RENCANA ANGGARAN BIAYA (RAB)

PEMBANGUNAN RUANG LAB KOMPUTER BARU

SMA BAITUL HIKMAH JL.OTISTA 66A


KEC. TAROGONG KALER
KAB. GARUT

NO URAIAN PEKERJAAN SATUA VOLUME

I
1 Penyediaan listrik, air kerja selama pelaksanaan Is 1
Pek. Administrasi dan dokumen pelaksanaan
2 Is 2.5
Pek. Pembuatan papan nama (bahan multi 9 mm finish cat) Pek. Pasang
3 papan bouwplank Is 0.7
4 Pek. Galian tanah pondasi m² 55
Pek. Urugan pasir di bawah pondasi, t 10 cm
5 Pasangan Pondasi Batu belah 1PC : 5Ps m³ 55
6 Pek. Urugan tanah kembali bekas galian pondasi dan pemadatan m³ 7.8
7 m³ 20.5
8 m³ 35.5
SUB JUMLAH
II PEKERJAAN STRUKTUR BETON
1 Pek. Beton Sloof 14/20 cm, K-176 (tul 178 kg/m³) m³ 4.56
Pek. Beton Kolom K 1, 13/23 cm, K-175 (tul 195 kg/m³) Pek. Beton Kolom
2 m³ 3.2
K 2, 13/18 cm, K-175 (tul 249 kg/m³)
3 Pek. Beton Kolom praktis P, 12/12 cm, K-175 (tul 260 kg/m³) Pek. Beton m³ 2.25
4 RB, 14/20 cm, K-175 (tul 208 kg/m³) m³ 1.215
Pek. Beton Lintel, 10/10 cm, K-175 (tul 292 kg/m³)
5 m³ 2
6 m³ 1.5
SUB JUMLAH
III PEKERJAAN PASANG BATA & PELESTERAN
1 Pek. Pasang dinding bata 1 PC : 3 PS Pek. Pasang dinding bata 1 PC : 5 m² 49.8
PS Pek. Plesteran 1 PC:3PC + acian
2 m² 95.82
Pek. Plesteran 1 PC:5PC + acian
3 Pek. Plesteran beton 1PC:3PS + acian m² 50.6
4 Pek. Pasang roster beton ukuran 20/20 cm m² 150.64
Pek. Pasang saluran air hujan dari grefer U dia 20 cm + pas. Bata
5 m² 40
Pek. Plesteran beton 1PC:3PS + acian
Pek. Pasang roster beton ukuran 20/20 cm
Pek. Pasang saluran air hujan dari grefer U dia 20 cm + pas. Bata

6 bh 40
7 m 62.6
SUB JUMLAH
IV PEKERJAAN UBIN LANTAI DAN DINDING
1 Pek. Urugan pasir di bawah lantai, t. 5 cm (dlm ruangan) Pek. Urugan m³ 9.81
pasir di bawah lantai, t. 5 cm (selasar)
2 m³ 4.9
Pek. Urugan pasir di bawah rabat, t 5 cm (keliling bangunan)
3 Pek. Lantai kerja 1 PC:3Ps , di bawah lantai, t.3 cm (dlm ruangan) Pek. m³ 5.1
4 Lantai kerja 1 PC:3Ps , di bawah lantai, t.3 cm (selasar) m³ 4.12
Pek. Ubin lantai keramik 30x30 cm sek. Roman/Mass (dlm ruangan) Pek.
5 Ubin lantai keramik 30x30 cm sek. Roman/Mass (selasar) m³ 2
6 Pek. Rabat beton tumbuk t.5 cm (keliling bangunan) m² 95.44
7 m² 20
8 m³ 6
SUB JUMLAH
V PEKERJAAN KAYU KUSEN PINTU DAN JENDELA
1 Pek. Kusen Pintu Jendela m³ 1.8
PEKERJAAN PERSIAPAN DAN PEKERJAAN TANAH/PONDASI
NO URAIAN PEKERJAAN SATUA VOLUME

2 Pek Daun Pintu Panil Rangka Kayu m² 2

3 Pek. Rangka Daun Panil Rangka Kayu No. 2 m² 4.81


4 Pek. Jalusi Datae 2/14 Kayu Kelas II m³ 0.5
SUB JUMLAH
NO URAIAN PEKERJAAN SATUA VOLUME

VI
1 Pek. Kuda - Kuda Skoor dan Makelat Kayu m³ 4.56
Pek. Ikatan Angin dan Silang Gempa Pek. Baut dan Penguat Kuda - Kuda
2 m³ 12.5
Pek. Genteng Plentong Kls II
3 Pek. Bubung Genteng Segitiga m³ 12
4 Pek. Lisplank 3/28 bh 108.3
Pek. Rangka Plafound
5 Pek. Plafound Internit bh 30
6 m³ 48
7 m² 80.52
8 m² 80.52
SUB JUMLAH
VII PEKERJAAN GANTUNGAN KUNCI DAN RANGKA

1 Pek. Kunci Tanam 2 Slaag Pek. Engsel Kupu -kupu Pintu Pek. Engsel Kupu bh 2
-kupu Jendela Pek. Slot Tanam Pintu 2 Daun Pek. Sloot Jendela
2 Pek. Kait Angin bh 6

3 bh 11
Pek. Kaca Polos
4 bh 4

5 bh 15

6 bh 10

7 m² 20

SUB JUMLAH
VIII PEKERJAAN INSTALASI LISTRIK
1 Pas. MCB bh 1
2 Pas. Instalasi Titik Lampu bh 8
3 Pasangan Stp Kontak bh 6
4 Pasangan Saklar Ganda bh 8
5 Pasangan Lampu TL bh 8

SUB JUMLAH
IX PEKERJAAN PENGECATAN DAN LABURAN

1 Pek. Pengecatan Kayu Pek. Pengecatan Dinding Pek. Pengecatan Plafound m² 60


Pek. Residu Kuda - Kuda dan Rangka Atap
2 m² 100

3 m² 90

4 m² 50

SUB JUMLAH
X PEKERJAAN LAIN - LAIN
1 Pek. Pembersihan Area Pekerjaan dan sisa Bahan Material Is 0.5

JUMLAH

PEKERJAAN KUDA-KUDA DAN RANGKA ATAP DAN PLAFOND


TERBIL
Garut, 18Januari 2016
Kepala SMA Baitul hikmah

Dra. Neneng Erika


NIP. 196306021988032007
GGARAN BIAYA (RAB)
JUMLAH HARGA (Rp)

2,000,000.00
2,500,000.00
525,000.00
5,500,000.00
5,500,000.00
780,000.00
4,100,000.00
3,550,000.00

24,455,000.00

4,377,600.00
2,902,900.00
9,135,000.00
5,418,900.00
7,491,096.00
4,845,000.00

34,170,496.00

7,719,000.00
18,205,800.00
5,161,200.00
13,557,600.00
3,800,000.00
3,200,000.00
4,069,000.00
3,800,000.00
3,200,000.00
4,069,000.00

55,712,600.00

6,670,800.00
3,307,500.00
3,366,000.00
1,154,630.00
1,249,754.00
7,635,200.00
1,600,000.00
960,000.00

25,943,884.00

7,200,000.00

JUMLAH HARGA
(Rp)
1,580,000.00
3,593,070.00
1,938,500.00
14,311,570.00

JUMLAH HARGA (Rp)

6,840,000.00
5,131,250.00
300,000.00
3,032,400.00
1,650,000.00
2,640,000.00
5,233,800.00
4,026,000.00
2,640,000.00
5,233,800.00
4,026,000.00

28,853,450.00

899,000.00

519,000.00

935,000.00

340,000.00

975,000.00

850,000.00

1,500,000.00
6,018,000.00

300,000.00
800,000.00
600,000.00
800,000.00
400,000.00

2,900,000.00

2,340,000.00

1,950,000.00

1,845,000.00

1,000,000.00
7,135,000.00

500,000.00
500,000.00
200,000,000.00
ATUS JUTA RUPIAH
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB) PER SATU RUANGAN

PEMBANGUNAN 2 RUANG KELAS BARU

Sekolah SMA BAITUL HIKMAH


Alamat JL.OTISTA 66A
Kecamatan KEC. TAROGONG KALER
Kabupaten KAB. GARUT

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)

I PEKERJAAN PERSIAPAN DAN PEKERJAAN TANAH/PONDASI 24,455,000.00

II PEKERJAAN STRUKTUR BETON 34,170,496.00

III PEKERJAAN PASANG BATA & PELESTERAN 55,712,600.00

IV PEKERJAAN UBIN LANTAI DAN DINDING 25,943,884.00

V PEKERJAAN KAYU KUSEN PINTU DAN JENDELA 14,311,570.00

VI PEKERJAAN KUDA-KUDA DAN RANGKA ATAP DAN PLAFOND 28,853,450.00

VII PEKERJAAN GANTUNGAN KUNCI DAN RANGKA 6,018,000.00

VIII PEKERJAAN INSTALASI LISTRIK 2,900,000.00

IX PEKERJAAN PENGECATAN DAN LABURAN 7,135,000.00

X PEKERJAAN LAIN - LAIN 500,000.00

JUMLAH 200,000,000.00
TERBILANG : DUA RATUS JUTA RUPIAH

Garut, 18Januari 2016


Kepala SMA Baitul Hikmah

Dra. Neneng Erika


NIP. 196306021988032007
B)

R BARU

6A

VOLUME HARGA SATUAN

( Rp )

1 2,000,000.00
2.5 1,000,000.00
0.7 750,000.00
55 100,000.00
55 100,000.00
7.8 100,000.00
20.5 200,000.00
35.5 100,000.00

4.56 960,000.00
3.2 1,730,000.00
2.25 4,060,000.00
1.215 4,460,000.00
2 2,395,000.00
1.5 3,230,000.00

49.8 155,000.00
95.82 190,000.00
50.6 102,000.00
150.64 90,000.00
40 95,000.00
40 80,000.00
62.6 65,000.00

9.81 680,000.00
4.9 675,000.00
5.1 660,000.00
4.12 280,250.00
2 624,800.00
95.44 80,000.00
20 80,000.00
6 160,000.00

1.8 4,000,000.00

VOLUME HARGA SATUAN

( Rp )

2 790,000.00

4.81 747,000.00
0.5 3,877,000.00

VOLUME HARGA SATUAN

( Rp )

4.56 1,500,000.00
12.5 410,500.00
12 25,000.00
108.3 28,000.00
30 55,000.00
48 55,000.00
80.52 65,000.00
80.52 50,000.00
2 449,500.00

6 86,500.00

11 85,000.00

4 85,000.00

15 65,000.00

10 85,000.00

20 75,000.00

1 300,000.00
8 100,000.00
6 100,000.00
8 100,000.00
8 50,000.00

60 39,000.00

100 19,500.00

90 20,500.00

50 20,000.00

0.5 1,000,000.00
JUMLAH :
JUMLAH I s.d. XI :

TERBILANG : DUA R
UANGAN

H HARGA (Rp)

000.00

496.00

600.00

884.00

570.00

450.00

00.00

00.00

00.00

0.00

00,000.00
Garut, 18Januari 2016
Kepala SMA Baitul Hikmah

Dra. Neneng Erika


NIP. 196306021988032007