindo Type PT3 + Unit 2.00 -
8 Pek. Pasang Partisi Kuzen dan Pintu Aluminium Merk Alexindo Type PT4 + Unit 2.00 -
9 Pemasangan 1 m2 Acrilic tebal 8 mm M2 34.56 -
JUMLAH VI -
SAT VOLUME HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.) (Rp.)
SAT VOLUME HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.) (Rp.)
VII PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
1 Pemasangan 1 m2 Water Proffing Membrane M2 68.00 -
JUMLAH VII -

VIII PEKERJAAN PLESTERAN


1 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang tebal 15 mm M2 41.80 -
2 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang (Afwerking) tebal 20 mm M2 163.32 -
3 Pemasangan 1 m2 Acian M2 205.12 -
4 Pemasangan 1 m2 Plesteran Granit Chip tebal 1 Cm M2 768.93 -
JUMLAH VIII -

IX PEKERJAAN PLAFOND
1 1 M2 Anal. Pek. Memasang Plafond PVC Merk Kingfon (Shunda Plafond) + R M2 93.55 -
2 Pemasangan 1 m' Les Plafond PVC M1 113.85 -
JUMLAH IX -

X PEKERJAAN PENGECATAN
1 Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2lapis cat M2 328.78 -
2 Pemasangan 1 m2 Aqua Proof M2 68.00 -
JUMLAH X -

XI PEKERJAAN NAMA MASJID


1 Pemasangan Nama dan Logo / Merk Stainless Steel
a. Logo / Merk Stainless Steel Tinggi 90 cm = 2 Buah Logo 2.00 -
b. Tinggi Huruf / Nama Stainless Steel 40 cm = 15 Huruf Huruf 15.00 -
JUMLAH XI -

C FINISHING LANTAI 3 / DAK BETON MASJID NURUL ‘ILMI

I PEKERJAAN BONGKARAN
1 1 m2 Membongkar Dan Menurunkan Atap Seng M2 66.14 -
2 Pembongkaran 1 m3 beton bertulang M3 0.04 -
3 1 m2 Pembobokan beton dinding M2 28.79 -
JUMLAH I -

II PEKERJAAN KOLOM INDUK ( K1 25 / 50 )


1 Penulangan Kolom Induk 25 / 50 Besi D 13 Kg 168.78 -
2 Penulangan Sengkang Kolom Induk 25 / 50 Besi Ø 8 - 15 Kg 119.31 -
3 Stek Besi Dinding Batu Bata Ø 8 Kg 7.10 -
4 Begisting Kolom Induk 25 / 50 (2 x Pakai) M2 32.40 -
5 Beton Ready Mix K-250/M3 M3 2.70 -
JUMLAH II -

III PEKERJAAN KOLOM PRAKTIS ( KP 13 / 13 )


1 Penulangan Kolom Praktis 13 / 13 Besi Ø 12 Kg 248.57 -
2 Penulangan Sengkang Kolom Praktis 13 / 13 Besi Ø 8 - 15 Kg 101.63 -
3 Stek Besi Dinding Batu Bata Ø 8 Kg 20.20 -
4 Begisting Kolom Praktis 13 / 13 (2 x Pakai) M2 21.00 -
5 Beton K-175/M3 M3 1.18 -
JUMLAH III -

IV PEKERJAAN KOLOM PRAKTIS ( KP 15 / 20 )


1 Penulangan Kolom Praktis 15 / 20 Besi Ø 12 Kg 29.82 -
2 Penulangan Sengkang Kolom Praktis 15 / 20 Besi Ø 8 - 15 Kg 15.90 -
3 Stek Besi Dinding Batu Bata Ø 8 Kg 1.65 -
4 Begisting Kolom Praktis 15 / 20 (2 x Pakai) M2 5.88 -
5 Beton K-175/M3 M3 0.25 -
JUMLAH IV -

V PEKERJAAN RING BALOK 15 / 20


1 Penulangan Ring Balok 15 / 20 Besi Ø 12 Kg 591.95 -
2 Penulangan Sengkang Ring Balok 15 / 20 Besi Ø 8 - 15 Kg 315.71 -
3 Begisting Ring Balok 15 / 20 (2 x Pakai) M2 66.68 -
4 Beton K-175/M3 M3 5.00 -
SAT VOLUME HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.) (Rp.)
JUMLAH V -
SAT VOLUME HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.) (Rp.)
VI PEKERJAAN DINDING
1 Pemasangan 1 m2 dinding Bata Merah tebal 1/2 batu Camp, 1PC : 4 Pasir P M2 212.47 -
2 Pemasangan 1 m2 GRC Ornament Uk. 5x36x60 M2 37.15 -
JUMLAH VI -

VII PEKERJAAN KAP / ATAP


1 Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Ringan (Canai Dingin) prof M2 66.14 -
2 Pemasangan Lisplank GRC Double / M1 M1 16.70 -
JUMLAH VII -

VIII PEKERJAAN PENUTUP ATAP


1 Pemasangan 1 m2 Genteng Metal Berpasir ukuran 80 x 100 Atap Pelana ( M2 66.14 -
2 Pemasangan 1 m1 Nok Genteng Metal M1 16.70 -
3 Flashing Atap Genteng Metal M1 16.70 -
JUMLAH VIII -

IX PEKERJAAN PLESTERAN
1 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang tebal 15 mm M2 212.47 -
2 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang (Afwerking) tebal 20 mm M2 62.98 -
3 Pemasangan 1 m2 Acian M2 275.45 -
4 Pemasangan 1 m2 Plesteran Granit Chip tebal 1 Cm M2 616.55 -
JUMLAH IX -

X PEKERJAAN PLAFOND
1 1 M2 Anal. Pek. Memasang Plafond PVC Merk Kingfon (Shunda Plafond) + R M2 66.14 -
2 Pemasangan 1 m' Les Plafond PVC M1 81.60 -
JUMLAH X -

XI PEKERJAAN PENGECATAN
1 Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2lapis cat M2 275.45 -
JUMLAH XI -

XII PEKERJAAN ELEKTRIKAL


Pekerjaan Instalasi Penerangan dan Stop Kontak
1 Pekerjaan Armature, Saklar dan Stop Kontak
a. Lampu Down Light LED 4" Philips 18 W Buah 8.00 -
2 Pekerjaan Instalasi
a. Instalasi Penerangan NYM 3 X 2.5mm2 + pipa counduit dia 20 mm2 Titik 8.00 -
JUMLAH XII -

D PEMBANGUNAN MENARA MASJID NURUL ‘ILMI (2 UNIT)

I PEKERJAAN KOLOM INDUK ( K1 40 / 40 )


1 Penulangan Kolom Induk 40 / 40 Besi D 16 Kg 963.61 -
2 Penulangan Sengkang Kolom Induk 40 / 40 Besi Ø 8 - 15 Kg 240.90 -
3 Stek Besi Dinding Batu Bata Ø 8 Kg 12.62 -
4 Begisting Kolom Induk 40 / 40 (2 x Pakai) M2 81.40 -
5 Beton Ready Mix K-250/M3 M3 8.01 -
JUMLAH I -

II PEKERJAAN KOLOM INDUK ( K2 20 / 20 )


1 Penulangan Kolom Induk 20 / 20 Besi D 13 Kg 52.67 -
2 Penulangan Sengkang Kolom Induk 20 / 20 Besi Ø 8 - 15 Kg 20.85 -
3 Stek Besi Dinding Batu Bata Ø 8 Kg 6.31 -
4 Begisting Kolom Induk 20 / 20 (2 x Pakai) M2 10.11 -
5 Beton Ready Mix K-250/M3 M3 0.37 -
JUMLAH II -

III PEKERJAAN KOLOM PRAKTIS ( KP 13 / 13 )


1 Penulangan Kolom Praktis 13 / 13 Besi Ø 12 Kg 179.54 -
2 Penulangan Sengkang Kolom Praktis 13 / 13 Besi Ø 8 - 15 Kg 54.82 -
3 Stek Besi Dinding Batu Bata Ø 8 Kg 12.62 -
4 Begisting Kolom Praktis 13 / 13 (2 x Pakai) M2 15.16 -
5 Beton K-175/M3 M3 0.63 -
SAT VOLUME HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.) (Rp.)
JUMLAH III -
SAT VOLUME HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.) (Rp.)
IV PEKERJAAN BALOK INDUK 20 / 30
1 Penulangan Balok Induk 20 / 30 Besi D 13 Kg 446.34 -
2 Penulangan Sengkang Balok Induk 20 / 30 Besi Ø 8 - 15 Kg 144.31 -
3 Begisting Balok Induk 20 / 30 (2 x Pakai) M2 40.64 -
4 Beton Ready Mix K-250/M3 M3 3.04 -
JUMLAH IV -

V PEKERJAAN RING BALOK 15 / 20


1 Penulangan Ring Balok 15 / 20 Besi Ø 12 Kg 92.32 -
2 Penulangan Sengkang Ring Balok 15 / 20 Besi Ø 8 - 15 Kg 35.60 -
3 Begisting Ring Balok 15 / 20 (2 x Pakai) M2 10.34 -
4 Beton Ready Mix K-250/M3 M3 0.56 -
JUMLAH V -

VI PEKERJAAN LISPLANK BETON JENDELA


1 Penulangan Plat Lisplank Beton Besi Ø 10 - 15 Kg 213.72 -
2 Penulangan Sengkang Plat Lisplank Beton Besi Ø 8 - 12,5 Kg 153.40 -
3 Begisting Plat Lisplank Beton M2 104.00 -
4 Beton Ready Mix K-250/M3 M3 6.26 -
JUMLAH VI -

VII PEKERJAAN DINDING


1 Pemasangan 1 m2 dinding Bata Merah tebal 1/2 batu Camp, 1PC : 4 Pasir P M2 100.30 -
JUMLAH VII -

VIII PEKERJAAN BESI DAN ALUMINIUM (KUSEN)


1 Hiasan Kaca Tempered Hias T 10 (Tulisan ALLAH) Unit 8.00 -
2 Pek. Pasang Kuzen dan Pintu Aluminium Merk Alexindo Type P1 + Aceseori Unit 2.00 -
3 Tangga Besi Unit 2.00 -
JUMLAH VIII -

IX PEKERJAAN KAP / ATAP


1 Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Ringan (Canai Dingin) prof M2 154.47 -
2 Pemasangan Lisplank GRC Double / M1 M1 100.00 -
JUMLAH IX -

X PEKERJAAN PENUTUP ATAP


1 Pemasangan 1 m2 Genteng Metal Berpasir ukuran 80 x 100 Atap Pelana ( M2 154.47 -
2 Pemasangan 1 m1 Nok Genteng Metal M1 51.60 -
3 Hiasan Puncak Menara Unit 2.00 -
JUMLAH X -

XI PEKERJAAN PLESTERAN
1 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang tebal 15 mm M2 104.80 -
2 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang (Afwerking) tebal 20 mm M2 82.14 -
3 Pemasangan 1 m2 Acian M2 186.94 -
4 Pemasangan 1 m2 Plesteran Granit Chip tebal 1 Cm M2 175.10 -
JUMLAH XI -

XII PEKERJAAN PLAFOND


1 1 M2 Anal. Pek. Memasang Plafond PVC Merk Kingfon (Shunda Plafond) + R M2 62.00 -
2 Pemasangan 1 m' Les Plafond PVC M1 64.40 -
JUMLAH XII -

XIII PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


1 Pemasangan 1 m2 Lantai Granit 60 x 60 (silver pearls, Granito) M2 16.24 -
JUMLAH XIII -

XIV PEKERJAAN PENGECATAN


1 Pengecatan bidang kayu baru (1lapis plamuur, 1 lapis cat dasar,3 lapis cat M2 25.00 -
2 Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2lapis cat M2 186.94 -
JUMLAH XIV -
SAT VOLUME HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.) (Rp.)
XV PEKERJAAN ELEKTRIKAL
Pekerjaan Instalasi Penerangan dan Stop Kontak
1 Pekerjaan Armature, Saklar dan Stop Kontak
a. Lampu Energi Saving Philips 18 watt Unit 2.00 -
2 Pekerjaan Instalasi
a. Instalasi Penerangan NYM 3 X 2.5mm2 + pipa counduit dia 20 mm2 Unit 2.00 -
JUMLAH XV -

E PEMBANGUNAN PLANK NAMA MASJID NURUL ‘ILMI

I PEKERJAAN TANAH
1 Penggalian 1 m3 tanah biasa sedalam 1 m M3 4.00 -
2 Pengurugan kembali 1 m3 galian tanah M3 1.33 -
JUMLAH I -

II PEKERJAAN PONDASI BATU KALI


1 Pengurugan 1 m3 dengan pasir urug M3 0.16 -
2 Pemasangan 1 m3 pondasi batu kali Camp, 1PC : 4 Pasir Pasang M3 1.34 -
3 Pemasangan 1 m3 pondasi batu kosong (Aanstampang) M3 0.64 -
JUMLAH II -

III PEKERJAAN PONDASI BATU BATA


1 Membuat Lantai kerja beton (K 100) M3 0.38 -
2 Pemasangan 1 m2 pondasi dinding Bata Merah (5x11x22) Cm tebal 1/2 ba M2 5.50 -
3 Pemasangan 1 m2 Plesteran 1PC : 2 Pasir Pasang tebal 15 mm M2 6.05 -
4 Pemasangan 1 m2 Acian M2 6.05 -
JUMLAH III -

IV PEKERJAAN PONDASI PLAT SETEMPAT


1 Membuat Lantai kerja beton (K 100) M3 0.10 -
2 Penulangan Plat Setempat Besi D 13 Kg 89.39 -
3 Begisting Pondasi Plat Setempat (2 x Pakai) M2 2.40 -
4 Beton Ready Mix K-250/M3 M3 0.60 -
JUMLAH IV -

V PEKERJAAN KOLOM INDUK ( K1 20 / 40 )


1 Penulangan Kolom Induk 20 / 40 Besi D 13 Kg 56.26 -
2 Penulangan Sengkang Kolom Induk 20 / 40 Besi Ø 8 - 15 Kg 31.24 -
3 Begisting Kolom Induk 20 / 40 (2 x Pakai) M2 9.60 -
4 Beton Ready Mix K-250/M3 M3 0.64 -
JUMLAH V -

VI PEKERJAAN SLOOF INDUK 20 /40


1 Penulangan Sloof Induk 20 / 40 Besi D 13 Kg 25.63 -
2 Penulangan Sengkang Sloof Induk 20 / 40 Besi Ø 8 - 15 Kg 11.11 -
3 Begisting Sloof Induk 20 / 40 (2 x Pakai) M2 2.56 -
4 Beton Ready Mix K-250/M3 M3 0.25 -
JUMLAH VI -

VII PEKERJAAN BALOK INDUK 20 / 40


1 Penulangan Balok Induk 20 / 40 Besi D 13 Kg 25.63 -
2 Penulangan Sengkang Balok Induk 20 / 40 Besi Ø 8 - 15 Kg 11.11 -
3 Begisting Balok Induk 20 / 40 (2 x Pakai) M2 3.20 -
4 Beton Ready Mix K-250/M3 M3 0.25 -
JUMLAH VII -

VIII PEKERJAAN DINDING


1 Pemasangan 1 m2 dinding Bata Merah tebal 1/2 batu Camp, 1PC : 4 Pasir P M2 5.12 -
JUMLAH VIII -

IX PEKERJAAN PLESTERAN
1 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang tebal 15 mm M2 5.12 -
2 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang (Afwerking) tebal 20 mm M2 11.68 -
3 Pemasangan 1 m2 Acian M2 16.80 -
SAT VOLUME HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.) (Rp.)
4 Pemasangan 1 m2 Plesteran Granit Chip tebal 1 Cm M2 5.12 -
JUMLAH IX -
SAT VOLUME HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.) (Rp.)
X PEKERJAAN PENGECATAN
1 Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2lapis cat M2 22.85 -
JUMLAH X -

XI PEKERJAAN NAMA MASJID


1 Pemasangan Nama dan Logo / Merk Stainless Steel (Jenis Huruf Rage Italic)
a. Logo / Merk Stainless Steel Tinggi 50 cm = 1 Buah Logo 1.00 -
b. Tinggi Huruf / Nama Stainless Steel 25 cm = 15 Huruf Huruf 15.00 -
c. Tinggi Huruf / Nama Stainless Steel 25 cm = 24 Huruf Huruf 24.00 -
JUMLAH XI -

XII PEKERJAAN ELEKTRIKAL


Pekerjaan Instalasi Penerangan dan Stop Kontak
1 Pekerjaan Armature, Saklar dan Stop Kontak
a. Lampu Taman LED Philip 50 Watt Buah 2.00 -
2 Pekerjaan Instalasi
a. Instalasi Penerangan NYM 3 X 2.5mm2 + pipa counduit dia 20 mm2 Titik 2.00 -
JUMLAH XII -

F PEMBANGUNAN TAMAN POT BUNGA MASJID

I PEKERJAAN POT BUNGA


1 Membuat Lantai kerja beton (K 100) M3 1.68 -
2 Pemasangan 1 m2 pondasi dinding Bata Merah (5x11x22) Cm tebal 1/2 ba M2 40.56 -
3 Pemasangan 1 m2 Plesteran 1PC : 2 Pasir Pasang tebal 15 mm M2 16.80 -
4 Pemasangan 1 m2 Acian M2 16.80 -
5 Pemasangan 1 m2 Plesteran Granit Chip tebal 1 Cm M2 40.56 -
6 Pemasangan 1 m3 Urugan Tanah Humus M3 5.13 -
7 Pemasangan 1 m2 Rumput Lempeng M2 9.10 -
8 Pemasangan 1 btg Bunga Pucuk Merah Btg 8.00 -
9 Pemasangan 1 btg Pohon Ketapang Putih Btg 4.00 -
JUMLAH I -

G REHABILITASI MENARA UTAMA MASJID

I PENGECATAN ULANG MENARA UTAMA MASJID


1 1 Set Pemasangan dan Pembongkaran Scafolding Unit 80.00 -
2 Pengikisan/pengerokan permukaan cat lama M2 661.56 -
3 Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup) M2 661.56 -
JUMLAH I -

II PERLENGKAPAN MENARA UTAMA MASJID


1 Pemasangan Tangga Besi T 4 m Unit 1.00 -
2 Pemasangan Puncak Menara Lafadz Allah + Lampu Unit 1.00 -
JUMLAH II -

Padang, 2023

Penawar,
Kontraktor Pelaksana
CV….................................

NAMA JELAS
............................................
DAFTAR HARGA SATUAN PEKERJAAN

PROGRAM : PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS


PEKERJAAN : RENOVASI MESJID NURUL ILMI
LOKASI : KAMPUS UNIVERSITAS ANDALAS, LIMAU MANIS - PADANG
TAHUN ANGGARAN : 2023

KODE HARGA SATUAN PEKERJAAN


NO URAIAN PEKERJAAN SAT KET
ANALISA (Rp)

A FINISHING LANTAI 1 MASJID NURUL ‘ILMI

I PEKERJAAN PERSIAPAN
1 Peralatan K3 konstruksi (Keselamatan dan Kesehatan Kerja) Unit Rp -

II PEKERJAAN BONGKARAN / PENYAMBUNGAN STRUKTUR


1 Pembongkaran 1 m3 beton bertulang A.2.2.1.13 M3 Rp -
2 Pembongkaran 1 m3 dinding tembok bata A.2.2.1.14 M3 Rp -
3 Pembongkaran Atap Kanopi Kanan Masjid M3 Ls

III PEKERJAAN TANAH


1 Penggalian 1 m3 tanah biasa sedalam 1 m A.2.3.1.1 M3 Rp -
2 Pengurugan kembali 1 m3 galian tanah A.2.3.1.9 M3 Rp -

IV PEKERJAAN PONDASI
1 Membuat Lantai kerja beton mutu f3c = 7,4 Mpa (K 100), slump (3 - 6) Cm, A.4.1.1.4 M3 Rp -
2 Pemasangan 1 m2 pondasi dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp, A.4.4.1.7 M2 Rp -
3 Pemasangan 1 m2 Plesteran 1PC : 2 Pasir Pasang tebal 15 mm A.4.4.2.2 M2 Rp -
4 Pemasangan 1 m2 Acian A.4.4.2.27 M2 Rp -

V PEKERJAAN PONDASI PLAT SETEMPAT (P1)


1 Pengurugan 1 m3 dengan pasir urug A.2.3.1.11 Rp -
2 Membuat Lantai kerja beton mutu f3c = 7,4 Mpa (K 100), slump (3 - 6) Cm, A.4.1.1.4 Rp -
3 Penulangan Plat Setempat Besi D 16 A.4.1.1.17 Kg Rp -
4 Begisting Pondasi Plat Setempat A.4.1.1.20 M2 Rp -
5 Beton Ready Mix K-250/M3 M3 Rp -

VI PEKERJAAN PONDASI PLAT SETEMPAT (P2) TANGGA


1 Pengurugan 1 m3 dengan pasir urug A.2.3.1.11 Rp -
2 Membuat Lantai kerja beton mutu f3c = 7,4 Mpa (K 100), slump (3 - 6) Cm, A.4.1.1.4 Rp -
3 Penulangan Plat Setempat Besi D 13 A.4.1.1.17 Kg Rp -
4 Begisting Pondasi Plat Setempat A.4.1.1.20 M2 Rp -
5 Beton Ready Mix K-250/M3 M3 Rp -

VII PEKERJAAN TIE BEAM / SLOOF (TB1 20 / 40)


1 Membuat Lantai kerja beton mutu f3c = 7,4 Mpa (K 100), slump (3 - 6) Cm, A.4.1.1.4 M3 Rp -
2 Penulangan Besi D 16 A.4.1.1.17 Kg Rp -
3 Penulangan Sengkang Besi Ø 10 - 10/15 A.4.1.1.17 Kg Rp -
4 Begisting Sloof (2 x Pakai) A.4.1.1.21 Kg Rp -
5 Beton Ready Mix K-250/M3 M3 Rp -
6 Stek Besi Kolom Praktis Ø 10 A.4.1.1.17 Kg Rp -

VIII PEKERJAAN TIE BEAM / SLOOF (TB2 20 / 30)


1 Membuat Lantai kerja beton mutu f3c = 7,4 Mpa (K 100), slump (3 - 6) Cm, A.4.1.1.4 M3 Rp -
2 Penulangan Besi D 16 A.4.1.1.17 Kg Rp -
3 Penulangan Sengkang Besi Ø 10 - 10/15 A.4.1.1.17 Kg Rp -
4 Begisting Sloof (2 x Pakai) A.4.1.1.21 Kg Rp -
5 Beton Ready Mix K-250/M3 M3 Rp -
6 Stek Besi Kolom Praktis Ø 10 A.4.1.1.17 Kg Rp -

IX PEKERJAAN KOLOM INDUK (K1 40 / 40)


1 Penulangan Besi D 16 A.4.1.1.17 Kg Rp -
2 Penulangan Sengkang Besi Ø 10 - 10/15 A.4.1.1.17 Kg Rp -
3 Begisting Kolom (2 x Pakai) A.4.1.1.22 Kg Rp -
4 Beton Ready Mix K-250/M3 M3 Rp -
5 Stek Besi Balok Latei Ø 10 A.4.1.1.17 Kg Rp -
KODE HARGA SATUAN PEKERJAAN
NO URAIAN PEKERJAAN SAT KET
ANALISA (Rp)
X PEKERJAAN KOLOM TANGGA (K2 20 / 20)
1 Penulangan Besi D 13 A.4.1.1.17 Kg Rp -
2 Penulangan Sengkang Besi Ø 8 - 10/15 A.4.1.1.17 Kg Rp -
3 Begisting Kolom (2 x Pakai) A.4.1.1.22 Kg Rp -
4 Beton Ready Mix K-250/M3 M3 Rp -

XI PEKERJAAN BALOK INDUK (B1 20 / 40)


1 Penulangan Besi D 16 A.4.1.1.17 Kg Rp -
2 Penulangan Sengkang Besi Ø 10 - 10/15 A.4.1.1.17 Kg Rp -
3 Begisting Balok (2 x Pakai) A.4.1.1.23 Kg Rp -
4 Beton Ready Mix K-250/M3 M3 Rp -

XII PEKERJAAN BALOK TANGGA (B2 15 / 30)


1 Penulangan Besi D 16 A.4.1.1.17 Kg Rp -
2 Penulangan Sengkang Besi Ø 8 - 10/15 A.4.1.1.17 Kg Rp -
3 Begisting Balok Tangga 15 / 30 (2 x Pakai) A.4.1.1.23 M2 Rp -
4 Beton Ready Mix K-250/M3 M3 Rp -

XIII PEKERJAAN PLAT LANTAI TANGGA


1 Penulangan Besi D 16 A.4.1.1.17 Kg Rp -
2 Penulangan Sengkang Besi Ø 10 - 15 A.4.1.1.17 Kg Rp -
3 Penulangan Sengkang Besi Ø 8 - 15 A.4.1.1.17 Kg Rp -
4 Begisting Plat Lantai Tangga (2 x Pakai) A.4.1.1.24 M2 Rp -
5 Beton Ready Mix K-250/M3 M3 Rp -

XIV PEKERJAAN PLAT LANTAI 2


1 Penulangan Plat lantai 2 Besi Ø 10 -15 A.4.1.1.17 Kg Rp -
2 Begisting Plat Lantai (2 x Pakai) A.4.1.1.24 M2 Rp -
3 Beton Ready Mix K-250/M3 M3 Rp -

XV PEKERJAAN KOLOM PRAKTIS ( KP 15 / 20 )


1 Penulangan Kolom Praktis 15 / 20 Besi Ø 12 A.4.1.1.17 Kg Rp -
2 Penulangan Sengkang Kolom Praktis 15 / 20 Besi Ø 8 - 15 A.4.1.1.17 Kg Rp -
3 Stek Besi Dinding Batu Bata Ø 8 A.4.1.1.17 Kg Rp -
4 Begisting Kolom Praktis 15 / 20 (2 x Pakai) A.4.1.1.22 M2 Rp -
5 Beton K-175/M3 A.4.1.1.5 M3 Rp -

XVI PEKERJAAN BALOK LATEI 15 / 20


1 Penulangan Balok Latei 15 / 20 Besi Ø 12 A.4.1.1.17 Kg Rp -
2 Penulangan Sengkang Balok Latei 15 / 20 Besi Ø 8 - 15 A.4.1.1.17 Kg Rp -
3 Begisting Balok Latei 15 / 20 (2 x Pakai) A.4.1.1.23 M2 Rp -
4 Beton K-175/M3 A.4.1.1.5 M3 Rp -

XVII PEKERJAAN RING BALOK 15 / 20


1 Penulangan Ring Balok 15 / 20 Besi Ø 12 A.4.1.1.17 Kg Rp -
2 Penulangan Sengkang Ring Balok 15 / 20 Besi Ø 8 - 15 A.4.1.1.17 Kg Rp -
3 Begisting Ring Balok 15 / 20 (2 x Pakai) A.4.1.1.23 M2 Rp -
4 Beton K-175/M3 A.4.1.1.5 M3 Rp -

XVIII PEKERJAAN LISPLANK BETON JENDELA


1 Penulangan Plat Lisplank Beton Besi Ø 10 - 15 A.4.1.1.17 Kg Rp -
2 Penulangan Sengkang Plat Lisplank Beton Besi Ø 8 - 12,5 A.4.1.1.17 Kg Rp -
3 Begisting Plat Lisplank Beton A.4.1.1.23 M2 Rp -
4 Beton Ready Mix K-250/M3 M3 Rp -

XIX PEKERJAAN DINDING


1 Pemasangan 1 m2 dinding Bata Merah tebal 1/2 batu Camp, 1PC : 4 Pasir Pasang A.4.4.1.9 M2 Rp -
2 Pemasangan 1 m2 GRC Ornament Uk. 5x36x60 A.4.4.1.24 M2 Rp -

XX PEKERJAAN PINTU DAN JENDELA ALUMINIUM (KUSEN)


1 Pek. Pasang Kuzen dan Pintu Aluminium Merk Alexindo Type P3 + Aceseoris Unit Rp -
2 Pek. Pasang Kuzen dan Jendela Aluminium Merk Alexindo Type J1 + Aceseoris Unit Rp -
3 Pek. Pasang Kuzen dan Jendela Aluminium Merk Alexindo Type V1 + Aceseoris Unit Rp -
4 Pemasangan Railling Tangga Besi Pipa Stainles Steel M2
KODE HARGA SATUAN PEKERJAAN
NO URAIAN PEKERJAAN SAT KET
ANALISA (Rp)
XXI PEKERJAAN KAP / ATAP
1 Pasangan Angkur Panjang 50 Cm D 16 A.4.1.1.17 Kg Rp -
2 Pas. Base Plate Plat 10 mm A.4.2.1.3 Kg Rp -
3 Memasang 1 M' Pipa Hitam Klas Medium Diameter 4" ( Tiang / Kolom ) A.4.2.1.1 Kg Rp -
4 Memasang 1 M' Pipa Hitam Klas Medium Diameter 4" ( Ring Balok ) A.4.2.1.1 Kg Rp -
5 Pengecatan 1 m2 Permukaan Baja Galvanis Secara Semprot Sistem 3 Lapis A.4.7.1.21 M2 Rp -
6 Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Ringan (Canai Dingin) profil C 7 A.4.2.1.22 M2 Rp -
7 Pemasangan Lisplank GRC Double / M1 A.4.4.1.7 M1 Rp -
8 Pemasangan 1 m2 Atap Spandek Berpasir SAMMA ROOF Tebal 0,35 mm Anal H.8 M2 Rp -
9 Pemasangan 1 m1 Perabung Atap Spandek Berpasir SAMMA ROOF Tebal 0,35 mm Anal H.10 M1 Rp -
10 Bola Bola / Flashing Atap Zincalume Anal H.10 M1 Rp -
11 Pemasangan 1 m Talang Air 1/2 Lingkaran D-15 Cm, Seng Plat BJLS 30 lebar 45 C A.4.2.1.19 M1 Rp -

XXII PEKERJAAN PLESTERAN


1 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang tebal 15 mm A.4.4.2.4 M2 Rp -
2 Pemasangan 1 m2 Acian A.4.4.2.27 M2 Rp -
3 Pemasangan 1 m2 Plesteran Granit Chip tebal 1 Cm A.4.4.2.21 M2 Rp -

XXIII PEKERJAAN PLAFOND


1 1 M2 Anal. Pek. Memasang Plafond PVC Merk Kingfon (Shunda Plafond) + Rangka A.4.5.1.3 M2 Rp -
2 Pemasangan 1 m' Les Plafond PVC A.4.5.1.3 M1 Rp -

XXIV PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


1 Pengurugan 1 m3 sirtu padat A.2.3.1.14 M3 Rp -
2 Pengurugan 1 m3 dengan pasir urug A.2.3.1.11 M3 Rp -
3 Membuat beton mutu f3c = 14,5 Mpa (K 175), slump (12 ± 2) Cm, w/c 0,66 A.4.1.1.5 M3 Rp -
4 Pemasangan 1 m2 Lantai Granit 60 x 60 (silver pearls, Granito) A.4.4.3.9 M2 Rp -
5 Pemasangan 1 m2 Lantai Granit 40 x 40 (Pearls White, Merk Granito) A.4.4.3.9 M2 Rp -
6 Pemasangan 1 m' Step Nosing Granit pjg = 30 cm A.4.4.3.40b M1 Rp -
7 Pemasangan 1 m' Bon Bon Keramik ukuran 10 Cm A.4.4.3.40c M1 Rp -

XXV PEKERJAAN PENGECATAN


1 Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2lapis cat penutup) A.4.7.1.10 M2 Rp -

XXVI PEKERJAAN ELEKTRIKAL


Pekerjaan Instalasi Penerangan dan Stop Kontak
1 Pekerjaan Armature, Saklar dan Stop Kontak
a. Pemasangan Lampu LED Panel Light Philips 48 watt Buah Rp -
b. Lampu Down Light LED 4" Philips 18 W Buah Rp -
2 Pekerjaan Instalasi
a. Instalasi Penerangan NYM 3 X 2.5mm2 + pipa counduit dia 20 mm2 Titik Rp -

XXVII PEKERJAAN INTERIOR MIHRAB


1 Pemasangan 1 m2 Dinding Pemisah Teakwood / Multiplek, Lapis HPL ( Khusus Inter A.4.6.1.25 M2 Rp -
2 Pemasangan 1 m2 Les Back Ground Dinding Triplek Finishing HPL, rangka plywoo A.4.6.1.25 M2 Rp -
3 Pemasangan 1 m2 Dinding ACP Merk Seven (Motif Cutting) A.4.2.1.21 M2 Rp -

B FINISHING LANTAI 2 MASJID NURUL ‘ILMI

I PEKERJAAN BONGKARAN
1 Pembongkaran 1 m3 beton bertulang A.2.2.1.13 M3 Rp -
2 Pembongkaran 1 m3 dinding tembok bata A.2.2.1.14 M3 Rp -
3 Membongkar Plafond PVC (sunda plafond) + Rangka Furing Hollow 4x4 (60 x 60) A.4.5.1.3 M3 Rp -

II PEKERJAAN KOLOM PRAKTIS ( KP 15 / 20 )


1 Penulangan Kolom Praktis 15 / 20 Besi Ø 12 A.4.1.1.17 Kg Rp -
2 Penulangan Sengkang Kolom Praktis 15 / 20 Besi Ø 8 - 15 A.4.1.1.17 Kg Rp -
3 Stek Besi Dinding Batu Bata Ø 8 A.4.1.1.17 Kg Rp -
4 Begisting Kolom Praktis 15 / 20 (2 x Pakai) A.4.1.1.22 M2 Rp -
5 Beton K-175/M3 A.4.1.1.5 M3 Rp -

III PEKERJAAN BALOK LATEI 15 / 20


1 Penulangan Balok Latei 15 / 20 Besi Ø 12 A.4.1.1.17 Kg Rp -
2 Penulangan Sengkang Balok Latei 15 / 20 Besi Ø 8 - 15 A.4.1.1.17 Kg Rp -
3 Begisting Balok Latei 15 / 20 (2 x Pakai) A.4.1.1.23 M2 Rp -
4 Beton K-175/M3 A.4.1.1.5 M3 Rp -

IV PEKERJAAN RING BALOK 15 / 20


1 Penulangan Ring Balok 15 / 20 Besi Ø 12 A.4.1.1.17 Kg Rp -
2 Penulangan Sengkang Ring Balok 15 / 20 Besi Ø 8 - 15 A.4.1.1.17 Kg Rp -
3 Begisting Ring Balok 15 / 20 (2 x Pakai) A.4.1.1.23 M2 Rp -
4 Beton K-175/M3 A.4.1.1.5 M3 Rp -
KODE HARGA SATUAN PEKERJAAN
NO URAIAN PEKERJAAN SAT KET
ANALISA (Rp)
V PEKERJAAN DINDING
1 Pemasangan 1 m2 dinding Bata Merah tebal 1/2 batu Camp, 1PC : 4 Pasir Pasang A.4.4.1.9 M2 Rp -
2 Pemasangan 1 m2 GRC Ornament Uk. 5x36x60 A.4.4.1.24 M2 Rp -
3 Pemasangan 1 m2 GRC Ornament Uk. 8x100x100 A.4.4.1.24 M2 Rp -
4 Pemasangan 1 m2 GRC Ornament Uk. 8x200x200 A.4.4.1.24 M2 Rp -
5 Hiasan Kaca Tempered Hias T 10 (Tulisan ALLAH) Unit

VI PEKERJAAN PINTU DAN JENDELA ALUMINIUM (KUSEN)


1 Pek. Pasang Kuzen dan Pintu Aluminium Merk Alexindo Type P2 + Aceseoris Unit Rp -
2 Pek. Pasang Kuzen dan Jendela Aluminium Merk Alexindo Type J1 + Aceseoris Unit Rp -
3 Pek. Pasang Kuzen dan Jendela Aluminium Merk Alexindo Type J2 + Aceseoris Unit Rp -
4 Pemasangan Railling Tangga Besi Pipa Stainles Steel M2
5 Pek. Pasang Partisi Kuzen dan Pintu Aluminium Merk Alexindo Type PT1 + Aceseoris Unit Rp -
6 Pek. Pasang Partisi Kuzen dan Pintu Aluminium Merk Alexindo Type PT2 + Aceseoris Unit Rp -
7 Pek. Pasang Partisi Kuzen dan Pintu Aluminium Merk Alexindo Type PT3 + Aceseoris Unit Rp -
8 Pek. Pasang Partisi Kuzen dan Pintu Aluminium Merk Alexindo Type PT4 + Aceseoris Unit Rp -
9 Pemasangan 1 m2 Acrilic tebal 8 mm M2 Rp -

VII PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


1 Pemasangan 1 m2 Water Proffing Membrane A.4.7.1.15 M2 Rp -

VIII PEKERJAAN PLESTERAN


1 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang tebal 15 mm A.4.4.2.4 M2 Rp -
2 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang (Afwerking) tebal 20 mm A.4.4.2.15 M2 Rp -
3 Pemasangan 1 m2 Acian A.4.4.2.27 M2 Rp -
4 Pemasangan 1 m2 Plesteran Granit Chip tebal 1 Cm A.4.4.2.21 M2 Rp -

IX PEKERJAAN PLAFOND
1 1 M2 Anal. Pek. Memasang Plafond PVC Merk Kingfon (Shunda Plafond) + Rangka A.4.5.1.3 M2 Rp -
2 Pemasangan 1 m' Les Plafond PVC A.4.5.1.3 M1 Rp -

X PEKERJAAN PENGECATAN
1 Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2lapis cat penutup) A.4.7.1.10 M2 Rp -
2 Pemasangan 1 m2 Aqua Proof A.4.7.1.15 M2 Rp -

XI PEKERJAAN NAMA MASJID


1 Pemasangan Nama dan Logo / Merk Stainless Steel
a. Logo / Merk Stainless Steel Tinggi 90 cm = 2 Buah Logo
b. Tinggi Huruf / Nama Stainless Steel 40 cm = 15 Huruf Buah

C FINISHING LANTAI 3 / DAK BETON MASJID NURUL ‘ILMI

I PEKERJAAN BONGKARAN
1 1 m2 Membongkar Dan Menurunkan Atap Seng ANAL. L 8/10 M2 Rp -
2 Pembongkaran 1 m3 beton bertulang A.2.2.1.13 M3 Rp -
3 1 m2 Pembobokan beton dinding A.2.2.1.14 M2 Rp -

II PEKERJAAN KOLOM INDUK ( K1 25 / 50 )


1 Penulangan Kolom Induk 25 / 50 Besi D 13 A.4.1.1.17 Kg Rp -
2 Penulangan Sengkang Kolom Induk 25 / 50 Besi Ø 8 - 15 A.4.1.1.17 Kg Rp -
3 Stek Besi Dinding Batu Bata Ø 8 A.4.1.1.17 Kg Rp -
4 Begisting Kolom Induk 25 / 50 (2 x Pakai) A.4.1.1.22 M2 Rp -
5 Beton Ready Mix K-250/M3 A.4.1.1.5 M3 Rp -

III PEKERJAAN KOLOM PRAKTIS ( KP 13 / 13 )


1 Penulangan Kolom Praktis 13 / 13 Besi Ø 12 A.4.1.1.17 Kg Rp -
2 Penulangan Sengkang Kolom Praktis 13 / 13 Besi Ø 8 - 15 A.4.1.1.17 Kg Rp -
3 Stek Besi Dinding Batu Bata Ø 8 A.4.1.1.17 Kg Rp -
4 Begisting Kolom Praktis 13 / 13 (2 x Pakai) A.4.1.1.22 M2 Rp -
5 Beton K-175/M3 A.4.1.1.5 M3 Rp -

IV PEKERJAAN KOLOM PRAKTIS ( KP 15 / 20 )


1 Penulangan Kolom Praktis 15 / 20 Besi Ø 12 A.4.1.1.17 Kg Rp -
2 Penulangan Sengkang Kolom Praktis 15 / 20 Besi Ø 8 - 15 A.4.1.1.17 Kg Rp -
3 Stek Besi Dinding Batu Bata Ø 8 A.4.1.1.17 Kg Rp -
4 Begisting Kolom Praktis 15 / 20 (2 x Pakai) A.4.1.1.22 M2 Rp -
5 Beton K-175/M3 A.4.1.1.5 M3 Rp -

V PEKERJAAN RING BALOK 15 / 20


1 Penulangan Ring Balok 15 / 20 Besi Ø 12 A.4.1.1.17 Kg Rp -
2 Penulangan Sengkang Ring Balok 15 / 20 Besi Ø 8 - 15 A.4.1.1.17 Kg Rp -
3 Begisting Ring Balok 15 / 20 (2 x Pakai) A.4.1.1.23 M2 Rp -
4 Beton K-175/M3 A.4.1.1.5 M3 Rp -
KODE HARGA SATUAN PEKERJAAN
NO URAIAN PEKERJAAN SAT KET
ANALISA (Rp)
VI PEKERJAAN DINDING
1 Pemasangan 1 m2 dinding Bata Merah tebal 1/2 batu Camp, 1PC : 4 Pasir Pasang A.4.4.1.9 M2 Rp -
2 Pemasangan 1 m2 GRC Ornament Uk. 5x36x60 A.4.4.1.24 M2 Rp -

VII PEKERJAAN KAP / ATAP


1 Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Ringan (Canai Dingin) profil C 7 A.4.2.1.22 M2 Rp -
2 Pemasangan Lisplank GRC Double / M1 M1 Rp -

VIII PEKERJAAN PENUTUP ATAP


1 Pemasangan 1 m2 Genteng Metal Berpasir ukuran 80 x 100 Atap Pelana (Merk Rain A.4.5.2.20 M2 Rp -
2 Pemasangan 1 m1 Nok Genteng Metal A.4.5.2.21 M1 Rp -
3 Flashing Atap Genteng Metal A.4.5.2.21 M1 Rp -

IX PEKERJAAN PLESTERAN
1 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang tebal 15 mm A.4.4.2.4 M2 Rp -
2 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang (Afwerking) tebal 20 mm A.4.4.2.15 M2 Rp -
3 Pemasangan 1 m2 Acian A.4.4.2.27 M2 Rp -
4 Pemasangan 1 m2 Plesteran Granit Chip tebal 1 Cm A.4.4.2.21 M2 Rp -

X PEKERJAAN PLAFOND
1 1 M2 Anal. Pek. Memasang Plafond PVC Merk Kingfon (Shunda Plafond) + Rangka A.4.5.1.3 M2 Rp -
2 Pemasangan 1 m' Les Plafond PVC A.4.5.1.3 M1 Rp -

XI PEKERJAAN PENGECATAN
1 Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2lapis cat penutup) A.4.7.1.10 M2 Rp -

XII PEKERJAAN ELEKTRIKAL


Pekerjaan Instalasi Penerangan dan Stop Kontak
1 Pekerjaan Armature, Saklar dan Stop Kontak
a. Lampu Down Light LED 4" Philips 18 W Buah Rp -
2 Pekerjaan Instalasi
a. Instalasi Penerangan NYM 3 X 2.5mm2 + pipa counduit dia 20 mm2 Titik Rp -

D PEMBANGUNAN MENARA MASJID NURUL ‘ILMI (2 UNIT)

I PEKERJAAN KOLOM INDUK ( K1 40 / 40 )


1 Penulangan Kolom Induk 40 / 40 Besi D 16 A.4.1.1.17 Kg Rp -
2 Penulangan Sengkang Kolom Induk 40 / 40 Besi Ø 8 - 15 A.4.1.1.17 Kg Rp -
3 Stek Besi Dinding Batu Bata Ø 8 A.4.1.1.17 Kg Rp -
4 Begisting Kolom Induk 40 / 40 (2 x Pakai) A.4.1.1.22 M2 Rp -
5 Beton Ready Mix K-250/M3 M3 Rp -

II PEKERJAAN KOLOM INDUK ( K2 20 / 20 )


1 Penulangan Kolom Induk 20 / 20 Besi D 13 A.4.1.1.17 Kg Rp -
2 Penulangan Sengkang Kolom Induk 20 / 20 Besi Ø 8 - 15 A.4.1.1.17 Kg Rp -
3 Stek Besi Dinding Batu Bata Ø 8 A.4.1.1.17 Kg Rp -
4 Begisting Kolom Induk 20 / 20 (2 x Pakai) A.4.1.1.22 M2 Rp -
5 Beton Ready Mix K-250/M3 M3 Rp -

III PEKERJAAN KOLOM PRAKTIS ( KP 13 / 13 )


1 Penulangan Kolom Praktis 13 / 13 Besi Ø 12 A.4.1.1.17 Kg Rp -
2 Penulangan Sengkang Kolom Praktis 13 / 13 Besi Ø 8 - 15 A.4.1.1.17 Kg Rp -
3 Stek Besi Dinding Batu Bata Ø 8 A.4.1.1.17 Kg Rp -
4 Begisting Kolom Praktis 13 / 13 (2 x Pakai) A.4.1.1.22 M2 Rp -
5 Beton K-175/M3 A.4.1.1.5 M3 Rp -

IV PEKERJAAN BALOK INDUK 20 / 30


1 Penulangan Balok Induk 20 / 30 Besi D 13 A.4.1.1.17 Kg Rp -
2 Penulangan Sengkang Balok Induk 20 / 30 Besi Ø 8 - 15 A.4.1.1.17 Kg Rp -
3 Begisting Balok Induk 20 / 30 (2 x Pakai) A.4.1.1.23 M2 Rp -
4 Beton Ready Mix K-250/M3 M3 Rp -

V PEKERJAAN RING BALOK 15 / 20


1 Penulangan Ring Balok 15 / 20 Besi Ø 12 A.4.1.1.17 Kg Rp -
2 Penulangan Sengkang Ring Balok 15 / 20 Besi Ø 8 - 15 A.4.1.1.17 Kg Rp -
3 Begisting Ring Balok 15 / 20 (2 x Pakai) A.4.1.1.23 M2 Rp -
4 Beton Ready Mix K-250/M3 M3 Rp -

VI PEKERJAAN LISPLANK BETON JENDELA


1 Penulangan Plat Lisplank Beton Besi Ø 10 - 15 A.4.1.1.17 Kg Rp -
2 Penulangan Sengkang Plat Lisplank Beton Besi Ø 8 - 12,5 A.4.1.1.17 Kg Rp -
3 Begisting Plat Lisplank Beton A.4.1.1.23 M2 Rp -
4 Beton Ready Mix K-250/M3 M3 Rp -

VII PEKERJAAN DINDING


KODE HARGA SATUAN PEKERJAAN
NO URAIAN PEKERJAAN SAT KET
ANALISA (Rp)
1 Pemasangan 1 m2 dinding Bata Merah tebal 1/2 batu Camp, 1PC : 4 Pasir Pasang A.4.4.1.9 M2 Rp -
KODE HARGA SATUAN PEKERJAAN
NO URAIAN PEKERJAAN SAT KET
ANALISA (Rp)
VIII PEKERJAAN BESI DAN ALUMINIUM (KUSEN)
1 Hiasan Kaca Tempered Hias T 10 (Tulisan ALLAH) Unit
2 Pek. Pasang Kuzen dan Pintu Aluminium Merk Alexindo Type P1 + Aceseoris Unit Rp -
3 Tangga Besi Unit

IX PEKERJAAN KAP / ATAP


1 Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Ringan (Canai Dingin) profil C 7 A.4.2.1.22 M2 Rp -
2 Pemasangan Lisplank GRC Double / M1 A.4.4.1.7 M1 Rp -

X PEKERJAAN PENUTUP ATAP


1 Pemasangan 1 m2 Genteng Metal Berpasir ukuran 80 x 100 Atap Pelana (Merk Rain A.4.5.2.20 M2 Rp -
2 Pemasangan 1 m1 Nok Genteng Metal A.4.5.2.21 M1 Rp -
3 Hiasan Puncak Menara Unit

XI PEKERJAAN PLESTERAN
1 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang tebal 15 mm A.4.4.2.4 M2 Rp -
2 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang (Afwerking) tebal 20 mm A.4.4.2.15 M2 Rp -
3 Pemasangan 1 m2 Acian A.4.4.2.27 M2 Rp -
4 Pemasangan 1 m2 Plesteran Granit Chip tebal 1 Cm A.4.4.2.21 M2 Rp -

XII PEKERJAAN PLAFOND


1 1 M2 Anal. Pek. Memasang Plafond PVC Merk Kingfon (Shunda Plafond) + Rangka A.4.5.1.3 M2 Rp -
2 Pemasangan 1 m' Les Plafond PVC A.4.5.1.3 M1 Rp -

XIII PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


1 Pemasangan 1 m2 Lantai Granit 60 x 60 (silver pearls, Granito) A.4.4.3.9 M2 Rp -

XIV PEKERJAAN PENGECATAN


1 Pengecatan bidang kayu baru (1lapis plamuur, 1 lapis cat dasar,3 lapis cat penutup) A.4.7.1.5 M2 Rp -
2 Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2lapis cat penutup) A.4.7.1.10 M2 Rp -

XV PEKERJAAN ELEKTRIKAL
Pekerjaan Instalasi Penerangan dan Stop Kontak
1 Pekerjaan Armature, Saklar dan Stop Kontak
a. Lampu Energi Saving Philips 18 watt Buah Rp -
2 Pekerjaan Instalasi
a. Instalasi Penerangan NYM 3 X 2.5mm2 + pipa counduit dia 20 mm2 Titik Rp -

E PEMBANGUNAN PLANK NAMA MASJID NURUL ‘ILMI

I PEKERJAAN TANAH
1 Penggalian 1 m3 tanah biasa sedalam 1 m A.2.3.1.1 M3 Rp -
2 Pengurugan kembali 1 m3 galian tanah A.2.3.1.9 M3 Rp -

II PEKERJAAN PONDASI BATU KALI


1 Pengurugan 1 m3 dengan pasir urug A.2.3.1.11 M3 Rp -
2 Pemasangan 1 m3 pondasi batu kali Camp, 1PC : 4 Pasir Pasang A.3.2.1.2 M3 Rp -
3 Pemasangan 1 m3 pondasi batu kosong (Aanstampang) A.3.2.1.9 M3 Rp -

III PEKERJAAN PONDASI BATU BATA


1 Membuat Lantai kerja beton (K 100) A.4.1.1.4 M3 Rp -
2 Pemasangan 1 m2 pondasi dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp, A.4.4.1.7 M2 Rp -
3 Pemasangan 1 m2 Plesteran 1PC : 2 Pasir Pasang tebal 15 mm A.4.4.2.2 M2 Rp -
4 Pemasangan 1 m2 Acian A.4.4.2.27 M2 Rp -

IV PEKERJAAN PONDASI PLAT SETEMPAT


1 Membuat Lantai kerja beton (K 100) A.4.1.1.4 M3 Rp -
2 Penulangan Plat Setempat Besi D 13 A.4.1.1.17 M3 Rp -
3 Begisting Pondasi Plat Setempat (2 x Pakai) A.4.1.1.20 M2 Rp -
4 Beton Ready Mix K-250/M3 A.4.1.1.8 M3 Rp -

V PEKERJAAN KOLOM INDUK ( K1 20 / 40 )


1 Penulangan Kolom Induk 20 / 40 Besi D 13 A.4.1.1.17 Kg Rp -
2 Penulangan Sengkang Kolom Induk 20 / 40 Besi Ø 8 - 15 A.4.1.1.17 Kg Rp -
3 Begisting Kolom Induk 20 / 40 (2 x Pakai) A.4.1.1.22 M2 Rp -
4 Beton Ready Mix K-250/M3 A.4.1.1.8 M3 Rp -

VI PEKERJAAN SLOOF INDUK 20 /40


1 Penulangan Sloof Induk 20 / 40 Besi D 13 A.4.1.1.17 Kg Rp -
2 Penulangan Sengkang Sloof Induk 20 / 40 Besi Ø 8 - 15 A.4.1.1.17 Kg Rp -
3 Begisting Sloof Induk 20 / 40 (2 x Pakai) A.4.1.1.21 M2 Rp -
4 Beton Ready Mix K-250/M3 A.4.1.1.8 M3 Rp -
KODE HARGA SATUAN PEKERJAAN
NO URAIAN PEKERJAAN SAT KET
ANALISA (Rp)
VII PEKERJAAN BALOK INDUK 20 / 40
1 Penulangan Balok Induk 20 / 40 Besi D 13 A.4.1.1.17 Kg Rp -
2 Penulangan Sengkang Balok Induk 20 / 40 Besi Ø 8 - 15 A.4.1.1.17 Kg Rp -
3 Begisting Balok Induk 20 / 40 (2 x Pakai) A.4.1.1.21 M2 Rp -
4 Beton Ready Mix K-250/M3 A.4.1.1.8 M3 Rp -

VIII PEKERJAAN DINDING


1 Pemasangan 1 m2 dinding Bata Merah tebal 1/2 batu Camp, 1PC : 4 Pasir Pasang A.4.4.1.9 M2 Rp -

IX PEKERJAAN PLESTERAN
1 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang tebal 15 mm A.4.4.2.4 M2 Rp -
2 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang (Afwerking) tebal 20 mm A.4.4.2.15 M2 Rp -
3 Pemasangan 1 m2 Acian A.4.4.2.27 M2 Rp -
4 Pemasangan 1 m2 Plesteran Granit Chip tebal 1 Cm A.4.4.2.21 M2 Rp -

X PEKERJAAN PENGECATAN
1 Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2lapis cat penutup) A.4.7.1.10 M2 Rp -

XI PEKERJAAN NAMA MASJID


1 Pemasangan Nama dan Logo / Merk Stainless Steel (Jenis Huruf Rage Italic)
a. Logo / Merk Stainless Steel Tinggi 50 cm = 1 Buah Logo
b. Tinggi Huruf / Nama Stainless Steel 25 cm = 15 Huruf Buah
c. Tinggi Huruf / Nama Stainless Steel 25 cm = 24 Huruf Buah

XII PEKERJAAN ELEKTRIKAL


Pekerjaan Instalasi Penerangan dan Stop Kontak
1 Pekerjaan Armature, Saklar dan Stop Kontak
a. Lampu Taman LED Philip 50 Watt Buah Rp -
2 Pekerjaan Instalasi
a. Instalasi Penerangan NYM 3 X 2.5mm2 + pipa counduit dia 20 mm2 Titik Rp -

F PEMBANGUNAN TAMAN POT BUNGA MASJID

I PEKERJAAN POT BUNGA


1 Membuat Lantai kerja beton (K 100) A.4.1.1.4 M3 Rp -
2 Pemasangan 1 m2 pondasi dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp, A.4.4.1.7 M3 Rp -
3 Pemasangan 1 m2 Plesteran 1PC : 2 Pasir Pasang tebal 15 mm A.4.4.2.2 M3 Rp -
4 Pemasangan 1 m2 Acian A.4.4.2.27 Kg Rp -
5 Pemasangan 1 m2 Plesteran Granit Chip tebal 1 Cm A.4.4.2.21 M2 Rp -
6 Pemasangan 1 m3 Urugan Tanah Humus M3 Rp -
7 Pemasangan 1 m2 Rumput Lempeng M2 Rp -
8 Pemasangan 1 btg Bunga Pucuk Merah Btg Rp -
9 Pemasangan 1 btg Pohon Ketapang Putih Btg Rp -

G REHABILITASI MENARA UTAMA MASJID

I PENGECATAN ULANG MENARA UTAMA MASJID


1 1 Set Pemasangan dan Pembongkaran Scafolding A.2.2.1.4 Set Rp -
2 Pengikisan/pengerokan permukaan cat lama A.4.7.1.1 M2 Rp -
3 Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup) A.4.7.1.11 M2 Rp -

II PERLENGKAPAN MENARA UTAMA MASJID


1 Pemasangan Tangga Besi T 4 m Unit
2 Pemasangan Puncak Menara Lafadz Allah + Lampu Unit

Padang, 2023

Penawar,
Kontraktor Pelaksana
CV….................................

NAMA JELAS
............................................
BIAYA UMUM

PROGRAM : PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS


PEKERJAAN : RENOVASI MESJID NURUL ILMI
LOKASI : KAMPUS UNIVERSITAS ANDALAS, LIMAU MANIS - PADANG
TAHUN ANGGARAN : 2023

NILAI PROYEK SETELAH PPN Rp. 2,959,176,250.83 Nilai Proyek Setelah PPN

NILAI PROYEK SEBELUM PPN Rp. 2,665,924,550.30 Nilai Proyek Sebelum PPN

Jumlah Orang / Jumlah


No Kualifikasi Harga Satuan (Rp) Jumlah Harga (Rp)
Koefisien Bulan

PERANCANGAN REHAB MASJID NURUL ‘ILMI KAMPUS UNIVERSITAS ANDALAS

A BIAYA UPAH PEGAWAI KANTOR LAPANGAN


1 Pelaksana 1.00 4.00 7,000,000.00 28,000,000.00
2 Drafter 1.00 4.00 5,000,000.00 20,000,000.00
3 Quantity Surveyor 1.00 4.00 5,000,000.00 20,000,000.00
4 Juru Ukur 1.00 2.00 5,000,000.00 10,000,000.00
5 Tenaga Administrasi Keuangan 1.00 4.00 3,000,000.00 12,000,000.00

B BIAYA RAPAT
1 Biaya Rapat 1.00 4.00 1,000,000.00 4,000,000.00

C BIAYA KANTOR, LISTRIK DAN KOMUNIKASI, DAN / ATAU


1 Biaya Kantor, Listrik dan Komunikasi, dan / atau 1.00 4.00 1,500,000.00 6,000,000.00

D BIAYA LAINNYA
1 Biaya Lainnya 1.00 4.00 750,000.00 3,000,000.00

E BPJS KETENAGAKERJAAN
1 PREMI (0,12 %) 0.1200 - 2,665,924,550.30 3,199,109.46

F PPH (1,75 %)
1 PPH (1,75 %) 0.0175 - 2,665,924,550.30 46,653,679.63

JUMLAH 152,852,789.09

Persentase 5.73

Padang, 2023

Penawar,
Kontraktor Pelaksana
CV….................................

NAMA JELAS
............................................
PENETAPAN PERHITUNGAN IURAN SEKTOR JASA KONSTRUKSI

PROGRAM : PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS


PEKERJAAN : RENOVASI MESJID NURUL ILMI
LOKASI : KAMPUS UNIVERSITAS ANDALAS, LIMAU MANIS - PADANG
TAHUN ANGGARAN : 2023

NILAI PROYEK SETELAH PPN Rp. 2,959,176,250.83 Nilai Proyek Setelah PPN

NILAI PROYEK SEBELUM PPN Rp. 2,665,924,550.30 Nilai Proyek Sebelum PPN

RANGE NILAI YANG NILAI PROYEK YANG


No RANGE NILAI PROYEK PPN PROYEK % PREMI PPN PROYEK
DIHITUNG DIHITUNG

RENOVASI MASJID NURUL ‘ILMI KAMPUS UNIVERSITAS ANDALAS

A BIAYA IURAN SEKTOR JASA KONSTRUKSI


Rp. 1,000,000.00 - Rp. 100,000,000.00 Rp. 100,000,000.00 x 0,24 % Rp. 240,000.00
Rp. 100,000,000.00 - Rp. 500,000,000.00 Rp. 400,000,000.00 x 0,19 % Rp. 760,000.00
Rp. 500,000,000.00 - Rp. 1,000,000,000.00 Rp. 500,000,000.00 Rp. 1,665,924,550.30 Rp. 1,665,924,550.30 x 0,15 % Rp. 750,000.00
Rp. 1,000,000,000.00 - Rp. 5,000,000,000.00 Rp. 1,665,924,550.30 x 0,12 % Rp. 1,999,109.46
> Rp. 5,000,000,000.00 Rp. - x 0,10 % Rp. -

TOTAL IURAN YANG HARUS DIBAYAR Rp. 3,749,109.46

Padang, 2023

Penawar,
Kontraktor Pelaksana
CV….................................
NAMA JELAS
............................................
ANALISA HARGA SATUAN PEKERJAAN
PROGRAM : PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS
PEKERJAAN : RENOVASI MESJID NURUL ILMI
LOKASI : KAMPUS UNIVERSITAS ANDALAS, LIMAU MANIS - PADANG
TAHUN ANGGARAN : 2023

HARGA SATUAN PEKERJAAN PERSIAPAN


JENIS PEKERJAAN : A.2.2.1.4 Pengukuran dan pemasangan 1 M' Bouwplank
SATUAN : M'
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.1000 - -
Tukang Kayu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kayu balok 5/7 M3 0.0120 - -
Paku biasa 2" - 5" Kg 0.0200 - -
Kayu papan 3/20 M3 0.0070 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.2.2.1.9 Pembersihan 1 m2 lapangan dan perataan


SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.1000 - -
Mandor L.04 OH 0.0500 - -
JUMLAH TENAGA KERJA -
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : A.2.2.1.4 1 Set Pemasangan dan Pembongkaran Scafolding
SATUAN : Set
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0300 - -
Mandor L.04 OH 0.0980 - -
JUMLAH TENAGA KERJA -
B BAHAN
Sewa Scafolding 0.7500 - -
Jack Base 0.5000 - -
Cat Walk 0.2500 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

HARGA SATUAN PEKERJAAN BONGKARAN


JENIS PEKERJAAN : ANAL. L 8/ 1 m2 Membongkar Dan Menurunkan Atap Seng

SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0500 - -
Tukang Kayu L.02 OH 0.1000 - -
JUMLAH TENAGA KERJA -
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.2.2.1.13 Pembongkaran 1 m3 beton bertulang


SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 7.8900 - -
Mandor L.04 OH 0.6660 - -
JUMLAH TENAGA KERJA -
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : A.2.2.1.14 Pembongkaran 1 m3 dinding tembok bata
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 6.6670 - -
Mandor L.04 OH 0.3330 - -
JUMLAH TENAGA KERJA -
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.2.2.1.14 1 m2 Pembobokan beton dinding


SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.2667 - -
Mandor L.04 OH 0.0133 - -
JUMLAH TENAGA KERJA -
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.5.1.3 Membongkar Plafond PVC (sunda plafond) + Rangka Furing Hollow 4x4 (60 x 60) cm
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.3500 - -
Mandor L.04 OH 0.0180 - -
JUMLAH TENAGA KERJA -
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
HARGA SATUAN PEKERJAAN TANAH
JENIS PEKERJAAN : A.2.3.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.7500 - -
Mandor L.04 OH 0.0250 - -
JUMLAH TENAGA KERJA -
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.2.3.1.9 Pengurugan kembali 1 m3 galian tanah


SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.5000 - -
Mandor L.04 OH 0.0500 - -
JUMLAH TENAGA KERJA -
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.2.3.1.11 Pengurugan 1 m3 dengan pasir urug


SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.3000 - -
Mandor L.04 OH 0.0100 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pasir urug M3 1.2000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : A.2.3.1.14 Pengurugan 1 m3 sirtu padat
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.2500 - -
Mandor L.04 OH 0.0250 - -
JUMLAH TENAGA KERJA -
B BAHAN
Sirtu M3 1.2000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

HARGA SATUAN PEKERJAAN PONDASI BATU KALI


JENIS PEKERJAAN : A.3.2.1.2 Pemasangan 1 m3 pondasi batu kali Camp, 1PC : 4 Pasir Pasang
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.5000 - -
Tukang Batu L.02 OH 0.7500 - -
Kepala Tukang L.03 OH 0.0750 - -
Mandor L.04 OH 0.0750 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu kali M3 1.2000 - -
Semen Portland Kg 163.0000 - -
Pasir Pasang M3 0.5200 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.3.2.1.9 Pemasangan 1 m3 pondasi batu kosong (Aanstampang)


SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.7800 - -
Tukang Batu L.02 OH 0.3900 - -
Kepala Tukang L.03 OH 0.0390 - -
Mandor L.04 OH 0.0390 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu kali M3 1.2000 - -
Pasir urug M3 0.4320 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : A.4.1.1.4 Membuat Lantai kerja beton mutu f3c = 7,4 Mpa (K 100), slump (3 - 6) Cm,
w/c 0,87
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.2000 - -
Tukang Batu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0600 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 230.0000 - -
Pasir beton Kg 893.0000 - -
Kerikil (Maks 30 mm) Kg 1027.0000 - -
Air Liter 200.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.4.1.7 Pemasangan 1 m2 pondasi dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp,
1PC : 2 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Bh 70.0000 - -
Semen Portland Kg 18.9500 - -
Pasir Pasang M3 0.0380 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
HARGA SATUAN PEKERJAAN BETON
JENIS PEKERJAAN : A.4.1.1.4 Membuat Lantai kerja beton mutu f3c = 7,4 Mpa (K 100), slump (3 - 6) Cm,
w/c 0,87
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.2000 - -
Tukang Batu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0600 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 230.0000 - -
Pasir beton Kg 893.0000 - -
Kerikil (Maks 30 mm) Kg 1027.0000 - -
Air Liter 200.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.1.1.5 Membuat beton mutu f3c = 14,5 Mpa (K 175), slump (12 ± 2) Cm, w/c 0,66
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.6500 - -
Tukang Batu L.02 OH 0.2750 - -
Kepala Tukang L.03 OH 0.0280 - -
Mandor L.04 OH 0.0830 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 326.0000 - -
Pasir beton Kg 760.0000 - -
Kerikil (Maks 30 mm) Kg 1029.0000 - -
Air Liter 215.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : A.4.1.1.8 Membuat beton mutu f3c = 21,7 Mpa (K 250), slump (12 ± 2) Cm, w/c 0,56
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.6500 - -
Tukang Batu L.02 OH 0.2750 - -
Kepala Tukang L.03 OH 0.0280 - -
Mandor L.04 OH 0.0830 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 384.0000 - -
Pasir beton Kg 692.0000 - -
Kerikil (Maks 30 mm) Kg 1039.0000 - -
Air Liter 215.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.1.1.10 Membuat beton mutu f3c = 26,4 Mpa (K 300), slump (12 ± 2) Cm, w/c 0,52
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.6500 - -
Tukang Batu L.02 OH 0.2750 - -
Kepala Tukang L.03 OH 0.0280 - -
Mandor L.04 OH 0.0830 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 413.0000 - -
Pasir beton Kg 681.0000 - -
Kerikil (Maks 30 mm) Kg 1021.0000 - -
Air Liter 215.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : Beton Ready Mix K-250/M3


SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.5000 - -
Tukang Batu L.02 OH 0.1250 - -
Kepala Tukang L.03 OH 0.0125 - -
Mandor L.04 OH 0.0500 - -
JUMLAH TENAGA KERJA -
B BAHAN
Beton Ready Mix K-250 M3 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Pompa Beton + Vibrator M3 0.1000 - -
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : Beton Ready Mix K-300/M3
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.6500 - -
Tukang Batu L.02 OH 0.2750 - -
Kepala Tukang L.03 OH 0.0280 - -
Mandor L.04 OH 0.0830 - -
JUMLAH TENAGA KERJA -
B BAHAN
Beton Ready Mix K-300 M3 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Pompa Beton + Vibrator M3 0.1000 - -
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.1.1.17 Pembesian 10 kg dengan besi polos


SATUAN : Kg
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0700 - -
Tukang Besi L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B BAHAN
Besi beton (polos) Kg 10.5000 - -
Kawat beton Kg 0.1500 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
Untuk 1 Kg 0.1 -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.1.1.17 Pembesian 10 kg dengan besi ulir


SATUAN : Kg
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0700 - -
Tukang Besi L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B BAHAN
Besi beton (ulir) Kg 10.5000 - -
Kawat beton Kg 0.1500 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
Untuk 1 Kg 0.1 -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : A.4.1.1.19 Pemasangan 10 Kg jaring kawat baja (Wiremesh M6)
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0250 - -
Tukang Besi L.02 OH 0.0250 - -
Kepala Tukang L.03 OH 0.0250 - -
Mandor L.04 OH 0.0010 - -
JUMLAH TENAGA KERJA -
B BAHAN
Jaring kawat baja di las Kg 10.2000 - -
Kawat beton Kg 0.0500 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
Untuk 1 Kg 0.1 -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.1.1.20 Pemasangan 1 m2 bekisting untuk pondasi


SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.5200 - -
Tukang Kayu L.02 OH 0.2600 - -
Kepala Tukang L.03 OH 0.0260 - -
Mandor L.04 OH 0.0260 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kayu kelas III M3 0.0400 - -
Paku 5 - 10 Cm Kg 0.3000 - -
Minyak bekisting Liter 0.1000 - -
JUMLAH HARGA BAHAN -
BAHAN 2 X PEMAKAIAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : A.4.1.1.21 Pemasangan 1 m2 bekisting untuk sloof
SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.5200 - -
Tukang Kayu L.02 OH 0.2600 - -
Kepala Tukang L.03 OH 0.0260 - -
Mandor L.04 OH 0.0260 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kayu kelas III M3 0.0450 - -
Paku 5 - 10 Cm Kg 0.3000 - -
Minyak bekisting Liter 0.1000 - -
JUMLAH HARGA BAHAN -
BAHAN 2 X PEMAKAIAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.1.1.22 Pemasangan 1 m2 bekisting untuk kolom


SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.6600 - -
Tukang Kayu L.02 OH 0.3300 - -
Kepala Tukang L.03 OH 0.0330 - -
Mandor L.04 OH 0.0330 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kayu kelas III M3 0.0400 - -
Paku 5 - 10 Cm Kg 0.4000 - -
Minyak bekisting Liter 0.2000 - -
Balok kayu kelas II M3 0.0150 - -
Plywod tebal 9 mm Lbr 0.3500 - -
Dolken kayu φ 8-10 Cm Batang 2.0000 - -
JUMLAH HARGA BAHAN -
BAHAN 2 X PEMAKAIAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : A.4.1.1.23 Pemasangan 1 m2 bekisting untuk balok
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.6600 - -
Tukang Kayu L.02 OH 0.3300 - -
Kepala Tukang L.03 OH 0.0330 - -
Mandor L.04 OH 0.0330 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kayu kelas III M3 0.0400 - -
Paku 5 - 10 Cm Kg 0.4000 - -
Minyak bekisting Liter 0.2000 - -
Balok kayu kelas II M3 0.0180 - -
Plywod tebal 9 mm Lbr 0.3500 - -
Dolken kayu φ 8-10 Cm Batang 2.0000 - -
JUMLAH HARGA BAHAN -
BAHAN 2 X PEMAKAIAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.1.1.24 Pemasangan 1 m2 bekisting untuk Lantai


SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.6600 - -
Tukang L.02 OH 0.3300 - -
Kepala tukang L.03 OH 0.0330 - -
Mandor L.04 OH 0.0330 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kayu kelas III m3 0.0400 - -
Paku 5 - 10 Cm Kg 0.4000 - -
Minyak bekisting Liter 0.2000 - -
Balok kayu kelas II m3 0.0150 - -
Plywod tebal 9 mm Lbr 0.3500 - -
Dolken kayu φ 8-10 Batang 6.0000 - -
JUMLAH HARGA BAHAN -
BAHAN 2 X PEMAKAIAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM
JENIS PEKERJAAN : A.4.2.1.1 Pembuatan 1 kg Baja Profil
SATUAN : Kg
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0600 - -
Tukang Las Konstruksi L.02 OH 0.0600 - -
Kepala Tukang L.03 OH 0.0060 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Besi Profil Kg 1.1500 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.2.1.3 Pengerjaan 100 kg Pekerjaan Perakitan


SATUAN : Kg
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.1000 - -
Tukang Besi Konstruksi L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0010 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Solar Liter 1.0000 - -
Minyak Pelumas Liter 0.1000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Alat Jam 0.8000 - -
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) -
Untuk 1 Kg 0.01 -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.2.1.3 Pemasangan 1 kg Rangka Besi Profil


SATUAN : Kg
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pemasangan Kg 1.0000 - -
Perakitan Kg 1.0000 - -
JUMLAH TENAGA KERJA -
JENIS PEKERJAAN : A.4.2.1.5 Pengerjaan 1 cm Pengelasan Dengan Las Listrik
SATUAN : Cm
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0040 - -
Tukang Besi L.02 OH 0.0020 - -
Kepala Tukang L.03 OH 0.0002 - -
Mandor L.04 OH 0.0002 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kawat Las Listrik Kg 0.0400 - -
Solar Liter 0.0300 - -
Minyak Pelumas Liter 0.0040 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Alat Jam 0.0170 - -
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.2.1.1 Memasang 1 M' Pipa Hitam Klas Medium Diameter 4" ( Tiang / Kolom )
SATUAN : Kg
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0810 - -
Tukang Las Konstruksi L.02 OH 0.1350 - -
Kepala Tukang L.03 OH 0.0135 - -
Mandor L.04 OH 0.0041 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa Hitam Diameter 4" Kg 1.2000 - -
Perlengkapan 0.3500 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.2.1.1 Memasang 1 M' Pipa Hitam Klas Medium Diameter 4" ( Ring Balok )
SATUAN : Kg
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0810 - -
Tukang Las Konstruksi L.02 OH 0.1350 - -
Kepala Tukang L.03 OH 0.0135 - -
Mandor L.04 OH 0.0041 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa Hitam Diameter 4" Kg 1.2000 - -
Perlengkapan 0.3500 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
HARGA SATUAN PEKERJAAN BESI DAN ALLUMINIUM
JENIS PEKERJAAN : A.4.2.1.11 Pemasangan 1 m1 kusen pintu alluminium
SATUAN : M1
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0430 - -
Tukang Besi L.02 OH 0.0430 - -
Kepala Tukang L.03 OH 0.0043 - -
Mandor L.04 OH 0.0021 - -
JUMLAH TENAGA KERJA -
B BAHAN
Profil Kozen Alluminium 4" (Putih) M1 1.1000 - -
Skrup fixer Bh 2.0000 - -
Sealant Tube 0.0600 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.2.1.12 Pemasangan 1 m2 pintu alluminium strip lebar 8 Cm


SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0850 - -
Tukang Besi L.02 OH 0.0850 - -
Kepala Tukang L.03 OH 0.0085 - -
Mandor L.04 OH 0.0042 - -
JUMLAH TENAGA KERJA -
B BAHAN
Profil alluminium M1 4.4000 - -
Alluminium strip M1 14.6000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : A.4.2.1.13 Pemasangan 1 m2 pintu kaca rangka alluminium
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0850 - -
Tukang Besi L.02 OH 0.0850 - -
Kepala Tukang L.03 OH 0.0090 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pintu alluminium M1 4.4000 - -
Profil kaca M1 4.5000 - -
Sealant Tube 0.0600 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.2.1.13 Pemasangan 1 m2 jendela kaca rangka alluminium


SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0850 - -
Tukang Besi L.02 OH 0.0850 - -
Kepala Tukang L.03 OH 0.0090 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Jendela alluminium M1 4.4000 - -
Profil kaca M1 4.5000 - -
Sealant Tube 0.0600 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

HARGA SATUAN PEKERJAAN KUSEN PINTU JENDELA ALLUMINIUM


JENIS PEKERJAAN : Pek. Pasang Kuzen dan Pintu Aluminium Merk Alexindo Type P1 + Aceseoris
SATUAN : Unit
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

Panjang Kozen Alumunium M1 6.6000 - -


Pintu Rangka Alumunium M2 1.6800 - -
Ventilasi Rangka Alumunium M2 0.3200 - -
Kaca Bening t = 8 mm M2 1.3464 - -
Kaca Bening t = 5 mm M2 0.1904 - -
Sticker Kaca Sandblast/Buram M2 1.5368 - -
Kunci Pintu Bh 1.0000 - -
Engsel Pintu Bh 2.0000 - -
Tarekan Pintu Stainless Bh 1.0000 - -
Engsel Jendela Allumunium Bh 0.0000 - -
Tarekan Jendela Bh 0.0000 - -
G Harga Satuan Pekerjaan (D+E) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : Pek. Pasang Kuzen dan Pintu Aluminium Merk Alexindo Type P2 + Aceseoris
SATUAN : Unit
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

Panjang Kozen Alumunium M1 7.1000 - -


Pintu Rangka Alumunium M2 4.2400 - -
Ventilasi Rangka Alumunium M2 0.0000 - -
Kaca Bening t = 8 mm M2 3.4408 - -
Kaca Bening t = 5 mm M2 0.0000 - -
Sticker Kaca Sandblast/Buram M2 3.4408 - -
Kunci Pintu Bh 1.0000 - -
Engsel Pintu Bh 6.0000 - -
Tarekan Pintu Stainless Bh 2.0000 - -
Engsel Jendela Allumunium Bh 0.0000 - -
Tarekan Jendela Bh 0.0000 - -
G Harga Satuan Pekerjaan (D+E) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : Pek. Pasang Kuzen dan Pintu Aluminium Merk Alexindo Type P3 + Aceseoris
SATUAN : Unit
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

Panjang Kozen Alumunium M1 6.2000 - -


Pintu Rangka Alumunium M2 0.0000 - -
Ventilasi Rangka Alumunium M2 0.0000 - -
Kaca Tempered T = 12 mm M2 3.9900 - -
Kaca Bening t = 8 mm M2 0.0000 - -
Kaca Bening t = 5 mm M2 0.0000 - -
Sticker Kaca Sandblast/Buram M2 3.9900 - -
Kunci Pintu Bh 1.0000 - -
Engsel Pintu Swing Set 2.0000 - -
Tarekan Pintu Stainless Bh 2.0000 - -
Engsel Jendela Allumunium Bh 0.0000 - -
Tarekan Jendela Bh 0.0000 - -
G Harga Satuan Pekerjaan (D+E) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : Pek. Pasang Kuzen dan Jendela Aluminium Merk Alexindo Type J1 + Aceseoris
SATUAN : Unit
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

Panjang Kozen Allumunium M1 7.9000 - -


Jendela Rangka Allumunium M2 2.1000 - -
Ventilasi Kisi Kisi Allumunium M2 0.0000 - -
Kaca Bening t = 5 mm M2 1.8432 - -
Engsel Jendela Allumunium Bh 4.0000 - -
Tarekan Jendela Bh 2.0000 - -
G Harga Satuan Pekerjaan (D+E) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : Pek. Pasang Kuzen dan Jendela Aluminium Merk Alexindo Type J2 + Aceseoris
SATUAN : Unit
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

Panjang Kozen Allumunium M1 4.8000 - -


Jendela Rangka Allumunium M2 1.0500 - -
Ventilasi Kisi Kisi Allumunium M2 0.0000 - -
Kaca Bening t = 5 mm M2 0.9216 - -
Engsel Jendela Allumunium Bh 2.0000 - -
Tarekan Jendela Bh 1.0000 - -
G Harga Satuan Pekerjaan (D+E) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : Pek. Pasang Kuzen dan Jendela Aluminium Merk Alexindo Type V1 + Aceseoris
SATUAN : Unit
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

Panjang Kozen Alumunium M1 8.4000 - -


Ventilasi Rangka Alumunium M2 0.0000 - -
Ventilasi Kisi Kisi Allumunium M2 0.0000 - -
Kaca Bening t = 5 mm M2 2.3400 - -
Engsel Jendela Allumunium Bh 0.0000 - -
Tarekan Jendela Bh 0.0000 - -
G Harga Satuan Pekerjaan (D+E) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : Pek. Pasang Partisi Kuzen dan Pintu Aluminium Merk Alexindo Type PT1 + Aceseoris
SATUAN : Unit
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

Panjang Kozen Alumunium M1 34.8750 - -


Pintu Rangka Alumunium M2 1.6800 - -
Jendela Rangka Allumunium M2 2.1000 - -
Ventilasi Rangka Alumunium M2 1.1600 - -
Kaca Bening t = 8 mm M2 1.3464 - -
Kaca Bening t = 5 mm M2 4.3088 - -
Sticker Kaca Sandblast/Buram M2 5.6552 - -
Dinding Gypsump T 9 mm M2 6.1200 - -
Kunci Pintu Bh 1.0000 - -
Engsel Pintu Bh 3.0000 - -
Tarekan Pintu Stainless Bh 1.0000 - -
Engsel Jendela Allumunium Bh 14.0000 - -
Tarekan Jendela Bh 7.0000 - -
G Harga Satuan Pekerjaan (D+E) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : Pek. Pasang Partisi Kuzen dan Pintu Aluminium Merk Alexindo Type PT2 + Aceseoris
SATUAN : Unit
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

Panjang Kozen Alumunium M1 39.7750 - -


Pintu Rangka Alumunium M2 0.0000 - -
Jendela Rangka Allumunium M2 1.4000 - -
Ventilasi Rangka Alumunium M2 1.1200 - -
Kaca Bening t = 8 mm M2 0.0000 - -
Kaca Bening t = 5 mm M2 5.8704 - -
Sticker Kaca Sandblast/Buram M2 5.8704 - -
Dinding Gypsump T 9 mm M2 7.0300 - -
Kunci Pintu Bh 0.0000 - -
Engsel Pintu Bh 0.0000 - -
Tarekan Pintu Stainless Bh 0.0000 - -
Engsel Jendela Allumunium Bh 8.0000 - -
Tarekan Jendela Bh 4.0000 - -
G Harga Satuan Pekerjaan (D+E) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : Pek. Pasang Partisi Kuzen dan Pintu Aluminium Merk Alexindo Type PT3 + Aceseoris
SATUAN : Unit
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

Panjang Kozen Alumunium M1 56.1750 - -


Pintu Rangka Alumunium M2 0.0000 - -
Jendela Rangka Allumunium M2 0.0000 - -
Ventilasi Rangka Alumunium M2 0.0000 - -
Kaca Bening t = 8 mm M2 0.0000 - -
Kaca Bening t = 5 mm M2 0.0000 - -
Sticker Kaca Sandblast/Buram M2 0.0000 - -
Dinding Gypsump T 9 mm M2 35.0400 - -
Kunci Pintu Bh 0.0000 - -
Engsel Pintu Bh 0.0000 - -
Tarekan Pintu Stainless Bh 0.0000 - -
Engsel Jendela Allumunium Bh 0.0000 - -
Tarekan Jendela Bh 0.0000 - -
G Harga Satuan Pekerjaan (D+E) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : Pek. Pasang Partisi Kuzen dan Pintu Aluminium Merk Alexindo Type PT4 + Aceseoris
SATUAN : Unit
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

Panjang Kozen Alumunium M1 15.4750 - -


Pintu Rangka Alumunium M2 0.0000 - -
Jendela Rangka Allumunium M2 0.0000 - -
Ventilasi Rangka Alumunium M2 0.0000 - -
Kaca Bening t = 8 mm M2 0.0000 - -
Kaca Bening t = 5 mm M2 0.0000 - -
Sticker Kaca Sandblast/Buram M2 0.0000 - -
Dinding Gypsump T 9 mm M2 7.5200 - -
Kunci Pintu Bh 0.0000 - -
Engsel Pintu Bh 0.0000 - -
Tarekan Pintu Stainless Bh 0.0000 - -
Engsel Jendela Allumunium Bh 0.0000 - -
Tarekan Jendela Bh 0.0000 - -
G Harga Satuan Pekerjaan (D+E) -
H Harga Satuan Pekerjaan (Pembulatan) -

HARGA SATUAN PEKERJAAN PASANGAN DINDING


JENIS PEKERJAAN : A.4.4.1.7 Pemasangan 1 m2 dinding Bata Merah tebal 1/2 batu Camp, 1PC : 2 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Bh 70.0000 - -
Semen Portland Kg 18.9500 - -
Pasir Pasang M3 0.0380 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : A.4.4.1.9 Pemasangan 1 m2 dinding Bata Merah tebal 1/2 batu Camp, 1PC : 4 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Bh 70.0000 - -
Semen Portland Kg 11.5000 - -
Pasir Pasang M3 0.0430 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.4.1.24 Pemasangan 1 m2 GRC Ornament Uk. 5x36x60


SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang L.02 OH 0.1500 - -
Kepala tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
GRC Ornament Uk. 5x36x60 m2 1.0000 - -
Semen Portland Kg 14.0000 - -
Pasir Pasang m3 0.0320 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.4.1.24 Pemasangan 1 m2 GRC Ornament Uk. 8x100x100


SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang L.02 OH 0.1500 - -
Kepala tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
GRC Ornament Uk. 8x100x100 m2 1.0000 - -
Semen Portland Kg 14.0000 - -
Pasir Pasang m3 0.0320 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.4.1.24 Pemasangan 1 m2 GRC Ornament Uk. 8x200x200


SATUAN : M2
HARGA SATUAN : Rp -

KODE HARGA SATUAN JUMLAH HARGA


NO URAIAN SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang L.02 OH 0.1500 - -
Kepala tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
GRC Ornament Uk. 8x200x200 m2 1.0000 - -
Semen Portland Kg 14.0000 - -
Pasir Pasang m3 0.0320 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.4.1.24 Pemasangan 1 m2 GRC Ornament Uk. 8x100x340


SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang L.02 OH 0.1500 - -
Kepala tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
GRC Ornament Uk. 8x100x340 m2 1.0000 - -
Semen Portland Kg 14.0000 - -
Pasir Pasang m3 0.0320 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM

Analisa Biaya Konstruksi Pekerjaan Pemasangan Kuda Kuda Baja Ringan ( Truss )
JENIS PEKERJAAN : A.4.2.1.22 Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Ringan (Canai Dingin) profil C 75 (TASO)
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.7340 - -
Tukang Besi L.02 OH 0.7340 - -
Kepala Tukang L.03 OH 0.0730 - -
Mandor L.04 OH 0.0370 - -
JUMLAH TENAGA KERJA -
B BAHAN
Baja Ringan Canai Dingin C 75 (TASO) Btg 0.8730 - -
Assesoris (Reng, Perkuatan, Las dll) % (Bahan) 10.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.4.1.7 Pemasangan Lisplank GRC Double / M1


SATUAN : M1
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0360 - -
Tukang Kayu L.02 OH 0.3640 - -
JUMLAH TENAGA KERJA -
B BAHAN
Lisplank GRC 20x1x244 cm M1 1.0000 - -
Lisplank GRC 10x1x244 cm M1 1.0000 - -
Paku Sekrup Bh 8.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : A.4.2.1.19 Pemasangan 1 m Talang Air 1/2 Lingkaran D-15 Cm, Seng Plat BJLS 30 lebar 45 Cm
SATUAN : M'
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.1500 - -
Tukang Kayu L.02 OH 0.3000 - -
Kepala Tukang L.03 OH 0.0300 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Seng Plat BJLS 30 M2 1.0500 - -
Paku Biasa 1 Cm - 2,5 Cm Kg 0.0100 - -
Besi Strip Kg 0.5000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.2.1.19 Pemasangan 1 m Talang Air Hujan Cm, Seng Plat BJLS 30 + Rangka Baja Ringan
SATUAN : M'
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.1500 - -
Tukang Kayu L.02 OH 0.3000 - -
Kepala Tukang L.03 OH 0.0300 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Seng Plat BJLS 30 M2 1.0500 - -
Paku Biasa 1 Cm - 2,5 Cm Kg 0.0100 - -
Truss C. 75.0.75 M1 1.0500 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
HARGA SATUAN PEKERJAAN PENUTUP ATAP
JENIS PEKERJAAN : A.4.5.2.20 Pemasangan 1 m2 Genteng Metal Berpasir ukuran 80 x 100 Atap Pelana (Merk Rainbouw)
SATUAN : M2
HARGA SATUAN : Rp -
JUMLAH HARGA
HARGA SATUAN (Rp)
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)

A TENAGA
Pekerja L.01 OH 0.2000 - -
Tukang L.02 OH 0.1000 - -
Kepala tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0010 - -
JUMLAH TENAGA KERJA -
B BAHAN
Genteng metal berpasir lbr 1.3000 - -
Paku Atap Genteng 1/2" - 1" Kg 0.2000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.5.2.21 Pemasangan 1 m1 Nok Genteng Metal


SATUAN : M1
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.2500 - -
Tukang L.02 OH 0.1500 - -
Kepala tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0130 - -
JUMLAH TENAGA KERJA -
B BAHAN
Perabung Genteng metal lbr 1.1000 - -
Paku Atap Genteng 1/2" - 1" Kg 0.0500 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : Anal H.8 Pemasangan 1 m2 Atap Spandek Berpasir SAMMA ROOF Tebal 0,35 mm
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.1650 - -
Tukang Besi L.02 OH 0.3300 - -
Kepala Tukang L.03 OH 0.0330 - -
Mandor L.04 OH 0.0165 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Spandek Berpasir SAMMA ROOF 0,35 Bmt M2 1.1000 - -
Sekrup Kg 0.0350 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : Anal H.10 Pemasangan 1 m1 Perabung Atap Spandek Berpasir SAMMA ROOF Tebal 0,35 mm
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0275 - -
Tukang Besi L.02 OH 0.0275 - -
Kepala Tukang L.03 OH 0.0028 - -
Mandor L.04 OH 0.0165 - -
JUMLAH TENAGA KERJA -
B BAHAN
Perabung Spandek Berpasir SAMMA ROOF Tebal 0,35 Bmt M2 1.1000 - -
Sekrup Kg 0.0200 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

HARGA SATUAN PEKERJAAN KAYU (PINTU DAN JENDELA)


JENIS PEKERJAAN : A.4.6.1.25 Pemasangan 1 m2 Dinding Pemisah Teakwood / Multiplek, Lapis HPL ( Khusus Interior )
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.5000 - -
Tukang L.02 OH 2.3747 - -
Kepala tukang L.03 OH 0.3000 - -
Mandor L.04 OH 0.0300 - -
JUMLAH TENAGA KERJA -
B BAHAN
Paku Biasa Kg 0.1500 - -
Pemasangan Lapis HPL (2 sisi) Lbr 0.4861 - -
Multiplek T 6 mm, 120 x 240 (Dinding) Lbr 0.4861 - -
Multiplek T 12 mm, 120 x 240 (Rangka ) Lbr 0.2083 - -
Lem kayu Kg 0.2500 - -
JUMLAH HARGA BAHAN -
C PERALATAN
- - - -
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : A.4.6.1.25 Pemasangan 1 m2 Les Back Ground Dinding Triplek Finishing HPL, rangka plywood 9 mm
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.2000 - -
Tukang L.02 OH 0.6000 - -
Kepala tukang L.03 OH 0.0600 - -
Mandor L.04 OH 0.0100 - -
JUMLAH TENAGA KERJA -
B BAHAN
Paku 5 dan 10 Cm Kg 0.1500 - -
Plywood 9 mm, 120x240 Lbr 0.8600 - -
Pemasangan Lapis HPL (1 sisi) Lbr 1.0500 - -
Lem kayu Kg 0.2500 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.5.1.3 Pemasangan 1 m' les kaca profil


SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.050 - -
Tukang Kayu L.02 OH 0.050 - -
Kepala Tukang L.03 OH 0.005 - -
Mandor L.04 OH 0.003 - -
JUMLAH TENAGA KERJA -
B BAHAN
Les Profil (3x3.5x400) M1 1.050 - -
Paku triplek Kg 0.010 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.7.1.15 Pemasangan 1 m2 Wallpaper


SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0200 - -
Tukang Cat L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0025 - -
JUMLAH TENAGA KERJA -
B BAHAN
Wallpaper Lbr 1.200 - -
Lem Kg 0.200 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : A.4.2.1.21 Pemasangan 1 m2 Dinding ACP Merk Seven (Motif Cutting)
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.6250 - -
Tukang Besi L.02 OH 0.8500 - -
Kepala Tukang L.03 OH 0.4250 - -
Mandor L.04 OH 0.2125 - -
JUMLAH TENAGA KERJA -
B BAHAN
ACP PVDF 0.30 mm tbl 5 mm Merk Seven M2 0.4470 - -
Rangka Besi Hollow 4x4 cm t. 3 mm Starbus M1 3.5000 - -
Sealant dengan Lakban ex. GE M1 2.5000 - -
Sekrup Bh 24.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

HARGA SATUAN PEKERJAAN PLESTERAN


JENIS PEKERJAAN : A.4.4.2.2 Pemasangan 1 m2 Plesteran 1PC : 2 Pasir Pasang tebal 15 mm
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 10.2240 - -
Pasir Pasang M3 0.0200 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : A.4.4.2.4 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang tebal 15 mm
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 6.2400 - -
Pasir Pasang M3 0.0240 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.4.2.15 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang (Afwerking) tebal 20 mm
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.4000 - -
Tukang Batu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0220 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 8.3200 - -
Pasir Pasang M3 0.0320 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.4.2.27 Pemasangan 1 m2 Acian


SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.2000 - -
Tukang Batu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0100 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 3.2500 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : A.4.4.2.21 Pemasangan 1 m2 Plesteran Granit Chip tebal 1 Cm
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.5600 - -
Tukang Batu L.02 OH 0.2100 - -
Kepala Tukang L.03 OH 0.0210 - -
Mandor L.04 OH 0.0280 - -
JUMLAH TENAGA KERJA -
B BAHAN
Granit Chip Hitam Kg 13.0000 - -
Granit Chip Putih Kg 7.0000 - -
Semen Portland Zak 0.2800 - -
Alat Bantu 1.0000 - -
Plesteran M2 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


JENIS PEKERJAAN : A.4.1.1.5 Membuat beton mutu f3c = 14,5 Mpa (K 175), slump (12 ± 2) Cm, w/c 0,66
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.6500 - -
Tukang Batu L.02 OH 0.2750 - -
Kepala Tukang L.03 OH 0.0280 - -
Mandor L.04 OH 0.0830 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 326.0000 - -
Pasir beton Kg 760.0000 - -
Kerikil (Maks 30 mm) Kg 1029.0000 - -
Air Liter 215.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : A.4.4.3.9 Pemasangan 1 m2 Lantai Granit 60 x 60 (silver pearls, Granito)
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.2500 - -
Tukang L.02 OH 0.1250 - -
Kepala tukang L.03 OH 0.0130 - -
Mandor L.04 OH 0.0130 - -
JUMLAH TENAGA KERJA -
B BAHAN
Granit 60 x 60 (silver pearls, Setara Granito) Bh 2.7778 - -
Semen Portland Kg 9.8000 - -
Semen warna (tepung affa) Kg 1.3000 - -
Pasir Pasang m3 0.0450 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.4.3.9 Pemasangan 1 m2 Lantai Granit 40 x 40 (Pearls White, Merk Granito)
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.2500 - -
Tukang Batu L.02 OH 0.1250 - -
Kepala Tukang L.03 OH 0.0130 - -
Mandor L.04 OH 0.0130 - -
JUMLAH TENAGA KERJA -
B BAHAN
Granit 40 x 40 (Pearls White, Merk Granito) Buah 6.2500 - -
Semen Portland Kg 9.8000 - -
Semen Warna (Tepung Alfa) Kg 1.3000 - -
Pasir Pasang M3 0.0450 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : A.4.4.3.10 Pemasangan 1 m2 Lantai Granit 30 x 30 (silver pearls, Granito)
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.2600 - -
Tukang L.02 OH 0.1300 - -
Kepala tukang L.03 OH 0.0130 - -
Mandor L.04 OH 0.0130 - -
JUMLAH TENAGA KERJA -
B BAHAN
Granit 30 x 30 (silver pearls, Setara Granito) Bh 11.1111 - -
Semen Portland Kg 10.0000 - -
Semen warna (tepung affa) Kg 1.5000 - -
Pasir Pasang m3 0.0450 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.7.1.15 Pemasangan 1 m2 Water Proffing Membrane


SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.1500 - -
Tukang Cat L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0090 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Water Proffing Membrane M1 1.3500 - -
Primer Water Proffing Kg 1.6000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : A.4.4.3.40b Pemasangan 1 m' Step Nosing Granit pjg = 30 cm
SATUAN : M'
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0900 - -
Tukang Batu L.02 OH 0.0900 - -
Kepala Tukang L.03 OH 0.0350 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Step Nosing Granit pjg = 30 cm Buah 3.3333 - -
Semen Portland Kg 1.1400 - -
Pasir Pasang M3 0.0030 - -
Semen Warna (Tepung Alfa) Kg 0.1000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.4.3.40c Pemasangan 1 m' Bon Bon Keramik ukuran 10 Cm


SATUAN : M'
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0900 - -
Tukang Batu L.02 OH 0.0900 - -
Kepala Tukang L.03 OH 0.0090 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bon Bon Keramik 10 Cm Buah 10.0000 - -
Semen warna (tepung affa) Kg 0.0500 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
JENIS PEKERJAAN : A.4.2.1.21 Pemasangan 1 m2 Rangka Besi Hollow Galvanis 40.40 mm, modul 60 x 60 Cm, untuk Plafond
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.3500 - -
Tukang Besi L.02 OH 0.3500 - -
Kepala Tukang L.03 OH 0.0350 - -
Mandor L.04 OH 0.0180 - -
JUMLAH TENAGA KERJA -
B BAHAN
Rangka Metal Hollow 40.40.2 mm M1 4.0000 - -
Assesoris (Perkuatan, Las dll) Ls 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.5.1.4 Pemasangan 1 m2 Langit-Langit Gypsum Board ukuran (120 x 240 x 9) mm
tebal 9 mm
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.1000 - -
Tukang Kayu L.02 OH 0.0500 - -
Kepala Tukang L.03 OH 0.0050 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Gypsum Board tebal 9 mm Lbr 0.3640 - -
Paku Triplek Kg 0.1100 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : A.4.5.1.3 1 M2 Anal. Pek. Memasang Plafond PVC Merk Kingfon (Shunda Plafond) + Rangka Furing Hollow 4x4 (60 x 60) c
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.1750 - -
Tukang Kayu L.02 OH 0.2250 - -
Kepala Tukang L.03 OH 0.0225 - -
Mandor L.04 OH 0.0088 - -
JUMLAH TENAGA KERJA -
B BAHAN
Shunda Plafond 30 x 400 Lbr 0.9200 - -
Rangka Hollow Galvalum 40 x 40 M1 4.6000 - -
Furring 1 x 3 M1 4.2000 - -
Paku Sekrup Buah 20.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.5.1.3 Pemasangan 1 m' Les Plafond PVC


SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0500 - -
Tukang Kayu L.02 OH 0.0500 - -
Kepala Tukang L.03 OH 0.0050 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
List Shunda Plafond M1 1.1000 - -
Paku Skrup 10 cm Kg 0.0100 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.5.1.4 Pemasangan 1 m2 Langit-Langit / Dinding Gypsum Board ukuran (120 x 240 x 9) mm
tebal 9 mm
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.1000 - -
Tukang Kayu L.02 OH 0.0500 - -
Kepala Tukang L.03 OH 0.0050 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Gypsum Board tebal 9 mm Lbr 0.3640 - -
Paku Triplek Kg 0.1100 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
HARGA SATUAN PEKERJAAN KUNCI DAN KACA ALLUMINIUM
JENIS PEKERJAAN : Anal. Pemasangan Pegangan Pintu Stainless / Buah
SATUAN : Bh
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0600 - -
Tukang Besi / Aluminium L.02 OH 0.6000 - -
Kepala Tukang L.03 OH 0.0600 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Lever Handle setara HRE 61.69 Solid Unit 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : Anal. Pasang Swing Lockcase / Buah


SATUAN : Bh
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0500 - -
Tukang Besi / Aluminium L.02 OH 0.5000 - -
Kepala Tukang L.03 OH 0.0500 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Swing Lockcase setara LC101WL-50 Solid Unit 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : Anal. Pasang Engsel Pintu Stainless Stell 4"


SATUAN : Set
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0500 - -
Tukang Besi / Aluminium L.02 OH 0.5000 - -
Kepala Tukang L.03 OH 0.0500 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Engsel Pintu Stainless Stell 4" Unit 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : Anal. Pasang Engsel Jendela / Buah
SATUAN : Bh
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0500 - -
Tukang Besi / Aluminium L.02 OH 0.5000 - -
Kepala Tukang L.03 OH 0.0500 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Engsel Jendela Unit 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.6.2.1 Pemasangan 1 buah kunci tanam antik


SATUAN : Bh
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0600 - -
Tukang Kayu L.02 OH 0.6000 - -
Kepala Tukang L.03 OH 0.0600 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kunci tanam antik Set 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.6.2.5 Pemasangan 1 buah engsel pintu


SATUAN : Bh
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0150 - -
Tukang L.02 OH 0.1500 - -
Kepala tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0008 - -
JUMLAH TENAGA KERJA -
B BAHAN
Engsel pintu Bh 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : A.4.6.2.6 Pemasangan 1 buah engsel jendela kupu-kupu
SATUAN : Bh
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0100 - -
Tukang Kayu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0005 - -
JUMLAH TENAGA KERJA -
B BAHAN
Engsel kupu-kupu Bh 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.6.2.7 Pemasangan 1 buah Tarikan Antik Jendela


SATUAN : Bh
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.1000 - -
Tukang Kayu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0005 - -
JUMLAH TENAGA KERJA -
B BAHAN
Tarikan Antik Jendela Bh 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.6.2.5 Pemasangan 1 buah Gerendel pintu


SATUAN : Bh
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0150 - -
Tukang Kayu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0008 - -
JUMLAH TENAGA KERJA -
B BAHAN
Gerendel pintu Bh 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : A.4.6.2.9 Pemasangan 1 buah kait angin
SATUAN : Bh
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0150 - -
Tukang Kayu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kait angin Bh 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.6.2.15 Pemasangan 1 m2 kaca tebal 3 mm


SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0150 - -
Tukang Kayu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0008 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kaca tebal 3 mm M2 1.1000 - -
Sealant Kg 0.0500 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.6.2.16 Pemasangan 1 m2 kaca tebal 5 mm


SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0150 - -
Tukang Kayu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0008 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kaca tebal 5 mm M2 1.1000 - -
Sealant Kg 0.0500 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : A.4.6.2.17 Pemasangan 1 m2 kaca tebal 8 mm
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0170 - -
Tukang Kayu L.02 OH 0.1700 - -
Kepala Tukang L.03 OH 0.0170 - -
Mandor L.04 OH 0.0009 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kaca tebal 8 mm M2 1.1000 - -
Sealant Kg 0.0700 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.6.2.17 Pemasangan 1 m2 Acrilic tebal 8 mm


SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0170 - -
Tukang Kayu L.02 OH 0.1700 - -
Kepala Tukang L.03 OH 0.0170 - -
Mandor L.04 OH 0.0009 - -
JUMLAH TENAGA KERJA -
B BAHAN
Acrilic tebal 8 mm M2 1.1000 - -
Paku Sekrup Buah 12.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

HARGA SATUAN PEKERJAAN PENGECATAN


JENIS PEKERJAAN : A.4.7.1.1 Pengikisan/pengerokan permukaan cat lama
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.1500 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Soda api Kg 0.0500 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : A.4.7.1.5 Pengecatan bidang kayu baru (1lapis plamuur, 1 lapis cat dasar,3 lapis cat penutup)
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0700 - -
Tukang Cat L.02 OH 0.1050 - -
Kepala Tukang L.03 OH 0.0040 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Cat menie Kg 0.2000 - -
Plamuur Kg 0.1500 - -
Cat dasar Kg 0.1700 - -
Cat penutup Kg 0.3500 - -
Kuas Bh 0.0100 - -
Pengencer Kg 0.0300 - -
Ampelas Lbr 0.2000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.7.1.10 Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2lapis cat penutup)
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0200 - -
Tukang Cat L.02 OH 0.0630 - -
Kepala Tukang L.03 OH 0.0063 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plamuur Kg 0.1000 - -
Cat dasar Kg 0.1000 - -
Cat penutup Kg 0.2600 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : A.4.7.1.11 Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0280 - -
Tukang L.02 OH 0.0420 - -
Kepala tukang L.03 OH 0.0042 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Cat dasar Kg 0.1200 - -
Cat penutup Kg 0.1800 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.7.1.10 Pengecatan 1 m2 plafond baru (1 lapis plamur, 1 lapis cat dasar, 2lapis cat penutup)
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0200 - -
Tukang Cat L.02 OH 0.0630 - -
Kepala Tukang L.03 OH 0.0060 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plamuur Kg 0.1500 - -
Cat dasar Kg 0.0500 - -
Cat penutup Kg 0.1000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : A.4.7.1.21 Pengecatan 1 m2 Permukaan Baja Galvanis Secara Semprot Sistem 3 Lapis
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.4000 - -
Tukang Cat L.02 OH 0.7000 - -
Kepala Tukang L.03 OH 0.0700 - -
Mandor L.04 OH 0.0200 - -
JUMLAH TENAGA KERJA -
B BAHAN
Cat Dasar Kg 0.3000 - -
Pengencer Liter 0.0100 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : A.4.7.1.15 Pemasangan 1 m2 Aqua Proof
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0200 - -
Tukang Cat L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0025 - -
JUMLAH TENAGA KERJA -
B BAHAN
Aqua Proof Kg 1.2000 - -
Kuas Bh 0.2000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

HARGA SATUAN PEKERJAAN TAMAN


JENIS PEKERJAAN : Pemasangan 1 bh Kanstin Type I (Baru)
SATUAN : Bh
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.1500 - -
Tukang Batu L.02 OH 0.0500 - -
Mandor L.04 OH 0.0250 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kanstin Type I Bh 1.0000 - -
Semen Portland Zak 0.0660 - -
Pasir Pasang M3 0.0250 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : Pemasangan 1 m2 Pengecatan Kanstin
SATUAN : Bh
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0700 - -
Tukang Cat L.02 OH 0.1050 - -
Kepala Tukang L.03 OH 0.0040 - -
Mandor L.04 OH 0.0025 - -
JUMLAH TENAGA KERJA -
B BAHAN
Cat Minyak Kg 0.3500 - -
Minyak Cat Ltr 0.1500 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : Pemasangan 1 m3 Urugan Tanah Humus


SATUAN : M3
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.3000 - -
Mandor L.04 OH 0.0100 - -
JUMLAH TENAGA KERJA -
B BAHAN
Urugan Tanah Humus M3 1.2000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : Pemasangan 1 m2 Rumput Gajah Mini


SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.1000 - -
Mandor L.04 OH 0.0100 - -
JUMLAH TENAGA KERJA -
B BAHAN
Rumput Gajah Mini M2 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
JENIS PEKERJAAN : Pemasangan 1 m2 Rumput Lempeng
SATUAN : M2
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.2000 - -
Mandor L.04 OH 0.0100 - -
JUMLAH TENAGA KERJA -
B BAHAN
Rumput Lempeng M2 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : Pemasangan 1 btg Bunga Pucuk Merah


SATUAN : Btg
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.1000 - -
Mandor L.04 OH 0.0100 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bunga Pucuk Merah Btg 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -

JENIS PEKERJAAN : Pemasangan 1 btg Pohon Ketapang Putih


SATUAN : Btg
HARGA SATUAN : Rp -

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.1000 - -
Mandor L.04 OH 0.0100 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pohon Ketapang Putih Btg 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) -
E Biaya Umum 5.73% x Jumlah -
F Keuntungan 4.27% x Jumlah -
G Harga Satuan Pekerjaan (D+E+F) -
H Harga Satuan Pekerjaan (Pembulatan) -
HARGA SATUAN PEKERJAAN INSTALASI LISTRIK
JENIS PEKERJAAN : Pemasangan Instalasi Listrik
SATUAN : Titik
HARGA SATUAN :

JENIS PEKERJAAN : Pemasangan Stop Kontak


SATUAN : Titik
HARGA SATUAN :

JENIS PEKERJAAN : Pemasangan Lampu LED Panel Light Philips 48 w


SATUAN : Buah
HARGA SATUAN :

JENIS PEKERJAAN : Pemasangan Lampu Taman


SATUAN : Buah
HARGA SATUAN :

JENIS PEKERJAAN : Pemasangan Lampu Down Light LED 4" 18 W


SATUAN : Buah
HARGA SATUAN :

JENIS PEKERJAAN : Pemasangan Lampu Energi Saving 18 watt


SATUAN : Buah
HARGA SATUAN :

Padang, 2023

Penawar,
Kontraktor Pelaksana
CV….................................

NAMA JELAS
............................................
MATA PEMBAYARAN UTAMA (MPU)
PROGRAM : PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS
PEKERJAAN : RENOVASI MESJID NURUL ILMI
LOKASI : KAMPUS UNIVERSITAS ANDALAS, LIMAU MANIS - PADANG
TAHUN ANGGARA : 2023

SAT VOLUME HARGA SATUAN JUMLAH HARGA Bobot


NO. URAIAN PEKERJAAN
(Rp.) (Rp.) (%)
1 Pemasangan 1 m2 Plesteran Granit Chip tebal 1 Cm M2 1,682.03
2 Begisting Kolom (2 x Pakai) M2 448.59
3 Pemasangan 1 m2 Dinding ACP Merk Seven (Motif Cutting) M2 147.00
4 Pemasangan 1 m2 GRC Ornament Uk. 5x36x60 M2 124.57
5 Pembesian Besi Polos Kg 7,214.14
6 Begisting Balok (2 x Pakai) M2 338.48
7 Pemasangan 1 m2 Dinding Pemisah Teakwood / Multiplek, Lapis HPL ( Khu M2 147.00
8 Pek. Pasang Kuzen dan Jendela Aluminium Merk Alexindo Type J1 + Acese Unit 22.00
9 1 M2 Anal. Pek. Memasang Plafond PVC Merk Kingfon (Shunda Plafond) + M2 395.99
10 Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Ringan (Canai Dingin) pro M2 327.41
11 Pembesian Besi Ulir Kg 3,826.21
12 Beton Ready Mix K-250/M3 M3 45.99
13 Pek. Pasang Partisi Kuzen dan Pintu Aluminium Merk Alexindo Type PT1 + Unit 4.00
14 Pemasangan 1 m2 dinding Bata Merah tebal 1/2 batu Camp, 1PC : 4 Pasir M2 396.81
15 Pemasangan Railling Tangga Besi Pipa Stainles Steel M2 70.56
16 Begisting Plat Lantai (2 x Pakai) M2 78.75
17 Pemasangan 1 m2 acian M2 756.53
18 Pengecatan tembok baru M2 854.99
19 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang (Afwerking) tebal 20 m M2 320.12
20 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang tebal 15 mm M2 405.16
21 Pas. 1 m1 les plafond PVC M1 490.65
22 Pemasangan 1 m2 Lantai Granit 40 x 40 (Pearls White, Merk Granito) M2 101.29

Padang, 2023

Penawar,
Kontraktor Pelaksana
CV….................................

NAMA JELAS
............................................
DAFTAR HARGA DASAR SATUAN UPAH
PROGRAM : PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS
PEKERJAAN : RENOVASI MESJID NURUL ILMI
LOKASI : KAMPUS UNIVERSITAS ANDALAS, LIMAU MANIS - PADANG
TAHUN ANGGARAN : 2023

HARGA HARGA
No. URAIAN KODE KETERANGAN SATUAN PERJAM SATUAN PERHARI
( Rp.) ( Rp.)

1 Pekerja L01 Rp -

2 Tukang L02 Rp -
Upah dihitung
dengan jumlah
3 Kepala Tukang L03 hari kerja di Rp -
asumsikan 25 hari
4 Mandor L04 dalam sebulan. Rp -
Jam kerja efektif
5 Juru ukur L05 diasumsikan 7 jam Rp -
sehari.
6 Pembantu juru ukur L06 Rp -

7 Penjaga malam L19 Rp -

Padang, 2023

Penawar,
Kontraktor Pelaksana
CV….................................

NAMA JELAS
............................................
DAFTAR HARGA DASAR SATUAN BAHAN

PROGRAM : PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS


PEKERJAAN : RENOVASI MESJID NURUL ILMI
LOKASI : KAMPUS UNIVERSITAS ANDALAS, LIMAU MANIS - PADANG
TAHUN ANGGARAN : 2023

HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)

A. KELOMPOK AIR, TANAH, BATU DAN SEMEN


1 Air M.02 M3
2 Pasir Pasang (Sedang) M01b M3 Base Camp
3 Pasir Beton (Kasar) M01a M3 Base Camp
4 Pasir Urug M44 M3 Base Camp
5 Batu kali M02 M3
6 Sirtu M16 M3
7 Kerikil/agregat Beton M.06 M3
8 Batu bata / merah bakar biasa M.04.c Bh
9 Semen / PC (50kg) M12 Zak Base Camp
10 Semen / PC (kg) M12 Kg Base Camp
11 Semen Warna (Tepung Alfa) M.15b Kg
12 Paving Block 10 x 20 cm t = 8 cm (Berwarna), Beton Mutu Sedang M.15b Pcs
13 Glass Block t = 8 cm Bh
14 GRC Ornament Uk. 5x36x60 M2
15 GRC Ornament Uk. 8x100x100 M2
16 GRC Ornament Uk. 8x200x200 M2
17 GRC Ornament Uk. 8x100x340 M2
18 Lempengan Rumput / Gebalan Rumput M32 M2
19 Kanstin Type I Bh
20 Urugan Tanah Humus M3
21 Rumput Gajah Mini M2
22 Bunga Pucuk Merah Btg
23 Pohon Ketapang Putih Btg

B. KELOMPOK BAHAN BETON PABRIKASI


1 Granit 40 x 40 (pearls white, Setara Granito) Bh Polished
2 Granit 40 x 40 (pearls white, Setara Granito) Bh Unpolished
3 Granit 60 x 60 (silver pearls, Setara Granito) Bh Polished
4 Granit 60 x 60 (silver pearls, Setara Granito) Bh Unpolished
5 Granit 30 x 30 (silver pearls, Setara Granito) Bh Polished
6 Granit 30 x 30 (silver pearls, Setara Granito) Bh Unpolished
7 Step Nosing Granit pjg = 60 cm Bh
8 Step Nosing Granit pjg = 40 cm Bh
9 Step Nosing Granit pjg = 30 cm Bh
10 Bon-bon Keramik M1
11 Granit Chip Hitam Kg
12 Granit Chip Putih Kg
13 Pompa Beton + Vibrator M3

C. KELOMPOK BAHAN KAYU


1 Dolken kayu galam dia 8-10 cm, pjg 4 m (Perancah) Btg
2 Kayu Banio ( Papan ) Klas I M3
3 Kayu Banio ( Balok) Klas I M3
4 Kayu Marsawa ( Papan ) Klas II M3
5 Kayu Marsawa ( Balok ) Klas II M3
6 Kayu Merantih ( Papan ) Klas III M3
7 Kayu Merantih ( Balok ) Klas III M3
8 Kayu untuk Perancah Kayu Klas III M3
9 Kayu Bekisting ( Papan ) Klas IV M3
10 Kayu Bekisting ( Balok ) Klas IV M3
11 Multiplek tebal 6 mm Lbr
12 Multiplek tebal 9 mm Lbr
13 Plywood 4 mm Lbr
14 Plywood 9 mm Lbr
15 Triflex t= 3 mm Lbr
16 Triflex t= 4 mm Lbr
17 Triflex t= 6 mm Lbr
18 Les Profil (3x3.5x400) M1
19 Les kaca (1x3x400) M1
20 Lem kayu Kg
21 Jendela naco ( 15 x 90 ) cm + Rangka Bh
22 Gypsum Board T 9 mm Lbr
23 Gypsum Board T 9 mm Berpori Lbr
24 GRC Board T 4 mm Lbr
25 GRC Board T 6 mm Lbr
26 Les Gypsum Profil 10 cm M1
27 List Profil Gypsumb 5 cm M1
28 Lem Profil Gypsum Kg
29 Plafond PVC (Setara Sunda Plafond) M1
30 Les Plafond PVC M1
31 GRC t= 4mm Lbr
32 GRC t = 6 mm Lbr
33 Pemasangan Lapis HPL (2 sisi) Lbr
33 Shunda Plafon 30 x 400 Lbr
34 Rangka Hollow Galvalum 40 x 40 M1
35 Furring 1 x 3 M1
36 Paku Sekrup Bh
37 List Shunda Plafond Bh
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)
38 Paku Skrup 10 cm Bh
39 Parquet Kayu Jati + Finishing UPL (Ultran Parquet Lack) - (untuk lantai) M2 Uk 1,2 x 5 x 25 cm
40 Wallpaper M2
41 Busa Peredam M2
42 HPL Lbr Motif
M2

D. KELOMPOK BAHAN LOGAM


1 Besi setrip Kg
2 Baja profil INP Kg
3 Besi Beton Polos M13 Kg
4 Besi Hollow 50.50.3 M'
5 Besi hollow 40.40.2 M'
6 Besi Ulir M13 Kg
7 Besi Siku L 30.30.3 Kg
8 Besi siku L.40.40.4 Kg
9 Kawat Beton / Bendrat M14 Kg
10 Kawat las lisrik Kg
11 Kawat las lisrik M51 Dos
12 Paku biasa 1 cm - 4 cm M18 Kg
13 Paku biasa 5 cm - 7 cm Kg
14 Paku pjg 10 cm - 12 cm Kg
15 Paku seng gelombang Kg
16 Paku Atap Genteng 1/2"-1" Kg
17 Profil alluminium M1
18 Pintu Alluminium M1
19 Jendela Alluminium M1
20 Alluminium strip M1
21 Skrup fixer Bh
22 Sealant (Lem Silicont) Tube
23 Profil kaca M1
24 Rangka Atap Baja Ringan M2
25 Rangka Atap Metal Furing M2
26 BRC (90x240 cm) Lbr
27 BRC (120x240 cm) Lbr
28 Wiremesh untuk pelat Lantai Beton Kg
29 Skrup Kg
30 Skrup Bh
31 Furing Hollow 4x4 M1
32 ACP PVDF 0.30 mm tbl 5 mm M2
33 Furing Hollow 4x4 M1
34 Baut HTB Ø 19 Bh
35 Smartdeck 0,75 TCT M2
36 Karet kaca Bh

E. KELOMPOK BAHAN ATAP


Atap Seng
1 - Seng BJLS 0.30 x 3' x 6' bd 9 Lbr
2 - Seng BJLS 0.20 x 3' x 6' bd 11 Lbr

Atap Seng Warna :


1 - Genteng Metal ( Polycolor ) 0.30 cm Lbr

Perabung Atap Seng


1 - Perabung Seng Plat BJLS 20 Lbr
2 - Perabung Seng Plat BJLS 30 Lbr
3 - Seng Plat BJLS 20 Lbr
4 - Seng Plat BJLS 30 Lbr
5 - Perabung Genteng metal Lbr
6 - Seng Plat BJLS 20 Warna Lbr

Atap Zincalume
1 - Atap Zincalume Tebal 0,35 Bmt M2
2 - Perabung Zincalume Tebal 0,35 Bmt Lbr

Rangka Atap Baja Ringan


1 - Truss C. 75.0.75 M1
2 - Reng / Topspan M1
3 - Baut / Screw 14 / 20 Pcs
4 - Baut / Screw 16 / 16 Pcs
5 - Dynabolt Pcs
6 - Talang M1
7 - Lisplank GRC 20x1x244 cm (Setara Superlank) M1
8 - Lisplank GRC 10x1x244 cm (Setara Superlank) M1

F. KELOMPOK BAHAN KACA


Kaca Polos
1 - Tebal 3 mm M2
2 - Tebal 5 mm M2
3 - Tebal 8 mm M2

Acrilic
1 - Tebal 8 mm M2

Kaca Tempered
1 - Tebal 10 mm M2
2 - Tebal 12 mm M2
3 - Sticker Kaca Sandblast / Buram M2
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)
G. PENGGANTUNG/PENGUNCI
1 - Kunci Antik A/C Itali/Seiss Set
2 - Kunci Shanghai 9702 LD Set
3 - Grendel Antik 2 Set
4 - Tarikan Antik Jendela Set
5 - Engsel Nylon Set
6 - Engsel Lokal Set
7 - Engsel 4" (Kuningan) Set
8 - Engsel 4" (Biasa) Set
9 - Engsel 3" (Kuningan) Set
10 - Engsel 3" (Biasa) Set
11 - Hak Angin Unit
12 - Handle Pintu (cisa) Unit
13 - Kunci Mandili 450 Itali/Seiss Set
14 - Kunci Lemari Set

PENGGANTUNG/PENGUNCI ALLUMINIUM
1 - Lever Handle Unit
2 - Swing Lockcase Set
3 - Engsel Pintu Stainless Stell 4" Set

H. ASPAL, BAHAN BAKAR, MINYAK, DAN CAT


1 Premium non subsidi / Pertalite M20 Ltr Pertamina
2 Solar non subsidi / Dexlite M21 Ltr Pertamina
3 Minyak Pelumas / Olie M22 Ltr Pertamina
4 Cat Minyak M42 Kg
5 Plemer Kayu Kg
6 Plemer Tembok Kg
7 Meni kayu - warna Kg
8 Meni besi - warna Kg
9 Cat tembok catilax Kg
10 Residu Ltr
11 Minyak Cat Ltr
12 Amplas Lbr
13 Cat Dasar TL Kg
14 Minyak bekisting Ltr
15 Soda api Ltr
16 Kuas Bh
17 Aqua Proof Kg
18 Sealtape (TDA) Bh
19 Cat Dasar Kerb Kg
20 Cat Penutup Kerb (Hitam) Kg
21 Cat Penutup Kerb (Putih) Kg
22 Wallpaper Lbr
23 Water Proffing Membrane M1
24 Primer Water Proffing Kg
25 Sewa Scafolding
26 Jack Base
27 Cat Walk
28 Sewa Alat Jam

J. KELOMPOK BAHAN PIPA


Pipa GIP SNI 0039-2010 Klas Medium
- Diameter 50 mm M'
- Diameter 75 mm M'

Padang, 2023

Penawar,
Kontraktor Pelaksana
CV….................................

NAMA JELAS
............................................
DAFTAR BIAYA SEWA PERALATAN PER-JAM KERJA

SEWA ALAT/JAM
No. URAIAN KODE HP KAP. KET.
(di luarPPN)

1 STAMPER E25 4.7 121.00 Ton Rp 52,903.82


2

Padang, 2023

Penawar,
Kontraktor Pelaksana
CV….................................

NAMA JELAS
............................................
SPESIFIKASI BAHAN DAN MATERIAL
PROGRAM : PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS
PEKERJAAN : RENOVASI MESJID NURUL ILMI
LOKASI : KAMPUS UNIVERSITAS ANDALAS, LIMAU MANIS - PADANG
TAHUN ANGGARAN : 2023

No. URAIAN Spesifikasi Bahan/ Material Merk

A. KELOMPOK AIR, TANAH, BATU DAN SEMEN



Harus bersih dan bebas dari unsur-unsur yang merusak,
1 Air
seperti alkali, asam, garam dan bahan anorganik lainnya

– Memenuhi ketentuan SNI 01-0220-1987



Harus bersih, keras, padat dan tajam, tidak mengandung
2 Pasir Pasang (Sedang)
lumpur dan tanah liat atau kotoran lain yang merusak
Lokal
– Kadar lumpur < 3 %
– Memenuhi SNI 8323:2016

Tidak boleh mengandung bahan-bahan anorganik, asam,
3 Pasir Beton (Kasar)
garam, alkali dan bahan-bahan lain yang merusak
Lokal
– Memiliki tekstur yang keras dan tajam
– Memenuhi ketentuan SNI 8321:2016
– Pasir urug harus pasir yang bersih dari akar-akar,
4 Pasir Urug Lokal
kotoran-kotoran, tidak mengandung tanah
– Batu Belah harus dari kualitas yang baik, keras, dan tidak
5 Batu Belah Lokal
retak yang dapat mengurangi kekuatan struktur
6 Sirtu Lokal
– harus bersih, keras, padat dan tajam, tidak mengandung
7 Kerikil/agregat Beton Lokal
lumpur atau kotoran lain yang merusak
– Ukuran batu bata rapi, tidak banyak yang keropos, pecah,
8 Batu bata / merah bakar biasa atau hancur meski ditumpuk di pasaran maupun ketika Lokal
diturunkan dari truk
9 Semen / PC (50kg) – Menggunakan Semen PCC Semen Padang
10 Semen / PC (kg)
11 Semen Warna (Tepung Alfa)

B. KELOMPOK BAHAN BETON PABRIKASI


1 Granit 60 x 60 (White, Garuda) Garuda
2 Granit 60 x 60 (White, Garuda) Garuda
3 Step Nosing Granit pjg = 60 cm
4 Step Nosing Granit pjg = 40 cm
5 Step Nosing Granit pjg = 30 cm
6 Bon-bon Keramik

C. KELOMPOK BAHAN KAYU


1 Dolken kayu galam dia 8-10 cm, pjg 4 m (Perancah) Lokal
2 Kayu Timbalun ( Balok Kuda Kuda) Klas I Lokal
3 Kayu Marsawa ( Papan ) Klas II Lokal
4 Kayu Marsawa ( Balok ) Klas II Lokal
5 Kayu Merantih ( Papan ) Klas III Lokal
6 Kayu Merantih ( Balok ) Klas III Lokal
7 Kayu untuk Perancah Kayu Klas III Lokal
8 Plywood 9 mm
9 Triflex t= 4 mm
10 Les Profil (3x3.5x400)
11 Gypsum Board T 9 mm
12 Les Gypsum Profil 10 cm
13 Lem Profil Gypsum
14 Plafond PVC (Sunda Plafond) Kingffon Sunda Plafond
15 Les Plafond PVC
16 GRC t = 4 mm
No. URAIAN Spesifikasi Bahan/ Material Merk

D. KELOMPOK BAHAN LOGAM


1 Besi setrip
2 Baja profil IWF Ex. DN SII – SNI 07-7178-2006 Baja Profil WF Gunung Garuda
3 Besi Beton Polos – Menggunakan besi dengan tingkat kekuatan BJTP24 KSTY
4 Besi hollow 40.40.2
5 Besi Beton Ulir – Menggunakan besi dengan tingkat kekuatan BJTS40 KSTY
6 Besi Siku L 30.30.3
7 Kawat Beton / Bendrat
8 Kawat las lisrik
9 Paku biasa 1 cm - 4 cm
10 Paku biasa 5 cm - 7 cm
11 Paku pjg 10 cm - 12 cm
12 Paku Sekrup 3,5"
13 Paku Atap Genteng 1/2"-1"
14 Profil alluminium Alexindo
15 Frame Pintu Alluminium Alexindo
16 Jendela Alluminium Alexindo
17 Alluminium strip Alexindo
18 Skrup fixer
19 Sealant (Lem Silicont)
20 Stiker sunblast Sanshui
21 Profil kaca
22 Wiremesh untuk pelat Lantai Beton
23 Paku Skrup 10 cm
24 Skrup
25 Furing 1x3
26 Hollow Galvalum 40x40

E. KELOMPOK BAHAN ATAP

Atap Seng Warna :


1 - Genteng Metal ( Polycolor ) 0.30 cm Sama Roof

Perabung Atap Seng


1 - Seng Plat BJLS 30
2 - Perabung Genteng metal

Rangka Atap Baja Ringan


1 - Truss C. 75.0.75 Sakura Truss
2 - Lisplank GRC 20x1x244 cm (Superlank) Superlank
3 - Lisplank GRC 10x1x244 cm (Superlank) Superlank

F. KELOMPOK BAHAN KACA


Kaca Polos
1 - Tebal 5 mm Mulia
2 - Tebal 8 mm Mulia

Kaca Tempered
1 - Tebal 10 mm

G. PENGGANTUNG/PENGUNCI
1 - Kunci Antik A/C Itali/Seiss
2 - Engsel Lokal
3 - Engsel 4" (Biasa)
4 - Engsel 3" (Kuningan)
5 - Hak Angin

PENGGANTUNG/PENGUNCI ALLUMINIUM
1 - Lever Handle
2 - Swing Lockcase
3 - Engsel Pintu Stainless Stell 4"

H. ASPAL, BAHAN BAKAR, MINYAK, DAN CAT


1 Solar non subsidi / Dexlite
2 Minyak Pelumas / Olie
3 Cat Minyak
4 Plemer Kayu
5 Plemer Tembok
6 Meni kayu - warna
7 Cat tembok catilax
8 Minyak Cat
9 Amplas
10 Cat dasar jotun essence easy primer
11 Minyak bekisting
12 Soda api
13 Kuas
14 Sealtape
15 Water Proffing Membrane
16 Primer Water Proffing
17 Sewa Alat
No. URAIAN Spesifikasi Bahan/ Material Merk

J. KELOMPOK BAHAN PIPA


Pipa PVC AW
- Diameter 4 " – Pipa PVC AW Paralon
- Diameter 3 " – Pipa PVC AW Paralon
- Diameter 2 " – Pipa PVC AW Paralon
- Diameter 1 " – Pipa PVC AW Paralon
- Diameter 3/4 " – Pipa PVC AW Paralon
- Diameter 1/2 " – Pipa PVC AW Paralon

Knie GIP 90 degree (Thread Joint)


- Diameter Nominal 50 mm ( 2'' )

Kran ( Thread Joint )


- Diameter Nominal 20 mm ( 3/4" )

Padang, 2023

Penawar,
Kontraktor Pelaksana
CV….................................

NAMA JELAS
............................................
DAFTAR KEBUTUHAN PENYELENGGARAAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI

PROGRAM PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS


PEKERJAAN RENOVASI MESJID NURUL ILMI
LOKASI KAMPUS UNIVERSITAS ANDALAS, LIMAU MANIS - PADANG
TAHUN ANGGARAN 2023

Pekerjaan RENOVASI MESJID NURUL ILMI


Nilai Pekerjaan Konstruksi
Jangka Waktu

SATUAN KUANT HARGA TOTAL HARGA


NO URAIAN PEKERJAAN KET
UKURAN ITAS SATUAN (Rp.) (Rp.)

I II III IV V VI (IV*V) VII


1 Penyiapan RK3K
a Pembuatan Dokumen Rencana Keselamatan Set 3 -
Konstruksi
b Pembuatan prosedur dan instruksi kerja Lb 12 -
c Penyiapan Formulir
A Sub Total Penyiapan RKK -

2 Sosialisasi, Promosi dan Pelatihan


a Induksi Keselamatan Konstruksi (Safety Org 5 -
Induction)
b Pengarahan Keselamatan Konstruksi (Safety
Briefing)
c Pertemuan Keselamatan (Safety Talk dan/ atau Org 5 -
Tool Box Meeting)
d Pelatihan Keselamatan Konstruksi
1) Bekerja di Ketinggian Org
2) Penggunaan Bahan Kimia (MSDS) Org
3) Analisa Keselamatan Pekerjaan Org 5 -
4) Perilaku berbasis keselamatan (Budaya K3) Org 5 -
5) P3K Org 5 -
e Sosialisasi HIV/ AIDS Org 5 -
f Simulasi Keselamatan Konstruksi Org 5 -
g Spanduk (banner) Lb 1 -
h Poster Lb 1 -
i Papan Informasi K3 Bh 2 -
B Sub Total Sosialisasi, Promosi dan Pelatihan -

3 Alat Pelindung Kerja dan Alat Pelindung Diri


a APK :
1) Jaring Pengaman (Safety Net) Ls
2) Tali Keselamatan (Life Line) Ls
3) Penahan Jatuh (Safety Deck) Ls
4) Pagar Pengaman (Guard Railing) Ls
5) Pembatas Area (Restricted Area) Ls
b APD
1) Topi Pelindung (Safety Helmet) Bh 10 -
2) Pelindung Mata (Googles, Spectacles) Bh
3) Tameng Muka (Face Shield) Bh
4) Masker Selam (Breathing Apparatus) Bh
5) Pelindung Telinga (Ear Plug, Ear Muff) Psg
6) Pelindung Pernafasan dan Mulut (Masker) Box
7) Sarung Tangan (Safety Gloves) Psg 10 -
8) Sepatu Keselamatan (Safety Shoes) Psg 8 -
9) Penunjang Seluruh Tubuh (full body harness) Bh

10) Jaket Pelampung (Life Vest) Bh


11) Rompi Keselamatan (Safety Vest) Bh 8 -
12) masker kotak 3 -
13) Pelindung jatuh (Fall Arrester) Bh
C Sub Total Alat Pelindung Kerja dan Alat -
Pelindung Diri
4 Asuransi dan Perijinan
a Asuransi Ls 1 -
b Surat Izin Laik Operasi Peralatan Alat/ Kend
c Surat Kompetensi Operator yang diterbitkan oleh Lb/ Alat
lembaga/ instansi yang berwenang sesuai dengan
Undang-Undang
d Surat Izin Pengesahan Panitia Pembina Ls
Keselamatan dan Kesehatan Kerja (P2K3)
D Sub Total Asuransi dan Perizinan -

5 Personel K3 Konstruksi
a Ahli K3 Konstruksi Org
b Petugas Keselamatan Konstruksi Org 1 - 1 x 4 0rg/bulan
c Petugas Tanggap Darurat Org
d Petugas P3K Org
e Petugas Pengatur Lalu Lintas (Flagman) Org
f Tenaga medis dan/ atau kesehatan Org
E Sub Total Personel K3 Konstruksi -

6 Fasilitas, sarana dan prasarana kesehatan


a Peralatan P3K (Kotak P3K, Tandu, Obat Luka, Ls 2 -
Perban)
b Ruang P3K (Tempat Tidur Pasien, Tabung Ls
Oksigen, Stetoskop, Timbangan Berat Badan)

c Peralatan Pengasapan (Fogging) Bh


d Obat Pengasapan Ls
e Ambulans Unit
F Sub Total Fasilitas, sarana dan prasarana -
kesehatan

7 Rambu-rambu yang diperlukan


a Rambu Petunjuk Bh 3 -
b Rambu Larangan Bh 3 -
c Rambu Peringatan Bh 3 -
d Rambu Kewajiban Bh 2 -
e Rambu Informasi Bh 2 -
f Rambu Pekerjaan Sementara Bh 2 -
g Jalur Evakuasi (Escape Route) Ls
h Tongkat Pengatur Lalu Lintas (Warning Lights Bh
Stick)
i Kerucut Lalu Lintas (Traffic Cone) Bh 5 -
j Lampu Putar (Rottary Lamp) Bh
k wastafel Ls
G Sub Total Rambu-rambu yang diperlukan -

8 Konsultasi dengan Ahli terkait Keselamatan Konstruksi


a Ahli Lingkungan OJ
b Ahli Struktur OJ
H Sub Total Konsultasi dengan Ahli terkait -
Keselamatan Konstruksi

9 Lain - Lain Terkait Pengendalian Risiko Keselamatan Konstruksi


a Pemeriksaan dan Pengujian Peralatan Ls
b Alat Pemadam Api Ringan (APAR) Bh 1 -
c Sirine Bh
d Bendera K3 Bh 4 -
e Lampu Darurat (Emergency Lamp) Bh
f Pemeriksaan Lingkungan Kerja Ls
1) Limbah B3 Ls
2) Polusi Udara Ls
g Program Inspeksi dan audit internal Ls
h Pelaporan dan Penyelidikan Insiden Ls
i Patroli Keselamatan Unit
j CCTV Unit
I Sub Total Lain - Lain Terkait Pengendalian -
Risiko Keselamatan Konstruksi
Total Mata Pembayaran Penerapan SMKK Pekerjaan ____________ -
Keterangan :
- Uraian pekerjaan sabagaimana tersebut dalam tabel, disesuaikan dengan jenis pekerjaan kontruksi yang dilaksanakan
- PPK menetapkan perincian uraian pekerjaan sesuai dengan kebutuhan pelaksanaan pekerjaan;
- Jumlah minimal kebutuhan personel K3 Konstruksi ditetapkan oleh pengguna jasa yang dituangkan pada dokumen tender;
- Satuan Konsultasi dengan Ahli terkait Keselamatan Konstruksi dilaksanakan untuk pekerjaan risiko keselamatan konstruksi besar dan
sedang, sedangkan untuk pekerjaan risiko keselamatan konstruksi kecil dilaksanakan apabila diperlukan.
- Format diatas, merupakan CONTOH Perhitungan Biaya K3, dapat ditambah/ dikurangi item yang dihitung sesuai dengan
kebutuhan dengan tetap memperhatikan Tingkat Resiko Bahaya dan Ketentuan yang telah diatur dalam Peraturan Menteri
PUPR tentang Penyelenggaraan SMKK

Padang, 2023

Penawar,
Kontraktor Pelaksana
CV….................................

NAMA JELAS
............................................
TIME SCHEDULLE
PROGRAM : PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS
PEKERJAAN : RENOVASI MESJID NURUL ILMI
LOKASI : KAMPUS UNIVERSITAS ANDALAS, LIMAU MANIS - PADANG
TAHUN ANGGARAN : 2023

BULAN I BULAN II BULAN III BULAN IV BULAN V


No URAIAN PEKERJAAN BOBOT MINGGU MINGGU MINGGU MINGGU MINGGU KET
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A FINISHING LANTAI 1 MASJID NURUL ‘ILMI 100


I PEKERJAAN PERSIAPAN
II PEKERJAAN BONGKARAN / PENYAMBUNGAN STRUKTUR
III PEKERJAAN TANAH
IV PEKERJAAN PONDASI
V PEKERJAAN PONDASI PLAT SETEMPAT (P1)
VI PEKERJAAN PONDASI PLAT SETEMPAT (P2) TANGGA
VII PEKERJAAN TIE BEAM / SLOOF (TB1 20 / 40)
VIII PEKERJAAN TIE BEAM / SLOOF (TB2 20 / 30)
IX PEKERJAAN KOLOM INDUK (K1 40 / 40)
X PEKERJAAN KOLOM TANGGA (K2 20 / 20)
XI PEKERJAAN BALOK INDUK (B1 20 / 40)
XII PEKERJAAN BALOK TANGGA (B2 15 / 30)
XIII PEKERJAAN PLAT LANTAI TANGGA
XIV PEKERJAAN PLAT LANTAI 2
XV PEKERJAAN KOLOM PRAKTIS ( KP 15 / 20 )
XVI PEKERJAAN BALOK LATEI 15 / 20
XVII PEKERJAAN RING BALOK 15 / 20
XVIII PEKERJAAN LISPLANK BETON JENDELA
XIX PEKERJAAN DINDING
XX PEKERJAAN PINTU DAN JENDELA ALUMINIUM (KUSEN)
XXI PEKERJAAN KAP / ATAP
XXII PEKERJAAN PLESTERAN
XXIII PEKERJAAN PLAFOND
XXIV PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
XXV PEKERJAAN PENGECATAN
XXVI PEKERJAAN ELEKTRIKAL
XXVII PEKERJAAN INTERIOR MIHRAB

B FINISHING LANTAI 2 MASJID NURUL ‘ILMI


I PEKERJAAN BONGKARAN
II PEKERJAAN KOLOM PRAKTIS ( KP 15 / 20 )
III PEKERJAAN BALOK LATEI 15 / 20
IV PEKERJAAN RING BALOK 15 / 20
V PEKERJAAN DINDING
VI PEKERJAAN PINTU DAN JENDELA ALUMINIUM (KUSEN)
VII PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
VIII PEKERJAAN PLESTERAN
IX PEKERJAAN PLAFOND
X PEKERJAAN PENGECATAN
XI PEKERJAAN NAMA MASJID

C FINISHING LANTAI 3 / DAK BETON MASJID NURUL ‘ILMI


I PEKERJAAN BONGKARAN
II PEKERJAAN KOLOM INDUK ( K1 25 / 50 )
III PEKERJAAN KOLOM PRAKTIS ( KP 13 / 13 )
IV PEKERJAAN KOLOM PRAKTIS ( KP 15 / 20 )
V PEKERJAAN RING BALOK 15 / 20
VI PEKERJAAN DINDING
VII PEKERJAAN KAP / ATAP
VIII PEKERJAAN PENUTUP ATAP
IX PEKERJAAN PLESTERAN
X PEKERJAAN PLAFOND
XI PEKERJAAN PENGECATAN
XII PEKERJAAN ELEKTRIKAL

D PEMBANGUNAN MENARA MASJID NURUL ‘ILMI (2 UNIT)


I PEKERJAAN KOLOM INDUK ( K1 40 / 40 )
II PEKERJAAN KOLOM INDUK ( K2 20 / 20 )
III PEKERJAAN KOLOM PRAKTIS ( KP 13 / 13 )
IV PEKERJAAN BALOK INDUK 20 / 30
V PEKERJAAN RING BALOK 15 / 20
VI PEKERJAAN LISPLANK BETON JENDELA
VII PEKERJAAN DINDING
VIII PEKERJAAN BESI DAN ALUMINIUM (KUSEN)
IX PEKERJAAN KAP / ATAP
X PEKERJAAN PENUTUP ATAP
XI PEKERJAAN PLESTERAN
XII PEKERJAAN PLAFOND
XIII PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
XIV PEKERJAAN PENGECATAN
XV PEKERJAAN ELEKTRIKAL

E PEMBANGUNAN PLANK NAMA MASJID NURUL ‘ILMI


I PEKERJAAN TANAH
II PEKERJAAN PONDASI BATU KALI
III PEKERJAAN PONDASI BATU BATA
IV PEKERJAAN PONDASI PLAT SETEMPAT
V PEKERJAAN KOLOM INDUK ( K1 20 / 40 )
VI PEKERJAAN SLOOF INDUK 20 /40
VII PEKERJAAN BALOK INDUK 20 / 40
VIII PEKERJAAN DINDING
IX PEKERJAAN PLESTERAN
X PEKERJAAN PENGECATAN
XI PEKERJAAN NAMA MASJID
XII PEKERJAAN ELEKTRIKAL

F PEMBANGUNAN TAMAN POT BUNGA MASJID


I PEKERJAAN POT BUNGA

G REHABILITASI MENARA UTAMA MASJID


I PENGECATAN ULANG MENARA UTAMA MASJID
II PERLENGKAPAN MENARA UTAMA MASJID
0
BOBOT RENCANA / MINGGU
JUMLAH BOBOT KOMULATIF 0
REALISASI BOBOT / MINGGU
JUMLAH REALISASI BOBOT
DEVIASI ( + / - )

JANGKA WAKTU PELAKSANAAN 120 ( SERATUS DUA PULUH ) HARI KALENDER

Padang, 2023

Penawar,
Kontraktor Pelaksana
CV….................................

NAMA JELAS
............................................
TABEL KUSEN
PROGRAM : PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS
#REF! #REF! #REF!
PEKERJAAN : RENOVASI MESJID NURUL ILMI
LOKASI : KAMPUS UNIVERSITAS ANDALAS, LIMAU MANIS - PADANG
TAHUN ANGGARAN : 2023

Panjang Pintu Jendela Ventilasi Perlengkapan


No TYPE Jumlah Luas Engsel
Kaca Kunci Engsel Grendel Grendel Tangan Hak
Keliling Dalam Panil Rangka Jalusi Angker Jendel
Mati Tanam Pintu Pintu Jendela Tangan Angin
a

1 P1 2 7.95 13.60 4.10 6.02 1.22 12.00 2.00 12.00 4.00

2 P2 2 4.77 12.40 1.80 3.48 0.72 12.00 2.00 6.00 4.00

2 P3 2 4.24 12.20 1.60 3.05 0.63 12.00 2.00 6.00 4.00

JUMLAH 16.96 38.20 7.50 12.55 0.00 0.00 2.57 36.00 6.00 24.00 12.00 0.00 0.00 0.00 0.00

Padang, 2023

Penawar,
Kontraktor Pelaksana
CV….................................

NAMA JELAS
............................................
HITUNGAN BETON
PROGRAM : PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS
#REF! #REF! #REF!
PEKERJAAN : RENOVASI MESJID NURUL ILMI
LOKASI : KAMPUS UNIVERSITAS ANDALAS, LIMAU MANIS - PADANG
TAHUN ANGGARAN : 2023

NO SKETSA HITUNGAN

1 0.2 Pas. Kolom 20 / 30


. 1 m3 = 16.67 m'
Beugel = 16.67 : 0.15 = 111.11111 ¥ 112.00 Bh
Besi Polos
Ø 12= 16.67 x 4.00 x 0.888 = 59.184
0.3 0.3 Ø 10= 16.67 x 2.00 x 0.617 = 20.550
Ø 8 = 112.00 x 0.67 x 0.395 = 29.608
109.342 ¥ 109.00 Kg
Pemakaian Bekisting :
16.67 x 1.00 = 16.6667 ¥ 16.667 m2
0.2 Pemakaian Stoot Werk :

2 Pas. Kolom Praktis 13 / 13


0.13 1 m3 = 59.17 m'
Beugel = 59.17 : 0.15 = 394.47732 ¥ 395.00 Bh
Besi Polos
Ø 12= 59.17 x 4.00 x 0.888 = 210.121
0.13 0.13 Ø 8 = 395.00 x 0.43 x 0.395 = 67.016
277.137 ¥ 277.00 Kg
Pemakaian Bekisting :
59.17 x 0.26 = 15.3846 ¥ 15.385 m2
0.13 Pemakaian Stoot Werk :

3 0.15 Pas. Sloof 15 / 20


. 1 m3 = 33.33 m'
Beugel = 33.33 : 0.15 = 222.22222 ¥ 223.00 Bh
Besi Polos
Ø 12 = 33.33 x 4.00 x 0.888 = 118.368
0.20 0.20 Ø 8 = 223.00 x 0.61 x 0.395 = 53.672
172.040 ¥ 172.00 Kg
Pemakaian Bekisting :
33.33 x 0.40 = 13.3333 ¥ 13.333 m2
Pemakaian Stoot Werk :
0.15

4 0.13 Pas. Balok Latei 13 / 20


. 1 m3 = 38.46 m'
Beugel = 38.46 : 0.15 = 256.41026 ¥ 257.00 Bh
Besi Polos
Ø10 = 38.46 x 4.00 x 0.617 = 94.846
0.20 0.20 Ø 8 = 257.00 x 0.53 x 0.395 = 53.743
148.589 ¥ 148.00 Kg
Pemakaian Bekisting :
38.46 x 0.40 = 15.3846 ¥ 15.385 m2
Pemakaian Stoot Werk :
0.13
NO SKETSA HITUNGAN

5 0.13 Pas. Ring Balok 13 / 20


1 m3 = 38.46 m'
Beugel = 38.46 : 0.15 = 256.41026 ¥ 257.00 Bh
Besi Polos
Ø 12= 38.46 x 4.00 x 0.888 = 136.578
0.20 0.20 Ø 8 = 257.00 x 0.53 x 0.395 = 53.743
190.321 ¥ 190.00 Kg
Pemakaian Bekisting :
38.46 x 0.40 = 15.3846 ¥ 15.385 m2
Pemakaian Stoot Werk :
0.13

6 Pas. Plat Beton T 10 cm


Tulangan 1 Lapis
Tebal Plat 10 cm
1 m3 = 10.00 m'
Besi = 10.00 : 0.15 = 66.666667 ¥ 67.00 Ps

Besi Polos
Ø 10= 67.00 x 2.00 x 0.617 = 82.611
82.611 ¥ 82.00 Kg
Pemakaian Bekisting :
= 10.0000 ¥ 10.000 m2
Pemakaian Stoot Werk :
10.00 x 4.00 x 0.01 = 0.5040 ¥ 0.504 m3

Padang, 2023

Penawar,
Kontraktor Pelaksana
CV….................................

NAMA JELAS
............................................
PERHITUNGAN VOLUME ( ACTUAL CHECK )
PROGRAM : PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS
PEKERJAAN : RENOVASI MESJID NURUL ILMI
LOKASI : KAMPUS UNIVERSITAS ANDALAS, LIMAU MANIS - PADANG
TAHUN ANGGARAN : 2023

No Uraian Pekerjaan Perhitungan Volume Satuan

A FINISHING LANTAI 1 MASJID NURUL ‘ILMI

I PEKERJAAN PERSIAPAN
1 Peralatan K3 konstruksi (Keselamatan dan Kesehatan Kerja)
DAFTAR KEBUTUHAN PENYELENGGARAAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
= 1.00 Unit 1.00 Unit
Pembulatan 1.00 Unit

II PEKERJAAN BONGKARAN / PENYAMBUNGAN STRUKTUR


1 Pembongkaran 1 m3 beton bertulang Pembongkaran Beton Bertulang
Sloof 20 / 40
0.20 x 0.40 x 0.40 M1 x 2.00 Sloof = 0.06 M3
Balok Induk 30 / 40 ( Lantai 2 )
0.20 x 0.40 x 0.40 M1 x 2.00 Balok = 0.06 M3
0.13 M3 0.13 M3
Pembulatan 0.12 M3

2 Pembongkaran 1 m3 dinding tembok bata Pembongkaran Dinding Tembok Bata


Untuk Pemasangan Ventilasi Baru Lantai 1
0.90 M1 x 2.60 M1 x 1 Ventilasi = 2.34 M2
2.34 M2

Total Volume Pembongkaran Dinding Tembok Bata


2.34 M2 x 0.15 M1 = 0.35 M3 0.35 M3
Pembulatan 0.35 M3

3 Pembongkaran Atap Kanopi Kanan Masjid Membongkar Atap Kanopi Bagian Kanan Masjid = 1.00 Ls 1.00 Ls
Pembulatan 1.00 Ls
No Uraian Pekerjaan Perhitungan Volume Satuan

III PEKERJAAN TANAH


1 Penggalian 1 m3 tanah biasa sedalam 1 m Ruang Samping Mihrab Masjid
Galian Tanah Pondasi Batu Bata ( Teras )
Lebar Galian Tanah = 0.35 M1
Tinggi Galian Tanah = 0.20 M1

Panjang Galian Tanah


Panjang Galian Tanah Teras Mihrab Kiri Masjid
2.00 + 4.00 M1 = 6.00 M1
Panjang Galian Tanah Teras Mihrab Kiri Masjid
2.00 + 4.00 M1 = 6.00 M1
12.00 M1

Volume Galian Tanah Pondasi Batu Bata ( Teras )


0.35 M1 x 0.20 M1 x 12.00 M1 = 0.84 M3

Galian Tanah Pondasi Plat Setempat (P1) Kolom Induk


Lebar Galian Tanah = 1.50 M1
Panjang Galian Tanah = 1.50 M1
Tinggi Galian Tanah 1.00 M1
Jumlah Pondasi Plat Setempat = 2.00 Titik

Volume Galian Tanah Pondasi Plat Setempat (P1)


1.50 x 1.50 x 1.00 x 2.00 Titik = 4.50 M3

Galian Tanah Pondasi Plat Setempat (P2) Tangga


Lebar Galian Tanah = 1.00 M1
Panjang Galian Tanah = 1.00 M1
= 2.40 M1

Tinggi Galian Tanah = 0.80 M1


Jumlah Pondasi Plat Setempat = 4.00 Titik
= 1.00 Titik

Volume Galian Tanah Pondasi Plat Setempat (P2)


1.00 x 1.00 x 0.80 x 4.00 Titik = 3.20 M3
1.00 x 2.40 x 0.80 x 1.00 Titik = 1.92 M3
5.12 M3

Total Volume Galian Tanah


0.84 M3 + 4.50 M3 + 5.12 M3 = 10.46 M3
10.46 M3 10.46 M3
No Uraian Pekerjaan Perhitungan Volume Satuan

Pembulatan 10.46 M3

2 Pengurugan kembali 1 m3 galian tanah Pengurugan Kembali Galian Tanah Biasa Sedalam 1 m
Total Volume Pengurugan Kembali Galian Tanah Tanah Biasa Sedalam 1 m
10.46 M3 x 0.33 = 3.45 M3
3.45 M3 3.45 M3
Pembulatan 3.45 M3

IV PEKERJAAN PONDASI
1 Membuat Lantai kerja beton mutu f3c = 7,4 Mpa (K 100), slump (3 - 6) Cm,
Pemasangan Pondasi Batu Bata ( Teras )
Lebar Lantai Kerja Beton = 0.35 M1
Tinggi Lantai Kerja Beton = 0.10 M1

Panjang Lantai Kerja Beton


Panjang Lantai Kerja Beton Teras Mihrab Kiri Masjid
2.00 + 4.00 M1 = 6.00 M1
Panjang Lantai Kerja Beton Teras Mihrab Kanan Masjid
2.00 + 4.00 M1 6.00 M1
12.00 M1

Volume Lantai Kerja Beton


0.35 M1 x 0.10 M1 x 12.00 M1 = 0.42 M3 0.42 M3
Pembulatan 0.42 M3

2 Pemasangan 1 m2 pondasi dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp,
Luas Pemasangan Pondasi Bata Merah
0.50 M1 x 12.00 M1 x 1.00 Bidang Pondasi = 6.00 M2 6.00 M2
Pembulatan 6.00 M2

3 Pemasangan 1 m2 Plesteran 1PC : 2 Pasir Pasang tebal 15 mm


Luas Plesteran Dinding Bata Merah Teras
0.70 M1 x 1.00 Lapis Plesteran x 12.00 M1 Teras = 8.40 M2 8.40 M2
Pembulatan 8.40 M2

4 Pemasangan 1 m2 Acian Luas Acian Dinding Bata Merah Teras


0.70 M1 x 1.00 Lapis Acian x 12.00 M1 Teras = 8.40 M2 8.40 M2
Pembulatan 8.40 M2

V PEKERJAAN PONDASI PLAT SETEMPAT (P1)


1 Pengurugan 1 m3 dengan pasir urug Jumlah Pondasi Plat Setempat (P1) = 2.00 Titik
No Uraian Pekerjaan Perhitungan Volume Satuan
No Uraian Pekerjaan Perhitungan Volume Satuan

Pengurugan Pasir Urug 0.05 x 1.50 x 1.50


0.05 x 1.50 x 1.50 x 2.00 Pondasi = 0.23 M3 0.23 M3
Pembulatan 0.22 M3

2 Membuat Lantai kerja beton mutu f3c = 7,4 Mpa (K 100), slump (3 - 6) Cm,
Jumlah Pondasi Plat Setempat (P1) = 2.00 Titik

Lantai Kerja 0.05 x 1.50 x 1.50


0.05 x 1.50 x 1.50 x 2.00 Pondasi = 0.23 M3 0.23 M3
Pembulatan 0.22 M3

3 Penulangan Plat Setempat Besi D 16 3.70 x 14.00 x 0.000256 x 6,165.00 x 2.00 Pondasi = 163.51 Kg
163.51 Kg 163.51 Kg
Pembulatan 163.50 Kg

4 Begisting Pondasi Plat Setempat 0.40 x 1.30 x 4 Bidang x 2.00 Pondasi = 4.16 M2 4.16 M2
Pembulatan 4.16 M2

5 Beton Ready Mix K-250/M3 Beton Ready Mix K-250/M3


Plat Setempat 0.40 x 1.30 x 1.30
0.40 x 1.30 x 1.30 x 2.00 Pondasi = 1.35 M3
1.35 M3 1.35 M3
Pembulatan 1.35 M3

VI PEKERJAAN PONDASI PLAT SETEMPAT (P2) TANGGA


1 Pengurugan 1 m3 dengan pasir urug Jumlah Pondasi Plat Setempat (P2) Tangga = 4.00 Titik
= 1.00 Titik

Pengurugan Pasir Urug 0.05 x 1.00 x 1.00


0.05 x 1.00 x 1.00 x 4.00 Pondasi = 0.20 M3
Pengurugan Pasir Urug 0.05 x 1.00 x 2.40
0.05 x 1.00 x 2.40 x 1.00 Pondasi = 0.12 M3
0.32 M3 0.32 M3
Pembulatan 0.32 M3

2 Membuat Lantai kerja beton mutu f3c = 7,4 Mpa (K 100), slump (3 - 6) Cm,
Jumlah Pondasi Plat Setempat (P2) Tangga = 4.00 Titik
= 1.00 Titik
No Uraian Pekerjaan Perhitungan Volume Satuan

Lantai Kerja 0.05 x 1.00 x 1.00


0.05 x 1.00 x 1.00 x 4.00 Pondasi = 0.20 M3
Lantai Kerja 0.05 x 1.00 x 2.40
0.05 x 1.00 x 2.40 x 1.00 Pondasi = 0.12 M3
0.32 M3 0.32 M3
Pembulatan 0.32 M3

3 Penulangan Plat Setempat Besi D 13 2.10 x 10.00 x 0.000169 x 6,165.00 x 4.00 Pondasi = 87.52 Kg
2.10 x 11.00 x 0.000169 x 6,165.00 x 1.00 Pondasi = 24.07 Kg
4.90 x 5.00 x 0.000169 x 6,165.00 x 1.00 Pondasi = 25.53 Kg
137.11 Kg 137.11 Kg
Pembulatan 137.11 Kg

4 Begisting Pondasi Plat Setempat 0.20 x 0.80 x 4 Bidang x 4.00 Pondasi = 2.56 M2
0.20 x 0.80 x 2 Bidang x 1.00 Pondasi = 0.32 M2
0.20 x 2.20 x 2 Bidang x 1.00 Pondasi = 0.88 M2
3.76 M2 3.76 M2
Pembulatan 3.76 M2

5 Beton Ready Mix K-250/M3 Beton Ready Mix K-250/M3


Plat Setempat 0.20 x 0.80 x 0.80
0.20 x 0.80 x 0.80 x 4.00 Pondasi = 0.51 M3
Plat Setempat 0.20 x 0.80 x 2.20
0.20 x 0.80 x 2.20 x 1.00 Pondasi = 0.35 M3
0.86 M3 0.86 M3
Pembulatan 0.86 M3

VII PEKERJAAN TIE BEAM / SLOOF (TB1 20 / 40)


1 Membuat Lantai kerja beton mutu f3c = 7,4 Mpa (K 100), slump (3 - 6) Cm,
Lantai Kerja Beton
Lebar Lantai Kerja Beton = 0.25 M1
Tinggi Lantai Kerja Beton = 0.10 M1

Panjang Lantai Kerja Beton


Lantai Kerja Beton Tie Beam / Sloof Ruang Samping Mihrab Kiri Masjid
4.00 + 6.00 M1 = 10.00 M1

Lantai Kerja Beton Tie Beam / Sloof Ruang Samping Mihrab Kanan Masjid
4.00 + 6.00 M1 = 10.00 M1
20.00 M1
No Uraian Pekerjaan Perhitungan Volume Satuan

Volume Lantai Kerja Beton Tie Beam / Sloof (TB1 20 / 40 )


0.25 M1 x 0.10 M1 x 20.00 M1 = 0.50 M3 0.50 M3
Pembulatan 0.50 M3

2 Penulangan Besi D 16 Penulangan Besi D 16


Tie Beam / Sloof Ruang Samping Mihrab Kiri Masjid
4.40 M1 x 1 Sloof x 1 Baris = 4.40 M1
6.40 M1 x 1 Sloof x 1 Baris = 6.40 M1

Tie Beam / Sloof Ruang Samping Mihrab Kanan Masjid


4.40 M1 x 1 Sloof x 1 Baris = 4.40 M1
6.40 M1 x 1 Sloof x 1 Baris = 6.40 M1
21.60 M1

6.00 x 0.000256 x 6,165.00 x 21.60 Sloof M1 = 204.54 Kg 204.54 Kg


Pembulatan 204.53 Kg

3 Penulangan Sengkang Besi Ø 10 - 10/15 0.98 x 147.20 x 0.000100 x 6,165.00 = 88.93 Kg 88.93 Kg
Pembulatan 88.93 Kg

4 Begisting Sloof (2 x Pakai) Panjang Begisting Tie Beam / Sloof (TB1 20 / 40 ) (2 x Pakai)
Tie Beam / Sloof Ruang Samping Mihrab Kiri Masjid
3.60 M1 x 1 Sloof x 1 Baris = 3.60 M1
5.60 M1 x 1 Sloof x 1 Baris = 5.60 M1

Tie Beam / Sloof Ruang Samping Mihrab Kanan Masjid


3.60 M1 x 1 Sloof x 1 Baris = 3.60 M1
5.60 M1 x 1 Sloof x 1 Baris = 5.60 M1
18.40 M1

0.40 M1 x 2 Bidang x 18.40 Sloof M1 = 14.72 M2 14.72 M2


Pembulatan 14.72 M2

5 Beton Ready Mix K-250/M3 Beton Tie Beam / Sloof (TB1 20 / 40 )


0.20 M1 x 0.40 M1 x 18.40 Sloof M1 = 1.47 M3 1.47 M3
Pembulatan 1.47 M3

6 Stek Besi Kolom Praktis Ø 10 1.50 x 4.00 x 0.000100 x 6,165.00 x 4.00 Kolom Praktis = 14.80 Kg 14.80 Kg
Pembulatan 14.79 Kg
No Uraian Pekerjaan Perhitungan Volume Satuan

VIII PEKERJAAN TIE BEAM / SLOOF (TB2 20 / 30)


1 Membuat Lantai kerja beton mutu f3c = 7,4 Mpa (K 100), slump (3 - 6) Cm,
Lantai Kerja Beton
Lebar Lantai Kerja Beton = 0.25 M1
Tinggi Lantai Kerja Beton = 0.10 M1

Panjang Lantai Kerja Beton


Lantai Kerja Beton Tie Beam / Sloof Ruang Samping Mihrab Kiri Masjid
4.00 M1 = 4.00 M1

Lantai Kerja Beton Tie Beam / Sloof Ruang Samping Mihrab Kanan Masjid
4.00 M1 = 4.00 M1
8.00 M1

Volume Lantai Kerja Beton Tie Beam / Sloof (TB2 20 / 30 )


0.25 M1 x 0.10 M1 x 8.00 M1 = 0.20 M3 0.20 M3
Pembulatan 0.20 M3

2 Penulangan Besi D 16 Penulangan Besi D 16


Tie Beam / Sloof Ruang Samping Mihrab Kiri Masjid
4.40 M1 x 1 Sloof x 1 Baris = 4.40 M1

Tie Beam / Sloof Ruang Samping Mihrab Kanan Masjid


4.40 M1 x 1 Sloof x 1 Baris = 4.40 M1
8.80 M1

6.00 x 0.000256 x 6,165.00 x 8.80 Sloof M1 = 83.33 Kg 83.33 Kg


Pembulatan 83.33 Kg

3 Penulangan Sengkang Besi Ø 10 - 10/15 0.76 x 57.60 x 0.000100 x 6,165.00 = 26.99 Kg 26.99 Kg
Pembulatan 26.98 Kg

4 Begisting Sloof (2 x Pakai) Panjang Begisting Tie Beam / Sloof (TB2 20 / 30 ) (2 x Pakai)
Tie Beam / Sloof Ruang Samping Mihrab Kiri Masjid
3.60 M1 x 1 Sloof x 1 Baris = 3.60 M1

Tie Beam / Sloof Ruang Samping Mihrab Kanan Masjid


3.60 M1 x 1 Sloof x 1 Baris = 3.60 M1
7.20 M1

0.30 M1 x 2 Bidang x 7.20 Sloof M1 = 4.32 M2 4.32 M2


Pembulatan 4.32 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

5 Beton Ready Mix K-250/M3 Beton Tie Beam / Sloof (TB2 20 / 30 )


0.20 M1 x 0.30 M1 x 7.20 Sloof M1 = 0.43 M3 0.43 M3
Pembulatan 0.43 M3

6 Stek Besi Kolom Praktis Ø 10 1.50 x 4.00 x 0.000100 x 6,165.00 x 4.00 Kolom Praktis = 14.80 Kg 14.80 Kg
Pembulatan 14.79 Kg

IX PEKERJAAN KOLOM INDUK (K1 40 / 40)


1 Penulangan Besi D 16 Jumlah Kolom Induk (K1 40 / 40) = 2.00 Kolom

7.00 x 8.00 x 0.000256 x 6,165.00 x 2.00 Kolom = 176.76 Kg


176.76 Kg 176.76 Kg
Pembulatan 176.76 Kg

2 Penulangan Sengkang Besi Ø 10 - 10/15 1.38 x 44.80 x 0.000100 x 6,165.00 x 2.00 Kolom = 76.23 Kg
76.23 Kg 76.23 Kg
Pembulatan 76.22 Kg

3 Begisting Kolom (2 x Pakai) 0.40 x 6.00 x 4 Bidang x 2.00 Kolom = 19.20 M2


19.20 M2 19.20 M2
Pembulatan 19.20 M2

4 Beton Ready Mix K-250/M3 Volume Kolom Induk (K1 40 / 40)


0.40 x 0.40 x 6.00 M1 x 2.00 Kolom = 1.92 M3
1.92 M3 1.92 M3
Pembulatan 1.92 M3

5 Stek Besi Balok Latei Ø 10 1.50 x 4.00 x 0.000100 x 6,165.00 x 4.00 Balok Latei = 14.80 Kg 14.80 Kg
Pembulatan 14.79 Kg

X PEKERJAAN KOLOM TANGGA (K2 20 / 20)


1 Penulangan Besi D 13 Jumlah Kolom Induk (K2 20 / 20) = 8.00 Kolom
= 2.00 Kolom

2.50 x 4.00 x 0.000169 x 6,165.00 x 8.00 Kolom = 83.35 Kg


1.00 x 22.00 x 0.000169 x 6,165.00 x 2.00 Kolom = 45.84 Kg
129.19 Kg 129.19 Kg
Pembulatan 129.19 Kg
No Uraian Pekerjaan Perhitungan Volume Satuan

2 Penulangan Sengkang Besi Ø 8 - 10/15 0.58 x 16.80 x 0.000064 x 6,165.00 x 8.00 Kolom = 30.76 Kg
4.54 x 4.80 x 0.000064 x 6,165.00 x 2.00 Kolom = 17.20 Kg
47.95 Kg 47.95 Kg
Pembulatan 47.95 Kg

3 Begisting Kolom (2 x Pakai) 0.20 x 2.10 x 4 Bidang x 8.00 Kolom = 13.44 M2


0.20 x 0.60 x 2 Bidang x 2.00 Kolom = 0.48 M2
2.20 x 0.60 x 2 Bidang x 2.00 Kolom = 5.28 M2
19.20 M2 19.20 M2
Pembulatan 19.20 M2

4 Beton Ready Mix K-250/M3 Volume Kolom Induk (K1 30 / 30)


0.20 x 0.20 x 2.10 x 8.00 Kolom = 0.67 M3
0.20 x 2.20 x 0.60 x 2.00 Kolom = 0.53 M3
1.20 M3 1.20 M3
Pembulatan 1.20 M3

XI PEKERJAAN BALOK INDUK (B1 20 / 40)


1 Penulangan Besi D 16 Penulangan Besi D 16
Balok Induk Ruang Samping Mihrab Kiri Masjid
4.40 M1 x 1 Balok Induk x 2 Baris = 8.80 M1
6.40 M1 x 1 Balok Induk x 1 Baris = 6.40 M1

Balok Induk Ruang Samping Mihrab Kanan Masjid


4.40 M1 x 1 Balok Induk x 2 Baris = 8.80 M1
6.40 M1 x 1 Balok Induk x 1 Baris = 6.40 M1
30.40 M1

8.00 x 0.000256 x 6,165.00 x 30.40 Balo M1 = 383.83 Kg 383.83 Kg


Pembulatan 383.82 Kg

2 Penulangan Sengkang Besi Ø 10 - 10/15 0.98 x 204.80 x 0.000100 x 6,165.00 = 123.73 Kg 123.73 Kg
Pembulatan 123.73 Kg

Panjang Begisting Balok (2 x Pakai)


Balok Induk Ruang Samping Mihrab Kiri Masjid
3.60 M1 x 1 Balok Induk x 2 Baris = 7.20 M1
5.60 M1 x 1 Balok Induk x 1 Baris = 5.60 M1

Balok Induk Ruang Samping Mihrab Kanan Masjid


3.60 M1 x 1 Balok Induk x 2 Baris = 7.20 M1
No Uraian Pekerjaan Perhitungan Volume Satuan

5.60 M1 x 1 Balok Induk x 1 Baris = 5.60 M1


25.60 M1
No Uraian Pekerjaan Perhitungan Volume Satuan

3 Begisting Balok (2 x Pakai) Luas Begisting Balok


0.76 M1 x 1 Bidang x 25.60 Balo M1 = 19.46 M2 19.46 M2
Pembulatan 19.45 M2

4 Beton Ready Mix K-250/M3 Beton Balok Induk (B1 20 / 40)


0.20 M1 x 0.28 M1 x 25.60 Balo M1 = 1.43 M3 1.43 M3
Pembulatan 1.43 M3

XII PEKERJAAN BALOK TANGGA (B2 15 / 30)


1 Penulangan Besi D 16 Penulangan Besi D 16
Balok Tangga Ruang Samping Mihrab Kiri Masjid
2.50 M1 x 4 Balok Anak x 1 Tangga = 10.00 M1

Balok Tangga Ruang Samping Mihrab Kanan Masjid


2.50 M1 x 4 Balok Anak x 1 Tangga = 10.00 M1
20.00 M1

6.00 x 0.000256 x 6,165.00 x 20.00 Balo M1 = 189.39 Kg 189.39 Kg


Pembulatan 189.38 Kg

2 Penulangan Sengkang Besi Ø 8 - 10/15 0.68 x 147.20 x 0.000100 x 6,165.00 = 61.71 Kg 61.71 Kg
Pembulatan 61.70 Kg

3 Begisting Balok Tangga 15 / 30 (2 x Pakai) Panjang Begisting Balok Anak


Balok Anak Tangga
Balok Tangga Ruang Samping Mihrab Kiri Masjid
2.30 M1 x 4 Balok Anak x 1 Tangga = 9.20 M1

Balok Tangga Ruang Samping Mihrab Kanan Masjid


2.30 M1 x 4 Balok Anak x 1 Tangga = 9.20 M1
18.40 M1

Luas Begisting Balok Anak Tangga


0.71 M1 x 1 Bidang x 18.40 Balo M1 = 13.06 M2 13.06 M2
Pembulatan 13.06 M2

4 Beton Ready Mix K-250/M3 Balok Anak Tangga (BL.5 15 / 40)


0.15 M1 x 0.18 x 18.40 Balok M1 = 0.50 M3 0.50 M3
Pembulatan 0.49 M3
No Uraian Pekerjaan Perhitungan Volume Satuan

XIII PEKERJAAN PLAT LANTAI TANGGA


1 Penulangan Besi D 16 Penulangan Besi D 16
Tangga Ruang Samping Mihrab Kiri Masjid
4.00 M1 x 8 Baris x 2 Lapis = 64.00 M1
1.50 M1 x 8 Baris x 2 Lapis = 24.00 M1
4.75 M1 x 8 Baris x 2 Lapis = 76.00 M1

Tangga Ruang Samping Mihrab Kanan Masjid


4.00 M1 x 8 Baris x 2 Lapis = 64.00 M1
1.50 M1 x 8 Baris x 2 Lapis = 24.00 M1
4.75 M1 x 8 Baris x 2 Lapis = 76.00 M1
328.00 M1

1.00 x 0.000256 x 6,165.00 x 328.00 Tang M1 = 517.66 Kg 517.66 Kg


Pembulatan 517.66 Kg

2 Penulangan Sengkang Besi Ø 10 - 15 Penulangan Sengkang Besi Ø 10 - 15


Tangga Ruang Samping Mihrab Kiri Masjid
1.50 M1 x 27 Baris x 2 Lapis = 80.00 M1
1.50 M1 x 10 Baris x 2 Lapis = 30.00 M1
1.50 M1 x 32 Baris x 2 Lapis = 95.00 M1

Tangga Ruang Samping Mihrab Kanan Masjid


1.50 M1 x 27 Baris x 2 Lapis = 80.00 M1
1.50 M1 x 10 Baris x 2 Lapis = 30.00 M1
1.50 M1 x 32 Baris x 2 Lapis = 95.00 M1
410.00 M1

1.00 x 0.000100 x 6,165.00 x 410.00 Tang M1 = 252.77 Kg 252.77 Kg


Pembulatan 252.76 Kg

3 Penulangan Sengkang Besi Ø 8 - 15 Penulangan Sengkang Besi Ø 8 -15


Tangga Ruang Samping Mihrab Kiri Masjid
0.75 M1 x 8 Baris x 25 Anak Tangga = 150.00 M1

Tangga Ruang Samping Mihrab Kanan Masjid


0.75 M1 x 8 Baris x 25 Anak Tangga = 150.00 M1
300.00 M1

1.00 x 0.000064 x 6,165.00 x 300.00 Anak M1 = 118.37 Kg 118.37 Kg


Pembulatan 118.36 Kg
No Uraian Pekerjaan Perhitungan Volume Satuan

4 Begisting Plat Lantai Tangga (2 x Pakai) Luas Begisting Plat lantai Tangga
Tangga Ruang Samping Mihrab Kiri Masjid
1.50 M1 x 4.00 M1 x 1 Bidang = 6.00 M2
1.50 M1 x 1.50 M1 x 1 Bidang = 2.25 M2
1.50 M1 x 4.75 M1 x 1 Bidang = 7.13 M2

Tangga Ruang Samping Mihrab Kanan Masjid


1.50 M1 x 4.00 M1 x 1 Bidang = 6.00 M2
1.50 M1 x 1.50 M1 x 1 Bidang = 2.25 M2
1.50 M1 x 4.75 M1 x 1 Bidang = 7.13 M2
30.75 M2

Total Luas Begisting Plat lantai Tangga


30.75 M2 = 30.75 M2 30.75 M2
Pembulatan 30.75 M2

5 Beton Ready Mix K-250/M3 Volume Beton Plat lantai Tangga


Tangga Ruang Samping Mihrab Kiri Masjid
1.50 M1 x 4.00 M1 x 0.15 M1 = 0.90 M3
1.50 M1 x 1.50 M1 x 0.12 M1 = 0.27 M3
1.50 M1 x 4.75 M1 x 0.15 M1 = 1.07 M3
Anak Tangga
0.18 x 0.30 x 1.50 M1 x 25 Anak Tangga = 0.98 M3
2

Tangga Ruang Samping Mihrab Kanan Masjid


1.50 M1 x 4.00 M1 x 0.15 M1 = 0.90 M3
1.50 M1 x 1.50 M1 x 0.12 M1 = 0.27 M3
1.50 M1 x 4.75 M1 x 0.15 M1 = 1.07 M3
Anak Tangga
0.18 x 0.30 x 1.50 M1 x 25 Anak Tangga = 0.98 M3
2
6.45 M3

Volume Beton Plat lantai Tangga


6.45 M3 = 6.45 M3 6.45 M3
Pembulatan 6.44 M3
No Uraian Pekerjaan Perhitungan Volume Satuan

XIV PEKERJAAN PLAT LANTAI 2


1 Penulangan Plat lantai 2 Besi Ø 10 -15 Penulangan Plat Lantai Besi Ø 10 -15
Penulangan Melintang dan Memanjang
Ruang Samping Mihrab Kiri Masjid
4.00 M1 x 40 Baris x 2 Lapis = 320.00 M1
6.00 M1 x 27 Baris x 2 Lapis = 320.00 M1
640.00 M1
Penulangan Melintang dan Memanjang
Ruang Samping Mihrab Kanan Masjid
4.00 M1 x 40 Baris x 2 Lapis = 320.00 M1
6.00 M1 x 27 Baris x 2 Lapis = 320.00 M1
640.00 M1

Penulangan Plat Lantai Besi Ø 10


640.00 M1 + 640.00 M1 = 1,280.00 M1

1.00 x 0.000100 x 6,165.00 x 1,280.00 M1 = 789.12 Kg 789.12 Kg


Pembulatan 789.12 Kg

2 Begisting Plat Lantai (2 x Pakai) Luas Begisting Plat lantai


Ruang Samping Mihrab Kiri Masjid
4.00 M1 x 6.00 M1 x 1 Bidang = 24.00 M2

Ruang Samping Mihrab Kanan Masjid


4.00 M1 x 6.00 M1 x 1 Bidang = 24.00 M2
48.00 M2

Total Luas Begisting Plat lantai


48.00 M2 = 48.00 M2 48.00 M2
Pembulatan 48.00 M2

3 Beton Ready Mix K-250/M3 Luas Beton Plat lantai


Ruang Samping Mihrab Kiri Masjid
4.00 M1 x 6.00 M1 x 1 Bidang = 24.00 M2

Ruang Samping Mihrab Kanan Masjid


4.00 M1 x 6.00 M1 x 1 Bidang = 24.00 M2
48.00 M2

Total Luas Beton Plat lantai


48.00 M2 = 48.00 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

Tebal Beton Plat lantai = 0.12 M1

Volume Beton Plat lantai


48.00 M2 x 0.12 M1 = 5.76 M3

Total Beton Plat lantai 2 Ruang Samping Mihrab Masjid


5.76 M3 = 5.76 M3 5.76 M3
Pembulatan 5.76 M3

XV PEKERJAAN KOLOM PRAKTIS ( KP 15 / 20 )


Jumlah Kolom Induk ( KP 15 / 20 )
J1 = 4 Unit Jendela x 2.00 Kolom = 8.00 Kolom
K3 = 2 Unit Jendela x 2.00 Kolom = 4.00 Kolom

1 Penulangan Kolom Praktis 15 / 20 Besi Ø 12 Jendela J1


2.50 x 4.00 x 0.000144 x 6,165.00 x 8.00 Kolom = 71.02 Kg
1.90 x 4.00 x 0.000144 x 6,165.00 x 8.00 Kolom = 53.98 Kg
Pintu K3
2.90 x 4.00 x 0.000144 x 6,165.00 x 4.00 Kolom = 41.19 Kg
2.35 x 4.00 x 0.000144 x 6,165.00 x 4.00 Kolom = 33.38 Kg
199.57 Kg 199.57 Kg
Pembulatan 199.56 Kg

2 Penulangan Sengkang Kolom Praktis 15 / 20 Besi Ø 8 - 15 Jendela J1


0.60 x 20.00 x 0.000064 x 6,165.00 x 8.00 Kolom = 37.88 Kg
0.60 x 15.20 x 0.000064 x 6,165.00 x 8.00 Kolom = 28.79 Kg
Pintu K3
0.60 x 23.20 x 0.000064 x 6,165.00 x 4.00 Kolom = 21.97 Kg
0.60 x 18.80 x 0.000064 x 6,165.00 x 4.00 Kolom = 17.80 Kg
106.44 Kg 106.44 Kg
Pembulatan 106.43 Kg

3 Stek Besi Dinding Batu Bata Ø 8 Jendela J1


0.60 x 3.00 x 0.000064 x 6,165.00 x 8.00 Kolom = 5.68 Kg
Pintu K3
0.60 x 3.00 x 0.000064 x 6,165.00 x 4.00 Kolom = 2.84 Kg
8.52 Kg 8.52 Kg
Pembulatan 8.52 Kg
No Uraian Pekerjaan Perhitungan Volume Satuan

4 Begisting Kolom Praktis 15 / 20 (2 x Pakai) Jendela J1


0.70 x 1.00 x 2.50 M1 x 8.00 Kolom = 14.00 M2
0.70 x 1.00 x 1.90 M1 x 8.00 Kolom = 10.64 M2
Pintu K3
0.70 x 1.00 x 2.90 M1 x 4.00 Kolom = 8.12 M2
0.70 x 1.00 x 2.35 M1 x 4.00 Kolom = 6.58 M2
39.34 M2 39.34 M2
Pembulatan 39.34 M2

5 Beton K-175/M3 Kolom Induk ( KP 15 / 20 )


Jendela J1
0.15 x 0.20 x 2.50 M1 x 8.00 Kolom = 0.60 M3
0.15 x 0.20 x 1.90 M1 x 8.00 Kolom = 0.46 M3
Pintu K3
0.15 x 0.20 x 2.90 M1 x 4.00 Kolom = 0.35 M3
0.15 x 0.20 x 2.35 M1 x 4.00 Kolom = 0.28 M3
1.69 M3 1.69 M3
Pembulatan 1.68 M3

XVI PEKERJAAN BALOK LATEI 15 / 20


Panjang Balok Latei 15 / 20
J1 = 4 Unit Jendela x 1.00 Balok Latei = 4.00 Balok Latei
K3 = 2 Unit Jendela x 1.00 Balok Latei = 2.00 Balok Latei

1 Penulangan Balok Latei 15 / 20 Besi Ø 12 Panjang Balok Latei 15 / 20


Jendela J1 = 1.85 M1 x 4.00 Balok Latei = 7.40 M1
Pintu K3 = 2.30 M1 x 2.00 Balok Latei = 4.60 M1

Jendela J1
4.00 x 0.000144 x 6,165.00 x 7.40 Balok M1 = 26.28 Kg
Pintu K3
4.00 x 0.000144 x 6,165.00 x 4.60 Balok M1 = 16.33 Kg
42.61 Kg 42.61 Kg
Pembulatan 42.61 Kg

2 Penulangan Sengkang Balok Latei 15 / 20 Besi Ø 8 - 15 Jendela J1


0.58 x 59.20 x 0.000064 x 6,165.00 = 13.55 Kg
Pintu K3
0.58 x 36.80 x 0.000064 x 6,165.00 = 8.42 Kg
21.97 Kg 21.97 Kg
Pembulatan 21.96 Kg
No Uraian Pekerjaan Perhitungan Volume Satuan

3 Begisting Balok Latei 15 / 20 (2 x Pakai) Panjang Begisting Balok Latei 15 / 20


Jendela J1
0.20 M1 x 2 Bidang x 7.40 Balok M1 = 2.96 M2
Pintu K3
0.20 M1 x 2 Bidang x 4.60 Balok M1 = 1.84 M2
4.80 M2 4.80 M2
Pembulatan 4.80 M2

4 Beton K-175/M3 Beton Balok Latei 15 / 20


Jendela J1
0.15 M1 x 0.20 M1 x 7.40 Balok M1 = 0.22 M3
Pintu K3
0.15 M1 x 0.20 M1 x 4.60 Balok M1 = 0.14 M3
0.36 M3 0.36 M3
Pembulatan 0.36 M3

XVII PEKERJAAN RING BALOK 15 / 20


Panjang Ring Balok 15 / 20
J1 = 4 Unit Jendela x 1.00 Ring Balok = 4.00 Ring Balok
K3 = 2 Unit Jendela x 1.00 Ring Balok = 2.00 Ring Balok

1 Penulangan Ring Balok 15 / 20 Besi Ø 12 Panjang Ring Balok 15 / 20


Jendela J1 = 2.95 M1 x 4.00 Ring Balok = 11.80 M1
Pintu K3 = 3.40 M1 x 2.00 Ring Balok = 6.80 M1

Jendela J1
4.00 x 0.000144 x 6,165.00 x 11.80 Ring M1 = 41.90 Kg
Pintu K3
4.00 x 0.000144 x 6,165.00 x 6.80 Ring M1 = 24.15 Kg
66.05 Kg 66.05 Kg
Pembulatan 66.04 Kg

2 Penulangan Sengkang Ring Balok 15 / 20 Besi Ø 8 - 15 Jendela J1


0.60 x 94.40 x 0.000064 x 6,165.00 = 22.35 Kg
Pintu K3
0.60 x 54.40 x 0.000064 x 6,165.00 = 12.88 Kg
35.23 Kg 35.23 Kg
Pembulatan 35.22 Kg
No Uraian Pekerjaan Perhitungan Volume Satuan

3 Begisting Ring Balok 15 / 20 (2 x Pakai) Jendela J1


0.20 M1 x 2 Bidang x 11.80 Ring M1 = 4.72 M2
Pintu K3
0.20 M1 x 2 Bidang x 6.80 Ring M1 = 2.72 M2
7.44 M2 7.44 M2
Pembulatan 7.44 M2

4 Beton K-175/M3 Beton Ring Balok 15 / 20


Jendela J1
0.15 M1 x 0.20 M1 x 11.80 Ring M1 = 0.35 M3
Pintu K3
0.15 M1 x 0.20 M1 x 6.80 Ring M1 = 0.20 M3
0.56 M3 0.56 M3
Pembulatan 0.55 M3

XVIII PEKERJAAN LISPLANK BETON JENDELA


1 Penulangan Plat Lisplank Beton Besi Ø 10 - 15 Ruang Samping Mihrab Kiri Kanan Masjid = 2.00 Ruang
Penulangan Plat Lisplank Beton Jendela Besi Ø 10

Penulangan Plat Lisplank Beton Jendela Bawah


Penulangan Memanjang Plat Lisplank Beton Jendela Bawah
0.50 M1 x 20 Baris x 1 Lisplank Beton = 10.00 M1

Penulangan Plat Lisplank Beton Jendela Atas


Penulangan Memanjang Plat Lisplank Beton Jendela Atas
1.00 M1 x 20 Baris x 1 Lisplank Beton = 20.00 M1

Penulangan Plat Lisplank Beton Jendela Samping Kiri Kanan


Penulangan Memanjang Plat Lisplank Beton Jendela Samping Kiri Kanan
0.75 M1 x 16 Baris x 2 Lisplank Beton = 24.50 M1
54.50 M1

1.00 x 0.000100 x 6,165.00 x 54.50 M1 = 33.60 Kg

Total Berat Penulangan Plat Lisplank Beton Jendela Besi Ø 10


33.60 Kg x 2 Ruang = 67.20 Kg 67.20 Kg
Pembulatan 67.19 Kg
No Uraian Pekerjaan Perhitungan Volume Satuan

2 Penulangan Sengkang Plat Lisplank Beton Besi Ø 8 - 12,5


Ruang Samping Mihrab Kiri Kanan Masjid = 2.00 Ruang
Penulangan Sengkang Plat Lisplank Beton Besi Ø 8

Penulangan Plat Lisplank Beton Bawah


Penulangan Sengkang Plat Lisplank Beton Bawah
3.00 x 3.33 x 0.000064 x 6,165.00 x 1 Lisplank Beton = 3.95 Kg

Penulangan Sengkang Plat Lisplank Beton Atas


3.00 x 6.67 x 0.000064 x 6,165.00 x 1 Lisplank Beton = 7.89 Kg

Penulangan Sengkang Plat Lisplank Jendela Samping Kiri Kanan


2.45 x 5.00 x 0.000064 x 6,165.00 x 2 Lisplank Beton = 9.67 Kg
21.50 Kg

Total Berat Penulangan Sengkang Plat Lisplank Beton Besi Ø 8


21.50 Kg x 2 Ruang = 43.01 Kg 43.01 Kg
Pembulatan 43.00 Kg

3 Begisting Plat Lisplank Beton Ruang Samping Mihrab Kiri Kanan Masjid = 2.00 Ruang
Begisting Lisplank Beton Plat Lisplank Beton Bawah
0.50 x 3.00 x 1.00 Bidang x 1 Lisplank Beton = 1.50 M2

Begisting Lisplank Beton Plat Lisplank Beton Atas


1.00 x 3.00 x 1.00 Bidang x 1 Lisplank Beton = 3.00 M2

Begisting Lisplank Beton Plat Lisplank Jendela Samping Kiri Kanan


0.75 x 2.45 x 1.00 Bidang x 2 Lisplank Beton = 3.68 M2
8.18 M2

Total Luas Begisting Lisplank Beton Plat Lisplank


8.18 M2 x 2 Ruang = 16.35 M2 16.35 M2
Pembulatan 16.35 M2

4 Beton Ready Mix K-250/M3 Ruang Samping Mihrab Kiri Kanan Masjid = 2.00 Ruang
Tebal Beton Lisplank = 0.12 M1

Volume Beton Plat Lisplank Beton Bawah


0.12 x 0.50 x 3.00 M1 x 1 Lisplank Beton = 0.18 M3

Volume Beton Plat Lisplank Beton Atas


0.12 x 1.00 x 3.00 M1 x 1 Lisplank Beton = 0.36 M3
No Uraian Pekerjaan Perhitungan Volume Satuan
No Uraian Pekerjaan Perhitungan Volume Satuan

Volume Beton Plat Lisplank Beton Samping Kiri Kanan


0.12 x 0.75 x 2.45 M1 x 2 Lisplank Beton = 0.44 M3
0.98 M3

Total Volume Beton Lisplank Beton Jendela


0.98 M3 x 2 Ruang = 1.96 M3 1.96 M3
Pembulatan 1.96 M3

XIX PEKERJAAN DINDING


1 Pemasangan 1 m2 dinding Bata Merah tebal 1/2 batu Camp, 1PC : 4 Pasir Pasang
Jumlah Bidang Jendela Lantai 2
J1 = 2 Unit Jendela (Lantai 1)
J1 = 2 Unit Jendela (Lantai 2)

K3 = 2 Unit Jendela (Lantai 1)

Tinggi Pemasangan Dinding Batu Bata 1:4 = 2.40 M1

Luas Pemasangan Dinding Batu Bata 1:4


J1
2.40 M1 x 2.55 M1 x 2 Dinding = 12.24 M2
1.60 M1 x 2.95 M1 x 2 Dinding = 9.44 M2
J1
2.40 M1 x 0.75 M1 x 2 Dinding = 3.60 M2
1.60 M1 x 2.95 M1 x 2 Dinding = 9.44 M2
K3
2.40 M1 x 0.50 M1 x 2 Dinding = 2.40 M2
37.12 M2

Total Luas Pemasangan Dinding Batu Bata 1:4


37.12 M2 = 37.12 M2 37.12 M2
Pembulatan 37.12 M2

2 Pemasangan 1 m2 GRC Ornament Uk. 5x36x60 Pemasangan Dinding GRC Ornament UK. 5x36x60
Jendela J1 (Lantai 1)
Jumlah Jendela J1 = 2.00 Unit

0.36 M1 x 2.15 M1 x 2.00 Bidang = 1.55 M2


0.36 M1 x 1.85 M1 x 1.00 Bidang = 0.67 M2
2.21 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

Luas Pemasangan Dinding GRC Ornament UK. 5x36x60


2.21 M2 x 2.00 Unit = 4.43 M2

Jendela J1 (Lantai 2)
Jumlah Jendela J2 = 2.00 Unit

0.36 M1 x 2.15 M1 x 2.00 Bidang = 1.55 M2


0.36 M1 x 1.85 M1 x 1.00 Bidang = 0.67 M2
2.21 M2

Luas Pemasangan Dinding GRC Ornament UK. 5x36x60


2.21 M2 x 2.00 Unit = 4.43 M2

Pintu K3 (Lantai 1)
Jumlah Pintu Samping Mihrab (Lantai 1) = 2.00 Unit

0.36 M1 x 2.75 M1 x 2.00 Bidang = 1.98 M2


0.36 M1 x 2.35 M1 x 1.00 Bidang = 0.85 M2
2.83 M2

Luas Pemasangan Dinding GRC Ornament UK. 5x36x60


2.83 M2 x 2.00 Unit = 5.65 M2

Pintu K3 (Lantai 1)
Jumlah Pintu Samping Mihrab (Lantai 1) = 2.00 Unit

0.36 M1 x 2.75 M1 x 2.00 Bidang = 1.98 M2


0.36 M1 x 2.35 M1 x 1.00 Bidang = 0.85 M2
2.83 M2

Luas Pemasangan Dinding GRC Ornament UK. 5x36x60


Bidang Dinding Lantai 3 (Dak Beton)
Jumlah Dinding Balkon (Lantai 2) = 2.00 Unit

0.60 M1 x 2.50 M1 x 2.00 Bidang = 3.00 M2


3.00 M2

Luas Pemasangan Dinding GRC Ornament UK. 5x36x60


3.00 M2 x 2.00 Unit = 6.00 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

Total Luas Pemasangan Dinding GRC Ornament UK. 5x36x60


4.43 M2 + 4.43 M2 + 5.65 M2 = 14.51 M2
6.00 M2 = 6.00 M2
20.51 M2 20.51 M2
Pembulatan 20.50 M2

XX PEKERJAAN PINTU DAN JENDELA ALUMINIUM (KUSEN)


1 Pek. Pasang Kuzen dan Pintu Aluminium Merk Alexindo Type P3 + Aceseoris
Banyak Kozen (Pintu Ruang Samping Mihrab Kiri Kanan Masjid Lantai 1) = 2.00 Unit
Lantai 1 = 2.00 Unit 2.00 Unit
Pembulatan 2.00 Unit

Luas Kozen 2.00 x 2.10 = 4.20 M2

Panjang Kozen Alumunium 2.00 + 2.10 + 2.10 = 6.20 M1

Pintu Rangka Alumunium - x - x - = - M2


Ventilasi Rangka Alumunium - x - x - = - M2

Kaca Tempered T = 12 mm 0.95 x 2.10 x 2.00 = 3.99 M2


Kaca Bening t = 8 mm - x - x - = - M2
Kaca Bening t = 5 mm - x - x - = - M2

Sticker Kaca Sandblast / Buram 0.95 x 2.10 x 2.00 = 3.99 M2


- x - x - = - M2
- x - x - = - M2
3.99 M2

Kunci Pintu 1.00 x 1.00 = 1.00 Bh


Engsel Pintu Swing 1.00 x 2.00 = 2.00 Set
Tarekan Pintu Stainless 1.00 x 2.00 = 2.00 Bh
Engsel Jendela - x - = - Bh
Tarekan Jendela - x - = - Bh

2 Pek. Pasang Kuzen dan Jendela Aluminium Merk Alexindo Type J1 + Aceseoris
Banyak Kozen (Jendela Ruang Samping Mihrab Kiri Kanan Masjid Lantai 1) = 2.00 Unit
Lantai 1 = 2.00 Unit 2.00 Unit
Pembulatan 2.00 Unit

Luas Kozen 1.55 x 1.60 = 2.48 M2


No Uraian Pekerjaan Perhitungan Volume Satuan

Panjang Kozen Alumunium 1.55 + 1.55 + 1.60 + 1.60 = 6.30 M1


1.60 = 1.60 M1
7.90 M1

Jendela Rangka Alumunium 0.70 x 1.50 x 2.00 = 2.10 M2

Ventilasi Kisi Kisi Alumunium - x - x - = - M2

Kaca Bening t = 5 mm 0.64 x 1.44 x 2.00 = 1.84 M2

Engsel Jendela 2.00 x 2.00 = 4.00 Bh


Tarekan Jendela 1.00 x 2.00 = 2.00 Bh

3 Pek. Pasang Kuzen dan Jendela Aluminium Merk Alexindo Type V1 + Aceseoris
Banyak Kozen (Ventilasi Gudang Lantai 1 Masjid) = 1.00 Unit
Lantai 1 = 1.00 Unit 1.00 Unit
Pembulatan 1.00 Unit

Luas Kozen 0.90 x 2.60 = 2.34 M2

Panjang Kozen Alumunium 0.70 + 0.90 + 0.90 + 0.70 = 3.20 M1


2.60 + 2.60 = 5.20 M1
8.40 M1

Ventilasi Rangka Alumunium - x - x - = - M2

Ventilasi Kisi Kisi Alumunium - x - x - = - M2

Kaca Bening t = 5 mm 0.90 x 2.60 x 1.00 = 2.34 M2

Engsel Jendela - x - = - Bh
Tarekan Jendela - x - = - Bh

4 Pemasangan Railling Tangga Besi Pipa Stainles Steel Luas Pemasangan Railling Tangga Besi Pipa Stainles Steel
Tinggi Pemasangan Railling Tangga Besi Pipa Stainles Steel = 0.90 M1
Panjang Pemasangan Railling Tangga Besi Pipa Stainles Steel
Tangga Ruang Samping Mihrab Kiri Masjid
3.35 + 3.35 + 1.50 + 1.50 + 4.75 M1 = 14.45 M1
4.75 + 5.55 + 1.35 M1 = 11.65 M1
No Uraian Pekerjaan Perhitungan Volume Satuan

Tangga Ruang Samping Mihrab Kanan Masjid


3.35 + 3.35 + 1.50 + 1.50 + 4.75 M1 = 14.45 M1
4.75 + 5.55 + 1.35 M1 = 11.65 M1
52.20 M1

Luas Pemasangan Railling Tangga Besi Pipa Stainles Steel


0.90 M1 x 52.20 M1 = 46.98 M2 46.98 M2
Pembulatan 46.98 M2

XXI PEKERJAAN KAP / ATAP


1 Pasangan Angkur Panjang 50 Cm D 16 Jumlah Pekerjaan Tiang / Kolom Baja = 4.00 Kolom

0.50 x 4.00 x 0.000256 x 6,165.00 x 4.00 Kolom = 12.63 Kg 12.63 Kg


Pembulatan 12.62 Kg

2 Pas. Base Plate Plat 10 mm Jumlah Pekerjaan Tiang / Kolom Baja = 4.00 Kolom

Berat Pas. Base Plate Plat 10 mm


0.25 x 0.25 x 0.010 x 7850.00 x 4.00 Kolom = 19.63 Kg

Berat Pas. Base Plate Plat 10 mm


19.63 Kg = 19.63 Kg 19.63 Kg
Pembulatan 19.62 Kg

3 Memasang 1 M' Pipa Hitam Klas Medium Diameter 4" ( Tiang / Kolom )
Jumlah Pekerjaan Tiang / Kolom Baja = 2.00 Kolom
Tinggi Pemasangan Pipa Hitam Klas Medium Diameter 4" = 1.20 M1
= 2.25 M1

Jumlah Pemasangan Pipa Hitam Klas Medium Diameter 4"


1.20 M1 x 2 Kolom = 2.40 M1
2.25 M1 x 2 Kolom = 4.50 M1
6.90 M1

Panjang Pemasangan Pipa Hitam Klas Medium Diameter 4"


6.90 M1 = 6.90 M1 6.90 M1
Pembulatan 6.90 M1

4 Memasang 1 M' Pipa Hitam Klas Medium Diameter 4" ( Ring Balok )
Panjang Pemasangan Pipa Hitam Klas Medium Diameter 4"
6.00 M1 x 2 Baris = 12.00 M1
12.00 M1 12.00 M1
No Uraian Pekerjaan Perhitungan Volume Satuan

Pembulatan 12.00 M1
No Uraian Pekerjaan Perhitungan Volume Satuan

5 Pengecatan 1 m2 Permukaan Baja Galvanis Secara Semprot Sistem 3 Lapis


Pengecatan Pipa Hitam Klas Medium Diameter 4" (Kolom) = 0.12 M1

6.90 M1 x 1.00 Bidang x 0.12 M1 = 0.83 M2

Pengecatan Pipa Hitam Klas Medium Diameter 4" (Ring Balok)


6.00 M1 x 2 Baris x 0.12 M1 = 1.44 M2
2.27 M2

Luas Pengecatan Pipa Hitam Klas Medium Diameter 4"


2.27 M2 = 2.27 M2

Total Luas Pengecatan Pipa Hitam Klas Medium Diameter 4"


2.27 M2 x 1.00 Atap Balkon Kiri Kanan = 2.27 M2 2.27 M2
Pembulatan 2.26 M2

6 Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Ringan (Canai Dingin) profil C 75 (TASO)
Luas Pemasangan Kuda-Kuda Baja Ringan (Truss)
Ruang Samping Mihrab Kiri Masjid
5.10 M1 x 8.00 M1 x 1.00 Bidang Atap = 40.80 M2
2.10 M1 x 6.00 M1 x 1.00 Bidang Atap = 12.60 M2

Ruang Samping Mihrab Kanan Masjid


5.10 M1 x 8.00 M1 x 1.00 Bidang Atap = 40.80 M2
2.10 M1 x 6.00 M1 x 1.00 Bidang Atap = 12.60 M2
106.80 M2 106.80 M2
Pembulatan 106.80 M2

7 Pemasangan Lisplank GRC Double / M1 Panjang Pemasangan Lisplank GRC Double


Ruang Samping Mihrab Kiri Masjid
5.10 M1 x 2.00 Lisplank GRC x 1.00 Bidang Atap = 10.20 M1
8.00 M1 x 1.00 Lisplank GRC x 1.00 Bidang Atap = 8.00 M1
2.10 M1 x 1.00 Lisplank GRC x 1.00 Bidang Atap = 2.10 M1
6.00 M1 x 1.00 Lisplank GRC x 1.00 Bidang Atap = 6.00 M1

Ruang Samping Mihrab Kanan Masjid


5.10 M1 x 2.00 Lisplank GRC x 1.00 Bidang Atap = 10.20 M1
8.00 M1 x 1.00 Lisplank GRC x 1.00 Bidang Atap = 8.00 M1
2.10 M1 x 1.00 Lisplank GRC x 1.00 Bidang Atap = 2.10 M1
6.00 M1 x 1.00 Lisplank GRC x 1.00 Bidang Atap = 6.00 M1
52.60 M1
No Uraian Pekerjaan Perhitungan Volume Satuan
No Uraian Pekerjaan Perhitungan Volume Satuan

Panjang Pemasangan Lisplank GRC Double


52.60 M1 = 52.60 M1 52.60 M1
Pembulatan 52.60 M1

8 Pemasangan 1 m2 Atap Spandek Berpasir SAMMA ROOF T Luas Pemasangan Atap Pemasangan 1 m2 Atap Zincalume Tebal 0,35 mm
Ruang Samping Mihrab Kiri Masjid
5.10 M1 x 8.00 M1 x 1.00 Bidang Atap = 40.80 M2
2.10 M1 x 6.00 M1 x 1.00 Bidang Atap = 12.60 M2

Ruang Samping Mihrab Kanan Masjid


5.10 M1 x 8.00 M1 x 1.00 Bidang Atap = 40.80 M2
2.10 M1 x 6.00 M1 x 1.00 Bidang Atap = 12.60 M2
106.80 M2 106.80 M2
Pembulatan 106.80 M2

9 Pemasangan 1 m1 Perabung Atap Spandek Berpasir SAMMA ROOF Tebal 0,35 mm


Panjang Pemasangan 1 m1 Perabung Atap Zincalume Tebal 0,35 mm
Ruang Samping Mihrab Kiri Masjid
8.00 M1 x 1.00 Perabung Atap x 1.00 Bidang Atap = 8.00 M1
6.00 M1 x 1.00 Perabung Atap x 1.00 Bidang Atap = 6.00 M1

Ruang Samping Mihrab Kanan Masjid


8.00 M1 x 1.00 Perabung Atap x 1.00 Bidang Atap = 8.00 M1
6.00 M1 x 1.00 Perabung Atap x 1.00 Bidang Atap = 6.00 M1
28.00 M1

Panjang Pemasangan 1 m1 Perabung Atap Zincalume Tebal 0,35 mm


28.00 M1 = 28.00 M1 28.00 M1
Pembulatan 28.00 M1

10 Bola Bola / Flashing Atap Zincalume Ruang Samping Mihrab Kiri Masjid
5.10 M1 x 2.00 Bola Bola Atap x 1.00 Bidang Atap = 10.20 M1
2.10 M1 x 2.00 Bola Bola Atap x 1.00 Bidang Atap = 4.20 M1

Ruang Samping Mihrab Kanan Masjid


5.10 M1 x 2.00 Bola Bola Atap x 1.00 Bidang Atap = 10.20 M1
2.10 M1 x 2.00 Bola Bola Atap x 1.00 Bidang Atap = 4.20 M1
28.80 M1 28.80 M1
Pembulatan 28.80 M1
No Uraian Pekerjaan Perhitungan Volume Satuan

11 Pemasangan 1 m Talang Air 1/2 Lingkaran D-15 Cm, Seng Plat BJLS 30 lebar 45 Cm
Ruang Samping Mihrab Kiri Masjid
8.00 M1 x 1.00 Talang Air Hujan x 1.00 Bidang Atap = 8.00 M1
6.00 M1 x 1.00 Talang Air Hujan x 1.00 Bidang Atap = 6.00 M1

Ruang Samping Mihrab Kanan Masjid


8.00 M1 x 1.00 Talang Air Hujan x 1.00 Bidang Atap = 8.00 M1
6.00 M1 x 1.00 Talang Air Hujan x 1.00 Bidang Atap = 6.00 M1
28.00 M1 28.00 M1
Pembulatan 28.00 M1

XXII PEKERJAAN PLESTERAN


1 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang tebal 15 mm
Total Luas Pemasangan Plesteran 1:4
Untuk Pemasangan Ventilasi Baru Lantai 1
0.15 M1 x 7.00 M1 x 1 Lapis = 1.05 M2
0.20 M1 x 7.00 M1 x 2 Lapis = 2.80 M2

Total Luas Pemasangan Dinding Batu Bata 1:4


37.12 M2 x 1 Lapis = 37.12 M2
40.97 M2 40.97 M2
Pembulatan 40.97 M2

2 Pemasangan 1 m2 Acian Pemasangan Acian


Luas Pemasangan Acian Ventilasi Baru Lantai 1
40.97 M2 x 1.00 Bidang = 40.97 M2 40.97 M2
Pembulatan 40.97 M2

3 Pemasangan 1 m2 Plesteran Granit Chip tebal 1 Cm Plesteran Granit Chip tebal 1 cm (Dinding Luar)
Ruang Samping Mihrab Kiri Masjid
Luas Pemasangan Plesteran Granit Chip tebal 1 cm (Dinding Luar)
37.12 M2 x 1 Dinding = 37.12 M2

Plesteran Granit Chip tebal 1 cm (Kolom Induk, Balok Induk, Lisplank Beton Jendela)
19.20 M2 + 19.46 M2 + 8.18 M2 = 38.66 M2

Total Luas Pemasangan 1 m2 Plesteran Granit Chip tebal 1 Cm


37.12 M2 + 38.66 M2 = 75.78 M2 75.78 M2
Pembulatan 75.77 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

XXIII PEKERJAAN PLAFOND


1 1 M2 Anal. Pek. Memasang Plafond PVC Merk Kingfon (Shunda Plafond) + Rangka Furing Hollow 4x4 (60 x 60) cm
Entrance Kiri Bangunan Masjid
2.50 M1 x 6.85 M1 x 1.00 Bidang Plafond = 17.13 M2
1.50 M1 x 4.75 M1 x 2.00 Bidang Plafond = 14.25 M2

Entrance Kanan Bangunan Masjid


2.50 M1 x 6.85 M1 x 1.00 Bidang Plafond = 17.13 M2
1.50 M1 x 4.75 M1 x 2.00 Bidang Plafond = 14.25 M2

Plafond Kiri Bangunan Masjid


0.90 M1 x 9.10 M1 x 2.00 Bidang Plafond = 16.38 M2
0.85 M1 x 4.60 M1 x 1.00 Bidang Plafond = 3.91 M2
0.85 M1 x 9.75 M1 x 1.00 Bidang Plafond = 8.29 M2

Plafond Kanan Bangunan Masjid


0.90 M1 x 9.10 M1 x 2.00 Bidang Plafond = 16.38 M2
0.85 M1 x 4.60 M1 x 1.00 Bidang Plafond = 3.91 M2
0.85 M1 x 9.75 M1 x 1.00 Bidang Plafond = 8.29 M2
119.90 M2

Ruang Samping Mihrab Kiri Masjid


3.85 M1 x 5.85 M1 x 1.00 Bidang Plafond = 22.52 M2
0.85 M1 x 5.50 M1 x 1.00 Bidang Plafond = 4.68 M2

Ruang Samping Mihrab Kanan Masjid


3.85 M1 x 5.85 M1 x 1.00 Bidang Plafond = 22.52 M2
0.85 M1 x 5.50 M1 x 1.00 Bidang Plafond = 4.68 M2
54.39 M2

Total Luas Pemasangan Plafond PVC (ex sunda plafond)


119.90 M2 + 54.39 M2 = 174.30 M2 174.30 M2
Pembulatan 174.30 M2

2 Pemasangan 1 m' Les Plafond PVC Les Plafond Entrance Kiri Bangunan Masjid
2.50 M1 x 2.00 Les Plafond = 5.00 M1
6.85 M1 x 2.00 Les Plafond = 13.70 M1
1.50 M1 x 2.00 Les Plafond = 3.00 M1
4.75 M1 x 2.00 Les Plafond = 9.50 M1
No Uraian Pekerjaan Perhitungan Volume Satuan

Les Plafond Entrance Kanan Bangunan Masjid


2.50 M1 x 2.00 Les Plafond = 5.00 M1
6.85 M1 x 2.00 Les Plafond = 13.70 M1
1.50 M1 x 2.00 Les Plafond = 3.00 M1
4.75 M1 x 2.00 Les Plafond = 9.50 M1

Les Plafond Kiri Bangunan Masjid


0.90 M1 x 2.00 Les Plafond = 1.80 M1
9.10 M1 x 2.00 Les Plafond = 18.20 M1
0.85 M1 x 2.00 Les Plafond = 1.70 M1
4.60 M1 x 2.00 Les Plafond = 9.20 M1
0.85 M1 x 2.00 Les Plafond = 1.70 M1
9.75 M1 x 2.00 Les Plafond = 19.50 M1

Les Plafond Kanan Bangunan Masjid


0.90 M1 x 2.00 Les Plafond = 1.80 M1
9.10 M1 x 2.00 Les Plafond = 18.20 M1
0.85 M1 x 2.00 Les Plafond = 1.70 M1
4.60 M1 x 2.00 Les Plafond = 9.20 M1
0.85 M1 x 2.00 Les Plafond = 1.70 M1
9.75 M1 x 2.00 Les Plafond = 19.50 M1
166.60 M1

Les Plafond Ruang Samping Mihrab Kiri Masjid


3.85 M1 x 2.00 Les Plafond = 7.70 M1
5.85 M1 x 2.00 Les Plafond = 11.70 M1
0.85 M1 x 2.00 Les Plafond = 1.70 M1
5.50 M1 x 2.00 Les Plafond = 11.00 M1

Les Plafond Ruang Samping Mihrab Kanan Masjid


3.85 M1 x 2.00 Les Plafond = 7.70 M1
5.85 M1 x 2.00 Les Plafond = 11.70 M1
0.85 M1 x 2.00 Les Plafond = 1.70 M1
5.50 M1 x 2.00 Les Plafond = 11.00 M1
64.20 M1

Total Panjang Pemasangan Les Plafond PVC


166.60 M1 + 64.20 M1 = 230.80 M1 230.80 M1
Pembulatan 230.80 M1
No Uraian Pekerjaan Perhitungan Volume Satuan

XXIV PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


1 Pengurugan 1 m3 sirtu padat Tebal Pasangan Urugan Sirtu = 0.15 M1
Ruang Samping Mihrab Kiri Masjid
0.15 M1 x 3.85 M1 x 5.85 M1 = 3.38 M3

Ruang Samping Mihrab Kanan Masjid


0.15 M1 x 3.85 M1 x 5.85 M1 = 3.38 M3
6.76 M3

Total Volume Pek. Pasangan Urugan Sirtu


6.76 M3 = 6.76 M3 6.76 M3
Pembulatan 6.75 M3

2 Pengurugan 1 m3 dengan pasir urug Tebal Pasangan Urugan Pasir = 0.10 M1


Ruang Samping Mihrab Kiri Masjid
0.10 M1 x 3.85 M1 x 5.85 M1 = 2.25 M3

Ruang Samping Mihrab Kanan Masjid


0.10 M1 x 3.85 M1 x 5.85 M1 = 2.25 M3
4.50 M3

Total Volume Pek. Pasangan Urugan Pasir


4.50 M3 = 4.50 M3 4.50 M3
Pembulatan 4.50 M3

3 Membuat beton mutu f3c = 14,5 Mpa (K 175), slump (12 ± 2) Cm, w/c 0,66
Tebal Pekerjaan Beton Lantai (K175) = 0.07 M1
Volume Pekerjaan Beton Lantai (K175)
Ruang Samping Mihrab Kiri Masjid
0.07 M1 x 3.85 M1 x 5.85 M1 = 1.58 M3

Ruang Samping Mihrab Kanan Masjid


0.07 M1 x 3.85 M1 x 5.85 M1 = 1.58 M3
3.15 M3

Total Volume Pekerjaan Beton Lantai (K175)


3.15 M3 = 3.15 M3 3.15 M3
Pembulatan 3.15 M3
No Uraian Pekerjaan Perhitungan Volume Satuan

4 Pemasangan 1 m2 Lantai Granit 60 x 60 (silver pearls, Granito)


Luas Pemasangan Granit Ukuran 60 cm x 60 cm
Ruang Samping Mihrab Kiri Masjid
3.85 M1 x 5.85 M1 x 1.00 Lantai = 22.52 M2
1.50 M1 x 6.00 M1 x 1.00 Lantai = 9.00 M2

Ruang Samping Mihrab Kanan Masjid


3.85 M1 x 5.85 M1 x 1.00 Lantai = 22.52 M2
1.50 M1 x 6.00 M1 x 1.00 Lantai = 9.00 M2
63.05 M2

Luas Pemasangan Aqua Proof


63.05 M2 = 63.05 M2 63.05 M2
Pembulatan 63.04 M2

5 Pemasangan 1 m2 Lantai Granit 40 x 40 (Pearls White, Merk Granito)


Luas Pemasangan Granit Ukuran 40 cm x 40 cm
Balkon Ruang Samping Mihrab Kiri Masjid (Lantai 2)
3.85 M1 x 5.85 M1 x 1.00 Lantai = 22.52 M2
1.50 M1 x 6.00 M1 x 1.00 Lantai = 9.00 M2

Balkon Ruang Samping Mihrab Kanan Masjid (Lantai 2)


3.85 M1 x 5.85 M1 x 1.00 Lantai = 22.52 M2
1.50 M1 x 6.00 M1 x 1.00 Lantai = 9.00 M2

Tangga Balkon Samping Mihrab Kiri Masjid


1.50 M1 x 1.50 M1 x 1.00 Lantai = 2.25 M2
0.15 M1 x 1.50 M1 x 25.00 Anak Tangga = 5.62 M2
0.30 M1 x 1.50 M1 x 25.00 Anak Tangga = 11.25 M2

Tangga Balkon Samping Mihrab Kanan Masjid


1.50 M1 x 1.50 M1 x 1.00 Lantai = 2.25 M2
0.15 M1 x 1.50 M1 x 25.00 Anak Tangga = 5.62 M2
0.30 M1 x 1.50 M1 x 25.00 Anak Tangga = 11.25 M2
101.30 M2

Luas Pemasangan Granit Ukuran 40 cm x 40 cm


101.30 M2 = 101.30 M2 101.30 M2
Pembulatan 101.29 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

6 Pemasangan 1 m' Step Nosing Granit pjg = 30 cm Tangga Balkon Samping Mihrab Kiri Masjid
1.50 M1 x 25.00 Anak Tangga = 37.50 M1
Tangga Balkon Samping Mihrab Kanan Masjid
1.50 M1 x 25.00 Anak Tangga = 37.50 M1
75.00 M1

Panjang Pemasangan 1 m' Step Nosing Granit pjg = 30 cm


75.00 M1 = 75.00 M1 75.00 M1
Pembulatan 75.00 M1

7 Pemasangan 1 m' Bon Bon Keramik ukuran 10 Cm 1.90 + 5.60 + 1.90 + 5.60 M1 = 15.00 M1
15.00 M1 15.00 M1
Pembulatan 15.00 M1

XXV PEKERJAAN PENGECATAN


1 Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2lapis cat penutup)
Luas Pengecatan Dinding Batu Bata 1:4
40.97 M2 x 1.00 Bidang = 40.97 M2
40.97 M2
Total Luas Pengecatan Dinding Batu Bata 1:4
40.97 M2 = 40.97 M2 40.97 M2
Pembulatan 40.97 M2

XXVI PEKERJAAN ELEKTRIKAL


Pekerjaan Instalasi Penerangan dan Stop Kontak
1 Pekerjaan Armature, Saklar dan Stop Kontak
a. Pemasangan Lampu LED Panel Light Philips 48 watt Plafond Keliling Masjid
2.00 Bh = 2.00 Buah
Ruang Samping Mihrab Kiri Masjid
2.00 Bh = 2.00 Buah
Ruang Samping Mihrab Kanan Masjid
2.00 Bh = 2.00 Buah
6.00 Buah 6.00 Buah
Pembulatan 6.00 Buah

b. Lampu Down Light LED 4" Philips 18 W Plafond Keliling Masjid


30.00 Bh = 30.00 Buah
Ruang Samping Mihrab Kiri Masjid
2.00 Bh = 2.00 Buah
Ruang Samping Mihrab Kanan Masjid
2.00 Bh = 2.00 Buah
= 34.00 Buah 34.00 Buah
No Uraian Pekerjaan Perhitungan Volume Satuan

Pembulatan 34.00 Buah

2 Pekerjaan Instalasi
a. Instalasi Penerangan NYM 3 X 2.5mm2 + pipa counduit dia 20 mm2
6.00 Ttk + 34.00 Ttk = 40.00 Titik 40.00 Titik
Pembulatan 40.00 Titik

XXVII PEKERJAAN INTERIOR MIHRAB


1 Pemasangan 1 m2 Dinding Pemisah Teakwood / Multiplek, Lapis HPL ( Khusus Interior )
Luas Pemasangan 1 m2 Dinding Pemisah Teakwood / Multiplek, Lapis HPL ( Khusus Interior )
Ruang Mihrab Depan (Lantai 1 dan Lantai 2)
3.00 M1 x 8.60 M1 x 2.00 Bidang = 51.60 M2
5.00 M1 x 9.00 M1 x 1.00 Bidang = 45.00 M2
Ruang Mihrab Belakang (Lantai 1)
5.60 M1 x 9.00 M1 x 1.00 Bidang = 50.40 M2
147.00 M2

Total Luas Pemasangan 1 m2 Dinding Pemisah Teakwood / Multiplek, Lapis HPL ( Khusus Interior )
147.00 M2 = 147.00 M2 147.00 M2
Pembulatan 147.00 M2

2 Pemasangan 1 m2 Les Back Ground Dinding Triplek Finishing HPL, rangka plywood 9 mm
Luas Pemasangan 1 m2 Les Back Ground Dinding Triplek Finishing HPL, rangka plywood 9 mm
Ruang Mihrab Depan (Lantai 1 dan Lantai 2)
0.90 M1 x 8.60 M1 x 2.00 Bidang = 15.48 M2
0.90 M1 x 9.00 M1 x 1.00 Bidang = 8.10 M2
Ruang Mihrab Belakang (Lantai 1)
5.60 M1 x 0.90 M1 x 1.00 Bidang = 5.04 M2
28.62 M2

Total Luas Pemasangan 1 m2 Les Back Ground Dinding Triplek Finishing HPL, rangka plywood 9 mm
28.62 M2 = 28.62 M2 28.62 M2
Pembulatan 28.62 M2

3 Pemasangan 1 m2 Dinding ACP Merk Seven (Motif Cutting)


Luas Pemasangan 1 m2 Dinding ACP Merk Seven (Motif Cutting)
Ruang Mihrab Depan (Lantai 1 dan Lantai 2)
3.00 M1 x 8.60 M1 x 2.00 Bidang = 51.60 M2
5.00 M1 x 9.00 M1 x 1.00 Bidang = 45.00 M2
Ruang Mihrab Belakang (Lantai 1)
5.60 M1 x 9.00 M1 x 1.00 Bidang = 50.40 M2
147.00 M2
No Uraian Pekerjaan Perhitungan Volume Satuan
No Uraian Pekerjaan Perhitungan Volume Satuan

Total Luas Pemasangan 1 m2 Dinding ACP Merk Seven (Motif Cutting)


147.00 M2 = 147.00 M2 147.00 M2
Pembulatan 147.00 M2

B FINISHING LANTAI 2 MASJID NURUL ‘ILMI

I PEKERJAAN BONGKARAN
1 Pembongkaran 1 m3 beton bertulang Pembongkaran Beton Bertulang
Jumlah Kolom Induk ( KP 15 / 20 )
J1 = 20 Unit Jendela x 2.00 Kolom = 40.00 Kolom
J2 = 10 Unit Jendela x 2.00 Kolom = 20.00 Kolom
K1 = 1 Unit Jendela x 6.00 Kolom = 6.00 Kolom

Kolom Induk ( KP 15 / 20 )
Jendela J1
0.15 x 0.20 x 0.20 M1 x 40.00 Kolom = 0.24 M3
0.15 x 0.20 x 0.20 M1 x 40.00 Kolom = 0.24 M3
Jendela J2
0.15 x 0.20 x 0.20 M1 x 20.00 Kolom = 0.12 M3
0.15 x 0.20 x 0.20 M1 x 20.00 Kolom = 0.12 M3
Jendela K1
0.15 x 0.20 x 0.20 M1 x 6.00 Kolom = 0.04 M3
0.76 M3 0.76 M3
Pembulatan 0.75 M3

2 Pembongkaran 1 m3 dinding tembok bata Pembongkaran Dinding Tembok Bata


Untuk Pemasangan Pintu dan Jendela Baru Lantai 2
3.00 M1 x 6.00 M1 x 2 Dinding = 36.00 M2

Total Volume Pembongkaran Dinding Tembok Bata


36.00 M2 x 0.15 M1 = 5.40 M3 5.40 M3
Pembulatan 5.40 M3
No Uraian Pekerjaan Perhitungan Volume Satuan

3 Membongkar Plafond PVC (sunda plafond) + Rangka Furing Hollow 4x4 (60 x 60) cm
Dinding Depan Bangunan Masjid
0.90 M1 x 16.35 M1 x 2.00 Bidang Plafond = 29.43 M2
0.90 M2 x 6.35 M2 x 1.00 Bidang Plafond = 5.72 M3

Dinding Kiri Bangunan Masjid


0.90 M1 x 9.10 M1 x 2.00 Bidang Plafond = 16.38 M2
0.90 M2 x 3.75 M2 x 1.00 Bidang Plafond = 3.38 M3
0.90 M2 x 10.50 M2 x 1.00 Bidang Plafond = 9.45 M3

Dinding Kanan Bangunan Masjid


0.90 M1 x 9.10 M1 x 2.00 Bidang Plafond = 16.38 M2
0.90 M2 x 3.75 M2 x 1.00 Bidang Plafond = 3.38 M3
0.90 M2 x 10.50 M2 x 1.00 Bidang Plafond = 9.45 M3
93.56 M2

Total Luas Pembongkaran Plafond PVC (ex sunda plafond)


93.56 M2 = 93.56 M2 93.56 M2
Pembulatan 93.55 M2

II PEKERJAAN KOLOM PRAKTIS ( KP 15 / 20 ) Jumlah Kolom Induk ( KP 15 / 20 )


J1 = 20 Unit Jendela x 2.00 Kolom = 40.00 Kolom
J2 = 10 Unit Jendela x 2.00 Kolom = 20.00 Kolom
K1 = 1 Unit Jendela x 6.00 Kolom = 6.00 Kolom

1 Penulangan Kolom Praktis 15 / 20 Besi Ø 12 Jendela J1


2.50 x 4.00 x 0.000144 x 6,165.00 x 40.00 Kolom = 355.10 Kg
1.90 x 4.00 x 0.000144 x 6,165.00 x 40.00 Kolom = 269.88 Kg
Jendela J2
2.50 x 4.00 x 0.000144 x 6,165.00 x 20.00 Kolom = 177.55 Kg
1.90 x 4.00 x 0.000144 x 6,165.00 x 20.00 Kolom = 134.94 Kg
Jendela K1
2.50 x 4.00 x 0.000144 x 6,165.00 x 6.00 Kolom = 53.27 Kg
990.74 Kg 990.74 Kg
Pembulatan 990.74 Kg
No Uraian Pekerjaan Perhitungan Volume Satuan

2 Penulangan Sengkang Kolom Praktis 15 / 20 Besi Ø 8 - 15 Jendela J1


0.60 x 20.00 x 0.000064 x 6,165.00 x 40.00 Kolom = 189.39 Kg
0.60 x 15.20 x 0.000064 x 6,165.00 x 40.00 Kolom = 143.94 Kg
Jendela J2
0.60 x 20.00 x 0.000064 x 6,165.00 x 20.00 Kolom = 94.69 Kg
0.60 x 15.20 x 0.000064 x 6,165.00 x 20.00 Kolom = 71.97 Kg
Jendela K1
0.60 x 20.00 x 0.000064 x 6,165.00 x 6.00 Kolom = 28.41 Kg
528.39 Kg 528.39 Kg
Pembulatan 528.39 Kg

3 Stek Besi Dinding Batu Bata Ø 8 Jendela J1


0.60 x 3.00 x 0.000064 x 6,165.00 x 40.00 Kolom = 28.41 Kg
Jendela J2
0.60 x 3.00 x 0.000064 x 6,165.00 x 20.00 Kolom = 14.20 Kg
Jendela K1
0.60 x 3.00 x 0.000064 x 6,165.00 x 6.00 Kolom = 4.26 Kg
46.87 Kg 46.87 Kg
Pembulatan 46.87 Kg

4 Begisting Kolom Praktis 15 / 20 (2 x Pakai) Jendela J1


0.70 x 1.00 x 2.50 M1 x 40.00 Kolom = 70.00 M2
0.70 x 1.00 x 1.90 M1 x 40.00 Kolom = 53.20 M2
Jendela J2
0.70 x 1.00 x 2.50 M1 x 20.00 Kolom = 35.00 M2
0.70 x 1.00 x 1.90 M1 x 20.00 Kolom = 26.60 M2
Jendela K1
0.70 x 1.00 x 2.50 M1 x 6.00 Kolom = 10.50 M2
195.30 M2 195.30 M2
Pembulatan 195.30 M2
5 Beton K-175/M3 Kolom Induk ( KP 15 / 20 )
Jendela J1
0.15 x 0.20 x 2.50 M1 x 40.00 Kolom = 3.00 M3
0.15 x 0.20 x 1.90 M1 x 40.00 Kolom = 2.28 M3
Jendela J2
0.15 x 0.20 x 2.50 M1 x 20.00 Kolom = 1.50 M3
0.15 x 0.20 x 1.90 M1 x 20.00 Kolom = 1.14 M3
Jendela K1
0.15 x 0.20 x 2.50 M1 x 6.00 Kolom = 0.45 M3
8.37 M3 8.37 M3
No Uraian Pekerjaan Perhitungan Volume Satuan

Pembulatan 8.37 M3

III PEKERJAAN BALOK LATEI 15 / 20 Panjang Balok Latei 15 / 20


J1 = 20 Unit Jendela x 1.00 Balok Latei = 20.00 Balok Latei
J2 = 10 Unit Jendela x 1.00 Balok Latei = 10.00 Balok Latei
K1 = 1 Unit Jendela x 1.00 Balok Latei = 1.00 Balok Latei

Panjang Balok Latei 15 / 20


Jendela J1 = 1.85 M1 x 20.00 Balok Latei = 37.00 M1
Jendela J2 = 1.10 M1 x 10.00 Balok Latei = 11.00 M1
Jendela K1 = 3.95 M1 x 1.00 Balok Latei = 3.95 M1

1 Penulangan Balok Latei 15 / 20 Besi Ø 12 Jendela J1


4.00 x 0.000144 x 6,165.00 x 37.00 Balok M1 = 131.39 Kg
Jendela J2
4.00 x 0.000144 x 6,165.00 x 11.00 Balok M1 = 39.06 Kg
Jendela K1
4.00 x 0.000144 x 6,165.00 x 3.95 Balok M1 = 14.03 Kg
184.48 Kg 184.48 Kg
Pembulatan 184.47 Kg

2 Penulangan Sengkang Balok Latei 15 / 20 Besi Ø 8 - 15 Jendela J1


0.58 x 296.00 x 0.000064 x 6,165.00 = 67.74 Kg
Jendela J2
0.58 x 88.00 x 0.000064 x 6,165.00 = 20.14 Kg
Jendela K1
0.58 x 31.60 x 0.000064 x 6,165.00 = 7.23 Kg
95.11 Kg 95.11 Kg
Pembulatan 95.10 Kg

3 Begisting Balok Latei 15 / 20 (2 x Pakai) Panjang Begisting Balok Latei 15 / 20


Jendela J1
0.20 M1 x 2 Bidang x 37.00 Balok M1 = 14.80 M2
Jendela J2
0.20 M1 x 2 Bidang x 11.00 Balok M1 = 4.40 M2
Jendela K1
0.20 M1 x 2 Bidang x 3.95 Balok M1 = 1.58 M2
20.78 M2 20.78 M2
Pembulatan 20.78 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

4 Beton K-175/M3 Beton Balok Latei 15 / 20


Jendela J1
0.15 M1 x 0.20 M1 x 37.00 Balok M1 = 1.11 M3
Jendela J2
0.15 M1 x 0.20 M1 x 11.00 Balok M1 = 0.33 M3
Jendela K1
0.15 M1 x 0.20 M1 x 3.95 Balok M1 = 0.12 M3
1.56 M3 1.56 M3
Pembulatan 1.55 M3

IV PEKERJAAN RING BALOK 15 / 20 Panjang Ring Balok 15 / 20


J1 = 20 Unit Jendela x 1.00 Ring Balok = 20.00 Ring Balok
J2 = 10 Unit Jendela x 1.00 Ring Balok = 10.00 Ring Balok
K1 = 1 Unit Jendela x 1.00 Ring Balok = 1.00 Ring Balok

Panjang Ring Balok 15 / 20


Jendela J1 = 2.95 M1 x 20.00 Ring Balok = 59.00 M1
Jendela J2 = 2.20 M1 x 10.00 Ring Balok = 22.00 M1
Jendela K1 = 6.35 M1 x 1.00 Ring Balok = 6.35 M1

1 Penulangan Ring Balok 15 / 20 Besi Ø 12 Jendela J1


4.00 x 0.000144 x 6,165.00 x 59.00 Ring M1 = 209.51 Kg
Jendela J2
4.00 x 0.000144 x 6,165.00 x 22.00 Ring M1 = 78.12 Kg
Jendela K1
4.00 x 0.000144 x 6,165.00 x 6.35 Ring M1 = 22.55 Kg
310.18 Kg 310.18 Kg
Pembulatan 310.18 Kg

2 Penulangan Sengkang Ring Balok 15 / 20 Besi Ø 8 - 15 Jendela J1


0.60 x 472.00 x 0.000064 x 6,165.00 = 111.74 Kg
Jendela J2
0.60 x 176.00 x 0.000064 x 6,165.00 = 41.67 Kg
Jendela K1
0.60 x 50.80 x 0.000064 x 6,165.00 = 12.03 Kg
165.43 Kg 165.43 Kg
Pembulatan 165.43 Kg
No Uraian Pekerjaan Perhitungan Volume Satuan

3 Begisting Ring Balok 15 / 20 (2 x Pakai) Jendela J1


0.20 M1 x 2 Bidang x 59.00 Ring M1 = 23.60 M2
Jendela J2
0.20 M1 x 2 Bidang x 22.00 Ring M1 = 8.80 M2
Jendela K1
0.20 M1 x 2 Bidang x 6.35 Ring M1 = 2.54 M2
34.94 M2 34.94 M2
Pembulatan 34.94 M2

4 Beton K-175/M3 Beton Ring Balok 15 / 20


Jendela J1
0.15 M1 x 0.20 M1 x 59.00 Ring M1 = 1.77 M3
Jendela J2
0.15 M1 x 0.20 M1 x 22.00 Ring M1 = 0.66 M3
Jendela K1
0.15 M1 x 0.20 M1 x 6.35 Ring M1 = 0.19 M3
2.62 M3 2.62 M3
Pembulatan 2.62 M3

V PEKERJAAN DINDING
1 Pemasangan 1 m2 dinding Bata Merah tebal 1/2 batu Camp, 1PC : 4 Pasir Pasang
Jumlah Bidang Jendela Lantai 2
J1 = 6 Unit Jendela (Jendela 1)
J1 = 8 Unit Jendela (Jendela 1)
J1 = 2 Unit Jendela (Jendela 2)
J1 = 2 Unit Jendela (Jendela 3)

J2 = 10 Unit Jendela

Tinggi Pemasangan Dinding Batu Bata 1:4 = 2.40 M1

Luas Pemasangan Dinding Batu Bata 1:4


2.40 M1 x 1.46 M1 x 6 Dinding = 21.02 M2
2.40 M1 x 0.50 M1 x 8 Dinding = 9.60 M2
2.40 M1 x 0.60 M1 x 2 Dinding = 2.88 M2
2.40 M1 x 0.73 M1 x 2 Dinding = 3.50 M2

2.40 M1 x 0.20 M1 x 10 Dinding = 4.80 M2


41.81 M2
Total Luas Pemasangan Dinding Batu Bata 1:4
41.81 M2 = 41.81 M2 41.81 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

Pembulatan 41.80 M2

2 Pemasangan 1 m2 GRC Ornament Uk. 5x36x60 Pemasangan Dinding GRC Ornament UK. 5x36x60
Jendela J1 (Lantai 2)
Jumlah Jendela J1 = 20.00 Unit

0.36 M1 x 2.15 M1 x 2.00 Bidang = 1.55 M2


0.36 M1 x 1.85 M1 x 1.00 Bidang = 0.67 M2
2.21 M2

Luas Pemasangan Dinding GRC Ornament UK. 5x36x60


2.21 M2 x 20.00 Unit = 44.28 M2

Jendela J2 (Lantai 2)
Jumlah Jendela J2 = 10.00 Unit

0.36 M1 x 2.15 M1 x 2.00 Bidang = 1.55 M2


0.36 M1 x 1.15 M1 x 1.00 Bidang = 0.41 M2
1.96 M2

Luas Pemasangan Dinding GRC Ornament UK. 5x36x60


1.96 M2 x 10.00 Unit = 19.62 M2

Jendela K1 (Lantai 2)
Jumlah Kaligrafhi Entrance (Lantai 2) = 1.00 Unit

0.72 M1 x 2.10 M1 x 2.00 Bidang = 3.02 M2


3.02 M2

Luas Pemasangan Dinding GRC Ornament UK. 5x36x60


3.02 M2 x 1.00 Unit = 3.02 M2

Total Luas Pemasangan Dinding GRC Ornament UK. 5x36x60


44.28 M2 + 19.62 M2 + 3.02 M2 = 66.92 M2
66.92 M2 66.92 M2
Pembulatan 66.92 M2

3 Pemasangan 1 m2 GRC Ornament Uk. 8x100x100 Jendela K1 (Lantai 2)


Jumlah Kaligrafhi Entrance (Lantai 2) = 1.00 Unit

1.00 M1 x 1.00 M1 x 4.00 Bidang = 4.00 M2


No Uraian Pekerjaan Perhitungan Volume Satuan

Luas Pemasangan Dinding GRC Ornament UK. 5x36x60


4.00 M2 x 1.00 Unit = 4.00 M2 4.00 M2
Pembulatan 4.00 M2

4 Pemasangan 1 m2 GRC Ornament Uk. 8x200x200 Jendela K1 (Lantai 2)


Jumlah Kaligrafhi Entrance (Lantai 2) = 1.00 Unit

2.00 M1 x 2.00 M1 x 1.00 Bidang = 4.00 M2

Luas Pemasangan Dinding GRC Ornament UK. 5x36x60


4.00 M2 x 1.00 Unit = 4.00 M2 4.00 M2
Pembulatan 4.00 M2

5 Hiasan Kaca Tempered Hias T 10 (Tulisan ALLAH) Pemasangan Hiasan Kaca Tempered Hias T 10 (Tulisan Allah)
Jendela J3
Jumlah Jendela J3 = 6.00 Unit

Jumlah Pemasangan Hiasan Kaca Tempered Hias T 10 (Tulisan Allah)


= 6.00 Unit 6.00 Unit
Pembulatan 6.00 Unit

VI PEKERJAAN PINTU DAN JENDELA ALUMINIUM (KUSEN)


1 Pek. Pasang Kuzen dan Pintu Aluminium Merk Alexindo Type P2 + Aceseoris
Banyak Kozen (Pintu Belakang Lantai 2 Masjid) = 2.00 Unit
Lantai 2 = 2.00 Unit 2.00 Unit
Pembulatan 2.00 Unit

Luas Kozen 1.70 x 2.70 = 4.59 M2

Panjang Kozen Alumunium 1.70 + 2.70 + 2.70 = 7.10 M1

Pintu Rangka Alumunium 0.80 x 2.65 x 2.00 = 4.24 M2


Ventilasi Rangka Alumunium - x - x - = - M2
Kaca Bening t = 8 mm 0.68 x 2.53 x 2.00 = 3.44 M2
Kaca Bening t = 5 mm - x - x - = - M2

Sticker Kaca Sandblast / Buram 0.68 x 2.53 x 2.00 = 3.44 M2


- x - x - = - M2
3.44 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

Kunci Pintu 1.00 x 1.00 = 1.00 Bh


Engsel Pintu 3.00 x 2.00 = 6.00 Bh
Tarekan Pintu Stainless 1.00 x 2.00 = 2.00 Bh
Engsel Jendela - x - = - Bh
Tarekan Jendela - x - = - Bh

2 Pek. Pasang Kuzen dan Jendela Aluminium Merk Alexindo Type J1 + Aceseoris
Banyak Kozen (Jendela Dinding Lantai 2 Bangunan) = 20.00 Unit
Lantai 2 = 20.00 Unit 20.00 Unit
Pembulatan 20.00 Unit

Luas Kozen 1.55 x 1.60 = 2.48 M2

Panjang Kozen Alumunium 1.55 + 1.55 + 1.60 + 1.60 = 6.30 M1


1.60 = 1.60 M1
7.90 M1

Jendela Rangka Alumunium 0.70 x 1.50 x 2.00 = 2.10 M2

Ventilasi Kisi Kisi Alumunium - x - x - = - M2

Kaca Bening t = 5 mm 0.64 x 1.44 x 2.00 = 1.84 M2

Engsel Jendela 2.00 x 2.00 = 4.00 Bh


Tarekan Jendela 1.00 x 2.00 = 2.00 Bh

3 Pek. Pasang Kuzen dan Jendela Aluminium Merk Alexindo Type J2 + Aceseoris
Banyak Kozen (Jendela Dinding Lantai 2 Bangunan) = 10.00 Unit
Lantai 2 = 10.00 Unit 10.00 Unit
Pembulatan 10.00 Unit

Luas Kozen 0.80 x 1.60 = 1.28 M2

Panjang Kozen Alumunium 0.80 + 0.80 + 1.60 + 1.60 = 4.80 M1


4.80 M1

Jendela Rangka Alumunium 0.70 x 1.50 x 1.00 = 1.05 M2

Ventilasi Kisi Kisi Alumunium - x - x - = - M2

Kaca Bening t = 5 mm 0.64 x 1.44 x 1.00 = 0.92 M2


No Uraian Pekerjaan Perhitungan Volume Satuan

Engsel Jendela 2.00 x 1.00 = 2.00 Bh


Tarekan Jendela 1.00 x 1.00 = 1.00 Bh

4 Pemasangan Railling Tangga Besi Pipa Stainles Steel Luas Pemasangan Railling Tangga Besi Pipa Stainles Steel
Tinggi Pemasangan Railling Tangga Besi Pipa Stainles Steel = 0.90 M1
Panjang Pemasangan Railling Tangga Besi Pipa Stainles Steel
Tangga Entrance Kiri
1.20 + 1.65 + 1.20 + 1.10 + 1.40 M1 = 6.55 M1
1.20 + 1.65 + 1.20 + 1.10 + 1.40 M1 = 6.55 M1

Tangga Entrance Kanan


1.20 + 1.65 + 1.20 + 1.10 + 1.40 M1 = 6.55 M1
1.20 + 1.65 + 1.20 + 1.10 + 1.40 M1 = 6.55 M1
26.20 M1

Luas Pemasangan Railling Tangga Besi Pipa Stainles Steel


0.90 M1 x 26.20 M1 = 23.58 M2 23.58 M2
Pembulatan 23.58 M2

5 Pek. Pasang Partisi Kuzen dan Pintu Aluminium Merk Alexindo Type PT1 + Aceseoris
Banyak Kozen (Dinding Partisi Ruang Organisasi Mahasiswa Masjid Lantai 2) = 4.00 Unit
Lantai 2 = 4.00 Unit 4.00 Unit
Pembulatan 4.00 Unit

Luas Kozen 3.20 x 3.48 = 11.12 M2

Panjang Kozen Alumunium 3.20 + 3.20 + 3.20 + 3.20 = 12.80 M1


3.20 + 3.20 = 6.40 M1
3.48 + 3.48 + 3.48 = 10.43 M1
2.63 + 2.63 = 5.25 M1
34.88 M1

Pintu Rangka Alumunium 0.80 x 2.10 x 1.00 = 1.68 M2

Jendela Rangka Alumunium 0.70 x 1.00 x 3.00 = 2.10 M2

Ventilasi Rangka Alumunium 0.40 x 0.80 x 1.00 = 0.32 M2


0.40 x 0.70 x 3.00 = 0.84 M2
1.16 M2

Kaca Bening t = 8 mm 0.68 x 1.98 x 1.00 = 1.35 M2


No Uraian Pekerjaan Perhitungan Volume Satuan
No Uraian Pekerjaan Perhitungan Volume Satuan

Kaca Bening t = 5 mm 0.58 x 0.88 x 3.00 = 1.53 M2


0.28 x 0.68 x 1.00 = 0.19 M2
0.28 x 0.58 x 3.00 = 0.49 M2
0.70 x 1.00 x 3.00 = 2.10 M2
4.31 M2

Sticker Kaca Sandblast / Buram 0.68 x 1.98 x 1.00 = 1.35 M2


0.58 x 0.88 x 3.00 = 1.53 M2
0.28 x 0.68 x 1.00 = 0.19 M2
0.28 x 0.58 x 3.00 = 0.49 M2
0.70 x 1.00 x 3.00 = 2.10 M2
5.66 M2

Dinding Gypsump T 9 mm 0.38 x 2.60 x 2.00 Lapis = 1.95 M2


0.60 x 3.48 x 2.00 Lapis = 4.17 M2
6.12 M2

Kunci Pintu 1.00 x 1.00 = 1.00 Bh


Engsel Pintu 3.00 x 1.00 = 3.00 Bh
Tarekan Pintu Stainless 1.00 x 1.00 = 1.00 Bh
Engsel Jendela 2.00 x 7.00 = 14.00 Bh
Tarekan Jendela 1.00 x 7.00 = 7.00 Bh

6 Pek. Pasang Partisi Kuzen dan Pintu Aluminium Merk Alexindo Type PT2 + Aceseoris
Banyak Kozen (Dinding Partisi Ruang Organisasi Mahasiswa Masjid Lantai 2) = 2.00 Unit
Lantai 2 = 2.00 Unit 2.00 Unit
Pembulatan 2.00 Unit

Luas Kozen 3.20 x 3.48 = 11.12 M2

Panjang Kozen Alumunium 3.20 + 3.20 + 3.20 + 3.20 = 12.80 M1


3.20 + 3.20 + 3.20 = 9.60 M1
3.48 + 3.48 + 3.48 + 3.48 = 13.90 M1
3.48 = 3.48 M1
39.78 M1

Pintu Rangka Alumunium - x - x - = - M2

Jendela Rangka Alumunium 0.70 x 1.00 x 2.00 = 1.40 M2

Ventilasi Rangka Alumunium 0.40 x 0.70 x 4.00 = 1.12 M2


1.12 M2
No Uraian Pekerjaan Perhitungan Volume Satuan
No Uraian Pekerjaan Perhitungan Volume Satuan

Kaca Bening t = 8 mm - x - x - = - M2

Kaca Bening t = 5 mm 0.58 x 0.88 x 2.00 = 1.02 M2


0.28 x 0.58 x 4.00 = 0.65 M2
0.70 x 1.00 x 2.00 = 1.40 M2
0.70 x 1.00 x 4.00 = 2.80 M2
5.87 M2

Sticker Kaca Sandblast / Buram - x - x - = - M2


0.58 x 0.88 x 2.00 = 1.02 M2
0.28 x 0.58 x 4.00 = 0.65 M2
0.70 x 1.00 x 2.00 = 1.40 M2
0.70 x 1.00 x 4.00 = 2.80 M2
5.87 M2

Dinding Gypsump T 9 mm 0.28 x 2.60 x 4.00 Lapis = 2.86 M2


0.60 x 3.48 x 2.00 Lapis = 4.17 M2
7.03 M2

Kunci Pintu - x - = - Bh
Engsel Pintu - x - = - Bh
Tarekan Pintu Stainless - x - = - Bh
Engsel Jendela 2.00 x 4.00 = 8.00 Bh
Tarekan Jendela 1.00 x 4.00 = 4.00 Bh

7 Pek. Pasang Partisi Kuzen dan Pintu Aluminium Merk Alexindo Type PT3 + Aceseoris
Banyak Kozen (Dinding Partisi Ruang Organisasi Mahasiswa Masjid Lantai 2) = 2.00 Unit
Lantai 2 = 2.00 Unit 2.00 Unit
Pembulatan 2.00 Unit

Luas Kozen 3.20 x 5.48 = 17.52 M2

Panjang Kozen Alumunium 3.20 + 3.20 + 3.20 + 3.20 = 12.80 M1


3.20 + 3.20 + 3.20 + 3.20 = 12.80 M1
3.20 = 3.20 M1
5.48 + 5.48 + 5.48 + 5.48 = 21.90 M1
5.48 = 5.48 M1
56.18 M1

Pintu Rangka Alumunium - x - x - = - M2

Jendela Rangka Alumunium - x - x - = - M2


No Uraian Pekerjaan Perhitungan Volume Satuan
No Uraian Pekerjaan Perhitungan Volume Satuan

Ventilasi Rangka Alumunium - x - x - = - M2


- M2

Kaca Bening t = 8 mm - x - x - = - M2

Kaca Bening t = 5 mm - x - x - = - M2
- x - x - = - M2
- x - x - = - M2
- x - x - = - M2
- M2

Sticker Kaca Sandblast / Buram - x - x - = - M2


- x - x - = - M2
- x - x - = - M2
- x - x - = - M2
- x - x - = - M2
- M2

Dinding Gypsump T 9 mm 3.20 x 5.48 x 2.00 Lapis = 35.04 M2


35.04 M2

Kunci Pintu - x - = - Bh
Engsel Pintu - x - = - Bh
Tarekan Pintu Stainless - x - = - Bh
Engsel Jendela - x - = - Bh
Tarekan Jendela - x - = - Bh

8 Pek. Pasang Partisi Kuzen dan Pintu Aluminium Merk Alexindo Type PT4 + Aceseoris
Banyak Kozen (Dinding Partisi Ruang Organisasi Mahasiswa Masjid Lantai 2) = 2.00 Unit
Lantai 1 = 2.00 Unit 2.00 Unit
Pembulatan 2.00 Unit

Luas Kozen 3.20 x 1.18 = 3.76 M2

Panjang Kozen Alumunium 3.20 + 3.20 + 3.20 = 9.60 M1


1.18 + 1.18 + 1.18 + 1.18 = 4.70 M1
1.18 = 1.18 M1
15.48 M1

Pintu Rangka Alumunium - x - x - = - M2

Jendela Rangka Alumunium - x - x - = - M2


No Uraian Pekerjaan Perhitungan Volume Satuan

Ventilasi Rangka Alumunium - x - x - = - M2


- M2

Kaca Bening t = 8 mm - x - x - = - M2

Kaca Bening t = 5 mm - x - x - = - M2
- x - x - = - M2
- x - x - = - M2
- x - x - = - M2
- M2

Sticker Kaca Sandblast / Buram - x - x - = - M2


- x - x - = - M2
- x - x - = - M2
- x - x - = - M2
- x - x - = - M2
- M2

Dinding Gypsump T 9 mm 3.20 x 1.18 x 2.00 Lapis = 7.52 M2


7.52 M2

Kunci Pintu - x - = - Bh
Engsel Pintu - x - = - Bh
Tarekan Pintu Stainless - x - = - Bh
Engsel Jendela - x - = - Bh
Tarekan Jendela - x - = - Bh

9 Pemasangan 1 m2 Acrilic tebal 8 mm Luas Pemasangan Acrilic tebal 8 mm (Ventilasi Gobah Masjid)
Ventilasi Gobah Utama Masjid
0.60 M1 x 1.20 M1 x 4.00 Ventilasi = 2.88 M2
0.60 M1 x 1.20 M1 x 4.00 Ventilasi = 2.88 M2
0.60 M1 x 1.20 M1 x 4.00 Ventilasi = 2.88 M2
0.60 M1 x 1.20 M1 x 4.00 Ventilasi = 2.88 M2

Ventilasi Gobah Puncak Masjid


0.60 M1 x 1.20 M1 x 8.00 Ventilasi = 5.76 M2
0.60 M1 x 1.20 M1 x 8.00 Ventilasi = 5.76 M2
0.60 M1 x 1.20 M1 x 8.00 Ventilasi = 5.76 M2
0.60 M1 x 1.20 M1 x 8.00 Ventilasi = 5.76 M2
34.56 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

Luas Pemasangan Acrilic tebal 8 mm (Ventilasi Gobah Masjid)


34.56 M2 = 34.56 M2 34.56 M2
Pembulatan 34.56 M2

VII PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


1 Pemasangan 1 m2 Water Proffing Membrane Luas Pemasangan Water Proffing Membrane
Lantai Atas Mihrab Bangunan Masjid
4.00 M1 x 17.00 M1 x 1.00 Lantai = 68.00 M2
68.00 M2

Luas Pemasangan Water Proffing Membrane


68.00 M2 = 68.00 M2 68.00 M2
Pembulatan 68.00 M2

VIII PEKERJAAN PLESTERAN


1 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang tebal 15 mm
Total Luas Pemasangan Dinding Batu Bata 1:4
41.81 M2 = 41.81 M2

Luas Pemasangan Plesteran 1:4


41.81 M2 x 1 Lapis Plesteran = 41.81 M2

Total Luas Luas Pemasangan Plesteran 1:4


41.81 M2 = 41.81 M2 41.81 M2
Pembulatan 41.80 M2

2 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang (Afwerking) tebal 20 mm


Pemasangan Plesteran 1:4 (Afwerking Kolom Dan Balok)

Jumlah Kolom Induk ( K1 15 / 20 )


J1 = 20 Unit Jendela x 2.00 Kolom = 40.00 Kolom
J2 = 10 Unit Jendela x 2.00 Kolom = 20.00 Kolom
K1 = 1 Unit Jendela x 6.00 Kolom = 6.00 Kolom

Jendela J1
0.70 x 1.00 x 2.50 M1 x 40.00 Kolom = 70.00 M2
0.70 x 1.00 x 2.00 M1 x 40.00 Kolom = 56.00 M2
Jendela J2
0.70 x 1.00 x 2.50 M1 x 20.00 Kolom = 35.00 M2
0.70 x 1.00 x 2.00 M1 x 20.00 Kolom = 28.00 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

Jendela K1
0.70 x 1.00 x 2.50 M1 x 6.00 Kolom = 10.50 M2
199.50 M2

Panjang Balok Latei 15 / 20


J1 = 20 Unit Jendela x 1.00 Balok Latei = 20.00 Balok Latei
J2 = 10 Unit Jendela x 1.00 Balok Latei = 10.00 Balok Latei
K1 = 1 Unit Jendela x 1.00 Balok Latei = 1.00 Balok Latei

Panjang Balok Latei 15 / 20


Jendela J1 = 1.85 M1 x 20.00 Balok Latei = 37.00 M1
Jendela J2 = 1.10 M1 x 10.00 Balok Latei = 11.00 M1
Jendela K1 = 3.00 M1 x 1.00 Balok Latei = 3.00 M1

Panjang Begisting Balok Latei 15 / 20


Jendela J1
0.20 M1 x 2 Bidang x 37.00 M1 = 14.80 M2
Jendela J2
0.20 M1 x 2 Bidang x 11.00 M1 = 4.40 M2
Jendela K1
0.20 M1 x 2 Bidang x 3.00 M1 = 1.20 M2
20.40 M2

Panjang Ring Balok 15 / 20


J1 = 20 Unit Jendela x 1.00 Ring Balok = 20.00 Ring Balok
J2 = 10 Unit Jendela x 1.00 Ring Balok = 10.00 Ring Balok
K1 = 1 Unit Jendela x 1.00 Ring Balok = 1.00 Ring Balok

Panjang Ring Balok 15 / 20


Jendela J1 = 3.40 M1 x 20.00 Ring Balok = 68.00 M1
Jendela J2 = 2.25 M1 x 10.00 Ring Balok = 22.50 M1
Jendela K1 = 6.35 M1 x 1.00 Ring Balok = 6.35 M1

Jendela J1
0.20 M1 x 2 Bidang x 68.00 M1 = 27.20 M2
Jendela J2
0.20 M1 x 2 Bidang x 22.50 M1 = 9.00 M2
Jendela K1
0.20 M1 x 2 Bidang x 6.35 M1 = 2.54 M2
38.74 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

Lantai Atas Mihrab Bangunan Masjid


4.00 M1 x 17.00 M1 x 1.00 Lantai = 68.00 M2
68.00 M2

Luas Pemasangan Plesteran Lantai Atas Mihrab Bangunan Masjid


68.00 M2 = 68.00 M2

Pemasangan Plesteran 1:4 (Afwerking Kolom Dan Balok)


199.50 M2 + 20.40 M2 + 38.74 M2 = 258.64 M2
68.00 M2 = 68.00 M2
326.64 M2

Luas Pemasangan Plesteran 1:4 (Afwerking Kolom Dan Balok)


326.64 M2 x 0.50 Bidang = 163.32 M2 163.32 M2
Pembulatan 163.32 M2

3 Pemasangan 1 m2 Acian Pemasangan Acian

Luas Pemasangan Acian Dinding Batu Bata 1:4


41.81 M2 x 1.00 Bidang = 41.81 M2

Luas Pemasangan Acian (Afwerking Kolom Teras)


326.64 M2 x 0.50 Bidang = 163.32 M2
205.13 M2
Total Pemasangan Acian
205.13 M2 = 205.13 M2 205.13 M2
Pembulatan 205.12 M2

4 Pemasangan 1 m2 Plesteran Granit Chip tebal 1 Cm Plesteran Granit Chip tebal 1 cm (Dinding Luar)
Dinding Luar (Depan)
Luas Pemasangan Plesteran Granit Chip tebal 1 cm Dinding Batu Bata 1:4
41.81 M2 x 1.00 Bidang = 41.81 M2

Luas Pemasangan Plesteran Granit Chip tebal 1 cm (Afwerking Kolom Dan Balok)
326.64 M2 x 0.50 Bidang = 163.32 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

Dinding Luar (Depan Mihrab)


Luas Pemasangan Plesteran Granit Chip tebal 1 cm Dinding Batu Bata 1:4
7.05 M1 x 17.40 M1 x 1 Bidang Dinding = 122.67 M2
7.05 M1 x 4.00 M1 x 1 Bidang Dinding = 28.20 M2
3.15 M1 x 10.80 M1 x 2 Bidang Dinding = 68.04 M2
3.15 M1 x 4.00 M1 x 2 Bidang Dinding = 25.20 M2
1.00 M1 x 11.50 M1 x 2 Bidang Dinding = 23.00 M2
4.00 M1 x 11.50 M1 x 2 Bidang Dinding = 92.00 M2
3.50 M1 x 11.50 M1 x 2 Bidang Dinding = 80.50 M2
1.25 M1 x 17.40 M1 x 2 Bidang Dinding = 43.50 M2
1.00 M1 x 40.35 M1 x 2 Bidang Dinding = 80.70 M2
563.81 M2

Total Luas Pemasangan Plesteran Granit Chip tebal 1 cm (Dinding) Lantai 1


41.81 M2 + 163.32 M2 + 563.81 M2 = 768.94 M2
768.94 M2 768.94 M2
Pembulatan 768.93 M2

IX PEKERJAAN PLAFOND
1 1 M2 Anal. Pek. Memasang Plafond PVC Merk Kingfon (Shunda Plafond) + Rangka Furing Hollow 4x4 (60 x 60) cm
Dinding Depan Bangunan Masjid
0.90 M1 x 16.35 M1 x 2.00 Bidang Plafond = 29.43 M2
0.90 M2 x 6.35 M2 x 1.00 Bidang Plafond = 5.72 M3

Dinding Kiri Bangunan Masjid


0.90 M1 x 9.10 M1 x 2.00 Bidang Plafond = 16.38 M2
0.90 M2 x 3.75 M2 x 1.00 Bidang Plafond = 3.38 M3
0.90 M2 x 10.50 M2 x 1.00 Bidang Plafond = 9.45 M3

Dinding Kanan Bangunan Masjid


0.90 M1 x 9.10 M1 x 2.00 Bidang Plafond = 16.38 M2
0.90 M2 x 3.75 M2 x 1.00 Bidang Plafond = 3.38 M3
0.90 M2 x 10.50 M2 x 1.00 Bidang Plafond = 9.45 M3
93.56 M2

Total Luas Pembongkaran Plafond PVC (ex sunda plafond)


93.56 M2 = 93.56 M2 93.56 M2
Pembulatan 93.55 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

2 Pemasangan 1 m' Les Plafond PVC Les Plafond Dinding Depan Bangunan Masjid
0.90 M1 x 2.00 Les Plafond = 1.80 M1
16.35 M1 x 2.00 Les Plafond = 32.70 M1
0.90 M1 x 1.00 Les Plafond = 0.90 M1
6.35 M1 x 1.00 Les Plafond = 6.35 M1

Les Plafond Dinding Kiri Bangunan Masjid


0.90 M1 x 2.00 Les Plafond = 1.80 M1
9.10 M1 x 2.00 Les Plafond = 18.20 M1
0.90 M1 x 1.00 Les Plafond = 0.90 M1
3.75 M1 x 1.00 Les Plafond = 3.75 M1
0.90 M1 x 1.00 Les Plafond = 0.90 M1
10.50 M1 x 1.00 Les Plafond = 10.50 M1

Les Plafond Dinding Kanan Bangunan Masjid


0.90 M1 x 2.00 Les Plafond = 1.80 M1
9.10 M1 x 2.00 Les Plafond = 18.20 M1
0.90 M1 x 1.00 Les Plafond = 0.90 M1
3.75 M1 x 1.00 Les Plafond = 3.75 M1
0.90 M1 x 1.00 Les Plafond = 0.90 M1
10.50 M1 x 1.00 Les Plafond = 10.50 M1
113.85 M1

Total Panjang Pemasangan Les Plafond PVC


113.85 M1 = 113.85 M1 113.85 M1
Pembulatan 113.85 M1

X PEKERJAAN PENGECATAN
1 Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2lapis cat penutup)
Luas Pengecatan Dinding Batu Bata 1:4
41.81 M2 x 1.00 Bidang = 41.81 M2

Luas Pemasangan Acian (Afwerking Kolom Teras)


326.64 M2 x 0.50 Bidang = 163.32 M2
205.13 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

Luas Pengecatan Dinding Partisi Gypsump


Partisi 1
6.12 M2 x 4.00 Bidang = 24.48 M2
Partisi 2
7.03 M2 x 2.00 Bidang = 14.06 M2
Partisi 3
35.04 M2 x 2.00 Bidang = 70.08 M2
Partisi 4
7.52 M2 x 2.00 Bidang = 15.04 M2
123.66 M2
Total Pengecatan Tembok Baru
205.13 M2 + 123.66 M2 = 328.79 M2 328.79 M2
Pembulatan 328.78 M2

2 Pemasangan 1 m2 Aqua Proof Luas Pemasangan Aqua Proof


Lantai Atas Mihrab Bangunan Masjid
4.00 M1 x 17.00 M1 x 1.00 Lantai = 68.00 M2
68.00 M2

Luas Pemasangan Aqua Proof


68.00 M2 = 68.00 M2 68.00 M2
Pembulatan 68.00 M2

XI PEKERJAAN NAMA MASJID


1 Pemasangan Nama dan Logo / Merk Stainless Steel Pemasangan Plank Nama / Merk Bangunan, Lengkap dengan pemasangan tulisan nama bangunan dan logo
Jenis Huruf : (Jenis Huruf Arial Narraw) - Untuk Semua Tulisan
Tebal Logo dan Huruf : 5 cm
1.00 Dinding Entrance Bangunan = 1.00 Unit
Logo UNIVERSITAS ANDALAS berbahan Stainless Steel (Sesuai ukuran)
a. Logo / Merk Stainless Steel Tinggi 90 cm = 2 Buah
2.00 Logo x 1.00 Dinding Entrance Bangunan = 2.00 Logo 2.00 Logo
Pembulatan 2.00 Logo

b. Tinggi Huruf / Nama Stainless Steel 40 cm = 15 Huruf Tulisan MASJID NURUL 'ILMI Tinggi Tulisan 40 cm berbahan Stainless Steel

15.00 Huruf x 1.00 Dinding Entrance Bangunan = 15.00 Huruf 15.00 Huruf
Pembulatan 15.00 Huruf
No Uraian Pekerjaan Perhitungan Volume Satuan

C FINISHING LANTAI 3 / DAK BETON MASJID NURUL ‘ILMI

I PEKERJAAN BONGKARAN
1 1 m2 Membongkar Dan Menurunkan Atap Seng Luas Membongkar Dan Menurunkan Atap Seng Lama
Dak Beton
2.65 M1 x 6.35 M1 x 2 Bidang Atap = 33.65 M2
2.85 M1 x 2.85 M1 x 4 Bidang Atap = 32.49 M2
66.15 M2 66.15 M2
Pembulatan 66.14 M2

2 Pembongkaran 1 m3 beton bertulang Pembongkaran Beton Bertulang


Dak Beton = 7.00 Kolom

Dak Beton
0.15 x 0.20 x 0.20 M1 x 7.00 Kolom = 0.04 M3
0.04 M3 0.04 M3
Pembulatan 0.04 M3

3 1 m2 Pembobokan beton dinding Luas Pembobokan Beton Dinding


2.65 M1 x 1.75 M1 x 2 Bidang Dinding = 9.28 M2
2.85 M1 x 2.85 M1 x 1 Bidang Dinding = 8.12 M2
2.00 M1 x 2.85 M1 x 2 Bidang Dinding = 11.40 M2
28.80 M2 28.80 M2
Pembulatan 28.79 M2

II PEKERJAAN KOLOM INDUK ( K1 25 / 50 )


Jumlah Kolom Induk Dak Beton ( K1 25 / 50 ) = 18.00 Kolom

1 Penulangan Kolom Induk 25 / 50 Besi D 13 Kolom Induk Dak Beton ( K1 25 / 50 )


1.50 x 6.00 x 0.000169 x 6,165.00 x 18.00 Kolom = 168.79 Kg 168.79 Kg
Pembulatan 168.78 Kg

2 Penulangan Sengkang Kolom Induk 25 / 50 Besi Ø 8 - 15 Kolom Induk Dak Beton ( K1 25 / 50 )


1.40 x 12.00 x 0.000064 x 6,165.00 x 18.00 Kolom = 119.31 Kg 119.31 Kg
Pembulatan 119.31 Kg

3 Stek Besi Dinding Batu Bata Ø 8 Kolom Induk Dak Beton ( K1 25 / 50 )


1.00 x 1.00 x 0.000064 x 6,165.00 x 18.00 Kolom = 7.10 Kg 7.10 Kg
Pembulatan 7.10 Kg
No Uraian Pekerjaan Perhitungan Volume Satuan

4 Begisting Kolom Induk 25 / 50 (2 x Pakai) Kolom Induk Dak Beton ( K1 25 / 50 )


1.50 x 1.00 x 1.20 M1 x 18.00 Kolom = 32.40 M2 32.40 M2
Pembulatan 32.40 M2

5 Beton Ready Mix K-250/M3 Kolom Induk Dak Beton ( K1 25 / 50 )


0.25 x 0.50 x 1.20 M1 x 18.00 Kolom = 2.70 M3 2.70 M3
Pembulatan 2.70 M3

III PEKERJAAN KOLOM PRAKTIS ( KP 13 / 13 ) Kolom Praktis Dak Beton


Jumlah Kolom Praktis Dak Beton ( KP 13 / 13 ) = 28.00 Kolom
= 4.00 Kolom

1 Penulangan Kolom Praktis 13 / 13 Besi Ø 12 2.00 x 4.00 x 0.000144 x 6,165.00 x 28.00 Kolom = 198.86 Kg
3.50 x 4.00 x 0.000144 x 6,165.00 x 4.00 Kolom = 49.71 Kg
248.57 Kg 248.57 Kg
Pembulatan 248.57 Kg

2 Penulangan Sengkang Kolom Praktis 13 / 13 Besi Ø 8 - 15 0.46 x 16.00 x 0.000064 x 6,165.00 x 28.00 Kolom = 81.31 Kg
0.46 x 28.00 x 0.000064 x 6,165.00 x 4.00 Kolom = 20.33 Kg
101.64 Kg 101.64 Kg
Pembulatan 101.63 Kg

3 Stek Besi Dinding Batu Bata Ø 8 0.80 x 2.00 x 0.000064 x 6,165.00 x 28.00 Kolom = 17.68 Kg
0.80 x 2.00 x 0.000064 x 6,165.00 x 4.00 Kolom = 2.53 Kg
20.20 Kg 20.20 Kg
Pembulatan 20.20 Kg

4 Begisting Kolom Praktis 13 / 13 (2 x Pakai) 0.15 x 2.00 x 2 Bidang x 28.00 Kolom = 16.80 M2
0.15 x 3.50 x 2 Bidang x 4.00 Kolom = 4.20 M2
21.00 M2 21.00 M2
Pembulatan 21.00 M2

5 Beton K-175/M3 Kolom Praktis ( KP 13 / 13 )


0.13 x 0.13 x 2.00 M1 x 28.00 Kolom = 0.95 M3
0.13 x 0.13 x 3.50 M1 x 4.00 Kolom = 0.24 M3
1.18 M3 1.18 M3
Pembulatan 1.18 M3

IV PEKERJAAN KOLOM PRAKTIS ( KP 15 / 20 ) Jumlah Kolom Induk ( KP 15 / 20 )


Dak Beton = 7.00 Kolom
No Uraian Pekerjaan Perhitungan Volume Satuan

1 Penulangan Kolom Praktis 15 / 20 Besi Ø 12 Dak Beton


1.20 x 4.00 x 0.000144 x 6,165.00 x 7.00 Kolom = 29.83 Kg
29.83 Kg 29.83 Kg
Pembulatan 29.82 Kg

2 Penulangan Sengkang Kolom Praktis 15 / 20 Besi Ø 8 - 15


Dak Beton
0.60 x 9.60 x 0.000064 x 6,165.00 x 7.00 Kolom = 15.91 Kg
15.91 Kg 15.91 Kg
Pembulatan 15.90 Kg

3 Stek Besi Dinding Batu Bata Ø 8 Dak Beton


0.60 x 1.00 x 0.000064 x 6,165.00 x 7.00 Kolom = 1.66 Kg
1.66 Kg 1.66 Kg
Pembulatan 1.65 Kg

4 Begisting Kolom Praktis 15 / 20 (2 x Pakai) Dak Beton


0.70 x 1.00 x 1.20 M1 x 7.00 Kolom = 5.88 M2
5.88 M2 5.88 M2
Pembulatan 5.88 M2

5 Beton K-175/M3 Kolom Induk ( KP 15 / 20 )


Dak Beton
0.15 x 0.20 x 1.20 M1 x 7.00 Kolom = 0.25 M3
0.25 M3 0.25 M3
Pembulatan 0.25 M3

V PEKERJAAN RING BALOK 15 / 20


Panjang Ring Balok 15 / 20
Dak Beton
3.30 + 1.00 + 3.30 + 1.00 + 16.00 M1 = 24.60 M1
3.30 + 1.00 + 3.30 + 1.00 + 16.00 M1 = 24.60 M1
1.50 + 4.50 + 2.50 + 1.00 M1 = 9.50 M1
1.50 + 4.50 + 2.50 + 1.00 + 6.50 M1 = 16.00 M1
3.00 + 1.00 + 3.00 + 1.00 M1 = 8.00 M1
3.00 + 1.00 + 3.00 + 1.00 M1 = 8.00 M1
3.00 + 1.00 + 3.00 + 1.00 M1 = 8.00 M1
3.00 + 1.00 + 3.00 + 1.00 M1 = 8.00 M1
9.00 + 9.00 + 9.00 + 3.00 M1 = 30.00 M1
9.00 + 9.00 + 9.00 + 3.00 M1 = 30.00 M1
166.70 M1
No Uraian Pekerjaan Perhitungan Volume Satuan
No Uraian Pekerjaan Perhitungan Volume Satuan

1 Penulangan Ring Balok 15 / 20 Besi Ø 12 Dak Beton


4.00 x 0.000144 x 6,165.00 x 166.70 Ring M1 = 591.96 Kg
591.96 Kg 591.96 Kg
Pembulatan 591.95 Kg

2 Penulangan Sengkang Ring Balok 15 / 20 Besi Ø 8 - 15 Dak Beton


0.60 x 1,333.60 x 0.000064 x 6,165.00 = 315.71 Kg
315.71 Kg 315.71 Kg
Pembulatan 315.71 Kg

3 Begisting Ring Balok 15 / 20 (2 x Pakai) Dak Beton


0.20 M1 x 2 Bidang x 166.70 Ring M1 = 66.68 M2
66.68 M2 66.68 M2
Pembulatan 66.68 M2

4 Beton K-175/M3 Beton Ring Balok 15 / 20


Dak Beton
0.15 M1 x 0.20 M1 x 166.70 Ring M1 = 5.00 M3
5.00 M3 5.00 M3
Pembulatan 5.00 M3

VI PEKERJAAN DINDING
1 Pemasangan 1 m2 dinding Bata Merah tebal 1/2 batu Camp, 1PC : 4 Pasir Pasang
Luas Pemasangan Dinding Batu Bata 1:4
Bidang Dinding Lantai 3 (Dak Beton)
0.80 M1 x 2.10 M1 x 8 Dinding = 13.44 M2
0.80 M1 x 3.15 M1 x 4 Dinding = 10.08 M2
0.80 M1 x 3.05 M1 x 2 Dinding = 4.88 M2

0.80 M1 x 2.25 M1 x 6 Dinding = 10.80 M2


0.80 M1 x 3.40 M1 x 3 Dinding = 8.16 M2

0.80 M1 x 2.25 M1 x 6 Dinding = 10.80 M2


0.80 M1 x 3.40 M1 x 3 Dinding = 8.16 M2

0.80 M1 x 2.85 M1 x 2 Dinding = 4.56 M2

Tangga Kiri Kanan


1.00 x 3.00 x 2.00 Bidang x 2 Bidang = 6.00 M2
2

1.00 M1 x 3.00 M1 x 2 Dinding = 6.00 M2


No Uraian Pekerjaan Perhitungan Volume Satuan
No Uraian Pekerjaan Perhitungan Volume Satuan

Entrance Tengah Kiri Kanan


2.00 M1 x 2.50 M1 x 4 Dinding = 20.00 M2

2.00 + 3.50 x 4.25 M1 x 4 Bidang = 46.75 M2


2

2.00 M1 x 3.50 M1 x 2 Dinding = 14.00 M2

2.00 M1 x 2.00 M1 x 2 Dinding = 8.00 M2

Lobang Tengah Kiri Kanan


1.00 M1 x 3.00 M1 x 2 Dinding = 6.00 M2

2.00 M1 x 3.00 M1 x 2 Dinding = 12.00 M2

1.00 + 2.00 x 3.00 M1 x 4 Bidang = 18.00 M2


2

Lobang Belakang Kiri Kanan


2.00 M1 x 3.00 M1 x 2 Dinding = 12.00 M2

2.00 M1 x 3.00 M1 x 2 Dinding = 12.00 M2

1.00 + 2.00 x 3.00 M1 x 4 Bidang = 18.00 M2


2
249.63 M2

Total Luas Pemasangan Dinding Batu Bata 1:4


249.63 M2 = 249.63 M2

Pengurangan Luas Pemasangan Dinding GRC Ornament UK. 5x36x60


Bidang Dinding Lantai 3 (Dak Beton)
0.60 M1 x 1.80 M1 x 8.00 Bidang = 8.64 M2
0.36 M1 x 2.88 M1 x 4.00 Bidang = 4.15 M2
0.36 M1 x 2.88 M1 x 2.00 Bidang = 2.07 M2

0.60 M1 x 2.15 M1 x 6.00 Bidang = 7.74 M2


0.36 M1 x 3.20 M1 x 3.00 Bidang = 3.46 M2

0.36 M1 x 2.15 M1 x 6.00 Bidang = 4.64 M2


0.36 M1 x 3.20 M1 x 3.00 Bidang = 3.46 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

0.60 M1 x 2.50 M1 x 2.00 Bidang = 3.00 M2


37.16 M2

Total Luas Pemasangan Dinding Batu Bata 1:4


249.63 M2 - 37.16 M2 = 212.47 M2 212.47 M2
Pembulatan 212.47 M2

2 Pemasangan 1 m2 GRC Ornament Uk. 5x36x60


Luas Pemasangan Dinding GRC Ornament UK. 5x36x60
Bidang Dinding Lantai 3 (Dak Beton)
0.60 M1 x 1.80 M1 x 8.00 Bidang = 8.64 M2
0.36 M1 x 2.88 M1 x 4.00 Bidang = 4.15 M2
0.36 M1 x 2.88 M1 x 2.00 Bidang = 2.07 M2

0.60 M1 x 2.15 M1 x 6.00 Bidang = 7.74 M2


0.36 M1 x 3.20 M1 x 3.00 Bidang = 3.46 M2

0.36 M1 x 2.15 M1 x 6.00 Bidang = 4.64 M2


0.36 M1 x 3.20 M1 x 3.00 Bidang = 3.46 M2

0.60 M1 x 2.50 M1 x 2.00 Bidang = 3.00 M2


37.16 M2

Total Luas Pemasangan Dinding GRC Ornament UK. 5x36x60


37.16 M2 = 37.16 M2 37.16 M2
Pembulatan 37.15 M2

VII PEKERJAAN KAP / ATAP


1 Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Ringan (Canai Dingin) profil C 75 (TASO)
Luas Pemasangan Kuda-Kuda Baja Ringan (Truss)
2.65 M1 x 6.35 M1 x 2 Bidang Atap = 33.65 M2
2.85 M1 x 2.85 M1 x 4 Bidang Atap = 32.49 M2
66.15 M2 66.15 M2
Pembulatan 66.14 M2

2 Pemasangan Lisplank GRC Double / M1 Panjang Pemasangan Lisplank GRC Double


2.65 M1 x 2.00 Lisplank GRC = 5.30 M1
2.85 M1 x 4.00 Lisplank GRC = 11.40 M1
16.70 M1

Panjang Pemasangan Lisplank GRC Double


16.70 M1 = 16.70 M1 16.70 M1
No Uraian Pekerjaan Perhitungan Volume Satuan

Pembulatan 16.70 M1
No Uraian Pekerjaan Perhitungan Volume Satuan

VIII PEKERJAAN PENUTUP ATAP


1 Pemasangan 1 m2 Genteng Metal Berpasir ukuran 80 x 100 Atap Pelana (Merk Rainbouw)
Luas Pemasangan Genteng Metal Berpasir
2.65 M1 x 6.35 M1 x 2 Bidang Atap = 33.65 M2
2.85 M1 x 2.85 M1 x 4 Bidang Atap = 32.49 M2
66.15 M2 66.15 M2
Pembulatan 66.14 M2

2 Pemasangan 1 m1 Nok Genteng Metal Panjang Pemasangan Perabung Atap Genteng Metal Berpasir
2.65 M1 x 2.00 Perabung Atap Genteng Metal Berpasir = 5.30 M1
2.85 M1 x 4.00 Perabung Atap Genteng Metal Berpasir = 11.40 M1
16.70 M1

Panjang Pemasangan Perabung Atap Genteng Metal Berpasir


16.70 M1 = 16.70 M1 16.70 M1
Pembulatan 16.70 M1

3 Flashing Atap Genteng Metal Flashing Atap Genteng Metal Berpasir


2.65 M1 x 2.00 Flashing Atap Genteng Metal Berpasir = 5.30 M1
2.85 M1 x 4.00 Flashing Atap Genteng Metal Berpasir = 11.40 M1
16.70 M1

Panjang Flashing Atap Genteng Metal Berpasir


16.70 M1 = 16.70 M1 16.70 M1
Pembulatan 16.70 M1

IX PEKERJAAN PLESTERAN
1 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang tebal 15 mm
Total Luas Pemasangan Dinding Batu Bata 1:4
249.63 M2 - 37.16 M2 = 212.47 M2

Luas Pemasangan Plesteran 1:4


212.47 M2 x 1 Lapis Plesteran = 212.47 M2

Total Luas Luas Pemasangan Plesteran 1:4


212.47 M2 = 212.47 M2 212.47 M2
Pembulatan 212.47 M2

2 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang (Afwerking) tebal 20 mm


Pemasangan Plesteran 1:4 (Afwerking Kolom Dan Balok)
No Uraian Pekerjaan Perhitungan Volume Satuan

Jumlah Kolom Induk Dak Beton ( K1 25 / 50 ) = 18.00 Kolom


Kolom Induk Dak Beton ( K1 25 / 50 )
1.50 x 1.00 x 1.20 M1 x 18.00 Kolom = 32.40 M2

Kolom Praktis Dak Beton


Jumlah Kolom Praktis Dak Beton ( KP 13 / 13 ) = 28.00 Kolom
= 4.00 Kolom

0.15 x 2.00 x 2 Bidang x 28.00 Kolom = 16.80 M2


0.15 x 3.50 x 2 Bidang x 4.00 Kolom = 4.20 M2
21.00 M2

Jumlah Kolom Induk ( KP 15 / 20 )


Dak Beton = 7.00 Kolom

Dak Beton
0.70 x 1.00 x 1.20 M1 x 7.00 Kolom = 5.88 M2
5.88 M2

Panjang Ring Balok 15 / 20


Dak Beton = 166.70 M1

Dak Beton
0.20 M1 x 2 Bidang x 166.70 M1 = 66.68 M2
66.68 M2

Pemasangan Plesteran 1:4 (Afwerking Kolom Dan Balok)


32.40 M2 + 21.00 M2 + 5.88 M2 = 59.28 M2
66.68 M2 = 66.68 M2
125.96 M2

Luas Pemasangan Plesteran 1:4 (Afwerking Kolom Dan Balok)


125.96 M2 x 0.50 Bidang = 62.98 M2 62.98 M2
Pembulatan 62.98 M2

3 Pemasangan 1 m2 Acian Pemasangan Acian

Luas Pemasangan Acian Dinding Batu Bata 1:4


212.47 M2 x 1.00 Bidang = 212.47 M2

Luas Pemasangan Acian (Afwerking Kolom Teras)


125.96 M2 x 0.50 Bidang = 62.98 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

275.45 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

Total Pemasangan Acian


275.45 M2 = 275.45 M2 275.45 M2
Pembulatan 275.45 M2

4 Pemasangan 1 m2 Plesteran Granit Chip tebal 1 Cm Plesteran Granit Chip tebal 1 cm (Dinding Luar)
Dinding Luar (Depan)
Luas Pemasangan Plesteran Granit Chip tebal 1 cm Dinding Batu Bata 1:4
249.63 M2 - 37.16 M2 = 212.47 M2

Luas Pemasangan Plesteran Granit Chip tebal 1 cm (Afwerking Kolom Dan Balok)
125.96 M2 x 0.50 Bidang = 62.98 M2

Lisplank Luar (Lisplank Dak Beton Lantai 3)


Luas Pemasangan Plesteran Granit Chip tebal 1 cm Dinding Batu Bata 1:4
3.15 M1 x 6.00 M1 x 5 Bidang Dinding = 94.50 M2
1.75 M1 x 4.00 M1 x 7 Bidang Dinding = 49.00 M2
3.15 M1 x 6.00 M1 x 5 Bidang Dinding = 94.50 M2
1.75 M1 x 4.00 M1 x 7 Bidang Dinding = 49.00 M2
1.00 M1 x 9.10 M1 x 2 Bidang Dinding = 18.20 M2
1.00 M1 x 8.85 M1 x 1 Bidang Dinding = 8.85 M2
1.00 M1 x 9.10 M1 x 2 Bidang Dinding = 18.20 M2
1.00 M1 x 8.85 M1 x 1 Bidang Dinding = 8.85 M2
341.10 M2

Total Luas Pemasangan Plesteran Granit Chip tebal 1 cm (Dinding) Lantai 1


212.47 M2 + 62.98 M2 + 341.10 M2 = 616.55 M2
616.55 M2 616.55 M2
Pembulatan 616.55 M2

X PEKERJAAN PLAFOND
1 1 M2 Anal. Pek. Memasang Plafond PVC Merk Kingfon (Shunda Plafond) + Rangka Furing Hollow 4x4 (60 x 60) cm
Luas Bidang Plafond Dak Atap
2.65 M1 x 6.35 M1 x 2 Bidang Atap = 33.65 M2
2.85 M1 x 2.85 M1 x 4 Bidang Atap = 32.49 M2
66.15 M2

Total Luas Pemasangan Plafond PVC (ex sunda plafond)


66.15 M2 = 66.15 M2 66.15 M2
Pembulatan 66.14 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

2 Pemasangan 1 m' Les Plafond PVC Panjang Pemasangan Les Plafond PVC
Les Plafond Dak Atap
2.65 M1 x 2.00 Les Plafond x 2 Bidang Atap = 10.60 M1
6.35 M1 x 2.00 Les Plafond x 2 Bidang Atap = 25.40 M1
2.85 M1 x 2.00 Les Plafond x 4 Bidang Atap = 22.80 M1
2.85 M1 x 2.00 Les Plafond x 4 Bidang Atap = 22.80 M1
81.60 M1

Total Panjang Pemasangan Les Plafond PVC


81.60 M1 = 81.60 M1 81.60 M1
Pembulatan 81.60 M1

XI PEKERJAAN PENGECATAN
1 Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2lapis cat penutup)
Luas Pengecatan Dinding Batu Bata 1:4
212.47 M2 x 1.00 Bidang = 212.47 M2

Luas Pemasangan Acian (Afwerking Kolom Teras)


125.96 M2 x 0.50 Bidang = 62.98 M2
275.45 M2
Total Pemasangan Acian
275.45 M2 = 275.45 M2 275.45 M2
Pembulatan 275.45 M2

XII PEKERJAAN ELEKTRIKAL


Pekerjaan Instalasi Penerangan dan Stop Kontak
1 Pekerjaan Armature, Saklar dan Stop Kontak
a. Lampu Down Light LED 4" Philips 18 W 8.00 Bh = 8.00 Buah 8.00 Buah
Pembulatan 8.00 Buah
2 Pekerjaan Instalasi
a. Instalasi Penerangan NYM 3 X 2.5mm2 + pipa coundui 8.00 Ttk = 8.00 Titik 8.00 Titik
Pembulatan 8.00 Titik

D PEMBANGUNAN MENARA MASJID NURUL ‘ILMI (2 UNIT)

I PEKERJAAN KOLOM INDUK ( K1 40 / 40 )


1 Penulangan Kolom Induk 40 / 40 Besi D 16 Jumlah Kolom Induk Menara ( K1 40 / 40 ) = 4.00 Kolom

Kolom Induk Menara ( K1 40 / 40 )


6.36 x 12.00 x 0.000256 x 6,165.00 x 4.00 Kolom = 481.81 Kg
No Uraian Pekerjaan Perhitungan Volume Satuan

Total Berat Penulangan Kolom Induk Menara ( K1 40 / 40 ) = 2.00 Menara


481.81 Kg x 2 Menara = 963.61 Kg 963.61 Kg
Pembulatan 963.61 Kg

2 Penulangan Sengkang Kolom Induk 40 / 40 Besi Ø 8 - 15 Kolom Induk Menara ( K1 40 / 40 )


1.50 x 50.88 x 0.000064 x 6,165.00 x 4.00 Kolom = 120.45 Kg

Total Berat Penulangan Sengkang Kolom Induk Menara ( K1 40 / 40 ) = 2.00 Menara


120.45 Kg x 2 Menara = 240.90 Kg 240.90 Kg
Pembulatan 240.90 Kg

3 Stek Besi Dinding Batu Bata Ø 8 Kolom Induk Menara ( K1 40 / 40 )


1.00 x 4.00 x 0.000064 x 6,165.00 x 4.00 Kolom = 6.31 Kg

Total Berat Stek Besi Dinding Batu Bata = 2.00 Menara


6.31 Kg x 2 Menara = 12.63 Kg 12.63 Kg
Pembulatan 12.62 Kg

4 Begisting Kolom Induk 40 / 40 (2 x Pakai) Kolom Induk Menara ( K1 40 / 40 )


1.60 x 1.00 x 6.36 M1 x 4.00 Kolom = 40.70 M2

Total Luas Begisting Kolom Induk Menara ( K1 40 / 40 ) = 2.00 Menara


40.70 M2 x 2 Menara = 81.41 M2 81.41 M2
Pembulatan 81.40 M2

5 Beton Ready Mix K-250/M3 Kolom Induk Menara ( K1 40 / 40 )


0.40 x 0.40 x 6.26 M1 x 4.00 Kolom = 4.01 M3

Total Volume Beton Ready Mix K-250 Kolom Induk Menara ( K1 40 / 40 ) = 2.00 Menara
4.01 M3 x 2 Menara = 8.01 M3 8.01 M3
Pembulatan 8.01 M3

II PEKERJAAN KOLOM INDUK ( K2 20 / 20 )


1 Penulangan Kolom Induk 20 / 20 Besi D 13 Jumlah Kolom Induk Menara ( K2 20 / 20 ) = 4.00 Kolom

Kolom Induk Menara ( K2 20 / 20 )


1.58 x 4.00 x 0.000169 x 6,165.00 x 4.00 Kolom = 26.34 Kg

Total Berat Penulangan Kolom Induk Menara ( K2 20 / 20 ) = 2.00 Menara


26.34 Kg x 2 Menara = 52.68 Kg 52.68 Kg
Pembulatan 52.67 Kg
No Uraian Pekerjaan Perhitungan Volume Satuan
No Uraian Pekerjaan Perhitungan Volume Satuan

2 Penulangan Sengkang Kolom Induk 20 / 20 Besi Ø 8 - 15 Kolom Induk Menara ( K2 20 / 20 )


0.70 x 9.44 x 0.000064 x 6,165.00 x 4.00 Kolom = 10.43 Kg

Total Berat Penulangan Sengkang Kolom Induk Menara ( K2 20 / 20 ) = 2.00 Menara


10.43 Kg x 2 Menara = 20.86 Kg 20.86 Kg
Pembulatan 20.85 Kg

3 Stek Besi Dinding Batu Bata Ø 8 Kolom Induk Menara ( K2 20 / 20 )


1.00 x 2.00 x 0.000064 x 6,165.00 x 4.00 Kolom = 3.16 Kg

Total Berat Stek Besi Dinding Batu Bata = 2.00 Menara


3.16 Kg x 2 Menara = 6.31 Kg 6.31 Kg
Pembulatan 6.31 Kg

4 Begisting Kolom Induk 20 / 20 (2 x Pakai) Kolom Induk Menara ( K2 20 / 20 )


0.80 x 1.00 x 1.58 M1 x 4.00 Kolom = 5.06 M2

Total Luas Begisting Kolom Induk Menara ( K2 20 / 20 ) = 2.00 Menara


5.06 M2 x 2 Menara = 10.11 M2 10.11 M2
Pembulatan 10.11 M2

5 Beton Ready Mix K-250/M3 Kolom Induk Menara ( K2 20 / 20 )


0.20 x 0.20 x 1.18 M1 x 4.00 Kolom = 0.19 M3

Total Volume Beton Ready Mix K-250 Kolom Induk Menara ( K2 20 / 20 ) = 2.00 Menara
0.19 M3 x 2 Menara = 0.38 M3 0.38 M3
Pembulatan 0.37 M3

III PEKERJAAN KOLOM PRAKTIS ( KP 13 / 13 )


1 Penulangan Kolom Praktis 13 / 13 Besi Ø 12 Jumlah Kolom Praktis Menara ( KP 13 / 13 ) = 16.00 Kolom

Kolom Praktis Menara ( KP 13 / 13 )


1.58 x 4.00 x 0.000144 x 6,165.00 x 16.00 Kolom = 89.77 Kg

Total Berat Penulangan Kolom Praktis Menara ( KP 13 / 13 ) = 2.00 Menara


89.77 Kg x 2 Menara = 179.54 Kg 179.54 Kg
Pembulatan 179.54 Kg

2 Penulangan Sengkang Kolom Praktis 13 / 13 Besi Ø 8 - 15 Kolom Praktis Menara ( KP 13 / 13 )


0.46 x 9.44 x 0.000064 x 6,165.00 x 16.00 Kolom = 27.41 Kg
No Uraian Pekerjaan Perhitungan Volume Satuan

Total Berat Penulangan Sengkang Kolom Praktis Menara ( KP 13 / 13 ) = 2.00 Menara


27.41 Kg x 2 Menara = 54.83 Kg 54.83 Kg
Pembulatan 54.82 Kg

3 Stek Besi Dinding Batu Bata Ø 8 Kolom Praktis Menara ( KP 13 / 13 )


1.00 x 1.00 x 0.000064 x 6,165.00 x 16.00 Kolom = 6.31 Kg

Total Berat Stek Besi Dinding Batu Bata = 2.00 Menara


6.31 Kg x 2 Menara = 12.63 Kg 12.63 Kg
Pembulatan 12.62 Kg

4 Begisting Kolom Praktis 13 / 13 (2 x Pakai) Kolom Praktis Menara ( KP 13 / 13 )


0.15 x 2.00 x 1.58 M1 x 16.00 Kolom = 7.58 M2

Total Luas Begisting Kolom Praktis Menara ( KP 13 / 13 ) = 2.00 Menara


7.58 M2 x 2 Menara = 15.17 M2 15.17 M2
Pembulatan 15.16 M2

5 Beton K-175/M3 Kolom Praktis Menara ( KP 13 / 13 )


0.13 x 0.13 x 1.18 M1 x 16.00 Kolom = 0.32 M3

Total Volume Beton K-175 Kolom Praktis Menara ( KP 13 / 13 ) = 2.00 Menara


0.32 M3 x 2 Menara = 0.64 M3 0.64 M3
Pembulatan 0.63 M3

IV PEKERJAAN BALOK INDUK 20 / 30


1 Penulangan Balok Induk 20 / 30 Besi D 13 Balok Induk 20 / 30
Memanjang & Melintang
1.60 M1 x 2 Balok Induk = 3.20 M1
3.25 M1 x 2 Balok Induk = 6.50 M1
3.25 M1 x 4 Balok Induk = 13.00 M1
3.25 M1 x 4 Balok Induk = 13.00 M1
35.70 M1

6.00 x 0.000169 x 6,165.00 x 35.70 M1 = 223.17 Kg

Total Berat Penulangan Balok Induk 20 / 30 = 2.00 Menara


223.17 Kg x 2 Menara = 446.34 Kg 446.34 Kg
Pembulatan 446.34 Kg
No Uraian Pekerjaan Perhitungan Volume Satuan

2 Penulangan Sengkang Balok Induk 20 / 30 Besi Ø 8 - 15


Panjang Beton Balok Induk 20 / 30
Memanjang & Melintang
0.95 M1 x 2 Balok Induk = 1.90 M1
2.35 M1 x 2 Balok Induk = 4.70 M1
2.35 M1 x 4 Balok Induk = 9.40 M1
2.35 M1 x 4 Balok Induk = 9.40 M1
25.40 M1

0.90 x 203.20 x 0.000064 x 6,165.00 = 72.16 Kg

Total Berat Penulangan Sengkang Balok Induk 20 / 30 = 2.00 Menara


72.16 Kg x 2 Menara = 144.31 Kg 144.31 Kg
Pembulatan 144.31 Kg

3 Begisting Balok Induk 20 / 30 (2 x Pakai) Panjang Begisting Balok Induk 20 / 30 = 25.40 M1

0.80 M1 x 1 Bidang x 25.40 M1 = 20.32 M2

Total Luas Begisting Balok Induk 20 / 30 = 2.00 Menara


20.32 M2 x 2 Menara = 40.64 M2 40.64 M2
Pembulatan 40.64 M2

4 Beton Ready Mix K-250/M3 Panjang Beton Balok Induk 20 / 30 = 25.40 M1

0.20 M1 x 0.30 M1 x 25.40 M1 = 1.52 M3

Total Volume Beton Ready Mix K-250 Balok Induk 20 / 30 = 2.00 Menara
1.52 M3 x 2 Menara = 3.05 M3 3.05 M3
Pembulatan 3.04 M3

V PEKERJAAN RING BALOK 15 / 20


1 Penulangan Ring Balok 15 / 20 Besi Ø 12 Ring Balok 15 / 20
Memanjang & Melintang
3.25 M1 x 4 Balok Induk = 13.00 M1

4.00 x 0.000144 x 6,165.00 x 13.00 M1 = 46.16 Kg

Total Berat Penulangan Balok Induk 20 / 30 = 2.00 Menara


46.16 Kg x 2 Menara = 92.33 Kg 92.33 Kg
Pembulatan 92.32 Kg
No Uraian Pekerjaan Perhitungan Volume Satuan

2 Penulangan Sengkang Ring Balok 15 / 20 Besi Ø 8 - 15 Panjang Beton Ring Balok 15 / 20


Memanjang & Melintang
2.35 M1 x 4 Balok Induk = 9.40 M1

0.60 x 75.20 x 0.000064 x 6,165.00 = 17.80 Kg

Total Berat Penulangan Sengkang Ring Balok 15 / 20 = 2.00 Menara


17.80 Kg x 2 Menara = 35.61 Kg 35.61 Kg
Pembulatan 35.60 Kg

3 Begisting Ring Balok 15 / 20 (2 x Pakai) Panjang Begisting Ring Balok 15 / 20 = 9.40 M1

0.55 M1 x 1 Bidang x 9.40 M1 = 5.17 M2

Total Luas Begisting Ring Balok 15 / 20 = 2.00 Menara


5.17 M2 x 2 Menara = 10.34 M2 10.34 M2
Pembulatan 10.34 M2

4 Beton Ready Mix K-250/M3 Panjang Beton Ring Balok 15 / 20 = 9.40 M1

0.15 M1 x 0.20 M1 x 9.40 M1 = 0.28 M3

Total Volume Beton Ready Mix K-250 Ring Balok 15 / 20 = 2.00 Menara
0.28 M3 x 2 Menara = 0.56 M3 0.56 M3
Pembulatan 0.56 M3

VI PEKERJAAN LISPLANK BETON JENDELA


1 Penulangan Plat Lisplank Beton Besi Ø 10 - 15 Penulangan Plat Lisplank Beton Jendela Besi Ø 10

Penulangan Plat Lisplank Beton Jendela Bawah


Penulangan Memanjang Plat Lisplank Beton Jendela Bawah
0.50 M1 x 55 Baris x 4 Lisplank Beton = 109.33 M1

Penulangan Plat Lisplank Beton Jendela Atas


Penulangan Memanjang Plat Lisplank Beton Jendela Atas
0.30 M1 x 11 Baris x 20 Lisplank Beton = 64.00 M1
173.33 M1

1.00 x 0.000100 x 6,165.00 x 173.33 M1 = 106.86 Kg

Total Berat Penulangan Plat Lisplank Beton Jendela Besi Ø 10 = 2.00 Menara
106.86 Kg x 2 Menara = 213.72 Kg 213.72 Kg
No Uraian Pekerjaan Perhitungan Volume Satuan

Pembulatan 213.72 Kg
No Uraian Pekerjaan Perhitungan Volume Satuan

2 Penulangan Sengkang Plat Lisplank Beton Besi Ø 8 - 12,5


Penulangan Sengkang Plat Lisplank Beton Besi Ø 8

Penulangan Plat Lisplank Beton Bawah


Penulangan Sengkang Plat Lisplank Beton Bawah
3.00 x 8.20 x 0.000064 x 6,165.00 x 4 Lisplank Beton = 38.82 Kg

Penulangan Plat Lisplank Beton Atas


Penulangan Sengkang Plat Lisplank Kiri Kanan (Jendela Depan Tengah)
3.00 x 1.60 x 0.000064 x 6,165.00 x 20 Lisplank Beton = 37.88 Kg
76.70 Kg

Total Berat Penulangan Sengkang Plat Lisplank Beton Besi Ø 8 = 2.00 Menara
76.70 Kg x 2 Menara = 153.40 Kg 153.40 Kg
Pembulatan 153.40 Kg

3 Begisting Plat Lisplank Beton Begisting Lisplank Beton Plat Lisplank Beton Bawah
0.50 x 8.20 x 2.00 Bidang x 4 Lisplank Beton = 32.80 M2

Begisting Lisplank Beton Plat Lisplank Beton Atas


0.30 x 1.60 x 2.00 Bidang x 20 Lisplank Beton = 19.20 M2
52.00 M2

Total Luas Begisting Lisplank Beton Plat Lisplank = 2.00 Menara


52.00 M2 x 2 Menara = 104.00 M2 104.00 M2
Pembulatan 104.00 M2

4 Beton Ready Mix K-250/M3 Tebal Beton Lisplank = 0.15 M1


= 0.07 M1

Volume Beton Plat Lisplank Beton Bawah


0.15 x 0.50 x 8.20 M1 x 4 Lisplank Beton = 2.46 M3

Volume Beton Plat Lisplank Beton Atas


0.07 x 0.30 x 1.60 M1 x 20 Lisplank Beton = 0.67 M3
3.13 M3

Total Volume Beton Lisplank Beton Jendela = 2.00 Menara


3.13 M3 x 2 Menara = 6.26 M3 6.26 M3
Pembulatan 6.26 M3
No Uraian Pekerjaan Perhitungan Volume Satuan

VII PEKERJAAN DINDING


1 Pemasangan 1 m2 dinding Bata Merah tebal 1/2 batu Camp, 1PC : 4 Pasir Pasang
Tinggi Pemasangan Dinding Batu Bata 1 : 4 = 3.30 M1
= 2.35 M1
= 0.35 M1

Panjang Pemasangan Dinding Batu Bata 1 : 4 = 2.35 M1

Luas Pemasangan Dinding Batu Bata 1 : 4


3.30 M1 x 2.35 M1 x 4 Dinding = 31.02 M2
2.35 M1 x 2.35 M1 x 4 Dinding = 22.09 M2
0.35 M1 x 2.35 M1 x 4 Dinding = 3.29 M2
56.40 M2

Pengurangan Luas Pemasangan Pintu Alluminium


0.90 M1 x 2.50 M1 x 1 Pintu = 2.25 M2
Pengurangan Luas Pemasangan Kaca Patri
1.00 M1 x 1.00 M1 x 4 Dinding = 4.00 M2
6.25 M2

Luas Pemasangan Dinding Batu Bata 1 : 4


56.40 M2 - 6.25 M2 = 50.15 M2

Total Luas Pemasangan Dinding Batu Bata 1 : 4 = 2.00 Menara


50.15 M2 x 2 Menara = 100.30 M2 100.30 M2
Pembulatan 100.30 M2

VIII PEKERJAAN BESI DAN ALUMINIUM (KUSEN)


1 Hiasan Kaca Tempered Hias T 10 (Tulisan ALLAH) 4.00 Unit x 2 Menara = 8.00 Unit 8.00 Unit
Pembulatan 8.00 Unit

2 Pek. Pasang Kuzen dan Pintu Aluminium Merk Alexindo Type P1 + Aceseoris
Banyak Kozen (Pintu Menara 1) = 1.00 Unit
Lantai Dak / Lantai 3 (Pintu Menara 2) = 1.00 Unit
= 2.00 Unit 2.00 Unit
Pembulatan 2.00 Unit

Luas Kozen 0.90 x 2.50 = 2.25 M2


Panjang Kozen Alumunium 0.90 + 0.80
2.45 + 2.45 = 6.60 M1
No Uraian Pekerjaan Perhitungan Volume Satuan

Pintu Rangka Alumunium 0.80 x 2.10 x 1.00 = 1.68 M2


Ventilasi Rangka Alumunium 0.80 x 0.40 x 1.00 = 0.32 M2
Kaca Bening t = 8 mm 0.68 x 1.98 x 1.00 = 1.35 M2
Kaca Bening t = 5 mm 0.68 x 0.28 x 1.00 = 0.19 M2

Sticker Kaca Sandblast / Buram 0.68 x 1.98 x 1.00 = 1.35 M2


0.68 x 0.28 x 1.00 = 0.19 M2
1.54 M2

Kunci Pintu 1.00 x 1.00 = 1.00 Bh


Engsel Pintu 2.00 x 1.00 = 2.00 Set
Tarekan Pintu Stainless 1.00 x 1.00 = 1.00 Bh
Engsel Jendela - x - = - Bh
Tarekan Jendela - x - = - Bh

3 Tangga Besi 1.00 Unit x 2 Menara = 2.00 Unit 2.00 Unit


Pembulatan 2.00 Unit
IX PEKERJAAN KAP / ATAP
1 Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Ringan (Canai Dingin) profil C 75 (TASO)
Luas Pemasangan Kuda-Kuda Baja Ringan
Atap Level 1
1.25 + 5.90 x 2.70 M1 x 4.00 Bidang = 38.61 M2
2

Atap Level 2
0.60 + 4.45 x 2.25 M1 x 4.00 Bidang = 22.72 M2
2

Atap Level 3
2.65 M1 x 1.50 M1 x 4.00 Bidang = 15.90 M2
77.24 M2

Total Luas Pemasangan Kuda-Kuda Baja Ringan = 2.00 Menara


77.24 M2 x 2 Menara = 154.47 M2 154.47 M2
Pembulatan 154.47 M2

2 Pemasangan Lisplank GRC Double / M1 Panjang Pemasangan Lisplank GRC Double


Atap Level 1
5.90 M1 x 4.00 Bh = 23.60 M1
Atap Level 2
4.20 M1 x 4.00 Bh = 16.80 M1
No Uraian Pekerjaan Perhitungan Volume Satuan

Atap Level 3
2.40 M1 x 4.00 Bh = 9.60 M1
50.00 M1

Total Panjang Pemasangan Lisplank GRC Double = 2.00 Menara


50.00 M1 x 2 Menara = 100.00 M1 100.00 M1
Pembulatan 100.00 M1

X PEKERJAAN PENUTUP ATAP


1 Pemasangan 1 m2 Genteng Metal Berpasir ukuran 80 x 100 Atap Pelana (Merk Rainbouw)
Luas Pemasangan Atap Genteng Metal Berpasir
Atap Level 1
1.25 + 5.90 x 2.70 M1 x 4.00 Bidang = 38.61 M2
2

Atap Level 2
0.60 + 4.45 x 2.25 M1 x 4.00 Bidang = 22.72 M2
2

Atap Level 3
2.65 M1 x 1.50 M1 x 4.00 Bidang = 15.90 M2
77.24 M2

Total Luas Pemasangan Atap Genteng Metal Berpasir = 2.00 Menara


77.24 M2 x 2 Menara = 154.47 M2 154.47 M2
Pembulatan 154.47 M2

2 Pemasangan 1 m1 Nok Genteng Metal Panjang Pemasangan Nok Genteng Metal


Atap Level 1
2.70 M1 x 4.00 Bidang = 10.80 M1
Atap Level 2
2.25 M1 x 4.00 Bidang = 9.00 M1
Atap Level 3
1.50 M1 x 4.00 Bidang = 6.00 M1
25.80 M1

Total Panjang Pemasangan Nok Genteng Metal = 2.00 Menara


25.80 M1 x 2 Menara = 51.60 M1 51.60 M1
Pembulatan 51.60 M1

3 Hiasan Puncak Menara 1.00 Unit x 2 Menara = 2.00 Unit 2.00 Unit
Pembulatan 2.00 Unit
No Uraian Pekerjaan Perhitungan Volume Satuan
No Uraian Pekerjaan Perhitungan Volume Satuan

XI PEKERJAAN PLESTERAN
1 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang tebal 15 mm
Tinggi Plesteran 1 : 4 (Dinding Dalam Menara) = 3.30 M1
= 2.35 M1
= 0.35 M1

Panjang Plesteran 1 : 4 (Dinding Dalam Menara) = 2.35 M1

Luas Pemasangan Plesteran 1 : 4 (Dinding Dalam Menara)


3.30 M1 x 2.35 M1 x 4 Dinding = 31.02 M2
2.35 M1 x 2.35 M1 x 4 Dinding = 22.09 M2
0.35 M1 x 2.35 M1 x 4 Dinding = 3.29 M2
56.40 M2

Pengurangan Luas Pemasangan Kaca Patri


1.00 M1 x 1.00 M1 x 4 Dinding = 4.00 M2

Luas Pemasangan Plesteran 1 : 4 (Dinding Dalam Menara)


56.40 M2 - 4.00 M2 = 52.40 M2

Total Luas Pemasangan Plesteran 1 : 4 (Dinding Dalam Menara) = 2.00 Menara


52.40 M2 x 2 Menara = 104.80 M2 104.80 M2
Pembulatan 104.80 M2

2 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang (Afwerking) tebal 20 mm


Luas Pemasangan Plesteran 1 : 4 (Afwerking) (Kolom Dan Balok Dalam Menara)
Kolom Induk Menara ( K1 40 / 40 )
6.26 M1 x 0.80 M1 x 4 Kolom = 20.03 M2
Kolom Induk Menara ( K2 20 / 20 )
1.18 M1 x 0.40 M1 x 4 Kolom = 1.89 M2
Kolom Praktis Menara ( KP 13 / 13 )
1.18 M1 x 0.15 M1 x 16 Kolom = 2.83 M2
Balok Induk 20 / 30
26.00 M1 x 0.30 M1 = 7.80 M2
Ring Balok 15 / 20
13.00 M1 x 0.20 M1 = 2.60 M2

Luas Pemasangan Plesteran 1 : 4 (Afwerking) (Lisplank Beton Jendela)


Lisplank Beton Jendela Bawah
0.50 M1 x 8.20 M1 = 4.10 M2
0.15 M1 x 8.20 M1 = 1.23 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

Lisplank Beton Jendela Bawah


0.30 M1 x 1.60 M1 = 0.48 M2
0.07 M1 x 1.60 M1 = 0.11 M2
41.07 M2

Total Luas Pemasangan Plesteran 1 : 4 (Afwerking) = 2.00 Menara


41.07 M2 x 2 Menara = 82.15 M2 82.15 M2
Pembulatan 82.14 M2

3 Pemasangan 1 m2 Acian Luas Luas Pemasangan Plesteran 1 : 4 (Dinding Dalam Menara)


52.40 M2 = 52.40 M2
Luas Pemasangan Plesteran 1 : 4 (Afwerking)
41.07 M2 = 41.07 M2
93.47 M2

Total Luas Pemasangan Plesteran 1 : 4 (Dinding Dalam Menara) Dan (Afwerking) = 2.00 Menara
93.47 M2 x 2 Menara = 186.95 M2 186.95 M2
Pembulatan 186.94 M2

4 Pemasangan 1 m2 Plesteran Granit Chip tebal 1 Cm Tinggi Plesteran Granit Chip (Dinding Luar Menara) = 3.30 M1
= 2.35 M1
= 0.35 M1

Panjang Plesteran Granit Chip (Dinding Luar Menara) = 2.35 M1

Luas Pemasangan Plesteran Granit Chip (Dinding Luar Menara)


3.30 M1 x 2.35 M1 x 4 Dinding = 31.02 M2
2.35 M1 x 2.35 M1 x 4 Dinding = 22.09 M2
0.35 M1 x 2.35 M1 x 4 Dinding = 3.29 M2
56.40 M2

Pengurangan Luas Pemasangan Kaca Patri


1.00 M1 x 1.00 M1 x 4 Dinding = 4.00 M2

Luas Pemasangan Plesteran Granit Chip (Dinding Luar Menara)


56.40 M2 - 4.00 M2 = 52.40 M2

Luas Pemasangan Plesteran Granit Chip (Kolom Dan Balok Luar Menara)
Kolom Induk Menara ( K1 40 / 40 )
6.26 M1 x 0.80 M1 x 4 Kolom = 20.03 M2
Kolom Induk Menara ( K2 20 / 20 )
1.18 M1 x 0.40 M1 x 4 Kolom = 1.89 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

Kolom Praktis Menara ( KP 13 / 13 )


1.18 M1 x 0.15 M1 x 16 Kolom = 2.83 M2
Balok Induk 20 / 30
26.00 M1 x 0.30 M1 = 7.80 M2
Ring Balok 15 / 20
13.00 M1 x 0.20 M1 = 2.60 M2
35.15 M2

Luas Pemasangan Plesteran Granit Chip (Dinding, Kolom dan Balok Luar Menara)
52.40 M2 + 35.15 M2 = 87.55 M2

Total Luas Pemasangan Plesteran Granit Chip (Dinding, Kolom dan Balok Luar Menara) = 2.00 Menara
87.55 M2 x 2 Menara = 175.10 M2 175.10 M2
Pembulatan 175.10 M2

XII PEKERJAAN PLAFOND


1 1 M2 Anal. Pek. Memasang Plafond PVC Merk Kingfon (Shunda Plafond) + Rangka Furing Hollow 4x4 (60 x 60) cm
Luas Bidang Plafond
2.85 M1 x 2.85 M1 x 1.00 Bidang = 8.12 M2

4.50 + 5.90 x 1.10 M1 x 4.00 Bidang = 22.88 M2


2
31.00 M2

Total Luas Pemasangan Plafond PVC (ex sunda plafond) = 2.00 Menara
31.00 M2 x 2 Menara = 62.01 M2 62.01 M2
Pembulatan 62.00 M2

2 Pemasangan 1 m' Les Plafond PVC Panjang Pemasangan Les Plafond PVC
2.85 M1 x 4.00 Bidang = 11.40 M1
4.50 M1 x 2.00 Bidang = 9.00 M1
5.90 M1 x 2.00 Bidang = 11.80 M1
32.20 M1

Total Panjang Pemasangan Les Plafond PVC = 2.00 Menara


32.20 M1 x 2 Menara = 64.40 M1 64.40 M1
Pembulatan 64.40 M1

XIII PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


1 Pemasangan 1 m2 Lantai Granit 60 x 60 (silver pearls, Granito)
Luas Pemasangan Lantai Granit Ukuran 60 cm x 60 cm
Toilet Bangunan Lantai 1
No Uraian Pekerjaan Perhitungan Volume Satuan

2.85 M1 x 2.85 M1 x 1.00 Lantai = 8.12 M2


No Uraian Pekerjaan Perhitungan Volume Satuan

Total Luas Pemasangan Lantai Granit Ukuran 60 cm x 60 cm = 2.00 Menara


8.12 M2 x 2 Menara = 16.25 M2 16.25 M2
Pembulatan 16.24 M2

XIV PEKERJAAN PENGECATAN


1 Pengecatan bidang kayu baru (1lapis plamuur, 1 lapis cat dasar,3 lapis cat penutup)
Panjang Pengecatan Lisplank GRC Double
Atap Level 1
5.90 M1 x 4.00 Bh x 0.25 M1 = 5.90 M2
Atap Level 2
4.20 M1 x 4.00 Bh x 0.25 M1 = 4.20 M2
Atap Level 3
2.40 M1 x 4.00 Bh x 0.25 M1 = 2.40 M2
12.50 M2

Total Panjang Pengecatan Lisplank GRC Double = 2.00 Menara


12.50 M2 x 2 Menara = 25.00 M2 25.00 M2
Pembulatan 25.00 M2

2 Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2lapis cat penutup)
Luas Pengecatan Tembok Baru (Dinding Dalam Menara)
52.40 M2 = 52.40 M2
Luas Pengecatan Tembok Baru (Lisplank Beton Jendela)
41.07 M2 = 41.07 M2
93.47 M2

Total Luas Pengecatan Tembok Baru (Dinding Dalam Menara) Dan (Lisplank Beton Jendela) = 2.00 Menara
93.47 M2 x 2 Menara = 186.95 M2 186.95 M2
Pembulatan 186.94 M2

XV PEKERJAAN ELEKTRIKAL
Pekerjaan Instalasi Penerangan dan Stop Kontak
1 Pekerjaan Armature, Saklar dan Stop Kontak
a. Lampu Energi Saving Philips 18 watt 1.00 Unit x 2 Menara = 2.00 Unit 2.00 Unit
Pembulatan 2.00 Unit

2 Pekerjaan Instalasi
a. Instalasi Penerangan NYM 3 X 2.5mm2 + pipa counduit dia 20 mm2 1.00 Unit x 2 Menara = 2.00 Unit 2.00 Unit
Pembulatan 2.00 Unit
No Uraian Pekerjaan Perhitungan Volume Satuan

E PEMBANGUNAN PLANK NAMA MASJID NURUL ‘ILMI

I PEKERJAAN TANAH
1 Penggalian 1 m3 tanah biasa sedalam 1 m Galian Tanah (Pondasi Batu Kali & Pondasi Plat Setempat)
Lebar Galian Tanah = 1.00 M1
Tinggi Galian Tanah = 1.00 M1
Panjang Galian Tanah = 4.00 M1

Volume Galian Tanah (Pondasi Batu Kali & Pondasi Plat Setempat)
1.00 M1 x 1.00 M1 x 4.00 M1 = 4.00 M3

Total Volume Galian Tanah (Pondasi Batu Kali & Pondasi Plat Setempat)
4.00 M3 = 4.00 M3 4.00 M3
Pembulatan 4.00 M3

2 Pengurugan kembali 1 m3 galian tanah Pengurugan Kembali Galian Tanah Biasa Sedalam 1 m
Total Volume Pengurugan Kembali Galian Tanah Tanah Biasa Sedalam 1 m
4.00 M3 x 0.33 = 1.33 M3 1.33 M3
Pembulatan 1.33 M3

II PEKERJAAN PONDASI BATU KALI


1 Pengurugan 1 m3 dengan pasir urug Pengurugan Dengan Pasir Urug (Bawah Aanstampang Pondasi Batu Kali)
Tinggi Pengurugan Dengan Pasir Urug = 0.05 M1
Lebar Pengurugan Dengan Pasir Urug = 1.00 M1
Panjang Pemasangan Pondasi Batu Kali = 3.20 M1

Volume Pengurugan Dengan Pasir Urug


0.05 M1 x 1.00 M1 x 3.20 M1 = 0.16 M3

Total Volume Pengurugan Dengan Pasir Urug


0.16 M3 = 0.16 M3 0.16 M3
Pembulatan 0.16 M3

2 Pemasangan 1 m3 pondasi batu kali Camp, 1PC : 4 Pasir Pasang


Pemasangan Pondasi Batu Kali
Panjang Pemasangan Pondasi Batu Kali = 3.20 M1

0.25 + 0.80 x 0.80 M1 x 3.20 M1 = 1.34 M3


2
No Uraian Pekerjaan Perhitungan Volume Satuan

Volume Pemasangan Pondasi Batu Kali


1.34 M3 = 1.34 M3 1.34 M3
Pembulatan 1.34 M3

3 Pemasangan 1 m3 pondasi batu kosong (Aanstampang)


Pemasangan Aanstampang Batu Kali
Panjang Pemasangan Pondasi Batu Kali = 3.20 M1

Volume Pemasangan Aanstampang Batu Kali


0.20 M1 x 1.00 M1 x 3.20 M1 = 0.64 M3

Total Volume Pemasangan Aanstampang Batu Kali


0.64 M3 = 0.64 M3 0.64 M3
Pembulatan 0.64 M3

III PEKERJAAN PONDASI BATU BATA


1 Membuat Lantai kerja beton (K 100) Lantai Kerja Pondasi Batu Bata Pot Bunga
Tinggi Lantai Kerja = 0.10 M1
Lebar Lantai Kerja = 0.35 M1
Panjang Lantai Kerja
0.50 + 4.00 + 0.50 M1 = 5.00 M1
1.00 + 4.00 + 1.00 M1 = 6.00 M1
11.00 M1

Volume Lantai Kerja Pondasi Batu Bata Pot Bunga


0.10 M1 x 0.35 M1 x 11.00 M1 = 0.38 M3

Total Volume Lantai Kerja Pondasi Batu Bata Pot Bunga


0.38 M3 = 0.38 M3 0.38 M3
Pembulatan 0.38 M3

2 Pemasangan 1 m2 pondasi dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp,
Pondasi Batu Bata Pot Bunga
Tinggi Pondasi Batu Bata Pot Bunga = 0.50 M1
Panjang Pondasi Batu Bata Pot Bunga = 11.00 M1
Lapis Pondasi Batu Bata Pot Bunga = 1.00 Lapis

Luas Pondasi Batu Bata Pot Bunga


0.50 M1 x 11.00 M1 x 1.00 Lapis = 5.50 M2

Total Luas Pemasangan Dinding Batu Bata Pot Bunga


5.50 M2 = 5.50 M2 5.50 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

Pembulatan 5.50 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

3 Pemasangan 1 m2 Plesteran 1PC : 2 Pasir Pasang tebal 15 mm


Pemasangan plesteran 1:2 Pondasi Batu Bata Pot Bunga
Tinggi plesteran 1:2 Pondasi Batu Bata Pot Bunga = 0.55 M1
Panjang plesteran 1:2 Pondasi Batu Bata Pot Bunga = 11.00 M1

Luas Pemasangan plesteran 1:2 Pondasi Batu Bata Pot Bunga


0.55 M1 x 11.00 M1 x 1.00 Bidang = 6.05 M2

Luas Pemasangan plesteran 1:2 Pondasi Batu Bata Pot Bunga


6.05 M2 = 6.05 M2 6.05 M2
Pembulatan 6.05 M2

4 Pemasangan 1 m2 Acian Luas Pemasangan Acian Pondasi Batu Bata Pot Bunga
6.05 M2 = 6.05 M2 6.05 M2
Pembulatan 6.05 M2

IV PEKERJAAN PONDASI PLAT SETEMPAT


1 Membuat Lantai kerja beton (K 100) Jumlah Pondasi Plat Setempat = 2.00 Titik

Lantai Kerja 0.05 x 1.00 x 1.00


0.05 x 1.00 x 1.00 x 2.00 Pondasi = 0.10 M3 0.10 M3
Pembulatan 0.10 M3

2 Penulangan Plat Setempat Besi D 13 2.80 x 14.00 x 0.000169 x 6,165.00 x 2.00 Pondasi = 81.68 Kg
3.70 x 1.00 x 0.000169 x 6,165.00 x 2.00 Pondasi = 7.71 Kg
89.39 Kg 89.39 Kg
Pembulatan 89.39 Kg

3 Begisting Pondasi Plat Setempat (2 x Pakai) 0.30 x 1.00 x 4 Bidang x 2.00 Pondasi = 2.40 M2 2.40 M2
Pembulatan 2.40 M2

4 Beton Ready Mix K-250/M3 Poor 0.3 x 1.00 x 1.00


0.30 x 1.00 x 1.00 x 2.00 Pondasi = 0.60 M3 0.60 M3
Pembulatan 0.60 M3

V PEKERJAAN KOLOM INDUK ( K1 20 / 40 )


1 Penulangan Kolom Induk 20 / 40 Besi D 13 Jumlah Kolom Induk 20 / 40 = 2.00 Kolom

4.50 x 6.00 x 0.000169 x 6,165.00 x 2.00 Kolom = 56.26 Kg 56.26 Kg


Pembulatan 56.26 Kg
No Uraian Pekerjaan Perhitungan Volume Satuan
No Uraian Pekerjaan Perhitungan Volume Satuan

2 Penulangan Sengkang Kolom Induk 20 / 40 Besi Ø 8 - 15 36.00 x 0.000064 x 6,165.00 x 2.00 Kolom = 31.25 Kg 31.25 Kg
Pembulatan 31.24 Kg

3 Begisting Kolom Induk 20 / 40 (2 x Pakai) 0.20 x 2.00 x 4.00 M1 x 2.00 Kolom = 3.20 M2
0.40 x 2.00 x 4.00 M1 x 2.00 Kolom = 6.40 M2
9.60 M2 9.60 M2
Pembulatan 9.60 M2

4 Beton Ready Mix K-250/M3 Volume Kolom Induk 20 / 40


0.20 x 0.40 x 4.00 M1 x 2.00 Kolom = 0.64 M3 0.64 M3
Pembulatan 0.64 M3

VI PEKERJAAN SLOOF INDUK 20 /40


1 Penulangan Sloof Induk 20 / 40 Besi D 13 Panjang Penulangan Besi Sloof 20 / 40 = 4.10 M1

6.00 x 0.000169 x 6,165.00 x 4.10 M1 = 25.63 Kg 25.63 Kg


Pembulatan 25.63 Kg

2 Penulangan Sengkang Sloof Induk 20 / 40 Besi Ø 8 - 15


Panjang Beton Sloof Induk 20 / 40 = 3.20 M1

1.10 x 25.60 x 0.000064 x 6,165.00 = 11.11 Kg 11.11 Kg


Pembulatan 11.11 Kg

3 Begisting Sloof Induk 20 / 40 (2 x Pakai) Panjang Begisting Sloof Induk 20 / 40 = 3.20 M1

0.40 M1 x 2 Bidang x 3.20 M1 = 2.56 M2 2.56 M2


Pembulatan 2.56 M2

4 Beton Ready Mix K-250/M3 Sloof Induk 20 / 40


0.20 M1 x 0.40 M1 x 3.20 M1 = 0.26 M3 0.26 M3
Pembulatan 0.25 M3

VII PEKERJAAN BALOK INDUK 20 / 40


1 Penulangan Balok Induk 20 / 40 Besi D 13 Panjang Penulangan Besi Balok Induk 20 / 40 = 4.10 M1

6.00 x 0.000169 x 6,165.00 x 4.10 M1 = 25.63 Kg 25.63 Kg


Pembulatan 25.63 Kg
No Uraian Pekerjaan Perhitungan Volume Satuan

2 Penulangan Sengkang Balok Induk 20 / 40 Besi Ø 8 - 15


Panjang Beton Balok Induk 20 / 40 = 3.20 M1

1.10 x 25.60 x 0.000064 x 6,165.00 = 11.11 Kg 11.11 Kg


Pembulatan 11.11 Kg

3 Begisting Balok Induk 20 / 40 (2 x Pakai) Panjang Begisting Balok Induk 20 / 40 = 3.20 M1

1.00 M1 x 1 Bidang x 3.20 M1 = 3.20 M2 3.20 M2


Pembulatan 3.20 M2

4 Beton Ready Mix K-250/M3 Balok Induk 20 / 40


0.20 M1 x 0.40 M1 x 3.20 M1 = 0.26 M3 0.26 M3
Pembulatan 0.25 M3

VIII PEKERJAAN DINDING


1 Pemasangan 1 m2 dinding Bata Merah tebal 1/2 batu Camp, 1PC : 4 Pasir Pasang
Tinggi Pemasangan Dinding Batu Bata 1 : 4 = 1.60 M1
Panjang Pemasangan Dinding Batu Bata 1 : 4 = 3.20 M1

Luas Pemasangan Dinding Batu Bata 1 : 4


1.60 M1 x 3.20 M1 x 1 Dinding = 5.12 M2 5.12 M2
Pembulatan 5.12 M2

IX PEKERJAAN PLESTERAN
1 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang tebal 15 mm
Tinggi Plesteran 1 : 4 (Dinding Belakang Plank Nama) = 1.60 M1
Panjang Plesteran 1 : 4 (Dinding Belakang Plank Nama) = 3.20 M1

Luas Pemasangan Plesteran 1 : 4 (Dinding Belakang Plank Nama)


1.60 M1 x 3.20 M1 x 1 Dinding = 5.12 M2 5.12 M2
Pembulatan 5.12 M2

2 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang (Afwerking) tebal 20 mm


Pemasangan Plesteran 1 : 4 (Afwerking Kolom, Sloof dan Balok)
Kolom 20 x 40
1.10 M1 x 2.40 M1 x 2 Kolom = 5.28 M2
Sloof 20 x 40
1.00 M1 x 3.20 M1 x 1 Sloof = 3.20 M2
Balok Induk 20 x 40
1.00 M1 x 3.20 M1 x 1 Balok Induk = 3.20 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

11.68 M2 11.68 M2
Pembulatan 11.68 M2

3 Pemasangan 1 m2 Acian Luas Pemasangan Acian (Dinding Belakang Plank Nama)


5.12 M2 = 5.12 M2
Luas Pemasangan Acian Kolom, Sloof dan Balok
11.68 M2 = 11.68 M2
16.80 M2 16.80 M2
Pembulatan 16.80 M2

4 Pemasangan 1 m2 Plesteran Granit Chip tebal 1 Cm Plesteran Granit Chip tebal 1 cm (Dinding Depan Plank Nama)
Tinggi Pemasangan Plesteran Granit Chip tebal 1 cm = 1.60 M1
Panjang Pemasangan Plesteran Granit Chip tebal 1 cm = 3.20 M1

Luas Pemasangan Plesteran Granit Chip tebal 1 cm (Dinding Depan Plank Nama)
1.60 M1 x 3.20 M1 x 1 Dinding = 5.12 M2 5.12 M2
Pembulatan 5.12 M2

X PEKERJAAN PENGECATAN
1 Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2lapis cat penutup)
Luas Pengecatan Pondasi Batu Bata Pot Bunga
6.05 M2 = 6.05 M2
Luas Pengecatan (Dinding Belakang Plank Nama)
5.12 M2 = 5.12 M2
Luas Pengecatan Kolom, Sloof dan Balok
11.68 M2 = 11.68 M2
22.85 M2 22.85 M2
Pembulatan 22.85 M2

XI PEKERJAAN NAMA MASJID


1 Pemasangan Nama dan Logo / Merk Stainless Steel (Jenis Huruf Rage Italic)
Pemasangan Plank Nama / Merk Bangunan, Lengkap dengan pemasangan tulisan nama bangunan dan logo
Jenis Huruf : (Jenis Huruf Arial Narraw) - Untuk Semua Tulisan
Tebal Logo dan Huruf : 5 cm
1.00 Dinding Nama Masjid = 1.00 Unit
Logo UNIVERSITAS ANDALAS berbahan Stainless Steel (Sesuai ukuran)

1.00 Logo x 1.00 Dinding Entrance Bangunan = 1.00 Logo 1.00 Logo
Pembulatan 1.00 Logo
Tulisan MASJID NURUL 'ILMI Tinggi Tulisan 25 cm berbahan Stainless Steel
No Uraian Pekerjaan Perhitungan Volume Satuan

15.00 Huruf x 1.00 Dinding Entrance Bangunan = 15.00 Huruf 15.00 Huruf
Pembulatan 15.00 Huruf
No Uraian Pekerjaan Perhitungan
Tulisan UNIVERSITAS ANDALAS PADANG Tinggi Tulisan 25 cm berbahan Stainless Steel Volume Satuan

24.00 Huruf x 1.00 Dinding Entrance Bangunan = 24.00 Huruf 24.00 Huruf
Pembulatan 24.00 Huruf

XII PEKERJAAN ELEKTRIKAL


Pekerjaan Instalasi Penerangan dan Stop Kontak
1 Pekerjaan Armature, Saklar dan Stop Kontak
a. Lampu Taman LED Philip 50 Watt 2.00 Bh = 2.00 Buah 2.00 Buah
Pembulatan 2.00 Buah

2 Pekerjaan Instalasi
a. Instalasi Penerangan NYM 3 X 2.5mm2 + pipa counduit dia 20 mm2
2.00 Ttk = 2.00 Titik 2.00 Titik
Pembulatan 2.00 Titik

F PEMBANGUNAN TAMAN POT BUNGA MASJID

I PEKERJAAN POT BUNGA


1 Membuat Lantai kerja beton (K 100) Jumlah Pot Bunga = 4.00 Bh

Lantai Kerja Pondasi Batu Bata Pot Bunga


Tinggi Lantai Kerja = 0.10 M1
Lebar Lantai Kerja = 0.35 M1
Panjang Lantai Kerja
1.38 + 1.38 + 0.40 M1 = 3.15 M1
2.15 + 0.70 + 2.15 + 0.70 M1 = 5.70 M1
1.38 + 1.38 + 0.40 M1 = 3.15 M1
12.00 M1

Volume Lantai Kerja Pondasi Batu Bata Pot Bunga


0.10 M1 x 0.35 M1 x 12.00 M1 = 0.42 M3

Total Volume Lantai Kerja Pondasi Batu Bata (4 Pot Bunga) = 4.00 Bh
0.42 M3 x 4 Pot Bunga = 1.68 M3 1.68 M3
Pembulatan 1.68 M3

2 Pemasangan 1 m2 pondasi dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp,
Pondasi Batu Bata Pot Bunga
Tinggi Pondasi Batu Bata Pot Bunga = 0.75 M1
= 0.95 M1
No Uraian Pekerjaan Perhitungan Volume Satuan

Panjang Pondasi Batu Bata Pot Bunga


1.38 + 1.38 + 0.40 M1 = 3.15 M1
2.15 + 0.70 + 2.15 + 0.70 M1 = 5.70 M1
1.38 + 1.38 + 0.40 M1 = 3.15 M1

Lapis Pondasi Batu Bata Pot Bunga = 1.00 Lapis

Luas Pondasi Batu Bata Pot Bunga


0.75 M1 x 3.15 M1 x 1.00 Lapis = 2.36 M2
0.95 M1 x 5.70 M1 x 1.00 Lapis = 5.42 M2
0.75 M1 x 3.15 M1 x 1.00 Lapis = 2.36 M2
10.14 M2

Total Luas Pemasangan Dinding Batu Bata (4 Pot Bunga) = 4.00 Bh


10.14 M2 x 4 Pot Bunga = 40.56 M2 40.56 M2
Pembulatan 40.56 M2

3 Pemasangan 1 m2 Plesteran 1PC : 2 Pasir Pasang tebal 15 mm


Pemasangan plesteran 1:2 Pondasi Batu Bata (Kepala Pot Bunga)
Tinggi plesteran 1:2 Pondasi Batu Bata (Kepala Pot Bunga) = 0.35 M1

Panjang plesteran 1:2 Pondasi Batu Bata (Kepala Pot Bunga) = 3.15 M1
= 5.70 M1
= 3.15 M1

Luas Pemasangan plesteran 1:2 Pondasi Batu Bata (Kepala Pot Bunga)
0.35 M1 x 3.15 M1 x 1.00 Bidang = 1.10 M2
0.35 M1 x 5.70 M1 x 1.00 Bidang = 1.99 M2
0.35 M1 x 3.15 M1 x 1.00 Bidang = 1.10 M2
4.20 M2

Luas Pemasangan plesteran 1:2 Pondasi Batu Bata (4 Pot Bunga) = 4.00 Bh
4.20 M2 x 4 Pot Bunga = 16.80 M2 16.80 M2
Pembulatan 16.80 M2

4 Pemasangan 1 m2 Acian Luas Pemasangan Acian Pondasi Batu Bata (4 Pot Bunga) = 4.00 Bh
4.20 M2 x 4 Pot Bunga = 16.80 M2 16.80 M2
Pembulatan 16.80 M2

5 Pemasangan 1 m2 Plesteran Granit Chip tebal 1 Cm Pemasangan plesteran 1:2 Pondasi Batu Bata Pot Bunga
Tinggi plesteran 1:2 Pondasi Batu Bata Pot Bunga = 0.75 M1
= 0.95 M1
No Uraian Pekerjaan Perhitungan Volume Satuan

Panjang plesteran 1:2 Pondasi Batu Bata Pot Bunga = 3.15 M1


= 5.70 M1
= 3.15 M1

Luas Pemasangan plesteran 1:2 Pondasi Batu Bata Pot Bunga


0.75 M1 x 3.15 M1 x 1.00 Bidang = 2.36 M2
0.95 M1 x 5.70 M1 x 1.00 Bidang = 5.42 M2
0.75 M1 x 3.15 M1 x 1.00 Bidang = 2.36 M2
10.14 M2

Luas Pemasangan plesteran 1:2 Pondasi Batu Bata (4 Pot Bunga) = 4.00 Bh
10.14 M2 x 4 Pot Bunga = 40.56 M2 40.56 M2
Pembulatan 40.56 M2

6 Pemasangan 1 m3 Urugan Tanah Humus Volume Pemasangan Urugan Tanah Humus


0.40 M1 x 1.23 M1 x 0.45 M1 = 0.22 M3
0.70 M1 x 1.85 M1 x 0.65 M1 = 0.84 M3
0.40 M1 x 1.23 M1 x 0.45 M1 = 0.22 M3
1.28 M3

Volume Pemasangan Urugan Tanah Humus (4 Pot Bunga) = 4.00 Bh


1.28 M2 x 4 Pot Bunga = 5.13 M3 5.13 M3
Pembulatan 5.13 M3

7 Pemasangan 1 m2 Rumput Lempeng Luas Pemasangan Rumput Lempeng


0.40 M1 x 1.23 M1 x 2.00 Bidang = 0.98 M2
0.70 M1 x 1.85 M1 x 1.00 Bidang = 1.30 M2
2.28 M2

Luas Pemasangan Rumput Lempeng (4 Pot Bunga) = 4.00 Bh


2.28 M2 x 4 Pot Bunga = 9.10 M2 9.10 M2
Pembulatan 9.10 M2

8 Pemasangan 1 btg Bunga Pucuk Merah Jumlah Pemasangan Bunga Pucuk Merah (4 Pot Bunga) = 4.00 Bh
2.00 Btg x 4 Pot Bunga = 8.00 Btg 8.00 Btg
Pembulatan 8.00 Btg

9 Pemasangan 1 btg Pohon Ketapang Putih Jumlah Pemasangan Pohon Ketapang Putih (4 Pot Bunga) = 4.00 Bh
1.00 Btg x 4 Pot Bunga = 4.00 Btg 4.00 Btg
Pembulatan 4.00 Btg
No Uraian Pekerjaan Perhitungan Volume Satuan
No Uraian Pekerjaan Perhitungan Volume Satuan

G REHABILITASI MENARA UTAMA MASJID

I PENGECATAN ULANG MENARA UTAMA MASJID


1 1 Set Pemasangan dan Pembongkaran Scafolding = 80.00 Unit 80.00 Unit
Pembulatan 80.00 Unit

2 Pengikisan/pengerokan permukaan cat lama Pengikisan/pengerokan permukaan cat lama

Menara Utama Masjid


Tinggi Pengikisan/pengerokan permukaan cat lama = 22.35 M1

Panjang Pengikisan/pengerokan permukaan cat lama (Dinding Menara Masjid)


Dinding Memanjang
1.85 + 1.85 + 1.85 + 1.85 + 1.85 M1 = 9.25 M1
1.85 + 1.85 + 1.85 = 5.55 M1
14.80 M1

Luas Pengikisan/pengerokan permukaan cat lama (Dinding Menara Masjid)


22.35 M1 x 14.80 M1 x 2 Bidang = 661.56 M2

Luas Pengikisan/pengerokan permukaan cat lama


661.56 M2 = 661.56 M2 661.56 M2
Pembulatan 661.56 M2

3 Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)


Luas Pengecatan Dinding Batu Bata / Tembok Lama
Perhitungan = Perhitungan Luas Pengikisan/pengerokan permukaan cat lama

Total Luas Pengecatan Dinding Batu Bata / Tembok Lama


Menara Utama Masjid
661.56 M2 = 661.56 M2 661.56 M2
Pembulatan 661.56 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

II PERLENGKAPAN MENARA UTAMA MASJID


1 Pemasangan Tangga Besi T 4 m = 1.00 Unit 1.00 Unit
Pembulatan 1.00 Unit

2 Pemasangan Puncak Menara Lafadz Allah + Lampu = 1.00 Unit 1.00 Unit
Pembulatan 1.00 Unit

Padang, 2023

Penawar,
Kontraktor Pelaksana
CV….................................

NAMA JELAS
............................................