C. Pekerjaan Beton
1 Pek. Beton Rabat Di bawah Poor Plat Tebal 5 cm, camp 1 : 3 : 5 992,261.00
1 M3 RABAT BETON K-100 :
Bahan 230 kg
0.638 m3
0.761 m3
200 ltr
Tenaga 1.200 oh
0.020 oh
`
MUTU BETON K-225 :
BETON MUTU K 225 @ Rp. 1,210,369.00 = Rp. 1,210,369.00
BEKISTING BALOK @ Rp. 1,410,540.00 = Rp. 1,410,540.00
PEMBESIAN 140 @ Rp. 1,777,300.00 = Rp. 1,777,300.00
Jumlah = Rp. 4,398,209.00