A.

WBS LEVEL 1 : NAMA PROYEK

WBS LEVEL 2 : SUBPROJECT/AREA

WBS LEVEL 3 : PRODUCT

WBS LEVEL 4 : SUB PRODUCT PONDASI TAPAK


A.3.2.1

KOLOM
A.3.2.4

WBS LEVEL 5 : PACKAGE GALIAN A.3.2.1.A


LANTAI KERJA A.3.2.1.B
ANTI RAYAP A.3.2.1.C
WATERROOFING A.3.2.1.D

GALIAN A.3.2.2.A
LANTAI KERJA A.3.2.2.B
ANTI RAYAP A.3.2.2.C
WATERROOFING A.3.2.2.D

WBS LEVEL 6 : SUBPACKAGE UPAH


BAHAN
ALAT
PROYEK RENOVASI SD SWASTA

GEDUNG 3 GEDUNG 2
A.1 A.2

STRUKTUR A.3.2

PONDASI BATU KALI SLOOF


A.3.2.2 A.3.2.3

RING BALOK
A.3.2.5

BEKISTING A.3.2.4. A BEKISTING A.3.2.3.A


BESI A.3.2.4.B BESI A.3.2.3.B
BETON A.3.2.4.C BETON A.3.2.3.C

BEKISTING A.3.2.5.A
BESI A.3.2.5.B
BETON A.3.2.5.C

UPAH UPAH
BAHAN BAHAN
ALAT ALAT
GEDUNG 1
A.3

ARS A.3.1

PASANGAN BATA PLASTERAN ACIAN


A.3.1.1 A.3.1.2 A.3.1.3

PEKERJAAN J1 PEKERJAAN P1 KERAMIK 40X40


A.3.1.5 A.3.1.6 A.3.1.7

RANGKA ATAP KALSIBOARD GIPSUMBOARD


A.3.1.9 A.3.1.10 A.3.1.11

RANGKA KALSI RANGKA GYB


A.3.1.12 A.3.1.13

PASANGAN BATA A.3.1.1.A FRAME ALU A.3.1.6.A


KOLOM/BALOK PRAKTIS A.3.1.1.B KACA JENDELA A.3.1.6.B
ACESSORIES A.3.1.6.C

UPAH UPAH UPAH


BAHAN BAHAN BAHAN
ALAT ALAT ALAT
MEP A.3.3

CAT INSTALASI LISTRIK A.3.3.1


A.3.1.4

PENUTUP GENTENG TANAH LIAT


A.3.1.8

SHADOW LINE A.3.1.11.A PANEL A.3.3.1.A


STOP KONTAK A.3.3.1.B
SALKAR A.3.3.1.C
LAMPU A.3.3.1.D

UPAH UPAH
BAHAN BAHAN
ALAT ALAT
INSTALASI PLUMBING A.3.3.2 UNIT PLUMBING A.3.3.3

SALURAN WC A.3.3.2.A KRAN A.3.3.A `


SALURAN WASHTAFEL A.3.3.2.B PIPA A.3.3.3.B
SALURAN AIR BERSIH
SALURAN AIR KOTOR

UPAH UPAH
BAHAN BAHAN
ALAT ALAT
GEDUNG I PANJANG DENAH=
PERSIAPAN
1 Bauplank 36 m'
PONDASI A.PERSIAPAN
1 Galian pondasi 51.3 m3 BOUPLANK
2 Aantampin 3.42 m3 P
3 Pas. Batu Kali 23.085 m3 L
4 Urugan tanah kembali 24.795 m3 L
PEMBETONAN
1 Pondasi Telapak 1.4145 m3
2 Sloof 1.71 m3 PEMBERSIHAN LAPANG
3 Kolom K1 1.2 m3 L
4 Kolom K2 1.26 m3
5 RinkBalk 1 1.71 m3
6 RinkBalk 2 0.126 m3
DINDING
Pas. Batu bata 216.5232 m2
Plesteran 410.2464 m2
Acian 410.2464 m2
LANTAI
keramik 40x40 446.6 m2
Keramik 20x20 8 m2
PLAFOND
Gypsum Board 350 m2
Kalsi Board 179.4 m2
Rangka Plafond 529.4 m2
KUSEN
P1 55.32 m'
P2 24 m'
P3 7.12 m'
J1 197.28 m'
J2 123.6 m'
PINTU
P1 21.168 m2
P2 29.4 m2
P3 16.8 m2
ATAP
Penutup Atap 669.6 m2
PENGECATAN
Cat Tembok m2
PANJANG DENAH= 57 BANGUNAN BARU

A.PERSIAPAN B.PEKERJAAN TANAH C.PEKERJAAN PONDASI


BOUPLANK PEK.GALIAN PEK.AAMSTAMPING
6m a 1.2 m L 0.1 m
6m b 0.6 m t 0.6 m
36 M2 t 1m VOL 3.42 M3
VOL 51.3 M3

PEMBERSIHAN LAPANGA URUGAN TANAH KEMBALI PEK.PAS.BATU


36 M2 V 24.795 M3 a 0.3 m
b 0.6 m
t 0.9 m
VOL 23.085 M3
PONDASI TELAPAK PEMBETONAN
TAPAK SLOOF RINGBALK 1
p 0.8 b 0.15 b 0.15
l 0.8 h 0.2 h 0.2
t 0.3 p 57 p 57
n 6 v 1.71 v 1.71
v 1.152
KOLOM K1 RINGBALK 2
TIANG b 0.25 b 0.15
p 0.25 h 0.2 h 0.3
l 0.25 t 4 p 2.8
t 0.7 n 6 v 0.126
n 6 v 1.2
v 0.2625
KOLOM K2
b 0.15
h 0.15
t 4
n 14
v 1.26

PEMBESIAN D10 - 150 LENTEU KG


TAPAK 2.09 12 25.08 150.48
BATANG 1 4 4 24
174.48
14.54 107.596

SLOOF
4 D 13 228 m 19 lt 237.5
d8 - 150 0.54 153.9 12.825 lt 61.62

KOLOM K1
6 d 13 144 m 12 lt 150
d8 - 150 276.266667 m 23.0222222 lt 113.76

KOLOM K2
4 d 13 224 m 18.6666667 lt 237.5
d8 - 150 164.266667 m 13.6888889 lt 66.36

RINKBALK 1
4 D 13 228 m 19 lt 237.5
d8 - 150 0.54 153.9 12.825 lt 61.62

RINKBALK 2
5 d 12 14 m 1.16666667 lt 21.4
d8 - 150 0.74 13.81 1.15111111 lt 9.48
LUAS KUSEN LUAS KERAMIK
JENIS p t n L L1 36
J1 2.16 1.12 6 2.4192 L2 16
J2 2.16 1.47 4 3.1752 PENGURANGAN 3
P1 2.68 1.68 2 4.5024 L TOTAL KERAMIK
KISI-KISI/ GEWEL 0.46 0.23 2 1.38
11.4768 LUAS KERAMIK WC
LUAS DINDING L1 4
P 57 L TOTAL KERAMIK
t 4
luas kusen 11.4768 LUAS PLAFOND GYPSUM BOARD
luas dinding 216.523 L1 34
L2 16
LUAS PLESTERAN/ ACIAN L TOTAL KERAMIK
luas dinding 216.523
pengurangan 11.4 LUAS PLAFOND KALSI BOARD
luas dinding 410.246 L1 79.4
L2 50
L TOTAL KERAMIK

RANGKA PLAFOND BANGUNAN


LUAS KERAMIK PEKERJAAN KUSEN PEKERJAAN DAUN PIN
8.8 316.8 JENIS P' n p total JENIS
8.8 140.8 P1 9.22 6 55.32 P1
8 11 P2 12 2 24 P2
446.6 P3 7.12 1 7.12 P3
J1 10.96 18 197.28
LUAS KERAMIK WC J2 12.36 10 123.6
2 8 407.32
8

LAFOND GYPSUM BOARD PEKERJAAN PENUTUP ATAP


7 238 P L LUAS
LUAS ATAP
7 112 55.8 12 669.6
350

PLAFOND KALSI BOARD


1 79.4 PENGECATAN
2 100 Cat Tembok 410.2464
179.4

FOND BANGUNAN 529.4


PEKERJAAN DAUN PINTU
l t n p total
1.68 2.1 6 21.168
7 2.1 2 29.4
8 2.1 1 16.8