Anda di halaman 1dari 11

KETERANGAN

LOKASI
REPUBLIK INDONESIA

110.0m
DERMAGA 10
66
DERMAm
GA 09
44
DERMAm
G A 08
55 DERMA
DERMAm GA EKS
IS
GA 07 TING
25
DERMAm
GA 06 18m
DERMA
GA 05
PLATFORM 65
DERMAm
PLATFORM GA 04

PLATFORM KOORDINAT UTM & ELEVASI BENCH MARK

TIMBUNAN DG SSP TIMB. DG SSP TIMB. DG SSP TIMB. DG SSP

PETI KE
REFERENSI ELEVASI

PETI KE
PETI KE

PETI KE

PETI KE
PETI KE

PETI KE

MAS

MAS
MAS

MAS

MAS
Sta. Pasang Surut TUAL
MAS

PETI KE
PETI KE
MAS

BM 01 = 3.585 METER (LWS)

PETI KE
PETI KE

MAS
MAS
PETI KE

MAS
MAS
+5.090 m (Palm)
HWS
TERMIN +2.495 m LWS
PETI KE

MAS

AL PEN
UMPAN
G
PETI KE

+3.930 m (Palm)
MSL
MAS

+1.335 m MLS

PEMUKIMAN
PETI KE

MAS

+2.595 m (Palm)
LWS

AN
PEMUKIM POS
NOL PALM (PEILSCHALL)

PEMUKIM
MAS

PEMBERI TUGAS
HAN
PELABU
MASUK
JALAN

AN
KEMENTERIAN PERHUBUNGAN
IMAN
PEMUK DIREKTORAT KEPELABUHANAN
JALAN MERDEKA BARAT NO 8 JAKARTA 1011

K IMAN
PEMU
NAMA PEKERJAAN

DETAIL ENGINEERING DAN DESAIN


FASILITAS PELABUHAN TUAL

LOKASI

KEL. MASRUM, KEC. PULAU DULLAH SELATAN


KOTA TUAL, PROVINSI MALUKU

GAMBAR :

LAYOUT PLATFORM, PERKERASAN,


LAPANGAN KONTAINER

URAIAN NAMA TANDA TANGAN


Digambar Abdul Muiz
Direncana Mikael Bulen
Diperiksa Sutanto
Disetujui Meta Safitri

SKALA : GBR No. : TL-ST-191


1:100 No. LBR : 206
KONSULTAN

Engineering and Management


KETERANGAN

PLATFORM 3 LOKASI
REPUBLIK INDONESIA

KOORDINAT UTM & ELEVASI BENCH MARK

TIMBUNAN DG SSP REFERENSI ELEVASI

Sta. Pasang Surut TUAL


BM 01 = 3.585 METER (LWS)

5000 5000 5000 5000 5000 5000 5000 +5.090 m (Palm)


HWS
DILATASI DG DOWEL DILATASI DG DOWEL DILATASI DG DOWEL DILATASI DG DOWEL +2.495 m LWS

+3.930 m (Palm)
MSL
+1.335 m MLS

+2.595 m (Palm)
LWS
1500

NOL PALM (PEILSCHALL)

KETERANGAN DESAIN TALUD PENGEMBANGAN =


KETERANGAN PLATFORM: PEMBERI TUGAS
= SHEETPILE DENGAN SSP PROFIL LARSSEN
1. PLAT T=30CM
AU-25 T14MM L=12M KEMENTERIAN PERHUBUNGAN
2. BALOK 90X50CM
3000

DIREKTORAT KEPELABUHANAN
PERKERASAN BETON 30 CM 3. PILECAP 3 TIPE SEPERTI DIBAWAH: JALAN MERDEKA BARAT NO 8 JAKARTA 1011

SUBBASE COARSE 50CM


NAMA PEKERJAAN
PC1 PC2 PC3
1500

DETAIL ENGINEERING DAN DESAIN


FASILITAS PELABUHAN TUAL
900 PERKERASAN BETON 30 CM LOKASI
SUBBASE COARSE 50CM
900 KEL. MASRUM, KEC. PULAU DULLAH SELATAN
KOTA TUAL, PROVINSI MALUKU
ELV. 3,500 MLWS
GAMBAR :
1500

STEEL PIPE PILE DENAH TIMBUNAN DENGAN SSP


PERKERASAN, PLATFORM 3 DAN DETAIL
DIA. 558 T=12MM L=27M

URAIAN NAMA TANDA TANGAN


12M

STEEL SHEET PILE PROFIL LARSSEN Digambar Abdul Muiz


Direncana Mikael Bulen
AU-25 T14MM L=12M
Diperiksa Sutanto
Disetujui Meta Safitri

SKALA : GBR No. : TL-ST-195


1:250
1:200 No. LBR : 210
KONSULTAN

DETAIL POTONGAN TALUD Engineering and Management


KETERANGAN

PER DOWEL PER DOWEL PER DOWEL PER DOWEL

VARIASI
LOKASI
B B REPUBLIK INDONESIA

KOORDINAT UTM & ELEVASI BENCH MARK

5000 5000 5000 5000 5000


REFERENSI ELEVASI

VARIASI Sta. Pasang Surut TUAL


BM 01 = 3.585 METER (LWS)

DENAH PENULANGAN PERKERASAN


A
VARIASI HWS +5.090 m (Palm)
+2.495 m LWS

+3.930 m (Palm)
MSL
+1.335 m MLS

+2.595 m (Palm)
LWS

NOL PALM (PEILSCHALL)

300
PEMBERI TUGAS

KEMENTERIAN PERHUBUNGAN
DIREKTORAT KEPELABUHANAN
D13-150 D13-150 D13-150 D13-150 JALAN MERDEKA BARAT NO 8 JAKARTA 1011

BASE/SUBASE COARSE NAMA PEKERJAAN

DETAIL ENGINEERING DAN DESAIN


FASILITAS PELABUHAN TUAL

POTONGAN A-A LOKASI

KEL. MASRUM, KEC. PULAU DULLAH SELATAN


5000 KOTA TUAL, PROVINSI MALUKU

GAMBAR :

PENULANGAN PERKERASAN TIMBUNAN DENGAN


PER DOWEL PER DOWEL SSP, DAN LAPANGAN PENIMBUNAN KONTAINER

URAIAN NAMA TANDA TANGAN

300
Digambar Abdul Muiz
Direncana Mikael Bulen
Diperiksa Sutanto

D13-150 D13-150 D13-150 D13-150 Disetujui Meta Safitri

SKALA : GBR No. : TL-ST-197


BASE/SUBASE COARSE 1:200
1:50 No. LBR : 212
KONSULTAN

POTONGAN B-B
Engineering and Management
KETERANGAN

0
LOKASI
REPUBLIK INDONESIA

KOORDINAT UTM & ELEVASI BENCH MARK

REFERENSI ELEVASI

DENAH PENULANGAN PLAT PLATFORM 3


Sta. Pasang Surut TUAL
BM 01 = 3.585 METER (LWS)

+5.090 m (Palm)
HWS
+2.495 m LWS

+3.930 m (Palm)
MSL
+1.335 m MLS

+2.595 m (Palm)
LWS

NOL PALM (PEILSCHALL)

PEMBERI TUGAS

KEMENTERIAN PERHUBUNGAN
DIREKTORAT KEPELABUHANAN
VARIASI JALAN MERDEKA BARAT NO 8 JAKARTA 1011

NAMA PEKERJAAN
VARIASI 4000 4000xVARIASI 4000 VARIASI
DETAIL ENGINEERING DAN DESAIN
FASILITAS PELABUHAN TUAL

300
LOKASI
D16-200 D16-200 D16-200 D16-200 D16-200 D16-200

900
600
KEL. MASRUM, KEC. PULAU DULLAH SELATAN
KOTA TUAL, PROVINSI MALUKU

GAMBAR :
POTONGAN A-A
PENULANGAN PLAT PLATFORM 3

URAIAN NAMA TANDA TANGAN


Digambar Abdul Muiz
Direncana Mikael Bulen
Diperiksa Sutanto
Disetujui Meta Safitri

SKALA : GBR No. : TL-ST-200


1:250
1:200 No. LBR : 215
KONSULTAN

Engineering and Management


KETERANGAN

LOKASI
REPUBLIK INDONESIA

KOORDINAT UTM & ELEVASI BENCH MARK

DENAH PENULANGAN PLAT PLATFORM 3

REFERENSI ELEVASI

Sta. Pasang Surut TUAL


BM 01 = 3.585 METER (LWS)
VARIASI
+5.090 m (Palm)
HWS

VARIASI 4000 4000xVARIAS 4000 VARIASI +2.495 m LWS

+3.930 m (Palm)
MSL
+1.335 m MLS

1 2 +2.595 m (Palm)
LWS

NOL PALM (PEILSCHALL)

PEMBERI TUGAS

300
KEMENTERIAN PERHUBUNGAN
DIREKTORAT KEPELABUHANAN

900
JALAN MERDEKA BARAT NO 8 JAKARTA 1011

500
NAMA PEKERJAAN

DETAIL ENGINEERING DAN DESAIN


500 0.25L 0.50L 0.25L 500 0.25L 0.50L 0.25L 500 0.25L 0.50L 0.25L 500 FASILITAS PELABUHAN TUAL

POTONGAN A-A LOKASI

1 2
KEL. MASRUM, KEC. PULAU DULLAH SELATAN
KOTA TUAL, PROVINSI MALUKU

BALOK MEMANJANG & MELINTANG


GAMBAR :

TUMPUAN (POT 1-1) LAPANGAN (POT 2-2)


PENULANGAN BALOK PLATFORM 3

URAIAN NAMA TANDA TANGAN


Digambar Abdul Muiz
Direncana Mikael Bulen
Diperiksa Sutanto
Disetujui Meta Safitri

SKALA : GBR No. : TL-ST-203


1:250
1:200 No. LBR : 218
KONSULTAN

Engineering and Management


KETERANGAN

1 1

LOKASI
REPUBLIK INDONESIA

DENAH PILE HEAD TIPE 1 PLATFORM


KOORDINAT UTM & ELEVASI BENCH MARK

REFERENSI ELEVASI

Sta. Pasang Surut TUAL


2 2 BM 01 = 3.585 METER (LWS)

+5.090 m (Palm)
HWS
+2.495 m LWS

+3.930 m (Palm)
MSL
+1.335 m MLS

+2.595 m (Palm)
LWS

NOL PALM (PEILSCHALL)

PEMBERI TUGAS

KEMENTERIAN PERHUBUNGAN
DIREKTORAT KEPELABUHANAN
POTONGAN 2-2 JALAN MERDEKA BARAT NO 8 JAKARTA 1011

NAMA PEKERJAAN

DETAIL ENGINEERING DAN DESAIN


FASILITAS PELABUHAN TUAL

LOKASI

KEL. MASRUM, KEC. PULAU DULLAH SELATAN


KOTA TUAL, PROVINSI MALUKU

GAMBAR :

DETAIL DAN POTONGAN PILE HEAD 1


PLATFORM

URAIAN NAMA TANDA TANGAN


POTONGAN 1-1 Digambar Abdul Muiz
Direncana Mikael Bulen
Diperiksa Sutanto
Disetujui Meta Safitri

SKALA : GBR No. : TL-ST-204


1:25
No. LBR : 219
KONSULTAN

Engineering and Management


KETERANGAN

1 1

LOKASI
REPUBLIK INDONESIA

DENAH PILE HEAD TIPE 2 PLATFORM KOORDINAT UTM & ELEVASI BENCH MARK

REFERENSI ELEVASI

Sta. Pasang Surut TUAL


BM 01 = 3.585 METER (LWS)
2 2

+5.090 m (Palm)
HWS
+2.495 m LWS

+3.930 m (Palm)
MSL
+1.335 m MLS

+2.595 m (Palm)
LWS

NOL PALM (PEILSCHALL)

PEMBERI TUGAS

KEMENTERIAN PERHUBUNGAN
DIREKTORAT KEPELABUHANAN
JALAN MERDEKA BARAT NO 8 JAKARTA 1011

POTONGAN 2-2
NAMA PEKERJAAN

DETAIL ENGINEERING DAN DESAIN


FASILITAS PELABUHAN TUAL

LOKASI

KEL. MASRUM, KEC. PULAU DULLAH SELATAN


KOTA TUAL, PROVINSI MALUKU

GAMBAR :

DETAIL DAN POTONGAN PILE HEAD 2


PLATFORM

URAIAN NAMA TANDA TANGAN


Digambar Abdul Muiz
POTONGAN 1-1 Direncana Mikael Bulen
Diperiksa Sutanto
Disetujui Meta Safitri

SKALA : GBR No. : TL-ST-205


1:25
No. LBR : 220
KONSULTAN

Engineering and Management


KETERANGAN

1
LOKASI
REPUBLIK INDONESIA

KOORDINAT UTM & ELEVASI BENCH MARK

REFERENSI ELEVASI
2 2

DENAH PILE HEAD TIPE 3 PLATFORM Sta. Pasang Surut TUAL


BM 01 = 3.585 METER (LWS)

+5.090 m (Palm)
HWS
+2.495 m LWS

+3.930 m (Palm)
MSL
+1.335 m MLS

+2.595 m (Palm)
LWS

NOL PALM (PEILSCHALL)

PEMBERI TUGAS

KEMENTERIAN PERHUBUNGAN
DIREKTORAT KEPELABUHANAN
JALAN MERDEKA BARAT NO 8 JAKARTA 1011

NAMA PEKERJAAN

DETAIL ENGINEERING DAN DESAIN


FASILITAS PELABUHAN TUAL

LOKASI

KEL. MASRUM, KEC. PULAU DULLAH SELATAN


POTONGAN 2-2 KOTA TUAL, PROVINSI MALUKU

GAMBAR :

POTONGAN 1-1 DETAIL DAN POTONGAN PILE HEAD3


PLATFORM

URAIAN NAMA TANDA TANGAN


Digambar Abdul Muiz
Direncana Mikael Bulen
Diperiksa Sutanto
Disetujui Meta Safitri

SKALA : GBR No. : TL-ST-206


1:25
No. LBR : 221
KONSULTAN

Engineering and Management


KETERANGAN

DILAS TUMPUL
3 LAPIS

DILAS 18 mm

PLAT BAJA t=12MM

POTONGAN 3-3

12.0 M
LOKASI
REPUBLIK INDONESIA

DILAS TUMPUL
3 LAPIS

PLAT PENYAMBUNG
t=10 mm
DILAS 18 mm

KOORDINAT UTM & ELEVASI BENCH MARK


27 M

REFERENSI ELEVASI
DETAIL A. SAMBUNGAN TIANG
Sta. Pasang Surut TUAL
BM 01 = 3.585 METER (LWS)
12.0 M

+5.090 m (Palm)
HWS
+2.495 m LWS

+3.930 m (Palm)
MSL
+1.335 m MLS

PLAT BAJA t=12MM LWS


+2.595 m (Palm)

NOL PALM (PEILSCHALL)

PEMBERI TUGAS

3 KEMENTERIAN PERHUBUNGAN
DIREKTORAT KEPELABUHANAN
JALAN MERDEKA BARAT NO 8 JAKARTA 1011

NAMA PEKERJAAN

DETAIL B. SEPATU TIANG (TYP) DETAIL ENGINEERING DAN DESAIN


3.0 M

FASILITAS PELABUHAN TUAL

LOKASI

KEL. MASRUM, KEC. PULAU DULLAH SELATAN


KOTA TUAL, PROVINSI MALUKU

GAMBAR :

DETAIL, PANJANG DAN SAMBUNGAN TIANG PANCANG


PLATFORM

PELAT PENYAMBUNG
t=10 mm URAIAN NAMA TANDA TANGAN
Digambar Abdul Muiz
DILAS 18 mm Direncana Mikael Bulen
Diperiksa Sutanto
Disetujui Meta Safitri

SKALA : GBR No. : TL-ST-207


NTS
DETAIL POT. SAMB. TIANG No. LBR : 222
KONSULTAN

KONFIGURASI PANJANG DAN SAMBUNGAN TIANG PLATFORM


SKALA NTS Engineering and Management
KETERANGAN

LOKASI

DENAH PENULANGAN PLAT PLATFORM 3


KOORDINAT UTM & ELEVASI BENCH MARK

No Elevasi Tiang Atas Koordinat Posisi Tiang Panjang Tiang Jenis Tiang Pancang Keterangan No Elevasi Tiang Atas Koordinat Posisi Tiang Panjang Tiang Jenis Tiang Pancang Keterangan
x y x y
P1 +1.900 MLWS 249752.100 9376552.474 Tegak 27 m Rencana Tiang Platform 3 Baru P51 +1.900 MLWS 249760.386 9376554.183 Tegak 27 m Rencana Tiang Platform 3 Baru REFERENSI ELEVASI
P2 +1.900 MLWS 249751.867 9376550.671 Tegak 27 m Rencana Tiang Platform 3 Baru P52 +1.900 MLWS 249759.802 9376549.649 Tegak 27 m Rencana Tiang Platform 3 Baru
P3 +1.900 MLWS 249751.356 9376546.704 Tegak 27 m Rencana Tiang Platform 3 Baru P53 +1.900 MLWS 249759.290 9376545.681 Tegak 27 m Rencana Tiang Platform 3 Baru
P4 +1.900 MLWS 249750.845 9376542.737 Tegak 27 m Rencana Tiang Platform 3 Baru P54 +1.900 MLWS 249758.779 9376541.714 Tegak 27 m Rencana Tiang Platform 3 Baru
P5 +1.900 MLWS 249750.334 9376538.769 Tegak 27 m Rencana Tiang Platform 3 Baru P55 +1.900 MLWS 249758.268 9376537.747 Tegak 27 m Rencana Tiang Platform 3 Baru Sta. Pasang Surut TUAL
P6 +1.900 MLWS 249749.822 9376534.802 Tegak 27 m Rencana Tiang Platform 3 Baru P56 +1.900 MLWS 249757.757 9376533.780 Tegak 27 m Rencana Tiang Platform 3 Baru BM 01 = 3.585 METER (LWS)
P7 +1.900 MLWS 249749.311 9376530.835 Tegak 27 m Rencana Tiang Platform 3 Baru P57 +1.900 MLWS 249757.246 9376529.813 Tegak 27 m Rencana Tiang Platform 3 Baru
P8 +1.900 MLWS 249748.800 9376526.868 Tegak 27 m Rencana Tiang Platform 3 Baru P58 +1.900 MLWS 249756.735 9376525.845 Tegak 27 m Rencana Tiang Platform 3 Baru
P9 +1.900 MLWS 249748.289 9376522.901 Tegak 27 m Rencana Tiang Platform 3 Baru P59 +1.900 MLWS 249756.223 9376521.878 Tegak 27 m Rencana Tiang Platform 3 Baru
P10 +1.900 MLWS 249747.778 9376518.933 Tegak 27 m Rencana Tiang Platform 3 Baru P60 +1.900 MLWS 249755.712 9376517.911 Tegak 27 m Rencana Tiang Platform 3 Baru HWS +5.090 m (Palm)
+2.495 m LWS

P11 +1.900 MLWS 249747.267 9376514.966 Tegak 27 m Rencana Tiang Platform 3 Baru P61 +1.900 MLWS 249755.201 9376513.944 Tegak 27 m Rencana Tiang Platform 3 Baru
P12 +1.900 MLWS 249746.755 9376510.999 Tegak 27 m Rencana Tiang Platform 3 Baru P62 +1.900 MLWS 249754.690 9376509.977 Tegak 27 m Rencana Tiang Platform 3 Baru +3.930 m (Palm)
MSL
P13 +1.900 MLWS 249746.244 9376507.032 Tegak 27 m Rencana Tiang Platform 3 Baru P63 +1.900 MLWS 249754.179 9376506.009 Tegak 27 m Rencana Tiang Platform 3 Baru +1.335 m MLS

P14 +1.900 MLWS 249745.733 9376503.065 Tegak 27 m Rencana Tiang Platform 3 Baru P64 +1.900 MLWS 249753.667 9376502.042 Tegak 27 m Rencana Tiang Platform 3 Baru
P15 +1.900 MLWS 249745.222 9376499.097 Tegak 27 m Rencana Tiang Platform 3 Baru P65 +1.900 MLWS 249753.156 9376498.075 Tegak 27 m Rencana Tiang Platform 3 Baru LWS
+2.595 m (Palm)

P16 +1.900 MLWS 249744.711 9376495.130 Tegak 27 m Rencana Tiang Platform 3 Baru P66 +1.900 MLWS 249752.645 9376494.108 Tegak 27 m Rencana Tiang Platform 3 Baru NOL PALM (PEILSCHALL)

P17 +1.900 MLWS 249744.200 9376491.163 Tegak 27 m Rencana Tiang Platform 3 Baru P67 +1.900 MLWS 249752.134 9376490.141 Tegak 27 m Rencana Tiang Platform 3 Baru
P18 +1.900 MLWS 249743.688 9376487.196 Tegak 27 m Rencana Tiang Platform 3 Baru P68 +1.900 MLWS 249751.623 9376486.173 Tegak 27 m Rencana Tiang Platform 3 Baru
P19 +1.900 MLWS 249743.177 9376483.229 Tegak 27 m Rencana Tiang Platform 3 Baru P69 +1.900 MLWS 249751.112 9376482.206 Tegak 27 m Rencana Tiang Platform 3 Baru PEMBERI TUGAS
P20 +1.900 MLWS 249742.666 9376479.261 Tegak 27 m Rencana Tiang Platform 3 Baru P70 +1.900 MLWS 249750.600 9376478.239 Tegak 27 m Rencana Tiang Platform 3 Baru
P21 +1.900 MLWS 249742.155 9376475.294 Tegak 27 m Rencana Tiang Platform 3 Baru P71 +1.900 MLWS 249750.089 9376474.272 Tegak 27 m Rencana Tiang Platform 3 Baru
Tegak Rencana Tiang Platform 3 Baru +1.900 MLWS 249749.578 9376470.305 Tegak Rencana Tiang Platform 3 Baru KEMENTERIAN PERHUBUNGAN
P22 +1.900 MLWS 249741.644 9376471.327 27 m P72 27 m
P23 +1.900 MLWS 249741.132 9376467.360 Tegak 27 m Rencana Tiang Platform 3 Baru P73 +1.900 MLWS 249749.067 9376466.337 Tegak 27 m Rencana Tiang Platform 3 Baru DIREKTORAT KEPELABUHANAN
JALAN MERDEKA BARAT NO 8 JAKARTA 1011
P24 +1.900 MLWS 249740.621 9376463.393 Tegak 27 m Rencana Tiang Platform 3 Baru P74 +1.900 MLWS 249748.556 9376462.370 Tegak 27 m Rencana Tiang Platform 3 Baru
P25 +1.900 MLWS 249740.400 9376461.676 Tegak 27 m Rencana Tiang Platform 3 Baru P75 +1.900 MLWS 249748.059 9376458.514 Tegak 27 m Rencana Tiang Platform 3 Baru
P26 +1.900 MLWS 249744.021 9376458.474 Tegak 27 m Rencana Tiang Platform 3 Baru P76 +1.900 MLWS 249752.097 9376458.554 Tegak 27 m Rencana Tiang Platform 3 Baru NAMA PEKERJAAN
P27 +1.900 MLWS 249744.588 9376462.881 Tegak 27 m Rencana Tiang Platform 3 Baru P77 +1.900 MLWS 249752.523 9376461.859 Tegak 27 m Rencana Tiang Platform 3 Baru
P28 +1.900 MLWS 249745.100 9376466.849 Tegak 27 m Rencana Tiang Platform 3 Baru P78 +1.900 MLWS 249753.034 9376465.826 Tegak 27 m Rencana Tiang Platform 3 Baru
P29 +1.900 MLWS 249745.611 9376470.816 Tegak 27 m Rencana Tiang Platform 3 Baru P79 +1.900 MLWS 249753.545 9376469.793 Tegak 27 m Rencana Tiang Platform 3 Baru DETAIL ENGINEERING DAN DESAIN
P30 +1.900 MLWS 249746.122 9376474.783 Tegak 27 m Rencana Tiang Platform 3 Baru P80 +1.900 MLWS 249754.056 9376473.761 Tegak 27 m Rencana Tiang Platform 3 Baru FASILITAS PELABUHAN TUAL
P31 +1.900 MLWS 249746.633 9376478.750 Tegak 27 m Rencana Tiang Platform 3 Baru P81 +1.900 MLWS 249754.568 9376477.728 Tegak 27 m Rencana Tiang Platform 3 Baru
P32 +1.900 MLWS 249747.144 9376482.717 Tegak 27 m Rencana Tiang Platform 3 Baru P82 +1.900 MLWS 249755.079 9376481.695 Tegak 27 m Rencana Tiang Platform 3 Baru
P33 +1.900 MLWS 249747.656 9376486.685 Tegak 27 m Rencana Tiang Platform 3 Baru P83 +1.900 MLWS 249755.590 9376485.662 Tegak 27 m Rencana Tiang Platform 3 Baru LOKASI
P34 +1.900 MLWS 249748.167 9376490.652 Tegak 27 m Rencana Tiang Platform 3 Baru P84 +1.900 MLWS 249756.101 9376489.629 Tegak 27 m Rencana Tiang Platform 3 Baru
P35 +1.900 MLWS 249748.678 9376494.619 Tegak 27 m Rencana Tiang Platform 3 Baru P85 +1.900 MLWS 249756.612 9376493.597 Tegak 27 m Rencana Tiang Platform 3 Baru
P36 +1.900 MLWS 249749.189 9376498.586 Tegak 27 m Rencana Tiang Platform 3 Baru P86 +1.900 MLWS 249757.123 9376497.564 Tegak 27 m Rencana Tiang Platform 3 Baru KEL. MASRUM, KEC. PULAU DULLAH SELATAN
P37 +1.900 MLWS 249749.700 9376502.553 Tegak 27 m Rencana Tiang Platform 3 Baru P87 +1.900 MLWS 249757.635 9376501.531 Tegak 27 m Rencana Tiang Platform 3 Baru KOTA TUAL, PROVINSI MALUKU
P38 +1.900 MLWS 249750.211 9376506.521 Tegak 27 m Rencana Tiang Platform 3 Baru P88 +1.900 MLWS 249758.146 9376505.498 Tegak 27 m Rencana Tiang Platform 3 Baru
P39 +1.900 MLWS 249750.723 9376510.488 Tegak 27 m Rencana Tiang Platform 3 Baru P89 +1.900 MLWS 249758.657 9376509.465 Tegak 27 m Rencana Tiang Platform 3 Baru
P40 +1.900 MLWS 249751.234 9376514.455 Tegak 27 m Rencana Tiang Platform 3 Baru P90 +1.900 MLWS 249759.168 9376513.433 Tegak 27 m Rencana Tiang Platform 3 Baru GAMBAR :
P41 +1.900 MLWS 249751.745 9376518.422 Tegak 27 m Rencana Tiang Platform 3 Baru P91 +1.900 MLWS 249759.679 9376517.400 Tegak 27 m Rencana Tiang Platform 3 Baru
P42 +1.900 MLWS 249752.256 9376522.389 Tegak 27 m Rencana Tiang Platform 3 Baru P92 +1.900 MLWS 249760.191 9376521.367 Tegak 27 m Rencana Tiang Platform 3 Baru
P43 +1.900 MLWS 249752.767 9376526.357 Tegak 27 m Rencana Tiang Platform 3 Baru P93 +1.900 MLWS 249760.702 9376525.334 Tegak 27 m Rencana Tiang Platform 3 Baru KOORDINAT TIANG PANCANG
P44 +1.900 MLWS 249753.279 9376530.324 Tegak 27 m Rencana Tiang Platform 3 Baru P94 +1.900 MLWS 249761.213 9376529.301 Tegak 27 m Rencana Tiang Platform 3 Baru PLATFORM 3
P45 +1.900 MLWS 249753.790 9376534.291 Tegak 27 m Rencana Tiang Platform 3 Baru P95 +1.900 MLWS 249761.724 9376533.269 Tegak 27 m Rencana Tiang Platform 3 Baru
P46 +1.900 MLWS 249754.301 9376538.258 Tegak 27 m Rencana Tiang Platform 3 Baru P96 +1.900 MLWS 249762.235 9376537.236 Tegak 27 m Rencana Tiang Platform 3 Baru
P47 +1.900 MLWS 249754.812 9376542.225 Tegak 27 m Rencana Tiang Platform 3 Baru P97 +1.900 MLWS 249762.746 9376541.203 Tegak 27 m Rencana Tiang Platform 3 Baru URAIAN NAMA TANDA TANGAN
P48 +1.900 MLWS 249755.323 9376546.193 Tegak 27 m Rencana Tiang Platform 3 Baru P98 +1.900 MLWS 249763.258 9376545.170 Tegak 27 m Rencana Tiang Platform 3 Baru Digambar Abdul Muiz
P49 +1.900 MLWS 249755.834 9376550.160 Tegak 27 m Rencana Tiang Platform 3 Baru P99 +1.900 MLWS 249763.769 9376549.137 Tegak 27 m Rencana Tiang Platform 3 Baru
Tegak Rencana Tiang Platform 3 Baru Direncana Mikael Bulen
P50 +1.901 MLWS 249756.346 9376554.127 Tegak 27 m Rencana Tiang Platform 3 Baru P100 +1.901 MLWS 249764.280 9376553.105 27 m
Diperiksa Sutanto
Disetujui Meta Safitri

SKALA : GBR No. : TL-KTP-22


NTS
No. LBR : 244
KONSULTAN

Engineering and Management