B PEKERJAAN DUCTING
- Ducting Suppply lengkap dengan isolasi bahan PE dencity 0,025
g./cm3 thick 13 mm,aluminium tape,hanger,acsesories dll.
- Bjls 60 600 x 400 20.0 m2
- Bjls 60 500 x 400 27.0 m2
- Bjls 80 1175 x 258 2.9 m2
- Bjls 60 563 x 258 1.6 m2
- Ducting Return lengkap dengan isolasi bahan PE dencity
0,025g./cm3 thick 10 mm,aluminium tape,hanger,acsesories dll.
- Bjls 60 500 x 500 6.0 m2
- Bjls 60 450 x 450 2.7 m2
- Bjls 60 350 x 350 7.0 m2
- Bjls 50 250 x 250 20.5 m2
- Ducting Exhouse lengkap dengan isolasi bahan PE dencity
0,025g./cm3 thick 10 mm,aluminium tape,hanger,acsesories dll.
- Bjls 50 200 x 200 10.4 m2
-Ducting Fresh Air tanpa isolasi lengkap dengan hanger,acsesories dll.
- Bjls 50 250 x 250 5.0 m2
D PEKERJAAN PIPA
1.PIPA REFRIGERANT
-PIPA LIQUID 1 DIAMETER : 3/8 INCH + ISOLASI 15 m'
-PIPA LIQUID 2 DIAMETER : 3/8 INCH + ISOLASI 15 m'
-PIPA GAS 1 DIAMETER : 3/4 INCH + ISOLASI 15 m'
-PIPA GAS 2 DIAMETER : 3/4 INCH + ISOLASI 15 m'
-PIPA HOT GAS 1 DIAMETER : 3/8 INCH + ISOLASI 15 m'
-PIPA HOT GAS 2 DIAMETER : 3/8 INCH + ISOLASI 15 m'
-Hand Valve DIAMETER : 3/8 INCH 2 set
-Pipa Leader 200 x 100 mm 20 m'
2.PIPA DRAIN
-PIPA dia. 25 mm 20 m'
E PEKERJAAN LISTRIK AC
a. Panel AC 1 unit
b. Dari Indoor Unit ke Start Up Panel (Inverter, VSD, TOR, PT dll)
-NYYHY 8 x 1,5 mm² 15 m'
c. Dari Panel AC ke Panel Start Up ke Fan Indoor AC
-NYY 4 x 2,5 mm² 35 m'
d. Dari Panel AC ke Out door
-NYY 4 x 6 mm 50 m'
e. Dari Outdoor Unit Ke start up panel
-NYYHY 16 x 1,5 mm² 15 m'
f. Dari Start up panel Ke Room
-NYYHY 4x1,5 mm² 15 m'
g. Dari Start up panel Ke Return duct
-NYYHY 4x1,5 mm² 15 m'
h. Dari Panel Start Up Ke Exhouse fan
-NYY 3 x 2,5 mm² 25 m'
i. Kabel Leader
-100 x 100 mm 50 m'
j. Material Bantu 1 lot