Jasa Pekerjaan Perawatan Material Casing, Tubing, Sparepart, Equipment, Tools dan Fasilitas yang ada di OpenYard,

Indoor Warehouse, Shaded Area, SPBB-Solar, dan Gudang Handak di wilayah Medco Blok A Asset

PENAWARAN / QUOTATION
No. Deskripsi QTY UOM UNIT PRICE FAKTOR TOTAL PRICE
PENGGUNAAN

1 Jasa pendukung Loading /unloading, Restacking, Cleaning Material 300 AU - -


dan Tubular
1.1 Buruh Harian/ Helper 1 Day 60% -
1.2 Mandor Harian 1 Day 60% -
Sewa Tools (Palu/Bor Listrik/ Gerinda/Jack Hammer/Circular
1.3 1 Day 60% -
saw)
1.4 Pallet kayu ukuran 120 x 120 cm 1 EA 60% -
1.5 Pengadaan Kayu Dunage Staging Tubular (4x6 panjang 4 1 Batang 60% -
meter)
1.6 Pengadaan Paku (all size) 1 Kg 60% -
2 Jasa Pendukung Perbaikan Peralatan dan Fasilitas Warehouse 200 AU - -
2.1 Mandor Harian 1 man/day 30% -
2.2 Tukang Las (MIGAS certified) 1 man/day 30% -
2.3 Tukang Las (uncertified) 1 man/day 30% -
2.4 Safety Officer 1 man/day 30% -
2.5 Tukang Bangunan/Kayu/Batu/Besi/Gerinda 1 man/day 30% -
2.6 Helper 1 man/day 30% -
2.7 Sewa Peralatan Tukang (cangkul/sekop/palu/gergaji.dll) 1 day 30% -
2.8 Sewa Mesin Las 400 A (Lincoln/Miller) 1 day 30% -
2.9 Sewa Mesin Gerinda 1 day 30% -
2.10 Sewa Lampu potong 1 day 30% -
2.11 Sewa Chain Block/ kotrek 1 day 30% -
2.12 sewa pipe clamp 1 day 30% -
2.13 oxygen 1 botol 30% -
2.14 LPG 1 botol 30% -
2.15 Batu Gerinda 1 EA 30% -
2.16 Kawat Las 1 Kg 30% -
2.17 Besi Behel/siku/plat/canal u/h beam/kawat 1 Kg 30% -
2.18 Cement Portland type I 1 sax 30% -
2.19 Pasir 1 kubik 30% -
2.20 Kayu Balok/reng/Papan 1 kubik 30% -
2.21 sewa mesin Brush 1 day 30% -

2.22 Sewa APD (1 set = helm, safety gloves, safety glasses, safety 1 set/day 30% -
shoes)
2.23 Transportasi Material 1 day 30% -
2.24 Beton tanpa tulang mutu K250 (site mix) 1 M3 30% -
2.25 Bekisting (Kayu cetakan) 1 M2 30% -
2.26 Beton Ready Mix K250 1 M3 30% -
3 Jasa Packing dan wraping Material 100 AU - -
3.1 Packing kayu lunak 1 M3 60% -
3.2 Packing Kayu Keras 1 M3 60% -
3.3 Packing triplex tebal 12mm 1 M3 60% -
3.4 Packing carton tanpa wrapping 1 M3 60% -
3.5 Packing carton dengan wrapping 1 M3 60% -
4 Jasa Pengecatan 100 AU - -
4.1 Cat Air WeatherShield DULUX untuk Dinding Exterior 1 M2 60% -
4.2 Cat Air Acrylic Emultion untuk Lantai Exterior 1 M2 60% -
4.3 Cat Minyak untuk pagar 1 M2 60% -

4.4 GAL 60% -


Pengadaan Cat Air WeatherShield DULUX (@ 2,5 Ltr/gall) 1
4.5 GAL 60% -
Pengadaan Cat Air Acrylic Emultion AFATEX (@ 4 Kg/gall) 1
4.6 Pengadaan Cat Minyak DULUX (@ 2,5 Ltr/gall) 1 GAL 60% -
5 Jasa perbaikan atau Tera Tangki dan Dispenser BBM 20 AU - -
5.1 Tera tanki 8000 Ltr include certificate & table 1 UNIT 60% -
5.2 Tera tanki 20000 Ltr Include certificate & table 1 UNIT 60% -
5.3 Biaya service perbaikan 1 UNIT 60% -
5.4 Pengadaan Sparepart Pengganti 1 EA 60% -
6 Jasa Perawatan Rumput dan Tanaman 10 AU - -
6.1 Babat Rumput 1 M2 90% -
6.2 Tanam Rumput (rumput gajah mini) 1 M2 90% -
6.3 Pengadaan Tanaman Buah 1 pohon 90% -
6.4 Pengadaan Bunga/ Kembang 1 pohon 90% -
6.5 Pengadaan Tanaman Pagar 1 pohon 90% -
7 Jasa Lab Analisa BBM Solar 5 AU - -
7.1 1 - 3 Botol/sample 1 botol 90% -
7.2 > 3 Botol/Sample 1 botol 90% -
8 Jasa Penyelenggaraan Meeting 20 AU - -
8.1 Lunch box plus buah, air mineral 250ml (1 lauk) 1 Box 100% -
8.2 Lunch box plus buah, air mineral 250ml (2 lauk) 1 Box 100% -
8.3 Aneka Buah 1 Kg 100% -
8.4 Sewa Kursi chitose include sarung kursi 1 SET 100% -
8.5 Sewa Kursi Sofa set 1 SET 100% -

8.6 Sewa sound system include 2 wireless mic & 2 mic with 1 SET 100% -
cables.
8.7 Sewa dekor panggung include tanaman hias hidup 1 SET 100% -
8.8 Pengadaan souvenir 1 EA 100% -
8.9 Air mineral botol 330 ML 1 BOX 100% -
8.10 Tissue Paseo 1 EA 100% -
8.11 Snack kue pasar 1 box 100% -
8.12 sewa jasa dokumentasi (foto & video include editing) 1 SET 100% -
8.13 Housekeeping 1 SET 100% -

9 Jasa Perbaikan Papan KIMAP, Rambu safety, Spanduk dan 100 AU - -


backdrop
9.1 Pembuatan Spanduk berwarna (lebih dari 3 warna) 1 M2 60% -
9.2 Pembuatan Backdrop berwarna (lebih dari 3 warna) 1 M2 60% -
9.3 Pembuatan standing sign KIMAP 1 EA 60% -

9.4 EA 60% -
Pembuatan Rambu Safety (tanpa tiang) dan pemasangan 1
9.5 Pembuatan Rambu Safety (1 tiang) dan pemasangan 1 EA 60% -
1
9.6 Pembuatan Rambu Safety (lebih dari 1 tiang) dan EA 60% -
pemasangan
10 Jasa Pendukung Cleaning/housekeeping Gudang indoor, Gudang 200 AU - -
Area F, Kios BBM, Open Yard dan Gudang Handak
10.1 Buruh Harian / Helper 1 Day 60% -
10.2 Sapu Lantai 1 EA 60% -
10.3 Sapu Lidi 1 EA 60% -
10.4 Kain Majun 1 EA 60% -
10.5 Cangkul 1 EA 60% -
10.6 Sekop 1 EA 60% -
10.7 Gerobak Sorong / Artco 1 EA 60% -

TOTAL PENAWARAN HARGA -