LEMBAR PERHITUNGAN

SATKER : OPERASI DAN PEMELIHARAAN SDA MALUKU PROVINSI MALUKU


PPK : OPERASI DAN PEMELIHARAAN SDA II
NAMA PEKERJAAN : PELAKSANAAN OP BANGUNAN PENGAMAN PANTAI WAKAL, PULAU AMBON. PROV. MALUKU
ITEM PEKERJAAN :

NO. SKETSA PERHITUNGAN Satuan Kuantitas

1. PEKERJAAN GALIAN TANAH

P1 100.00 M
1.10
11 M
P2 M
@ 100.00 M
1.0 M

= 1.00 + 1.10 x 1.10 x 100.00 M3 115.50


1.00
10 M
2

2. PEKERJAAN PASANGAN BATU


0.55
0.60
T1 0.40 + 0.55 x 0.40 x 100.00 19.00
2
0.25
0.40
0.55 x 0.25 x 100.00 x 13.75
0.65
0.9
0.90 x 0.85 x 100.00 76.50
0.40 + 0.80 x 0.20 x 100.00 12.00
2
0.40
0.40
Volume Pasangan Batu M3 121.25

Existing
3. PEKERJAAN PLESTERAN
0.40

= 1.30 + 2.00 x 100.00 330.00


0.2

Volume Total Plesteran M2 330.00

0.8

0.80