KURVA SCHEDULLE MUTUAL CHECK KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

SNVT PENYEDIA PERUMAHAN PROVINSI SULAWESI TENGGARA


PEMBANGUNAN RUMAH SUSUN UNIVERSITAS HALUOLEO KENDARI
PPK RUMAH SUSUN DAN RUMAH KHUSUS PROV. SULTRA
KONSULTAN MK SUPERVISI
NO. SPK / KONTRAK : 013/SP/PPK3-SATKER-PP-SULTRA/VI/2021 PT. DIAGRAM DESAIN KONSULTAN - CV. KAISON KONSULTAN (KSO)
TANGGAL SPK / KONTRAK : 23 June 2021
NILAI KONTAK : Rp 14.489.537.620 KONTRAKTOR PELAKSANA
TAHUN ANGGARAN : 2021 PT. CITRA PUTRA LATERRANG

PERIODE TANGGAL : PERIODE MINGGU :

WAKTU PELAKSANAAN PEKERJAAN


Bobot
No. Uraian Pekerjaan Nilai Kontrak BULAN KE - 1 BULAN KE - 2 BULAN KE - 3 BULAN KE - 4 BULAN KE - 5 BULAN KE - 6 BULAN KE - 7 BULAN KE - 8 BULAN KE - 9 BULAN KE - 10 BULAN KE - 11 BULAN KE - 12 BULAN KE - 13 BULAN KE - 14 KET.
(% )
23 JUNI - 22 JULI 2021 23 JULI - 21 AGUSTUS 2021 22 Agustus - 20 September 2021 21 September - 20 Oktoberi 2021 21 Oktober - 19 November 2021 20 November - 19 Desember 2021 20 Desember 2021 - 18 Januari 2022 19 Januari - 17 Februari 2022 18 Februari - 19 Maret 2022 20 Maret - 18 April 2022 19 April - 18 Mei 2022 19 Mei - 17 Juni 2022 18 Juni - 30 Juni 2022 1 Juli - 30 Juli 2022
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54
I. PEKERJAAN PERSIAPAN STANDAR DAN PEKERJAAN RK3K KONSTRUKSI
I.A PEKERJAAN PERSIAPAN Rp 98.314.076,000 0,746 0,001 0,361 0,001 0,001 0,001 0,001 0,001 0,313 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001 100
1.B PEKERJAAN PERSIAPAN STANDAR DAN PEKERJAAN RK3K KONSTRUKSI Rp 88.785.000,000 0,674 0,278 0,007 0,035 0,010 0,007 0,200 0,007 0,007 0,007 0,007 0,015 0,093
II. PEKERJAAN STANDART
II.A PEKERJAAN STRUKTUR STANDART
1. Pekerjaan Beton 25 Mpa (K-300) Rp 742.572.966,941 5,637 0,262 0,262 1,352 0,262 0,262 1,352 0,262 0,262 1,360
2. Pekerjaan Pembesian Rp 1.436.357.042,481 10,904 0,727 0,727 0,727 0,727 0,727 0,727 0,727 0,727 0,727 0,727 0,727 0,727 0,727 0,727 0,727
3. Besi Wire Mesh M8 Rp 50.781.535,299 0,386 0,193 0,193
4. Pekerjaan Bekisting Rp 573.558.673,582 4,354 0,196 0,196 0,550 0,526 0,196 0,196 0,526 0,526 0,196 0,196 0,526 0,526
5. Perkerjaan dalam bangunan Rp 122.465.296,515 0,930 0,930
6. RANGKA ATAP BAJA Rp 245.045.726,915 1,860 0,192 0,192 0,192 0,192 0,084 0,282 0,105 0,105 0,507 0,011
II.B PEKERJAAN ARSITEKTUR STANDAR
1 PEKERJAAN PASANGAN DINDING & BETON PRAKTIS Rp 857.151.814,197 6,507 0,426 0,565 0,565 0,908 0,908 0,880 1,065 0,681 0,255 0,255 0,75
2. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING Rp 907.635.104,000 6,890 0,532 0,045 1,162 1,625 0,309 0,352 1,174 0,664 0,730 0,184
3. PEKERJAAN PLAFOND Rp 546.334.486,110 4,148 0,875 0,445 0,398 0,398 0,438 0,477 0,467 0,401 0,222
4. PEKERJAAN LANTAI Rp 814.756.348,847 6,185 0,048 0,354 2,358 0,860 0,982 0,908 0,456 0,026 0,096
5 PEKERJAAN UTILITAS Rp 202.226.440,000 1,535 0,755 0,319 0,087 0,116 0,064 0,097 0,080
6 PEKERJAAN PENGECATAN Rp 346.108.115,989 2,628 0,382 0,249 1,342 0,532 0,123
c PEKERJAAN RAMP DI ENTRANCE TERAS, ASESORIS DI FACADE DAN SELASAR KELILING BANGUNAN Rp 18.435.398,000 0,140 0,060 0,034
7 Pekerjaan Selasar Keliling bangunan Rp 79.422.720,000 0,603 0,240 0,316 0,022 0,022
8. PEKERJAAN PENUTUP ATAP Rp 189.520.747,620 1,439 0,357 0,434 0,273 0,375
II.C PEKERJAAN MEKANIKAL & ELEKTRIKAL STANDART
1. Perpipaan AIR BERSIH Rp 47.839.276,575 0,363 0,097 0,097 0,068 0,029 0,071
2 Perpipaan AIR KOTOR & AIR BEKAS Rp 129.571.635,300 0,984 0,434 0,434 0,007 0,109
3 Perpipaan AIR HUJAN
4 Perpipaan VENT 0,50
5 INSTALASI PANEL Rp 254.256.237,250 1,930 1,930
6 INSTALASI KABEL FEEDER Rp 52.633.068,234 0,400 0,400
7
8.
9.
INSTALASI KABEL TRAY
INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK
INSTALASI PENERANGAN & STOP KONTAK
Rp
Rp
Rp
15.990.754,126
45.830.395,610
141.542.908,650
0,121
0,348
1,075
ADDENDUM 0,325 0,325 0,425
0,121
0,071 0,098 0,135

10 PEKERJAAN UTILITAS Rp 99.058.742,656 0,752 0,192 0,028 0,150


III. PEKERJAAN NON STANDART
III.A PEKERJAAN STRUKTUR NON STANDART
1 PEKERJAAN STRUKTUR BAWAH (SUB STRUCTURE) Rp 1.584.819.664,457 12,031 0,416 0,345 1,192 1,977 4,510 0,739 0,019 0,019 0,037 0,088 0,041 0,082 0,555 0,555 0,593 0,485 0,138 0,012 0,025 0,103 0,103
2 PEKERJAAN STRUKTUR GWT, RUANG POMPA DAN STP Rp 161.710.295,267 1,228 0,106 0,482 0,116 0,157 0,178 0,030 0,033 0,125
III.B PEKERJAAN ARSITEKTUR NON STANDART
1. PEK. KELILING BAGIAN LUAR BANGUNAN Rp 2.129.531.831,052 16,167 0,136 0,050 0,396 0,256 0,102 0,120 0,617 2,833 0,418 1,564 1,092 4,898 0,517
c PEKERJAAN DRAINASE KELILING BAGIAN LUAR BANG. 0,25
1 DRAINASE LUAR/SEKELILING BANGUNAN Rp 193.044.285,678 1,466 0,024 0,033 0,196 0,136 0,012 0,656 0,010 0,039 0,215
2 PEKERJAAN GROUND TANK DAN R. POMPA DI LUAR BANGUNAN Rp 122.434.216,027 0,929 0,107 0,030 0,509
III.C PEKERJAAN MEKANIKAL & ELEKTRIKAL NON STANDART
1 PEKERJAAN PEMADAM KEBAKARAN Rp 412.012.897,542 3,128 0,582
2. PEKERJAAN VENTILASI UDARA Rp 35.510.107,350 0,270
3 PEKERJAAN INSTALASI ELEKTRONIK Rp 118.582.584,014 0,900
4 PEKERJAAN SARANA DAN PRASARANA LINGKUNGAN (LUAR BANGUNAN) Rp 233.347.843,578 1,772 0,033 0,187 0,140 0,464 0,004
5 PENYAMBUNGAN DAYA PLN Rp 66.000.000,000 0,501 0,401
6 PEKERJAAN INSTALASI KABEL FEEDER Rp 9.118.690,996 0,069
JUMLAH Rp 13.172.306.926,858 100,000 0,00
RENCANA MINGGUAN (%) 0,187 0,187 0,187 0,187 1,558 1,558 1,558 2,310 2,310 1,558 1,558 1,558 2,514 0,975 0,975 0,975 1,916 1,916 1,916 1,916 3,621 3,621 0,975 3,621 3,621 2,621 1,954 1,954 1,954 1,954 1,954 1,954 0,998 0,998 1,998 1,998 1,935 1,935 1,935 0,811 2,300 1,090 1,340 0,807 2,485 2,178 4,894 0,921 1,419 5,086 1,910 0,610 1,608 3,121
KUMULATIF MINGGUAN (%) 0,187 0,374 0,561 0,748 2,306 3,864 5,422 7,732 10,042 11,600 13,158 14,716 17,230 18,205 19,180 20,155 22,071 23,987 25,903 27,819 31,440 35,061 36,036 39,657 43,278 45,899 47,853 49,807 51,761 53,715 55,669 57,623 58,621 59,619 61,617 63,615 65,550 67,485 69,420 70,231 72,531 73,621 74,961 75,768 78,253 80,431 85,325 86,246 87,665 92,751 94,661 95,271 96,879 100,000
REALISASI MINGGUAN (%) 0,001 1,191 0,404 1,228 2,385 4,808 0,940 0,440 0,147 0,046 0,097 0,769 0,825 1,283 1,283 1,779 1,672 1,417 2,618 1,212 1,187 1,254 2,606 2,116 3,400 6,164 2,452 1,003 0,910 0,881 1,258 0,874 0,449 0,449 0,443 0,717 0,106 0,106 0,508 0,540 2,043 1,058 1,772 2,210 1,453 4,384 5,445 6,029 5,113 6,928 1,547 0,895
KUMULATIF MINGGUAN (%) 0,001 1,192 1,596 2,823 5,208 10,016 10,957 11,397 11,544 11,590 11,686 12,456 13,281 14,564 15,847 17,627 19,298 20,715 23,333 24,545 25,731 26,985 29,592 31,708 35,107 41,271 43,723 44,726 45,635 46,516 47,774 48,649 49,097 49,546 49,989 50,707 50,813 50,918 51,426 51,966 54,009 55,067 56,839 59,049 60,502 64,886 70,330 76,360 81,473 88,401 89,948 90,843
DEVIASI MINGGUAN (%) -0,186 0,818 1,035 2,075 2,902 6,152 5,535 3,665 1,502 -0,010 -1,472 -2,260 -3,949 -3,641 -3,333 -2,528 -2,773 -3,272 -2,570 -3,274 -5,709 -8,076 -6,444 -7,949 -8,171 -4,628 -4,130 -5,081 -6,126 -7,199 -7,895 -8,974 -9,524 -10,073 -11,628 -12,908 -14,737 -16,567 -17,994 -18,265 -18,522 -18,554 -18,122 -16,719 -17,751 -15,545 -14,995 -9,886 -6,192 -4,350 -4,713 -4,428

KETERANGAN

: RENCANA

: REALISASI

MENGETAHUI DIPERIKSA DIAJUKAN


PPK Rumah Susun dan Rumah Khusus SNVT Penyediaan Perumahan Provinsi Sulawesi Tenggara PT. DIAGRAM DESAIN KONSULTAN KONTRAKTOR PELAKSANA
CV. KAISON KONSULTAN (KSO) PT. CITRA PUTRA LA TERANG

LAHARUDI, ST Ir. YASRUN LA URU, M.Si Ir. BURAHANUDDIN BADRUN


NIP. 199900513 201502 1 001 TEAM LEADER DIREKTUR