MATA PEMBAYARAN UTAMA (MPU)

PEMBANGUNAN SAUNG

PROGRAM : PENYEDIAAN DAN PENGEMBANGAN PRASARANA PERTANIAN


KEGIATAN : PEMBANGUNAN PRASARANA PERTANIAN
SUB KEGIATAN PEMBANGUNAN, REHABILITASI DAN PEMELIHARAAN SAUNG
PEKERJAAN : PEMBANGUNAN KANOPI UNTUK KELILING GEDUNG RPH DAN SAUNG
LOKASI : RPH AIA PACAH KOTA PADANG

NO. URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH SUB TOTAL


1 Sloof Beton bertulang 15X20 cm m3 0.90 4,448,979.00 4,004,081.10
2 Panel MCB unit 1.00 1,500,000.00 1,500,000.00
3 Beton K250 m3 0.98 951,463.48 932,434.21
4 Beton K250 m3 0.30 951,463.48 285,439.04
5 Beton K250 m3 1.40 951,463.48 1,332,048.87
6 Beton K250 m3 0.41 951,463.48 390,100.03
7 Beton K250 m3 0.81 951,463.48 770,685.42
8 Pondasi batu belah Camp. 1 : 3 m3 2.94 908,518.50 2,671,044.39
9 Rabat Lantai Kerja beton K125 m3 4.17 906,579.73 3,780,437.47
10 Pekerjaan Pemasangan Ornamen Tempel m2 23.00 525,276.22 12,081,353.06
11 Pembersihan Lapangan ls 1.00 436,000.00 436,000.00
12 Lampu led flat 30X120 bh 6.00 425,000.00 2,550,000.00
13 Pengukuran dan pemasangan Bouwplank ls 1.00 400,000.00 400,000.00
14 Bekisting m2 1.87 305,590.00 571,453.30
15 Bekisting m2 2.00 305,590.00 611,180.00
16 Bekisting m2 9.34 305,590.00 2,854,210.60
17 Bekisting m2 3.60 305,590.00 1,100,124.00
18 Bekisting m2 4.95 305,590.00 1,512,670.50
19 Granit Lantai Polish 60X60 m2 115.12 255,082.28 29,365,072.07
20 Rambu-rambu ls 1.00 200,000.00 200,000.00
21 Instalasi Titik lampu (Outbouw) ttk 10.00 171,600.00 1,716,000.00
22 Instalasi Titik Stop Kontak (Outbouw) ttk 8.00 171,600.00 1,372,800.00
23 Finishing Kayu Melamin Kuas m2 23.00 157,000.00 3,611,000.00
24 Safety shoes bh 4.00 150,000.00 600,000.00
25 Urugan Pasir Bawah Pondasi m3 1.30 131,460.00 170,898.00
26 Rangka Atap Baja Ringan ex TASO m2 124.98 125,000.00 15,622,500.00
27 Pengurugan sirtu padat dalam bangunan m3 22.92 106,750.00 2,446,710.00
28 Pasangan 1/2 Bata Camp. 1:2 m2 23.76 93,000.00 2,209,680.00
29 Penutup Plafond PVC motif Kayu m2 91.84 93,000.00 8,541,120.00
30 Galian Tanah Pondasi m3 6.96 90,562.50 630,315.00
31 Lampu Led Inbouw/ Downlight 7W bh 4.00 86,500.00 346,000.00
32 Helmet bh 4.00 70,000.00 280,000.00
33 Lantai Kerja Beton bawah pondasi tapak m3 1.08 63,100.00 68,148.00
34 Plesteran Camp 1:2 tebal 1.5 cm m2 38.16 62,724.00 2,393,547.84
35 Pengurugan kembali galian tanah m3 1.31 57,500.00 75,325.00
36 Rangka Plafond Hollow Galvanis m2 91.84 55,919.60 5,135,656.06
37 Ornamen Umpak Palsu Beton Exspose bh 20.00 55,000.00 1,100,000.00
38 Atap genteng berpasir m2 124.98 55,000.00 6,873,900.00
39 Acian m2 38.16 38,250.00 1,459,620.00
40 Stop Kontak Biasa (Outbouw) bh 10.00 32,100.00 321,000.00
41 Listplank GRC 30cm double m 73.60 30,000.00 2,208,000.00
42 Saklar Ganda (Outbouw) bh 5.00 29,700.00 148,500.00
43 Cat Dinding Emulsi m2 70.12 27,537.00 1,930,894.44
44 Safety vest bh 4.00 20,000.00 80,000.00
45 Perabung Atap m 29.00 12,500.00 362,500.00
46 Besi kg 213.64 12,487.00 2,667,722.68
47 Besi kg 63.00 12,487.00 786,681.00
48 Besi kg 182.39 12,487.00 2,277,503.93
49 Besi kg 87.93 12,487.00 1,097,981.91
50 Besi kg 98.60 12,487.00 1,231,218.20
51 Sarung Tangan bh 8.00 10,000.00 80,000.00
52 Biaya Pasang baru Listrik 900 Wh 900.00 1,300.00 1,170,000.00

Padang, 2021