LAPORAN BULANAN

KEGIATAN PEMBANGANUNAN PRASARANA PERTANIAN


DINAS PERTANIAN
KABUPATEN LUWU TIMUR TAHUN ANGGARAN 2021

NAMA PAKET : PEMBANGUNAN, REHABILITAS DAN PEMELIHARAAN JARINGAN IRIGASI USAHA TANI POKTAN BUANA INDA
Kabupaten : LUWU TIMUR
KONSULTAN PENGAWAS : CV. HIDJOE LOEMOET 2000 DESIGN
KONTRAKTOR PELAKSANA : CV. BUMITAMAMAS BULAN
NOMOR KONTRAK : 800/06/SPK-JIDES/PSP/DISTAN/IX/2021 TANGGAL
ffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffff
NILAI KONTRAKvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvv
: x
WAKTU PELAKSANAAN : 90 (Hari Kelender) TOT
MASA PEMELIHARAAN : - RENCANA :
TANGGAL SPMK : 24 SEPTEMBER 2021 REALISASI :
DEVIASI :
REKAPITULASI AKHIR BULANAN
BOBOT KEMAJUAN PEKERJAAN
KONTRAK RE
No. Harga Pajak Nilai Bobot volume
Urain Pekerjaan Sat.
Devisi Satuan Volume s/d Bulan Bulan
(10%) (Rp) %
(Rp.) Lalu ini
1 2 3 4 5 6 7 8 9
I PEKERJAAN PERSIAPAN
Biaya K3 Konstruksi Ls
1 Alat Pelindung Kerja (APK) dan Alat Pelindung Diri ( Ls 1,000,000.00 1.00 100,000.00 1,100,000.00 0.60 - 1.00
2 Personil K3 Konstruksi Ls 1,100,000.00 1.00 110,000.00 1,210,000.00 0.66 - 1.00
3 Fasilitas Sarana Kesehatan Ls - 1.00 - - - - 1.00
4 Sosialisasi Promosi & Pelatihan Ls - 1.00 - - - - 1.00
5 Asuransi & Perizinan Ls 350,137.00 1.00 35,013.70 385,150.70 0.21 - 1.00
6 Penyiapan RK3K Ls - 1.00 - - - - 1.00
7 Rambu - Rambu Yang Diperlukan Ls 200,000.00 1.00 20,000.00 220,000.00 0.12 - 1.00
8 Lain Tterkait Pengendalian Resiko Keselamatan Ls - 1.00 - - - - 1.00
9 Prasasti Ls 350,000.00 1.00 35,000.00 385,000.00 0.21 - -
II PEKERJAAN SALURAN
1 Galian Tanah M³ 92,844.00 34.00 315,669.60 3,472,365.60 1.88 - 15.30
2 Urugan Kembali Bekas Galian M³ 82,455.00 11.90 98,121.45 1,079,335.95 0.58 - 3.57
3 Pasangan Batu Kali 1 PC : 4 PP M³ 1,047,512.00 112.20 11,753,075.61 129,283,831.75 70.03 - 35.41
4 Plesteran Biasa 1 PC : 3 PP M2 109,730.00 204.00 2,238,492.00 24,623,412.00 13.34 - -
5 Plesteran Biasa 1 PC : 2 PP M2 87,280.00 238.00 2,077,264.00 22,849,904.00 12.38 - -

TOTAL HARGA FISIK SUDAH TERMASUK PAJAK 10% 184,609,000.00 100.00


NILAI KONTRAK 184,609,000.00

Mengetahui Oleh, Diperiksa Oleh,


Pejabat Pembuat Komitmen, Konsultan Supervisi
(PPK) CV. HIDJOE LOEMOET 2000 DESIGN

ABDUL GHAFFUR, S.ST ERNI WAHYU NINGSIH, ST


NIP. 19781219 200502 1 003 Site Engineer
WEEKLY REPORT (LAPORAN MINGGUAN)
Konsultan Pengawas : CV. HIDJOE LOEMOET 2000 DESIGN PEMBANGUNAN, REHABILITAS DAN PEMELIHARAAN JARINGAN
Kontraktor Pelaksana : CV. BUMITAMAMAS IRIGASI USAHA TANI POKTAN BUANA INDAH DESA BAHARI KEC.
Kabupaten : Luwu Timur WOTU
No. Kontrak : 800/06/SPK-JIDES/PSP/DISTAN/IX/2021
Nilai Kontrak : x
Tanggal Kontrak : 24 SEPTEMBER 2021
PERINCIAN
BOBOT KEMAJUAN PEKERJAAN
KONTRAK RE
No. Mata
Harga Pajak Nilai Bobot volume
Pembaya Urain Pekerjaan Sat.
Satuan Volume Terhadap s/d mng minggu
ran (10%) (Rp)
(Rp.) kontrak lalu ini
1 2 3 4 5 6 7 8 9 10
I PEKERJAAN PENDAHULUAN
Biaya K3 Konstruksi
1 Alat Pelindung Kerja (APK) dan Alat Pelindung Diri ( Ls 1,000,000.00 1.00 100,000.00 1,100,000.00 0.60 - 1.00
2 Promosi K3 Konstruksi Ls 1,100,000.00 1.00 110,000.00 1,210,000.00 0.66 - 1.00
3 Fasilitas Sarana Kesehatan Ls - 1.00 - - - - 1.00
4 Sosialisasi Promosi & Pelatihan Ls - 1.00 - - - - 1.00
5 Asuransi & Perizinan Ls 350,137.00 1.00 35,013.70 385,150.70 0.21 - 1.00
6 Penyiapan RK3K Ls - 1.00 - - - - 1.00
7 Rambu - Rambu Yang Diperlukan Ls 200,000.00 1.00 20,000.00 220,000.00 0.12 - 1.00
8 Lain Tterkait Pengendalian Resiko Keselamatan Ls - 1.00 - - - - 1.00
9 Pembuatan Prasasti Ls 350,000.00 1.00 35,000.00 385,000.00 0.21 - -
II PEKERJAAN SALURAN
1 Galian Tanah M³ 92,844.00 34.00 315,669.60 3,472,365.60 1.88 - 10.20
2 Urugan Kembali Bekas Galian M³ 82,455.00 11.90 98,121.45 1,079,335.95 0.58 - -
3 Pasangan Batu Kali 1 PC : 4 PP M³ 1,047,512.00 112.20 11,753,075.61 129,283,831.75 70.03 - -
4 Plesteran Biasa 1 PC : 3 PP M2 109,730.00 204.00 2,238,492.00 24,623,412.00 13.34 - -
5 Plesteran Biasa 1 PC : 2 PP M2 87,280.00 238.00 2,077,264.00 22,849,904.00 12.38 - -
Jumlah harga A 184,609,000.00 100.00

TOTAL HARGA FISIK SUDAH TERMASUK PAJAK 10% 184,609,000.00 100.00 TOTAL HARGA FISIK SUDAH TERMASUK PAJAK 1
NILAI KONTRAK 184,609,000.00 NILAI KONTRAK
Total Bobot Pekerjaan Sampai Minggu lalu
Total Bobot Pekerjaan Minggu ini
Komulatif Bobot Pekerjaan Sampai Minggu ini

Mengetahui Oleh, Diperiksa Oleh,


Pejabat Pembuat Komitmen, Konsultan Supervisi
(PPK) CV. HIDJOE LOEMOET 2000 DESIGN

ABDUL GHAFFUR, S.ST ERNI WAHYU NINGSIH, ST


NIP. 19781219 200502 1 003 Site Engineer
WEEKLY REPORT (LAPORAN MINGGUAN)
Konsultan Pengawas : CV. HIDJOE LOEMOET 2000 DESIGN PEMBANGUNAN, REHABILITAS DAN PEMELIHARAAN JARINGAN
Kontraktor Pelaksana : CV. BUMITAMAMAS IRIGASI USAHA TANI POKTAN BUANA INDAH DESA BAHARI KEC.
Kabupaten : Luwu Timur WOTU
No. Kontrak : 800/06/SPK-JIDES/PSP/DISTAN/IX/2021
Nilai Kontrak : x
Tanggal Kontrak : 24 SEPTEMBER 2021
PERINCIAN
BOBOT KEMAJUAN PEKERJAAN
KONTRAK RE
No. Mata
Harga Pajak Nilai Bobot volume
Pembaya Urain Pekerjaan Sat.
Satuan Volume Terhadap s/d mng minggu
ran (10%) (Rp)
(Rp.) kontrak lalu ini
1 2 3 4 5 6 7 8 9 10
I PEKERJAAN PENDAHULUAN
Biaya K3 Konstruksi
1 Drainase Ls - 1.00 1,952,000.00 1,952,000.00 3.64 - -
2 Timbunan Ls - 1.00 1,250,000.00 1,250,000.00 2.33 - -
3 Pondasi Ls - 1.00 2,632,000.00 2,632,000.00 4.91 - 1.00
4 Loef Ls - 1.00 4,351,800.00 4,351,800.00 8.11 - 1.00
5 Kolom Ls - 1.00 4,543,200.00 4,543,200.00 8.47 - -
6 Balok Ls - 1.00 5,079,500.00 5,079,500.00 9.47 - -
7 Plat Ls - 1.00 1,757,400.00 1,757,400.00 3.28 - -
8 Bata Ls - 1.00 9,305,000.00 9,305,000.00 17.35 - 0.30
9 Plesteran Ls - 1.00 3,305,000.00 3,305,000.00 6.16 - -
1 Plamur M³ - 1.00 3,887,500.00 3,887,500.00 7.25 - -
2 Keramik M³ - 1.00 3,679,000.00 3,679,000.00 6.86 - -
3 Plafon M³ - 1.00 2,018,000.00 2,018,000.00 3.76 - -
4 Pipa M2 - 1.00 697,000.00 697,000.00 1.30 - -
5 Atap M2 - 1.00 9,175,000.00 9,175,000.00 17.11 - -
Jumlah harga A 53,632,400.00 53,632,400.00 100.00

TOTAL HARGA FISIK SUDAH TERMASUK PAJAK 10% 53,632,400.00 100.00 TOTAL HARGA FISIK SUDAH TERMASUK PAJAK 1
NILAI KONTRAK 53,632,400.00 NILAI KONTRAK
Total Bobot Pekerjaan Sampai Minggu lalu
Total Bobot Pekerjaan Minggu ini
Komulatif Bobot Pekerjaan Sampai Minggu ini

Mengetahui Oleh, Diperiksa Oleh,


Pejabat Pembuat Komitmen, Konsultan Supervisi
(PPK) CV. HIDJOE LOEMOET 2000 DESIGN 68,132,400.00

ABDUL GHAFFUR, S.ST ERNI WAHYU NINGSIH, ST


NIP. 19781219 200502 1 003 Site Engineer
WEEKLY REPORT (LAPORAN MINGGUAN)
Konsultan Pengawas : CV. HIDJOE LOEMOET 2000 DESIGN PEMBANGUNAN, REHABILITAS DAN PEMELIHARAAN JARINGAN
Kontraktor Pelaksana : CV. BUMITAMAMAS IRIGASI USAHA TANI POKTAN BUANA INDAH DESA BAHARI KEC.
Kabupaten : Luwu Timur WOTU
No. Kontrak : 800/06/SPK-JIDES/PSP/DISTAN/IX/2021
Nilai Kontrak : x
Tanggal Kontrak : 24 SEPTEMBER 2021
PERINCIAN
BOBOT KEMAJUAN PEKERJAAN
KONTRAK RE
No. Mata
Harga Pajak Nilai Bobot volume
Pembaya Urain Pekerjaan Sat.
Satuan Volume Terhadap s/d mng minggu
ran (10%) (Rp)
(Rp.) kontrak lalu ini
1 2 3 4 5 6 7 8 9 10
I PEKERJAAN PENDAHULUAN
Biaya K3 Konstruksi
1 Alat Pelindung Kerja (APK) dan Alat Pelindung Diri ( Ls 1,000,000.00 1.00 100,000.00 1,100,000.00 0.60 1.00 -
2 Promosi K3 Konstruksi Ls 1,100,000.00 1.00 110,000.00 1,210,000.00 0.66 1.00 -
3 Fasilitas Sarana Kesehatan Ls - 1.00 - - - 1.00 -
4 Sosialisasi Promosi & Pelatihan Ls - 1.00 - - - 1.00 -
5 Asuransi & Perizinan Ls 350,137.00 1.00 35,013.70 385,150.70 0.21 1.00 -
6 Penyiapan RK3K Ls - 1.00 - - - 1.00 -
7 Rambu - Rambu Yang Diperlukan Ls 200,000.00 1.00 20,000.00 220,000.00 0.12 1.00 -
8 Lain Tterkait Pengendalian Resiko Keselamatan Ls - 1.00 - - - 1.00 -
9 Pembuatan Prasasti Ls 350,000.00 1.00 35,000.00 385,000.00 0.21 - -
II PEKERJAAN SALURAN
1 Galian Tanah M³ 92,844.00 34.00 315,669.60 3,472,365.60 1.88 - 6.80
2 Urugan Kembali Bekas Galian M³ 82,455.00 11.90 98,121.45 1,079,335.95 0.58 - -
3 Pasangan Batu Kali 1 PC : 4 PP M³ 1,047,512.00 112.20 11,753,075.61 129,283,831.75 70.03 - 16.83
4 Plesteran Biasa 1 PC : 3 PP M2 109,730.00 204.00 2,238,492.00 24,623,412.00 13.34 - -
5 Plesteran Biasa 1 PC : 2 PP M2 87,280.00 238.00 2,077,264.00 22,849,904.00 12.38 - -
Jumlah harga A 184,609,000.00 100.00

TOTAL HARGA FISIK SUDAH TERMASUK PAJAK 10% 184,609,000.00 100.00 TOTAL HARGA FISIK SUDAH TERMASUK PAJAK 1
NILAI KONTRAK 184,609,000.00 NILAI KONTRAK
Total Bobot Pekerjaan Sampai Minggu lalu
Total Bobot Pekerjaan Minggu ini
Komulatif Bobot Pekerjaan Sampai Minggu ini

Mengetahui Oleh, Diperiksa Oleh,


Pejabat Pembuat Komitmen, Konsultan Supervisi
(PPK) CV. HIDJOE LOEMOET 2000 DESIGN

ABDUL GHAFFUR, S.ST ERNI WAHYU NINGSIH, ST


NIP. 19781219 200502 1 003 Site Engineer
WEEKLY REPORT (LAPORAN MINGGUAN)
Konsultan Pengawas : CV. HIDJOE LOEMOET 2000 DESIGN PEMBANGUNAN, REHABILITAS DAN PEMELIHARAAN JARINGAN
Kontraktor Pelaksana : CV. BUMITAMAMAS IRIGASI USAHA TANI POKTAN BUANA INDAH DESA BAHARI KEC.
Kabupaten : Luwu Timur WOTU
No. Kontrak : 800/06/SPK-JIDES/PSP/DISTAN/IX/2021
Nilai Kontrak : x
Tanggal Kontrak : 24 SEPTEMBER 2021
PERINCIAN
BOBOT KEMAJUAN PEKERJAAN
KONTRAK RE
No. Mata
Harga Pajak Nilai Bobot volume
Pembaya Urain Pekerjaan Sat.
Satuan Volume Terhadap s/d mng minggu
ran (10%) (Rp)
(Rp.) kontrak lalu ini
1 2 3 4 5 6 7 8 9 10
I PEKERJAAN PENDAHULUAN
Biaya K3 Konstruksi
1 Alat Pelindung Kerja (APK) dan Alat Pelindung Diri ( Ls 1,000,000.00 1.00 100,000.00 1,100,000.00 0.60 1.00 -
2 Promosi K3 Konstruksi Ls 1,100,000.00 1.00 110,000.00 1,210,000.00 0.66 1.00 -
3 Fasilitas Sarana Kesehatan Ls - 1.00 - - - 1.00 -
4 Sosialisasi Promosi & Pelatihan Ls - 1.00 - - - 1.00 -
5 Asuransi & Perizinan Ls 350,137.00 1.00 35,013.70 385,150.70 0.21 1.00 -
6 Penyiapan RK3K Ls - 1.00 - - - 1.00 -
7 Rambu - Rambu Yang Diperlukan Ls 200,000.00 1.00 20,000.00 220,000.00 0.12 1.00 -
8 Lain Tterkait Pengendalian Resiko Keselamatan Ls - 1.00 - - - 1.00 -
9 Pembuatan Prasasti Ls 350,000.00 1.00 35,000.00 385,000.00 0.21 - -
II PEKERJAAN SALURAN
1 Galian Tanah M³ 92,844.00 34.00 315,669.60 3,472,365.60 1.88 6.80 8.50
2 Urugan Kembali Bekas Galian M³ 82,455.00 11.90 98,121.45 1,079,335.95 0.58 - 3.57
3 Pasangan Batu Kali 1 PC : 4 PP M³ 1,047,512.00 112.20 11,753,075.61 129,283,831.75 70.03 16.83 18.58
4 Plesteran Biasa 1 PC : 3 PP M2 109,730.00 204.00 2,238,492.00 24,623,412.00 13.34 - -
5 Plesteran Biasa 1 PC : 2 PP M2 87,280.00 238.00 2,077,264.00 22,849,904.00 12.38 - -
Jumlah harga A 184,609,000.00 100.00

TOTAL HARGA FISIK SUDAH TERMASUK PAJAK 10% 184,609,000.00 100.00 TOTAL HARGA FISIK SUDAH TERMASUK PAJAK 1
NILAI KONTRAK 184,609,000.00 NILAI KONTRAK
Total Bobot Pekerjaan Sampai Minggu lalu
Total Bobot Pekerjaan Minggu ini
Komulatif Bobot Pekerjaan Sampai Minggu ini

Mengetahui Oleh, Diperiksa Oleh,


Pejabat Pembuat Komitmen, Konsultan Supervisi
(PPK) CV. HIDJOE LOEMOET 2000 DESIGN

ABDUL GHAFFUR, S.ST ERNI WAHYU NINGSIH, ST


NIP. 19781219 200502 1 003 Site Engineer
RAN BULANAN
NUNAN PRASARANA PERTANIAN
AS PERTANIAN
TIMUR TAHUN ANGGARAN 2021

NGAN IRIGASI USAHA TANI POKTAN BUANA INDAH DESA BAHARI KEC. WOTU

MALILI , 21 OKTOBER 2021


: I (SEPTEMBER 2021 s/d OKTOBER 2021 )
: 24 SEPTEMBER 2021 s/d 21 OKTOBER 2021
vvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvv
TOTAL BOBOT KEMAJUAN PEKERJAAN
25.084 % (TIME SCHEDULE)
29.191 %
4.107 %
TULASI AKHIR BULANAN
KEMAJUAN PEKERJAAN
REALISASI PEKERJAAN
volume Nilai pekerjaan Bobot %
s/d Bulan Trhdp item Trhdp total
s/d Bulan ini
ini pekerjaan nilai kontrak
10 11 12 13

1.00 1,100,000.00 100.00 0.60


1.00 1,210,000.00 100.00 0.66
1.00 - - -
1.00 - - -
1.00 385,150.70 100.00 0.21
1.00 - - -
1.00 220,000.00 100.00 0.12
1.00 - - -
- - - -

15.30 1,736,182.80 50.00 0.94


3.57 392,485.80 36.36 0.21
35.41 48,845,782.25 37.78 26.46
- - - -
- - - -

53,889,601.55 524.15
29.191
53,889,601.55

MALILI , 21 OKTOBER 2021


Dibuat Oleh,
Kontraktor Pelaksana
CV. BUMITAMAMAS

Drs. WIRATMAN Z. SAPAN


Direktur
MALILI , 30 SEPTEMBER 2021
HARI : JUMAT s/d KAMIS
TANGGAL : 24 SEPTEMBER s/d 30 SEPTEMBER. 2021
MINGGU : I (PERTAMA)
BULAN : I (SEPTEMBER s/d OKTOBER 2021)
TOTAL BOBOT KEMAJUAN PEKERJAAN
RENCANA : 0.122 % (Time Schedule)
REALISASI : 2.263 %
DEVIASI : 2.142 %
PERINCIAN
KEMAJUAN PEKERJAAN
REALISASI PEKERJAAN
volume Nilai pekerjaan Bobot %
s/d mng Trhdp item Thdp total
s/d Minggu ini
ini pekerjaan nilai kontrak
11 12 13 14

1.00 1,100,000.00 100.00 0.60


1.00 1,210,000.00 100.00 0.66
1.00 - - -
1.00 - - -
1.00 385,150.70 100.00 0.21
1.00 - - -
1.00 220,000.00 100.00 0.12
1.00 - - -
- - - -

10.20 1,262,678.40 36.36 0.68


- - -
- - - -
- - - -
- - - -
4,177,829.10 436.36 2.263

TOTAL HARGA FISIK SUDAH TERMASUK PAJAK 10% 4,177,829.10


2.263
NILAI KONTRAK 4,177,829.10
- (%)
2.263 (%)
2.263 (%)

MALILI , 30 SEPTEMBER 2021


Dibuat Oleh,
Kontraktor Pelaksana
CV. BUMITAMAMAS

Drs. WIRATMAN Z. SAPAN


Direktur
MALILI , 07 OKTOBER 2021
HARI : JUMAT s/d KAMIS
TANGGAL : 01 OKTOBER s/d 07 OKTOBER. 2021
MINGGU : II (KEDUA)
BULAN : I (SEPTEMBER s/d OKTOBER 2021)
TOTAL BOBOT KEMAJUAN PEKERJAAN
RENCANA : 0.870 % (Time Schedule)
REALISASI #DIV/0! %
DEVIASI #DIV/0! %
PERINCIAN
KEMAJUAN PEKERJAAN
REALISASI PEKERJAAN
volume Nilai pekerjaan Bobot %
s/d mng Trhdp item Thdp total
s/d Minggu ini
ini pekerjaan nilai kontrak
11 12 13 14

- - - -
- - - -
1.00 2,632,000.00 - 4.91
1.00 4,351,800.00 - 8.11
- - - #DIV/0!
- - - -
- - - -
0.30 2,791,500.00 - 5.20
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
9,775,300.00 - #DIV/0!

TOTAL HARGA FISIK SUDAH TERMASUK PAJAK 10% 9,775,300.00


#DIV/0!
NILAI KONTRAK 9,775,300.00
2.263 (%)
#DIV/0! (%)
#DIV/0! (%)

MALILI , 07 OKTOBER 2021


Dibuat Oleh,
Kontraktor Pelaksana
CV. BUMITAMAMAS

Drs. WIRATMAN Z. SAPAN


Direktrur
MALILI , 14 OKTOBER 2021
HARI : JUMAT s/d KAMIS
TANGGAL : 08 OKTOBER s/d 14 OKTOBER. 2021
MINGGU : III (KETIGA)
BULAN : I (SEPTEMBER s/d OKTOBER 2021)
TOTAL BOBOT KEMAJUAN PEKERJAAN
RENCANA : 13.290 % (Time Schedule)
REALISASI : 18.008 %
DEVIASI : 4.718 %
PERINCIAN
KEMAJUAN PEKERJAAN
REALISASI PEKERJAAN
volume Nilai pekerjaan Bobot %
s/d mng Trhdp item Thdp total
s/d Minggu ini
ini pekerjaan nilai kontrak
11 12 13 14

1.00 1,100,000.00 100.00 0.60


1.00 1,210,000.00 100.00 0.66
1.00 - - -
1.00 - - -
1.00 385,150.70 100.00 0.21
1.00 - - -
1.00 220,000.00 100.00 0.12
1.00 - - -
- - - -

6.80 947,008.80 27.27 0.51


- - - -
16.83 29,382,689.03 22.73 15.92
- - - -
- - - -
33,244,848.53 450.00 18.008

TOTAL HARGA FISIK SUDAH TERMASUK PAJAK 10% 33,244,848.53


18.008
NILAI KONTRAK 33,244,848.53
#DIV/0! (%)
#DIV/0! (%)
#DIV/0! (%)

MALILI , 14 OKTOBER 2021


Dibuat Oleh,
Kontraktor Pelaksana
CV. BUMITAMAMAS

Drs. WIRATMAN Z. SAPAN


Direktrur
MALILI , 21 OKTOBER 2021
HARI : JUMAT s/d KAMIS
TANGGAL : 15 OKTOBER s/d 21 OKTOBER. 2021
MINGGU : IV (EMPAT)
BULAN : I (SEPTEMBER s/d OKTOBER 2021)
TOTAL BOBOT KEMAJUAN PEKERJAAN
RENCANA : 25.084 % (Time Schedule)
REALISASI : 29.191 %
DEVIASI : 4.107 %
PERINCIAN
KEMAJUAN PEKERJAAN
REALISASI PEKERJAAN
volume Nilai pekerjaan Bobot %
s/d mng Trhdp item Thdp total
s/d Minggu ini
ini pekerjaan nilai kontrak
11 12 13 14

1.00 1,100,000.00 100.00 0.60


1.00 1,210,000.00 100.00 0.66
1.00 - - -
1.00 - - -
1.00 385,150.70 100.00 0.21
1.00 - - -
1.00 220,000.00 100.00 0.12
1.00 - - -
- - - -

15.30 1,736,182.80 50.00 0.94


3.57 392,485.80 36.36 0.21
35.41 48,845,782.25 37.78 26.46
- - - -
- - - -
53,889,601.55 524.15 29.191

TOTAL HARGA FISIK SUDAH TERMASUK PAJAK 10% 53,889,601.55


29.191
NILAI KONTRAK 53,889,601.55
#DIV/0! (%)
#DIV/0! (%)
#DIV/0! (%)

MALILI , 21 OKTOBER 2021


Dibuat Oleh,
Kontraktor Pelaksana
CV. BUMITAMAMAS

Drs. WIRATMAN Z. SAPAN


Direktrur
KONTRAKTOR PELAKSANA :
CV. BUMITAMAMAS
LAPORAN HARIAN PROYEK FORM.1

NAMA KEGIATAN : KONSULTAN PENGAWAS :


PEMBANGUNAN PRASARANA PERTANIAN CV. HIDJIOE LOEMOET 2000 DESIGN
KAB. LUWU TIMUR
NAMA PAKET : PEMBANGUNAN, REHABILITAS DAN PEMELIHARAAN JARINGAN LOKASI HARI : JUMAT
IRIGASI USAHA TANI POKTAN BUANA INDAH DESA BAHARI KEC. WOTU KEC. WOTU TANGGAL : 24 SEPTEMBER 2021
KONDISI CUACA Cerah - Gerimis Hujan
PEKERJAAN YANG DILAKSANAKAN VOLUME SAT KETERANGAN

n
gi ata
e
ad aK
ak
Tid

(I) . KONTRAKTOR (II) . KONSULTAN ( IV ) . Jumlah ( I + II + III )


( Orang ) ( Orang ) ( Orang )
GS : Orang SE : Orang
Pelaksana : Orang MT : Orang Jumlah : Orang
Mandor : Orang Isp : Orang
Surveyor : Orang Surv : Orang
TENAGA KERJA Operator : Orang
Driver : Orang (III) . DIREKSI LAPANGAN
Chekker : Orang ( Orang )
Mekanik : Orang PPK : Orang
Kepala Tkg : Orang
Tukang : Orang
Pekerja : Orang

BAHAN YANG DIGUNAKAN JUMLAH SAT PERALATAN YANG DIGUNAKAN JUMLAH

USULAN PENGAJUAN , SARAN - SARAN , INSTRUKSI :


DIREKSI :

KONSULTAN :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas, Kontraktor Pelaksana,
CV. HIDJOE LOEMOET 2000 DESIGN CV. BUMITAMAMAS

MUH. RIDHO, ST Drs. WIRATMAN Z. SAPAN


Inspector Direktur

KONTRAKTOR PELAKSANA :
CV. BUMITAMAMAS
LAPORAN HARIAN PROYEK FORM.1

NAMA KEGIATAN : KONSULTAN PENGAWAS :


PEMBANGUNAN PRASARANA PERTANIAN CV. HIDJIOE LOEMOET 2000 DESIGN
KAB. LUWU TIMUR
NAMA PAKET : PEMBANGUNAN, REHABILITAS DAN PEMELIHARAAN JARINGAN LOKASI HARI : SABTU
IRIGASI USAHA TANI POKTAN BUANA INDAH DESA BAHARI KEC. WOTU KEC. WOTU TANGGAL : 25 SEPTEMBER 2021
KONDISI CUACA Cerah - Gerimis Hujan
PEKERJAAN YANG DILAKSANAKAN VOLUME SAT KETERANGAN

ta n
e gia
ad aK
i d ak
T

(I) . KONTRAKTOR (II) . KONSULTAN ( IV ) . Jumlah ( I + II + III )


( Orang ) ( Orang ) ( Orang )
GS : Orang SE : Orang
Pelaksana : Orang MT : Orang Jumlah : Orang
Mandor : Orang Isp : Orang
Surveyor : Orang Surv : Orang
TENAGA KERJA Operator : Orang
Driver : Orang (III) . DIREKSI LAPANGAN
Chekker : Orang ( Orang )
Mekanik : Orang PPK : Orang
Kepala Tkg : Orang
Tukang : Orang
Pekerja : Orang

BAHAN YANG DIGUNAKAN JUMLAH SAT PERALATAN YANG DIGUNAKAN JUMLAH

USULAN PENGAJUAN , SARAN - SARAN , INSTRUKSI :


DIREKSI :

KONSULTAN :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas, Kontraktor Pelaksana,
CV. HIDJOE LOEMOET 2000 DESIGN CV. BUMITAMAMAS
MUH. RIDHO, ST Drs. WIRATMAN Z. SAPAN
Inspector Direktur

KONTRAKTOR PELAKSANA :
CV. BUMITAMAMAS
LAPORAN HARIAN PROYEK FORM.1

NAMA KEGIATAN : KONSULTAN PENGAWAS :


PEMBANGUNAN PRASARANA PERTANIAN CV. HIDJIOE LOEMOET 2000 DESIGN
KAB. LUWU TIMUR
NAMA PAKET : PEMBANGUNAN, REHABILITAS DAN PEMELIHARAAN JARINGAN LOKASI HARI : MINGGU
IRIGASI USAHA TANI POKTAN BUANA INDAH DESA BAHARI KEC. WOTU KEC. WOTU TANGGAL : 26 SEPTEMBER 2021
KONDISI CUACA Cerah - Gerimis Hujan
PEKERJAAN YANG DILAKSANAKAN VOLUME SAT KETERANGAN

ta n
e gia
ad aK
ak
Tid

(I) . KONTRAKTOR (II) . KONSULTAN ( IV ) . Jumlah ( I + II + III )


( Orang ) ( Orang ) ( Orang )
GS : Orang SE : Orang
Pelaksana : Orang MT : Orang Jumlah : Orang
Mandor : Orang Isp : Orang
Surveyor : Orang Surv : Orang
TENAGA KERJA Operator : Orang
Driver : Orang (III) . DIREKSI LAPANGAN
Chekker : Orang ( Orang )
Mekanik : Orang PPK : Orang
Kepala Tkg : Orang
Tukang : Orang
Pekerja : Orang

BAHAN YANG DIGUNAKAN JUMLAH SAT PERALATAN YANG DIGUNAKAN JUMLAH

USULAN PENGAJUAN , SARAN - SARAN , INSTRUKSI :


DIREKSI :

KONSULTAN :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas, Kontraktor Pelaksana,
CV. HIDJOE LOEMOET 2000 DESIGN CV. BUMITAMAMAS

MUH. RIDHO, ST Drs. WIRATMAN Z. SAPAN


Inspector Direktur

KONTRAKTOR PELAKSANA :
CV. BUMITAMAMAS
LAPORAN HARIAN PROYEK FORM.1

NAMA KEGIATAN : KONSULTAN PENGAWAS :


PEMBANGUNAN PRASARANA PERTANIAN CV. HIDJIOE LOEMOET 2000 DESIGN
KAB. LUWU TIMUR
NAMA PAKET : PEMBANGUNAN, REHABILITAS DAN PEMELIHARAAN JARINGAN LOKASI HARI : SENIN
IRIGASI USAHA TANI POKTAN BUANA INDAH DESA BAHARI KEC. WOTU KEC. WOTU TANGGAL : 27 SEPTEMBER 2021
KONDISI CUACA Cerah - Gerimis Hujan
PEKERJAAN YANG DILAKSANAKAN VOLUME SAT KETERANGAN

n
gi ata
e
ad aK
ak
Tid

(I) . KONTRAKTOR (II) . KONSULTAN ( IV ) . Jumlah ( I + II + III )


( Orang ) ( Orang ) ( Orang )
GS : Orang SE : Orang
Pelaksana : Orang MT : Orang Jumlah : Orang
Mandor : Orang Isp : Orang
Surveyor : Orang Surv : Orang
TENAGA KERJA Operator : Orang
Driver : Orang (III) . DIREKSI LAPANGAN
Chekker : Orang ( Orang )
Mekanik : Orang PPK : Orang
Kepala Tkg : Orang
Tukang : Orang
Pekerja : Orang

BAHAN YANG DIGUNAKAN JUMLAH SAT PERALATAN YANG DIGUNAKAN JUMLAH

USULAN PENGAJUAN , SARAN - SARAN , INSTRUKSI :


DIREKSI :

KONSULTAN :
Diperiksa Oleh : Dibuat Oleh :
Konsultan Pengawas, Kontraktor Pelaksana,
CV. HIDJOE LOEMOET 2000 DESIGN CV. BUMITAMAMAS

MUH. RIDHO, ST Drs. WIRATMAN Z. SAPAN


Inspector Direktur

KONTRAKTOR PELAKSANA :
CV. BUMITAMAMAS
LAPORAN HARIAN PROYEK FORM.1

NAMA KEGIATAN : KONSULTAN PENGAWAS :


PEMBANGUNAN PRASARANA PERTANIAN CV. HIDJIOE LOEMOET 2000 DESIGN
KAB. LUWU TIMUR
NAMA PAKET : PEMBANGUNAN, REHABILITAS DAN PEMELIHARAAN JARINGAN LOKASI HARI : SELASA
IRIGASI USAHA TANI POKTAN BUANA INDAH DESA BAHARI KEC. WOTU KEC. WOTU TANGGAL : 28 SEPTEMBER 2021
KONDISI CUACA Cerah - Gerimis Hujan
PEKERJAAN YANG DILAKSANAKAN VOLUME SAT KETERANGAN

ta n
e gia
ad aK
ak
Tid

(I) . KONTRAKTOR (II) . KONSULTAN ( IV ) . Jumlah ( I + II + III )


( Orang ) ( Orang ) ( Orang )
GS : Orang SE : Orang
Pelaksana : Orang MT : Orang Jumlah : Orang
Mandor : Orang Isp : Orang
Surveyor : Orang Surv : Orang
TENAGA KERJA Operator : Orang
Driver : Orang (III) . DIREKSI LAPANGAN
Chekker : Orang ( Orang )
Mekanik : Orang PPK : Orang
Kepala Tkg : Orang
Tukang : Orang
Pekerja : Orang

BAHAN YANG DIGUNAKAN JUMLAH SAT PERALATAN YANG DIGUNAKAN JUMLAH

USULAN PENGAJUAN , SARAN - SARAN , INSTRUKSI :


DIREKSI :
KONSULTAN :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas, Kontraktor Pelaksana,
CV. HIDJOE LOEMOET 2000 DESIGN CV. BUMITAMAMAS

MUH. RIDHO, ST Drs. WIRATMAN Z. SAPAN


Inspector Direktur

KONTRAKTOR PELAKSANA :
CV. BUMITAMAMAS
LAPORAN HARIAN PROYEK FORM.1

NAMA KEGIATAN : KONSULTAN PENGAWAS :


PEMBANGUNAN PRASARANA PERTANIAN CV. HIDJIOE LOEMOET 2000 DESIGN
KAB. LUWU TIMUR
NAMA PAKET : PEMBANGUNAN, REHABILITAS DAN PEMELIHARAAN JARINGAN LOKASI HARI : RABU
IRIGASI USAHA TANI POKTAN BUANA INDAH DESA BAHARI KEC. WOTU KEC. WOTU TANGGAL : 29 SEPTEMBER 2021
KONDISI CUACA Cerah - Gerimis Hujan
PEKERJAAN YANG DILAKSANAKAN VOLUME SAT KETERANGAN

- Galian Tanah 5.10 M3

(I) . KONTRAKTOR (II) . KONSULTAN ( IV ) . Jumlah ( I + II + III )


( Orang ) ( Orang ) ( Orang )
GS : Orang SE : 1 Orang
Pelaksana : 1 Orang MT : Orang Jumlah : 9 Orang
Mandor : 1 Orang Isp : 1 Orang
Surveyor : Orang Surv : Orang
TENAGA KERJA Operator : Orang
Driver : Orang (III) . DIREKSI LAPANGAN
Chekker : Orang ( Orang )
Mekanik : Orang PPK : Orang
Kepala Tkg : 1 Orang
Tukang : Orang
Pekerja : 4 Orang

BAHAN YANG DIGUNAKAN JUMLAH SAT PERALATAN YANG DIGUNAKAN JUMLAH

- SKOP 5.00 Bh

USULAN PENGAJUAN , SARAN - SARAN , INSTRUKSI :


DIREKSI :
KONSULTAN :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas, Kontraktor Pelaksana,
CV. HIDJOE LOEMOET 2000 DESIGN CV. BUMITAMAMAS

MUH. RIDHO, ST Drs. WIRATMAN Z. SAPAN


Inspector Direktur

KONTRAKTOR PELAKSANA :
CV. BUMITAMAMAS
LAPORAN HARIAN PROYEK FORM.1

NAMA KEGIATAN : KONSULTAN PENGAWAS :


PEMBANGUNAN PRASARANA PERTANIAN CV. HIDJIOE LOEMOET 2000 DESIGN
KAB. LUWU TIMUR
NAMA PAKET : PEMBANGUNAN, REHABILITAS DAN PEMELIHARAAN JARINGAN LOKASI HARI : KAMIS
IRIGASI USAHA TANI POKTAN BUANA INDAH DESA BAHARI KEC. WOTU KEC. WOTU TANGGAL : 30 SEPTEMBER 2021
KONDISI CUACA Cerah - Gerimis Hujan
PEKERJAAN YANG DILAKSANAKAN VOLUME SAT KETERANGAN

- Galian Tanah 5.10 M3

(I) . KONTRAKTOR (II) . KONSULTAN ( IV ) . Jumlah ( I + II + III )


( Orang ) ( Orang ) ( Orang )
GS : Orang SE : 1 Orang
Pelaksana : 1 Orang MT : Orang Jumlah : 9 Orang
Mandor : 1 Orang Isp : 1 Orang
Surveyor : Orang Surv : Orang
TENAGA KERJA Operator : Orang
Driver : Orang (III) . DIREKSI LAPANGAN
Chekker : Orang ( Orang )
Mekanik : Orang PPK : Orang
Kepala Tkg : 1 Orang
Tukang : Orang
Pekerja : 4 Orang

BAHAN YANG DIGUNAKAN JUMLAH SAT PERALATAN YANG DIGUNAKAN JUMLAH

- SKOP 5.00 Bh
USULAN PENGAJUAN , SARAN - SARAN , INSTRUKSI :
DIREKSI :

KONSULTAN :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas, Kontraktor Pelaksana,
CV. HIDJOE LOEMOET 2000 DESIGN CV. BUMITAMAMAS

MUH. RIDHO, ST Drs. WIRATMAN Z. SAPAN


Inspector Direktur
TIME SCHEDULE
KEGIATAN : PEMBANGUNAN PRASARANA PERTANIAN DINAS PERTANIAN KABUPATEN LUWU TIMUR T.A 2021
PEKERJAAN : PEMBANGUNAN, REHABILITAS JARINGAN JARINGAN IRIGASI USAHA TANI POKTAN BUANA INDAH DESA B

LOKASI : DESA BAHARI


KEC. : WOTU
KAB. : LUWU TIMUR
BOBOT BULAN I BULAN II
NO. URAIAN
1 2 3 4 5 6 7 8 9

(%) 24 Sep-30 Sept 01 oktb-07 Oktb 08 Oktb-14 Oktb 15 Oktb-21 Oktb 22 Oktb-28 Oktb 29 Oktb-04 Nov 05 Nov-11 Nov 12 Nov-18 Nov 19 Nov-25 Nov

I PEKERJAAN PERSIAPAN
Biaya K3 Konstruksi 1.58 0.1215 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122
Prasasti 0.21
II PEKERJAAN SALURAN
1 Galian Tanah 1.88 0.627 0.627 0.627
2 Urugan Kembali Bekas Galian 0.58 0.585
3 Pasangan Batu Kali 1 PC : 4 PP 70.03 11.672 11.672 11.672 11.672 11.672 11.672
4 Plesteran Biasa 1 PC : 3 PP 13.34
5 Plesteran Biasa 1 PC : 2 PP 12.38 6.189

JUMLAH 100

KEMAJUAN PEKERJAAN %
0
0.122 0.749 12.420 11.793 12.420 11.793 11.793 12.378 6.310

KEMAJUAN PEKERJAAN KOMUL %


0
0.122 0.870 13.290 25.084 37.504 49.298 61.091 73.469 79.779

REALISASI KEMAJUAN % 2.263 #DIV/0! 18.008 29.191


0
DEVISIASI % 2.142 #DIV/0! 4.718 4.107
0

Disetujui Oleh, Diperiksa Oleh,


Pejabat Pembuat Komitmen, Konsultan Pengawas
(PPK) CV. HIDJOE LOEMOET 2000 DESIGN

ABDUL GHAFFUR, S.ST ERNI WAHYU NINGSIH, ST


Nip. 19781219 200502 1 003 Site Engineer
E SCHEDULE

I USAHA TANI POKTAN BUANA INDAH DESA BAHARI KEC. WOTU

BULAN III BULAN IV


KET.

10 11 12 13

26 Nov-02 Des 03 Des-09 Des 10 Des-16 Des 17 Des-22 Des

100%
0.122 0.122 0.122 0.122
0.210

50%

4.446 4.446 4.446


6.189 0%

6.310 4.568 4.568 4.778

86.090 90.657 95.225 100.00

Malili, 18 DESEMBER 2021


Diperiksa Oleh,
Kontraktor Pelaksana
CV. BUMITAMAMAS

Drs. WIRATMAN Z. SAPAN


Direktur
PEMERINTAH KABUPATEN LUWU TIMUR
DINAS PERTANIAN

LAPORAN BULAN I

KEGIATAN : PENGEMBANGAN SUMBER - SUMBER AIR (JIDES)


PEKERJAAN : BELANJA HIBAH BARANG/JASA KONSTRUKSI JARINGAN IRIGASI DESA POKTAN
SUMBER KARYA DESA MADANI
LOKASI : KEC. WOTU
NOMOR KONTAK : 800/08/SPK-JIDES/PSP-DISTAN/VIII/2019
TANGGAL SPMK : 23 AGUSTUS 2019
NILAI SPK : x
(SERATUS EMPAT PULUH SEMBILAN JUTA DELAPAN RATUS SEMBILAN PULUH RIBU RUPIAH)

CV. ADRI PRATAMA CV. HIDJOE LOEMOET 2000 DESIGN


KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI