Anda di halaman 1dari 61

KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN

UNIVERSITAS TANJUNGPURA
FAKULTAS TEKNIK
PROGRAM STUDI SARJANA TEKNIK SIPIL
Jalan Prof. Dr. H. Hadari Nawawi Pontianak 78124 Telp. (0561) 740186 Kotak Pos 1049
Website: http/www.untan.ac.id Website: http://ft.untan.web.id

TUGAS TERSTRUKTUR
ANALISIS STABILITAS & KONSTRUKSI PENAHAN TANAH (TKS-3342)

MATERI: Dinding Penahan Tanah (Retaining Wall) dan Turap (Sheet Pile Wall)

Nama : Gilbert Laurent A. & Hilman Tias

NIM : D1011191082 & D1011191092

DATA PERENCANAAN:
RETAINING WALL SHEET PILE WALL
Sudut permukaan tanah: alfa = 6 derajat Ketinggian eksisting: 10.00m
Jenis Konstruksi: Batukali Jenis Konstruksi: Berjangkar
Ketinggian eksisting: 4m Data untuk Analisis: Lab DB3
Data untuk Analisis: Lab DB1

PERENCANAAN TUGAS TERSTRUKTUR MELIPUTI:


1. Dinding Penahan Tanah (Retaining Wall)
2. Turap (Sheet Pile Wall)

RENCANA TUGAS:
1. Teori dan metode perhitungan yang digunakan untuk merancang Retaining Wall dan
Sheet Pile Wall
2. Perhitungan lengkap Retaining Wall
3. Perhitungan lengkap Sheet Pile Wall
4. Gambar kerja

Catatan :
1. Tugas berlaku 1 (satu) semester.
2. Asistensi pertama dilakukan paling lambat 1 (satu) minggu setelah tugas
diterima/diberikan.
3. Tugas harus diselesaikan (100%) seminggu sebelum menempuh Ujian Akhir Semester.
4. Tugas harus ditulis rapi, dijilid dan melampiri lembar kegiatan bimbingan.

Februari 2022
Pontianak,… .........................2020

Pembimbing Tugas

…………………………………..
NIP.
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
UNIVERSITAS TANJUNGPURA
FAKULTAS TEKNIK
PROGRAM STUDI SARJANA TEKNIK SIPIL
Jalan Prof. Dr. H. Hadari Nawawi Pontianak 78124 Telp. (0561) 740186 Kotak Pos 1049
Website: http/www.untan.ac.id Website: http://ft.untan.web.id

Langkah-langkah perencanaan retaining wall

Batu Kali
1. Gambarkan kondisi eksisting & rencana konstruksi dinding penahan tanah
2. Parameter tanah (engineering properties)
3. Koefisien tekanan tanah
4. Gambarkan distribusi tekanan tanah
5. Tekanan tanah lateral
6. Gaya aktif dan pasif
7. Dimensi dinding penahan tanah
a. Tinjau kondisi terhadap patah konstruksi
b. Tinjau garis tekan berada dalam inti/kern
c. Tinjau tegangan tanah dibawah konstruksi tidak terlampaui
a, b, dan c ambil dimensi TERBESAR
d. Tinjau kondisi terhadap geser
Jika tidak memenuhi maka tambahkan kaki tapak (toe) dan ujung kaki tapak (heel)
8. Gambarkan konstruksi yang sudah dihitung dan diagram distribusi yang sebenarnya
9. Mencari berat konstruksi
10. Mencari gaya aktif dan pasif yang sebenarnya
11. Mencari titik resultante pada diagram tekanan tanah
12. Mencari tegangan ( ) tanah di bawah konstruksi
13. Kontrol terhadap patah pada kaki tapak (toe) & ujung kaki tapak (heel)
14. Kontrol terhadap guling (overturning)
15. Kontrol terhadap geser (sliding)
16. Kontrol terhadap daya dukung tanah (bearing capacity)
17. Mencari tekanan pada masing-masing pias
18. Mencari berat pada masing-masing pias
19. Gambarkan hasil perhitungan tekanan dan berat pada masing-masing pias
20. Rencanakan Drainase pada Dinding Penahan Tanah
21. Gambar lengkap

Beton Bertulang
1. Gambarkan kondisi eksisting & rencana konstruksi dinding penahan tanah
2. Parameter tanah (engineering properties) ; Data Beton dan mutu baja
3. Dimensi proporsional konstruksi penahan tanah
4. Gambarkan distribusi tekanan tanah
5. Analisis konstruksi penahan tanah
- Analisis terhadap stabilitas gaya-gaya eksternal
(Stabilitas guling/overturning; Stabilitas geser/sliding; Daya dukung tanah yang diijinkan
dilampaui/Bearing Capacity Failure)
- Analisis terhadap stabilitas gaya-gaya internal
Tinjauan terhadap desak, tarik dan geser di
➢ tengah dinding tegak (steam) ;
➢ antara dinding tegak dan pelat dasar ;
➢ pelat dasar belakang (heel) ;
➢ pelat dasar muka (toe).
6. Penulangan dinding dan pelat dasar pada konstruksi penahan tanah
7. Rencanakan Drainase pada Dinding Penahan Tanah
8. Gambar lengkap
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
UNIVERSITAS TANJUNGPURA
FAKULTAS TEKNIK
PROGRAM STUDI SARJANA TEKNIK SIPIL
Jalan Prof. Dr. H. Hadari Nawawi Pontianak 78124 Telp. (0561) 740186 Kotak Pos 1049
Website: http/www.untan.ac.id Website: http://ft.untan.web.id

Langkah-langkah perencanaan sheet pile wall :


- Penggambaran kondisi eksisting
- Penggambaran rencana diagram distribusi tekanan tanah dan beban surcharge
- Rencana letak tumpuan jangkar
- Konvesi satuan
- Data untuk perhitungan
- Koefisien tekanan tanah
- Tekanan tanah aktif dan pasif
- Tegangan & gaya2 & momen yang bekerja baik pd kondisi aktif maupun pd kondisi pasif
- Kedalaman pemancangan turap teori dan aktual
- Panjang total turap yang diperlukan
- Gaya pada jangkar
- Momen maksimum
- Dimensi minimal turap
- Dimensi jangkar
- Panjang jangkar
- Perencanaan blok jangkar
- Dimensi tiang turap, balok air dan balok penutup
- Gambar :
➢ Diagram distribusi tekanan tanah dan beban surcharge setelah perhitungan
➢ Turap (sheet pile wall) dan pendukungnya
SUMMARY LABORATORY TEST RESULT
Perencanaan Retaining Wall

γd γm Wn Sr wl wp Ip Classifi Cv qu c ɸ MIT Classification


No No. Sampel Depth (m) Gs e n cation eo Cc Sand Silt Clay

t/m3 t/m3 % % % % % Unified cm2/dt kg/cm2 kg/cm2 (o) 0.06-2.00 0.002-0.06 ≤ 0.002
el Undisturbed : Atterberg Konsolidasi Geser Langsung Hydrometer & Analisa Saringan

1 DB1.1 3,5 - 4 2,379 1,414 1,824 29,02 0,68 0,406 100,000 33,36 24,67 8,69 ML 1,109 0,381 2,563E-03 0,961 0,269 11,750 34,0 46,0 20,0
2 DB1.2 9,5 - 10 2,463 1,495 1,889 26,32 0,65 0,393 100,000 40,12 28,12 12,00 ML 1,021 0,444 3,615E-03 1,175 0,275 15,908 15,0 51,0 34,0
3 DB2.1 3,5 - 4 2,624 1,322 1,848 39,778 0,98 0,496 100,000 40,47 28,23 12,24 ML 1,414 0,312 7,603E-03 1,291 0,176 11,310 42,0 32,0 26,0
4 DB2.2 7,5 - 8 2,629 1,410 1,989 41,068 0,86 0,464 100,000 53,78 28,83 24,95 CH 1,692 0,580 1,987E-03 0,695 0,317 18,159 33,0 32,0 35,0
5 DB3.1 3,5 - 4 2,552 1,492 2,013 34,93 0,71 0,415 100,000 41,68 28,56 13,12 ML 1,438 0,447 2,222E-03 0,404 0,206 12,134 29,0 41,0 30,0
6 DB3.2 7,5 - 8 2,568 1,411 1,838 30,21 0,82 0,450 94,694 36,76 28,19 8,57 ML 1,224 0,386 5,470E-03 1,281 0,248 24,513 28,0 42,0 30,0
SUMMARY LABORATORY TEST RESULT
Perencanaan Sheetpile

γd γm Wn Sr wl wp Ip Classifi Cv qu c ɸ MIT Classification


No No. Sampel Depth (m) Gs e n cation eo Cc Sand Silt Clay

t/m3 t/m3 % % % % % Unified cm2/dt kg/cm2 kg/cm2 (o) 0.06-2.00 0.002-0.06 ≤ 0.002
Sampel Undisturbed : Atterberg Konsolidasi Geser Langsung Hydrometer & Analisa Saringan

1 DB1.1 3.00-3.50 1,862 0,307 1,088 254,512 5,067 0,835 93,53 187,71 82,75 104,96 OH 7,053 2,974 9,799E-04 0,173 0,121 7,632 51,0 31,0 18,0
2 DB1.2 7.00-7.50 1,968 0,432 1,410 226,199 3,553 0,780 100,00 166,48 84,07 82,41 OH 6,554 3,246 3,779E-04 0,074 0,109 9,537 45,0 41,0 14,0
3 DB2.1 5.00-5.50 2,499 0,734 1,531 108,702 2,407 0,706 100,00 91,33 40,43 50,90 MH 4,076 2,797 8,521E-04 0,132 0,093 5,086 30,0 54,0 16,0
4 DB2.2 12.50-13.00 2,604 1,225 1,694 38,320 1,126 0,530 88,60 35,32 24,27 11,05 ML 1,603 0,606 3,168E-04 0,059 0,076 3,947 35,0 50,5 14,5
5 DB3.1 9.00-9.50 2,326 0,918 1,596 73,914 1,535 0,605 100,00 67,22 41,88 25,34 MH 2,730 1,446 8,168E-04 0,174 0,093 5,086 13,5 67,5 19,0
6 DB3.2 12.50-13.00 2,088 0,687 1,505 119,194 2,041 0,671 100,00 108,35 38,81 69,54 OH 3,575 2,437 7,648E-04 0,300 0,149 6,334 38,0 36,0 26,0
7 DB3.3 14.50-15.00 2,506 1,070 1,684 57,436 1,343 0,573 100,00 41,52 27,47 14,05 ML 1,474 0,723 4,023E-04 0,036 0,061 3,776 15,0 65,5 19,5
A
B
C
A
N
A
G
N
O
T
O
P
D
E
F
G
H
FAKULTAS TEKNIK
UNIVERSITAS TANJUNGPURA

TUGAS TERSTRUKTUR

ANALISA STABILITAS DAN


KONSTRUKSI PENAHAN TANAH

DIKERJAKAN OLEH

GILBERT LAURENT ATMADJA NIM. D1011191082

HILMAN TIAS NIM. D1011191092

DOSEN MATA KULIAH

VIVI BACHTIAR, S.T., M.T.


NIP. 197001051997022003

TANAH TIMBUNAN DOSEN PEMBIMBING


JALUR PEJALAN KAKI

0,3 m
0,582 m

0,3 m
VIVI BACHTIAR, S.T., M.T.
NIP. 197001051997022003
DB 1.1
0,2 m

0,15 m
WEEP HOLES
PVC DIAMETER 50 MM
JARAK PER METER 750 MM JUDUL GAMBAR
JALAN RAYA
SALURAN LONGITUDINAL
DETAIL POTONGAN A-A
PIPA PVC DIAMETER 150 MM
TERBUNGKUS MATERIAL GRANULAR 0,3 m RETAINING WALL
0,2 m

0,15 m

KETERANGAN

SKALA NOMOR

1 : 100 3
C:\Users\User\Downloads\Lambang_Universitas_Tanjungpura.png

WEEP HOLES
PVC DIAMETER 50 MM
JARAK PER METER 750 MM FAKULTAS TEKNIK
UNIVERSITAS TANJUNGPURA

TUGAS TERSTRUKTUR

ANALISA STABILITAS DAN


KONSTRUKSI PENAHAN TANAH

DIKERJAKAN OLEH

GILBERT LAURENT ATMADJA NIM. D1011191082

HILMAN TIAS NIM. D1011191092

DOSEN MATA KULIAH

1,3 m VIVI BACHTIAR, S.T., M.T.


NIP. 197001051997022003

DOSEN PEMBIMBING

VIVI BACHTIAR, S.T., M.T.


NIP. 197001051997022003

JUDUL GAMBAR

DETAIL TAMPAK DEPAN


RETAINING WALL

KETERANGAN

2,3 m

0,75 m 0,75 m 0,75 m 0,75 m

SKALA NOMOR

1 : 25 2
WEEP HOLES
JALUR PEJALAN KAKI PVC DIAMETER 50 MM C:\Users\User\Downloads\Lambang_Universitas_Tanjungpura.png

0,582 m
JARAK PER METER 750 MM
0,3 m 0,3 m FAKULTAS TEKNIK
UNIVERSITAS TANJUNGPURA

0,2 m TUGAS TERSTRUKTUR

ANALISA STABILITAS DAN


0,15 m KONSTRUKSI PENAHAN TANAH

DIKERJAKAN OLEH

GILBERT LAURENT ATMADJA NIM. D1011191082

HILMAN TIAS NIM. D1011191092

DOSEN MATA KULIAH

VIVI BACHTIAR, S.T., M.T.


NIP. 197001051997022003

DOSEN PEMBIMBING

VIVI BACHTIAR, S.T., M.T.


NIP. 197001051997022003
4m
JUDUL GAMBAR

DETAIL TAMPAK SAMPING


SALURAN LONGITUDINAL RETAINING WALL

PIPA PVC DIAMETER 150 MM


KETERANGAN
TERBUNGKUS MATERIAL GRANULAR

0,3 m

0,2 m

0,15 m

1m SKALA NOMOR

1 : 20 1
C:\Users\User\Downloads\Lambang_Universitas_Tanjungpura.png

P1 FAKULTAS TEKNIK
UNIVERSITAS TANJUNGPURA
W1
TUGAS TERSTRUKTUR
P2 ANALISA STABILITAS DAN
P1 P2 P3 P4 P5
KONSTRUKSI PENAHAN TANAH
W1
W2
P3 DIKERJAKAN OLEH

W2 GILBERT LAURENT ATMADJA NIM. D1011191082

P4 HILMAN TIAS NIM. D1011191092

W3 DOSEN MATA KULIAH


P5
W3 VIVI BACHTIAR, S.T., M.T.
NIP. 197001051997022003

DOSEN PEMBIMBING
W4
VIVI BACHTIAR, S.T., M.T.
NIP. 197001051997022003

W4
JUDUL GAMBAR

W5
ANALISA BERAT TIAP PIAS

KETERANGAN

W5

SKALA NOMOR

SKALA GAMBAR 1 : 20
SKALA GAYA 1 : 10 4
Section S = Single pile Sectional Mass Moment Elastic Radius of Coating
D = Double pile area of inertia section gyration area1)
modulus
cm2 kg/m cm4 cm3 cm m2/m

AZ®-700 and AZ®-770

AZ 42-700N 18.0 Per S 181.1 142.1 73450 2945 20.14 1.03


14.0
Per D 362.1 284.3 146900 5890 20.14 2.06

499
y y
~425
63.2°
Per m of wall 258.7 203.1 104930 4205 20.14 1.47
1400

AZ 44-700N 19.0 Per S 191.0 149.9 77100 3085 20.09 1.03


15.0
Per D 382.0 299.8 154210 6170 20.09 2.06
500

y y
~425
63.2°
Per m of wall 272.8 214.2 110150 4405 20.09 1.47
1400

AZ 46-700N 20.0 Per S 200.9 157.7 80760 3220 20.05 1.03


16.0
Per D 401.8 315.4 161520 6450 20.05 2.06
501

y y
~425
63.2°
Per m of wall 287.0 225.3 115370 4605 20.05 1.47
1400

22.0
AZ 48-700 Per S 201.9 158.5 83760 3330 20.37 1.02
15.0
y y Per D 403.8 317.0 167510 6660 20.37 2.04
503

63.2°
~426
Per m of wall 288.4 226.4 119650 4755 20.37 1.46
1400

23.0
AZ 50-700 Per S 211.8 166.3 87430 3470 20.32 1.02
16.0
y y Per D 423.6 332.5 174850 6940 20.32 2.04
504

63.2°
~426

1400
Per m of wall 302.6 237.5 124890 4955 20.32 1.46

24.0
AZ 52-700 Per S 221.7 174.1 91100 3610 20.27 1.02
17.0
y y Per D 443.5 348.1 182200 7215 20.27 2.04
505

63.2°
~426

1400
Per m of wall 316.8 248.7 130140 5155 20.27 1.46

1)
One side, excluding inside of interlocks.

Coastal defense project, Colwyn Bay, UK

© VolkerStevin | UK

Z-Sections / 13

Anda mungkin juga menyukai