ARSITEKTUR EXISITNG
ARSITEKTUR RENCANA
ARSITEKTUR RENCANA
STRUKTUR
STRUKTUR
ELEKTRIKAL PLUMBING
STRUKTUR
ELEKTRIKAL PLAMBING
TOILET 2 BILIK
AESITEKTUR EXISTING
ELEKTRIKAL PLAMBING
AESITEKTUR RENCANA
STRUKTUR
ELEKTRIKAL PLAMBING
DAFTAR GAMBAR
AESITEKTUR RENCANA
STRUKTUR
LAPANGAN UPACARA BENDERA & TIANG BENDERA
AESITEKTUR
ELEKTRIKAL PLAMBING
KAWASAN
AESITEKTUR RENCANA
98.00
RABAT BETON
-0.05
RABAT BETON
-0.06
34.00 5.90 2.00
RABAT BETON
-0.17 RABAT BETON
-0.05
PARKIRAN
KELAS I KELAS PARTISI
TRIPLEK
KELAS KELAS KELAS KELAS RUANG
-0.17
TOILET
TOILET
V V1 GURU
-0.17
-0.17
RABAT BETON
+0.00 II IV III -0.16 -0.16
-0.15
TOILET
TOILET
-0.15
-0.17
-0.17
+0.00 +0.00 +0.00 40.0000
RABAT BETON
-0.06
TERAS
-0.15
39.9426 -0.30
POT TERAS
-0.45
BUNGA -0.05
+0.60
SALURAN
DRAINASE
LAPANGAN UKS
TERAS
RABAT BETON
-0.05
-0.06
VOLI DAN
BATMINTON
-0.25
GERBANG KEDUA
GERBANG UTAMA
JALAN UMUM
LAYOUT EXISTING
1 : 250
LAY
A
B
C
D
E
F
G
H
98.00
G TANDON AIR 3
RABAT BETON
-0.05
H D
RABAT BETON
-0.06
TANDON AIR 2
TANDON AIR 1
RABAT BETON
-0.17 RABAT BETON
-0.05
A C V1 GURU
RABAT BETON
-0.15
40.0000
RABAT BETON
-0.06
TERAS
-0.15
SALURAN
DRAINASE
PAVING BLOK
RABAT BETON
-0.06
B E UKS
TERAS
RABAT BETON
-0.05
F
-0.06
GERBANG KEDUA
GERBANG UTAMA
JALAN UMUM
BLOCK PLAN
1 : 250 LAY
98.00
TANDON AIR 3
TOILET
DISABILITAS RABAT BETON
-0.05
TOILET
RABAT BETON
-0.06
TANDON AIR 2
TANDON AIR 1
RABAT BETON
-0.17 RABAT BETON
-0.05
PARKIRAN
-0.17 KELAS I KELAS PARTISI
TRIPLEK
KELAS KELAS KELAS KELAS RUANG
TOILET
TOILET
V VI GURU
-0.17
-0.17
RABAT BETON
+0.00 II IV III -0.16 -0.16
-0.15
TOILET
TOILET
-0.15
-0.17
-0.17
+0.00 +0.00 +0.00 40.0000
RABAT BETON
-0.06
TERAS
-0.15
PAVING BLOK
RABAT BETON
-0.06
PERPUSTAKAAN
+0.00
LAPANGAN UKS
TERAS
RABAT BETON
-0.05
-0.06
VOLI DAN
BATMINTON
-0.25
GERBANG KEDUA
GERBANG UTAMA
JALAN UMUM
LAYOUT PLAN
1 : 250
LAY
(GEDUNG A)
KELAS 1,2,3,4 GUDANG, PARKIR DAN WC
ARSITEKTUR
EXISTING
RENCANA PEKERJAAN :
1. PEMBONGKARAN ATAP &
PEMASANGAN ATAP BAJA RINGAN
2. PEMBONGKARAN & PEMASANGAN
PLAFOND PVC
3. PEMBONGKARAN & PEKERJAAN
LANTAI SERTA RABAT BETON
A 4. PEMBONGKARAN KUSEN, PINTU
44.27
DAN JENDELA & PEMASANGAN
KUSEN DAN JENDELA ALLUMINIUM
34.00 8.53 5. PENGEROKAN CAT LAMA &
0.50 5.08 7.50 7.50 7.50 5.40 2.26 1.53 1.17 1.48 1.17 1.38 1.40 0.40 PENGECATAN KEMBALI
6. PEKERJAAN INSTALASI
KELISTRIKAN
7. PEKERJAAN INSTALASI APAR
8. PEKERJAAN SANITAIR & SALURAN
0.41
RABAT BETON
1.80 -0.17
0.41
1.00
PARKIRAN
TOILET
-0.17
TOILET
-0.17
-0.17
RABAT BETON
TEMPAT WUDHU
GUDANG
-0.16 -0.16
-0.15
7.30 3.06
-0.02
KELAS I KELAS II KELAS IV KELAS III
TOILET
TOILET
-0.17
+0.00 +0.00 +0.00 +0.00
-0.17
TERAS 1.90
-0.15
0.28
0.41
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
5.00 7.50 7.50 7.50 5.00 2.00 1.50 0.80 1.80 0.80 1.50 1.39
DENAH EXISTING
1 : 100
+ 4.94
0.55
0.50
0.55
2.65
2.35
2.35
+ 3.00
1.80
0.95
LANTAI ± 0.00
LANTAI ± 0.00
2.15
1.95
0.90
7.00
POTONGAN A-A
1 : 100
ARS
SALURAN
DRAINASE
TAMPAK BELAKANG
1 : 100
SALURAN
DRAINASE
TAMPAK DEPAN
1 : 100
ARS
4.80
2.05
1.00
4.80
1.85
ARS
ARSITEKTUR
RENCANA
RENCANA PEKERJAAN :
1. PEMBONGKARAN ATAP &
PEMASANGAN ATAP BAJA RINGAN
2. PEMBONGKARAN & PEMASANGAN
PLAFOND PVC
3. PEMBONGKARAN & PEKERJAAN
LANTAI SERTA RABAT BETON
4. PEMBONGKARAN KUSEN, PINTU
DAN JENDELA & PEMASANGAN
KUSEN DAN JENDELA ALLUMINIUM
5. PENGEROKAN CAT LAMA &
PENGECATAN KEMBALI
6. PEKERJAAN INSTALASI
KELISTRIKAN
7. PEKERJAAN INSTALASI APAR
8. PEKERJAAN SANITAIR & SALURAN
A
42.70
0.40
1.00
2.08
0.40
1.08
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
TOILET
TOILET
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
-0.17
-0.17
PARKIRAN
RABAT BETON
1.50
-0.17
KELAS I KELAS II KELAS IV KELAS III -0.16 -0.16
-0.15
7.30
+0.00 +0.00 +0.00
B +0.00
B
TOILET
TOILET
11.13
-0.17
-0.17
1.50
TERAS 1.80
-0.15
-0.30
POT
-0.45
BUNGA
-0.60
2.00
1.88 RABAT BETON TERAS
-0.17 -0.15
0.40 0.78
SALURAN
DRAINASE
0.40 5.00 7.50 7.50 7.50 7.50 1.08 1.50 1.65 1.62 0.40 1.05
42.70
+ 5.35
+ 5.00
+ 3.65
+ 3.05
CH +3.05 CH +3.05 CH +3.05 CH +3.05 + 2.80
CH +2.95
+ 2.50
CH +2.80
KERAMIK KERAMIK
20/25 20/25
1.35
FFL.±0.00 FFL.±0.00 FFL.±0.00 FFL.±0.00
± 0.00 FFL.±0.15 FFL.±0.15 ± 0.00
FFL.-0.30 - 0.05
- 0.30
POTONGAN B - B
1 : 100
7.17
4.10
3.50
CH +3.50
FFL.±0.00 FFL.-0.05
+ 0.00
POTONGAN A-A
1 : 100
ARS
TAMPAK BELAKANG
1 : 100
KACA
KACA
KACA
PAPAN PAPAN PAPAN PAPAN
SOLID PAPAN PAPAN SOLID SOLID PAPAN SOLID PAPAN
SOLID SOLID SOLID SOLID
TAMPAK DEPAN
1 : 100
C RABAT BETON
42.70
0.40
1.00 C C
2.08
0.40
1.50
7.30
C A A A A D D
11.13
1.50
D D
1.80
2.00
1.88 B B B B
0.40 0.78
0.40 5.00 7.50 7.50 7.50 7.50 1.08 1.50 1.65 1.62 0.40 1.05
42.70
ARS
NTS
42.70
2.08
0.40
1.08
0.78
0.40 5.00 7.50 7.50 7.50 7.50 1.08 1.50 1.65 1.62 0.40 1.05
42.70
ARS
42.70
0.40
1.00
2.08
J1 J1 J1 J1
P2 P2
0.40
1.08
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
1.50
P3 P3
7.30 FG
11.13
1.50
P3 P3
1.80
J2 J2 J2 J2 P1 P1 J2 J2 J2 J2 J2 J2 J2 J2 P1 J2 J2 J2 J2 P1
2.00
1.88
0.40 0.78
0.40 5.00 7.50 7.50 7.50 7.50 1.08 1.50 1.65 1.62 0.40 1.05
42.70
0.05
0.50 0.55
0.05
1.45
KACA
0.85 PAPAN 2.00
PAPAN PAPAN
1.25 SOLID SOLID
1.15
1.10
1.00
1.70
KUSEN ALUMUNIUM WHITE TYPE JMLH KUSEN KAYU TYPE JMLH KUSEN KAYU TYPE JMLH
KUSEN KAYU TYPE JMLH
3.00
3.00
6.80
6.80
FG 1
2.15
2.15
RING BALOK 15X20 RING BALOK 15X20 RING BALOK 15X20 RING BALOK 15X20
10 15
2 P 12 2 P 12 2 P 12
15
20
1 1 1
4Ln =Tumpuan 2 Ln =Tumpuan 4 Ln =Tumpuan
SK P10-100 SK P10-150 SK P10-100
1 : 20
Ln =Bentang
STR
A B C D E
30.00
1.00 1.00
TOILET
DIREKTORAT JENDERAL CIPTA KARYA
TOILET
-0.17
-0.17
PARKIRAN BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
-0.17 0.71 0.71
KELAS I KELAS II KELAS IV KELAS III
7.30 +0.00 +0.00 +0.00 +0.00
TOILET
TOILET
-0.17
-0.17
0.71 0.71
TERAS
-0.15
1.03 1.03 1.03 1.03 1.71 1.71 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.71 1.03 1.03 1.03 1.03 1.71
1
RABAT BETON
-0.17
STR
A B C D E
30.00
0.91
2
7.30
PLAFOND
PVC +2.95
-0.30
1 POT
-0.45
BUNGA
+0.60
2.28
TAMPAK ATAP
1 : 100
STR
RENG BAJA RINGAN
KUDA-KUDA BAJA RINGAN V45.31 T.0,50
C75.75 T.0,75
A B C D E
30.00
0.91
2
7.30
2.28
STR
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
7.00 2.00
STR
DETAIL A DETAIL B
1 : 20 1 : 20 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
DETAIL C
1 : 20
STR
ELEKTRIKAL PLAMBING
RENCANA
DETAIL INSTALASI LISTRIK
42.70
0.40
1.00
2.08
0.40
1.08
1.50
7.30
11.13
1.50
1.80
2.00
1.88
0.40 0.78
0.40 5.00 7.50 7.50 7.50 7.50 1.08 1.50 1.65 1.62 0.40 1.05
42.70
42.70
0.40
1.00
2.08
0.40
1.08
PCV 1''
1.50
7.30
11.13
1.50
1.80
PCV 1''
2.00
1.88
0.40 0.78
0.40 5.00 7.50 7.50 7.50 7.50 1.08 1.50 1.65 1.62 0.40 1.05
42.70
0.40
KE SEPTIC TANK
1.00
2.08
KE SALURAN 0.40
1.50
PCV 4'' PCV 4''
7.30
11.13
1.50
1.80
PCV 1''
2.00
1.88
0.40 0.78
0.40 5.00 7.50 7.50 7.50 7.50 1.08 1.50 1.65 1.62 0.40 1.05
42.70
EP
KODE KETERANGAN JUMLAH
Paku Rivet
TABUNG
2 BUAH
APAR
Paku Rivet
TITIK 2 BUAH
1.20
APAR
Lantai
NTS
0.40
1.00
2.08
0.40
1.08
1.50
7.30
11.13
1.50
1.80
2.00
1.88
0.40 0.78
0.40 5.00 7.50 7.50 7.50 7.50 1.08 1.50 1.65 1.62 0.40 1.05
42.70
7.50
PERPUSTAKAAN SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
+0.00
A 10.64
A
1.25 TERAS
-0.05
0.90
TAMAN
BUNGA
SALURAN
TAMPAK DEPAN DRAINASE
1 : 65
TAMPAK BELAKANG
1 : 65 SALURAN
DRAINASE
ARS
TAMPAK KANAN
1 : 65
+ 5.77
+ 0.00
7.50 1.80
POTONGAN
1 : 65
TAMPAK KIRI
1 : 65
ARS
10.00
1.00
KERAMIK 40X40
7.50
10.64
1.25
0.90 TAMAN
BUNGA
ARS
10.00
1.00 PLAFOND
PVC +3.52
7.50
PLAFOND
10.64 PVC +3.52
1.25 PLAFOND
PVC +3.00
0.90 TAMAN
BUNGA
ARS
ARSITEKTUR
RENCANA
B
10.40
0.20
A A
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
7.50
PERPUSTAKAAN
+0.00
11.05
1.25 TERAS
-0.05
0.90 TAMAN
BUNGA
0.20
DENAH RENCANA
1 : 100
ARS
SDN 03 SELAT NASIK
KEMENTERIAN PUPR
DIREKTORAT JENDERAL
CIPTA KARYA
2022
TAMPAK DEPAN
1 : 100
SALURAN
DRAINASE
ARS
+ 6.80
+ 3.61
+ 3.00
CH +3.00
+ 2.37
+ 1.04
+ 0.00
POTONGAN A-A
1 : 100
+ 6.80
+ 3.61
+ 3.00
CH +3.00
+ 0.00
-0.50
POTONGAN B-B
1 : 100
ARS
KETERANGAN
A LANTAI KERAMIK 40x40 (GLASS)
C RABAT BETON
10.40
0.20
1.00 C
7.50
C A C
11.05
1.25
B
0.90
C
0.20
ARS
10.40
0.20
PLAFOND
1.00
PVC +3.00
PLAFOND
7.50 PVC +3.00
11.05
PLAFOND
1.25
PVC +3.00
0.90
0.20
ARS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
NTS
ARS
STRUKTUR
RENCANA
2 P 12 2 P 12 2 P 12
20
RING BALOK 15X20 2 P 12 2 P 12 2 P 12
1 1 1
Ln =Tumpuan
4 2 Ln =Tumpuan 4 Ln =Tumpuan
RING BALOK 15X20
Ln =Bentang
20
TUL. UTAMA 4 Ø-12
TUL. TAMBAHAN -
SENGKANG Ø8 - 150
1 : 20
STR
A B
9.83
0.92 8.00 0.92
2
1.00
1
TAMPAK ATAP
1 : 100
STR
KUDA-KUDA BAJA RINGAN
C75.75 T.0,75
RENG BAJA RINGAN
A B
V45.31 T.0,50
9.83
0.92 8.00 0.92
10.58 7.50
2
1.00
1
STR
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
7.50 1.00
STR
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
DETAIL A DETAIL B
1 : 20 1 : 20
STR
DETAIL C
ELEKTRIKAL PLAMBING
RENCANA
10.40
0.20
1.00
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
7.50
11.05
0.90
0.20
EP
10.40
0.20
1.00
Rabat Beton
Rolag
7.50
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
11.05
Pasir Urug DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
Buis Beton
-0.25 Tanah Dasar
-0.30
50 125 150 50
200
1.25
0.20
DETAIL SALURAN
1 : 20
50
300
50
130 300 130
EP
0.20
1.00
TITIK 1 BUAH
1.20
7.50
APAR
Lantai
11.05
1 : 65
1.25
0.90
0.20
EP
(GEDUNG C)
RUANG KELAS 5
ARSITEKTUR
RENCANA
A
10.80
0.40
1.00 8.00 1.00 0.40
0.40
RABAT BETON
1.00
-0.05
TERAS
1.80
-0.05
0.40
DENAH RENCANA
1 : 100
ARS
TAMPAK DEPAN
1 : 100 TAMPAK BELAKANG KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
1 : 100 BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
ARS
6.84
3.66
3.05
CH +3.05
0.00
-0.50
7.00
POTONGAN A-A
1 : 100
6.84
3.66
3.05
CH +3.05
0.00
-0.50
8.00
POTONGAN B-B
1 : 100 ARS
KETERANGAN
A LANTAI KERAMIK 40x40 (GLASS)
C RABAT BETON
10.80
0.40
1.00 8.00 1.00 0.40
0.40
1.00 C
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
7.00
10.60
C A C
1.80 B
0.40
ARS
10.80
0.40
1.00 8.00 1.00 0.40
0.40
PLAFOND
1.00
PVC +3.05
PLAFOND
1.80 PVC +3.05
0.40
ARS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
NTS
ARS
10.80
0.40
1.00 8.00 1.00 0.40
0.40
1.00
J2 J2 J2
7.00
10.60
J1 J1 P1
1.80
0.40
ARS
0.05
0.05
0.50 0.50
0.05
0.05 1.10
KACA
PAPAN
SOLID PAPAN 0.50
SOLID
0.85
2.70
0.05
2.70 2.70
0.05
PAPAN PAPAN
SOLID SOLID
1.60
1.25
LANTAI ± 0.00 LANTAI ± 0.00 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
KUSEN ALUMUNIUM WHITE TYPE JMLH KUSEN ALUMUNIUM WHITE TYPE JMLH KUSEN ALUMUNIUM WHITE TYPE JMLH
ARS
STRUKTUR
RENCANA
Tebal Selimut Beton Min.20mm
A B
15
10
8.00
15
20
RING BALOK 15X20
2 TUL. UTAMA 4 Ø-12 TUL. UTAMA 4 Ø-12
TUL. TAMBAHAN - TUL. TAMBAHAN -
SENGKANG Ø8 - 150 SENGKANG Ø8 - 150
RING BALOK 15X20
1.50
2 P 12 2 P 12 2 P 12
20
DENAH RENCANA RING BALOK 2 P 12 2 P 12 2 P 12
1 : 40
1 1 1
Ln =Tumpuan
4 2 Ln =Tumpuan 4 Ln =Tumpuan
SK P10-100 SK P10-150 SK P10-100
Ln =Bentang
STR
A B
8.00
1.50
STR
A B
2.01
7.00
2.03
TAMPAK ATAP
1 : 100
STR
KUDA-KUDA BAJA RINGAN
C75.75 T.0,75
RENG BAJA RINGAN
V45.31 T.0,50
A B
2.01
7.00
2.03
STR
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
7.00 1.50
STR
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
DETAIL A DETAIL B SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
1 : 20 1 : 20
DETAIL C STR
1 : 20
ELEKTRIKAL PLAMBING
RENCANA
10.80
0.40
1.00 8.00 1.00 0.40
0.40
1.00
7.00
10.60
1.80
0.40
EP
10.80
0.40
1.00 8.00 1.00 0.40
0.40
RABAT BETON
1.00
-0.05
10.60 KELAS V SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
+0.00
TERAS
1.80
-0.05
0.40
EP
10.80
0.40
1.00 8.00 1.00 0.40
0.40
1.00
TITIK 1 BUAH
1.20
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
7.00
APAR DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
Lantai
10.60
NTS
1.80
0.40
EP
(GEDUNG D)
TOILET 2 BILLIK
ARSITEKTUR
EXISTING
3.85
0.43 1.50 1.50 0.43
0.70
WC WC
3.00 1.60 GURU GURU
0.70
1 : 40
1 : 40
1 : 40 ARS
ARSITEKTUR
RENCANA
3.85
0.43 1.50 1.50 0.43
0.70
A A
WC WC
3.00 1.60 GURU GURU
0.70
ARS
+ 3.67
3.85
0.43 1.50 1.50 0.43
+ 2.60
0.70
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
+ 0.00
0.70
1.50 1.50
3.00
TAMPAK POTONGAN DENAH KERAMIK
1 : 40
1 : 40
ARS
3.85
0.43 1.50 1.50 0.43
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
0.70 BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
3.00 1.60
PLAFOND
PVC
+3.05
0.70
NTS
DENAH PLAFOND
1 : 40
ARS
STRUKTUR
RENCANA
Tebal Selimut Beton Min.20mm
15
20
RING BALOK 15X20 RING BALOK 15X20
1.60
1 : 20
STR
0.56 1.50 1.50 0.56
0.66
1.60
0.66
TAMPAK ATAP
1 : 40
STR
KUDA-KUDA BAJA RINGAN
C75.75 T.0,75
RENG BAJA RINGAN
V45.31 T.0,50
0.56 1.50 1.50 0.56
0.66
1.60
0.66
STR
ELEKTRIKAL PLAMBING
RENCANA
3.85 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
0.70
3.00 1.60
EP
MENARA AIR
biofil
3.85 3.85
0.43 1.50 1.50 0.43 0.43 1.50 1.50 0.43
0.70 0.70
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
0.70 0.70
EP
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
EP
PIPA VENTILASI
MANHOLE
DISINFEKTAN TUBE
MTA
MEGACELL A
MEGACELL B
OUTLET
INLET
VENTILASI
BF-08
EP
TOILET DISABILITAS
ARSITEKTUR
RENCANA
A B
B
3.00
A 2.00 Toilet
ffl ±0.00 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
1.50
Teras
ffl ±0.00
1
ARS
+4.50 +4.50
+3.50 +3.50
+3.00 +3.00
+ 0.00 + 0.00
-1.30 -1.30
A B 3 2 1
ARS
TAMPAK DEPAN TAMPAK SAMPING KANAN
1 : 50 1 : 50 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
ARS
A B
3.00
2.00
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
3.50 SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
1.50
ARS
A B
3.00
2.00
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
3.50 BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
1.50
ARS
A B
3.00
BV1
3
3.50 SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
1.50
ARS
0.05 0.05
0.50 0.50
0.05 0.05
KUSEN ALUMUNIUM WHITE TYPE JMLH KUSEN ALUMUNIUM WHITE TYPE JMLH KUSEN ALUMUNIUM WHITE TYPE JMLH
ARS
STRUKTUR
RENCANA
PONDASI A B
PONDASI BATU GUNUNG
3.00
1.50
STR
0.15
0.80
15
15
20
TUL. UTAMA 4 D-13 TUL. UTAMA 4 D-13 TUL. UTAMA 4 Ø-12
TUL. TAMBAHAN - TUL. TAMBAHAN - TUL. TAMBAHAN -
0.05 SENGKANG D8 - 150 SENGKANG D8 - 150 SENGKANG Ø8 - 150
0.30
0.70
0.90
1 : 20
1 : 20
STR
KOLOM A B
K1 150X150
(KOLOM TOILET DIFABEL)
3.00
3
K1 K1
2
K1 K1
1.50
1
K1 K1
STR
A B
SLOOF
SL = 150 X 200
3.00
3
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
2.00
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
1.50
STR
A B
RING BALOK
RB 100 X 150
3.00
3
RB 10X15
RB 10X15
RB 10X15
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
2.00
2
RB 10X15 RB 10X15
RB 10X15
1.50
1
RB 10X15
STR
A B
3.00
2.00
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
3.50 BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
1.50
TAMPAK ATAP
1 : 50
STR
A B
3.00
2.00
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
3.50 BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
STR
ELEKTRIKAL PLAMBING
RENCANA
A B
3.00
3
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
2.00
3.50
2
DETAIL INSTALASI LISTRIK
1.50
EP
A B
3.00
3.50
2
1.50
EP
PIPA VENTILASI
MANHOLE
DISINFEKTAN TUBE
MTA
MEGACELL A
MEGACELL B
PASIR DIPADATKAN
T = 10CM
OUTLET
INLET
VENTILASI
BF-08
EP
RABAT BETON
1.00
-0.05
1
7.00
KELAS VI
+0.00
TERAS
2.00 -0.05
ARS
TAMPAK DEPAN
1 : 100 TAMPAK BELAKANG
1 : 100
ARS
A B
RABAT BETON
1.00
-0.05
1
TERAS
2.00 -0.05
ARS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
ARS
RUANG GURU
ARSITEKTUR
RENCANA
A B
RABAT BETON
1.00
-0.05
2
3.00
RUANG GURU
+0.00
4.00
TERAS
2.00 -0.05
ARS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
TAMPAK DEPAN DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
1 : 100 TAMPAK BELAKANG SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
1 : 100
ARS
A B
8.00
RABAT BETON
1.00
-0.05
2
3.00
RUANG GURU
+0.00
4.00
TERAS
2.00 -0.05
ARS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
ARS
PAGAR
ARSITEKTUR
RENCANA
TANDON AIR 3
RABAT BETON
-0.05
RABAT BETON
-0.06
TANDON AIR 2
TANDON AIR 1
TOILET
TOILET
V V1 GURU
-0.17
-0.17
RABAT BETON
+0.00 II IV III -0.16 -0.16
-0.15
-0.18 -0.18
TOILET
TOILET
-0.15
-0.17
-0.17
+0.00 +0.00 +0.00
RABAT BETON
-0.06
TERAS
-0.15
-0.30
POT TERAS TERAS TERAS
-0.45
BUNGA -0.05 -0.07 -0.07
+0.60
SALURAN
DRAINASE
5.00
3.75
PAVING BLOK
RABAT BETON
TERAS
-0.06
-0.07
PERPUSTAKAAN
+0.00
LAPANGAN UKS
TERAS
RABAT BETON
-0.05
-0.06
GERBANG KEDUA
GERBANG UTAMA
ARS
PAGAR MENYAMBUNG
PAGAR BRC DARI PAGAR TK
53.50
TANDON AIR 3
RABAT BETON
-0.05
14.00
RABAT BETON
-0.06
TANDON AIR 2
TANDON AIR 1
TOILET
TOILET
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
V V1 GURU
-0.17
-0.17
RABAT BETON
+0.00 II IV III -0.16 -0.16 SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
-0.15
-0.18 -0.18
TOILET
TOILET
-0.15
-0.17
-0.17
+0.00 +0.00 +0.00
RABAT BETON
-0.06
TERAS
-0.15
-0.30
POT TERAS TERAS TERAS
-0.45
BUNGA -0.05 -0.07 -0.07
+0.60
SALURAN
DRAINASE
PAVING BLOK
RABAT BETON
TERAS
-0.06
-0.07
PERPUSTAKAAN
+0.00
LAPANGAN UKS
TERAS
RABAT BETON
-0.05
-0.06
GERBANG KEDUA
GERBANG UTAMA
24.40
PAGAR BRC
ARS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
1.20
0.10
0.80
ARS
1.30 1.30
0.80 0.80
2.40
0.60 0.60
0.50 0.50
0.60 0.60
ARS
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
ARS
0.10 0.05
0.60
0.10
0.20 0.10
0.50 0.80
0.10
0.50
2.70
0.60
0.30 0.30
0.50
0.60
ARS
LAPANGAN UPACARA DAN
TIANG BENDERA
2.61
4.91
5.77
ON
RABAT BET
7.83
6.06
9.31
RABAT BETON
5.21
RABAT BETON
14.12
0.10
ARS
RABAT BETON
0.30
PAVING BLOCK
9.00
29.46
ARS
PIPA Ø2" PIPA Ø2"
STAINLESS STEEL STAINLESS STEEL
PIPA Ø3"
STAINLESS STEEL
PIPA Ø3"
STAINLESS STEEL
PIPA Ø3"
STAINLESS STEEL
20
ARS
PIPA Ø3"
PLAT PENUTUP
PIPA Ø3"
BAUT M12
BETON 1:2:3
55
BETON 1:2:3
ANGKUR Ø10MM
70
PLAT LANTAI
4
ROLAG 1 BATA
ARS
KAWASAN
ARSITEKTUR
RENCANA
98.00
TANDON AIR 3
TOILET
DISABILITAS RABAT BETON
-0.05
TOILET
RABAT BETON
-0.06
TANDON AIR 2
TANDON AIR 1
RABAT BETON
-0.17 RABAT BETON
-0.05
TOILET
TOILET
V VI GURU
-0.17
-0.17
RABAT BETON
+0.00 II IV III -0.16 -0.16
-0.15
TOILET
TOILET
-0.15
-0.17
-0.17
40.0000
+0.00 +0.00 +0.00
RABAT BETON
-0.06
TERAS
-0.15
SALURAN
DRAINASE
PAVING BLOK
RABAT BETON
-0.06
PERPUSTAKAAN
+0.00
LAPANGAN UKS
TERAS
RABAT BETON
-0.05
-0.06
VOLI DAN
BATMINTON
-0.25
GERBANG KEDUA
GERBANG UTAMA
ARS
POHON EKSISTING
FLAMBOYAN (5 BTG)
98.00
TANDON AIR 3
TOILET
DISABILITAS RABAT BETON
-0.05
TOILET
RABAT BETON
-0.06
TANDON AIR 2
RABAT BETON
-0.17 RABAT BETON
-0.05
PARKIRAN
TOILET
TOILET
V VI GURU
-0.17
-0.17
RABAT BETON
+0.00 II IV III -0.16 -0.16
-0.15
TOILET
TOILET
-0.15
-0.17
-0.17
40.0000
+0.00 +0.00 +0.00
RABAT BETON
-0.06
TERAS
-0.15
SALURAN
DRAINASE
PAVING BLOK
RABAT BETON
-0.06
PERPUSTAKAAN
+0.00
LAPANGAN UKS
TERAS
RABAT BETON
-0.05
-0.06
VOLI DAN
BATMINTON
-0.25
GERBANG KEDUA
GERBANG UTAMA
JALAN UMUM
ARS
Manometer Check Valve Ø 75 mm
Gate Valve Ø 75 mm
Ke Menara Air
Air Release Valve Pipa GI Ø 75 mm
Ø 1/2 ''
Pipa GI Ø 75 mm
Kabel Listrik
0.20 Beton Tumbuk 1:3:5
0.52 1.50
3.50
2.00
Cement Grooting
Tanah Liat
Pipa Cassing GI Ø 200 mm
Pompa Submersible
Centering Device
dipasang jarak 6 meter
Cement Grouthing
13.64 2.00 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
Reducer BALAI PRASARANA PERMUKIMAN WILAYAH KEPULAUAN BANGKA BELITUNG
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN PROVINSI KEPULAUAN BANGKA BELITUNG
Gravel
Batu kerikil
Saringan
Stainles steel Low carbon
Dop 3.60 A A
Lubang Bor
Ø 200 mm
DETAIL SUMUR BOR
TAMPOT A-A
1 : 100
DENAH RENCANA SUMUR BOR
1 : 100
ARS