PENGASPALAN JALAN
DESA ......................KECAMATAN..................
KABUPATEN BATANG
Latasir (Sandsheet)
PANJANG JALAN = 500 M
LEBAR JALAN = 3 M
LEBAR BAHU JALAN = 0 M
DAFTAR HARGA SATUAN BAHAN DAN ALAT
ALAT ADMINISTRASI
1 Prasasti 1 Rp 350,000.00
2 Papan Informasi 1 Rp 150,000.00
3 Papan Proyek 1 Rp 200,000.00
ALAT PROYEK
1 Keranjang Bh Rp 10,000.00
2 Benang Kg Rp 2,500.00
3 Selang timbangan M Rp 2,500.00
4 Wals Jam Rp 550,000.00
5 Mobilisasi Walls Ls Rp 1,500,000.00
6 Sprayer Jam Rp 38,500.00
7 Dump Truk Jam Rp 55,000.00
8 Paku kg Rp 15,000.00
9 Ompreng bh Rp 50,000.00
10 arco bh Rp 250,000.00
DI HITUNG OLEH
.........................
360
60
120.00
100
48.00
688
ANALISA PERHITUNGAN JALAN ASPAL
Desa :
5
Harga sat. Bahan Upah Total
No Uraian Analisa Volume Kebutuhan
Rp. Rp Rp. Rp.
Kebutuhan
Batu pecah 5-3 cm = 60.00 = 60.00 m3
Batu pecah 2-3 cm = 33.21 = 33.00 m3
Batu pecah 1-2 cm = 16.61 = 16.00 m3
Batu pecah 0,5 cm = 7.64 = 7.00 m3
Abu batu = 3.75 = 3.00 m3
Pasir Beton = 30.00 = 30.00 m3
Aspal = 7,875.00 = 51 drum
Kayu Bakar = 42.00 = 42 M3
Operator Terlatih = 47.14 = 47 HOK
Juru Godok = 18.60 = 18 HOK
Buruh terlatih = 67.14 = 67 HOK
Buruh tak terlatih = 156.07 = 156 HOK
Mesin Gilas 3 roda 6T = 76.33 = 9 hr
RENCANA ANGGARAN BIAYA
DESA SIDALANG KECAMATAN TERSONO
TAHUN ANGGARAN 2015
0+050
0+100
0 PROPINSI JAWA TENGAH
0+150
0
0+200 KABUPATEN BATANG
0+250
KECAMATAN .....................
0+300
DESA
0+350 SIDALANG
0+650 .............................
0
0+700 MENGETAHUI
0 KADES ...............
0+750 0
0+800 ...................................
0 0+850 MENGETAHUI
KASI. PMD
0+900
0+950 ..................................
NIP..................................
0+956,3
0 0
PROPINSI JAWA TENGAH
......m ......m
KABUPATEN BATANG
POTONGAN PERKERASAN LAPENSHEET
KECAMATAN .....................
SANDSHEET 1CM ( 1,25 KG ASPAL)
ASPAL 1 KG DESA
BATU PECAH 1/2 0.02
ASPAL 1,75KG 0.02 SIDALANG
JUDUL GAMBAR
DENAH LOKASI KEGIATAN
DIBUAT OLEH
TPK
.............................
MENGETAHUI
......m ......m KADES ...............