PEMASUKAN DAN PENGELUARAN

PEMBANGUNAN RUANG KELAS

PEMASUKAN
No Uraian TANGGAL PEMASUKAN PENGELUARAN SALDO

1 Iuran Orang Tua 10,000,000 10,000,000


2 Kas MTs 15,000,000 25,000,000
3 Jariyah Pa Ende 2,850,000 27,850,000
4 Pinjaman Pribadi 4,160,000 32,010,000
5 Pinjaman kas Ujian 3,920,000 35,930,000
6 Ladang Rongsokan 200,000
7 Jariyah Tamim 120,000

TOTAL PEMASUKAN SEMENTARA 36,250,000


-

PENGELUARAN
No Uraian TANGGAL PEMASUKAN PENGELUARAN SALDO
PEMASUKAN SEMENTARA 36,250,000 36,250,000
1 Besi Beton 5,350,000 30,900,000
2 Papan/Kaso 2,924,000 27,976,000
3 Koprok 78,000 27,898,000
4 koprok I dus 158,000 27,740,000
5 Pasir, Seplit, Semen 2,250,000 25,490,000
6 Koprok 150,000 25,340,000
7 Buruh 8 hari 3,360,000 21,980,000
8 Koprok 155,000 21,825,000
9 Supir Besi 30,000 21,795,000
10 Konsumsi minggu ke 1 220,000 21,575,000
11 Koprok 155,000 21,420,000
12 Kusen, Paku, Pasir 3,780,000 17,640,000
13 Pasir, Seplit, Semen 1,030,000 16,610,000
14 Buruh minggu ke 2 2,310,000 14,300,000
15 Koprok 155,000 14,145,000
16 Bonek 10 5,500,000 8,645,000
17 Supir Bonek 40,000 8,605,000
18 Koprok 155,000 8,450,000
19 Belanja barang 1,000,000 7,450,000
20 Buruh Minggu Ke 3 2,160,000 5,290,000
21 Koprok 155,000 5,135,000
22 Bonek 2 1,100,000 4,035,000
23 Buruh Minggu Ke 4 2,520,000 1,515,000
24 Konsumsi 2 minggu 400,000 1,115,000
25 Koprok 155,000 960,000
26 Bayar tunggakan barang 960,000 -
-

TOTAL 36,250,000 36,250,000 -

REKAPITULASI
1 PEMASUKAN 36,250,000
2 PENGELUARAN 36,250,000
3 SALDO -

CATATAN:
No Uraian TANGGAL PEMASUKAN PENGELUARAN SALDO

1. 2 Pintu, 1 kloset dan alat Listrik=belum dibayar


2. Biaya Pengecoran dari Dana Pesantren habis Rp. 28.800.000,-

Terbilang: Lima Puluh Juta Rupiah

Ketua

ADANG MAMAN
PEMASUKAN DAN PENGELUARAN
PEMBANGUNAN RUANG KELAS

PEMASUKAN
No Uraian TANGGAL PEMASUKAN PENGELUARAN SALDO

1 Jariyah Proposal Kelas 12 7,200,000 7,200,000


2 7,200,000
3 7,200,000
4 7,200,000
5 7,200,000
6 7,200,000
7 7,200,000
8 7,200,000
9 7,200,000
TOTAL PEMASUKAN SEMENTARA 7,200,000
-

PENGELUARAN
No Uraian TANGGAL PEMASUKAN PENGELUARAN SALDO
SALDO 7,200,000 7,200,000
1 Rokok dan Kopi 5 hari 5/4/2020 310,000 6,890,000
2 Buruh 5 hari 9/4/2020 2,100,000 4,790,000
3 Rokok 1 pac dan Kopi 2 11/4/2020 153,000 4,637,000
4 Rokok 2 pac dan Kopi 4 13/4/2020 306,000 4,331,000
5 Buruh 6 hari 16/4/2020 2,520,000 1,811,000
6 Bayar Konsumsi 16/04/2020 330,000 1,481,000
7 rokok &kopi 3 hari 16/04/2020 191,000 1,290,000
8 Rokok ,kopi hari 21/04/2020 173,000 1,117,000
9 1,117,000
10 1,117,000
11 1,117,000
12 1,117,000
13 1,117,000
14 1,117,000
15 1,117,000
16 1,117,000
17 1,117,000
18 1,117,000
19 1,117,000
20 1,117,000
21 1,117,000
22 1,117,000
23 1,117,000
24 1,117,000
25 1,117,000
26 1,117,000

TOTAL 7,200,000 6,083,000 1,117,000

REKAPITULASI
1 PEMASUKAN 7,200,000
2 PENGELUARAN 6,083,000
3 SALDO 1,117,000

CATATAN:
1. 2 Pintu, 1 kloset dan alat Listrik=belum dibayar
No Uraian TANGGAL PEMASUKAN PENGELUARAN SALDO

2. Biaya Pengecoran dari Dana Pesantren habis Rp. 28.800.000,-

Terbilang: Lima Puluh Juta Rupiah

Ketua

ADANG MAMAN
RENCANA ANGGARAN BIAYA PEMBANGUNA DAN PENGADAAN SARANA PRASARANA
DINIYAH TAKMILIYAH AWALIYAH AL-BAROKAH

No Uraian Volume Satuan Harga Satuan Jumlah


1 - Triplek 50.00 lembar Rp. 60,000.00 Rp. 3,000,000.00
2 - Paku 5, 7, 10 10.00 Kg Rp. 17,500.00 Rp. 175,000.00
3 - Dempul Kayu 10.00 Kg Rp. 50,000.00 Rp. 500,000.00
4 - Cat Kayu 5.00 Kg Rp. 50,000.00 Rp. 250,000.00
5 - Paku 5-12 10.00 kg Rp. 15,000.00 Rp. 150,000.00
6 - Kaso-Kaso 1.00 m3 Rp. 2,500,000.00 Rp. 2,500,000.00
7 - Bata 1000.00 buah Rp. 650.00 Rp. 650,000.00
8 - Pasir 1.00 truk Rp. 1,000,000.00 Rp. 1,000,000.00
9 - Semen 20.00 zak Rp. 65,000.00 Rp. 1,300,000.00
10 - Closet 2.00 buah Rp. 300,000.00 Rp. 600,000.00
11 - Pintu WC 2.00 kg Rp. 750,000.00 Rp. 1,500,000.00
12 - Kran Air 5.00 m3 Rp. 50,000.00 Rp. 250,000.00
13 - Paralon 1/2 inch 5.00 buah Rp. 30,000.00 Rp. 150,000.00
14 - Bengkokan Paralon 10.00 buah Rp. 5,000.00 Rp. 50,000.00
15 - Paralon 3 Inch 2.00 m3 Rp. 75,000.00 Rp. 150,000.00
16 - Keramik Dinding 18.00 dus Rp. 60,000.00 Rp. 1,080,000.00
17 - Keramik Lantai 4.00 dus Rp. 50,000.00 Rp. 200,000.00
18 - Cat Tembok 10.00 Kg Rp. 25,000.00 Rp. 250,000.00
19 - Kabel 20.00 m Rp. 20,000.00 Rp. 400,000.00
20 - Lampu 10 10.00 buah Rp. 40,000.00 Rp. 400,000.00
21 - Dudukan Lampu 10.00 buah Rp. 15,000.00 Rp. 150,000.00
22 - Saklar 5.00 buah Rp. 15,000.00 Rp. 75,000.00
23 - Meja Guru 2.00 buah Rp. 400,000.00 Rp. 800,000.00
24 - Kursi Guru 2.00 buah Rp. 150,000.00 Rp. 300,000.00
Jumlah Total Rp. 15,880,000.00
120000 6 720000
90000 6 540000

1260000
2
2520000
84000
6
14000
5.18E+11
2.92E+11
5.18E+11