Rab Rumah
Rab Rumah
PERENCANA :
KEIZHA ZSADA AYOMI DEWI
XI DPIB / 15
17137
PERHITUNGAN VOLUME PEKERJAAN
- p.h = 15.65+(4.65*2)+(6.15*2)+5.15+(4.65*3)+2.15+2.65+4.15+3
131.1 m
b. Volume total sloof:
V = L. tampang * p. sloof
= 0.03*131.1
3.933 m3
p = (2*(1.36+2.2))+(2*(1.49+1.75))+(2*(5.25+1.85))+(2*(0.35+1.37))
+(2*3*(0.9+2.2))+(2*3*(0.8+2.15))+(2*(2.26+0.85))+(2*4*(1.85+1.75))
+(2*2*(2.48+1.75)+(2*2*(0.85+0.75))+(2*3*(0.7+0.5)
133.08 m
c. Panjang total sponengan =
p = p. sudut dinding
826.8 m
F PEKERJAAN BUKAAN
1 Pek. Kusen Pintu Dan Jendela a. Panjang kusen PJ1 = ((2*2.2)+1.26)+((1.49*2)+(1.65*3))
13.59 m
c. Panjang kusen PJ2 = 5.25+(1.94*2)+(2.2*2)+(1.73*8)
27.37 m
d. Panjang kusen P1 = ((2*2.2)+0.8)*3
15.6 m
e Panjang kusen P2 = ((2*2.15)+0.7)*3
15 m
f. Panjang kusen P3 = (2*2.26)+1.72
6.24 m
g. Panjang kusen J1 = ((1.85*2)+(1.65*2))*4
28 m
h. Panjang kusen J2 = ((1.75*2)+(2.4*2))*2
16.6
i. Panjang kusen J3 = ((1.75*2)+(0.77*2))*2
10.08
j. Panjang kusen BV = ((0.7*2)+(0.4*2))*3
6.6
k. Panjang total kusen =
139.08 m
i. Volume total kusen pintu dan jendela =
V = L penampang*Panjang total kusen
- L penampang = 0.05*0.12
0.0072 m2
V = 0.0072*139.08
1.001376 m3
2 Pek. Daun Pintu Dan Jendela a. Luas daun pintu PJ1 = (1.26*2.15)-((0.15*0.7)*2)
2.499 m2
b. Luas daun pintu PJ2 = 1.2525*2.04
2.5551 m2
c. Luas daun pintu P1 = (0.8*2.15)*3
5.16 m2
d. Luas daun pintu P2 = (0.7*2.1)*3
4.41 m2
e. Luas daun pintu P3 = 0.85*2.26
1.921 m2
f. Luas daun jendela PJ1 = ((0.07*1.65*2)+(0.07*0.32*2))*3
0.8274 m2
g. Luas daun jendela PJ2 = ((0.07*1.59*2)+(0.07*0.42*2))*4
1.1256 m2
h. Luas daun jendela J1 = (((0.07*1.65*2)+(0.07*0.38*2))*2)*4
2.2736 m2
i. Luas daun jendela J2 = (((0.07*1.65*2)+(0.07*0.38*2))*2)*2
1.1368 m2
j. Luas daun jendela J3 = ((0.07*1.65*2)+(0.07*0.61*2))*2
0.6328 m2
k. Luas total daun pintu dan jendela =
22.5413 m2
3 Pek. Kaca Tebal 5 mm a. Luas kaca pintu jendela PJ1 = ((0.15*0.7)*2)+((0.32*1.51)*3)
1.6596 m2
b. Luas kaca pintu jendela PJ2 = ((0.58*1.73)*2)+((0.42*1.53)*4)
4.5772 m2
c. Luas kaca jendela J1 = (((0.39*1.51)*2)+(0.61*1.65))*4
8.7372 m2
d. Luas kaca jendela J2 = ((0.62*1.67*2)+(0.38*1.53*2))*2
6.4672
e. Luas kaca jendela J3 = (0.63*1.53)*2
1.9278
f. Luas kaca bv = (0.25*0.62*2)*3
0.93 m2
g. Luas total kaca tebal 5 mm =
24.299 m2
G PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek. Rangka Atap a. Nok 8/12 = 0.08*0.12*12.9
0.12384 m3
b. Gording 8/12 = 0.08*0.12*((2.8*2)+(4.6*2)+(3.8*2))
0.21504 m3
c. Murplat 8/12 = 0.08*0.12*((2.5*2)+(2.85*2)+(2.7*2))
0.15456 m3
d. Volume total rangka atap =
0.49344 m3
2 Pek. Penutup Atap a. Genteng bubungan = Panjang nok = 4.5+5.75+1+7.275
18.525 m
b. Rangka Penutup Atap 5/7 dan 2/3 = Luas bidang atap
L = 85.306+76.789375+70.334+26.030375+19.575+8+31.70325
317.738 m2
c. lisplank = 23.25
23.25 m
d. Luas penutup atap =
1.) luas bidang 1 = ((4.5+17.6)*7.72)/2
85.306 m2
2.) luas bidang 2 = ((13.15*7.72)/2)+(((7.275+3.2)*4.97)/2)
76.789375 m2
3.) luas bidang 3 = ((13.15*7.72)/2)+(((1+5.75)*5.8)/2)
70.334 m2
4.) luas bidang 4 = ((7.275+3.2)*4.97)/2
26.030375 m2
5.) luas bidang 5 = ((1+5.75)*5.8)/2
19.575 m2
6.) luas bidang 6 = 2*(4*1)
8 m2
7.) luas bidang 7 =
(((4.5+17.6)*7.72)/2)-(((2*(4.97*4.075)/2)+(2*(5.75*5.8)/2)))
31.70325 m2
L total penutup atap =
317.738 m2
H PEKERJAAN PLAFOND
1 Pek. Plafond Gypsum Rangka Kayu Luas Plafond Rangka Kayu =
2 Pek. Instalasi Pipa PVC 4" Saluran Tinja Panjang pipa dari kloset ke septictank =
29 m
3 Pek. Instalasi Pipa PVC 3" Saluran Air Bekas a. Panjang pipa dari bak kontrol air hujan ke resapan air hujan =
46 m
b. Panjang total =
46 m
4 Pek. Kran Air Pasang kran air =
12 unit
5 Pek. Kloset Duduk Pasang kloset duduk =
2 unit
6 Pek. Wastafel Pasang wastafel =
2 unit
7 Pek. Floordrain Pasang floordrain =
4 unit
8 Pek. Septictank + Rembesan Pasang Septictank =
1 unit
10 Pek. Bak Kontrol Air Hujan Pasang bak kontrol air hujan =
1 unit
11 Pek. Sumur Resapan Air Hujan Sumur resapan air hujan =
1 unit
M PEKERJAAN PENGUNCI DAN PENGGANTUNG
1 Pek. Engsel Pintu Pasang engsel pintu (3 buah/pintu) = 3*11
33 unit
2 Pek. Engsel Jendela Pasang engsel jendela (2 buah/jendela) = 2*21
221 unit
3 Pek. Handle Pintu Pasang handle pintu (2 buah/pintu) =
22 unit
4 Pek. Handle Jendela Pasang handle jendela (1 buah/jendela) = 1*21
21 unit
5 Pek. Grendel Pasang grendel pintu dan jendela (1 buah/pintu & 1 buah/jendela =
11+21
32 unit
6 Pek. Hak Angin Pasang hak angin (1 buah/jendela) =
21 unit
PERENCANA :
KEIZHA ZSADA AYOMI DEWI
XI DPIB / 15
17137
ANALISA HARGA SATUAN PEKERJAAN (SNI 2017/2018)
HARGA SATUAN JUMLAH
NO URAIAN PEKERJAAN SATUAN KOEFISIEN
(RP) (RP)
I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Lahan m2 1.000
Pekerja oh 0.100 70,000.00 7,000.00
Mandor oh 0.050 85,000.00 4,250.00
jumlah 11,250.00
2 Pek. Pemasangan Bouwplank m 1.000
Kaso Meranti 5/7 m3 0.012 2,400,000.00 28,800.00
Paku biasa 2" - 3 " kg 0.020 26,000.00 520.00
Papan Meranti 2/20 m3 0.007 2,800,000.00 19,600.00
Pekerja oh 0.100 70,000.00 7,000.00
Tukang Kayu oh 0.100 80,000.00 8,000.00
Kepala Tukang Kayu oh 0.010 90,000.00 900.00
Mandor oh 0.005 85,000.00 382.50
Jumlah 65,202.50
II PEKERJAAN TANAH
1 Pek. Galian Tanah Pondasi m3 1.000
Pekerja oh 0.750 70,000.00 52,500.00
Mandor oh 0.025 85,000.00 2,125.00
Jumlah 54,625.00
2 Pek. Urugan Kembali Bekas Galian m3 1.000
Pekerja oh 0.102 70,000.00 7,140.00
Mandor oh 0.019 85,000.00 1,615.00
Jumlah 8,755.00
3 Pek. Urug Pasir m3 1.000
Pasir Urug m3 1.200 268,000.00 321,600.00
Pekerja oh 0.300 70,000.00 21,000.00
Mandor oh 0.100 85,000.00 8,500.00
Jumlah 351,100.00
III PEKERJAAN PONDASI
1 Pondasi Batu Kali 1PC/3PS m3 1.000
Batu kali belah m3 1.200 145,000.00 174,000.00
Semen Portland kg 202.000 2,000.00 404,000.00
Pasir Pasang m3 0.485 371,000.00 179,935.00
Pekerja oh 1.500 70,000.00 105,000.00
Tukang Batu oh 0.750 80,000.00 60,000.00
Kepala Tukang Batu oh 0.075 85,000.00 6,375.00
Mandor oh 0.075 85,000.00 6,375.00
Jumlah 935,685.00
IV PEKERJAAN BETON
1 Pek. Beton Sloof m3 1.000
Kayu Meranti Papan m3 0.270 10,315,000.00 2,785,050.00
Paku biasa 2-3" kg 2.000 26,000.00 52,000.00
Minyak Begesting ltr 0.600 7,500.00 4,500.00
Besi Beton Polos kg 210.000 13,000.00 2,730,000.00
Kawat beton (bendrat) kg 3.000 28,000.00 84,000.00
Pasir Beton m3 0.540 371,000.00 200,340.00
Semen Portland kg 336.000 2,000.00 672,000.00
Kerikil m3 0.810 357,000.00 289,170.00
Pekerja oh 5.650 70,000.00 395,500.00
Tukang Batu oh 0.275 80,000.00 22,000.00
Tukang Kayu oh 1.560 80,000.00 124,800.00
Tukang Besi oh 1.400 80,000.00 112,000.00
Kepala Tukang oh 0.323 90,000.00 29,070.00
Mandor oh 0.283 85,000.00 24,055.00
jumlah 7,524,485.00
2 Pek. Beton Kolom m3 1.000
Kayu Meranti Papan m3 0.400 10,315,000.00 4,126,000.00
Paku biasa 2-3" kg 4.000 26,000.00 104,000.00
Besi Beton Polos kg 315.000 13,000.00 4,095,000.00
Kawat beton (bendrat) kg 4.500 28,000.00 126,000.00
Pasir Beton m3 0.540 371,000.00 200,340.00
Semen Portland kg 336.000 2,000.00 672,000.00
Kerikil m3 0.810 357,000.00 289,170.00
Kayu Meranti Balok m3 0.150 10,315,000.00 1,547,250.00
Plywood 9mm lbr 3.500 98,000.00 343,000.00
Minyak Begesting ltr 2.000 7,500.00 15,000.00
Dolken Kayu 8-10 cm btg 20.000 17,000.00 340,000.00
Pekerja oh 7.050 70,000.00 493,500.00
Tukang Batu oh 0.275 80,000.00 22,000.00
Tukang Kayu oh 1.560 80,000.00 124,800.00
Tukang Besi oh 1.400 80,000.00 112,000.00
Kepala Tukang oh 0.323 90,000.00 29,070.00
Mandor oh 0.283 85,000.00 24,055.00
jumlah 12,663,185.00
3 Pek. Beton Ring Balok m3 1.000
Kayu Meranti Papan m3 0.320 10,315,000.00 3,300,800.00
Paku biasa 2-3" kg 3.200 26,000.00 83,200.00
Besi Beton Polos kg 210.000 13,000.00 2,730,000.00
Kawat beton (bendrat) kg 3.000 28,000.00 84,000.00
Minyak Begesting ltr 1.600 7,500.00 12,000.00
Pasir Beton m3 0.540 371,000.00 200,340.00
Semen Portland kg 336.000 2,000.00 672,000.00
Kerikil m3 0.015 357,000.00 5,355.00
Pekerja oh 6.350 70,000.00 444,500.00
Tukang Batu oh 0.275 80,000.00 22,000.00
Tukang Kayu oh 1.650 80,000.00 132,000.00
Tukang Besi oh 1.400 80,000.00 112,000.00
Kepala Tukang oh 0.333 90,000.00 29,970.00
Mandor oh 0.318 85,000.00 27,030.00
jumlah 7,855,195.00
2 Pek. Beton Dak Dan Topi-Topi m3 1.000
Kayu Meranti Papan m3 0.320 10,315,000.00 3,300,800.00
Paku biasa 2-3" kg 3.200 26,000.00 83,200.00
Besi Beton Polos kg 157.500 13,000.00 2,047,500.00
Kawat beton (bendrat) kg 2.250 28,000.00 63,000.00
Pasir Beton m3 0.540 371,000.00 200,340.00
Semen Portland kg 336.000 2,000.00 672,000.00
Kerikil m3 0.810 357,000.00 289,170.00
Kayu Meranti Balok m3 0.120 10,315,000.00 1,237,800.00
Plywood 9mm lbr 2.800 98,000.00 274,400.00
Minyak Begesting ltr 1.600 7,500.00 12,000.00
Dolken Kayu 8-10 cm btg 32.000 17,000.00 544,000.00
Pekerja oh 5.300 70,000.00 371,000.00
Tukang Batu oh 0.275 80,000.00 22,000.00
Tukang Kayu oh 1.300 80,000.00 104,000.00
Tukang Besi oh 1.050 80,000.00 84,000.00
Kepala Tukang oh 0.265 90,000.00 23,850.00
Mandor oh 0.265 85,000.00 22,525.00
jumlah 9,351,585.00
V PEKERJAAN DINDING
1 Pek. Pasangan Trasraam 1/2 Bata m2 1.000
Batu Bata Merah bh 70.000 1,000.00 70,000.00
Semen Portland kg 14.370 2,000.00 28,740.00
Pasir Pasang m3 0.040 371,000.00 14,840.00
Pekerja oh 0.300 70,000.00 21,000.00
Tukang Batu oh 0.100 80,000.00 8,000.00
Kepala Tukang Batu oh 0.010 85,000.00 850.00
Mandor oh 0.015 85,000.00 1,275.00
Jumlah 144,705.00
2 Pek. Pasangan Dinding Bata Merah 1/2 Bata m2 1.000
Batu Bata Merah bh 70.000 1,000.00 70,000.00
Semen Portland kg 9.680 2,000.00 19,360.00
Pasir Pasang m3 0.045 371,000.00 16,695.00
Pekerja oh 0.300 70,000.00 21,000.00
Tukang Batu oh 0.100 80,000.00 8,000.00
Kepala Tukang Batu oh 0.010 85,000.00 850.00
Mandor oh 0.015 85,000.00 1,275.00
Jumlah 137,180.00
3 Pek. Plesteran Dinding m2 1.000
Semen Portland kg 5.184 2,000.00 10,368.00
Pasir pasang m3 0.026 371,000.00 9,646.00
Pekerja oh 0.300 70,000.00 21,000.00
Tukang Batu oh 0.150 80,000.00 12,000.00
Kepala Tukang Batu oh 0.015 85,000.00 1,275.00
Mandor oh 0.015 85,000.00 1,275.00
Jumlah 55,564.00
4 Pek. Plesteran Sudut m 1.000
Semen Portland zak 0.010 51,000.00 510.00
Pasir Pasang m3 0.013 371,000.00 4,823.00
Pekerja oh 0.080 70,000.00 5,600.00
Tukang Batu oh 0.040 80,000.00 3,200.00
Kepala Tukang Batu oh 0.040 85,000.00 3,400.00
Mandor oh 0.004 85,000.00 340.00
Jumlah 17,873.00
VI PEKERJAAN BUKAAN
1 Pek. Kusen Pintu Dan Jendela m3 1.000
Kayu Kamper Balok m3 1.200 10,644,000.00 12,772,800.00
Paku Usuk kg 1.250 15,000.00 18,750.00
Lem Kayu kg 1.000 40,000.00 40,000.00
Pekerja oh 6.000 70,000.00 420,000.00
Tukang Kayu oh 18.000 80,000.00 1,440,000.00
Kepala Tukang Kayu oh 1.800 90,000.00 162,000.00
Mandor oh 0.300 85,000.00 25,500.00
Jumlah 14,879,050.00
2 Pek. Daun Pintu Dan Jendela m3 1.000
Kayu Jati (Papan) m3 0.040 22,579,000.00 903,160.00
Lem Kayu kg 0.500 40,000.00 20,000.00
Pekerja oh 1.000 70,000.00 70,000.00
Tukang Kayu oh 3.000 80,000.00 240,000.00
Kepala Tukang Kayu oh 0.300 90,000.00 27,000.00
Mandor oh 0.050 85,000.00 4,250.00
Jumlah 1,264,410.00
3 Pek. Kaca Tebal 5 mm m2 1.000
Kaca Reyband Tebal 5 mm m2 1.100 123,000.00 135,300.00
Sealent kg 0.050 69,000.00 3,450.00
Pekerja oh 0.015 70,000.00 1,050.00
Tukang Kayu oh 0.150 80,000.00 12,000.00
Kepala Tukang Kayu oh 0.015 90,000.00 1,350.00
Mandor oh 0.008 85,000.00 637.50
Jumlah 153,787.50
VII PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek. Rangka Atap m3 1.000
Kayu Bengkirai Balok m3 1.200 9,750,000.00 11,700,000.00
Paku Usuk kg 5.600 15,000.00 84,000.00
Besi Plat kg 15.000 13,500.00 202,500.00
Pekerja oh 6.700 70,000.00 469,000.00
Tukang Kayu oh 20.100 80,000.00 1,608,000.00
Kepala Tukang Kayu oh 2.010 90,000.00 180,900.00
Mandor oh 0.335 85,000.00 28,475.00
Jumlah 14,272,875.00
2 Pek Rangka Penutup Atap m2 1.000
Kayu Bengkirai Balok m3 0.014 9,750,000.00 136,500.00
Paku usuk kg 0.150 15,000.00 2,250.00
Pekerja oh 0.100 70,000.00 7,000.00
Tukang Kayu oh 0.100 80,000.00 8,000.00
Kepala Tukang Kayu oh 0.010 90,000.00 900.00
Mandor oh 0.005 85,000.00 425.00
Jumlah 155,075.00
3 Pasang Lisplank UK 2/20 m 1.000
Kayu Kamper (papan) m3 0.011 10,644,000.00 117,084.00
Paku usuk kg 0.100 15,000.00 1,500.00
Pekerja oh 0.100 70,000.00 7,000.00
Tukang Kayu oh 0.200 80,000.00 16,000.00
Kepala Tukang Kayu oh 0.020 90,000.00 1,800.00
Mandor oh 0.005 85,000.00 425.00
Jumlah 143,809.00
4 Pasang Genteng Bubungan Tanah m 1.000
Bubungan Genteng Tanah bh 5.000 4,000.00 20,000.00
Semen PC kg 15 2,000.00 30,480.00
Pasir Pasang m3 0.015 371,000.00 5,639.20
Kapur m3 0.015 147,000.00 2,234.40
Pekerja oh 0.400 70,000.00 28,000.00
Tukang Kayu oh 0.200 80,000.00 16,000.00
Kepala Tukang Kayu oh 0.020 90,000.00 1,800.00
Mandor oh 0.020 85,000.00 1,700.00
Jumlah 105,853.60
5 Pasang Genteng Tanah Penutup Atap m2 1.000
Genteng Tanah bh 25.000 2,000.00 50,000.00
Pekerja oh 0.150 70,000.00 10,500.00
Tukang Kayu oh 0.075 80,000.00 6,000.00
Kepala Tukang Kayu oh 0.008 90,000.00 720.00
Mandor oh 0.008 85,000.00 680.00
Jumlah 67,900.00
VIII PEKERJAAN PLAFOND
1 Pek. Pasang Plafond Gypsum Rangka Kayu m2 1.000
Kaso Meranti 5/7 m 0.016 2,400,000.00 38,400.00
Paku Biasa 2" - 3 " kg 0.250 26,000.00 6,500.00
Pekerja oh 0.200 70,000.00 14,000.00
Tukang Kayu oh 0.300 80,000.00 24,000.00
Kepala Tukang Kayu oh 0.030 90,000.00 2,700.00
Mandor oh 0.010 85,000.00 850.00
Jumlah 86,450.00
2 Pek. Pasang Plafond Gypsum m2 1.000
Gypsum Board t=9mm lbr 0.364 63,000.00 22,932.00
Paku Asbes Skrup 4 bh 0.110 1,000.00 110.00
Pekerja oh 0.100 70,000.00 7,000.00
Tukang Kayu oh 0.050 80,000.00 4,000.00
Kepala Tukang Kayu oh 0.005 90,000.00 450.00
Mandor oh 0.005 85,000.00 425.00
Jumlah 34,917.00
3 Pek. List Gypsum m 1.000
List Gypsum m 1.050 26,000.00 27,300.00
Sekrup bh 4.000 1,000.00 4,000.00
Pekerja oh 0.050 70,000.00 3,500.00
Tukang Kayu oh 0.050 80,000.00 4,000.00
Kepala Tukang Kayu oh 0.005 90,000.00 450.00
Mandor oh 0.003 85,000.00 255.00
Jumlah 39,505.00
IX PEKERJAAN LANTAI KERAMIK
1 Pemasangan Keramik Lantai 20x20 KM/WC m2 1.000
Semen PC kg 10.400 2,000.00 20,800.00
Semen Warna kg 0.500 19,000.00 9,500.00
Pasir Pasang m3 0.045 371,000.00 16,695.00
Ubin Keramik 20x20 dos 1.050 85,000.00 89,250.00
Pekerja oh 0.700 70,000.00 49,000.00
Tukang Batu oh 0.350 80,000.00 28,000.00
Kepala Tukang Batu oh 0.035 85,000.00 2,975.00
Mandor oh 0.035 85,000.00 2,975.00
Jumlah 219,195.00
2 Pemasangan Keramik Lantai 40x40 m2 1.000
Keramik 40x40 cm Polished m2 1.050 89,000.00 93,450.00
Semen PC kg 11.380 2,000.00 22,760.00
Pasir Pasang m2 0.045 371,000.00 16,695.00
Semen Warna kg 1.620 19,000.00 30,780.00
Pekerja OH 0.700 70,000.00 49,000.00
Tukang Batu OH 0.350 80,000.00 28,000.00
Kepala Tukang Batu OH 0.035 85,000.00 2,975.00
Mandor OH 0.035 85,000.00 2,975.00
Jumlah 246,635.00
3 Pemasangan Plint 10x40 m2 1.000
Plint Ubin 10x40 m2 2.650 59,500.00 157,675.00
Semen PC kg 1.140 2,000.00 2,280.00
Pasir Pasang m2 0.003 371,000.00 1,113.00
Semen Warna kg 0.100 19,000.00 1,900.00
Pekerja OH 0.090 70,000.00 6,300.00
Tukang Batu OH 0.090 80,000.00 7,200.00
Kepala Tukang Batu OH 0.009 85,000.00 765.00
Mandor OH 0.005 85,000.00 425.00
Jumlah 177,658.00
4 Pemasangan Keramik Dinding 20x20 m2 1.000
Keramik Dinding 20x20 m2 2.650 51,000.00 135,150.00
Semen PC kg 9.300 2,000.00 18,600.00
Pasir Pasang m2 0.018 371,000.00 6,678.00
Semen Warna kg 1.940 19,000.00 36,860.00
Pekerja OH 0.900 70,000.00 63,000.00
Tukang Batu OH 0.450 80,000.00 36,000.00
Kepala Tukang Batu OH 0.045 85,000.00 3,825.00
Mandor OH 0.045 85,000.00 3,825.00
Jumlah 303,938.00
X PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Baru m2 1.000
Plamur kg 0.100 28,000.00 2,800.00
Cat Dasar kg 0.100 36,000.00 3,600.00
Cat Penutup kg 0.260 36,000.00 9,360.00
Pekerja oh 0.020 70,000.00 1,400.00
Tukang Cat oh 0.063 80,000.00 5,040.00
Kepala Tukang Cat oh 0.006 85,000.00 535.50
Mandor oh 0.003 85,000.00 255.00
Jumlah 22,990.50
2 Pek. Cat Politur Kayu m2 1.000
Politur lt 0.150 112,000.00 16,800.00
Politur Jadi lt 0.372 112,000.00 41,664.00
Amplas lbr 2.000 4,000.00 8,000.00
Pekerja oh 0.040 70,000.00 2,800.00
Tukang Cat oh 0.060 80,000.00 4,800.00
Kepala Tukang Cat oh 0.016 85,000.00 1,360.00
Mandor oh 0.003 85,000.00 255.00
Jumlah 75,679.00
XI PEKERJAAN INSTALASI LISTRIK
1 Pemasangan MCB + Box Sekring Unit 1.000
Pipa PVC 5"-8" m 0.800 2,500.00 2,000.00
Kabel NYA 4mm m 10.000 6,000.00 60,000.00
Isolasi roll 1.000 7,000.00 7,000.00
MCB buah 2.000 164,000.00 328,000.00
Box Sekring buah 1.000 35,000.00 35,000.00
Tukang Listrik oh 0.160 85,000.00 13,600.00
jumlah 445,600.00
2 Pemasangan Titik Lampu Titik 1.000
Lampu 18 WATT bh 1.000 60,000.00 60,000.00
Tukang Listrik oh 0.100 85,000.00 8,500.00
jumlah 68,500.00
3 Pemasangan Saklar Ganda Unit 1.000
Saklar Ganda bh 1.000 25,000.00 25,000.00
Tukang Listrik oh 0.100 85,000.00 8,500.00
jumlah 33,500.00
4 Pemasangan Saklar Tunggal Unit 1.000
Saklar Tunggal bh 1.000 19,000.00 19,000.00
Tukang Listrik oh 0.100 85,000.00 8,500.00
jumlah 27,500.00
5 Pemasangan Stopkontak Unit 1.000
Stopkontak bh 1.000 21,000.00 21,000.00
Tukang Listrik oh 0.100 85,000.00 8,500.00
jumlah 29,500.00
6 Penyambungan Listrik PLN Unit 1.000
Biaya Penyambungan 1300 VA Unit 1.000 1,218,000.00 1,218,000.00
jumlah 1,218,000.00
XII PEKERJAAN SANITASI
1 Pasang Layanan PDAM Kelompok I unit 1.000
Biaya penyambungan unit 1.000 1,100,000.00 1,100,000.00
Accessories unit 1.000 885,255.00 885,255.00
Biaya Pendaftaran unit 1.000 15,000.00 15,000.00
Biaya Jaminan Langganan unit 1.000 100,000.00 100,000.00
jumlah 2,100,255.00
2 Pek. Instalasi Pipa Galvanis 3/4" Air Bersih m 1.000
Pipa Galvanis 3/4" m 1.200 165,000.00 198,000.00
Pekerja oh 0.054 70,000.00 3,780.00
Tukang Batu oh 0.090 80,000.00 7,200.00
Kepala Tukang Batu oh 0.009 85,000.00 765.00
Mandor oh 0.027 85,000.00 2,295.00
Perlengkapan % 0.350 100,000.00 35,000.00
jumlah 247,040.00
3 Pek. Instalasi Pipa PVC 4" Saluran Tinja m 1.000
Pipa PVC 4" m 1.200 308,000.00 369,600.00
Pekerja oh 0.081 70,000.00 5,670.00
Tukang Batu oh 0.135 80,000.00 10,800.00
Kepala Tukang Batu oh 0.014 85,000.00 1,147.50
Mandor oh 0.004 85,000.00 340.00
Perlengkapan % 0.350 100,000.00 35,000.00
jumlah 422,557.50
4 Pek. Instalasi Pipa PVC 3" Saluran Air Bekas m 1.000
Pipa PVC 3" m 1.200 193,000.00 231,600.00
Pekerja oh 0.081 70,000.00 5,670.00
Tukang Batu oh 0.135 80,000.00 10,800.00
Kepala Tukang Batu oh 0.014 85,000.00 1,147.50
Mandor oh 0.004 85,000.00 340.00
Perlengkapan % 0.350 100,000.00 35,000.00
jumlah 284,557.50
5 Pek. Bak Kontrol Air Hujan unit 1.000
Batu Bata Merah bh 123.000 1,000.00 123,000.00
Semen Portland kg 114.000 2,000.00 228,000.00
Pasir Pasang m3 0.180 371,000.00 66,780.00
Pasir Beton m3 0.120 320,000.00 38,400.00
Kerikil m3 0.030 357,000.00 10,710.00
Baja Tulangan kg 4.850 19,000.00 92,150.00
Pekerja oh 3.200 70,000.00 224,000.00
Tukang Batu oh 1.150 80,000.00 92,000.00
Kepala Tukang Batu oh 0.011 85,000.00 935.00
Mandor oh 0.016 85,000.00 1,360.00
jumlah 877,335.00
6 Pek. Galian Sumur Resapan Air Hujan m 1.000
Buis D80 unit 2.000 141,000.00 282,000.00
Ijuk m3 0.015 8,000.00 120.00
Pekerja oh 0.735 70,000.00 51,450.00
Tukang Gali Sumur oh 1.000 100,000.00 100,000.00
Mandor oh 0.074 85,000.00 6,247.50
jumlah 439,817.50
7 Pek. Pemasangan Kran Air unit 1.000
Kran Air bh 1.000 58,000.00 58,000.00
Seal Tape bh 0.025 6,000.00 150.00
Pekerja oh 0.010 70,000.00 700.00
Tukang Batu oh 0.400 80,000.00 32,000.00
Kepala Tukang Batu oh 0.040 85,000.00 3,400.00
Mandor oh 0.005 85,000.00 425.00
jumlah 94,675.00
8 Pek. Pemasangan Septictank unit 1.000
Batu Bata Merah bh 1.000 1,000.00 1,000.00
Semen Portland kg 7.700 2,000.00 15,400.00
Pasir Pasang m3 1.215 371,000.00 450,765.00
Pasir Urug m3 0.300 268,000.00 80,400.00
Pasir Beton m3 0.700 320,000.00 224,000.00
Kerikil m3 0.166 357,000.00 59,262.00
Baja Tulangan kg 2.600 19,000.00 49,400.00
Kawat beton (bendrat) kg 0.260 28,000.00 7,280.00
Paku biasa 2" - 3 " kg 0.400 26,000.00 10,400.00
Kayu papan 3/20 m2 0.031 10,644,000.00 329,964.00
Pipa Besi btg 1.000 122,000.00 122,000.00
Kerstek T bh 1.000 6,000.00 6,000.00
Pekerja oh 2.800 70,000.00 196,000.00
Tukang Batu oh 0.500 80,000.00 40,000.00
Mandor oh 0.760 85,000.00 64,600.00
jumlah 1,656,471.00
9 Pek. Pemasangan Kloset Duduk unit 1.000
Kloset duduk unit 1.000 1,546,000.00 1,546,000.00
Perlengkapan % 0% 92,760.00 92,760.00
Pekerja oh 3.3 70,000.00 231,000.00
Tukang Batu oh 1.1 80,000.00 88,000.00
Kepala Tukang Batu oh 0.01 85,000.00 850.00
Mandor oh 0.16 85,000.00 13,600.00
jumlah 1,972,210.00
10 Pek. Pemasangan wastafel unit 1.000
Wastafel unit 1.200 508,000.00 609,600.00
Semen Portland kg 6.000 2,000.00 12,000.00
Pasir Pasang m3 0.010 371,000.00 3,710.00
Perlengkapan % 0.060 100,000.00 6,000.00
Pekerja oh 1.200 70,000.00 84,000.00
Tukang Batu oh 1.450 80,000.00 116,000.00
Kepala Tukang Batu oh 0.150 85,000.00 12,750.00
Mandor oh 0.060 85,000.00 5,100.00
jumlah 849,160.00
11 Pek. Pemasangan Floordrain unit 1.000
Floordrain unit 1.000 28,000.00 28,000.00
Pekerja oh 0.01 70,000.00 700.00
Tukang Batu oh 0.1 80,000.00 8,000.00
Kepala Tukang Batu oh 0.01 85,000.00 850.00
Mandor oh 0.005 85,000.00 425.00
jumlah 37,975.00
XIII PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pek. Pemasangan Engsel Pintu unit 1.000
Engsel Pintu unit 1.000 30,000.00 30,000.00
Pekerja oh 0.015 70,000.00 1,050.00
Tukang Kayu oh 0.15 80,000.00 12,000.00
Kepala Tukang Kayu oh 0.015 90,000.00 1,350.00
Mandor oh 0.0008 85,000.00 68.00
jumlah 44,468.00
2 Pek. Pemasangan Engsel Jendela unit 1.000
Engsel Jendela unit 1.000 7,000.00 7,000.00
Pekerja oh 0.01 70,000.00 700.00
Tukang Kayu oh 0.1 80,000.00 8,000.00
Kepala Tukang Kayu oh 0.01 90,000.00 900.00
Mandor oh 0.0005 85,000.00 42.50
jumlah 16,642.50
3 Pek. Pemasangan Handle Pintu unit 1.000
Handle Pintu unit 1.000 78,000.00 78,000.00
Pekerja oh 0.05 70,000.00 3,500.00
Tukang Kayu oh 0.5 80,000.00 40,000.00
Kepala Tukang Kayu oh 0.05 90,000.00 4,500.00
Mandor oh 0.0025 85,000.00 212.50
jumlah 126,212.50
4 Pek. Pemasangan Handle Jendela unit 1.000
Handle Jendela unit 1.000 12,500.00 12,500.00
Pekerja oh 0.05 70,000.00 3,500.00
Tukang Kayu oh 0.5 80,000.00 40,000.00
Kepala Tukang Kayu oh 0.05 90,000.00 4,500.00
Mandor oh 0.0025 85,000.00 212.50
jumlah 60,712.50
5 Pek. Pemasangan Grendel unit 1.000
Grendel unit 1.000 26,000.00 26,000.00
Pekerja oh 0.02 70,000.00 1,400.00
Tukang Kayu oh 0.2 80,000.00 16,000.00
Kepala Tukang Kayu oh 0.02 90,000.00 1,800.00
Mandor oh 0.001 85,000.00 85.00
jumlah 45,285.00
6 Pek. Pemasangan Hak Angin unit 1.000
Hak Angin unit 1.000 7,000.00 7,000.00
Pekerja oh 0.015 70,000.00 1,050.00
Tukang Kayu oh 0.15 80,000.00 12,000.00
Kepala Tukang Kayu oh 0.015 90,000.00 1,350.00
Mandor oh 0.0008 85,000.00 68.00
jumlah 21,468.00
SUMBER : PERENCANA :
3 Urugan Pasir
Pasir Urug
Pekerja
Mandor
4 Urugan Tasirtu
Tasirtu
Sewa stemper
Pekerja
Mandor
3 Benangan Sudut 1 : 2
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
4 Acian Beton
Semen Portland
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
3 Beton K-225
Semen Portland 40 kg
Pasir beton
Batu pecah mesin 1/2
Air (biaya air tawar)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
4 Beton K-300
Semen Portland 40 kg
Pasir beton
Batu pecah mesin 1/2
Air (biaya air tawar)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
7 Pembesian Wiremesh M6
Wiremesh M6 (210 x 495 cm )
Kawat beton
Pekerja
Tukang Besi
Kepala Tukang Besi
Mandor
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
12 Bekisting Plat Lantai
Kayu meranti usuk
Paku biasa 2"- 5"
Minyak Begesting
Balok Kayu Meranti
Multiplek tebal 12 mm
Dolken Kayu Gelam 8-10/400 cm
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
13 Bekisting Tangga
Kayu meranti usuk
Paku Usuk
Minyak Begesting
Balok Kayu Kamper 3/5
Multiplek tebal 9 mm
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
41 Beton lisplank t= 8 cm
Beton K300
Begesting 2x pakai
Besi beton polos U24
Besi beton ulir U39
8 Pasang Kaca t= 6 mm
Kaca polos t= 6 mm
Pekerja
Tukang
Kepala Tukang
Mandor
12 Pasang Multiplek t= 12 mm
Multiplek t= 12 mm (122X244 cm
Pekerja
Tukang
Kepala Tukang
Mandor
17 Railing Tangga 2
Untuk panjang reiling
Hand railing pipa BSP dia 2 1/2 " t= 3,2 mm
Kolom Railing Hollow 40x40x2,3 mm
Hollow 20x20x2 mm
Base Plate
Cat pipa railing
4 Pengerjaan Waterproofing
Water Proofing dan Scredding
Pekerja
Tukang cat
Kepala Tukang cat
Mandor
Jumlah
Pekerjaan Sat. Koef. Harga Satuan (Rp)
(Rp)
m2 1.000
OH 0.100 85,500.00 8,550.00
OH 0.050 198,000.00 9,900.00
Jumlah 18,450.00
m 1.000
m3 0.012 3,498,000.00 41,976.00
kg 0.020 15,900.00 318.00
m3 0.007 1,890,000.00 13,230.00
oh 0.100 85,500.00 8,550.00
oh 0.100 107,400.00 10,740.00
oh 0.010 136,800.00 1,368.00
oh 0.005 198,000.00 891.00
Jumlah 77,073.00
m2 1.000
bln 7.000 1,798,500.00 12,589,500.00
Jumlah 12,589,500.00
m1 1.000
m3 1.000
OH 0.750 85,500.00 64,125.00
OH 0.025 198,000.00 4,950.00
Jumlah 69,075.00
m3 1.000
OH 1.440 85,500.00 123,120.00
OH 0.072 198,000.00 14,256.00
jam 1.200 15,000.00 18,000.00
Jumlah 155,376.00
m3 1.000
m3 1.100 136,800.00 150,480.00
OH 0.300 85,500.00 25,650.00
OH 0.100 198,000.00 19,800.00
Jumlah 195,930.00
m3 1.000
m3 1.200 96,100.00 115,320.00
hari 0.009 100,000.00 900.00
OH 0.250 85,500.00 21,375.00
OH 0.025 198,000.00 4,950.00
Jumlah 142,545.00
m3 1.000
OH 0.102 85,500.00 8,721.00
OH 0.019 198,000.00 3,762.00
Jumlah 12,483.00
m3 1.000
OH 0.200 85,500.00 17,100.00
OH 0.040 198,000.00 7,920.00
Jumlah 25,020.00
m3 1.000
m3 1.2000 155,300.00 186,360.00
m3 0.3000 136,800.00 41,040.00
oh 0.7800 85,500.00 66,690.00
oh 0.3900 109,300.00 42,627.00
oh 0.0390 133,200.00 5,194.80
oh 0.0390 198,000.00 7,722.00
Jumlah 349,633.80
m3 1.000
m3 1.100 155,300.00 170,830.00
kg 136.000 1,200.00 163,200.00
m3 0.544 169,100.00 91,990.40
oh 1.500 85,500.00 128,250.00
oh 0.750 109,300.00 81,975.00
oh 0.075 133,200.00 9,990.00
oh 0.075 198,000.00 14,850.00
Jumlah 661,085.40
m3 1.000
bh 70.000 700.00 49,000.00
zak 0.287 61,100.00 17,560.14
m3 0.040 169,100.00 6,764.00
oh 0.300 85,500.00 25,650.00
oh 0.100 109,300.00 10,930.00
oh 0.010 133,200.00 1,332.00
oh 0.015 198,000.00 2,970.00
Jumlah 1 m2 114,206.14
Jumlah 1 m3 8.333 114,206.14 951,717.83
TEMBOK
m2 1.000
bh 70.000 700.00 49,000.00
zak 0.287 61,100.00 17,560.14
m3 0.040 169,100.00 6,764.00
OH 0.300 85,500.00 25,650.00
OH 0.100 109,300.00 10,930.00
OH 0.010 133,200.00 1,332.00
OH 0.015 198,000.00 2,970.00
Jumlah 114,206.14
Jumlah 1 m3 8.330 114,206.14 951,337.15
m2 1.000
bh 70.000 700.00 49,000.00
zak 0.194 61,100.00 11,853.40
m3 0.045 169,100.00 7,609.50
OH 0.300 85,500.00 25,650.00
OH 0.100 109,300.00 10,930.00
OH 0.010 133,200.00 1,332.00
OH 0.015 198,000.00 2,970.00
Jumlah 109,344.90
GAN DAN ACIAN
m2 1.000
zak 0.156 61,100.00 9,501.05
m3 0.023 169,100.00 3,889.30
OH 0.300 85,500.00 25,650.00
OH 0.150 109,300.00 16,395.00
OH 0.015 133,200.00 1,998.00
OH 0.015 198,000.00 2,970.00
Jumlah 60,403.35
m2 1.000
zak 0.104 61,100.00 6,336.07
m3 0.026 169,100.00 4,396.60
OH 0.300 85,500.00 25,650.00
OH 0.150 109,300.00 16,395.00
OH 0.015 133,200.00 1,998.00
OH 0.015 198,000.00 2,970.00
Jumlah 57,745.67
m 1.000
zak 0.010 61,100.00 611.00
m3 0.013 169,100.00 2,198.30
OH 0.080 85,500.00 6,840.00
OH 0.040 109,300.00 4,372.00
OH 0.040 133,200.00 5,328.00
OH 0.004 198,000.00 792.00
Jumlah 20,141.30
m2 1.000
zak 0.065 61,100.00 3,971.50
OH 0.200 85,500.00 17,100.00
OH 0.100 109,300.00 10,930.00
OH 0.010 133,200.00 1,332.00
OH 0.010 198,000.00 1,980.00
Jumlah 35,313.50
m, l= 12 m m 1.000
m 1.000 148,200.00 148,200.00
oh 0.125 198,000.00 24,750.00
Jam 0.218 130,000.00 28,340.00
Jam 0.218 150,000.00 32,700.00
Jumlah 233,990.00
bh 1.000
bh 1.000 33,600.00 33,600.00
kg 0.500 38,200.00 19,100.00
lt 0.050 32,100.00 1,605.00
lt 1.000 7,000.00 7,000.00
hr 0.050 50,000.00 2,500.00
oh 0.250 99,800.00 24,950.00
Jumlah 88,755.00
ttk 1.000
oh 0.420 85,500.00 35,910.00
oh 0.250 99,800.00 24,950.00
oh 0.020 198,000.00 3,960.00
Jumlah 64,820.00
m3 1.000
zak 5.750 56,700.00 326,025.00
m3 0.558 182,400.00 101,797.44
m3 0.541 271,200.00 146,583.60
lt 215.000 100.00 21,500.00
OH 1.200 85,500.00 102,600.00
OH 0.200 109,300.00 21,860.00
OH 0.020 133,200.00 2,664.00
OH 0.060 198,000.00 11,880.00
Jumlah 734,910.04
m3 1.000
zak 6.900 56,700.00 391,230.00
m3 0.518 182,400.00 94,392.00
m3 0.533 271,200.00 144,441.12
lt 215.000 100.00 21,500.00
OH 1.650 85,500.00 141,075.00
OH 0.275 109,300.00 30,057.50
OH 0.028 133,200.00 3,729.60
OH 0.083 198,000.00 16,434.00
Jumlah 842,859.22
m3 1.000
zak 9.275 56,700.00 525,892.50
m3 0.436 182,400.00 79,581.12
m3 0.551 271,200.00 149,458.32
lt 215.000 100.00 21,500.00
OH 1.650 85,500.00 141,075.00
OH 0.275 109,300.00 30,057.50
OH 0.028 133,200.00 3,729.60
OH 0.083 198,000.00 16,434.00
Jumlah 967,728.04
m3 1.000
zak 10.325 56,700.00 585,427.50
m3 0.426 182,400.00 77,629.44
m3 0.537 271,200.00 145,742.88
lt 215.000 100.00 21,500.00
OH 1.650 85,500.00 141,075.00
OH 0.275 109,300.00 30,057.50
OH 0.028 133,200.00 3,729.60
OH 0.083 198,000.00 16,434.00
Jumlah 1,021,595.92
kg 1.000
kg 1.050 10,900.00 11,445.00
kg 0.015 17,600.00 264.00
OH 0.007 85,500.00 598.50
OH 0.007 109,300.00 765.10
OH 0.001 133,200.00 93.24
OH 0.000 198,000.00 79.20
Jumlah 13,245.04
kg 1.000
kg 1.050 10,600.00 11,130.00
kg 0.015 17,600.00 264.00
OH 0.007 85,500.00 598.50
OH 0.007 109,300.00 765.10
OH 0.001 133,200.00 93.24
OH 0.000 198,000.00 79.20
Jumlah 12,930.04
m2 1.000
lbr 0.0900 428,000.00 38,520.00
kg 0.0300 17,600.00 528.00
OH 0.1500 85,500.00 12,825.00
OH 0.0300 109,300.00 3,279.00
OH 0.0150 133,200.00 1,998.00
OH 0.0300 198,000.00 5,940.00
Jumlah 63,090.00
m2 1.000
bh 14.000 2,300.00 32,200.00
m3 0.027 169,100.00 4,565.70
Kg 7.500 1,200.00 9,000.00
HO 0.320 85,500.00 27,360.00
HO 0.100 109,300.00 10,930.00
HO 0.010 133,200.00 1,332.00
HO 0.005 198,000.00 990.00
Jumlah 86,377.70
m2 1.000
m3 0.022 1,890,000.00 41,580.00
m3 0.002 3,498,000.00 6,996.00
kg 0.300 15,900.00 4,770.00
ltr 0.100 7,100.00 710.00
Jumlah bahan 54,056.00
OH 0.520 85,500.00 44,460.00
OH 0.260 109,300.00 28,418.00
OH 0.026 133,200.00 3,463.20
OH 0.026 198,000.00 5,148.00
Jumlah upah 81,489.20
Bahan Begesting 2x pakai 0.500 54,056.00 27,028.00
Upah bgesting 2 x pakai 1.000 81,489.20 81,489.20
Jumlah begesting 2 x pakai 108,517.20
m2 1.000
m3 0.010 3,498,000.00 34,980.00
kg 0.400 15,900.00 6,360.00
ltr 0.200 7,100.00 1,420.00
m3 0.015 4,161,000.00 62,415.00
lbr 0.350 175,400.00 61,390.00
btg 2.000 15,000.00 30,000.00
Jumlah bahan 196,565.00
OH 0.660 85,500.00 56,430.00
OH 0.330 109,300.00 36,069.00
OH 0.033 133,200.00 4,395.60
OH 0.033 198,000.00 6,534.00
Jumlah upah 103,428.60
Bahan Begesting 2x pakai 0.500 196,565.00 98,282.50
Upah bgesting 2 x pakai 1.000 103,428.60 103,428.60
Jumlah begesting 2 x pakai 201,711.10
m3 1.000
m3 0.020 3,498,000.00 69,960.00
kg 0.400 15,900.00 6,360.00
ltr 0.200 7,100.00 1,420.00
m3 0.018 4,161,000.00 74,898.00
lbr 0.350 175,400.00 61,390.00
btg 2.000 15,000.00 30,000.00
Jumlah bahan 244,028.00
OH 0.660 85,500.00 56,430.00
OH 0.330 109,300.00 36,069.00
OH 0.033 133,200.00 4,395.60
OH 0.033 198,000.00 6,534.00
Jumlah upah 103,428.60
Bahan Begesting 2x pakai 0.500 244,028.00 122,014.00
Upah bgesting 2 x pakai 1.000 103,428.60 103,428.60
Jumlah begesting 2 x pakai 225,442.60
m3 1.000
m3 0.0238 3,498,000.00 83,252.40
kg 0.4000 15,900.00 6,360.00
ltr 0.2000 7,100.00 1,420.00
m3 0.0150 4,161,000.00 62,415.00
lbr 0.3500 175,400.00 61,390.00
btg 6.0000 15,000.00 90,000.00
Jumlah bahan 304,837.40
OH 0.660 85,500.00 56,430.00
OH 0.330 109,300.00 36,069.00
OH 0.033 133,200.00 4,395.60
OH 0.033 198,000.00 6,534.00
Jumlah upah 103,428.60
Bahan Begesting 2x pakai 0.500 304,837.40 152,418.70
Upah bgesting 2 x pakai 1.000 103,428.60 103,428.60
Jumlah begesting 2 x pakai 255,847.30
m3 1.000
m3 0.030 3,498,000.00 104,940.00
kg 0.400 16,700.00 6,680.00
ltr 0.150 7,100.00 1,065.00
m3 0.015 4,161,000.00 62,415.00
lbr 0.350 119,800.00 41,930.00
Jumlah bahan 217,030.00
OH 0.660 85,500.00 56,430.00
OH 0.330 109,300.00 36,069.00
OH 0.033 133,200.00 4,395.60
OH 0.033 198,000.00 6,534.00
Jumlah upah 103,428.60
Bahan Begesting 2x pakai 0.500 217,030.00 108,515.00
Upah bgesting 2 x pakai 1.000 103,428.60 103,428.60
Jumlah begesting 2 x pakai 211,943.60
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 3.790 86,377.70 327,371.48
kg 57.750 12,930.04 746,709.81
kg 96.871 13,245.04 1,283,059.84
Jumlah 3,378,737.06
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 2.710 86,377.70 234,083.57
kg 159.384 13,245.04 2,111,053.91
Jumlah 3,366,733.40
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 2.580 86,377.70 222,854.47
kg 224.991 13,245.04 2,980,009.96
Jumlah 4,224,460.34
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 2.160 86,377.70 186,575.83
kg 175.225 13,245.04 2,320,866.04
Jumlah 3,529,037.79
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
kg 89.000 12,930.04 1,150,773.56
Jumlah 2,172,369.48
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 5.000 108,517.20 542,586.00
kg 49.193 12,930.04 636,061.92
kg 89.143 13,245.04 1,180,700.71
Jumlah 3,380,944.54
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 6.660 108,517.20 722,724.55
kg 64.494 12,930.04 833,907.13
kg 86.667 13,245.04 1,147,903.47
Jumlah 3,726,131.07
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 6.660 108,517.20 722,724.55
kg 59.232 12,930.04 765,872.13
kg 55.467 13,245.04 734,658.22
Jumlah 3,244,850.82
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 13.330 108,517.20 1,446,534.28
kg 252.947 12,930.04 3,270,610.52
kg 0.000 13,245.04 -
Jumlah 5,738,740.71
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 11.660 201,711.10 2,351,951.43
kg 49.090 12,930.04 634,738.54
kg 156.000 13,245.04 2,066,226.24
Jumlah 6,074,512.12
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 10.000 201,711.10 2,017,111.00
kg 42.325 12,930.04 547,268.25
kg 156.000 13,245.04 2,066,226.24
Jumlah 5,652,201.41
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 13.330 201,711.10 2,688,808.96
kg 36.036 12,930.04 465,941.17
kg 138.667 13,245.04 1,836,645.55
Jumlah 6,012,991.60
m3 1.000
m3 1.000 967,728.04 967,728.04
m2 13.330 108,517.20 1,446,534.28
kg 191.483 12,930.04 2,475,884.29
Jumlah 4,890,146.60
m3 1.000
m3 1.000 967,728.04 967,728.04
m2 13.330 108,517.20 1,446,534.28
kg 162.620 12,930.04 2,102,683.10
Jumlah 4,516,945.42
gga 1 (Utama) m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 8.330 211,943.60 1,765,490.19
kg 191.047 12,930.04 2,470,250.52
Jumlah 5,257,336.63
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 12.500 225,442.60 2,818,032.50
kg 40.480 12,930.04 523,408.02
kg 117.000 13,245.04 1,549,669.68
Jumlah 5,912,706.12
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 6.160 225,442.60 1,388,726.42
kg 60.771 12,930.04 785,776.47
kg 117.796 13,245.04 1,560,211.65
Jumlah 4,756,310.46
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 7.000 225,442.60 1,578,098.20
kg 66.560 12,930.04 860,629.21
kg 128.267 13,245.04 1,698,897.13
Jumlah 5,159,220.46
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 7.000 225,442.60 1,578,098.20
kg 66.560 12,930.04 860,629.21
kg 96.200 13,245.04 1,274,172.85
Jumlah 4,734,496.18
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 7.060 225,442.60 1,591,624.76
kg 44.462 12,930.04 574,898.31
kg 97.760 13,245.04 1,294,835.11
Jumlah 4,482,954.10
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 8.100 225,442.60 1,826,085.06
kg 56.253 12,930.04 727,357.85
kg 115.440 13,245.04 1,529,007.42
Jumlah 5,104,046.25
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 9.500 225,442.60 2,141,704.70
kg 65.980 12,930.04 853,124.04
kg 78.000 13,245.04 1,033,113.12
Jumlah 5,049,537.78
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 9.330 225,442.60 2,103,379.46
kg 55.956 12,930.04 723,507.57
kg 104.000 13,245.04 1,377,484.16
Jumlah 5,225,967.11
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 8.660 225,442.60 1,952,332.92
kg 52.729 12,930.04 681,786.64
kg 55.467 13,245.04 734,658.22
Jumlah 4,390,373.70
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 8.330 225,442.60 1,877,936.86
kg 47.831 12,930.04 618,458.18
kg 60.667 13,245.04 803,532.43
Jumlah 4,321,523.38
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 6.667 255,847.30 1,705,648.67
kg 172.000 12,930.04 2,223,966.88
kg 0.000 13,245.04 -
Jumlah 4,951,211.47
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 8.333 255,847.30 2,132,060.83
kg 152.000 12,930.04 1,965,366.08
kg 0.000 13,245.04 -
Jumlah 5,119,022.83
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 10.000 255,847.30 2,558,473.00
kg 132.000 12,930.04 1,706,765.28
kg 0.000 13,245.04 -
Jumlah 5,286,834.20
m3 1.000
m3 1.000 1,021,595.92 1,021,595.92
m2 12.500 255,847.30 3,198,091.25
kg 156.000 12,930.04 2,017,086.24
kg 0.000 13,245.04 -
Jumlah 6,236,773.41
m3 1.000
m3 1.000 967,728.04 967,728.04
m2 0.100 86,377.70 8,637.77
m2 12.500 63,090.00 788,625.00
Jumlah 1,764,990.81
m3 1.000
m3 1.000 967,728.04 967,728.04
m2 3.000 108,517.20 325,551.60
kg 0.000 12,930.04 -
kg 101.000 13,245.04 1,337,749.04
Jumlah 2,631,028.68
m3 1.000
m3 1.000 967,728.04 967,728.04
m2 13.333 255,847.30 3,411,297.33
kg 0.000 12,930.04 -
kg 121.000 13,245.04 1,602,649.84
Jumlah 5,981,675.21
m3 1.000
m3 1.000 967,728.04 967,728.04
m2 6.667 255,847.30 1,705,648.67
kg 0.000 12,930.04 -
kg 121.000 13,245.04 1,602,649.84
Jumlah 4,276,026.55
PENUTUP ATAP
t= 0,75 mm m2 1.000
m1 3.000 19,600.00 58,800.00
bh 6.000 600.00 3,600.00
OH 0.005 198,000.00 990.00
OH 0.001 134,400.00 134.40
OH 0.100 105,500.00 10,550.00
OH 0.100 85,500.00 8,550.00
Jumlah 82,624.40
,5 mm m2 1.000
m1 4.000 8,400.00 33,600.00
bh 10.000 600.00 6,000.00
OH 0.005 198,000.00 990.00
OH 0.001 134,400.00 134.40
OH 0.100 105,500.00 10,550.00
OH 0.100 85,500.00 8,550.00
Jumlah 59,824.40
mm (Kalsiplank m1 1.000
m 1.000
m' 1.050 93,500.00 98,175.00
buah 1.000 500.00 500.00
tube 4.000 2,500.00 10,000.00
OH 0.150 85,500.00 12,825.00
OH 0.250 105,500.00 26,375.00
OH 0.022 134,400.00 2,956.80
OH 0.025 198,000.00 4,950.00
Jumlah 155,781.80
m 1.000
m' 1.050 84,000.00 88,200.00
buah 1.000 500.00 500.00
tube 4.000 2,500.00 10,000.00
OH 0.150 85,500.00 12,825.00
OH 0.250 105,500.00 26,375.00
OH 0.022 134,400.00 2,956.80
OH 0.025 198,000.00 4,950.00
Jumlah 145,806.80
cm (ambang atas) m 1.000
m 1.050 95,800.00 100,590.00
m 1.000 2,400.00 2,400.00
bh 4.000 500.00 2,000.00
OH 0.150 85,500.00 12,825.00
OH 0.250 105,500.00 26,375.00
OH 0.022 134,400.00 2,956.80
OH 0.025 198,000.00 4,950.00
Jumlah 152,096.80
m (ambang bwh) m 1.000
cm (amb bwh) m 1.050 92,300.00 96,915.00
m 1.000 2,400.00 2,400.00
bh 4.000 500.00 2,000.00
OH 0.150 85,500.00 12,825.00
OH 0.250 105,500.00 26,375.00
OH 0.022 134,400.00 2,956.80
OH 0.025 198,000.00 4,950.00
Jumlah 148,421.80
m 1.000
m 1.050 89,700.00 94,185.00
m 1.000 2,400.00 2,400.00
bh 4.000 500.00 2,000.00
OH 0.150 85,500.00 12,825.00
OH 0.250 105,500.00 26,375.00
OH 0.022 134,400.00 2,956.80
OH 0.025 198,000.00 4,950.00
Jumlah 145,691.80
m 1.000
m 1.050 24,000.00 25,200.00
bh 4.000 500.00 2,000.00
OH 0.150 85,500.00 12,825.00
OH 0.150 105,500.00 15,825.00
OH 0.010 134,400.00 1,344.00
OH 0.020 198,000.00 3,960.00
Jumlah 61,154.00
m2 1.000
m2 1.050 85,600.00 89,880.00
OH 0.015 85,500.00 1,282.50
OH 0.150 105,500.00 15,825.00
OH 0.015 134,400.00 2,016.00
OH 0.008 198,000.00 1,485.00
Jumlah 110,488.50
m2 1.000
m2 1.050 124,400.00 130,620.00
OH 0.015 85,500.00 1,282.50
OH 0.150 105,500.00 15,825.00
OH 0.015 134,400.00 2,016.00
OH 0.008 198,000.00 1,485.00
Jumlah 151,228.50
m2 1.000
m2 1.050 185,500.00 194,775.00
OH 0.015 85,500.00 1,282.50
OH 0.150 105,500.00 15,825.00
OH 0.015 134,400.00 2,016.00
OH 0.008 198,000.00 1,485.00
Jumlah 215,383.50
m2 1.000
m2 1.050 593,600.00 623,280.00
OH 0.020 85,500.00 1,710.00
OH 0.200 105,500.00 21,100.00
OH 0.020 134,400.00 2,688.00
OH 0.010 198,000.00 1,980.00
Jumlah 650,758.00
m2 1.000
m2 1.050 1,312,500.00 1,378,125.00
OH 0.025 85,500.00 2,137.50
OH 0.250 105,500.00 26,375.00
OH 0.025 134,400.00 3,360.00
OH 0.013 198,000.00 2,475.00
Jumlah 1,412,472.50
m2 1.000
lbr 0.350 175,400.00 61,390.00
OH 0.0250 85,500.00 2,137.50
OH 0.0750 105,500.00 7,912.50
OH 0.0075 134,400.00 1,008.00
OH 0.0013 198,000.00 257.40
Jumlah 72,705.40
m2 1.000
m1 1.0500 179,200.00 188,160.00
bh 20.0000 1,100.00 22,000.00
OH 0.040 85,500.00 3,420.00
OH 0.400 105,500.00 42,200.00
OH 0.040 134,400.00 5,376.00
OH 0.0200 198,000.00 3,960.00
Jumlah 265,116.00
Pergoreted 3 cm m2 1.000
m1 1.0500 253,000.00 265,650.00
bh 20.0000 1,100.00 22,000.00
OH 0.040 85,500.00 3,420.00
OH 0.400 105,500.00 42,200.00
OH 0.040 134,400.00 5,376.00
OH 0.0200 198,000.00 3,960.00
Jumlah 342,606.00
unit 1.000
m1 9.560 155,781.80 1,489,274.01
m1 9.840 152,096.80 1,496,632.51
m1 1.440 148,421.80 213,727.39
m2 2.310 72,705.40 167,949.47
m2 6.390 69,800.00 446,022.00
m1 3.600 43,600.00 156,960.00
m2 0.310 110,488.50 34,251.44
m2 1.060 151,228.50 160,302.21
set 2.000 318,000.00 636,000.00
stel 3.000 32,400.00 97,200.00
set 2.000 333,000.00 666,000.00
set 1.000 178,200.00 178,200.00
set 2.000 32,400.00 64,800.00
bh 1.000 64,200.00 64,200.00
bh 1.000 43,600.00 43,600.00
Jumlah 5,915,119.03
unit 1.000
m2 7.840 1,412,472.50 11,073,784.40
m2 5.840 650,758.00 3,800,426.72
stel 4.000 357,000.00 1,428,000.00
set 4.000 169,500.00 678,000.00
set 4.000 201,300.00 805,200.00
set 4.000 1,356,000.00 5,424,000.00
set 4.000 115,500.00 462,000.00
set 4.000 242,000.00 968,000.00
m2 8.900 265,116.00 2,359,532.40
m1 56.600 37,429.59 2,118,514.79
m3 0.280 5,225,967.11 1,463,270.79
Jumlah 30,580,729.10
unit 1.000
m1 10.120 155,781.80 1,576,511.82
m1 10.120 152,096.80 1,539,219.62
m1 1.720 148,421.80 255,285.50
m2 2.800 215,383.50 603,073.80
m1 5.160 61,154.00 315,554.64
set 2.000 289,300.00 578,600.00
stel 3.000 32,400.00 97,200.00
set 2.000 333,000.00 666,000.00
set 1.000 178,200.00 178,200.00
bh 1.000 64,200.00 64,200.00
bh 1.000 43,600.00 43,600.00
Jumlah 5,917,445.37
unit 1.000
m1 9.560 155,781.80 1,489,274.01
m1 9.840 152,096.80 1,496,632.51
m1 1.440 148,421.80 213,727.39
m2 2.310 72,705.40 167,949.47
m2 6.390 69,800.00 446,022.00
m1 3.600 43,600.00 156,960.00
m2 0.310 110,488.50 34,251.44
m1 4.200 61,154.00 256,846.80
set 2.000 318,000.00 636,000.00
stel 3.000 32,400.00 97,200.00
set 2.000 333,000.00 666,000.00
set 1.000 178,200.00 178,200.00
set 2.000 32,400.00 64,800.00
bh 1.000 64,200.00 64,200.00
bh 1.000 43,600.00 43,600.00
Jumlah 6,011,663.62
unit 1.000
m1 4.480 155,781.80 697,902.46
m1 10.120 152,096.80 1,539,219.62
m1 1.720 148,421.80 255,285.50
m2 0.970 72,705.40 70,524.24
m2 1.940 69,800.00 135,412.00
set 1.000 161,000.00 161,000.00
stel 2.000 32,400.00 64,800.00
set 1.000 178,200.00 178,200.00
Jumlah 3,102,343.81
unit 1.000
m1 7.660 155,781.80 1,193,288.59
m1 5.050 152,096.80 768,088.84
m1 0.850 148,421.80 126,158.53
m2 1.380 72,705.40 100,333.45
m2 2.760 69,800.00 192,648.00
m1 1.800 43,600.00 78,480.00
m2 0.150 110,488.50 16,573.28
m2 0.610 151,228.50 92,249.39
set 1.000 161,000.00 161,000.00
stel 2.000 32,400.00 64,800.00
set 1.000 178,200.00 178,200.00
Jumlah 2,971,820.07
unit 1.000
m1 7.660 155,781.80 1,193,288.59
m1 5.050 152,096.80 768,088.84
m1 0.850 148,421.80 126,158.53
m2 1.380 72,705.40 100,333.45
m2 2.760 69,800.00 192,648.00
m1 1.800 43,600.00 78,480.00
m2 0.150 110,488.50 16,573.28
m1 5.100 61,154.00 311,885.40
set 1.000 161,000.00 161,000.00
stel 2.000 32,400.00 64,800.00
set 1.000 178,200.00 178,200.00
Jumlah 3,191,456.09
unit 1.000
m1 5.010 155,781.80 780,466.82
m1 4.930 152,096.80 749,837.22
m1 1.460 148,421.80 216,695.83
m2 0.990 72,705.40 71,978.35
m2 1.990 69,800.00 138,902.00
set 1.000 161,000.00 161,000.00
stel 2.000 32,400.00 64,800.00
set 1.000 178,200.00 178,200.00
Jumlah 2,361,880.22
unit 1.000
m1 4.260 155,781.80 663,630.47
m1 6.280 152,096.80 955,167.90
m2 0.700 72,705.40 50,893.78
m2 1.400 69,800.00 97,720.00
set 1.000 135,000.00 135,000.00
stel 2.000 32,400.00 64,800.00
set 1.000 156,800.00 156,800.00
Jumlah 2,124,012.15
unit 1.000
m1 3.500 155,781.80 545,236.30
m1 3.340 152,096.80 508,003.31
m2 0.300 72,705.40 21,811.62
m2 0.600 69,800.00 41,880.00
set 1.000 135,000.00 135,000.00
stel 1.000 32,400.00 32,400.00
set 1.000 156,800.00 156,800.00
Jumlah 1,441,131.23
unit 1.000
m1 16.150 155,781.80 2,515,876.07
m1 5.960 145,691.80 868,323.13
m2 3.810 110,488.50 420,961.19
m1 24.600 2,500.00 61,500.00
set 2.000 74,800.00 149,600.00
set 2.000 67,800.00 135,600.00
Jumlah 4,151,860.38
unit 1.000
m1 16.600 155,781.80 2,585,977.88
m1 6.120 145,691.80 891,633.82
m2 3.920 110,488.50 433,114.92
m1 22.100 2,500.00 55,250.00
set 2.000 74,800.00 149,600.00
set 2.000 67,800.00 135,600.00
Jumlah 4,251,176.62
unit 1.000
m1 16.150 155,781.80 2,515,876.07
m1 5.960 145,691.80 868,323.13
m1 14.400 61,154.00 880,617.60
m2 1.880 110,488.50 207,718.38
m1 9.400 2,500.00 23,500.00
set 2.000 74,800.00 149,600.00
set 2.000 67,800.00 135,600.00
Jumlah 4,781,235.18
unit 1.000
m1 16.600 155,781.80 2,585,977.88
m1 6.120 145,691.80 891,633.82
m1 15.120 61,154.00 924,648.48
m2 2.010 110,488.50 222,081.89
m1 11.300 2,500.00 28,250.00
set 2.000 74,800.00 149,600.00
set 2.000 67,800.00 135,600.00
Jumlah 4,937,792.06
unit 1.000
m1 5.560 155,781.80 866,146.81
m1 3.240 145,691.80 472,041.43
m1 3.840 61,154.00 234,831.36
m2 0.430 110,488.50 47,510.06
m1 2.700 2,500.00 6,750.00
set 1.000 74,800.00 74,800.00
set 1.000 67,800.00 67,800.00
Jumlah 1,769,879.66
unit 1.000
m1 31.800 155,781.80 4,953,861.24
m1 11.580 145,691.80 1,687,111.04
m1 20.100 61,154.00 1,229,195.40
m2 6.630 110,488.50 732,538.76
m1 38.100 2,500.00 95,250.00
set 2.000 74,800.00 149,600.00
set 3.000 67,800.00 203,400.00
Jumlah 9,050,956.44
unit 1.000
m1 26.500 155,781.80 4,128,217.70
m1 7.840 145,691.80 1,142,223.71
m1 16.800 61,154.00 1,027,387.20
m2 5.400 110,488.50 596,637.90
m1 26.600 2,500.00 66,500.00
set 2.000 74,800.00 149,600.00
set 2.000 67,800.00 135,600.00
Jumlah 7,246,166.51
unit 1.000
m1 2.000 155,781.80 311,563.60
m1 1.520 145,691.80 221,451.54
m2 1.100 110,488.50 121,537.35
m1 1.400 2,500.00 3,500.00
bh 2.000 74,800.00 149,600.00
set 1.000 67,800.00 67,800.00
Jumlah 875,452.49
unit 1.000
m1 14.600 155,781.80 2,274,414.28
m1 9.760 145,691.80 1,421,951.97
m2 2.480 151,228.50 375,046.68
m1 17.000 2,500.00 42,500.00
set 4.000 74,800.00 299,200.00
set 4.000 67,800.00 271,200.00
Jumlah 4,684,312.93
unit 1.000
m1 15.600 155,781.80 2,430,196.08
m2 3.040 151,228.50 459,734.64
m1 20.000 2,500.00 50,000.00
Jumlah 2,939,930.72
unit 1.000
m1 29.900 155,781.80 4,657,875.82
m2 6.880 151,228.50 1,040,452.08
m1 42.400 2,500.00 106,000.00
Jumlah 5,804,327.90
unit 1.000
m1 19.100 155,781.80 2,975,432.38
m1 9.120 145,691.80 1,328,709.22
m2 4.400 151,228.50 665,405.40
m1 24.040 2,500.00 60,100.00
set 2.000 74,800.00 149,600.00
set 2.000 67,800.00 135,600.00
Jumlah 5,314,847.00
DARY SKIN, RAILIING
LAS LISTRIK CM 10.000
kg 0.400 38,200.00 15,280.00
ltr 0.300 7,000.00 2,100.00
ltr 0.040 30,000.00 1,200.00
jam 0.170 50,000.00 8,500.00
OH 0.002 198,000.00 396.00
OH 0.020 105,500.00 2,110.00
OH 0.002 134,400.00 268.80
OH 0.002 85,500.00 171.00
Jumlah 30,025.80
A BAJA (ELECTRODA) M1 1.000
kg 0.006 38,200.00 229.20
ltr 0.005 7,000.00 31.50
ltr 0.001 30,000.00 18.00
jam 0.210 50,000.00 10,500.00
OH 0.002 198,000.00 396.00
OH 0.060 105,500.00 6,330.00
OH 0.006 134,400.00 806.40
OH 0.028 85,500.00 2,394.00
Jumlah 20,705.10
A (ELECTRODA) KG 1.000
cm 0.200 30,025.80 6,005.16
OH 0.001 198,000.00 99.00
OH 0.001 105,500.00 105.50
OH 0.000 134,400.00 13.44
OH 0.001 85,500.00 85.50
Jumlah 6,308.60
NGAN DAN ELECTRODA KG 1.000
kg 1.050 13,400.00 14,070.00
kg 1.000 6,308.60 6,308.60
Jumlah 20,378.60
GAN DAN ELECTRODA KG 1.000
kg 1.050 13,400.00 14,070.00
kg 1.000 6,308.60 6,308.60
Jumlah 20,378.60
MASANGAN DAN ELECTRODA KG 1.000
kg 1.050 13,100.00 13,755.00
kg 1.000 6,308.60 6,308.60
Jumlah 20,063.60
ANGAN DAN ELECTRODA KG 1.000
kg 1.050 13,500.00 14,175.00
kg 1.000 6,308.60 6,308.60
Jumlah 20,483.60
PEMASANGAN DAN ELECTRODA KG 1.000
kg 1.050 10,900.00 11,445.00
kg 1.000 6,308.60 6,308.60
Jumlah 17,753.60
M PEMASANGAN DAN ELECTRODA KG 1.000
kg 1.050 10,900.00 11,445.00
kg 1.000 6,308.60 6,308.60
Jumlah 17,753.60
HOLLOW 20.20 M1 1.000
m1 1.050 7,900.00 8,295.00
m1 0.250 20,705.10 5,176.28
Jumlah 13,471.28
HOLLOW 20.40 M1 1.000
m1 1.050 14,900.00 15,645.00
m1 0.500 20,705.10 10,352.55
Jumlah 25,997.55
HOLLOW 40.40 M1 1.000
m1 1.050 17,900.00 18,795.00
m1 0.900 20,705.10 18,634.59
Jumlah 37,429.59
HOLLOW 40.80 M1 1.000
m1 1.050 22,900.00 24,045.00
m1 1.500 20,705.10 31,057.65
Jumlah 55,102.65
HOLLOW 75.75 M1 1.000
m1 1.050 31,100.00 32,655.00
m1 1.750 20,705.10 36,233.93
Jumlah 68,888.93
NLIS DIA 2 1/2 " M1 1.000
m1 1.050 381,500.00 400,575.00
m1 2.940 20,705.10 60,872.99
Jumlah 461,447.99
NLIS DIA 1 " M1 1.000
m1 1.050 190,800.00 200,340.00
m1 2.500 20,705.10 51,762.75
Jumlah 252,102.75
DIA 2 1/2 " M1 1.000
m1 1.050 214,000.00 224,700.00
m1 2.940 20,705.10 60,872.99
Jumlah 285,572.99
M1 1.000
m1 1.050 137,500.00 144,375.00
m1 1.200 20,705.10 24,846.12
Jumlah 169,221.12
unit 1.000
kg 395.850 20,378.60 8,066,868.81
m1 300.900 55,102.65 16,580,387.39
m2 87.190 29,274.56 2,552,448.89
bh 217.200 3,400.00 738,480.00
Jumlah 27,938,185.08
m1 1.000
m1 1.000 461,447.99 461,447.99
m1 2.200 269,800.00 593,560.00
m1 1.260 461,447.99 581,424.47
m1 0.750 252,102.75 189,077.06
m1 1.900 27,300.00 51,870.00
bh 1.000 63,900.00 63,900.00
Jumlah 1,941,279.53
m1 1.000
m1 1.100 461,447.99 507,592.79
bh 1.000 56,000.00 56,000.00
Jumlah 563,592.79
m1 1.000
m1 8.500
m1 8.500 285,572.99 2,427,370.45
m1 11.700 37,429.59 437,926.20
m1 23.000 13,471.28 309,839.33
bh 1.000 63,900.00 63,900.00
m2 22.000 29,274.56 644,040.32
Jumlah 8,5 M 3,883,076.30
Jumlah 1 M 456,832.51
m1 1.000
m1 5.600
m1 5.600 285,572.99 1,599,208.77
m2 1.344 29,274.56 39,345.01
bh 4.000 56,000.00 224,000.00
Jumlah 5 M 1,862,553.78
Jumlah 1 M 332,598.89
m2 1.000
m 0.750 37,429.59 28,072.19
m 2.000 25,997.55 51,995.10
lbr 0.382 65,100.00 24,861.69
bh 4.000 600.00 2,400.00
OH 0.150 85,500.00 12,825.00
OH 0.250 107,400.00 26,850.00
OH 0.025 136,800.00 3,420.00
OH 0.075 198,000.00 14,850.00
Jumlah 165,273.98
ka Hollow m2 1.000
m 0.750 37,429.59 28,072.19
m 2.000 25,997.55 51,995.10
lbr 0.382 92,400.00 35,287.56
bh 4.000 600.00 2,400.00
OH 0.150 85,500.00 12,825.00
OH 0.250 107,400.00 26,850.00
OH 0.025 136,800.00 3,420.00
OH 0.075 198,000.00 14,850.00
Jumlah 175,699.85
m1 1.000
m 1.050 27,600.00 28,980.00
bh 4.000 600.00 2,400.00
OH 0.050 85,500.00 4,275.00
OH 0.050 107,400.00 5,370.00
OH 0.005 136,800.00 684.00
OH 0.003 198,000.00 594.00
Jumlah 42,303.00
m1 1.000
m 1.050 11,400.00 11,970.00
bh 4.000 600.00 2,400.00
OH 0.050 85,500.00 4,275.00
OH 0.050 107,400.00 5,370.00
OH 0.005 136,800.00 684.00
OH 0.003 198,000.00 594.00
Jumlah 25,293.00
m2 1.000
kg 0.120 28,500.00 3,420.00
klg 0.360 23,000.00 8,280.00
OH 0.028 85,500.00 2,394.00
OH 0.042 107,400.00 4,510.80
OH 0.004 136,800.00 574.56
OH 0.003 198,000.00 495.00
Jumlah 19,674.36
m2 1.000
kg 0.120 28,500.00 3,420.00
klg 0.360 130,000.00 46,800.00
OH 0.028 85,500.00 2,394.00
OH 0.042 107,400.00 4,510.80
OH 0.004 136,800.00 574.56
OH 0.003 198,000.00 495.00
Jumlah 58,194.36
m2 1.000
kg 0.100 49,100.00 4,910.00
bh 0.010 10,500.00 105.00
OH 0.020 85,500.00 1,710.00
OH 0.200 107,400.00 21,480.00
OH 0.004 136,800.00 574.56
OH 0.003 198,000.00 495.00
Jumlah 29,274.56
m2 1.000
kg 0.350 44,100.00 15,435.00
OH 0.050 85,500.00 4,275.00
OH 0.075 107,400.00 8,055.00
OH 0.008 136,800.00 1,026.00
OH 0.003 198,000.00 495.00
Jumlah 29,286.00
m1 1.000
m1 1.000 148,400.00 148,400.00
m3 0.160 69,075.00 11,052.00
m3 0.040 195,930.00 7,837.20
Jumlah 167,289.20
m1 1.000
m1 1.000 305,100.00 305,100.00
m3 0.590 69,075.00 40,754.25
m3 0.070 195,930.00 13,715.10
Jumlah 359,569.35
m1 1.000
m1 1.000 107,800.00 107,800.00
m1 0.100 107,800.00 10,780.00
OH 0.080 85,500.00 6,840.00
OH 0.135 107,400.00 14,499.00
OH 0.014 136,800.00 1,846.80
OH 0.004 198,000.00 811.80
Jumlah 142,577.60
261250 287375
85000 425
75000 7500
70000 28000
Jumlah 324100
205865 226451.5
85000 425
80000 800
75000 7500
Jumlah 263176.5