Anda di halaman 1dari 48

GRAFIK KOREKSI KEPADATAN

PT. HUTAMA PRIMA UNTUK MATERIAL KASAR


J l. M etro Duta Niag a Blo k IIB/A3 Po nd o k Ind ah J akarta, (0 2 1) 76 6 9 50 1 REFERENSI : AASHTO T 224 - 67
J l. Po o l Bina M arg a, Kayumanis Tanah Sereal Bo g o r, (0 2 51) 753 59 8 6 NO. FORMAT

CONSULTANT : PT. PURIDIMENSI


PAKET 0

JENIS PEKERJAAN Lapis Pondasi Aggregat A


CONTRACTOR : PT. HUTAMA PRIMA LOKASI 0
TANGGAL TES 12/30/1899
DITES OLEH Beben cs

2.446 2.8

BULK SP. GR.


2.7
2.283
2.6
MAXIMUM DRY DENSITY ( gr/cm3 )

MDD (Lab)
2.120 2.5

2.4
1.957 % Ret No 4(Lab)

1.794

1.631 C

E
1.468 A

0 10 20 30 40 50 60 70 80
B D
PERCENT COARSE PARTICLES

REMARKS :

STATION +0 -+100 -+200 -+300


A MDD ( Lab ) gr/cm3 2.016 2.016 2.016 2.016
B Percent Tertahan No. 4 ( Lab ) % 54.05 54.05 54.05 54.05
C Berat Jenis 2.723 2.723 2.723 2.723
D Percent Tertahan No. 4 ( Field ) % Err:509 Err:509 Err:509 Err:509
E Koreksi MDD gr/cm3 2.075 2.052 2.044 2.044
F Hasil Kepadatan % 102.09

CONTRACTOR CONSULTANT OWNER


GRAFIK KOREKSI KEPADATAN

PT. HUTAMA PRIMA UNTUK MATERIAL KASAR


J l. M etro Duta Niag a Blo k IIB/A3 Po nd o k Ind ah J akarta, (0 2 1) 76 6 9 50 1 REFERENSI : AASHTO T 224 - 67
J l. Po o l Bina M arg a, Kayumanis Tanah Sereal Bo g o r, (0 2 51) 753 59 8 6 NO. FORMAT

PAKET PENINGKATAN JALAN


CONSULTANT : PT. PURIDIMENSI PARUNGPANJANG-BUNAR

JENIS PEKERJAAN Lapis Pondasi Aggregat Kelas A


LOKASI 0
CONTRACTOR : PT. HUTAMA PRIMA
TANGGAL TES 12/30/1899
DITES OLEH beben

2.446 2.8

BULK SP. GR.


2.7
2.283
2.6
MAXIMUM DRY DENSITY ( gr/cm3 )

MDD (Lab)
2.120 2.5

2.4
1.957 % Ret No 4(Lab)

1.794

1.631 C

E
1.468 A

0 10 20 30 40 50 60 70 80
B D
PERCENT COARSE PARTICLES

REMARKS :

STATION
A MDD ( Lab ) gr/cm3 2.016 2.016 2.016 2.016
B Percent Tertahan No. 4 ( Lab ) % 54.05 54.05 54.05 54.05
C Berat Jenis 2.723 2.723 2.723 2.723
D Percent Tertahan No. 4 ( Field ) % Err:509 Err:509 Err:509 Err:509
E Koreksi MDD gr/cm3 2.075 2.052 2.031 2.044
F Hasil Kepadatan %

CONTRACTOR CONSULTANT OWNER


PEMERINTAH PROVINSI JAWA BARAT DINAS BINA MARGA KEGIATAN PENINGKATAN JALAN
DAN JEMBATAN PROVINSI BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN I

REKAPITULASI PEMERIKSAAN KEPADATAN

Paket PENINGKATAN JALAN PARUNGPANJANG-BUNAR


Kontraktor PT. HUTAMA PRIMA
Konsultan PT. PURIDIMENSI
Jenis Pekerjaan timbunan pilihan b

JOB MIX FORMULA HASIL TES LAPANGAN KEPADATAN


No Tanggal pengujian Lokasi / Km Titik uji KETERANGAN
Dry Density OMC Dry Density Water Cont. Result Spec
gr / cc % gr / cc % % %
STA L/R
00+000 L 0.000 0.00 0.00 SEGMEN 4
1 ### 00+000 s/d 00+000
00+000 L 0.000 0.00 0.00 SEGMEN 4
00+300 L -1.011 9.45 -51.41 SEGMEN 4
2 ### 00+240 s/d 00+475
00+400 L -1.514 -12.53 -76.96 SEGMEN 4
00+550 L -1.037 8.88 -52.74 SEGMEN 4
3 ### 00+475 s/d 00+702
00+650 L -1.135 9.21 -57.72 SEGMEN 4
00+075 R -1.173 9.31 -59.66 SEGMEN 4
4 ### 00+000 s/d 00+237
00+175 R -1.003 8.58 -51.02 SEGMEN 4
00+237 R -0.953 9.74 -48.47 SEGMEN 4
5 ### 00+237 s/d 00+477 1.967 11.84
00+477 R -0.922 8.77 -46.86 SEGMEN 4
00+552 R -1.090 9.84 -55.43 SEGMEN 4
6 ### 00+477 s/d 00+702
00+652 R -0.981 9.54 -49.89 SEGMEN 4
01+425 L -1.026 9.81 -53.59 SEGMEN 12
7 ### 01+500 s/d 01+290
01+325 L -1.054 10.03 -52.15 SEGMEN 12
01+215 L -0.860 8.97 -43.70 SEGMEN 12
8 Sunday, July 31, 2016 01+290 s/d 01+070
01+115 L -1.172 9.35 -59.59 SEGMEN 12
00+995 L -0.919 9.32 -46.72 SEGMEN 12
9 ### 01+070 s/d 00+840
00+895 L -0.979 9.07 -49.77 SEGMEN 12

min 100
00+765 L -0.977 9.94 -49.68 SEGMEN 12
10 ### 00+840 s/d 00+625
00+665 L -1.113 9.00 -56.61 SEGMEN 12
01+425 L -1.079 9.80 -54.84 SEGMEN 12
11 ### 01+500 01+285
01+325 L -1.085 8.88 -55.16 SEGMEN 12
01+210 L -1.165 9.79 -59.21 SEGMEN 12
12 ### 01+285 01+063
01+110 L -1.114 8.95 -56.64 SEGMEN 12
00+988 L -1.018 9.12 -51.75 SEGMEN 12
13 ### 01+063 00+835
00+888 L -1.043 9.71 -53.03 SEGMEN 12
00+760 L -1.040 8.54 -52.85 SEGMEN 12
14 ### 00+835 00+625
00+660 L -1.071 9.49 -54.44 SEGMEN 12
00+075 L -1.143 9.79 -58.10 SEGMEN 12
15 ### 00+000 00+230
00+175 L -1.196 8.59 -60.79 SEGMEN 6
min 100
00+305 L -1.166 9.93 -59.26 SEGMEN 6
16 ### 00+230 00+450
00+405 L -1.057 9.35 -53.74 SEGMEN 6
### 00+450 00+550 00+525 L 1.967 9.75 -52.47 SEGMEN 6
17
00+075 R -1.068 9.76 -54.30 SEGMEN 6
### 00+000 00+230
00+175 R -0.913 9.69 -46.40 SEGMEN 6
18
00+300 R -0.966 8.76 -49.10 SEGMEN 6
### 00+225 00+475
00+400 R -1.109 7.82 -56.39 SEGMEN 6
19
00+495 R -1.061 10.00 -53.95 SEGMEN 6
### 00+475 00+550

Diperiksa Oleh,
Disetujui Oleh, Konsultan Pengawas Diajukan Oleh,
BINA MARGA PT.PURIDIMENSI Kontraktor Pelaksana
Pengawas Lapangan PT.HUTAMA PRIMA

Imansyah, ST.MM Wawan Siswanto,ST. BEBEN


NIP. 19590503 199803 1 003 QUALITY ENGINEER QUALITY CONTROL
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI

TEST KEPADATAN (Sand Cone)

PEMOHON : PAKET :

PEKERJAAN :
TANGGAL :
Petugas :

NOMOR :

TITIK
No URAIAN

VOLUME LUBANG RUMUS


A Berat Pasir Sebelum Tes gr
B Berat Pasir Setelah Tes gr
C Berat Pasir Dalam Corong gr
D Berat Pasir Dalam Lubang gr D = A-B-C
E Berat Isi Pasir ( Ys ) gr/cc
F Volume Lubang gr/cc F =D/E
BERAT CONTOH DALAM LUBANG
G Berat Contoh + Pan gr
H Berat Pan gr
I Berat Contoh gr I = G-H
KADAR AIR ( WC )
J Berat Contoh Basah + Pan gr
K Berat Contoh Kering + Pan gr
L Berat Pan gr
M Berat Contoh Kering gr M = K-L
N Berat Air gr N = J-K
O Kadar Air (WC) % O = (N/M)*100
KEPADATAN MAKSIMUM
P Berat Isi Contoh Basah ( ∂ Wet ) gr/cc P = I/F
Q Berat Isi Contoh Kering ( ∂ Dry ) gr/cc Q = P/ (1+(O/100))
R Kepadatan Kering LAB ( ∂ LAB ) gr/cc
V Kadar Air Optimum %
W Derajat Kepadatan % T = (Q/R)*100
RATA-RATA

Divisi Laboratorium Dites Oleh

Syara Hanjaya, S.T. Bayu Rosma Rahayu


HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI

g
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
g TEST KEPADATAN (Sand Cone)

KONSULTAN : PT. PURIDIMENSI PAKET : PENINGKATAN JALAN


PARUNGPANJANG-BUNAR

KONTRAKTOR : PT. HUTAMA PRIMA JENIS PEKERJAAN : timbunan pilihan

LOKASI : Segmen 4 00+240 s/d 00+475

TANGGAL : 31-Dec-1899

Kiri Kiri
No URAIAN
00+300 00+400
VOLUME LUBANG RUMUS
A Berat Pasir Sebelum Tes gr -13 -33
B Berat Pasir Setelah Tes gr 3671 2928
C Berat Pasir Dalam Corong gr 1354 1354
D Berat Pasir Dalam Lubang gr D = A-B-C -5038 -4315
E Berat Isi Pasir ( Ys ) gr/cc 1.456 1.456
F Volume Lubang gr/cc F =D/E -3460.165 -2963.599
BERAT CONTOH DALAM LUBANG
G Berat Contoh + Pan gr
H Berat Pan gr
I Berat Contoh gr I = G-H 3830 3924
KADAR AIR ( WC )
J Berat Contoh Basah + Pan gr 772 505
K Berat Contoh Kering + Pan gr 720 553
L Berat Pan gr 170 170
M Berat Contoh Kering gr M = K-L 550 383
N Berat Air gr N = J-K 52 -48
O Kadar Air (WC) % O = (N/M)*100 9.45 -12.53
KEPADATAN MAKSIMUM
P Berat Isi Contoh Basah ( ∂ Wet ) gr/cc P = I/F -1.107 -1.324
Q Berat Isi Contoh Kering ( ∂ Dry ) gr/cc Q = P/ (1+(O/100)) -1.011 -1.514
R Kepadatan Kering LAB ( ∂ LAB ) gr/cc 1.967 1.967
V Kadar Air Optimum % 9.48 9.48
W Derajat Kepadatan % T = (Q/R)*100 -51.41 -76.96
RATA-RATA

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


BINA MARGA Konsultan Pengawas Kontraktor Pelaksana
Pengawas Lapangan PT.HUTAMA PRIMA

g
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
g Sudarwanto Endi Ramdani BEBEN
NIP. 19590503 199103 1 002 LAB,TEKNISI Quality Control
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
TEST KEPADATAN (Sand Cone)

KONSULTAN : PT. PURIDIMENSI PAKET : PENINGKATAN JALAN


PARUNGPANJANG-BUNAR

KONTRAKTOR : PT. HUTAMA PRIMA JENIS PEKERJAAN : timbunan pilihan

LOKASI : Segmen 4 00+475 s/d 00+702

TANGGAL : 01-Jan-1900

Kiri Kiri Kiri


No URAIAN
00+550 00+650
VOLUME LUBANG RUMUS
A Berat Pasir Sebelum Tes gr -43 -57
B Berat Pasir Setelah Tes gr 3597 3434
C Berat Pasir Dalam Corong gr 1354 1354
D Berat Pasir Dalam Lubang gr D = A-B-C -4994 -4845
E Berat Isi Pasir ( Ys ) gr/cc 1.456 1.456
F Volume Lubang gr/cc F =D/E -3429.945 -3327.610
BERAT CONTOH DALAM LUBANG
G Berat Contoh + Pan gr
H Berat Pan gr
I Berat Contoh gr I = G-H 3874 4126
KADAR AIR ( WC )
J Berat Contoh Basah + Pan gr 697 834
K Berat Contoh Kering + Pan gr 654 778
L Berat Pan gr 170 170
M Berat Contoh Kering gr M = K-L 484 608
N Berat Air gr N = J-K 43 56
O Kadar Air (WC) % O = (N/M)*100 8.88 9.21
KEPADATAN MAKSIMUM
P Berat Isi Contoh Basah ( ∂ Wet ) gr/cc P = I/F -1.129 -1.240
Q Berat Isi Contoh Kering ( ∂ Dry ) gr/cc Q = P/ (1+(O/100)) -1.037 -1.135
R Kepadatan Kering LAB ( ∂ LAB ) gr/cc 1.967 1.967
V Kadar Air Optimum % 11.84 11.84
W Derajat Kepadatan % T = (Q/R)*100 -52.74 -57.72
RATA-RATA

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


BINA MARGA Konsultan Pengawas Kontraktor Pelaksana
Pengawas Lapangan PT.HUTAMA PRIMA
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
Sudarwanto Endi Ramdani BEBEN
NIP. 19590503 199103 1 002 LAB,TEKNISI Quality Control
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
TEST KEPADATAN (Sand Cone)
g
KONSULTAN : PT. PURIDIMENSI PAKET : PENINGKATAN JALAN
PARUNGPANJANG-BUNAR

KONTRAKTOR : PT. HUTAMA PRIMA JENIS PEKERJAAN : timbunan pilihan

LOKASI : Segmen 4 00+000 s/d 00+237

TANGGAL : 09-Aug-2016

KANAN KANAN
No URAIAN
00+075 00+175
VOLUME LUBANG RUMUS
A Berat Pasir Sebelum Tes gr -67 -81
B Berat Pasir Setelah Tes gr 3367 3619
C Berat Pasir Dalam Corong gr 1354 1354
D Berat Pasir Dalam Lubang gr D = A-B-C -4788 -5054
E Berat Isi Pasir ( Ys ) gr/cc 1.456 1.456
F Volume Lubang gr/cc F =D/E -3288.462 -3471.154
BERAT CONTOH DALAM LUBANG
G Berat Contoh + Pan gr
H Berat Pan gr
I Berat Contoh gr I = G-H 4218 3782
KADAR AIR ( WC )
J Berat Contoh Basah + Pan gr 675 765
K Berat Contoh Kering + Pan gr 632 718
L Berat Pan gr 170 170
M Berat Contoh Kering gr M = K-L 462 548
N Berat Air gr N = J-K 43 47
O Kadar Air (WC) % O = (N/M)*100 9.31 8.58
KEPADATAN MAKSIMUM
P Berat Isi Contoh Basah ( ∂ Wet ) gr/cc P = I/F -1.283 -1.090
Q Berat Isi Contoh Kering ( ∂ Dry ) gr/cc Q = P/ (1+(O/100)) -1.173 -1.003
R Kepadatan Kering LAB ( ∂ LAB ) gr/cc 1.967 1.967
V Kadar Air Optimum % 11.84 11.84
W Derajat Kepadatan % T = (Q/R)*100 -59.66 -51.02
RATA-RATA

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


BINA MARGA Konsultan Pengawas Kontraktor Pelaksana
Pengawas Lapangan PT.HUTAMA PRIMA
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
Sudarwanto Endi Ramdani BEBEN
NIP. 19590503 199103 1 002 LAB,TEKNISI Quality Control
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
TEST KEPADATAN (Sand Cone)

KONSULTAN : PT. PURIDIMENSI PAKET : PENINGKATAN JALAN


PARUNGPANJANG-BUNAR

KONTRAKTOR : PT. HUTAMA PRIMA JENIS PEKERJAAN : timbunan pilihan

LOKASI : Segmen 4 00+237 s/d 00+477

TANGGAL : 10-Aug-2016

KANAN KANAN
No URAIAN
00+312 00+412
VOLUME LUBANG RUMUS
A Berat Pasir Sebelum Tes gr -91 -105
B Berat Pasir Setelah Tes gr 3701 3742
C Berat Pasir Dalam Corong gr 1354 1354
D Berat
g Pasir Dalam Lubang gr D = A-B-C -5146 -5201
E Berat Isi Pasir ( Ys ) gr/cc 1.456 1.456
F Volume Lubang gr/cc F =D/E -3534.341 -3572.115
BERAT CONTOH DALAM LUBANG
G Berat Contoh + Pan gr
H Berat Pan gr
I Berat Contoh gr I = G-H 3698 3581
KADAR AIR ( WC )
J Berat Contoh Basah + Pan gr 587 691
K Berat Contoh Kering + Pan gr 550 649
L Berat Pan gr 170 170
M Berat Contoh Kering gr M = K-L 380 479
N Berat Air gr N = J-K 37 42
O Kadar Air (WC) % O = (N/M)*100 9.74 8.77
KEPADATAN MAKSIMUM
P Berat Isi Contoh Basah ( ∂ Wet ) gr/cc P = I/F -1.046 -1.002
Q Berat Isi Contoh Kering ( ∂ Dry ) gr/cc Q = P/ (1+(O/100)) -0.953 -0.922
R Kepadatan Kering LAB ( ∂ LAB ) gr/cc 1.967 1.967
V Kadar Air Optimum % 11.84 11.84
W Derajat Kepadatan % T = (Q/R)*100 -48.47 -46.86
RATA-RATA

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


BINA MARGA Konsultan Pengawas Kontraktor Pelaksana
Pengawas Lapangan PT.HUTAMA PRIMA
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
Sudarwanto Endi Ramdani BEBEN
NIP. 19590503 199103 1 002 LAB,TEKNISI Quality Control
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
TEST KEPADATAN (Sand Cone)

KONSULTAN : PT. PURIDIMENSI PAKET : PENINGKATAN JALAN


PARUNGPANJANG-BUNAR

KONTRAKTOR : PT. HUTAMA PRIMA JENIS PEKERJAAN : timbunan pilihan

LOKASI : Segmen 4 00+477 s/d 00+702

TANGGAL : 11-Aug-2016

KANAN KANAN
No URAIAN
00+552 00+652
VOLUME LUBANG RUMUS
A Berat Pasir Sebelum Tes gr -115 -129
B Berat Pasir Setelah Tes gr 3440 3613
C Berat Pasir Dalam Corong gr 1354 1354
D Berat Pasir Dalam Lubang gr D = A-B-C -4909 -5096
E Berat Isi Pasir ( Ys ) gr/cc 1.456 1.456
F Volume Lubang gr/cc F =D/E -3371.566 -3500.000
BERAT CONTOH DALAM LUBANG
G Berat Contoh + Pan gr
H Berat Pan gr
I Berat Contoh gr I = G-H 4038 3762
KADAR AIR ( WC )
J Berat Contoh Basah + Pan gr 784 549
K Berat Contoh Kering + Pan gr 729 516
L Berat Pan gr 170 170
M Berat Contoh Kering gr M = K-L 559 346
N Berat Air gr N = J-K 55 33
O Kadar Air (WC) % O = (N/M)*100 9.84 9.54
g KEPADATAN MAKSIMUM
P Berat Isi Contoh Basah ( ∂ Wet ) gr/cc P = I/F -1.198 -1.075
Q Berat Isi Contoh Kering ( ∂ Dry ) gr/cc Q = P/ (1+(O/100)) -1.090 -0.981
R Kepadatan Kering LAB ( ∂ LAB ) gr/cc 1.967 1.967
V Kadar Air Optimum % 11.84 11.84
W Derajat Kepadatan % T = (Q/R)*100 -55.43 -49.89
RATA-RATA

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


BINA MARGA Konsultan Pengawas Kontraktor Pelaksana
Pengawas Lapangan PT.HUTAMA PRIMA
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
Sudarwanto Endi Ramdani BEBEN
NIP. 19590503 199103 1 002 LAB,TEKNISI Quality Control
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
TEST KEPADATAN (Sand Cone)

KONSULTAN : PT. PURIDIMENSI PAKET : PENINGKATAN JALAN


PARUNGPANJANG-BUNAR

KONTRAKTOR : PT. HUTAMA PRIMA JENIS PEKERJAAN : timbunan pilihan

LOKASI : Segmen 12 01+500 s/d 01+290

TANGGAL : 30-Jul-2016

KANAN KANAN
No URAIAN
01+425 01+325
VOLUME LUBANG RUMUS
A Berat Pasir Sebelum Tes gr -139 -153
B Berat Pasir Setelah Tes gr 3483 3514
C Berat Pasir Dalam Corong gr 1354 1354
D Berat Pasir Dalam Lubang gr D = A-B-C -4976 -5021
E Berat Isi Pasir ( Ys ) gr/cc 1.456 1.456
F Volume Lubang gr/cc F =D/E -3417.582 -3448.489
BERAT CONTOH DALAM LUBANG
G Berat Contoh + Pan gr
H Berat Pan gr
I Berat Contoh gr I = G-H 3956 3892
KADAR AIR ( WC )
J Berat Contoh Basah + Pan gr 875 532
K Berat Contoh Kering + Pan gr 812 499
L Berat Pan gr 170 170
M Berat Contoh Kering gr M = K-L 642 329
N Berat Air gr N = J-K 63 33
O Kadar Air (WC) % O = (N/M)*100 9.81 10.03
g KEPADATAN MAKSIMUM
P Berat Isi Contoh Basah ( ∂ Wet ) gr/cc P = I/F -1.158 -1.129
Q Berat Isi Contoh Kering ( ∂ Dry ) gr/cc Q = P/ (1+(O/100)) -1.054 -1.026
R Kepadatan Kering LAB ( ∂ LAB ) gr/cc 1.967 1.967
V Kadar Air Optimum % 11.84 11.84
W Derajat Kepadatan % T = (Q/R)*100 -53.59 -52.15
RATA-RATA

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


BINA MARGA Konsultan Pengawas Kontraktor Pelaksana
Pengawas Lapangan PT.HUTAMA PRIMA
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
Sudarwanto Endi Ramdani BEBEN
NIP. 19590503 199103 1 002 LAB,TEKNISI Quality Control
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
TEST KEPADATAN (Sand Cone)

KONSULTAN : PT. PURIDIMENSI PAKET : PENINGKATAN JALAN


PARUNGPANJANG-BUNAR

KONTRAKTOR : PT. HUTAMA PRIMA JENIS PEKERJAAN : timbunan pilihan

LOKASI : Segmen 12 01+290 s/d 01+070

TANGGAL : 31-Jul-2016

KANAN KANAN
No URAIAN
01+215 01+115
VOLUME LUBANG RUMUS
A Berat Pasir Sebelum Tes gr -163 -177
B Berat Pasir Setelah Tes gr 3798 3259
C Berat Pasir Dalam Corong gr 1354 1354
D Berat Pasir Dalam Lubang gr D = A-B-C -5315 -4790
E Berat Isi Pasir ( Ys ) gr/cc 1.456 1.456
F Volume Lubang gr/cc F =D/E -3650.412 -3289.835
BERAT CONTOH DALAM LUBANG
G Berat Contoh + Pan gr
H Berat Pan gr
I Berat Contoh gr I = G-H 3419 4217
KADAR AIR ( WC )
J Berat Contoh Basah + Pan gr 498 965
K Berat Contoh Kering + Pan gr 471 897
L Berat Pan gr 170 170
M Berat Contoh Kering gr M = K-L 301 727
N Berat Air gr N = J-K 27 68
O Kadar Air (WC) % O = (N/M)*100 8.97 9.35
g KEPADATAN MAKSIMUM
P Berat Isi Contoh Basah ( ∂ Wet ) gr/cc P = I/F -0.937 -1.282
Q Berat Isi Contoh Kering ( ∂ Dry ) gr/cc Q = P/ (1+(O/100)) -0.860 -1.172
R Kepadatan Kering LAB ( ∂ LAB ) gr/cc 1.967 1.967
V Kadar Air Optimum % 11.84 11.84
W Derajat Kepadatan % T = (Q/R)*100 -43.70 -59.59
RATA-RATA

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


BINA MARGA Konsultan Pengawas Kontraktor Pelaksana
Pengawas Lapangan PT.HUTAMA PRIMA
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
Sudarwanto Endi Ramdani BEBEN
NIP. 19590503 199103 1 002 LAB,TEKNISI Quality Control
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
TEST KEPADATAN (Sand Cone)

KONSULTAN : PT. PURIDIMENSI PAKET : PENINGKATAN JALAN


PARUNGPANJANG-BUNAR

KONTRAKTOR : PT. HUTAMA PRIMA JENIS PEKERJAAN : timbunan pilihan

LOKASI : Segmen 12 01+070 s/d 00+840

TANGGAL : 01-Aug-2016

KANAN KANAN
No URAIAN
00+995 00+895
VOLUME LUBANG RUMUS
A Berat Pasir Sebelum Tes gr -187 -201
B Berat Pasir Setelah Tes gr 3668 3549
C Berat Pasir Dalam Corong gr 1354 1354
D Berat Pasir Dalam Lubang gr D = A-B-C -5209 -5104
E Berat Isi Pasir ( Ys ) gr/cc 1.456 1.456
F Volume Lubang gr/cc F =D/E -3577.610 -3505.495
BERAT CONTOH DALAM LUBANG
G Berat Contoh + Pan gr
H Berat Pan gr
I Berat Contoh gr I = G-H 3594 3743
KADAR AIR ( WC )
J Berat Contoh Basah + Pan gr 745 723
K Berat Contoh Kering + Pan gr 696 677
L Berat Pan gr 170 170
M Berat Contoh Kering gr M = K-L 526 507
N Berat Air gr N = J-K 49 46
O Kadar Air (WC) % O = (N/M)*100 9.32 9.07
g KEPADATAN MAKSIMUM
P Berat Isi Contoh Basah ( ∂ Wet ) gr/cc P = I/F -1.005 -1.068
Q Berat Isi Contoh Kering ( ∂ Dry ) gr/cc Q = P/ (1+(O/100)) -0.919 -0.979
R Kepadatan Kering LAB ( ∂ LAB ) gr/cc 1.967 1.967
V Kadar Air Optimum % 11.84 11.84
W Derajat Kepadatan % T = (Q/R)*100 -46.72 -49.77
RATA-RATA

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


BINA MARGA Konsultan Pengawas Kontraktor Pelaksana
Pengawas Lapangan PT.HUTAMA PRIMA
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
Sudarwanto Endi Ramdani BEBEN
NIP. 19590503 199103 1 002 LAB,TEKNISI Quality Control
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
TEST KEPADATAN (Sand Cone)

KONSULTAN : PT. PURIDIMENSI PAKET : PENINGKATAN JALAN


PARUNGPANJANG-BUNAR

KONTRAKTOR : PT. HUTAMA PRIMA JENIS PEKERJAAN : timbunan pilihan

LOKASI : Segmen 12 00+840 s/d 00+625

TANGGAL : 02-Aug-2016

KANAN KANAN
No URAIAN
00+765 00+665
VOLUME LUBANG RUMUS
A Berat Pasir Sebelum Tes gr -211 -225
B Berat Pasir Setelah Tes gr 3542 3298
C Berat Pasir Dalam Corong gr 1354 1354
D Berat Pasir Dalam Lubang gr D = A-B-C -5107 -4877
E Berat Isi Pasir ( Ys ) gr/cc 1.456 1.456
F Volume Lubang gr/cc F =D/E -3507.555 -3349.588
BERAT CONTOH DALAM LUBANG
G Berat Contoh + Pan gr
H Berat Pan gr
I Berat Contoh gr I = G-H 3768 4065
KADAR AIR ( WC )
J Berat Contoh Basah + Pan gr 513 897
K Berat Contoh Kering + Pan gr 482 837
L Berat Pan gr 170 170
M Berat Contoh Kering gr M = K-L 312 667
N Berat Air gr N = J-K 31 60
O Kadar Air (WC) % O = (N/M)*100 9.94 9.00
g KEPADATAN MAKSIMUM
P Berat Isi Contoh Basah ( ∂ Wet ) gr/cc P = I/F -1.074 -1.214
Q Berat Isi Contoh Kering ( ∂ Dry ) gr/cc Q = P/ (1+(O/100)) -0.977 -1.113
R Kepadatan Kering LAB ( ∂ LAB ) gr/cc 1.967 1.967
V Kadar Air Optimum % 11.84 11.84
W Derajat Kepadatan % T = (Q/R)*100 -49.68 -56.61
RATA-RATA

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


BINA MARGA Konsultan Pengawas Kontraktor Pelaksana
Pengawas Lapangan PT.HUTAMA PRIMA
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
Sudarwanto Endi Ramdani BEBEN
NIP. 19590503 199103 1 002 LAB,TEKNISI Quality Control
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
TEST KEPADATAN (Sand Cone)

KONSULTAN : PT. PURIDIMENSI PAKET : PENINGKATAN JALAN


PARUNGPANJANG-BUNAR

KONTRAKTOR : PT. HUTAMA PRIMA JENIS PEKERJAAN : timbunan pilihan

LOKASI : Segmen 12 01+500 s/d 01+285

TANGGAL : 20-Aug-2016

kiri kiri
No URAIAN
01+425 01+325
VOLUME LUBANG RUMUS
A Berat Pasir Sebelum Tes gr -235 -249
B Berat Pasir Setelah Tes gr 3347 3311
C Berat Pasir Dalam Corong gr 1354 1354
D Berat Pasir Dalam Lubang gr D = A-B-C -4936 -4914
E Berat Isi Pasir ( Ys ) gr/cc 1.456 1.456
F Volume Lubang gr/cc F =D/E -3390.110 -3375.000
BERAT CONTOH DALAM LUBANG
G Berat Contoh + Pan gr
H Berat Pan gr
I Berat Contoh gr I = G-H 4015 3987
KADAR AIR ( WC )
J Berat Contoh Basah + Pan gr 876 587
K Berat Contoh Kering + Pan gr 813 553
L Berat Pan gr 170 170
M Berat Contoh Kering gr M = K-L 643 383
N Berat Air gr N = J-K 63 34
O Kadar Air (WC) % O = (N/M)*100 9.80 8.88
g KEPADATAN MAKSIMUM
P Berat Isi Contoh Basah ( ∂ Wet ) gr/cc P = I/F -1.184 -1.181
Q Berat Isi Contoh Kering ( ∂ Dry ) gr/cc Q = P/ (1+(O/100)) -1.079 -1.085
R Kepadatan Kering LAB ( ∂ LAB ) gr/cc 1.967 1.967
V Kadar Air Optimum % 11.84 11.84
W Derajat Kepadatan % T = (Q/R)*100 -54.84 -55.16
RATA-RATA

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


BINA MARGA Konsultan Pengawas Kontraktor Pelaksana
Pengawas Lapangan PT.HUTAMA PRIMA
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
Sudarwanto Endi Ramdani BEBEN
NIP. 19590503 199103 1 002 LAB,TEKNISI Quality Control
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
TEST KEPADATAN (Sand Cone)

KONSULTAN : PT. PURIDIMENSI PAKET : PENINGKATAN JALAN


PARUNGPANJANG-BUNAR

KONTRAKTOR : PT. HUTAMA PRIMA JENIS PEKERJAAN : timbunan pilihan

LOKASI : Segmen 12 01+285 s/d 01+063

TANGGAL : 21-Aug-2016

kiri kiri
No URAIAN
01+210 01+110
VOLUME LUBANG RUMUS
A Berat Pasir Sebelum Tes gr -259 -273
B Berat Pasir Setelah Tes gr 3190 3249
C Berat Pasir Dalam Corong gr 1354 1354
D Berat Pasir Dalam Lubang gr D = A-B-C -4803 -4876
E Berat Isi Pasir ( Ys ) gr/cc 1.456 1.456
F Volume Lubang gr/cc F =D/E -3298.764 -3348.901
BERAT CONTOH DALAM LUBANG
G Berat Contoh + Pan gr
H Berat Pan gr
I Berat Contoh gr I = G-H 4218 4065
KADAR AIR ( WC )
J Berat Contoh Basah + Pan gr 787 876
K Berat Contoh Kering + Pan gr 732 818
L Berat Pan gr 170 170
M Berat Contoh Kering gr M = K-L 562 648
N Berat Air gr N = J-K 55 58
O Kadar Air (WC) % O = (N/M)*100 9.79 8.95
g KEPADATAN MAKSIMUM
P Berat Isi Contoh Basah ( ∂ Wet ) gr/cc P = I/F -1.279 -1.214
Q Berat Isi Contoh Kering ( ∂ Dry ) gr/cc Q = P/ (1+(O/100)) -1.165 -1.114
R Kepadatan Kering LAB ( ∂ LAB ) gr/cc 1.967 1.967
V Kadar Air Optimum % 11.84 11.84
W Derajat Kepadatan % T = (Q/R)*100 -59.21 -56.64
RATA-RATA

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


BINA MARGA Konsultan Pengawas Kontraktor Pelaksana
Pengawas Lapangan PT.HUTAMA PRIMA
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
Sudarwanto Endi Ramdani BEBEN
NIP. 19590503 199103 1 002 LAB,TEKNISI Quality Control
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
TEST KEPADATAN (Sand Cone)

KONSULTAN : PT. PURIDIMENSI PAKET : PENINGKATAN JALAN


PARUNGPANJANG-BUNAR

KONTRAKTOR : PT. HUTAMA PRIMA JENIS PEKERJAAN : timbunan pilihan

LOKASI : Segmen 12 01+063 s/d 00+835

TANGGAL : 22-Aug-2016

kiri kiri
No URAIAN
00+988 00+888
VOLUME LUBANG RUMUS
A Berat Pasir Sebelum Tes gr -283 -297
B Berat Pasir Setelah Tes gr 3389 3338
C Berat Pasir Dalam Corong gr 1354 1354
D Berat Pasir Dalam Lubang gr D = A-B-C -5026 -4989
E Berat Isi Pasir ( Ys ) gr/cc 1.456 1.456
F Volume Lubang gr/cc F =D/E -3451.923 -3426.511
BERAT CONTOH DALAM LUBANG
G Berat Contoh + Pan gr
H Berat Pan gr
I Berat Contoh gr I = G-H 3834 3921
KADAR AIR ( WC )
J Berat Contoh Basah + Pan gr 876 509
K Berat Contoh Kering + Pan gr 817 479
L Berat Pan gr 170 170
M Berat Contoh Kering gr M = K-L 647 309
N Berat Air gr N = J-K 59 30
O Kadar Air (WC) % O = (N/M)*100 9.12 9.71
g KEPADATAN MAKSIMUM
P Berat Isi Contoh Basah ( ∂ Wet ) gr/cc P = I/F -1.111 -1.144
Q Berat Isi Contoh Kering ( ∂ Dry ) gr/cc Q = P/ (1+(O/100)) -1.018 -1.043
R Kepadatan Kering LAB ( ∂ LAB ) gr/cc 1.967 1.967
V Kadar Air Optimum % 11.84 11.84
W Derajat Kepadatan % T = (Q/R)*100 -51.75 -53.03
RATA-RATA

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


BINA MARGA Konsultan Pengawas Kontraktor Pelaksana
Pengawas Lapangan PT.HUTAMA PRIMA
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
Sudarwanto Endi Ramdani BEBEN
NIP. 19590503 199103 1 002 LAB,TEKNISI Quality Control
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
TEST KEPADATAN (Sand Cone)

KONSULTAN : PT. PURIDIMENSI PAKET : PENINGKATAN JALAN


PARUNGPANJANG-BUNAR

KONTRAKTOR : PT. HUTAMA PRIMA JENIS PEKERJAAN : timbunan pilihan

LOKASI : Segmen 12 00+835 s/d 00+625

TANGGAL : 23-Aug-2016

kiri kiri
No URAIAN
00+760 00+660
VOLUME LUBANG RUMUS
A Berat Pasir Sebelum Tes gr -307 -321
B Berat Pasir Setelah Tes gr 3339 3270
C Berat Pasir Dalam Corong gr 1354 1354
D Berat Pasir Dalam Lubang gr D = A-B-C -5000 -4945
E Berat Isi Pasir ( Ys ) gr/cc 1.456 1.456
F Volume Lubang gr/cc F =D/E -3434.066 -3396.291
BERAT CONTOH DALAM LUBANG
G Berat Contoh + Pan gr
H Berat Pan gr
I Berat Contoh gr I = G-H 3875 3982
KADAR AIR ( WC )
J Berat Contoh Basah + Pan gr 513 897
K Berat Contoh Kering + Pan gr 486 834
L Berat Pan gr 170 170
M Berat Contoh Kering gr M = K-L 316 664
N Berat Air gr N = J-K 27 63
O Kadar Air (WC) % O = (N/M)*100 8.54 9.49
g KEPADATAN MAKSIMUM
P Berat Isi Contoh Basah ( ∂ Wet ) gr/cc P = I/F -1.128 -1.172
Q Berat Isi Contoh Kering ( ∂ Dry ) gr/cc Q = P/ (1+(O/100)) -1.040 -1.071
R Kepadatan Kering LAB ( ∂ LAB ) gr/cc 1.967 1.967
V Kadar Air Optimum % 11.84 11.84
W Derajat Kepadatan % T = (Q/R)*100 -52.85 -54.44
RATA-RATA

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


BINA MARGA Konsultan Pengawas Kontraktor Pelaksana
Pengawas Lapangan PT.HUTAMA PRIMA
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
Sudarwanto Endi Ramdani BEBEN
NIP. 19590503 199103 1 002 LAB,TEKNISI Quality Control
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
TEST KEPADATAN (Sand Cone)

KONSULTAN : PT. PURIDIMENSI PAKET : PENINGKATAN JALAN


PARUNGPANJANG-BUNAR

KONTRAKTOR : PT. HUTAMA PRIMA JENIS PEKERJAAN : timbunan pilihan

LOKASI : Segmen 6 00+000 s/d 00+230

TANGGAL : 01-Aug-2016

kanan kanan
No URAIAN
00+075 00+175
VOLUME LUBANG RUMUS
A Berat Pasir Sebelum Tes gr -331 -345
B Berat Pasir Setelah Tes gr 3148 3052
C Berat Pasir Dalam Corong gr 1354 1354
D Berat Pasir Dalam Lubang gr D = A-B-C -4833 -4751
E Berat Isi Pasir ( Ys ) gr/cc 1.456 1.456
F Volume Lubang gr/cc F =D/E -3319.368 -3263.049
BERAT CONTOH DALAM LUBANG
G Berat Contoh + Pan gr
H Berat Pan gr
I Berat Contoh gr I = G-H 4165 4237
KADAR AIR ( WC )
J Berat Contoh Basah + Pan gr 686 762
K Berat Contoh Kering + Pan gr 640 715
L Berat Pan gr 170 170
M Berat Contoh Kering gr M = K-L 470 545
N Berat Air gr N = J-K 46 47
O Kadar Air (WC) % O = (N/M)*100 9.79 8.59
g KEPADATAN MAKSIMUM
P Berat Isi Contoh Basah ( ∂ Wet ) gr/cc P = I/F -1.255 -1.298
Q Berat Isi Contoh Kering ( ∂ Dry ) gr/cc Q = P/ (1+(O/100)) -1.143 -1.196
R Kepadatan Kering LAB ( ∂ LAB ) gr/cc 1.967 1.967
V Kadar Air Optimum % 11.84 11.84
W Derajat Kepadatan % T = (Q/R)*100 -58.10 -60.79
RATA-RATA

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


BINA MARGA Konsultan Pengawas Kontraktor Pelaksana
Pengawas Lapangan PT.HUTAMA PRIMA
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
Sudarwanto Endi Ramdani BEBEN
NIP. 19590503 199103 1 002 LAB,TEKNISI Quality Control
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
TEST KEPADATAN (Sand Cone)

KONSULTAN : PT. PURIDIMENSI PAKET : PENINGKATAN JALAN


PARUNGPANJANG-BUNAR

KONTRAKTOR : PT. HUTAMA PRIMA JENIS PEKERJAAN : timbunan pilihan

LOKASI : Segmen 6 00+230 s/d 00+450

TANGGAL : 02-Aug-2016

kiri kiri
No URAIAN
00+305 00+405
VOLUME LUBANG RUMUS
A Berat Pasir Sebelum Tes gr -355 -369
B Berat Pasir Setelah Tes gr 3081 3246
C Berat Pasir Dalam Corong gr 1354 1354
D Berat Pasir Dalam Lubang gr D = A-B-C -4790 -4969
E Berat Isi Pasir ( Ys ) gr/cc 1.456 1.456
F Volume Lubang gr/cc F =D/E -3289.835 -3412.775
BERAT CONTOH DALAM LUBANG
G Berat Contoh + Pan gr
H Berat Pan gr
I Berat Contoh gr I = G-H 4216 3945
KADAR AIR ( WC )
J Berat Contoh Basah + Pan gr 668 872
K Berat Contoh Kering + Pan gr 623 812
L Berat Pan gr 170 170
M Berat Contoh Kering gr M = K-L 453 642
N Berat Air gr N = J-K 45 60
O Kadar Air (WC) % O = (N/M)*100 9.93 9.35
g KEPADATAN MAKSIMUM
P Berat Isi Contoh Basah ( ∂ Wet ) gr/cc P = I/F -1.282 -1.156
Q Berat Isi Contoh Kering ( ∂ Dry ) gr/cc Q = P/ (1+(O/100)) -1.166 -1.057
R Kepadatan Kering LAB ( ∂ LAB ) gr/cc 1.967 1.967
V Kadar Air Optimum % 11.84 11.84
W Derajat Kepadatan % T = (Q/R)*100 -59.26 -53.74
RATA-RATA

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


BINA MARGA Konsultan Pengawas Kontraktor Pelaksana
Pengawas Lapangan PT.HUTAMA PRIMA
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
Sudarwanto Endi Ramdani BEBEN
NIP. 19590503 199103 1 002 LAB,TEKNISI Quality Control
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
TEST KEPADATAN (Sand Cone)

KONSULTAN : PT. PURIDIMENSI PAKET : PENINGKATAN JALAN


PARUNGPANJANG-BUNAR

KONTRAKTOR : PT. HUTAMA PRIMA JENIS PEKERJAAN : timbunan pilihan

LOKASI : Segmen 6 00+450 s/d 00+550

TANGGAL : 03-Aug-2016

kanan
No URAIAN
00+525
VOLUME LUBANG RUMUS
A Berat Pasir Sebelum Tes gr -379
B Berat Pasir Setelah Tes gr 3270
C Berat Pasir Dalam Corong gr 1354
D Berat Pasir Dalam Lubang gr D = A-B-C -5003
E Berat Isi Pasir ( Ys ) gr/cc 1.456
F Volume Lubang gr/cc F =D/E -3436.126
BERAT CONTOH DALAM LUBANG
G Berat Contoh + Pan gr
H Berat Pan gr
I Berat Contoh gr I = G-H 3892
KADAR AIR ( WC )
J Berat Contoh Basah + Pan gr 654
K Berat Contoh Kering + Pan gr 611
L Berat Pan gr 170
M Berat Contoh Kering gr M = K-L 441
N Berat Air gr N = J-K 43
O Kadar Air (WC) % O = (N/M)*100 9.75
g KEPADATAN MAKSIMUM
P Berat Isi Contoh Basah ( ∂ Wet ) gr/cc P = I/F -1.133
Q Berat Isi Contoh Kering ( ∂ Dry ) gr/cc Q = P/ (1+(O/100)) -1.032
R Kepadatan Kering LAB ( ∂ LAB ) gr/cc 1.967
V Kadar Air Optimum % 11.84
W Derajat Kepadatan % T = (Q/R)*100 -52.47
RATA-RATA

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


BINA MARGA Konsultan Pengawas Kontraktor Pelaksana
Pengawas Lapangan PT.HUTAMA PRIMA
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
Sudarwanto Endi Ramdani BEBEN
NIP. 19590503 199103 1 002 LAB,TEKNISI Quality Control
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
TEST KEPADATAN (Sand Cone)

KONSULTAN : PT. PURIDIMENSI PAKET : PENINGKATAN JALAN


PARUNGPANJANG-BUNAR

KONTRAKTOR : PT. HUTAMA PRIMA JENIS PEKERJAAN : timbunan pilihan

LOKASI : Segmen 6 00+000 s/d 00+230

TANGGAL : 14-Aug-2016

kiri kiri
No URAIAN
00+075 00+175
VOLUME LUBANG RUMUS
A Berat Pasir Sebelum Tes gr -400 -414
B Berat Pasir Setelah Tes gr 3198 3443
C Berat Pasir Dalam Corong gr 1354 1354
D Berat Pasir Dalam Lubang gr D = A-B-C -4952 -5211
E Berat Isi Pasir ( Ys ) gr/cc 1.456 1.456
F Volume Lubang gr/cc F =D/E -3401.099 -3578.984
BERAT CONTOH DALAM LUBANG
G Berat Contoh + Pan gr
H Berat Pan gr
I Berat Contoh gr I = G-H 3987 3583
KADAR AIR ( WC )
J Berat Contoh Basah + Pan gr 766 487
K Berat Contoh Kering + Pan gr 713 459
L Berat Pan gr 170 170
M Berat Contoh Kering gr M = K-L 543 289
N Berat Air gr N = J-K 53 28
O Kadar Air (WC) % O = (N/M)*100 9.76 9.69
g KEPADATAN MAKSIMUM
P Berat Isi Contoh Basah ( ∂ Wet ) gr/cc P = I/F -1.172 -1.001
Q Berat Isi Contoh Kering ( ∂ Dry ) gr/cc Q = P/ (1+(O/100)) -1.068 -0.913
R Kepadatan Kering LAB ( ∂ LAB ) gr/cc 1.967 1.967
V Kadar Air Optimum % 11.84 11.84
W Derajat Kepadatan % T = (Q/R)*100 -54.30 -46.40
RATA-RATA

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


BINA MARGA Konsultan Pengawas Kontraktor Pelaksana
Pengawas Lapangan PT.HUTAMA PRIMA
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
Sudarwanto Endi Ramdani BEBEN
NIP. 19590503 199103 1 002 LAB,TEKNISI Quality Control
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
TEST KEPADATAN (Sand Cone)

KONSULTAN : PT. PURIDIMENSI PAKET : PENINGKATAN JALAN


PARUNGPANJANG-BUNAR

KONTRAKTOR : PT. HUTAMA PRIMA JENIS PEKERJAAN : timbunan pilihan

LOKASI : Segmen 6 00+225 s/d 00+475

TANGGAL : 15-Aug-2016

kiri kiri
No URAIAN
00+300 00+400
VOLUME LUBANG RUMUS
A Berat Pasir Sebelum Tes gr -424 -438
B Berat Pasir Setelah Tes gr 3339 3097
C Berat Pasir Dalam Corong gr 1354 1354
D Berat Pasir Dalam Lubang gr D = A-B-C -5117 -4889
E Berat Isi Pasir ( Ys ) gr/cc 1.456 1.456
F Volume Lubang gr/cc F =D/E -3514.423 -3357.830
BERAT CONTOH DALAM LUBANG
G Berat Contoh + Pan gr
H Berat Pan gr
I Berat Contoh gr I = G-H 3692 4016
KADAR AIR ( WC )
J Berat Contoh Basah + Pan gr 654 873
K Berat Contoh Kering + Pan gr 615 822
L Berat Pan gr 170 170
M Berat Contoh Kering gr M = K-L 445 652
N Berat Air gr N = J-K 39 51
O Kadar Air (WC) % O = (N/M)*100 8.76 7.82
g KEPADATAN MAKSIMUM
P Berat Isi Contoh Basah ( ∂ Wet ) gr/cc P = I/F -1.051 -1.196
Q Berat Isi Contoh Kering ( ∂ Dry ) gr/cc Q = P/ (1+(O/100)) -0.966 -1.109
R Kepadatan Kering LAB ( ∂ LAB ) gr/cc 1.967 1.967
V Kadar Air Optimum % 11.84 11.84
W Derajat Kepadatan % T = (Q/R)*100 -49.10 -56.39
RATA-RATA

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


BINA MARGA Konsultan Pengawas Kontraktor Pelaksana
Pengawas Lapangan PT.HUTAMA PRIMA
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
Sudarwanto Endi Ramdani BEBEN
NIP. 19590503 199103 1 002 LAB,TEKNISI Quality Control
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
TEST KEPADATAN (Sand Cone)

KONSULTAN : PT. PURIDIMENSI PAKET : PENINGKATAN JALAN


PARUNGPANJANG-BUNAR

KONTRAKTOR : PT. HUTAMA PRIMA JENIS PEKERJAAN : timbunan pilihan

LOKASI : Segmen 6 00+475 s/d 00+550

TANGGAL : 16-Aug-2016

kiri
No URAIAN
00+495
VOLUME LUBANG RUMUS
A Berat Pasir Sebelum Tes gr -448
B Berat Pasir Setelah Tes gr 3157
C Berat Pasir Dalam Corong gr 1354
D Berat Pasir Dalam Lubang gr D = A-B-C -4959
E Berat Isi Pasir ( Ys ) gr/cc 1.456
F Volume Lubang gr/cc F =D/E -3405.907
BERAT CONTOH DALAM LUBANG
G Berat Contoh + Pan gr
H Berat Pan gr
I Berat Contoh gr I = G-H 3976
KADAR AIR ( WC )
J Berat Contoh Basah + Pan gr 687
K Berat Contoh Kering + Pan gr 640
L Berat Pan gr 170
M Berat Contoh Kering gr M = K-L 470
N Berat Air gr N = J-K 47
O Kadar Air (WC) % O = (N/M)*100 10.00
g KEPADATAN MAKSIMUM
P Berat Isi Contoh Basah ( ∂ Wet ) gr/cc P = I/F -1.167
Q Berat Isi Contoh Kering ( ∂ Dry ) gr/cc Q = P/ (1+(O/100)) -1.061
R Kepadatan Kering LAB ( ∂ LAB ) gr/cc 1.967
V Kadar Air Optimum % 11.84
W Derajat Kepadatan % T = (Q/R)*100 -53.95
RATA-RATA

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


BINA MARGA Konsultan Pengawas Kontraktor Pelaksana
Pengawas Lapangan PT.HUTAMA PRIMA
HIMPUNAN MAHASISWA SIPIL
FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
Sudarwanto Endi Ramdani BEBEN
NIP. 19590503 199103 1 002 LAB,TEKNISI Quality Control
GRAFIK KOREKSI KEPADATAN

PT. HUTAMA PRIMA UNTUK MATERIAL KASAR


J l. M etro Duta Niag a Blo k IIB/A3 Po nd o k Ind ah J akarta, (0 2 1) 76 6 9 50 1 REFERENSI : AASHTO T 224 - 67
J l. Po o l Bina M arg a, Kayumanis Tanah Sereal Bo g o r, (0 2 51) 753 59 8 6 NO. FORMAT

PAKET PENINGKATAN JALAN


CONSULTANT : PT. PURIDIMENSI PARUNGPANJANG-BUNAR

JENIS PEKERJAAN Lapis Pondasi Aggregat Klas A


LOKASI caringin
CONTRACTOR : PT. HUTAMA PRIMA
TANGGAL TES 5/22/2015
DITES OLEH beben

2.446 2.8

BULK SP. GR.


2.7
2.283
2.6
MAXIMUM DRY DENSITY ( gr/cm3 )

MDD (Lab)
2.120 2.5

2.4
1.957 % Ret No 4(Lab)

1.794

1.631 C

E
1.468 A

0 10 20 30 40 50 60 70 80
B D
PERCENT COARSE PARTICLES

REMARKS :

STATION
A MDD ( Lab ) gr/cm3 2.016 2.016
B Percent Tertahan No. 4 ( Lab ) % 54.05 54.05
C Berat Jenis 2.723 2.723
D Percent Tertahan No. 4 ( Field ) % 55.44 57.86
E Koreksi MDD gr/cm3 2.031 2.044
F Hasil Kepadatan %

CONTRACTOR CONSULTANT OWNER


PEMERINTAH PROVINSI JAWA BARAT
DINAS BINA MARGA PT. HUTAMA PRIMA
KEGIATAN PENINGKATAN JALAN DAN JEMBATAN PROVINSI Jl. M etro Duta Niag a Blo k IIB/A3 Pond ok Ind ah Jakarta, (0 21) 76 6 9 50 1
BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN I Jl. Po ol Bina Marg a, Kayumanis Tanah Sereal Bo g or, (02 51) 753 59 8 6

TEST KEPADATAN (Sand Cone)

KONSULTAN : PT. PURIDIMENSI PAKET : PENINGKATAN JALAN PARUNGPANJANG-


BUNAR

KONTRAKTOR : PT. HUTAMA PRIMA JENIS PEKERJAAN : AGREGAT KELAS A

LOKASI :

TANGGAL : 22-May-2015

No URAIAN
02+000 01+950
VOLUME LUBANG RUMUS
A Berat Pasir Sebelum Tes gr 7191 7163
B Berat Pasir Setelah Tes gr 3986 3456
C Berat Pasir Dalam Corong gr 1354 1354 1354 1354
D Berat Pasir Dalam Lubang gr D = A-B-C 1851 2353
E Berat Isi Pasir ( Ys ) gr/cc 1.456 1.456 1.456 1.456
F Volume Lubang gr/cc F =D/E 1271.291 1616.071
BERAT CONTOH DALAM LUBANG
G Berat Contoh + Pan gr
H Berat Pan gr
I Berat Contoh gr I = G-H 2805 3574
KADAR AIR ( WC )
J Berat Contoh Basah + Pan gr 485 587
K Berat Contoh Kering + Pan gr 460 557
L Berat Pan gr 170 170
M Berat Contoh Kering gr M = K-L 290 387
N Berat Air gr N = J-K 25 30
O Kadar Air (WC) % O = (N/M)*100 8.62 7.75
KEPADATAN MAKSIMUM
P Berat Isi Contoh Basah ( ∂ Wet ) gr/cc P = I/F 2.206 2.212
Q Berat Isi Contoh Kering ( ∂ Dry ) gr/cc Q = P/ (1+(O/100)) 2.031 2.052
R Kepadatan Kering LAB ( ∂ LAB ) gr/cc 2.016 2.016 2.016 2.016
S Berat Tertahan Saringan #4 gr 1555 2068
T Persentase Tertahan Saringan #4 % 55.44 57.86
U Koreksi MDD gr/cc 2.031 2.044
V Kadar Air Optimum % 9.48 9.48 9.48 9.48
W Derajat Kepadatan % T = (Q/R)*100 100.02 100.41
RATA-RATA

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


BINA MARGA Konsultan Pengawas Kontraktor Pelaksana
Pengawas Lapangan PT.HUTAMA PRIMA

Sudarwanto 0 Bayu Rosma Rahayu


NIP. 19590503 199103 1 002 LAB,TEKNISI 0
GRAFIK KOREKSI KEPADATAN

PT. HUTAMA PRIMA UNTUK MATERIAL KASAR


J l. M etro Duta Niag a Blo k IIB/A3 Po nd o k Ind ah J akarta, (0 2 1) 76 6 9 50 1 REFERENSI : AASHTO T 224 - 67
J l. Po o l Bina M arg a, Kayumanis Tanah Sereal Bo g o r, (0 2 51) 753 59 8 6 NO. FORMAT

CONSULTANT : PT. PURIDIMENSI PAKET PENINGKATAN JALAN


PARUNGPANJANG-BUNAR

JENIS PEKERJAAN Lapis Pondasi Aggregat Kelas A


LOKASI #REF!
CONTRACTOR : PT. HUTAMA PRIMA
TANGGAL TES #REF!
DITES OLEH Beben

2.446 2.8

BULK SP. GR.


2.7
2.283
2.6
MAXIMUM DRY DENSITY ( gr/cm3 )

MDD (Lab)
2.120 2.5

2.4
1.957 % Ret No 4(Lab)

1.794

1.631 C

E
1.468 A

0 10 20 30 40 50 60 70 80
B D
PERCENT COARSE PARTICLES

REMARKS :

STATION
A MDD ( Lab ) gr/cm3 2.016 2.016 2.016
B Percent Tertahan No. 4 ( Lab ) % 54.05 54.050 54.05
C Berat Jenis 2.723 2.723 2.723
D Percent Tertahan No. 4 ( Field ) % #REF! #REF! #REF!
E Koreksi MDD gr/cm3 2.013 2.031 2.027
F Hasil Kepadatan %

CONTRACTOR CONSULTANT OWNER


GRAFIK KOREKSI KEPADATAN

PT. HUTAMA PRIMA UNTUK MATERIAL KASAR


J l. M etro Duta Niag a Blo k IIB/A3 Po nd o k Ind ah J akarta, (0 2 1) 76 6 9 50 1 REFERENSI : AASHTO T 224 - 67
J l. Po o l Bina M arg a, Kayumanis Tanah Sereal Bo g o r, (0 2 51) 753 59 8 6 NO. FORMAT

PAKET PENINGKATAN JALAN


CONSULTANT : PT. PURIDIMENSI PARUNGPANJANG-BUNAR

JENIS PEKERJAAN Lapis Pondasi Aggregat Klas A


LOKASI #REF!
CONTRACTOR : PT. HUTAMA PRIMA
TANGGAL TES #REF!
DITES OLEH Beben

2.446 2.8

BULK SP. GR.


2.7
2.283
2.6
MAXIMUM DRY DENSITY ( gr/cm3 )

MDD (Lab)
2.120 2.5

2.4
1.957 % Ret No 4(Lab)

1.794

1.631 C

E
1.468 A

0 10 20 30 40 50 60 70 80
B D
PERCENT COARSE PARTICLES

REMARKS :

STATION
A MDD ( Lab ) gr/cm3 2.016 2.016 2.016
B Percent Tertahan No. 4 ( Lab ) % 54.05 54.05 54.05
C Berat Jenis 2.723 2.723 2.723
D Percent Tertahan No. 4 ( Field ) % #REF! #REF! #REF!
E Koreksi MDD gr/cm3 2.031 2.015 2.028
F Hasil Kepadatan %