Anda di halaman 1dari 5

Work Order Details

24917597: INSPEKSI TIER 1 SEGMENT TIANG AWAL KEK - CDW JUR KEK 119.863241 -0.7271657

Asset: 22069481 SEGMENT TIANG AWAL KEK - CDW JUR KEK 119.863241 -0.7271657
Location: ULP.31230 ULP TAWAELI
HI Value: BAIK
HI Numeric Value: 0
HI Total Value: 72 dari 105

Sched Start: 6 Juli 2022 Site: TND Job Plan:


Sched Finish: 31 Juli 2022 Priority: Supervisor: 8910028E
Target Start: 2 Juli 2022 Work Type: INST1 Lead: 31230.YANTEK
Target Finish: 2 Juli 2022 Status: COMP Vendor:
Actual Start: 6 Juli 2022 Parent: Owner: 31230.INSPEKSIJTM
Actual Finish: 18 Agustus 2022 Failure Class:
Report Date: 2 Juli 2022 Problem Code:
Reported By: MAXADMIN kMs: 0

18/08/2022 11:47 AM
Work Order Details
24917597: INSPEKSI TIER 1 SEGMENT TIANG AWAL KEK - CDW JUR KEK 119.863241 -0.7271657

Task IDs
Task ID Description Status HI Value HI Numerical Value
10 TG01.19393560 CDW JUR KEK COMP BAIK 36
119.865039 -0.7277030
20 TG01.19393561 CDW JUR KEK COMP BAIK 36
119.865064 -0.7277528

Measurements hicondvalue
Meter Measurement
Sequence Meter Description Measure date Value Measure Unit Mandatory Observation HI Value
TG01.19393560
CDW JUR KEK
119.865039
-0.7277030
0 KAWATTANAH Kawat Tanah Aug 8, 2022 0 Andongan Baik
14:56:16 Normal Dan
Tidak Rantas
0 ARMTIE Armtie Aug 8, 2022 1 Fisik Dan Baik
14:56:09 Konstruksi Baik
0 ROWBAMBU Row Terhadap Aug 8, 2022 1 2,5M Dari Row Baik
Bambu 14:56:18 Dan Tidak
Membahayakan
Row
0 ROWBANGUNAN Row Terhadap Aug 8, 2022 1 2,5M Dari Row Baik
Bangunan 14:56:21 Dan Tidak
Membahayakan
Row
0 ROWLAYANGAN Row Terhadap Aug 8, 2022 1 Bersih Baik
Layangan 14:56:24
0 ROWPOHON Row Terhadap Aug 8, 2022 1 2,5M Dari Row Baik
Pohon 14:56:31 Dan Tidak
Membahayakan
Row
0 ROWUMBUL Row Terhadap Aug 8, 2022 1 Bersih Baik
Umbul-Umbul 14:56:34
0 TIANG Tiang Aug 8, 2022 1 Tegak Dan Fisik Baik
14:56:42 Bagus
0 TOPTIES Topties Aug 8, 2022 1 Fisik Dan Baik
14:56:45 Konstruksi Baik
0 TRAVERS Travers Aug 8, 2022 1 Fisik Dan Baik
14:56:47 Konstruksi Baik
0 ISOLATOR Isolator Aug 8, 2022 1 Fisik Dan Baik
14:56:11 Konstruksi Baik
0 JUMPER Jumper Aug 8, 2022 1 Terpasang Baik
14:56:13 Dengan Baik
0 GROUNDING Sambungan Aug 8, 2022 1 Warna Tembaga Baik
Grounding 14:56:36 Natural Dan
Sambungan Baik
0 SKURDRUCK Skur/Druck Aug 8, 2022 0 Tidak Ada
14:56:40

TG01.19393561
CDW JUR KEK
119.865064
-0.7277528
0 KAWATTANAH Kawat Tanah Aug 8, 2022 0 Andongan Baik
15:01:42 Normal Dan
Tidak Rantas
0 ARMTIE Armtie Aug 8, 2022 1 Fisik Dan Baik
15:01:27 Konstruksi Baik

18/08/2022 11:47 AM
Work Order Details
24917597: INSPEKSI TIER 1 SEGMENT TIANG AWAL KEK - CDW JUR KEK 119.863241 -0.7271657

Measurements hicondvalue
Meter Measurement
Sequence Meter Description Measure date Value Measure Unit Mandatory Observation HI Value
TG01.19393561
CDW JUR KEK
119.865064
-0.7277528
0 ROWBAMBU Row Terhadap Aug 8, 2022 1 2,5M Dari Row Baik
Bambu 15:01:44 Dan Tidak
Membahayakan
Row
0 ROWBANGUNAN Row Terhadap Aug 8, 2022 1 2,5M Dari Row Baik
Bangunan 15:01:47 Dan Tidak
Membahayakan
Row
0 ROWLAYANGAN Row Terhadap Aug 8, 2022 1 Bersih Baik
Layangan 15:01:49
0 ROWPOHON Row Terhadap Aug 8, 2022 1 2,5M Dari Row Baik
Pohon 15:01:52 Dan Tidak
Membahayakan
Row
0 ROWUMBUL Row Terhadap Aug 8, 2022 1 Bersih Baik
Umbul-Umbul 15:01:54
0 SKURDRUCK Skur/Druck Aug 8, 2022 0 Terpasang Baik
15:02:03 Dengan Baik
Dan Bersih Dari
Tanaman
0 TIANG Tiang Aug 8, 2022 1 Tegak Dan Fisik Baik
15:02:05 Bagus
0 TOPTIES Topties Aug 8, 2022 1 Fisik Dan Baik
15:02:07 Konstruksi Baik
0 TRAVERS Travers Aug 8, 2022 1 Fisik Dan Baik
15:02:09 Konstruksi Baik
0 ISOLATOR Isolator Aug 8, 2022 1 Fisik Dan Baik
15:01:37 Konstruksi Baik
0 JUMPER Jumper Aug 8, 2022 1 Terpasang Baik
15:01:40 Dengan Baik
0 GROUNDING Sambungan Aug 8, 2022 1 Warna Tembaga Baik
Grounding 15:01:57 Natural Dan
Sambungan Baik

Actual Labor
Contract Regular Premium Premium
Task ID Craft Skill Level Labor Vendor Num Hours Hours Regular Rate Rate Line Cost
ELECT SENIOR 31230.INSPEKSIJTM 00:00 00:00 0.00 0.00 0.00
Total Actual Labor: 0.00

18/08/2022 11:47 AM
Work Order Details
24917597: INSPEKSI TIER 1 SEGMENT TIANG AWAL KEK - CDW JUR KEK 119.863241 -0.7271657

Attachments
Asset/Locations Description URL
TG01.19393560 CDW JUR KEK Trapes tumpu tiang beton http://10.1.80.92/attachments4/TG01.19393560_202271155526_31230.inspeksijtm.jpg
119.865039 -0.7277030 isolator tumpu kramik konduktor
HIC

18/08/2022 11:47 AM
Work Order Details
24917597: INSPEKSI TIER 1 SEGMENT TIANG AWAL KEK - CDW JUR KEK 119.863241 -0.7271657

Attachments
Asset/Locations Description URL
TG01.19393561 CDW JUR KEK Trapes aspan tiang beton http://10.1.80.92/attachments4/TG01.19393561_20227116053_31230.inspeksijtm.jpg
119.865064 -0.7277528 isolator tarik polimer konduktor
HIC ket out arester polimer