KABUPATEN : Kendal
KECAMATAN :
DESA :
JENIS KEGIATAN : Sarana Prasarana Dasar Umum
B. BARANG
1 Papan Proyek bh 0.00
2 Prasasti bh 0.00
3 Semen kg 1,420.00
4 Semen (40 kg ) zak 52,500.00
5 Pasir urug m3 100,000.00
6 Pasir pasang m3 130,000.00
7 Pasir Beton Muntilan m3 200,000.00
8 Batu belah m3 170,000.00
9 Batu pecah 2/3 (mesin) m3 230,000.00
10 Sirtu m3 110,000.00
11 Papan Cor ( 12 x 2 x 250 ) Tengah btg 8,000.00
12 Papan Cor ( 12 x 3 x 400 ) Pinggir m3 30,000.00
13 Paku kg 20,000.00
14 Besi beton Ø 16 kg 161,200.00
15 Besi beton Ø 10 kg 63,000.00
16 Besi beton Ø 12 kg 91,000.00
17 Besi beton Ø 6 kg 23,000.00
18 Kawat Bendrat kg 20,000.00
19 Sewa Molen hari 200,000.00
20 Plamir Tembok kg 30,000.00
21 Cat Tembok kg 30,000.00
5
KABUPATEN : Kendal Jenis Prasarana : Talud Jalan
KECAMATAN : Take Of Sheet Lokasi :
DESA : Volume : m'
Dimensi Talud
Talud 1 25.00 m' 1 Lajur T = 0.700
t' = 0.500
0.3 L = 0.500
Plesteran P = 25.000
Ban-Banan Pekerjaan Galian Tanah
Volume Galian Tanah = 0.500 x 0.500 x 25.000 = 6.250 m³
Suling = 6.250 x 1 = 6.250 m³
0.700 Pekerjaan Urugan Tanah Kembali
Volume Urugan Tanah Kembali = 1/3 Galian Tanah = 2.083 m³
= 2.083 x 1 = 2.083 m³
Pekerjaan Pasangan Batu Kali 1 : 4
Volume Pas. Batu Kali = 0.3 + 0.500 x 0.700 x 25.0 = 7.000 m³
0.500 0.500 2
= 0.500 x 0.500 x 25.000 = 6.250 m³
0.500 13.250 m³
= 13.250 x 1 = 13.250 m³
Pekerjaan Plesteran Ban-Banan 1 : 3
Volume Plesteran =( 0.300 + 0.100 )x 25.000 = 10.000 m2
= 10.000 x 1 = 10.000 m2
Dimensi Talud
Talud 2 25.000 m' ( ) T = 1.000
t' = 0.400
L = 0.400
Plesteran P = 25.000
Ban-Banan Pekerjaan Galian Tanah
Volume Galian Tanah = 0.400 x 0.400 x 25.000 = 4.000 m³
Suling
Pekerjaan Urugan Tanah Kembali
Volume Urugan Tanah Kembali = 1/3 Galian Tanah = 1.333 m³
Dk. Menjangan RT 05 RW 1
Dimensi Talud
Talud 3 300.000 m' ( P0 - P1 ) T = 1.000
t' = 0.500
0.3 L = 0.500
Plesteran P = 300.000
Ban-Banan Pekerjaan Galian Tanah
Volume Galian Tanah = 0.500 x 0.500 x 300.000 = 75.000 m³
Suling
1.000 Pekerjaan Urugan Tanah Kembali
Volume Urugan Tanah Kembali = 1/3 Galian Tanah = 25.000 m³
Dimensi Talud
Talud 4 - m' ( P3 - P4 ) T = -
t' = -
0.3 L = -
Plesteran P = -
Ban-Banan Pekerjaan Galian Tanah
Volume Galian Tanah = 0.600 x 0.500 x - = - m³
Suling
1.500 Pekerjaan Urugan Tanah Kembali
Volume Urugan Tanah Kembali = 1/3 Galian Tanah = - m³
BAHAN
Semen = 35,503.950 kg 887.599 zak ( Semen 40 kg )
Pasir Pasang = 113.030 m³
Batu kali = 254.700 m³
UPAH
Pekerja = 385.931 HOK
Tukang = 180.188 HOK
Mandor / Ketua Kelompok = 164.537 HOK
Volume Jumlah
URAIAN Dari Dari Dana Satuan Harga Satuan (Rp) Swadaya
Total
Swadaya Desa ( Rp )
a b c=a-b d f g=bxf
1. BAHAN
1.1 Semen ( 40 kg ) 887.599 887.599 zak 52,500.00 -
1.2 Pasir Pasang 113.030 113.030 m3 130,000.00 -
1.3 Batu Belah / Kali 254.700 254.700 m3 170,000.00 -
Sub Total 1) -
2. ALAT
2.1 Alat Bantu - 1.000 bh 280,600.00 -
2.2 Papan Proyek - 1.000 bh 250,000.00 -
Sub Total 2) -
3. UPAH
3.1 Pekerja 385.931 - 385.931 HOK 55,000.00 -
3.1 Tukang 180.188 180.188 HOK 75,000.00 -
3.2 Mandor 164.537 164.537 HOK 50,000.00 -
Catatan :
Sumbangan lahan tidak dimasukkan dalam RAB tetapi dilaporkan dengan form. 6a, 6b dan 6c
Sumbangan dalam bentuk bahan , upah dan alat, ditulis dalam kolom Volume dari Swadaya
Kategori Biaya
Jumlah
DD
( Rp )
h=cxf
46,598,900.00
14,693,900.00
43,299,000.00
104,591,800.00
280,600.00
250,000.00
530,600.00
21,226,200.00
13,514,000.00
8,226,800.00
42,967,000.00
148,089,400.00
148,089,400.00
-