BILL OF QUANTITY

Pekerjaan : Pembangunan Gudang Kebun


Area : 15 x 40 m2
Lokasi : Kebun Sei Bangko
Emplasmen : PT.JatimJaya Perkasa
hal 1/5
Price In Total Price In Bobot Progress
No. D E S C R I P T I O N Qty Unit Bobot Progres
( Rp ) ( Rp ) % %
A Pekerjaan Persiapan Gudang Kebun
1 Demobilisasi & Mobilisasi 1.00 Lis 10,000,000 10,000,000 0.943 - -
2 Upah meratakan Area 158.00 m2 5,000 790,000 0.074 - -
3 Upah pasang bowplank dan pengukuran 122.00 m' 15,000 1,830,000 0.173 - -
- Papan 3/4" x 8" 0.20 ton 3,500,000 700,000 0.066 - -
- Kayu 1,5" x 2,5" 0.16 ton 3,500,000 560,000 0.053 - -
- Paku 2" 2.44 kg 16,000 39,040 0.004 - -
Sub Total A 13,919,040 1.313 -
B Pekerjaan Pondasi ( Type duduk 26), K225; 1:2:3
1 Material :
- Kayu Cerucuk dia 4" x 5m ( kayu bakau / mahang ) 156.00 btg 15,000 2,340,000 0.221 - -
- Semen biasa ( KW 1)@ 50 kg 113.59 zak 70,000 7,951,580 0.750 - -
- Pasir cor. 13.53 m3 257,000 3,477,480 0.328 - -
- Batu seplit 15.16 m3 560,000 8,488,771 0.800 - -
- Besi Beton Ø 8mm x 12 m 70.50 kg 8,000 564,000 0.053 - -
- Besi Beton Ø12mm x 12 m 788.84 kg 8,000 6,310,720 0.595 - -
- Anchol bolt Ø⅝ x 300 m 96.00 pcs 75,000 7,200,000 0.679 - -
- Papan & kayu ( bekisting ) 1.92 ton 3,500,000 6,720,000 0.634 - -
- Paku 9.60 kg 16,000 153,600 0.014 - -
- Kawat Beton 17.19 kg 16,000 274,989 0.026 - -
total 1 43,481,140
2 Upah kerja pondasi :
- Galian tanah pondasi 37.44 m3 50,000 1,872,000 0.177 - -
- Lantai kerja tebal 5 cm 1.30 m3 750,000 975,000 0.092 - -
- Cor pondasi & stump + pembesian dan bigisting ( 26 titik) 15.41 m3 750,000 11,553,750 1.090 - -
- Pemancangan kayu cerucuk dia 4" x 5m (6 titik Tiap podasi type duduk) 156.00 btg 12,000 1,872,000 0.177 - -
total 2 16,272,750
Sub Total B 59,753,890 5.635 -
C Pekerjaan Sloof dan Lantai, K225; 1:2:3
I Pekerjaan Sloof
1 Material :
- Kayu Cerucuk dia 4" x 5m ( kayu bakau / mahang ) 274.00 btg 15,000 4,110,000 0.388 - -
- Semen biasa ( KW 1)@ 50 kg 87.92 zak 70,000 6,154,680 0.580 - -
- Pasir cor. 10.47 m3 257,000 2,691,638 0.254 - -
- Batu split 11.02 m3 560,000 6,171,648 0.582 - -
- CNP 100 x 50 x 20 x 2 x 6000mm (83 Batang) 1,774 kg - - - - -
- Besi Beton Ø12mm x 12 m 799.50 pcs 8,000 6,396,000 0.603 - -
- Besi Beton Ø 6mm x 10 m 324.52 kg 8,000 2,596,160 0.245 - -
- Kawat Beton 22.48 kg 16,000 359,686 0.034 - -
- Papan & kayu ( bekisting ) 1.16 ton 3,500,000 4,042,500 0.381 - -
- Paku 5.78 kg 16,000 92,400 0.009 - -
total a 32,614,713
2 Upah kerja sloof dan lantai:
- Galian tanah sloof 10.96 M3 50,000 548,000 0.052 - -
- Pemancangan kayu cerucuk dia 4" x 5m (Jarak 50 cm) 274.00 btg 12,000 3,288,000 0.310 - -
- Lantai kerja tebal 5 cm 1.73 m3 750,000 1,297,500 0.122 - -
- Pek. Cor balok sloof , pembesian + bekisting (4000 x 200 mm) 11.20 M3 750,000 8,400,000 0.792 - -
(Tulanggan Ø12 -6 bh-Ø6-15cm) total b 13,533,500
total I 46,148,213
Price In Total Price In Bobot Progress
No. D E S C R I P T I O N Qty Unit Bobot Progres
( Rp ) ( Rp ) % %
II Pekerjaan Lantai dalam Wiremesh Ø6mm 2 layer & keramik kantor
1 Material :
- Kayu Cerucuk dia 4" x 5m ( kayu bakau / mahang ) 2184.00 btg 15,000 32,760,000 3.089 - -
- Semen biasa ( KW 1)@ 50 kg 820.00 zak 70,000 57,400,000 5.413 - -
- Pasir cor. 97.20 m3 257,000 24,980,400 2.356 - -
- Batu seplit 88.56 m3 560,000 49,593,600 4.677 - -
- Besi wiremesh Ø Y 6mm x 5,4 x 2,1 m x 150 x 150 mm (2 layer) 3,893 kg 11,000 42,824,320 4.038 - -
- Plastik hitam (alas cor) 660.00 m2 5,000 3,300,000 0.311 - -
- Kawat Beton 4.10 kg 16,000 65,600 0.006 - -
- Keramik polos 30 x30 cm 26.00 ktk 85,000 2,210,000 0.208 - -
total c 213,133,920
2 Upah kerja :
- Pemancangan kayu cerucuk dia 4" x 5m 2184.00 btg 12,000 26,208,000 2.471 - -
- Penimbunan tanah, pemadatan dan angkut 60.00 m3 75,000 4,500,000 0.424 - -
( diambil dari tanah sekitar bangunan)
- Pasang plastik hitam (alas cor) 660.00 m2 5,000 3,300,000 0.311 - -
- Lantai kerja tebal 5 cm 30.00 m3 750,000 22,500,000 2.122 - -
- Cor lantai tebal 15cm + tulangan pinishing lantai ( diaci ) 90.00 m3 750,000 67,500,000 6.365 - -
- Pasang keramik lantai kantor (30x30cm) 26.00 m2 45,000 1,170,000 0.110 - -
total d 125,178,000
total II 338,311,920
III Pekerjaan Lantai Selasar, teras Wiremesh Ø6mm 1 layer & keramik teras
1 Material :
- Kayu Cerucuk dia 4" x 5m ( kayu bakau / mahang ) 240.00 btg 15,000 3,600,000 0.339 - -
- Semen biasa ( KW 1)@ 50 kg 82.24 Zak 70,000 5,756,800 0.543 - -
- Pasir cor. 9.56 m3 257,000 2,456,406 0.232 - -
- Batu seplit 11.61 m3 560,000 6,502,272 0.613 - -
- Besi wiremesh Ø Y 6mm x 5,4 x 2,1 m x 150 x 150 mm (1 layer) 556.16 kg 11,000 6,117,760 0.577 - -
- Plastik hitam (alas cor) 46.90 m2 5,000 234,500 0.022 - -
- Kawat Beton 11.12 Kg 16,000 177,971 0.017 - -
- Papan & kayu ( bekisting ) 1.13 Ton 3,500,000 3,937,500 0.371 - -
- Paku 5.63 Kg 16,000 90,000 0.008 - -
- Keramik polos 30 x30 cm 6.00 ktk 85,000 510,000 0.048 - -
total e 29,383,209
2 Upah kerja :
- Pemancangan kayu cerucuk dia 4" x 5m 240.00 btg 12,000 2,880,000 0.272 - -
- Galian tanah drainase 4.24 m3 50,000 212,000 0.020 - -
- Penimbunan tanah, pemadatan dan angkut 45.40 m3 65,000 2,951,000 0.278 - -
( diambil dari tanah sekitar bangunan)
- Pasang plastik hitam (alas cor) 46.90 m2 5,000 234,500 0.022 - -
- Cor Selasar tebal 10cm + tulangan + begisting 8.48 m3 750,000 6,360,000 0.600 - -
pinishing lantai ( diaci )
- Cor lantai teras:10cm + tulangan + begisting 0.60 m3 750,000 450,000 0.042 - -
- Cor lantai drainase:10cm + tulangan + begisting (20 cm x 20 cm ) 2.72 m3 750,000 2,040,000 0.192 - -
- Pasang keramik lantai kantor (30x30cm) 6.00 m2 45,000 270,000 0.025 - -
total f 15,397,500 -
total III 44,780,709 -
Sub Total C ( I + II + III ) 429,240,842 40.478 -
D Pekerjaan Tiang HB 200 X 200 x 8 x 12mm (PC1,PC2,PC3,PC4,PC5) -
1 Upah HB 200 x 200 x 8 x 12 mm (26 titik) 7188.00 kg 4,000 28,752,000 2.711 - -
- HB 200 x 200 x 8 x 12 mm x12mtr (24 titik) 7,188.00 kg 10,500 75,474,000.00 7.117 - -
- Baut Ø 1½ " x 2 " 200.00 pcs 2,500 500,000.00 0.047 - -
- Plate Ø 6mm 65.00 kg 10,000 650,000 0.061 - -

2 Pekerjaan Tiang Teras CNP 150 x 150 x 20 x 2 (Di Selimutri Beton 200 X 200)
Pekerjaan Tiang Teras CNP 150 x 150 x 20 x 2 (Di Selimutri Beton 200 X 200) 2 Titik 0.40 kg 750,000 300,000 0.028 - -
- CNP 150 x 150 x 20 x 2 (200 X 200 )2 Titik 112.40 kg 10,000 1,124,000 0.106 - -
- Semen biasa ( KW 1)@ 50 kg 2.72 Zak 70,000 190,400 0.018 - -
- Pasir cor. 0.22 m3 257,000 55,512 0.005 - -
- Batu seplit 0.33 m3 560,000 183,680 0.017 - -
- Baut Ø 1½ " x 2 " 50.00 pcs 2,500 125,000 0.012 - -
- Plate Ø 6mm 20.00 kg 10,000 200,000 0.019 - -
Sub Total D 107,554,592 9.937 -
E PEKERJAAN STRUKTUR - -
E.1 PEKERJAAN ATAP - -
1 Upah pekerjaan atap Zincalume, rangka + aksesories 832.06 m2 75,000 62,404,500 5.885 - -
2 Atap Zincalume warna hijau (0,3 x 840 x 5280mm) 104.00 lbr 203,280 21,141,120 1.994 - -
3 Atap Zincalume warna hijau (0,3 x 840 x 4270mm) 104.00 lbr 164,395 17,097,080 1.612 - -
4 Atap Zincalume warna hijau (0,3 x 840 x 1953mm) 7.00 lbr 75,460 528,220 0.050 - -
5 Rabung alumzeng (300 x 2400) 20.00 lbr 43,000 860,000 0.081 - -
6 Chanel Galvalume u/ rafter (C85x39x12.5) 1,768.80 m' 9,800 17,334,240 1.635 - -
7 Reng untuk atap; 70x35 1,221.00 m' 7,500 9,157,500 0.864 - -
8 Risplank kalsiboard 9mm (2400 x 200mm) 50.00 lbr 85,000 4,250,000 0.401 - -
9 Self Drilling Screw 10-16x16 mm u/U-Reng ke Rafter 562.50 pcs 160 90,000 0.008 - -
10 Self Drilling Screw 12-14x20 mm u/ Rafter ke Rafter 2,283.00 pcs 225 513,675 0.048 - -
11 Self Drilling Screw 12x45 mm u/ atap zincalume 3,015.00 pcs 750 2,261,250 0.213 - -
Sub Total E 135,637,585 12.791 -
Price In Total Price In Bobot Progress
No. D E S C R I P T I O N Qty Unit Bobot Progres
( Rp ) ( Rp ) % %
F. Pekerjaan Tibim CNP Double Cor 150 x 50 x 20 x 2mm (Beton 200 x 200 K-225 Panjang 158 mtr) -
1 Material :
- Semen biasa ( KW 1)@ 50 kg 42.98 zak 70,000 3,008,320.00 0.284 - -
- Pasir cor. 4.10 kg 257,000 1,052,507.52 0.099 - -
- Batu seplit 7.77 lbr 560,000 4,353,216.00 0.411 - -
- CNP 150 x 50 x 20 x 2 x 6000mm 1367.68 kg 10,000 13,676,800.00 1.290 - -
- Baut Ø 1½ " x 1,5 " 250.00 pcs 1,500 375,000.00 0.035 - -
- Plate Ø 6mm 150.00 pcs 10,000 1,500,000.00 0.141 - -
- Papan & kayu ( bekisting ) 3.20 pcs 3,500,000 11,200,000.00 1.056 - -
- Paku 35.00 pcs 16,000 560,000.00 0.053 - -

2 Upah :
Pek. Cor tibim 200 x 200mm x 158 mtr 6.32 m3 750,000 4,740,000.00 0.447 - -
Sub Total F 40,465,843.52 3.816 -
G. Pekerjaan Sruktur Dinding (Pasangan Batu Bata Merah)+(atap zincalume -
1 Material :
- Semen biasa ( KW 1)@ 50 kg 150.00 zak 70,000 10,500,000.00 0.990 - -
- Pasir cor. 18.00 m3 257,000 4,626,000.00 0.436 - -
- Batu bata merah 25,200.00 pcs 800 20,160,000.00 1.901 - -
- Broti 2x4x4 mtr 1.00 m3 3,500,000 3,500,000.00 0.330 - -
- Atap Zincalume warna hijau (0,3 x 840 x 2000mm) 171.25 lbr 75,460 12,922,525.00 1.219 - -
- Chanel Galvalume (C85x39x12.5) 597.00 m' 9,800 5,850,600.00 0.552 - -
- Self Drilling Screw 12-14x20 mm 4455.00 pcs 750 3,341,250.00 0.315 - -

2 Upah :
Pek. Batu bata merah 280.75 m2 30,000 8,422,500.00 0.794 - -
Pek. Pranca 1.00 lot 2,500,000 2,500,000.00 0.236 - -
Upah pekerjaan Dinding Zincalume, rangka + aksesories 274.00 m2 25,000 6,850,000.00 0.646 - -
Sub Total G 78,672,875.00 7.419 -
H. Pekerjaan Plater Dinding Luar dalam tebal 3 cm -
1 Material :
- Semen biasa ( KW 1)@ 50 kg 166.65 zak 70,000 11,665,458.00 1.100 - -
- Pasir cor. 20.57 m3 257,000 5,287,518.00 0.499 - -
- Broti 2x4x4 mtr 1.00 m3 3,500,000 3,500,000.00 0.330 - -

2 Upah :
Pek. Plaster dinding luar dalam + acian (tebal 3cm) 633.05 m2 31,000 19,624,550.00 1.851 - -
Pek. Pranca 1.00 lot 1,300,000 1,300,000.00 0.123 - -
Sub Total H 41,377,526.00 3.902 -
I. Pekerjaan Cor Kolom Praksit Ring balok 150x150 Beton K-225 -
1 Material :
- Semen biasa ( KW 1)@ 50 kg 19.89 zak 70,000 1,392,300.00 0.131 - -
- Pasir cor. 1.58 m3 257,000 405,931.50 0.038 - -
- Batu seplit 2.40 m3 560,000 1,343,160.00 0.127 - -
- Besi Beton Ø 6mm x 12 m 133.00 kg 8,000 1,064,000.00 0.100 - -
- Besi Beton Ø10mm x 12 m 547.60 kg 8,000 4,380,800.00 0.413 - -
- Broti 2"x2"x4 mtr 1.00 m3 3,500,000 3,500,000.00 0.330 - -
- Teriplek 9mm 10.00 lbr 145,000 1,450,000.00 0.137 - -
- Kawat Beton 13.61 pcs 16,000 217,792.00 0.021 - -
- Paku 7.08 lbr 16,000 113,337.60 0.011 - -

2 Upah :
Pek. Cor kolom praktis , pembesian + bekisting 2.93 m3 750,000 2,193,750.00 0.207 - -
Sub Total I 16,061,071.10 1.515 -
J. Pekerjaan Struktur Dinding (Atap Zincalume) -
1 Material :
- Chanel Galvalume u/ rafter (C85x39x12.5) 435.60 m' 9,800 4,268,880.00 0.403 - -
- Plate Ø 6mm 20.00 kg 18,000 360,000.00 0.034 - -
- Atap Zincalume warna polos (0,3 x 840 x 2000mm) 184.52 lbr 84,700 15,629,166.67 1.474 - -
- Self Drilling Screw 12-14x20 mm u/ Rafter ke Rafter 1170.00 pcs 225 263,250.00 0.025 - -
- Baut Ø 1½ " x 1,5 " 100.00 pcs 1,500 150,000.00 0.014 - -
2 Upah :
Pek. Diding atap zincalume 220.00 m' 25,000 5,500,000.00 0.519 - -
Sub Total J 26,171,296.67 2.468 -
K. Pekerjaan Pintu Besi 3mtr x 4 mtr (2 unit),Pintu kayu,jendela nako -
1 Material :
- UNP 100 x 5mm-6mm(2 batang) 112.40 kg 10,000 1,124,000 0.106 - -
- Besi siku 60 x 60 x 5mm (21 batang) 574.14 kg 10,000 5,741,400 0.541 - -
- Besi beton Ø 16mm 37.92 btg 8,000 303,360 0.029 - -
- Roda + Gatung pintu 1.00 lot 5,000,000 5,000,000 0.472 - -
- Plate Ø 3mm (4 x 8) 9 lembar 630.00 kg 10,000 6,300,000 0.594 - -
- daun Pintu 2000 x 900 mm 4.00 bh 360,000 1,440,000 0.136 - -
- Chanel Galvalume u/ rafter (C85x39x12.5) 22.00 m' 9,800 215,600 0.020 - -
- Kaca nako riben hitam :tebal 5 mm x 150 x 600 40.00 bh 35,000 1,400,000 0.132 - -

2 Upah :
Pek. Pintu Besi 3mtr x 4 mtr (2 unit) 2.00 unit 2,500,000 5,000,000 0.472 - -
Pek. Pintu , Kusen dan kunci 4.00 bh 50,000 200,000 0.019 - -
Upah pekerjaan Jendela + Kusen 40.00 set 10,000 400,000 0.038 - -
Sub Total K 27,124,360 2.558 -
Price In Total Price In Bobot Progress
No. D E S C R I P T I O N Qty Unit Bobot Progres
( Rp ) ( Rp ) % %
L. Pekerjaan Ventilasi -
1 Material :
- Siku 40 x 40 x 4mm 980.00 kg 10,000 9,800,000 0.924 - -
- Besi wiremesh Ø Y 6mm x 5,4 x 2,1 m x 150 x 150 mm 278.08 kg 11,000 3,058,880 0.288 - -
- Baut Ø 5 " 4 x 38 b/n 155.00 pcs 15,000 2,325,000 0.219 - -
- Plate strip 2 x 3 mm 45.00 btg 55,000 2,475,000 0.233 - -
- Cat meni 53.00 kg 33,000 1,749,000 0.165 - -
- Cat finising 53.00 kg 58,000 3,074,000 0.290 - -
2 Upah pekerjaan
Pek. Ventilasi jalusi 158 mtr x 0,5 mtr 158.00 m' 65,000 10,270,000 0.968 - -
Sub Total L 32,751,880 3.089 -
M. Pekerjaan Plafond -
1 Material :
- Rangka Plafond hoiiow 20 x 40 mm 70.00 btg 52,000 3,640,000.00 0.343 - -
- Kalsiboard (2400 x 1200 x 4,5mm) 30.00 lbr 83,000 2,490,000.00 0.235 - -
- Paku (self drilling screw 0,5 x 43-45mm) 2660.00 pcs 250 665,000.00 0.063 - -
2 Upah pekerjaan
Pek. Plafond 60.00 m2 30,000 1,800,000.00 0.170 - -
Sub Total M 8,595,000.00 0.811 -
N. Pekerjaan Instalasi Listrik -
1 Upah pekerjaan listrik 60.00 titik 135,000 8,100,000 0.764 - -
2 Saklar ganda "brocco" Art 6622U 4.00 buah 20,000 80,000 0.008 - -
3 Saklar tunggal "brocco" Art 5163 4.00 buah 25,300 101,200 0.010 - -
4 Stop kontak "brocco" Art 5153 7.00 buah 25,500 178,500 0.017 - -
5 Lampu TL 2 x 20 watt ex. PHILIPS 39.00 buah 275,000 10,725,000 1.011 - -
6 Lampu Sorot 250 watt ex. PHILIPS 4.00 buah 705,000 2,820,000 0.266 - -
7 Kabel listrik NYA 1 x 2.5 mm2 @ 100 m - merah 4.80 rol 320,000 1,536,000 0.145 - -
8 Kabel listrik NYA 1 x 1.5 mm2 @ 100 m - hitam 2.80 rol 225,000 630,000 0.059 - -
9 Pipa listrik PVC 5/8" @ 6 meter 60.00 btg 12,500 750,000 0.071 - -
10 Tee dos 39.00 buah 2,500 97,500 0.009 - -
11 Inbowdus 48.00 buah 1,000 48,000 0.005 - -
12 Elbow pipa 5/8" 25.00 buah 2,000 50,000 0.005 - -
13 Isolasi Unibel Jumbo 4.00 buah 7,500 30,000 0.003 - -
14 MCB 1 Phase 30 A c/w box 4.00 buah 305,000 1,220,000 0.115 - -
Sub Total N 26,366,200 2.486 -
O. Pekerjaan Pengecatan -
1 Pengecatan Dinding,Ventilasi,Plaffon -
a. Dinding dalam 389.10 m2 6,000 2,334,600 0.220 - -
- Cat tembok vinilex - warna white 101.166 kg 22,500 2,276,235 0.215 - -
- Cat Plamur Nippon Paint 'Matex Putih' @ 4kg 16.86 klg 64,000 1,079,104 0.102 - -
b. Dinding Luar 389.10 m2 6,000 2,334,600 0.220 - -
- Cat tembok vinilex - warna tear drop 101.166 kg 22,500 2,276,235 0.215 - -
- Cat air Nippon paint Vinilex 5180 @ 5kg 16.86 klg 112,500 1,896,863 0.179 - -
c. Plaffon 60.00 m2 6,000 360,000 0.034 - -
- Cat tembok vinilex - warna tear drop 15.60 kg 22,500 351,000 0.033 - -
- Cat air Nippon paint Vinilex 5180 @ 5kg 2.60 klg 112,500 292,500 0.028 - -
D Ventilasi & pintu besi 55.00 m2 10,000 550,000 0.052 - -
- Cat minyak Bee brand 1000 - warna coklat 14.300 kg 50,000 715,000 0.067 - -
- Tepung Talak kayu u/Dempul Daun Pintu Kayu 0.286 kg 6,000 1,716 0.000 - -
- Tiner 9.35 liter 22,000 205,700 0.019 - -
- Kuas roll 2.73 buah 22,000 60,066 0.006 - -
2 Pengecatan Pintu,Jendela & Risplank - -
a. Kusen Chanel Pintu & Jendela 29.00 m2 10,000 290,000 0.027 - -
- Cat minyak Bee brand 1000 - warna coklat 7.54 kg 50,000 377,000 0.036 - -
- Tepung Talak kayu u/Dempul Daun Pintu Kayu 0.68 kg 6,000 4,050 0.000 - -
- Tiner 4.93 liter 22,000 108,460 0.010 - -
b. Daun Pintu 9.50 m2 10,000 95,000 0.009 - -
- Cat minyak Bee brand 1000 - warna coklat 2.47 kg 50,000 123,500 0.012 - -
- Tiner 0.35 liter 22,000 7,667 0.001 - -
- Kuas 4" 4.86 bh 16,500 80,223 0.008 - -
Sub Total O 15,819,518 1.492 -
P. Konsumable
- Mata Grinda Potong (chanai besi) dia. 4" 6.00 buah 12,000 72,000 0.007 - -
- Mata Grinda Potong (chanai besi) dia. 14" 4.00 buah 57,000 228,000 0.022 - -
- Kain Amplas no 240 1.00 roll 275,000 275,000 0.026 - -
- Scrap Compount 10" (Plastik) 5.00 pcs 19,250 96,250 0.009 - -
- Scrap Kusen 2.00 set 20,000 40,000 0.004 - -
- Lem Fox Kayu 5.00 kg 42,500 212,500 0.020 - -
Sub Total P 923,750 0.087 -

TOTAL PROGRESS -
TOTAL MATERIAL 703,112,019
BIAYA UPAH KERJA 357,323,250
GRAND TOTAL 1,060,435,269.19
Terbilang,................................................................................................................................................
KOP SURAT PERUSAHAAN
PEMBANGUNAN GUDANG PUPUK PERMANEN 60x18x5 Mtr
DI PT. GRAHADURA LEIDONGPRIMA

SURAT PERNYATAAN TENDER


No. ……………………

Kepada Yth :Corp. Procurement Dept. Head


PT. Bakrie Sumatera Plantation Tbk

Dengan hormat,

Setelah meneliti semua dokumen tender dan gambar untuk pekerjaan tersebut diatas serta memahami seluruh permasalahan dalam aanwijing berikut dengan
berita acaranya, kami dari PT/CV……………………………. menawarkan untuk mensupply / memasok bahan, upah kerja dan membangun serta menjamin
keseluruhan pekerjaaan sesuai gambar kerja dan spesifikasi tehnis serta seluruh ketentuan atau kondisi kontrak dengan nilaI sbb :

PEMBANGUNAN GUDANG PUPUK PERMANEN 60x18x5 Mtr = Rp. -


DI PT. GRAHADURA LEIDONGPRIMA

PPN 10% = Rp. -


Grand Total = Rp. -

(……………………………………………………………………………………………………………..Rupiah)

Detail dan Rekapitulasi Rencana Anggaran Biaya (RAB) terlampir.

Jika tender kami diterima, maka kami akan memulai pekerjaan dalam waktu 14 (empat belas) hari sejak diterimanya Surat Perintah Kerja (Letter of Intent) dari
PT. Bakrie Sumatera Plantation Tbk dan akan menyelesaikan serta menyerahkan seluruh pekerjaan yang tertera di kontrak dalam waktu .... (..........) Minggu
sudah termasuk hari libur nasional terhitung sejak tanggal Surat Perjanjian di tanda tangani.

Kami setuju untuk mengikat diri dengan tender ini selama 90 (sembilan puluh) hari dihitung dari tanggal penawaran untuk menerima hal yang sama dari
penawaran kami ini sebagai dasar dijadikan kontrak hingga berakhirnya masa 90 hari tersebut.

Apabila dokumen persetujuan kontrak belum selesai dipersiapkan dan ditanda tangani, maka surat konfirmasi penerimaan pekerjaan sebagai pemenang tender
akan merupakan dasar pengikatan diri pada kontrak.

Kami sangat mengerti dan memahami bahwa penentuan pemenang tender oleh PT. Bakrie Sumatera Plantation Tbk tidak hanya terikat pada harga penawaran
yang terendah atau termurah saja, tetapi juga berdasarkan hasil verifikasi lainnya.

…………., ….. ......................... 2022

Saksi PT/CV……………………..

Materai
Rp. 10,000

………………………. ………………………………
Direktur
BILL OF QUANTITY

Pekerjaan : Pembangunan Gudang Kebun


Area : 18 x 60 m2
Lokasi : PT. GRAHADURA LEIDONGPRIMA
Emplasment : 1,080.00

Price In Total Price In


No. D E S C R I P T I O N Qty Unit
( Rp ) ( Rp )
A1 Pekerjaan Timbun Tapak
1 Demobilisasi & Mobilisasi 1,280 m³ - -
Sub Total A1 -
A. Pekerjaan Persiapan Gudang Kebun
2 Upah meratakan Area 158.00 m2 5,000 790,000
3 Upah pasang bowplank dan pengukuran 172.00 m' 15,000 2,580,000
- Papan 3/4" x 8" 0.50 ton 3,500,000 1,750,000
- Kayu 1,5" x 2,5" 0.20 ton 3,500,000 700,000
- Paku 2" 3.44 kg 16,000 55,040
Sub Total A 5,875,040
B. Pekerjaan Pondasi ( Type duduk 26) 1:2:3
1 Material :
- Kayu Cerucuk dia 4" x 5m ( kayu bakau / mahang ) 104.00 btg 15,000 1,560,000
- Semen biasa ( KW 1)@ 50 kg 56.93 zak 70,000 3,985,072
- Pasir cor. 6.78 m3 257,000 1,742,799
- Batu seplit 6.96 m3 560,000 3,896,955
- Besi Beton Ø 8mm x 12 m 366.60 kg 8,000 2,932,800
- Besi Beton Ø10mm x 12 m 106.50 kg 8,000 852,000
- Besi Beton Ø6mm x 12 m 39.90 kg 8,000 319,200
- Anchol bolt Ø⅝ x 300 m 104.00 pcs 75,000 7,800,000
- Papan & kayu ( bekisting ) 1.92 ton 3,500,000 6,720,000
- Paku 9.60 kg 16,000 153,600
- Kawat Beton 9.46 kg 16,000 151,392
2 Upah kerja pondasi :
- Galian tanah pondasi 37.44 m3 50,000 1,872,000
- Lantai kerja tebal 5 cm 1.30 m3 750,000 975,000
- Cor pondasi & stump + pembesian,bigisting ( 26 titik) 7.07 m3 750,000 5,304,000
- Pemancangan kayu cerucuk dia 4" x 5m (4titik Tiap podasi type duduk) 104.00 btg 12,000 1,248,000
Sub Total B 39,512,818
C. Pekerjaan Sloof ; 1:2:3
1 Material :
- Kayu Cerucuk dia 4" x 5m ( kayu bakau / mahang ) 312.00 btg 15,000 4,680,000
- Semen biasa ( KW 1)@ 50 kg 95.47 zak 70,000 6,683,040
- Pasir cor. 11.37 m3 275,000 3,127,410
- Batu split 11.51 m3 560,000 6,447,168
- Besi Beton Ø12mm x 12 m 906.10 pcs 8,000 7,248,800
- Besi Beton Ø 6mm x 10 m 319.20 kg 8,000 2,553,600
- Kawat Beton 24.51 kg 16,000 392,096
- Papan & kayu ( bekisting ) 1.16 ton 3,500,000 4,042,500
- Paku 5.78 kg 16,000 92,400
2 Upah kerja sloof dan lantai:
- Galian tanah sloof 18.72 M3 50,000 936,000
- Pemancangan kayu cerucuk dia 4" x 5m (Jarak 50 cm) 312.00 btg 12,000 3,744,000
- Lantai kerja tebal 5 cm 2.34 m3 750,000 1,755,000
- Pek. Cor balok sloof , pembesian + bekisting 11.70 M3 750,000 8,775,000
Sub Total C 50,477,014
D. Pekerjaan Pondasi ( Type duduk Bawah Lantai 112 titik) 1:2:3
1 Material :
- Kayu Cerucuk dia 4" x 5m ( kayu bakau / mahang ) 448.00 btg 15,000 6,720,000
- Semen biasa ( KW 1)@ 50 kg 123.38 zak 70,000 8,636,544
- Pasir cor. 9.80 m3 275,000 2,694,384
- Batu seplit 13.22 m3 560,000 7,405,978
- Besi Beton Ø 8mm x 12 m 488.80 kg 8,000 3,910,400
- Besi Beton Ø10mm x 12 m 454.40 kg 8,000 3,635,200
- Besi Beton Ø6mm x 12 m 276.64 kg 8,000 2,213,120
- Papan & kayu ( bekisting ) 3.84 ton 3,500,000 13,440,000
- Paku 19.20 kg 16,000 307,200
- Kawat Beton 18.86 kg 16,000 301,824
Upah kerja pondasi :
- Galian tanah pondasi 48.38 m3 50,000 2,419,200
- Lantai kerja tebal 5 cm 2.02 m3 750,000 1,512,000
- Cor pondasi & stump + pembesian,bigisting ( 112 titik) 16.13 m3 750,000 12,096,000
- Pemancangan kayu cerucuk dia 4" x 5m (4titik Tiap podasi type duduk) 448.00 btg 12,000 5,376,000
Sub Total D 70,667,850
E. Pekerjaan Pondasi Bawah Lantai & Lantai
1 Material :
- Kayu Cerucuk dia 4" x 5m ( kayu bakau / mahang ) 1,334.00 btg 15,000 20,010,000
- Semen biasa ( KW 1)@ 50 kg 340.17 zak 70,000 23,811,900
- Pasir cor. 27.01 m3 275,000 7,428,713
- Batu split 34.18 m3 560,000 19,142,900
- Besi Beton Ø10mm x 12 m 1,576.20 pcs 8,000 12,609,600
- Besi Beton Ø 6mm x 10 m 965.58 kg 8,000 7,724,640
- Kawat Beton 50.84 kg 16,000 813,370
- Papan & kayu ( bekisting ) 3.26 ton 3,500,000 11,411,400
- Paku 16.30 kg 16,000 260,832
2 Upah kerja sloof dan lantai:
- Galian tanah sloof 50.03 M3 50,000 2,501,250
- Pemancangan kayu cerucuk dia 4" x 5m (Jarak 50 cm) 1,334.00 btg 12,000 16,008,000
- Lantai kerja tebal 5 cm 8.34 m3 750,000 6,253,125
- Pek. Cor balok sloof , pembesian + bekisting 41.69 M3 750,000 31,265,625
Sub Total E 159,241,354
F. Pekerjaan Lantai
1 Material :
- Semen biasa ( KW 1)@ 50 kg 1,836.00 zak 70,000 128,520,000
- Pasir cor. 145.80 m3 275,000 40,095,000
- Batu seplit 177.12 m3 560,000 99,187,200
- Besi weremesh Ø Y 6mm x 5,4 x 2,1 m x 150 x 150 mm (2 layer) 6,673.92 kg 11,000 73,413,120
- Plastik hitam (alas cor) 1,188.00 m2 5,000 5,940,000
- Kawat Beton 9.18 kg 16,000 146,880
2 Upah kerja :
- Penimbunan tanah, pemadatan dan angkut 162.00 m3 75,000 12,150,000
( diambil dari tanah sekitar bangunan)
- Pasang plastik hitam (alas cor) 1,188.00 m2 5,000 5,940,000
- Lantai kerja tebal 5 cm 54.00 m3 750,000 40,500,000
- Cor lantai tebal 15cm + tulangan pinishing lantai ( diaci ) 216.00 m3 750,000 162,000,000
Pekerjaan Lantai Selasar Weremesh Ø6mm 1 layer
1 Material :
- Semen biasa ( KW 1)@ 50 kg 84.86 Zak 70,000 5,940,480
- Pasir cor. 6.74 m3 275,000 1,853,280
- Batu seplit 10.23 m3 560,000 5,730,816
- Besi weremesh Ø Y 6mm x 5,4 x 2,1 m x 150 x 150 mm (1 layer) 417.12 kg 11,000 4,588,320
- Plastik hitam (alas cor) 124.80 m2 5,000 624,000
- Kawat Beton 8.34 Kg 16,000 133,478
- Papan & kayu ( bekisting ) 1.13 Ton 3,500,000 3,937,500
- Paku 5.63 Kg 16,000 90,000
- Keramik polos 30 x30 cm 6.00 ktk 45,000 270,000
2 Upah kerja :
- Penimbunan tanah, pemadatan dan angkut 62.40 m3 75,000 4,680,000
( diambil dari tanah sekitar bangunan)
- Pasang plastik hitam (alas cor) 124.80 m2 5,000 624,000
- Cor Selasar tebal 10cm + tulangan + begisting 12.48 m3 750,000 9,360,000
pinishing lantai ( diaci )
Sub Total F 605,724,074
G. Pekerjaan Tiang HB 200 X 200 x 8 x 12mm (PC1,PC2,PC3,PC4,PC5)
1 Upah HB 200 x 200 x 8 x 12 mm (26 titik) 7,188.00 kg 4,000 28,752,000
- HB 200 x 200 x 8 x 12 mm x12mtr (24 titik) 7,188.00 kg 10,500 75,474,000
- Anchor bolt c/w washer 7/8" x 500mm 104.00 pcs - -
- Plate Ms Ø 8mm 190.00 kg - -
- Kawat Las RB 26 x 2.5mm 15.00 kg - -
- LPG 12.00 kg - -
- Oksigen 150.00 kg - -
- Mata Gerida Gosok 15.00 pcs - -
- Cat Minyak 25.00 kg - -
- Kuas 4" 6.00 pcs - -
Sub Total G 104,226,000
H. PEKERJAAN STRUKTUR
H.1 PEKERJAAN ATAP
1 Upah pekerjaan atap Zincalume, rangka + aksesories 1,209.02 m2 75,000 90,676,200
2 Atap Zincalume warna hijau (0,3 x 840 x 6000mm) 432.00 m' - -
3 Atap Zincalume warna hijau (0,3 x 840 x 5126mm) 369.07 m' - -
4 Rabung alumzeng (300 x 2400) 33.00 lbr 43,000 1,419,000
5 Chanel Galvalume u/ rafter (C75x75x39x12.5) 3,906.00 m' 9,800 38,278,800
6 Reng untuk atap; 70x35 1,996.80 m' 7,500 14,976,000
7 Risplank kalsiboard 9mm (2400 x 200mm) 74.17 lbr 85,000 6,304,167
8 Self Drilling Screw 10-16x16 mm u/U-Reng ke Rafter 1,110.75 pcs 160 177,720
9 Self Drilling Screw 12-14x20 mm u/ Rafter ke Rafter 2,594.00 pcs 225 583,650
10 Self Drilling Screw 12x45 mm u/ atap zincalume 3,216.00 pcs 750 2,412,000
Sub Total H 154,827,537
I. Pekerjaan Sruktur Dinding (Pasangan Batu Bata Merah)
1 Material :
- Semen biasa ( KW 1)@ 50 kg 133.20 zak 70,000 9,324,000
- Pasir cor. 22.20 m3 275,000 6,105,000
- Batu bata merah 26,640.00 pcs 800 21,312,000
2 Upah :
Pek. Batu bata merah 296.00 m2 30,000 8,880,000
Pek. Pranca 1.00 lot 2,500,000 2,500,000
Sub Total J 48,121,000
K. Pekerjaan Plater Dinding Luar dalam tebal 3 cm
1 Material :
- Semen biasa ( KW 1)@ 50 kg 125.04 zak 70,000 8,752,800
- Pasir cor. 11.25 m3 275,000 3,094,740
- Broti 2x4x4 mtr 1.00 m3 2,500,000 2,500,000
2 Upah :
Pek. Plaster dinding luar dalam + acian (tebal 3cm) 332.00 m2 31,000 10,292,000
Pek. Pranca 1.00 lot 2,500,000 2,500,000
Sub Total K 27,139,540
L. Pekerjaan Ring balok 150 x 200
1 Material :
- Semen biasa ( KW 1)@ 50 kg 29.17 zak 70,000 2,042,040
- Pasir cor. 2.32 m3 275,000 637,065
- Batu seplit 3.52 m3 560,000 1,969,968
- Besi Beton Ø 6mm x 12 m 133.00 kg 8,000 1,064,000
- Besi Beton Ø10mm x 12 m 345.36 kg 8,000 2,762,864
- Papan & kayu ( bekisting ) 1.00 m3 3,500,000 3,500,000
- Kawat Beton 9.57 kg 16,000 153,075
- Paku 13.39 kg 16,000 214,304
2 Upah :
Pek. Cor kolom praktis , pembesian + bekisting 4.29 m3 750,000 3,217,500
Sub Total L 15,560,816
M. Pekerjaan Struktur Dinding (Atap Zincalume)
1 Material :
- CNP 150 x 50 x 20 x 2 x 6000mm 426.00 m' - -
- Plate Ø 8mm 65.00 kg - -
- Atap Zincalume warna polos (0,3 x 840 x 2600mm) 548.11 m' - -
- Self Drilling Screw 12-14x20 mm u/ Rafter ke Rafter 1,170.00 pcs - -
- Baut Ø 1½ " x 1,5 " 168.00 pcs - -
2 Upah :
Pek. Diding atap zincalume 220.00 m' - -
Sub Total M -
N. Pekerjaan Pintu Besi 3mtr x 4 mtr (2 unit)
1 Material :
- UNP 100 x 5mm-6mm 224.80 kg - -
- Besi siku 60 x 60 x 5mm (21 batang) 328.08 kg - -
- Besi beton Ø 16mm 37.92 btg - -
- LPG 12.00 kg - -
- Oksigen 100.00 kg - -
- Kawat Las RB 26 x 2.5mm 20.00 kg - -
- Mata Gerida Gosok 20.00 pcs - -
- Mata Gerida Potong 20.00 pcs - -
- Plate Ø 3mm 560.00 kg - -
- Plate Ø 6mm 140.00 kg - -
- UNP 80 x 45 x 5mm 184.80 bh - -
- Ø 5 Grease Nipple 10.00 m' - -
- Nut Ø 16 10.00 bh - -
2 Upah :
Pek. Pintu Besi 3mtr x 4 mtr (2 unit) 2.00 unit - -
Pek. Pintu , Kusen dan kunci 4.00 bh - -
Upah pekerjaan Jendela + Kusen 40.00 set - -
Sub Total N -
Price In Total Price In
No. D E S C R I P T I O N Qty Unit
( Rp ) ( Rp )
O. Pekerjaan Ventilasi 20 unit
1 Material :
- Siku 50 x 50 x 4mm 17,430.00 kg - -
- Besi wiremesh Ø Y 6mm x 5,4 x 2,1 m x 150 x 150 mm 173.80 kg - -
- Baut Ø 5 " 4 x 38 b/n 160.00 pcs - -
- Plate strip 2 x 3 mm 20.00 btg - -
- Cat minyak 20.00 kg - -
- Kawat Las RB 26 x 2.5mm 40.00 kg - -
- Mata Gerida Gosok 10.00 pcs - -
- Mata Gerida Potong 30.00 pcs - -
- Kuas 4" 6.00 pcs - -
2 Upah pekerjaan
Pek. Ventilasi jalusi 158 mtr x 0,5 mtr 120.00 m' - -
Sub Total O -
P. Pekerjaan Instalasi Listrik
1 Upah pekerjaan listrik 24.00 titik - -
2 Saklar ganda "brocco" Art 6622U 4.00 buah - -
3 Saklar tunggal "brocco" Art 5163 4.00 buah - -
4 Stop kontak "brocco" Art 5153 7.00 buah - -
5 Lampu TL 2 x 20 watt ex. PHILIPS 24.00 buah - -
6 Kabel listrik NYA 1 x 2.5 mm 2 @ 100 m - merah 5.00 rol - -
7 Kabel listrik NYA 1 x 1.5 mm 2 @ 100 m - hitam 5.00 rol - -
8 Pipa listrik PVC 5/8" @ 6 meter 60.00 btg - -
9 Tee dos 39.00 buah - -
10 Inbowdus 48.00 buah - -
11 Elbow pipa 5/8" 25.00 buah - -
12 Isolasi Unibel Jumbo 4.00 buah - -
13 MCB 1 Phase 30 A c/w box 4.00 buah - -
Sub Total P -
Q. Pekerjaan Pengecatan
1 Pengecatan Dinding,Ventilasi,Plaffon
a. Dinding dalam 312.00 m2 - -
- Cat tembok vinilex - warna white 81.12 kg - -
- Cat Plamur Nippon Paint 'Matex Putih' @ 4kg 13.52 klg - -
- Kuas roll 2.00 buah - -
b. Dinding Luar 312.00 m2 - -
- Cat tembok vinilex - warna tear drop 81.12 kg - -
- Cat air Nippon paint Vinilex 5180 @ 5kg 13.52 klg - -
- Kuas roll 2.00 buah - -
b. Daun Pintu 11.78 m2 - -
- Cat minyak Bee brand 1000 - warna coklat 3.06 kg - -
- Tiner 0.06 liter - -
- Kuas 4" 0.61 bh - -
Sub Total Q -
R. Konsumable
- Mata Grinda Potong (chanai besi) dia. 4" 6.00 buah - -
- Mata Grinda Potong (chanai besi) dia. 14" 4.00 buah - -
- Kain Amplas no 240 1.00 roll - -
- Scrap Compount 10" (Plastik) 5.00 pcs - -
- Scrap Kusen 2.00 set - -
- Dempul 5.00 kg - -
Sub Total R -

TOTAL PROGRESS
TOTAL MATERIAL 1,281,373,043
BIAYA UPAH KERJA -
JASA KONTRAKTOR 15% 192,205,956
GRAND TOTAL 1,473,578,999
Terbilang,................................................................................................................................................
WAKTU PENYELESASIAN PEKERJAAN …... Minggu